(65 ILCS 5/11-135.5-65) Sec. 11-135.5-65. Small projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the commission may combine the two-phase procedure for selection described in Section 11-135.5-60 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 11-135.5-60.
(Source: P.A. 102-1134, eff. 2-10-23.) |
(65 ILCS 5/11-135.5-70) Sec. 11-135.5-70. Submission of proposals. Proposals must be properly identified and sealed. Proposals may not be reviewed until after the deadline for submission has passed as set forth in the request for proposals. All design-build entities submitting proposals shall be disclosed after the deadline for submission, and all design-build entities who are selected for Phase II evaluation shall also be disclosed at the time of that determination. Proposals shall include a bid bond in the form and security as designated in the request for proposals. Proposals shall also contain a separate sealed envelope with the cost information within the overall proposal submission. Proposals shall include a list of all design professionals, public art designers, and other entities to which any work may be subcontracted during the performance of the contract. Proposals must meet all material requirements of the request for proposal or they may be rejected as non-responsive. The commission has the right to reject any and all proposals. The drawings and specifications of the proposal may remain the property of the design-build entity. The commission shall review the proposals for compliance with the performance criteria and evaluation factors. Proposals may be withdrawn prior to evaluation for any cause. After evaluation begins by the commission, clear and convincing evidence of error is required for withdrawal.
(Source: P.A. 102-1134, eff. 2-10-23.) |
(65 ILCS 5/11-135.5-75) Sec. 11-135.5-75. Award; performance. The commission may award the contract to the highest overall ranked entity. Notice of award shall be made in writing. Unsuccessful entities shall also be notified in writing. The commission may not request a best and final offer after the receipt of proposals. The commission may negotiate with the selected design-build entity after award but prior to contract execution for the purpose of securing better terms than originally proposed, provided that the salient features of the request for proposal are not diminished. A design-build entity and associated design professionals shall conduct themselves in accordance with the relevant laws of this State and the related provisions of the Illinois Administrative Code.
(Source: P.A. 102-1134, eff. 2-10-23.) |
(65 ILCS 5/Art. 11 Div. 136 heading) DIVISION 136.
JOINT ACQUISITION AND OPERATION
OF WATER AND SEWAGE SYSTEMS
|