(225 ILCS 710/45.05) (from Ch. 96 1/2, par. 4258)
    Sec. 45.05. Loading and unloading cage. At all mines where hoisting is done by cage from 2 or more levels a person shall be employed whose duties shall be to load and unload the cage and to give the signals to the hoisting engineer. The superintendent shall be responsible for the enforcement of this rule.
(Source: P.A. 87-1133.)