TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE C: WATER POLLUTION
CHAPTER I: POLLUTION CONTROL BOARD
PART 309 PERMITS
SECTION 309.202 CONSTRUCTION PERMITS


 

Section 309.202  Construction Permits

 

Except for treatment works or wastewater sources which have or will have discharges for which NPDES Permits are required, and for which NPDES Permits have been issued by the Agency:

 

a)         No person shall cause or allow the construction of any new treatment works, sewer or wastewater source or cause or allow the modification of any existing treatment works, sewer or wastewater source without a construction permit issued by the Agency, except as provided in paragraph (b).

 

b)         Construction permits shall not be required for the following:

 

1)         Storm sewers that transport only land runoff; or

 

2)         Any treatment works, sewer or wastewater source designed and intended to serve a single building and eventually treat or discharge less than an average of 1500 gallons per day (5700 1/day) of domestic sewage and which will discharge, if at all, directly to a publicly owned or publicly regulated sanitary or combined sewer; or

 

3)         Any sewer required by statute to secure a permit pursuant to Section 3 of "An Act to provide for, license and regulate mobile homes and mobile home parks", P.A. 77-1472, (Ill. Rev. Stat. 1981, ch. 111½, par. 713); or

 

4)         Any treatment works, pretreatment works, sewer or wastewater source that, on the effective date of this Subpart B, is being constructed or will be constructed under the authorization of a permit already issued by the Agency or its predecessors; provided however, that all construction must be completed within four years from the effective date of this Subpart B; or

 

5)         Privately owned sewers tributary to industrial treatment works owned by the same person if the additional waste load does not exceed the permitted design capacity of the industrial treatment works.

 

c)         No person without a construction permit issued by the Agency shall cause or allow the construction of any pretreatment works or cause or allow the modification of any existing pretreatment works if such pretreatment works, after construction or modification, will:

 

1)         Discharge toxic pollutants, as defined in Section 502(13) of the CWA, or pollutants which may interfere with the treatment process into the receiving treatment works or be subject to regulations promulgated under Section 307 of the Clean Water Act (CWA); or

 

2)         Discharge 15% or more of the total hydraulic flow received by the treatment works; or

 

3)         Discharge 15% or more of the total biological loading received by the treatment works as measured by the 5-day biochemical oxygen demand;

 

(Source:  Amended at 8 Ill. Reg. 1612, effective January 18, 1984)