| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
1 | AN ACT concerning local government.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Counties Code is amended by changing | ||||||||||||||||||||||||
5 | Sections 5-1062, 5-1062.2, and 5-1062.3 as follows:
| ||||||||||||||||||||||||
6 | (55 ILCS 5/5-1062) (from Ch. 34, par. 5-1062)
| ||||||||||||||||||||||||
7 | Sec. 5-1062. Stormwater management.
| ||||||||||||||||||||||||
8 | (a) The purpose of this Section is to allow management and | ||||||||||||||||||||||||
9 | mitigation of the
effects of urbanization on stormwater | ||||||||||||||||||||||||
10 | drainage in metropolitan counties located
in the area served by | ||||||||||||||||||||||||
11 | the Chicago Metropolitan Agency for Planning Northeastern | ||||||||||||||||||||||||
12 | Illinois Planning Commission , and
references to "county" in | ||||||||||||||||||||||||
13 | this Section shall apply only to those counties.
This Section | ||||||||||||||||||||||||
14 | shall not apply to any county with a population in excess of
| ||||||||||||||||||||||||
15 | 1,500,000, except as provided in subsection (c). The purpose of | ||||||||||||||||||||||||
16 | this Section
shall be achieved by:
| ||||||||||||||||||||||||
17 | (1) consolidating the existing stormwater management | ||||||||||||||||||||||||
18 | framework into a
united, countywide structure;
| ||||||||||||||||||||||||
19 | (2) setting minimum standards for floodplain and | ||||||||||||||||||||||||
20 | stormwater management with an emphasis on the use of | ||||||||||||||||||||||||
21 | cost-effective solutions to flooding problems ;
and
| ||||||||||||||||||||||||
22 | (3) preparing a countywide plan for the management of | ||||||||||||||||||||||||
23 | stormwater runoff,
including the management of natural and |
| |||||||
| |||||||
1 | man-made drainageways. The countywide
plan may incorporate | ||||||
2 | watershed plans and shall evaluate and address flooding | ||||||
3 | problems that exist in urbanized areas that are a result of | ||||||
4 | urban flooding .
| ||||||
5 | (b) A stormwater management planning committee shall be | ||||||
6 | established by
county board resolution, with its membership | ||||||
7 | consisting of equal numbers of
county board and municipal | ||||||
8 | representatives from each county board
district, and such other | ||||||
9 | members as may be determined by the county and
municipal | ||||||
10 | members. However, if the county has more than 6 county board
| ||||||
11 | districts, the county board may by ordinance divide the county | ||||||
12 | into not
less than 6 areas of approximately equal population, | ||||||
13 | to be used instead of
county board districts for the purpose of | ||||||
14 | determining representation on the
stormwater management | ||||||
15 | planning committee.
| ||||||
16 | The county board members shall be appointed by the chairman | ||||||
17 | of the county
board. Municipal members from each county board | ||||||
18 | district or other
represented area shall be appointed by a | ||||||
19 | majority vote of the mayors of
those municipalities which have | ||||||
20 | the greatest percentage of their respective
populations | ||||||
21 | residing in such county board district or other represented
| ||||||
22 | area. All municipal and county board representatives shall be | ||||||
23 | entitled
to a vote; the other members shall be nonvoting | ||||||
24 | members, unless authorized
to vote by the unanimous consent of | ||||||
25 | the municipal and county board
representatives. A municipality | ||||||
26 | that is located in more than one county may
choose, at the time |
| |||||||
| |||||||
1 | of formation of the stormwater management planning
committee | ||||||
2 | and based on watershed boundaries, to participate in the
| ||||||
3 | stormwater management planning program of either or both of the | ||||||
4 | counties.
Subcommittees of the stormwater management planning | ||||||
5 | committee may be
established to serve a portion of the county | ||||||
6 | or a particular drainage basin
that has similar stormwater | ||||||
7 | management needs. The stormwater management
planning committee | ||||||
8 | shall adopt by-laws, by a majority vote of the county and
| ||||||
9 | municipal members, to govern the functions of the committee and | ||||||
10 | its
subcommittees. Officers of the committee shall include a | ||||||
11 | chair and vice chair,
one of whom shall be a county | ||||||
12 | representative and one a municipal
representative.
| ||||||
13 | The principal duties of the committee shall be to develop a | ||||||
14 | stormwater
management plan for presentation to and approval by | ||||||
15 | the county board, and
to direct the plan's implementation and | ||||||
16 | revision. The committee may retain
engineering, legal and | ||||||
17 | financial advisors and inspection personnel. The
committee | ||||||
18 | shall meet at least quarterly and shall hold at least one | ||||||
19 | public
meeting during the preparation of the plan and prior to | ||||||
20 | its submittal to the
county board. The committee may make | ||||||
21 | grants to: (1) units of local government; (2) not-for-profit | ||||||
22 | organizations; and (3) landowners. In order for a municipality | ||||||
23 | located partially or wholly within a mapped floodplain to | ||||||
24 | receive grant moneys, the municipality must be a member in the | ||||||
25 | Federal Emergency Management Agency's National Flood Insurance | ||||||
26 | Program. A municipality receiving grant moneys must have |
| |||||||
| |||||||
1 | adopted an ordinance requiring actions consistent with the | ||||||
2 | stormwater management plan. Use of the grant moneys must be | ||||||
3 | consistent with the stormwater management plan.
| ||||||
4 | (c) In the preparation of a stormwater management plan, a | ||||||
5 | county
stormwater management planning committee shall | ||||||
6 | coordinate the planning
process with each adjoining county to | ||||||
7 | ensure that recommended stormwater
projects will have no | ||||||
8 | significant impact on the levels or flows of
stormwaters in | ||||||
9 | inter-county watersheds or on the capacity of existing and
| ||||||
10 | planned stormwater retention facilities. An adopted stormwater | ||||||
11 | management
plan shall identify steps taken by the county to | ||||||
12 | coordinate the development
of plan recommendations with | ||||||
13 | adjoining counties.
| ||||||
14 | (d) (Blank).
| ||||||
15 | (e) Prior to recommending the plan to the county board, the | ||||||
16 | stormwater
management planning committee shall hold at least | ||||||
17 | one public hearing thereon
and shall afford interested persons | ||||||
18 | an opportunity to be heard. The hearing
shall be held in the | ||||||
19 | county seat. Notice of the hearing shall be published at
least | ||||||
20 | once no less than 15 days in advance thereof in a newspaper of | ||||||
21 | general
circulation published in the county. The notice shall | ||||||
22 | state the time and place
of the hearing and the place where | ||||||
23 | copies of the proposed plan will be
accessible for examination | ||||||
24 | by interested parties. If an affected municipality
having a | ||||||
25 | stormwater management plan adopted by ordinance wishes to | ||||||
26 | protest the
proposed county plan provisions, it shall appear at |
| |||||||
| |||||||
1 | the hearing and submit in
writing specific proposals to the | ||||||
2 | stormwater management planning committee.
After consideration | ||||||
3 | of the matters raised at the hearing, the committee may
amend | ||||||
4 | or approve the plan and recommend it to the county board for | ||||||
5 | adoption.
| ||||||
6 | The county board may enact the proposed plan by ordinance. | ||||||
7 | If the
proposals for modification of the plan made by an | ||||||
8 | affected municipality having
a stormwater management plan are | ||||||
9 | not included in the proposed county plan,
and the municipality | ||||||
10 | affected by the plan opposes adoption of the county
plan by | ||||||
11 | resolution of its corporate authorities, approval of
the county | ||||||
12 | plan shall require an affirmative vote of at least two-thirds | ||||||
13 | of the
county board members present and voting. If the county | ||||||
14 | board wishes to
amend the county plan, it shall submit in | ||||||
15 | writing specific proposals to the
stormwater management | ||||||
16 | planning committee. If the proposals are not
approved by the | ||||||
17 | committee, or are opposed by resolution of the corporate
| ||||||
18 | authorities of an affected municipality having a municipal | ||||||
19 | stormwater
management plan, amendment of the plan shall require | ||||||
20 | an affirmative vote of
at least two-thirds of the county board | ||||||
21 | members present and voting.
| ||||||
22 | (f) The county board may prescribe by ordinance reasonable | ||||||
23 | rules and
regulations for floodplain or stormwater management | ||||||
24 | and for governing the location,
width, course and release rate | ||||||
25 | of all stormwater runoff channels, streams
and basins in the | ||||||
26 | county, in accordance with the adopted stormwater
management |
| |||||||
| |||||||
1 | plan. These rules and regulations shall, at a minimum, meet
the | ||||||
2 | standards for floodplain management established by the Office | ||||||
3 | of Water Resources and
the requirements of the Federal | ||||||
4 | Emergency Management Agency for participation
in the National | ||||||
5 | Flood Insurance Program.
| ||||||
6 | (g) In accordance with, and if recommended in, the adopted | ||||||
7 | stormwater
management plan, the county board may adopt a | ||||||
8 | schedule of fees
as may be reasonable and necessary to mitigate | ||||||
9 | the effects of increased stormwater runoff
resulting from new | ||||||
10 | development. The fees shall not exceed the cost of
satisfying | ||||||
11 | the onsite stormwater retention or detention requirements of | ||||||
12 | the
adopted stormwater management plan. The fees shall be used | ||||||
13 | to finance
activities undertaken by the county or its included | ||||||
14 | municipalities to
mitigate the effects of urban stormwater | ||||||
15 | runoff by providing regional
stormwater retention or detention | ||||||
16 | facilities, as identified in the county
plan. All such fees | ||||||
17 | collected by the county shall be held in a separate fund,
and | ||||||
18 | shall be expended only in the watershed within which they were | ||||||
19 | collected.
| ||||||
20 | (h) For the purpose of implementing this Section and for | ||||||
21 | the
development, design, planning, construction, operation and | ||||||
22 | maintenance of
stormwater facilities provided for in the | ||||||
23 | stormwater management plan, a
county board that has established | ||||||
24 | a stormwater management planning
committee pursuant to this | ||||||
25 | Section may cause an annual tax of not to exceed
0.20% of the | ||||||
26 | value, as equalized or assessed by the Department of Revenue,
|
| |||||||
| |||||||
1 | of all taxable property in the county to be levied upon all the | ||||||
2 | taxable
property in the county. The tax shall be in addition to | ||||||
3 | all other taxes
authorized by law to be levied and collected in | ||||||
4 | the county and shall be in
addition to the maximum tax rate | ||||||
5 | authorized by law for general county
purposes. The 0.20% | ||||||
6 | limitation provided in this Section may be increased
or | ||||||
7 | decreased by referendum in accordance with the provisions of | ||||||
8 | Sections
18-120, 18-125, and 18-130 of the Property Tax Code.
| ||||||
9 | Any revenues generated as a result of ownership or | ||||||
10 | operation of facilities
or land acquired with the tax funds | ||||||
11 | collected pursuant to this subsection
(h) shall be held in a | ||||||
12 | separate fund and be used either to abate such
property tax or | ||||||
13 | for implementing this Section.
| ||||||
14 | However, unless at least part of the county has been | ||||||
15 | declared after
July 1, 1986 by presidential proclamation to be | ||||||
16 | a disaster area as a result
of flooding, the tax authorized by | ||||||
17 | this subsection (h) shall not be levied
until the question of | ||||||
18 | its adoption, either for a specified period or
indefinitely, | ||||||
19 | has been submitted to the electors thereof and approved by a
| ||||||
20 | majority of those voting on the question. This question may be | ||||||
21 | submitted
at any election held in the county after the adoption | ||||||
22 | of a resolution by
the county board providing for the | ||||||
23 | submission of the question to the
electors of the county. The | ||||||
24 | county board shall certify the resolution and
proposition to | ||||||
25 | the proper election officials, who shall submit the
proposition | ||||||
26 | at an election in accordance with the general election law. If
|
| |||||||
| |||||||
1 | a majority of the votes cast on the question is in favor of the | ||||||
2 | levy of
the tax, it may thereafter be levied in the county for | ||||||
3 | the specified
period or indefinitely, as provided in the | ||||||
4 | proposition. The question shall
be put in substantially the | ||||||
5 | following form:
| ||||||
6 | -------------------------------------------------------------
| ||||||
7 | Shall an annual tax be levied
| ||||||
8 | for stormwater management purposes YES
| ||||||
9 | (for a period of not more than
| ||||||
10 | ...... years) at a rate not exceeding ------------------
| ||||||
11 | .....% of the equalized assessed
| ||||||
12 | value of the taxable property of NO
| ||||||
13 | ........ County?
| ||||||
14 | -------------------------------------------------------------
| ||||||
15 | (i) Upon the creation and implementation of a county | ||||||
16 | stormwater management
plan, the county may petition the circuit | ||||||
17 | court to dissolve any or all drainage
districts created | ||||||
18 | pursuant to the Illinois Drainage Code or predecessor Acts
| ||||||
19 | which are located entirely within the area of the county | ||||||
20 | covered by the plan.
| ||||||
21 | However, any active drainage district implementing a plan | ||||||
22 | that is
consistent with and at least as stringent as the county | ||||||
23 | stormwater
management plan may petition the stormwater | ||||||
24 | management planning committee
for exception from dissolution. | ||||||
25 | Upon filing of the petition, the committee
shall set a date for | ||||||
26 | hearing not less than 2 weeks, nor more than 4 weeks,
from the |
| |||||||
| |||||||
1 | filing thereof, and the committee shall give at least one | ||||||
2 | week's
notice of the hearing in one or more newspapers of | ||||||
3 | general circulation
within the district, and in addition shall | ||||||
4 | cause a copy of the notice to be
personally served upon each of | ||||||
5 | the trustees of the district. At the
hearing, the committee | ||||||
6 | shall hear the district's petition and allow the
district | ||||||
7 | trustees and any interested parties an opportunity to present | ||||||
8 | oral
and written evidence. The committee shall render its | ||||||
9 | decision upon the
petition for exception from dissolution based | ||||||
10 | upon the best interests of
the residents of the district. In | ||||||
11 | the event that the exception is not
allowed, the district may | ||||||
12 | file a petition within 30 days of the decision
with the circuit | ||||||
13 | court. In that case, the notice and hearing requirements
for | ||||||
14 | the court shall be the same as herein provided for the | ||||||
15 | committee.
The court shall likewise render its decision of | ||||||
16 | whether to dissolve the
district based upon the best interests | ||||||
17 | of residents of the district.
| ||||||
18 | The dissolution of any drainage district shall not affect | ||||||
19 | the obligation
of any bonds issued or contracts entered into by | ||||||
20 | the district nor
invalidate the levy, extension or collection | ||||||
21 | of any taxes or special
assessments upon the property in the | ||||||
22 | former drainage district. All property
and obligations of the | ||||||
23 | former drainage district shall be assumed and
managed by the | ||||||
24 | county, and the debts of the former drainage district shall
be | ||||||
25 | discharged as soon as practicable.
| ||||||
26 | If a drainage district lies only partly within a county |
| |||||||
| |||||||
1 | that adopts a
county stormwater management plan, the county may | ||||||
2 | petition the circuit
court to disconnect from the drainage | ||||||
3 | district that portion of the district
that lies within that | ||||||
4 | county. The property of the drainage district within the
| ||||||
5 | disconnected area shall be assumed and managed by the county. | ||||||
6 | The county shall
also assume a portion of the drainage | ||||||
7 | district's debt at the time of
disconnection, based on the | ||||||
8 | portion of the value of the taxable property of the
drainage | ||||||
9 | district which is located within the area being disconnected.
| ||||||
10 | The operations of any drainage district that continues to | ||||||
11 | exist in a
county that has adopted a stormwater management plan | ||||||
12 | in accordance with
this Section shall be in accordance with the | ||||||
13 | adopted plan.
| ||||||
14 | (j) Any county that has adopted a county stormwater | ||||||
15 | management plan
under this Section may, after 10 days written | ||||||
16 | notice to the owner or
occupant, enter upon any lands or waters | ||||||
17 | within the county for the purpose
of inspecting stormwater | ||||||
18 | facilities or causing the removal of any
obstruction to an | ||||||
19 | affected watercourse. The county shall be responsible
for any | ||||||
20 | damages occasioned thereby.
| ||||||
21 | (k) Upon petition of the municipality, and based on a | ||||||
22 | finding of the
stormwater management planning committee, the | ||||||
23 | county shall not enforce
rules and regulations adopted by the | ||||||
24 | county in any municipality located
wholly or partly within the | ||||||
25 | county that has a municipal stormwater
management ordinance | ||||||
26 | that is consistent with and at least as stringent as
the county |
| |||||||
| |||||||
1 | plan and ordinance, and is being enforced by the municipal
| ||||||
2 | authorities.
| ||||||
3 | (l) A county may issue general obligation bonds for | ||||||
4 | implementing any
stormwater plan adopted under this Section in | ||||||
5 | the manner prescribed in
Section 5-1012; except that the | ||||||
6 | referendum requirement of Section 5-1012 shall
not apply to | ||||||
7 | bonds issued pursuant to this Section on which the principal | ||||||
8 | and
interest are to be paid entirely out of funds generated by | ||||||
9 | the taxes and fees
authorized by this Section.
| ||||||
10 | (m) The powers authorized by this Section may be | ||||||
11 | implemented by the
county board for a portion of the county | ||||||
12 | subject to similar stormwater
management needs.
| ||||||
13 | (n) The powers and taxes authorized by this Section are in | ||||||
14 | addition to the
powers and taxes authorized by Division 5-15; | ||||||
15 | in exercising its powers
under this Section, a county shall not | ||||||
16 | be subject to the restrictions and
requirements of that | ||||||
17 | Division.
| ||||||
18 | (o) Pursuant to paragraphs (g) and (i) of Section 6 of | ||||||
19 | Article VII of
the Illinois Constitution, this Section | ||||||
20 | specifically denies and limits the
exercise of any power which | ||||||
21 | is inconsistent herewith by home rule units in
any county with | ||||||
22 | a population of less than 1,500,000 in the area served by
the | ||||||
23 | Chicago Metropolitan Agency for Planning Northeastern Illinois | ||||||
24 | Planning Commission . This Section does not
prohibit the | ||||||
25 | concurrent exercise of powers consistent herewith.
| ||||||
26 | (p) As used in this Section: |
| |||||||
| |||||||
1 | "Urban flooding" means the flooding of public and private | ||||||
2 | land in urban communities that results from stormwater or | ||||||
3 | snowmelt runoff overwhelming the existing drainage | ||||||
4 | infrastructure, unrelated to the overflow of any river or lake, | ||||||
5 | whether or not that land is located in or near a floodplain. | ||||||
6 | "Urbanized areas" means a statistical geographic entity | ||||||
7 | consisting of a densely settled core created from census tracts | ||||||
8 | or blocks and contiguous qualifying territory that together | ||||||
9 | have a minimum population of at least 50,000 persons and has | ||||||
10 | been delineated as an urbanized area by the United States | ||||||
11 | Census Bureau after the most recent decennial census. | ||||||
12 | (Source: P.A. 97-916, eff. 8-9-12.)
| ||||||
13 | (55 ILCS 5/5-1062.2) | ||||||
14 | Sec. 5-1062.2. Stormwater management. | ||||||
15 | (a) The purpose of this Section is to allow management and | ||||||
16 | mitigation of the effects of urbanization on stormwater | ||||||
17 | drainage in the metropolitan counties of Madison, St. Clair, | ||||||
18 | Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and Boone | ||||||
19 | as well as all counties containing all or a part of an | ||||||
20 | urbanized area and references to "county" in this Section apply | ||||||
21 | only to those counties. This Section does not apply to counties | ||||||
22 | in the Chicago Metropolitan Agency for Planning Northeastern | ||||||
23 | Illinois Planning Commission that are granted authorities in | ||||||
24 | Section 5-1062. The purpose of this Section shall be achieved | ||||||
25 | by: |
| |||||||
| |||||||
1 | (1) Consolidating the existing stormwater management
| ||||||
2 | framework into a united, countywide structure. | ||||||
3 | (2) Setting minimum standards for floodplain and
| ||||||
4 | stormwater management with an emphasis on the use of | ||||||
5 | cost-effective solutions to flooding problems . | ||||||
6 | (3) Preparing a countywide plan for the management
of | ||||||
7 | stormwater runoff, including the management of natural and | ||||||
8 | man-made drainageways. The countywide plan may incorporate | ||||||
9 | watershed plans and shall evaluate and address flooding | ||||||
10 | problems that exist in urbanized areas that are a result of | ||||||
11 | urban flooding . | ||||||
12 | (a-5) This Section also applies to all counties not | ||||||
13 | otherwise covered in Section 5-1062, 5-1062.2, or 5-1062.3 if | ||||||
14 | the question of allowing the county board to establish a | ||||||
15 | stormwater management planning council has been submitted to | ||||||
16 | the electors of the county and approved by a majority of those | ||||||
17 | voting on the question. | ||||||
18 | (b) A stormwater management planning committee may be | ||||||
19 | established by county board resolution, with its membership | ||||||
20 | consisting of equal numbers of county board and municipal | ||||||
21 | representatives from each county board district, one member | ||||||
22 | representing drainage districts, and one member representing | ||||||
23 | soil and water conservation districts and such other members as | ||||||
24 | may be determined by the stormwater management planning | ||||||
25 | committee county and municipal members. If the county has more | ||||||
26 | than 6 county board districts, however, the county board may by |
| |||||||
| |||||||
1 | ordinance divide the county into not less than 6 areas of | ||||||
2 | approximately equal population, to be used instead of county | ||||||
3 | board districts for the purpose of determining representation | ||||||
4 | on the stormwater management planning committee. | ||||||
5 | The county board members shall be appointed by the chairman | ||||||
6 | of the county board. Municipal members from each county board | ||||||
7 | district or other represented area shall be appointed by a | ||||||
8 | majority vote of the mayors of those municipalities that have | ||||||
9 | the greatest percentage of their respective populations | ||||||
10 | residing in that county board district or other represented | ||||||
11 | area. The member representing drainage districts shall be | ||||||
12 | appointed by the drainage district chairperson or by a majority | ||||||
13 | vote of all drainage district chairpersons in the county if | ||||||
14 | more than one drainage district exists in the county. The | ||||||
15 | member representing soil and water conservation districts | ||||||
16 | shall be appointed by a majority vote of the soil and water | ||||||
17 | conservation district board or by a majority vote of all soil | ||||||
18 | and water conservation district boards in the county if more | ||||||
19 | than one soil and water conservation district board exists in | ||||||
20 | the county. All municipal , and county board , drainage district, | ||||||
21 | and soil and water conservation district representatives shall | ||||||
22 | be entitled to a vote; the other members shall be nonvoting | ||||||
23 | members, unless authorized to vote by the unanimous consent of | ||||||
24 | the voting members of the committee; however, Madison, St. | ||||||
25 | Clair, Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and | ||||||
26 | Boone counties are not required to have a drainage district or |
| |||||||
| |||||||
1 | a soil and water conservation representative the municipal and | ||||||
2 | county board representatives . A municipality that is located in | ||||||
3 | more than one county may choose, at the time of formation of | ||||||
4 | the stormwater management planning committee and based on | ||||||
5 | watershed boundaries, to participate in the stormwater | ||||||
6 | management planning program of either or both of the counties. | ||||||
7 | Subcommittees of the stormwater management planning committee | ||||||
8 | may be established to serve a portion of the county or a | ||||||
9 | particular drainage basin that has similar stormwater | ||||||
10 | management needs. The stormwater management planning committee | ||||||
11 | shall adopt bylaws, by a majority vote of the county and | ||||||
12 | municipal members, to govern the functions of the committee and | ||||||
13 | its subcommittees. Officers of the committee shall include a | ||||||
14 | chair and vice chair, one of whom shall be a county | ||||||
15 | representative and one a municipal representative. | ||||||
16 | The principal duties of the committee shall be to develop a | ||||||
17 | stormwater management plan for presentation to and approval by | ||||||
18 | the county board, and to direct the plan's implementation and | ||||||
19 | revision. The committee may retain engineering, legal, and | ||||||
20 | financial advisors and inspection personnel. The committee | ||||||
21 | shall meet at least quarterly and shall hold at least one | ||||||
22 | public meeting during the preparation of the plan and prior to | ||||||
23 | its submittal to the county board. The committee may make | ||||||
24 | grants to : (1) units of local government ; (2) not-for-profit | ||||||
25 | organizations; and (3) landowners. In order for a municipality | ||||||
26 | located partially or wholly within a mapped floodplain to |
| |||||||
| |||||||
1 | receive grant moneys, the municipality must be a member in the | ||||||
2 | Federal Emergency Management Agency's National Flood Insurance | ||||||
3 | Program. A municipality receiving grant moneys must that have | ||||||
4 | adopted an ordinance requiring actions consistent with the | ||||||
5 | stormwater management plan . Use and to landowners for the | ||||||
6 | purposes of stormwater management, including special projects; | ||||||
7 | use of the grant money must be consistent with the stormwater | ||||||
8 | management plan. | ||||||
9 | The committee shall not have or exercise any power of | ||||||
10 | eminent domain.
| ||||||
11 | (c) In the preparation of a stormwater management plan, a | ||||||
12 | county stormwater management planning committee shall | ||||||
13 | coordinate the planning process with each adjoining county to | ||||||
14 | ensure that recommended stormwater projects will have no | ||||||
15 | significant impact on the levels or flows of stormwaters in | ||||||
16 | inter-county watersheds or on the capacity of existing and | ||||||
17 | planned stormwater retention facilities. An adopted stormwater | ||||||
18 | management plan shall identify steps taken by the county to | ||||||
19 | coordinate the development of plan recommendations with | ||||||
20 | adjoining counties. | ||||||
21 | (d) The stormwater management committee may not enforce any | ||||||
22 | rules or regulations that would interfere with (i) any power | ||||||
23 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
24 | operate, construct, maintain, or improve drainage systems or | ||||||
25 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
26 | systems used on or by land or a facility used for production |
| |||||||
| |||||||
1 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
2 | 105/), except newly constructed buildings and newly installed | ||||||
3 | impervious paved surfaces. Disputes regarding an exception | ||||||
4 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
5 | by the disputing party or parties. | ||||||
6 | (e) Before the stormwater management planning committee | ||||||
7 | recommends to the county board a stormwater management plan for | ||||||
8 | the county or a portion thereof, it shall submit the plan to | ||||||
9 | the Office of Water Resources of the Department of Natural | ||||||
10 | Resources for review and recommendations. The Office, in | ||||||
11 | reviewing the plan, shall consider such factors as impacts on | ||||||
12 | the levels or flows in rivers and streams and the cumulative | ||||||
13 | effects of stormwater discharges on flood levels. The Office of | ||||||
14 | Water Resources shall determine whether the plan or ordinances | ||||||
15 | enacted to implement the plan complies with the requirements of | ||||||
16 | subsection (f). Within a period not to exceed 60 days, the | ||||||
17 | review comments and recommendations shall be submitted to the | ||||||
18 | stormwater management planning committee for consideration. | ||||||
19 | Any amendments to the plan shall be submitted to the Office for | ||||||
20 | review. | ||||||
21 | (f) Prior to recommending the plan to the county board, the | ||||||
22 | stormwater management planning committee shall hold at least | ||||||
23 | one public hearing thereon and shall afford interested persons | ||||||
24 | an opportunity to be heard. The hearing shall be held in the | ||||||
25 | county seat. Notice of the hearing shall be published at least | ||||||
26 | once no less than 15 days in advance of the hearing in a |
| |||||||
| |||||||
1 | newspaper of general circulation published in the county. The | ||||||
2 | notice shall state the time and place of the hearing and the | ||||||
3 | place where copies of the proposed plan will be accessible for | ||||||
4 | examination by interested parties. If an affected municipality | ||||||
5 | having a stormwater management plan adopted by ordinance wishes | ||||||
6 | to protest the proposed county plan provisions, it shall appear | ||||||
7 | at the hearing and submit in writing specific proposals to the | ||||||
8 | stormwater management planning committee. After consideration | ||||||
9 | of the matters raised at the hearing, the committee may amend | ||||||
10 | or approve the plan and recommend it to the county board for | ||||||
11 | adoption. | ||||||
12 | The county board may enact the proposed plan by ordinance. | ||||||
13 | If the proposals for modification of the plan made by an | ||||||
14 | affected municipality having a stormwater management plan are | ||||||
15 | not included in the proposed county plan, and the municipality | ||||||
16 | affected by the plan opposes adoption of the county plan by | ||||||
17 | resolution of its corporate authorities, approval of the county | ||||||
18 | plan shall require an affirmative vote of at least two-thirds | ||||||
19 | of the county board members present and voting. If the county | ||||||
20 | board wishes to amend the county plan, it shall submit in | ||||||
21 | writing specific proposals to the stormwater management | ||||||
22 | planning committee. If the proposals are not approved by the | ||||||
23 | committee, or are opposed by resolution of the corporate | ||||||
24 | authorities of an affected municipality having a municipal | ||||||
25 | stormwater management plan, amendment of the plan shall require | ||||||
26 | an affirmative vote of at least two-thirds of the county board |
| |||||||
| |||||||
1 | members present and voting. | ||||||
2 | (g) The county board may prescribe by ordinance reasonable | ||||||
3 | rules and regulations for floodplain or stormwater management | ||||||
4 | and for governing the location, width, course, and release rate | ||||||
5 | of all stormwater runoff channels, streams, and basins in the | ||||||
6 | county, in accordance with the adopted stormwater management | ||||||
7 | plan. Land, facilities, and drainage district facilities used | ||||||
8 | for production agriculture as defined in subsection (d) shall | ||||||
9 | not be subjected to regulation by the county board or | ||||||
10 | stormwater management committee under this Section for | ||||||
11 | floodplain management and for governing location, width, | ||||||
12 | course, maintenance, and release rate of stormwater runoff | ||||||
13 | channels, streams and basins, or water discharged from a | ||||||
14 | drainage district. These rules and regulations shall, at a | ||||||
15 | minimum, meet the standards for floodplain management | ||||||
16 | established by the Office of Water Resources and the | ||||||
17 | requirements of the Federal Emergency Management Agency for | ||||||
18 | participation in the National Flood Insurance Program. The | ||||||
19 | Commission may not impose more stringent regulations regarding | ||||||
20 | water quality on entities discharging in accordance with a | ||||||
21 | valid National Pollution Discharge Elimination System permit | ||||||
22 | issued under the Environmental Protection Act. | ||||||
23 | (h) In accordance with, and if recommended in, the adopted | ||||||
24 | stormwater management plan, the county board may adopt a | ||||||
25 | schedule of reasonable fees as may be necessary to mitigate the | ||||||
26 | effects of increased stormwater runoff resulting from new |
| |||||||
| |||||||
1 | development based on actual costs. The fees shall not exceed | ||||||
2 | the cost of satisfying the onsite stormwater retention or | ||||||
3 | detention requirements of the adopted stormwater management | ||||||
4 | plan. The fees shall be used to finance activities undertaken | ||||||
5 | by the county or its included municipalities to mitigate the | ||||||
6 | effects of urban stormwater runoff by providing regional | ||||||
7 | stormwater retention or detention facilities, as identified in | ||||||
8 | the county plan. The county board shall provide for a credit or | ||||||
9 | reduction in fees for any onsite retention, detention, drainage | ||||||
10 | district assessments, or other similar stormwater facility | ||||||
11 | that the developer is required to construct consistent with the | ||||||
12 | stormwater management ordinance. All these fees collected by | ||||||
13 | the county shall be held in a separate fund, and shall be | ||||||
14 | expended only in the watershed within which they were | ||||||
15 | collected. | ||||||
16 | (i) For the purpose of implementing this Section and for | ||||||
17 | the development, design, planning, construction, operation, | ||||||
18 | and maintenance of stormwater facilities provided for in the | ||||||
19 | stormwater management plan, a county board that has established | ||||||
20 | a stormwater management planning committee pursuant to this | ||||||
21 | Section may cause an annual tax of not to exceed 0.20% of the | ||||||
22 | value, as equalized or assessed by the Department of Revenue, | ||||||
23 | of all taxable property in the county to be levied upon all the | ||||||
24 | taxable property in the county or occupation and use taxes of | ||||||
25 | 1/10 of one cent. The property tax shall be in addition to all | ||||||
26 | other taxes authorized by law to be levied and collected in the |
| |||||||
| |||||||
1 | county and shall be in addition to the maximum tax rate | ||||||
2 | authorized by law for general county purposes. The 0.20% | ||||||
3 | limitation provided in this Section may be increased or | ||||||
4 | decreased by referendum at a general election in accordance | ||||||
5 | with the provisions of Sections 18-120, 18-125, and 18-130 of | ||||||
6 | the Property Tax Code (35 ILCS 200/). | ||||||
7 | Any revenues generated as a result of ownership or | ||||||
8 | operation of facilities or land acquired with the tax funds | ||||||
9 | collected pursuant to this subsection shall be held in a | ||||||
10 | separate fund and be used either to abate such property tax or | ||||||
11 | for implementing this Section. | ||||||
12 | However, the tax authorized by this subsection shall not be | ||||||
13 | levied until the question of its adoption, either for a | ||||||
14 | specified period or indefinitely, has been submitted to the | ||||||
15 | electors thereof and approved by a majority of those voting on | ||||||
16 | the question. This question may be submitted at any general | ||||||
17 | election held in the county after the adoption of a resolution | ||||||
18 | by the county board providing for the submission of the | ||||||
19 | question to the electors of the county. The county board shall | ||||||
20 | certify the resolution and proposition to the proper election | ||||||
21 | officials, who shall submit the proposition at an election in | ||||||
22 | accordance with the general election law. If a majority of the | ||||||
23 | votes cast on the question is in favor of the levy of the tax, | ||||||
24 | it may thereafter be levied in the county for the specified | ||||||
25 | period or indefinitely, as provided in the proposition. The | ||||||
26 | question shall be put in substantially the following form: |
| |||||||
| |||||||
1 | Shall an annual tax be levied
for stormwater management | ||||||
2 | purposes (for a period of not more than ..... years) at a | ||||||
3 | rate not exceeding
.....% of the equalized assessed
value | ||||||
4 | of the taxable property of ..... County?
| ||||||
5 | Or this question may be submitted at any general election held | ||||||
6 | in the county after the adoption of a resolution by the county | ||||||
7 | board providing for the submission of the question to the | ||||||
8 | electors of the county to authorize use and occupation taxes of | ||||||
9 | 1/10 of one cent: | ||||||
10 | Shall use and occupation taxes be raised for stormwater | ||||||
11 | management purposes (for a period of not more than ..... | ||||||
12 | years) at a rate of 1/10 of one cent for taxable goods in | ||||||
13 | ..... County? | ||||||
14 | Votes shall be recorded as Yes or No.
| ||||||
15 | (i-5) Before a county that establishes a stormwater | ||||||
16 | management planning council after submission of the question to | ||||||
17 | the electors of the county pursuant to subsection (a-5) may | ||||||
18 | submit a referendum question to the electors of the county for | ||||||
19 | an annual tax under subsection (i), the county shall: | ||||||
20 | (1) adopt and enforce a floodplain management | ||||||
21 | ordinance or a stormwater management ordinance under | ||||||
22 | subsection (g) that has been approved by the Office of | ||||||
23 | Water Resources of the Department of Natural Resources; and | ||||||
24 | (2) designate a certified floodplain manager who has | ||||||
25 | been certified by the Association of State Floodplain | ||||||
26 | Managers; however, nothing in this paragraph (2) requires a |
| |||||||
| |||||||
1 | county to create a new position or designate another | ||||||
2 | individual if the county already has a certified floodplain | ||||||
3 | manager on staff. | ||||||
4 | If a county fails to continually meet any of the conditions | ||||||
5 | of this subsection (i-5) after approval of a referendum | ||||||
6 | question for an annual tax, the county may not levy a tax under | ||||||
7 | subsection (i) until they are in full compliance with this | ||||||
8 | subsection (i-5). | ||||||
9 | (j) For those counties that adopt a property tax in | ||||||
10 | accordance with the provisions in this Section, the stormwater | ||||||
11 | management committee shall offer property tax abatements or | ||||||
12 | incentive payments to property owners who construct, maintain, | ||||||
13 | and use approved stormwater management devices. For those | ||||||
14 | counties that adopt use and occupation taxes in accordance with | ||||||
15 | the provisions of this Section, the stormwater management | ||||||
16 | committee may offer tax rebates or incentive payments to | ||||||
17 | property owners who construct, maintain, and use approved | ||||||
18 | stormwater management devices.
The stormwater management | ||||||
19 | committee is authorized to offer credits to the property tax, | ||||||
20 | if applicable, based on authorized practices consistent with | ||||||
21 | the stormwater management plan and approved by the committee. | ||||||
22 | Expenses of staff of a stormwater management committee that are | ||||||
23 | expended on regulatory project review may be no more than 20% | ||||||
24 | of the annual budget of the committee, including funds raised | ||||||
25 | under subsections (h) and (i). | ||||||
26 | (k) Any county that has adopted a county stormwater |
| |||||||
| |||||||
1 | management plan under this Section may, after 10 days written | ||||||
2 | notice receiving consent of the owner or occupant, enter upon | ||||||
3 | any lands or waters within the county for the purpose of | ||||||
4 | inspecting stormwater facilities or causing the removal of any | ||||||
5 | obstruction to an affected watercourse. If consent is denied or | ||||||
6 | cannot be reasonably obtained, the county ordinance shall | ||||||
7 | provide a process or procedure for an administrative warrant to | ||||||
8 | be obtained. The county shall be responsible for any damages | ||||||
9 | occasioned thereby. | ||||||
10 | (l) Upon petition of the municipality, and based on a | ||||||
11 | finding of the stormwater management planning committee, the | ||||||
12 | county shall not enforce rules and regulations adopted by the | ||||||
13 | county in any municipality located wholly or partly within the | ||||||
14 | county that has a municipal stormwater management ordinance | ||||||
15 | that is consistent with and at least as stringent as the county | ||||||
16 | plan and ordinance, and is being enforced by the municipal | ||||||
17 | authorities. On issues that the county ordinance is more | ||||||
18 | stringent as deemed by the committee, the county shall only | ||||||
19 | enforce rules and regulations adopted by the county on the more | ||||||
20 | stringent issues and accept municipal permits. The county shall | ||||||
21 | have no more than 60 days to review permits or the permits | ||||||
22 | shall be deemed approved. | ||||||
23 | (m) A county may issue general obligation bonds for | ||||||
24 | implementing any stormwater plan adopted under this Section in | ||||||
25 | the manner prescribed in Section 5-1012; except that the | ||||||
26 | referendum requirement of Section 5-1012 does not apply to |
| |||||||
| |||||||
1 | bonds issued pursuant to this Section on which the principal | ||||||
2 | and interest are to be paid entirely out of funds generated by | ||||||
3 | the taxes and fees authorized by this Section. | ||||||
4 | (n) The powers authorized by this Section may be | ||||||
5 | implemented by the county board for a portion of the county | ||||||
6 | subject to similar stormwater management needs. | ||||||
7 | (o) The powers and taxes authorized by this Section are in | ||||||
8 | addition to the powers and taxes authorized by Division 5-15; | ||||||
9 | in exercising its powers under this Section, a county shall not | ||||||
10 | be subject to the restrictions and requirements of that | ||||||
11 | Division.
| ||||||
12 | (p) As used in this Section: | ||||||
13 | "Urban flooding" means the flooding of public and private | ||||||
14 | land in urban communities that results from stormwater or | ||||||
15 | snowmelt runoff overwhelming the existing drainage | ||||||
16 | infrastructure, unrelated to the overflow of any river or lake, | ||||||
17 | whether or not that land is located in or near a floodplain. | ||||||
18 | "Urbanized areas" means a statistical geographic entity | ||||||
19 | consisting of a densely settled core created from census tracts | ||||||
20 | or blocks and contiguous qualifying territory that together | ||||||
21 | have a minimum population of at least 50,000 persons and has | ||||||
22 | been delineated as an urbanized area by the United States | ||||||
23 | Census Bureau after the most recent decennial census. | ||||||
24 | (Source: P.A. 94-675, eff. 8-23-05.) | ||||||
25 | (55 ILCS 5/5-1062.3) |
| |||||||
| |||||||
1 | Sec. 5-1062.3. Stormwater management; DuPage and Peoria | ||||||
2 | Counties. | ||||||
3 | (a) The purpose of this Section is to allow management and | ||||||
4 | mitigation of the effects of urbanization on stormwater | ||||||
5 | drainage in the metropolitan counties of DuPage and Peoria, and | ||||||
6 | references to "county" in this Section apply only to those | ||||||
7 | counties. This Section does not apply to a municipality that | ||||||
8 | only partially lies within one of these counties and, on the | ||||||
9 | effective date of this amendatory Act of the 98th General | ||||||
10 | Assembly, is served by an existing Section in the Counties Code | ||||||
11 | regarding stormwater management. The purpose of this Section | ||||||
12 | shall be achieved by: | ||||||
13 | (1) consolidating the existing stormwater management | ||||||
14 | framework into a
united, countywide structure; | ||||||
15 | (2) setting minimum standards for floodplain and | ||||||
16 | stormwater management with an emphasis on the use of | ||||||
17 | cost-effective solutions to flooding problems ;
and | ||||||
18 | (3) preparing a countywide plan for the management of | ||||||
19 | stormwater runoff,
including the management of natural and | ||||||
20 | man-made drainageways. The countywide
plan may incorporate | ||||||
21 | watershed plans and shall evaluate and address flooding | ||||||
22 | problems that exist in urbanized areas that are a result of | ||||||
23 | urban flooding . | ||||||
24 | (b) A stormwater management planning committee may be | ||||||
25 | established by county board resolution, with its membership | ||||||
26 | consisting of equal numbers of county board and municipal |
| |||||||
| |||||||
1 | representatives from each county board district, and such other | ||||||
2 | members as may be determined by the county and municipal | ||||||
3 | members. If the county has more than 6 county board districts, | ||||||
4 | however, the county board may by ordinance divide the county | ||||||
5 | into not less than 6 areas of approximately equal population, | ||||||
6 | to be used instead of county board districts for the purpose of | ||||||
7 | determining representation on the stormwater management | ||||||
8 | planning committee. | ||||||
9 | The county board members shall be appointed by the chairman | ||||||
10 | of the county board. Municipal members from each county board | ||||||
11 | district or other represented area shall be appointed by a | ||||||
12 | majority vote of the mayors of those municipalities that have | ||||||
13 | the greatest percentage of their respective populations | ||||||
14 | residing in that county board district or other represented | ||||||
15 | area. All municipal and county board representatives shall be | ||||||
16 | entitled to a vote; the other members shall be nonvoting | ||||||
17 | members, unless authorized to vote by the unanimous consent of | ||||||
18 | the municipal and county board representatives. A municipality | ||||||
19 | that is located in more than one county may choose, at the time | ||||||
20 | of formation of the stormwater management planning committee | ||||||
21 | and based on watershed boundaries, to participate in the | ||||||
22 | stormwater management planning program of either county. | ||||||
23 | Subcommittees of the stormwater management planning committee | ||||||
24 | may be established to serve a portion of the county or a | ||||||
25 | particular drainage basin that has similar stormwater | ||||||
26 | management needs. The stormwater management planning committee |
| |||||||
| |||||||
1 | shall adopt bylaws, by a majority vote of the county and | ||||||
2 | municipal members, to govern the functions of the committee and | ||||||
3 | its subcommittees. Officers of the committee shall include a | ||||||
4 | chair and vice chair, one of whom shall be a county | ||||||
5 | representative and one a municipal representative. | ||||||
6 | The principal duties of the committee shall be to develop a | ||||||
7 | stormwater management plan for presentation to and approval by | ||||||
8 | the county board, and to direct the plan's implementation and | ||||||
9 | revision. The committee may retain engineering, legal, and | ||||||
10 | financial advisors and inspection personnel. The committee | ||||||
11 | shall meet at least quarterly and shall hold at least one | ||||||
12 | public meeting during the preparation of the plan and prior to | ||||||
13 | its submittal to the county board. The committee may make | ||||||
14 | grants to : (1) units of local government ; (2) not-for-profit | ||||||
15 | organizations; and (3) landowners. In order for a municipality | ||||||
16 | located partially or wholly within a mapped floodplain to | ||||||
17 | receive grant moneys, the municipality must be a member in the | ||||||
18 | Federal Emergency Management Agency's National Flood Insurance | ||||||
19 | Program. A municipality receiving grant moneys must that have | ||||||
20 | adopted an ordinance requiring actions consistent with the | ||||||
21 | stormwater management plan . Use and to landowners for the | ||||||
22 | purposes of stormwater management, including special projects; | ||||||
23 | use of the grant money must be consistent with the stormwater | ||||||
24 | management plan. | ||||||
25 | The committee shall not have or exercise any power of | ||||||
26 | eminent domain. |
| |||||||
| |||||||
1 | (c) In the preparation of a stormwater management plan, a | ||||||
2 | county stormwater management planning committee shall | ||||||
3 | coordinate the planning process with each adjoining county to | ||||||
4 | ensure that recommended stormwater projects will have no | ||||||
5 | significant impact on the levels or flows of stormwaters in | ||||||
6 | inter-county watersheds or on the capacity of existing and | ||||||
7 | planned stormwater retention facilities. An adopted stormwater | ||||||
8 | management plan shall identify steps taken by the county to | ||||||
9 | coordinate the development of plan recommendations with | ||||||
10 | adjoining counties. | ||||||
11 | (d) The stormwater management committee may not enforce any | ||||||
12 | rules or regulations that would interfere with (i) any power | ||||||
13 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
14 | operate, construct, maintain, or improve drainage systems or | ||||||
15 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
16 | systems used on or by land or a facility used for production | ||||||
17 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
18 | 105/), except newly constructed buildings and newly installed | ||||||
19 | impervious paved surfaces. Disputes regarding an exception | ||||||
20 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
21 | by the disputing party or parties. | ||||||
22 | (e) Before the stormwater management planning committee | ||||||
23 | recommends to the county board a stormwater management plan for | ||||||
24 | the county or a portion thereof, it shall submit the plan to | ||||||
25 | the Office of Water Resources of the Department of Natural | ||||||
26 | Resources for review and recommendations. The Office, in |
| |||||||
| |||||||
1 | reviewing the plan, shall consider such factors as impacts on | ||||||
2 | the levels or flows in rivers and streams and the cumulative | ||||||
3 | effects of stormwater discharges on flood levels. The Office of | ||||||
4 | Water Resources shall determine whether the plan or ordinances | ||||||
5 | enacted to implement the plan complies with the requirements of | ||||||
6 | subsection (f). Within a period not to exceed 60 days, the | ||||||
7 | review comments and recommendations shall be submitted to the | ||||||
8 | stormwater management planning committee for consideration. | ||||||
9 | Any amendments to the plan shall be submitted to the Office for | ||||||
10 | review. | ||||||
11 | (f) Prior to recommending the plan to the county board, the | ||||||
12 | stormwater management planning committee shall hold at least | ||||||
13 | one public hearing thereon and shall afford interested persons | ||||||
14 | an opportunity to be heard. The hearing shall be held in the | ||||||
15 | county seat. Notice of the hearing shall be published at least | ||||||
16 | once and no less than 15 days in advance of the hearing in a | ||||||
17 | newspaper of general circulation published in the county. The | ||||||
18 | notice shall state the time and place of the hearing and the | ||||||
19 | place where copies of the proposed plan will be accessible for | ||||||
20 | examination by interested parties. If an affected municipality | ||||||
21 | having a stormwater management plan adopted by ordinance wishes | ||||||
22 | to protest the proposed county plan provisions, it shall appear | ||||||
23 | at the hearing and submit in writing specific proposals to the | ||||||
24 | stormwater management planning committee. After consideration | ||||||
25 | of the matters raised at the hearing, the committee may amend | ||||||
26 | or approve the plan and recommend it to the county board for |
| |||||||
| |||||||
1 | adoption. | ||||||
2 | The county board may enact the proposed plan by ordinance. | ||||||
3 | If the proposals for modification of the plan made by an | ||||||
4 | affected municipality having a stormwater management plan are | ||||||
5 | not included in the proposed county plan, and the municipality | ||||||
6 | affected by the plan opposes adoption of the county plan by | ||||||
7 | resolution of its corporate authorities, approval of the county | ||||||
8 | plan shall require an affirmative vote of at least two-thirds | ||||||
9 | of the county board members present and voting. If the county | ||||||
10 | board wishes to amend the county plan, it shall submit in | ||||||
11 | writing specific proposals to the stormwater management | ||||||
12 | planning committee. If the proposals are not approved by the | ||||||
13 | committee, or are opposed by resolution of the corporate | ||||||
14 | authorities of an affected municipality having a municipal | ||||||
15 | stormwater management plan, amendment of the plan shall require | ||||||
16 | an affirmative vote of at least two-thirds of the county board | ||||||
17 | members present and voting. | ||||||
18 | (g) The county board may prescribe by ordinance reasonable | ||||||
19 | rules and regulations for floodplain or stormwater management | ||||||
20 | and for governing the location, width, course, and release rate | ||||||
21 | of all stormwater runoff channels, streams, and basins in the | ||||||
22 | county, in accordance with the adopted stormwater management | ||||||
23 | plan. Land, facilities, and drainage district facilities used | ||||||
24 | for production agriculture as defined in subsection (d) shall | ||||||
25 | not be subjected to regulation by the county board or | ||||||
26 | stormwater management committee under this Section for |
| |||||||
| |||||||
1 | floodplain management and for governing location, width, | ||||||
2 | course, maintenance, and release rate of stormwater runoff | ||||||
3 | channels, streams and basins, or water discharged from a | ||||||
4 | drainage district. These rules and regulations shall, at a | ||||||
5 | minimum, meet the standards for floodplain management | ||||||
6 | established by the Office of Water Resources and the | ||||||
7 | requirements of the Federal Emergency Management Agency for | ||||||
8 | participation in the National Flood Insurance Program. With | ||||||
9 | respect to DuPage County only, the Chicago Metropolitan Agency | ||||||
10 | for Planning may not impose more stringent regulations | ||||||
11 | regarding water quality on entities discharging in accordance | ||||||
12 | with a valid National Pollution Discharge Elimination System | ||||||
13 | permit issued under the Environmental Protection Act. | ||||||
14 | (h) For the purpose of implementing this Section and for | ||||||
15 | the development, design, planning, construction, operation, | ||||||
16 | and maintenance of stormwater facilities provided for in the | ||||||
17 | adopted stormwater management plan, a county board that has | ||||||
18 | established a stormwater management planning committee | ||||||
19 | pursuant to this Section or has participated in a stormwater | ||||||
20 | management planning process may adopt a schedule of reasonable | ||||||
21 | fees applicable to all real property within the county which | ||||||
22 | benefits from the county's stormwater management facilities | ||||||
23 | and activities, and as may be necessary to mitigate the effects | ||||||
24 | of increased stormwater runoff resulting from development. The | ||||||
25 | total amount of the fees assessed must be specifically and | ||||||
26 | uniquely attributable to the actual costs of the county in the |
| |||||||
| |||||||
1 | preparation, administration, and implementation of the adopted | ||||||
2 | stormwater management plan, construction and maintenance of | ||||||
3 | stormwater facilities, and other activities related to the | ||||||
4 | management of the runoff from the property. The individual fees | ||||||
5 | must be specifically and uniquely attributable to the portion | ||||||
6 | of the actual cost to the county of managing the runoff from | ||||||
7 | the property. The fees shall be used to finance activities | ||||||
8 | undertaken by the county or its included municipalities to | ||||||
9 | mitigate the effects of urban stormwater runoff by providing | ||||||
10 | and maintaining stormwater collection, retention, detention, | ||||||
11 | and particulate treatment facilities, and improving water | ||||||
12 | bodies impacted by stormwater runoff, as identified in the | ||||||
13 | county plan. In establishing, maintaining, or replacing such | ||||||
14 | facilities, the county shall not duplicate facilities operated | ||||||
15 | by other governmental bodies within its corporate boundaries. | ||||||
16 | The schedule of fees established by the county board shall | ||||||
17 | include a procedure for a full or partial fee waiver for | ||||||
18 | property owners who have taken actions or put in place | ||||||
19 | facilities that reduce or eliminate the cost to the county of | ||||||
20 | providing stormwater management services to their property. | ||||||
21 | The county board may also offer tax or fee rebates or incentive | ||||||
22 | payments to property owners who construct, maintain, and use | ||||||
23 | approved green infrastructure stormwater management devices or | ||||||
24 | any other methods that reduce or eliminate the cost to the | ||||||
25 | county of providing stormwater management services to the | ||||||
26 | property, including but not limited to facilities that reduce |
| |||||||
| |||||||
1 | the volume, temperature, velocity, and pollutant load of the | ||||||
2 | stormwater managed by the county, such as systems that | ||||||
3 | infiltrate, evapotranspirate, or harvest stormwater for reuse, | ||||||
4 | known as "green infrastructure". In exercising this authority, | ||||||
5 | the county shall provide notice to the municipalities within | ||||||
6 | its jurisdiction of any fees proposed under this Section and | ||||||
7 | seek the input of each municipality with respect to the | ||||||
8 | calculation of the fees. The county shall also give property | ||||||
9 | owners at least 2 years' notice of the fee, during which time | ||||||
10 | the county shall provide education on green infrastructure | ||||||
11 | practices and an opportunity to take action to reduce or | ||||||
12 | eliminate the fee. All these fees collected by the county shall | ||||||
13 | be held in a separate fund, and shall be expended only in the | ||||||
14 | watershed within which they were collected. The county may | ||||||
15 | enter into intergovernmental agreements with other government | ||||||
16 | bodies for the joint administration of stormwater management | ||||||
17 | and the collection of the fees authorized in this Section. | ||||||
18 | A fee schedule authorized by this subsection must have the | ||||||
19 | same limit as the authorized stormwater tax. In Peoria County | ||||||
20 | only, the fee schedule shall not be adopted unless (i) a | ||||||
21 | referendum has been passed approving a stormwater tax as | ||||||
22 | provided in subsection (i) of this Section; or (ii) the | ||||||
23 | question of the adoption of a fee schedule with the same limit | ||||||
24 | as the authorized stormwater tax has been approved in a | ||||||
25 | referendum by a majority of those voting on the question. | ||||||
26 | (i) In the alternative to a fee imposed under subsection |
| |||||||
| |||||||
1 | (h), the county board may cause an annual tax of not to exceed | ||||||
2 | 0.20% of the value, as equalized or assessed by the Department | ||||||
3 | of Revenue, of all taxable property in the county to be levied | ||||||
4 | upon all the taxable property in the county. The property tax | ||||||
5 | shall be in addition to all other taxes authorized by law to be | ||||||
6 | levied and collected in the county and shall be in addition to | ||||||
7 | the maximum tax rate authorized by law for general county | ||||||
8 | purposes. The 0.20% limitation provided in this Section may be | ||||||
9 | increased or decreased by referendum in accordance with the | ||||||
10 | provisions of Sections 18-120, 18-125, and 18-130 of the | ||||||
11 | Property Tax Code (35 ILCS 200/). | ||||||
12 | Any revenues generated as a result of ownership or | ||||||
13 | operation of facilities or land acquired with the tax funds | ||||||
14 | collected pursuant to this subsection shall be held in a | ||||||
15 | separate fund and be used either to abate such property tax or | ||||||
16 | for implementing this Section. | ||||||
17 | If at least part of the county has been declared by a | ||||||
18 | presidential proclamation after July 1, 1986 and before | ||||||
19 | December 31, 1987, to be a disaster area as a result of | ||||||
20 | flooding, the tax authorized by this subsection does not | ||||||
21 | require approval by referendum. However, in Peoria County, the | ||||||
22 | tax authorized by this subsection shall not be levied until the | ||||||
23 | question of its adoption, either for a specified period or | ||||||
24 | indefinitely, has been submitted to the electors thereof and | ||||||
25 | approved by a majority of those voting on the question. This | ||||||
26 | question may be submitted at any election held in the county |
| |||||||
| |||||||
1 | after the adoption of a resolution by the county board | ||||||
2 | providing for the submission of the question to the electors of | ||||||
3 | the county. The county board shall certify the resolution and | ||||||
4 | proposition to the proper election officials, who shall submit | ||||||
5 | the proposition at an election in accordance with the general | ||||||
6 | election law. If a majority of the votes cast on the question | ||||||
7 | is in favor of the levy of the tax, it may thereafter be levied | ||||||
8 | in the county for the specified period or indefinitely, as | ||||||
9 | provided in the proposition. The question shall be put in | ||||||
10 | substantially the following form: | ||||||
11 | Shall an annual tax be levied
for stormwater management | ||||||
12 | purposes (for a period of not more than ..... years) at a | ||||||
13 | rate not exceeding
.....% of the equalized assessed
value | ||||||
14 | of the taxable property of ..... County? | ||||||
15 | Votes shall be recorded as Yes or No. | ||||||
16 | The following question may be submitted at any election | ||||||
17 | held in the county after the adoption of a resolution by the | ||||||
18 | county board providing for the submission of the question to | ||||||
19 | the electors of the county to authorize adoption of a schedule | ||||||
20 | of fees applicable to all real property within the county: | ||||||
21 | Shall the county board be authorized to adopt a | ||||||
22 | schedule of fees, at a rate not exceeding that of the | ||||||
23 | stormwater management tax, applicable to all real property | ||||||
24 | for preparation, administration, and implementation of an | ||||||
25 | adopted stormwater management plan, construction and | ||||||
26 | maintenance of related facilities, and management of the |
| |||||||
| |||||||
1 | runoff from the property? | ||||||
2 | Votes shall be recorded as Yes or No. | ||||||
3 | If these questions have been approved by a majority of | ||||||
4 | those voting prior to the effective date of this amendatory Act | ||||||
5 | of the 98th General Assembly, this subsection does not apply. | ||||||
6 | (j) For those counties that adopt a property tax in | ||||||
7 | accordance with the provisions in this Section, the stormwater | ||||||
8 | management committee shall offer property tax abatements or | ||||||
9 | incentive payments to property owners who construct, maintain, | ||||||
10 | and use approved stormwater management devices. The stormwater | ||||||
11 | management committee is authorized to offer credits to the | ||||||
12 | property tax, if applicable, based on authorized practices | ||||||
13 | consistent with the stormwater management plan and approved by | ||||||
14 | the committee. Expenses of staff of a stormwater management | ||||||
15 | committee that are expended on regulatory project review may be | ||||||
16 | no more than 20% of the annual budget of the committee, | ||||||
17 | including funds raised under subsections (h) and (i). | ||||||
18 | (k) Upon the creation and implementation of a county | ||||||
19 | stormwater management
plan, the county may petition the circuit | ||||||
20 | court to dissolve any or all drainage
districts created | ||||||
21 | pursuant to the Illinois Drainage Code or predecessor Acts
| ||||||
22 | which are located entirely within the area of the county | ||||||
23 | covered by the plan. | ||||||
24 | However, any active drainage district implementing a plan | ||||||
25 | that is
consistent with and at least as stringent as the county | ||||||
26 | stormwater
management plan may petition the stormwater |
| |||||||
| |||||||
1 | management planning committee
for exception from dissolution. | ||||||
2 | Upon filing of the petition, the committee
shall set a date for | ||||||
3 | hearing not less than 2 weeks, nor more than 4 weeks,
from the | ||||||
4 | filing thereof, and the committee shall give at least one | ||||||
5 | week's
notice of the hearing in one or more newspapers of | ||||||
6 | general circulation
within the district, and in addition shall | ||||||
7 | cause a copy of the notice to be
personally served upon each of | ||||||
8 | the trustees of the district. At the
hearing, the committee | ||||||
9 | shall hear the district's petition and allow the
district | ||||||
10 | trustees and any interested parties an opportunity to present | ||||||
11 | oral
and written evidence. The committee shall render its | ||||||
12 | decision upon the
petition for exception from dissolution based | ||||||
13 | upon the best interests of
the residents of the district. In | ||||||
14 | the event that the exception is not
allowed, the district may | ||||||
15 | file a petition within 30 days of the decision
with the circuit | ||||||
16 | court. In that case, the notice and hearing requirements
for | ||||||
17 | the court shall be the same as herein provided for the | ||||||
18 | committee.
The court shall likewise render its decision of | ||||||
19 | whether to dissolve the
district based upon the best interests | ||||||
20 | of residents of the district. | ||||||
21 | The dissolution of any drainage district shall not affect | ||||||
22 | the obligation
of any bonds issued or contracts entered into by | ||||||
23 | the district nor
invalidate the levy, extension or collection | ||||||
24 | of any taxes or special
assessments upon the property in the | ||||||
25 | former drainage district. All property
and obligations of the | ||||||
26 | former drainage district shall be assumed and
managed by the |
| |||||||
| |||||||
1 | county, and the debts of the former drainage district shall
be | ||||||
2 | discharged as soon as practicable. | ||||||
3 | If a drainage district lies only partly within a county | ||||||
4 | that adopts a
county stormwater management plan, the county may | ||||||
5 | petition the circuit
court to disconnect from the drainage | ||||||
6 | district that portion of the district
that lies within that | ||||||
7 | county. The property of the drainage district within the
| ||||||
8 | disconnected area shall be assumed and managed by the county. | ||||||
9 | The county shall
also assume a portion of the drainage | ||||||
10 | district's debt at the time of
disconnection, based on the | ||||||
11 | portion of the value of the taxable property of the
drainage | ||||||
12 | district which is located within the area being disconnected. | ||||||
13 | The operations of any drainage district that continues to | ||||||
14 | exist in a
county that has adopted a stormwater management plan | ||||||
15 | in accordance with
this Section shall be in accordance with the | ||||||
16 | adopted plan. | ||||||
17 | (l) Any county that has adopted a county stormwater | ||||||
18 | management plan under this Section may, after 10 days' written | ||||||
19 | notice receiving consent of the owner or occupant, enter upon | ||||||
20 | any lands or waters within the county for the purpose of | ||||||
21 | inspecting stormwater facilities or causing the removal of any | ||||||
22 | obstruction to an affected watercourse. If consent is denied or | ||||||
23 | cannot be reasonably obtained, the county ordinance shall | ||||||
24 | provide a process or procedure for an administrative warrant to | ||||||
25 | be obtained. The county shall be responsible for any damages | ||||||
26 | occasioned thereby. |
| |||||||
| |||||||
1 | (m) Except as otherwise provided in subsection (a) of this | ||||||
2 | Section, upon petition of the municipality, and based on a | ||||||
3 | finding of the stormwater management planning committee, the | ||||||
4 | county shall not enforce rules and regulations adopted by the | ||||||
5 | county in any municipality located wholly or partly within the | ||||||
6 | county that has a municipal stormwater management ordinance | ||||||
7 | that is consistent with and at least as stringent as the county | ||||||
8 | plan and ordinance, and is being enforced by the municipal | ||||||
9 | authorities. On issues that the county ordinance is more | ||||||
10 | stringent as deemed by the committee, the county shall only | ||||||
11 | enforce rules and regulations adopted by the county on the more | ||||||
12 | stringent issues and accept municipal permits. The county shall | ||||||
13 | have no more than 60 days to review permits or the permits | ||||||
14 | shall be deemed approved. | ||||||
15 | (n) A county may issue general obligation bonds for | ||||||
16 | implementing any stormwater plan adopted under this Section in | ||||||
17 | the manner prescribed in Section 5-1012; except that the | ||||||
18 | referendum requirement of Section 5-1012 does not apply to | ||||||
19 | bonds issued pursuant to this Section on which the principal | ||||||
20 | and interest are to be paid entirely out of funds generated by | ||||||
21 | the taxes and fees authorized by this Section. | ||||||
22 | (o) A county that has adopted a fee schedule pursuant to | ||||||
23 | this Section may not thereafter issue any bond extensions | ||||||
24 | related to implementing a stormwater management plan. | ||||||
25 | (p) The powers authorized by this Section may be | ||||||
26 | implemented by the county board for a portion of the county |
| |||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||
1 | subject to similar stormwater management needs. | ||||||||||||||||||||||||||||||||||||||||
2 | (q) The powers and taxes authorized by this Section are in | ||||||||||||||||||||||||||||||||||||||||
3 | addition to the powers and taxes authorized by Division 5-15; | ||||||||||||||||||||||||||||||||||||||||
4 | in exercising its powers under this Section, a county shall not | ||||||||||||||||||||||||||||||||||||||||
5 | be subject to the restrictions and requirements of that | ||||||||||||||||||||||||||||||||||||||||
6 | Division. | ||||||||||||||||||||||||||||||||||||||||
7 | (r) Stormwater management projects and actions related to | ||||||||||||||||||||||||||||||||||||||||
8 | stormwater management in a county that has adopted a fee | ||||||||||||||||||||||||||||||||||||||||
9 | schedule or tax pursuant to this Section prior to the effective | ||||||||||||||||||||||||||||||||||||||||
10 | date of this amendatory Act of the 98th General Assembly are | ||||||||||||||||||||||||||||||||||||||||
11 | not altered by this amendatory Act of the 98th General | ||||||||||||||||||||||||||||||||||||||||
12 | Assembly.
| ||||||||||||||||||||||||||||||||||||||||
13 | (s) As used in this Section: | ||||||||||||||||||||||||||||||||||||||||
14 | "Urban flooding" means the flooding of public and private | ||||||||||||||||||||||||||||||||||||||||
15 | land in urban communities that results from stormwater or | ||||||||||||||||||||||||||||||||||||||||
16 | snowmelt runoff overwhelming the existing drainage | ||||||||||||||||||||||||||||||||||||||||
17 | infrastructure, unrelated to the overflow of any river or lake, | ||||||||||||||||||||||||||||||||||||||||
18 | whether or not that land is located in or near a floodplain. | ||||||||||||||||||||||||||||||||||||||||
19 | "Urbanized areas" means a statistical geographic entity | ||||||||||||||||||||||||||||||||||||||||
20 | consisting of a densely settled core created from census tracts | ||||||||||||||||||||||||||||||||||||||||
21 | or blocks and contiguous qualifying territory that together | ||||||||||||||||||||||||||||||||||||||||
22 | have a minimum population of at least 50,000 persons and has | ||||||||||||||||||||||||||||||||||||||||
23 | been delineated as an urbanized area by the United States | ||||||||||||||||||||||||||||||||||||||||
24 | Census Bureau after the most recent decennial census. | ||||||||||||||||||||||||||||||||||||||||
25 | (Source: P.A. 98-335, eff. 8-13-13; 98-756, eff. 7-16-14.) | ||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||