TITLE 41: FIRE PROTECTION
CHAPTER I: STATE FIRE MARSHAL
PART 120 BOILER AND PRESSURE VESSEL SAFETY
 


OFFICE OF THE STATE FIRE MARSHAL

DIVISION OF BOILER & PRESSURE VESSEL SAFETY

1035 STEVENSON DRIVE

SPRINGFIELD, IL  62703-4259

(217)782-2696

FAX:  (217)782-1062

 

Section 120.APPENDIX A   Operational and Maintenance Log

 

Section 120.EXHIBIT A   Hot Water Heating Boilers

Operational and Maintenance Log

Building:

Month:

Year:

 

Hot Water Heating Boilers

Address:

Fuel Type:

Person(s) to be Notified in Emergency (Name and Telephone No.)

Illinois No.:

CHECKS (Enter Date)

 

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

(1) Record Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2) Record Boiler Water Temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(3) Record Flue Gas Temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECKS (Enter Date)

(1) Observe Flame Condition

WEEK 1

WEEK 2

WEEK 3

WEEK 4

(2) Observe Circulating Pumps

 

 

 

 

 

 

 

 

 

CHECKS (Enter Date)

(1) Manual Lift Safety Valve

 

(A) Flame Detection Devices

 

(F) Refractory

 

 

(B) Limit Controls

 

(G) Stop Valves

 

(2) Review Condition of

(C) Operating Controls

 

(H) Check Valves

 

 

or Test Each Item

(D) Floor Drains

 

(I) Drain Valves

 

 

(E) Fuel Piping

 

(J) Linkages

 

(3) Observe Gage Glass on Expansion Tank

 

 

 

(4) Combustion Air Adequate/Unobstructed

 

 

 

General Comments:

 

(Source:  Added at 23 Ill. Reg. 162, effective January 1, 1999)


 

 

OFFICE OF THE STATE FIRE MARSHAL

DIVISION OF BOILER & PRESSURE VESSEL SAFETY

1035 STEVENSON DRIVE

SPRINGFIELD, IL  62703-4259

(217)782-2696

FAX:  (217)782-1062

 

Section 120.APPENDIX A   Operational and Maintenance Log

 

Section 120.EXHIBIT B   Steam Heating Boilers

Operational and Maintenance Log

Building:

Month:

Year:

 

Steam Heating Boilers

Address:

Fuel Type:

Person(s) to be Notified in Emergency (Name and Telephone No.)

Illinois No.:

CHECKS (Enter Date)

 

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

(1) Observe Water Level

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2) Record Pressure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(3) Record Flue Gas Temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECKS (Enter Date)

(1) Test Low Water Cutoff

WEEK 1

WEEK 2

WEEK 3

WEEK 4

(2) Test Gage Glass

 

 

 

 

(3) Observe Flame Condition

 

 

 

 

CHECKS (Enter Date)

(1) Manual Lift Safety Valve

 

(A) Linkages

 

(F) Floor Drains

 

 

(B) Damper Controls

 

(G) Flame Detection Device

 

(2) Review Condition of

(C) Stop Valves

 

(H) Limit Controls

 

 

or Test Each Item

(D) Refractory

 

(I) Operating Controls

 

 

(E) Flue-Chimney Breeching

 

 

 

(3) Inspect Fuel Piping