1.
|
Age of wastewater treatment
facilities since last upgrade …. _____years. (0.5 point for each 5 years over
20 years old)...........................................................................
|
|
|
|
|
|
|
2.
|
Is plant concrete sound? Y N . Extensive spauling of concrete must
be evident to be classed unsound. (0.1 point for each 10% of the concrete
thickness that is gone.)....................................................................................................................
|
|
|
|
|
|
|
3.
|
If yes, is the reinforcing
steel exposed? Y N (1.0 point if
steel is exposed.)...
|
|
|
|
|
|
|
4.
|
Does the condition of the
concrete pose a threat to the integrity of any unit process, building, or
mechanical equipment in the plant or pose a safety hazard to operating
personnel? Y N (If yes, 1.0
point.)..............................................................
|
|
|
|
|
|
|
5.
|
Is the present condition of
various plant concrete structures to or causing effluent violations? Y N (If yes, 1.0 point.)..............................................................
|
|
|
|
|
|
|
6.
|
Would a failure of any of the
concrete structures which are in condition cause a discharge to the waters of
the state or an effluent violation? Y N (If yes, 1.0 point.).......................................................................................................................
|
|
|
|
|
|
|
7.
|
Is corrosion of metal
structures (bridges, walkways, control, valve vaults, handrails, etc.) at the
point where a potential threat exists to continued operation of plant units
or a safety threat exists for plant personnel? Y N (If yes, 1.0 point.).................
|
|
|
|
|
|
|
8.
|
Number of mechanical equipment
failures during the past five years…._____.
|
|
|
|
Causes:
|
|
|
|
|
|
|
|
|
|
(0.1 point for each occurrence
that resulted in one unit being out of service for at least one day;
maximum.)..................................................................................................
|
|
|
|
|
|
|
9.
|
Number of mechanical equipment
failures during the past year _____. Causes:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10.
|
Were the mechanical failures
in any way related to improper maintenance?.................
|
|
|
|
Y N (If no, then 0.1 point for each event in which a unit process was
out of operation for at least one day; 2.0 points maximum.)..................................................
|
|
|
|
|
|
|
11.
|
Did any of the mechanical
failures result in a raw or partially treated sewage discharge to waters of
the state?....Y N (If yes, 2.0
points.).........................................
|
|
|
|
|
|
|
12.
|
Did any of these mechanical
failures result in an actual or potential safety hazard to plant personnel ….
Y N (If yes, 1.0 point.)..................................................
|
|
|
|
|
|
|
13.
|
Are there portions of the
plant which are permanently out of service due to mechanical failure or lack
of availability of replacement parts due to equipment age? (0.5 point for
each tank or functional unit that is no longer operational, 4 points
maximum.).........
|
|
|
|
|
|
|
14.
|
Were these mechanical failures
due to equipment design or application problems?.... Y N (If yes,
subtract 1.0 point.)...................................................................
|
|
|
|
|
|
|
15.
|
Have all warrantees
expired?.... Y N (If no, subtract 1 point for each piece of equipment
that is not operational for which the warranty is still in effect.).................
|
|
|
|
|
|
|
TOTAL SCORE, WASTE TREATMENT
FACILITIES....................................................
|
|
|
|
|
|
|
|
|
1.
|
Age of the original sewer
system in years. …. _____ (1.0 point for each 10 years or fraction thereof
over 50 years old; 3.0 points maximum.)............................................
|
|
|
|
|
|
|
2.
|
Material of construction:
vitrified clay pipe (VCP)____; reinforced concrete pipe (RCP) ____; brick
____; cast-in-place concrete ____ (brick = one point; RCP = 0.5 point;
cast-in-place = 0.5 point)................................................................................
|
|
|
|
|
|
|
3.
|
If concrete, is there crown
corrosion? Y N (If yes, 1.0.)..............................
|
|
|
|
|
|
|
4.
|
If yes, what percent of the pipe
thickness at the crown is gone?....____ (1.0 point for each 25% of pipe
thickness lost.)..............................................................................
|
|
|
|
|
|
|
5.
|
If pipe is brick, percent of
joint material remaining….____ (1.0 point for each 25% of joint material lost.).....................................................................................................
|
|
|
|
|
|
|
6.
|
If pipe is reinforced concrete
pipe or cast-in-place concrete, is the reinforcing steel exposed? Y N (If steel is exposed, 1.0 point.).............................................
|
|
|
|
|
|
|
7.
|
Have there been any cave-ins on
the system in the past five years? Y N (If yes, then 1.0 point for each
cave-in event; 3.0 points maximum.)................................
|
|
|
|
|
|
|
8.
|
Have there been any cave-ins
in the past year? Y N (If yes, add one additional point for each event;
3.0 points maximum.).................................................
|
|
|
|
|
|
|
9.
|
Have there been any discharges
to waters of the state or basement backups as a result of any of these
cave-ins? Y N (0.1 additional point for each overflow or basement backup
event caused by pipe failures; 3.0 points maximum.).......................
|
|
|
|
|
|
|
10.
|
Number of system overflows
over the last 5 years due to dry weather surcharging ____ (associated with a
non-pipe failure event i.e. tree roots, pipe settled with grit, etc.) (0.1
point for each overflow; 3.0 points maximum.)............................................
|
|
|
|
|
|
|
11.
|
Number of homes experience
basement backups over the last 5 years due to dry weather surcharging ____
(non-pipe failure event); (0.5 point for each 50 homes or fraction thereof,
5.0 points maximum.).......................................................................
|
|
|
|
|
|
|
12.
|
Percent of system that is
combined sewers: ____% (For sewer separation projects, 1.0 point for each
10% of the entire system or fraction thereof that will be separated by the
proposed project; 5.0 points maximum.).........................................................
|
|
|
|
|
|
|
TOTAL SCORE SEWER COLLECTION
SYSTEMS......................................................
|
|
|
1.
|
Percent of lift stations on
the system that are over 20 years old _____ (1.0 point for each 25% of the
total stations or fraction thereof over 20 years old; 4.0 points maximum.)................................................................................................................
|
|
|
|
|
|
|
2.
|
Are all stations equipped with
alarms? Y N (No = 1.0 point.)......................
|
|
|
|
|
|
|
3.
|
Number of homes experiencing
backups over the lst 5 years due to lift station failures or power outages
____ (1.0 point for each 50 homes or fraction thereof; 4.0 points maximum.)................................................................................................................
|
|
|
|
|
|
|
4.
|
Number of homes experiencing
backups over the last 5 years due to lift station failures or power outages
____. (1.0 point for each overflow event; 4.0 points maximum.).....
|
|
|
|
|
|
|
5.
|
Percent of total station pumping
capacity that is out of service due to obsolete equipment ____. (1.0 point
for each 10% of total capacity that is out because of inability to get
replacement equipment; 2.0 points maximum.).....................................
|
|
|
|
|
|
|
6.
|
Do all pumping stations have
standby power or alternate means of pumping during power failures as
required? Y N (If no, 0.5 point for each station not properly equipped
that will be upgraded by this project; 2.0 points maximum.)...........
|
|
|
|
|
|
|
7.
|
How many lift stations have
equipment or structural deterioration problems which contribute to
operational problems or safety hazards to operating personnel? ____. (0.5
point for each station that will have these problems corrected by the
proposed project; maximum 2.0 points.)...................................................................................
|
|
|
|
|
|
TOTAL SCORE FOR LIFT STATIONS...........................................................................
|
|