Section 366.APPENDIX C Excellence
of Operation Scoring Review Sheet For Local Government Units That Own
Wastewater Treatment Facilities
This scoring sheet will be used
to rate those projects which have demonstrated excellence in the maintenance
and operation of existing wastewater treatment facilities. The scoring factors
are as follows:
A. PROCESS PERFORMANCE AND CONTROL:
|
1.
|
Plant performance compared to
permit limit requirements. (If both BOD/SS are consistently 20% below permit
limits, 2.0 points; if 40% or more below limits, 3.0 points.).....................................................................................................................
|
|
|
|
|
|
|
2.
|
How long has the plant been
producing an effluent no greater than 80% of its permit limits? (If at least
5 years, 1.0 point; if 10 or more years, 2.0 points.)..........................
|
|
|
|
|
|
|
3.
|
Current plant loading as a
percentage of the design capacity. (If the current average daily load is 80
to 90% of design capacity, 0.5 point; if 90 to 100%; 2.0 points; if over
100%, 3.0 points.)............................................................................................
|
|
|
|
|
|
|
4.
|
Does the operator use
laboratory data to make appropriate process control adjustments? (If yes,
1.0 point.)................................................................................
|
|
|
|
|
|
|
5.
|
Is the effluent quality
consistent during the entire range of plant flows? (If it is within permit
limits at all flows, 1.0 point.)............................................................................
|
|
|
|
|
|
|
6.
|
Is the sludge quality
acceptable for land application? (If a land application permit has been
issued, 1.0 point.).............................................................................................
|
|
|
|
|
|
|
7.
|
Is the process subject to
process upsets? (If there have been no process upsets due to discharges into
the sewer system I the last 5 years, 0.5 point.)................................
|
|
|
|
|
|
|
8.
|
For processes using the
activated sludge process, is microscopic analysis used for process
monitoring? (If yes, 0.5 point.).....................................................................
|
|
|
|
|
|
TOTAL PROCESS PERFORMANCE AND
CONTROL.................................................
|
|
B. MAINTENANCE:
|
1.
|
How long have mechanical
equipment and structures been in service without a failure that affected
plant performance? (Over 5 years, 0.5 point; over 10 years, 1.0 point; 20 or
more years, 2.0 points.)...................................................................................
|
|
|
|
|
|
|
2.
|
Are the plant grounds,
buildings and equipment well-maintained (grass cut, equipment and buildings
painted, etc.)? (If yes, 0.5 point.).........................................................
|
|
|
|
|
|
|
3.
|
Does the plant have a routine
preventative maintenance program? (If yes, 0.5 point.).
|
|
|
|
|
|
|
4.
|
Does the plant have a spare
parts inventory? (If yes, 0.5 point.)................................
|
|
|
|
|
|
|
TOTAL MAINTENANCE................................................................................................
|
|
C. ADMINISTRATION:
|
1.
|
Does the operating agency
control industrial discharges into the sewer system that may adversely affect
the treatment process, sludge or effluent quality or pose a safety hazard to
system workers? (If a local ordinance exists, 0.5 point; if there is an
approved local pretreatment program, 1.0 point.)......................................................
|
|
|
|
|
|
|
2.
|
Are all self-monitored reports
and other reports required by permit conditions submitted on time? (If they
are, 0.5 point.)................................................................
|
|
|
|
|
|
|
3.
|
Are all financial reporting
requirements submitted in accordance with permit conditions? (If they are,
0.5 point.)...........................................................................
|
|
|
|
|
|
|
4.
|
Does the chief operator have
the proper level of certification required by Title 35, Subtitle C of the
Illinois Pollution Control Board Regulations? (If yes, 0.5 point.).......
|
|
|
|
|
|
|
5.
|
Has the plant been issued an
Agency safety certificate during the past year? (If yes, 0.5 point.).................................................................................................................
|
|
|
|
|
|
|
6.
|
Does the plant have an
emergency plan to respond to hazardous material emergencies? (If yes, 0.5
point.)...............................................................................
|
|
|
|
|
|
|
7.
|
Does the plant manager prepare
an annual report to the board or council on annual facility performance which
includes budget needs for the coming year? (If yes, 0.5 point.).......................................................................................................................
|
|
|
|
|
|
|
8.
|
Is revenue being accumulated
for annual O & M needs and equipment replacement? (If yes, 0.5 point.).....................................................................................................
|
|
|
|
|
|
TOTAL ADMINISTRATION...........................................................................................
|
|
|
|
|
|
TOTAL ALL CATEGORIES.............................................................................................
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
Reviewer
|
|
|
Date
|
|
|
|
|
|
|
|
|
|
|
|