90_HB1961
Makes appropriations and reappropriations to the Capital
Development Board for permanent improvements, minor capital
improvements, repair and maintenance, and related purposes
for the fiscal year beginning July 1, 1997. Makes
reappropriations to various state agencies for continuing
Build Illinois projects for the fiscal year beginning July 1,
1997.
CAPITAL PROJECTS - TO CDB
FUND NEW APPROPS. REAPPROPS. TOTAL
General Revenue $20,000.0 $37,527.2 $57,527.2
School
Construction 0 1,972.2 1,972.2
Capital
Development 318,613.9 814,161.3 1,132,775.2
Asbestos
Abatement 0 318.7 318.7
Historic Sites
Fund 0 2,300.0 2,300.0
TOTAL 338,613.9 856,279.4 1,194,893.3
CAPITAL PROJECTS - TO AGENCIES
CAPITAL DEVELOPMENT FUND
Sec. of St. $0 $6.8 $6.8
Space Needs
Comm. 0 5.7 5.7
Bd. of Higher Ed. 0 3,636.7 3,636.7
SIU 0 102.5 102.5
U of I 0 301.1 301.1
TOTAL 0 4,052.8 4,052.8
BUILD ILLINOIS PROJECTS
FUND REAPPROPRIATIONS
Build Illinois Purposes $5,355.2
Build Illinois Bond 173,505.7
TOTAL $178,860.9
LRB9005264WHsb
LRB9005264WHsb
1 AN ACT making appropriations and reappropriations.
2 Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
4 ARTICLE 1
5 Section 1. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 Capital Development Fund to the Capital Development Board for
8 the Department of Agriculture for the projects hereinafter
9 enumerated:
10 ILLINOIS STATE FAIRGROUNDS - DUQUOIN
11 For planning the renovation of the
12 Round Houses ................................. $ 40,000
13 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
14 For replacing the HVAC system in the
15 Administration Building ...................... 929,000
16 Total, Section 1 $969,000
17 Section 2. The following named amounts, or so much
18 thereof as may be necessary, are appropriated from the
19 Capital Development Fund to the Capital Development Board for
20 the Department of Central Management Services for the
21 projects hereinafter enumerated:
22 ILLINOIS REHABILITATION AND
23 EDUCATION CENTER (WOOD) - CHICAGO
24 For replacing the skylight system
25 and roof flashing ............................ $ 45,000
26 For installing security system and
27 perimeter lighting ........................... 375,000
28 ELGIN REGIONAL OFFICE BUILDING
29 For replacing the utility system ............... 2,625,000
30 CENTRAL STATE GARAGE - SPRINGFIELD
-2- LRB9005264WHsb
1 For replacing the roof and drainage system ..... 425,000
2 Total, Section 2 $3,470,000
3 Section 2a. The following named amounts, or so much
4 thereof as may be necessary, are appropriated from the
5 General Revenue Fund to the Capital Development Board for the
6 Department of Central Management Services for the projects
7 hereinafter enumerated:
8 JAMES R. THOMPSON CENTER - CHICAGO
9 For restoring the exterior plaza ............... $ 890,000
10 EAST ST. LOUIS - REGIONAL OFFICE
11 For replacing windows .......................... 65,500
12 Total, Section 2a $955,500
13 Section 3. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 Capital Development Fund to the Capital Development Board for
16 the Department of Corrections for the projects hereinafter
17 enumerated:
18 DWIGHT CORRECTIONAL CENTER
19 For upgrading water and sewer systems .......... $ 1,000,000
20 For renovating buildings, in addition
21 funds previously appropriated ................ 600,000
22 For constructing a gatehouse and
23 sallyport and upgrading the
24 security system .............................. 2,375,000
25 EAST MOLINE CORRECTIONAL CENTER
26 For upgrading the electrical
27 system ....................................... 2,300,000
28 JOLIET CORRECTIONAL CENTER
29 For correcting erosion and
30 stabilizing the masonry wall ................. 1,800,000
31 MENARD CORRECTIONAL CENTER - CHESTER
32 For renovating the Old Hospital
-3- LRB9005264WHsb
1 Building, in addition to funds
2 previously appropriated ...................... 4,700,000
3 For replacing and installing
4 water storage tank ........................... 1,200,000
5 For replacing Boiler #2, in addition
6 to funds previously appropriated ............. 800,000
7 For converting a room into a shower room ....... 395,000
8 STATEWIDE
9 For replacing roofing systems at the
10 following locations at the approximate
11 costs set forth below: ....................... $2,100,000
12 Big Muddy Correctional Center, Ina
13 Two buildings ......................$425,000
14 East Moline Correctional Center,
15 Three buildings .....................500,000
16 Graham Correctional Center, Hillsboro
17 Seven buildings .....................600,000
18 Sheridan Correctional Center, LaSalle
19 Three buildings .....................410,000
20 Stateville Correctional Center, Joliet
21 One building ........................165,000
22 For replacing doors and locks at the
23 following locations at the approximate
24 costs set forth below: ....................... 2,575,000
25 IYC - St. Charles ...................$585,000
26 Lincoln Correctional Center ...........50,000
27 Jacksonville Correctional Center .....975,000
28 Sheridan Correctional Center .........965,000
29 For upgrading fire safety systems at the
30 following locations at the approximate
31 costs set forth below, in addition to
32 funds previously appropriated : .............. 6,500,000
33 Menard Correctional Center .........2,000,000
34 Pontiac Correctional Center ........3,000,000
-4- LRB9005264WHsb
1 Stateville Correctional Center .....1,500,000
2 For upgrading water and wastewater
3 systems at the following locations
4 at the approximate costs set forth below:..... 4,465,000
5 Big Muddy Correctional Center
6 for installing mechanical
7 bar screen ..........................300,000
8 Centralia Correctional Center
9 for upgrading water
10 treatment plant ...................1,500,000
11 East Moline Correctional Center
12 for upgrading sewage system .........655,000
13 Ed Jenison Work Camp (Paris)
14 for installing mechanical
15 bar screen ..........................120,000
16 IYC - Harrisburg for upgrading
17 water distribution system ...........500,000
18 Kankakee MSU for constructing
19 well #2 .............................300,000
20 IYC - St. Charles for upgrading
21 sewage/storm system .................850,000
22 IYC - Valley View for installing
23 mechanical bar screen ...............240,000
24 For planning, design, construction,
25 equipment and other necessary costs
26 for a Maximum Security Correctional
27 Center, in addition to funds previously
28 appropriated ................................. 95,000,000
29 VIENNA CORRECTIONAL CENTER
30 For renovating the kitchen ..................... 2,000,000
31 Total, Section 3 $127,810,000
32 Section 3a. The following named amounts, or so much
33 thereof as may be necessary, are appropriated from the
-5- LRB9005264WHsb
1 General Revenue Fund to the Capital Development Board for the
2 Department of Corrections for the projects hereinafter
3 numerated:
4 MENARD CORRECTIONAL CENTER - CHESTER
5 For stabilizing dams ........................... $ 100,000
6 For repairing masonry and
7 waterproofing exterior ....................... 245,000
8 STATEVILLE CORRECTIONAL CENTER - JOLIET
9 For tuckpointing buildings ..................... 200,000
10 VANDALIA CORRECTIONAL CENTER
11 For tuckpointing, waterproofing and
12 replacing facade ............................. 165,000
13 Total, Section 3a $710,000
14 Section 4. The following named amounts, or so much
15 thereof as may be necessary, are appropriated from the
16 Capital Development Fund to the Capital Development Board for
17 the Historic Preservation Agency for the projects hereinafter
18 enumerated:
19 FORT DE CHARTRES - RANDOLPH COUNTY
20 For replacing Maintenance Building ............. $ 264,000
21 OLD STATE CAPITOL - SPRINGFIELD
22 For renovating garage ramp ..................... 419,000
23 STATEWIDE
24 For replacing roofing systems at the
25 following locations at the approximate
26 costs set forth below: ....................... 462,000
27 Fort De Chartres, Randolph County .....93,000
28 Washburne House, Galena ...............50,000
29 David Davis Mansion, Bloomington ......25,000
30 Bishop Hill House, Henry County ......294,000
31 VANDALIA STATE HOUSE
32 For rehabilitating HVAC and electrical
33 systems and interior ........................ 378,000
-6- LRB9005264WHsb
1 Total, Section 4 $1,523,000
2 Section 4a. The following named amounts, or so much
3 thereof as may be necessary, are appropriated from the
4 General Revenue Fund to the Capital Development Board for the
5 Historic Preservation Agency for the projects hereinafter
6 enumerated:
7 JOURNAL REGISTER BUILDING - SPRINGFIELD
8 For renovating building ........................ $ 702,000
9 DANA-THOMAS HOUSE - SPRINGFIELD
10 For restoring the exterior and interior ........ 417,000
11 Total, Section 4a $1,119,000
12 Section 5. The following named amounts, or so much thereof
13 as may be necessary, are appropriated from the Capital
14 Development Fund to the Capital Development Board for the
15 Department of Human Services (formerly the Department of
16 Mental Health and Developmental Disabilities) for the
17 projects hereinafter enumerated:
18 ALTON MENTAL HEALTH CENTER
19 For constructing two building additions
20 at the Forensic Complex ...................... $ 11,924,000
21 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
22 For completing HVAC system upgrade,
23 in addition to funds previously
24 appropriated ................................. 1,433,000
25 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
26 For rehabilitating the emergency
27 electrical system ............................ 314,000
28 For renovating Elm Cottage ..................... 3,082,000
29 CHESTER MENTAL HEALTH CENTER
30 For replacing fencing and upgrading
31 recreational yard ............................ 1,400,000
32 For renovating support and residential
-7- LRB9005264WHsb
1 area ......................................... 3,910,000
2 ELGIN MENTAL HEALTH CENTER
3 For renovating the central dietary
4 and kitchen .................................. 3,994,000
5 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
6 For extending chilled water line ............... 327,000
7 KILEY DEVELOPMENTAL CENTER - WAUKEGAN
8 For renovating homes ........................... 741,000
9 MADDEN MENTAL HEALTH CENTER - HINES
10 For renovating dietary ......................... 930,000
11 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
12 For replacing cooling towers and
13 rehabilitating absorbers ..................... 1,040,000
14 SINGER MENTAL HEALTH CENTER - ROCKFORD
15 For renovating mechanicals and
16 residential areas ............................ 2,736,000
17 STATEWIDE
18 For replacing roofing systems at the
19 following locations at the approximate
20 costs set forth below: ....................... 392,000
21 Elgin Mental Health Center,
22 five buildings ......................256,000
23 Jacksonville Mental Health and
24 Developmental Center, two buildings .136,000 ____________
25 Total, Section 5 $32,223,000
26 Section 5.1. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Department of Human Services (formerly the Department of
30 Rehabilitation Services) for the projects hereinafter
31 enumerated:
32 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
33 For completing the HVAC system upgrade,
-8- LRB9005264WHsb
1 in addition to funds previously
2 appropriated ................................. $ 300,000
3 For replacing the storm and sanitary
4 system ....................................... 2,000,000
5 For renovating Unit 5 .......................... 215,000
6 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
7 For rehabilitating the power house ............. 275,000
8 Total, Section 5.1 $2,790,000
9 Section 5a. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 General Revenue Fund to the Capital Development Board for the
12 Department of Human Services (formerly the Department of
13 Mental Health and Developmental Disabilities) for the
14 projects hereinafter enumerated:
15 ALTON MENTAL HEALTH CENTER
16 For replacing windows in four buildings ........ $1,181,000
17 CHESTER MENTAL HEALTH CENTER
18 For replacing backflow prevention
19 devices ...................................... 160,000
20 LINCOLN DEVELOPMENTAL CENTER
21 For replacing windows .......................... 756,000
22 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
23 For replacing windows in complex
24 buildings .................................... 486,000
25 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
26 For installing windows in residential
27 buildings .................................... 775,000
28 ZELLER MENTAL HEALTH CENTER - PEORIA
29 For replacing windows .......................... 1,499,000
30 Total, Section 5a $4,857,000
31 Section 5a.1. The following named amounts, or so much
32 thereof as may be necessary, are appropriated from the
-9- LRB9005264WHsb
1 General Revenue Fund to the Capital Development Board for the
2 Department of Human Services (formerly the Department of
3 Rehabilitation Services) for the projects hereinafter
4 enumerated:
5 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
6 For installing an emergency generator .......... $ 550,000
7 For installing security systems in
8 three buildings .............................. 50,000
9 Total, Section 5a.1 $600,000
10 Section 6. The following named amount, or so much
11 thereof as may be necessary, is appropriated from the Capital
12 Development Fund to the Capital Development Board for the
13 Department of Military Affairs for the project hereinafter
14 enumerated:
15 CARBONDALE ARMORY
16 For upgrading mechanical systems ............... $ 1,440,000
17 Total, Section 6 $1,440,000
18 Section 6a. The following named amount, or so much
19 thereof as may be necessary, is appropriated from the General
20 Revenue Fund to the Capital Development Board for the
21 Department of Military Affairs for the project hereinafter
22 enumerated:
23 LAWRENCEVILLE ARMORY
24 For renovating interior ........................ $ 180,000
25 Total, Section 6a $180,000
26 Section 7. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Department of Natural Resources for the projects
30 hereinafter enumerated:
31 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
-10- LRB9005264WHsb
1 For stabilizing the feeder canal bank .......... $ 500,000
2 KANKAKEE RIVER STATE PARK - KANKAKEE COUNTY
3 For planning and constructing a
4 sanitary sewer system ........................ 200,000
5 DICKSON MOUNDS - LEWISTOWN
6 For renovating Canton Liverpool
7 Toll Booth ................................... 73,000
8 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
9 For rehabilitating the levee system ............ 225,000
10 RED HILLS STATE PARK - LAWRENCE COUNTY
11 For replacing the sewage treatment system,
12 in addition to funds previously appropriated . 510,000
13 For rehabilitating the dam ..................... 90,000
14 SANGANOIS CONSERVATION AREA -
15 CASS, MASON AND SCHUYLER COUNTIES
16 For rehabilitating the levee system ............ 315,000
17 STATEWIDE
18 For replacing concession buildings and
19 upgrading support facilities at the following
20 locations at the approximate costs set
21 forth below: ................................. 2,895,000
22 Kickapoo State Park ..................538,000
23 Rock Cut State Park ..................525,000
24 Stephen A. Forbes State Park .......1,832,000
25 STATEWIDE
26 For constructing vault toilets at the
27 following locations at the approximate
28 costs set forth below: ...................... 1,593,000
29 Apple River Canyon State Park .......285,000
30 Des Plaines Conservation Area .......240,000
31 Kankakee River State Park ...........410,000
32 Lake Le-Aqua-Na State Park ..........295,000
33 Marshall County Conservation Area ....83,000
34 Morrison-Rockwood State Park ........195,000
-11- LRB9005264WHsb
1 Rice Lake Conservation Area ..........85,000
2 STATEWIDE
3 For replacing roofing systems and structural
4 repairs at the following locations at the
5 approximate costs set forth below: ........... 452,000
6 Mine Rescue Station, One building .....36,000
7 Castle Rock State Park,
8 One building .........................37,000
9 Dixon Springs State Park,
10 Three buildings ......................49,000
11 Cave-In-Rock State Park,
12 Two buildings ........................30,000
13 Ferne Clyffe State Park,
14 One building .........................30,000
15 Hamilton County Conservation
16 Area, One building ...................30,000
17 Lake Murphysboro State Park,
18 Two buildings ........................54,000
19 Red Hills State Park, Two
20 buildings ............................34,000
21 Fox Ridge State Park, Six
22 buildings ............................73,000
23 Shelbyville Fish and Wildlife
24 Area, Two buildings ..................49,000
25 Newton Lake Fish and Wildlife
26 Area, One building ...................30,000 ____________
27 Total, Section 7 $6,853,000
28 Section 7a. The following named amounts, or so much
29 thereof as may be necessary, are appropriated from the
30 General Revenue Fund to the Capital Development Board for the
31 Department of Natural Resources for the projects hereinafter
32 enumerated:
33 ILLINOIS BEACH STATE PARK
-12- LRB9005264WHsb
1 For stabilizing the shoreline .................. $ 400,000
2 STATEWIDE
3 For maintaining lodge and concession
4 facilities at various DNR locations .......... 400,000
5 For rehabilitating or replacing
6 playground equipment, in addition
7 to funds previously appropriated ............. 300,000
8 Total, Section 7a $1,100,000
9 Section 8. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 Capital Development Fund to the Capital Development Board for
12 the Department of Revenue for the projects hereinafter
13 enumerated:
14 WILLARD ICE BUILDING - SPRINGFIELD
15 For upgrading the uninterruptible power
16 system, in addition to funds previously
17 appropriated ................................. $ 1,200,000
18 For replacing the halon fire suppression
19 system ....................................... 344,000
20 Total, Section 8 $1,544,000
21 Section 9. The following named amounts, or so much
22 thereof as may be necessary, are appropriated from the
23 Capital Development Fund to the Capital Development Board for
24 the Department of State Police for the projects hereinafter
25 enumerated:
26 STATEWIDE
27 For replacing the roofs and roof
28 drainage systems at various locations,
29 at the approximate costs
30 set forth below:.............................. $ 182,000
31 DuQuoin, District #13 .................85,000
32 Springfield, District #9 and
-13- LRB9005264WHsb
1 Supply Building ......................97,000
2 For replacing radio communication
3 towers and equipment buildings and
4 installing emergency power
5 generators at Andover, Eaton,
6 Pecatonica, and Cypress ...................... 1,150,000
7 Total, Section 9 $1,332,000
8 Section 10. The following named amount, or so much
9 thereof as may be necessary, is appropriated from the Capital
10 Development Fund to the Capital Development Board for the
11 Department of Veterans' Affairs for the project hereinafter
12 enumerated:
13 ILLINOIS VETERANS' HOME - QUINCY
14 For renovating Lippincott Hall ................. $ 215,000
15 Total, Section 10 $215,000
16 Section 10a. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 General Revenue Fund to the Capital Development Board for the
19 Department of Veterans' Affairs for the projects hereinafter
20 enumerated:
21 ILLINOIS VETERANS' HOME - LASALLE
22 For relocating security alarm
23 system ....................................... $ 37,800
24 For installing an exit door
25 alarm system ................................. 52,500
26 ILLINOIS VETERANS' HOME - MANTENO
27 For replacing wiring in light poles ............ 153,900
28 For replacing exterior doors and frames ........ 200,000
29 Total, Section 10a $444,200
30 Section 11.01. The following named amounts, or so much
31 thereof as may be necessary, are appropriated from the
-14- LRB9005264WHsb
1 Capital Development Fund to the Capital Development Board for
2 the projects hereinafter enumerated:
3 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
4 For replacing the roof ......................... $ 104,000
5 SUPREME COURT BUILDING - SPRINGFIELD
6 For planning the library upgrade ............... 127,000
7 Total, Section 11.01 $231,000
8 Section 11.01a. The following named amount, or so much
9 thereof as may be necessary, is appropriated from the General
10 Revenue Fund to the Capital Development Board for the project
11 hereinafter enumerated:
12 SUPREME COURT BUILDING - SPRINGFIELD
13 For tuckpointing and cleaning exterior ......... $ 220,000
14 Total, Section 11.01a $220,000
15 Section 11.02. The following named amounts, or so much
16 thereof as may be necessary, are appropriated from the
17 Capital Development Fund to the Capital Development Board for
18 the projects hereinafter enumerated:
19 STATE CAPITOL BUILDING - SPRINGFIELD
20 For upgrading the life/safety and
21 security systems, in addition to
22 funds previously appropriated ................ $ 2,600,000
23 CAPITOL COMPLEX - SPRINGFIELD
24 For stabilizing the parking ramp ............... 3,000,000
25 For installing fire/security alarm
26 system ....................................... 1,100,000
27 STRATTON OFFICE BUILDING - SPRINGFIELD
28 For installing fire alarm system ............... 400,000
29 Total, Section 11.02 $7,100,000
30 Section 11.03. The following named amounts, or so much
31 thereof as may be necessary, are appropriated from the
-15- LRB9005264WHsb
1 Capital Development Fund to the Capital Development Board for
2 the projects hereinafter enumerated:
3 STATEWIDE
4 For surveys and modifications to
5 buildings to meet requirements of the
6 federal Americans with Disabilities Act ...... $ 5,000,000
7 For abatement of hazardous materials ........... 5,000,000
8 For upgrading/retrofitting mechanized
9 refrigeration equipment (CFC's) .............. 5,000,000
10 For upgrade and remediation of underground
11 storage tanks ................................ 5,000,000
12 Total, Section 11.03 $20,000,000
13 Section 11.03a. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 General Revenue Fund to the Capital Development Board for the
16 projects hereinafter enumerated:
17 STATEWIDE
18 For repair of minor problems and
19 emergencies .................................. $ 3,614,300
20 For construction site archaeological
21 studies ...................................... 200,000
22 For surveys for and abatement of
23 asbestos-containing material ................. 1,000,000
24 For demolition of buildings .................... 5,000,000
25 Total, Section 11.03a $9,814,300
26 Section 12. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Illinois Community College Board for the projects
30 hereinafter enumerated:
31 WILLIAM RAINEY HARPER COLLEGE - PALATINE
32 For constructing a Multi-purpose
-16- LRB9005264WHsb
1 Instructional Center and renovating
2 Building A Cafeteria ......................... $ 6,823,200
3 HEARTLAND COMMUNITY COLLEGE - NORMAL
4 For constructing buildings and making
5 site improvements, including equipment ....... 21,015,900
6 SHAWNEE COMMUNITY COLLEGE - ULLIN
7 For constructing additions, parking
8 facilities, and renovating buildings,
9 including equipment .......................... 7,403,200
10 Total, Section 12 $35,242,300
11 Section 13. The following named amounts, or so much
12 thereof as may be necessary, are appropriated from the
13 Capital Development Fund to the Capital Development Board for
14 the Board of Higher Education for the projects hereinafter
15 enumerated:
16 CHICAGO STATE UNIVERSITY - CHICAGO
17 For renovating buildings and upgrading
18 mechanical systems ........................... $ 3,300,000
19 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
20 For constructing an addition and
21 renovating Booth Library ..................... 16,764,500
22 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
23 For renovating the auditorium in
24 Building E ................................... 7,156,700
25 NORTHERN ILLINOIS UNIVERSITY - DEKALB
26 For renovating Altgeld Hall and
27 purchasing equipment ......................... 19,150,400
28 UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN
29 For constructing an Agricultural
30 Library ...................................... 9,500,000
31 Total, Section 13 $55,871,600
32 Section 14. The sum of $14,992,000, or so much thereof
-17- LRB9005264WHsb
1 as may be necessary, is appropriated from the Capital
2 Development Fund to the Capital Development Board for the
3 Board of Higher Education for miscellaneous capital
4 improvements including construction, capital facilities, cost
5 of planning, supplies, equipment, materials, services and all
6 other expenses required to complete the work at the various
7 universities set forth below. This appropriation shall be in
8 addition to any other appropriated amounts which can be
9 expended for these purposes.
10 For Chicago State University ..........301,400
11 For Eastern Illinois University .......564,100
12 For Governors State University ........181,600
13 For Illinois State University .......1,150,600
14 For Northeastern Illinois University ..423,700
15 For Northern Illinois University ....1,287,700
16 For Western Illinois University .......862,400
17 For Southern Illinois University -
18 Carbondale ........................1,991,500
19 For Southern Illinois University -
20 Edwardsville ........................751,500
21 For University of Illinois -
22 Chicago ...........................3,280,400
23 For University of Illinois -
24 Springfield .........................216,800
25 For University of Illinois -
26 Urbana-Champaign ..................3,980,300
27 Section 15. The sum of $5,008,000, or so much thereof as
28 may be necessary, is appropriated from the Capital
29 Development Fund to the Capital Development Board for the
30 Illinois Community College Board for miscellaneous capital
31 improvements including construction, reconstruction,
32 remodeling, improvement, repair and installation of capital
33 facilities, cost of planning, supplies, equipment, materials,
-18- LRB9005264WHsb
1 services and all other expenses required to complete the work
2 at the various community colleges. This appropriation shall
3 be in addition to any other appropriated amounts which can be
4 expended for these purposes.
5 Section 16. No contract shall be entered into or
6 obligation incurred for any expenditures from appropriations
7 made in this Article until after the purposes and amounts
8 have been approved in writing by the Governor.
9 ARTICLE 2
10 Section 1. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 1997, from reappropriations
13 heretofore made for such purposes in Article 77, Section 1
14 and Article 78, Section 1 of Public Act 89-0501, are
15 reappropriated from the Capital Development Fund to the
16 Capital Development Board for the Department of Agriculture
17 for the projects hereinafter enumerated:
18 (From Article 78, Section 1 of Public Act 89-0501):
19 CENTRALIA ANIMAL DISEASE LABORATORY
20 For purchasing and upgrading diagnostic
21 laboratory ................................... $ 909,666
22 DUQUOIN STATE FAIRGROUNDS
23 (From Article 77, Section 1 of Public Act 89-0501):
24 For replacement of the grandstand
25 bleachers .................................... 1,716,000
26 (From Article 78, Section 1 of Public Act 89-0501):
27 For planning and construction of
28 a livestock complex .......................... 171,655
29 For rehabilitation of the Grandstand ........... 13,403
30 For construction of an All-Purpose Building .... 2,621,797
31 ILLINOIS STATE FAIRGROUNDS
-19- LRB9005264WHsb
1 For renovation of the laboratory and print
2 shop - Phase II, in addition to funds
3 previously appropriated ...................... 22,299
4 For installation of the ventilation system, in
5 addition to funds previously appropriated .... 11,692
6 For repairing the exterior and replacing the
7 roofing system ............................... 62,625
8 For planning and upgrading the storm/
9 sanitary and water systems ................... 13,634
10 For renovation of the comfort stations-
11 Phase I ...................................... 102,537
12 For upgrading the Administration Building ...... 159,822
13 For upgrading Building #13 ..................... 84,984
14 For renovation of the Coliseum ................. 17,122
15 For renovation of the Emmerson Building ....... 18,598
16 For construction of a volumetric calibration
17 laboratory ................................... 7,469
18 For renovation of the Jr. Livestock Building,
19 including the cover over the outdoor
20 arena, roof, HVAC, plumbing and electrical
21 systems and installation of an elevator
22 for accessibility, and for upgrading
23 the sewer system ............................. 404,709
24 For rehabilitation of the Administration
25 Building, including planning & upgrading
26 laboratories ................................. 55,114
27 For planning the renovation of the show
28 horse barns .................................. 257,229
29 For rehabilitation of six racehorse barns-
30 Phase I ...................................... 217,318
31 For planning the rehabilitation of sidewalks,
32 curbs, gutters and streets ................... 173,371
33 For renovation of Building #33, including the
34 roofing system ............................... 10,810
-20- LRB9005264WHsb
1 Total, Section 1 $7,051,854
2 Section 1A. The following named amounts, or so much
3 thereof as may be necessary, and remain unexpended at the
4 close of business on June 30, 1997, from appropriations
5 heretofore made for such purposes in Article 77, Section 1A
6 of Public Act 89-0501, as amended, are reappropriated from
7 the Capital Development Fund to the Capital Development Board
8 for the Department of Agriculture for the projects
9 hereinafter enumerated:
10 ANIMAL DISEASE LABORATORY - CENTRALIA
11 For upgrading the diagnostic laboratory
12 facility, in addition to funds previously
13 appropriated ................................. $ 200,000
14 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
15 For replacing and/or repairing sidewalks,
16 curbs, gutters and streets, in addition
17 to funds previously appropriated ............. 1,050,000
18 For completing the installation of fiber
19 optics system, in addition to funds
20 previously appropriated ...................... 25,000
21 For upgrading the storm/sanitary and water
22 systems, in addition to funds previously
23 appropriated ................................. 1,600,000
24 For renovation or replacement of
25 comfort stations, in addition
26 to funds previously appropriated ............. 1,273,000
27 For upgrading Building 13, in addition to
28 funds previously appropriated ................ 733,000
29 Total, Section 1A $4,881,000
30 Section 2. The following named amounts, or so much
31 thereof as may be necessary and remain unexpended at the
32 close of business on June 30, 1997, from reappropriations
33 heretofore made for such purposes in Article 78, Section 2 of
-21- LRB9005264WHsb
1 Public Act 89-0501, are reappropriated from the Capital
2 Development Fund to the Capital Development Board for the
3 Courts of Illinois for the projects hereinafter enumerated:
4 SPRINGFIELD - SUPREME COURT BUILDING
5 For installation of an elevator and
6 replacement of the exterior lights ........... $ 53,764
7 For repairing the ramp, drainage system,
8 retaining wall and landscaping ............... 55,960
9 Total, Section 2 $109,724
10 Section 3. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 1997, from reappropriations
13 heretofore made for such purposes in Article 77, Section 2
14 and Article 78, Section 3 of Public Act 89-0501, are
15 reappropriated from the Capital Development Fund to the
16 Capital Development Board for the Department of Central
17 Management Services for the projects hereinafter enumerated:
18 (From Article 78, Section 3 of Public Act 89-0501):
19 CHICAGO - STATE OF ILLINOIS CENTER
20 For completing the installation of elevators, in
21 addition to funds previously
22 appropriated ................................. $ 650,760
23 For the correction of design/construction
24 deficiencies, including remedial work in
25 the heating, refrigeration, temperature
26 control and ventilation systems at the
27 State of Illinois Center at Chicago .......... 355,645
28 CHICAGO - STATE OF ILLINOIS BUILDING
29 For planning, renovation, equipment and all
30 other costs associated with the renovation
31 of the State of Illinois Building located
32 at 160 North LaSalle in Chicago, in addition
33 to any other amounts heretofore
-22- LRB9005264WHsb
1 appropriated for such purpose ................ 53,345
2 For planning for renovation of the building
3 at 160 North LaSalle ......................... 48,170
4 CHICAGO MEDICAL CENTER
5 ILLINOIS REHABILITATION AND EDUCATION CENTER
6 For completing the upgrade of HVAC system, in
7 addition to funds previously appropriated .... 97,303
8 For construction of an independent living
9 apartment building ........................... 457,593
10 For rehabilitation of the parking lot,
11 driveway and installation of fencing ......... 13,464
12 For rehabilitation of the air conditioning
13 system, installation of a sprinkler system
14 and improvements for handicapped
15 accessibility ................................ 105,913
16 CHICAGO MEDICAL CENTER
17 EVELYN EDWARDS CENTER
18 For replacement of the heating system .......... 25,274
19 CHICAGO MEDICAL CENTER
20 LAWNDALE DAY CARE
21 For renovation of the Lawndale Day Care
22 Center ....................................... 111,394
23 CHICAGO MEDICAL CENTER
24 OFFICE AND LABORATORY FACILITY
25 For replacement of the electric autoclave
26 boilers ...................................... 13,222
27 CHICAGO MEDICAL CENTER
28 VISUALLY HANDICAPPED INSTITUTE
29 For completing heating and cooling systems
30 renovation, in addition to funds
31 previously appropriated ...................... 17,088
32 For renovation of the loading dock ............. 89,573
33 For rehabilitation of the chiller and
34 replacement of the cooling tower ............. 7,288
-23- LRB9005264WHsb
1 CHAMPAIGN STATE GARAGE
2 For replacement of the electrical system and
3 windows and installation of restrooms ........ 74,303
4 (From Article 77, Section 2 of Public Act 89-0501):
5 REGIONAL OFFICE BUILDING - CHAMPAIGN
6 For replacement of roofing system and
7 rooftop heating and cooling unit ............. 381,112
8 (From Article 78, Section 3 of Public Act 89-0501):
9 SUBURBAN NORTH REGIONAL
10 OFFICE -
11 DES PLAINES
12 For designing the renovation, phase III ........ 726,169
13 For the purchase and renovation of the high
14 school ....................................... 57,995
15 OTTAWA STATE GARAGE
16 For rehabilitation of the lighting and
17 electrical systems ........................... 106,694
18 PEORIA STATE GARAGE
19 For planning, design, land acquisition,
20 construction, equipment, and all costs
21 related to the relocation of the Peoria
22 State Garage ................................. 38,663
23 SPRINGFIELD - CAPITOL COMPLEX
24 For construction of a day care center, in
25 addition to funds previously appropriated
26 for such purpose ............................. 950,000
27 For construction of a day care center in the
28 Capitol Complex in Springfield ............... 244,348
29 SPRINGFIELD COMPUTER FACILITY
30 For replacement of the uninterruptible
31 power system ................................. 18,838
32 (From Article 77, Section 2 of Public Act 89-0501):
33 ASH STREET COMPLEX-
34 MUSEUM AND COLLECTION CENTER -
-24- LRB9005264WHsb
1 SPRINGFIELD
2 For replacement of the roofing system .......... 850,036
3 (From Article 78, Section 3 of Public Act 89-0501):
4 11TH AND ASH STREET - SPRINGFIELD
5 For improving the Warehouse Complex ............ 25,146
6 Total, Section 3 $5,519,336
7 Section 3A. The following named amounts, or so much
8 thereof as may be necessary, and remain unexpended at the
9 close of business on June 30, 1997, from appropriations
10 heretofore made for such purposes in Article 77, Section 2A
11 of Public Act 89-0501, as amended, are reappropriated from
12 the Capital Development Fund to the Capital Development Board
13 for the Department of Central Management Services for the
14 projects hereinafter enumerated:
15 ILLINOIS REHABILITATION AND
16 EDUCATION CENTER (ROOSEVELT) - CHICAGO
17 For upgrading the HVAC system .................. $ 2,250,000
18 SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
19 For renovation of Suburban North Regional
20 Office Building (formerly Maine Township
21 North High School building), in addition
22 to funds previously appropriated for such
23 purpose, Phase III ........................... 5,400,000
24 For renovation and expansion of garage ......... 375,000
25 MARION REGIONAL OFFICE BUILDING
26 For construction of a Regional Office
27 Building Addition ............................ 2,000,000
28 COMPUTER FACILITY - SPRINGFIELD
29 For replacement of the halon fire
30 suppression system ........................... 875,000
31 Total, Section 3A $10,900,000
32 Section 3.1. The following named amounts, or so much
33 thereof as may be necessary and remain unexpended at the
-25- LRB9005264WHsb
1 close of business on June 30, 1997, from reappropriations
2 heretofore made for such purposes in Article 78, Section 3.1
3 of Public Act 89-0501, are reappropriated from the General
4 Revenue Fund to the Capital Development Board for the
5 Department of Central Management Services for the projects
6 hereinafter enumerated:
7 CHICAGO MEDICAL CENTER
8 ILLINOIS REHABILITATION AND EDUCATION CENTER
9 For rehabilitation for fire safety and
10 accessibility ................................ $ 11,086
11 CHICAGO MEDICAL CENTER
12 OFFICE AND LABORATORY BUILDING
13 For rehabilitation of the electrical vault
14 ceiling and exterior concrete deck ........... 3,373
15 CHICAGO MEDICAL CENTER
16 JUVENILE RESEARCH INSTITUTE
17 For rehabilitation of the interior and
18 exterior walls, planning the rehabilitation
19 of the HVAC system and renovation of
20 the elevator ................................. 23,433
21 CHICAGO MEDICAL CENTER
22 VISUALLY HANDICAPPED INSTITUTE
23 For upgrading the fire alarm and safety
24 system ....................................... 31,209
25 Total, Section 3.1 $69,101
26 Section 4. The following named amounts, or so much
27 thereof as may be necessary and remain unexpended at the
28 close of business on June 30, 1997, from appropriations
29 heretofore made for such purposes in Article 77, Section 6
30 and Article 78, Section 4 of Public Act 89-0501, are
31 reappropriated from the Capital Development Fund to the
32 Capital Development Board for the Department of Natural
33 Resources for the projects hereinafter enumerated:
-26- LRB9005264WHsb
1 (From Article 78, Section 4 of Public Act 89-0501):
2 For Beall Woods Conservation Area for
3 construction of a bridge and Class C
4 campground ................................... $ 42,488
5 For Chain O'Lakes State Park for replacement
6 of overhead power lines ...................... 153,810
7 For Chain O'Lakes State Park for planning
8 the replacement of concession buildings ...... 46,107
9 For Clinton Lake for construction of a
10 sewage treatment system ...................... 93,209
11 For Eagle Creek State Park for planning and
12 rehabilitation of the sewage treatment
13 system ....................................... 309,769
14 For Eagle Creek State Park for construction
15 of restrooms and providing playground
16 equipment .................................... 137,537
17 For Fort Massac State Park for planning the
18 reconstruction of the fort .................. 150,000
19 For Hennepin Canal Parkway State Park for
20 rehabilitation of Lock 33 Taintor
21 gates ........................................ 13,619
22 For Hennepin Canal Parkway State Park for
23 rehabilitation of canal ...................... 2,860
24 For Heron Pond-Little Black Slough for
25 improvements for erosion control ............. 219,876
26 For Horseshoe Lake Conservation Area for
27 dam rehabilitation and land acquisition ...... 858,655
28 For Horseshoe Lake State Fish and Wildlife
29 Area for construction of a pole building
30 and hunter check station ..................... 83,816
31 For Illinois Beach State Park for
32 stabilization of the shoreline ............... 177,565
33 For Illinois Beach State Park for renovation
34 of the lodge basement floor and drainage
-27- LRB9005264WHsb
1 system ....................................... 152,973
2 For Illinois-Michigan Canal State Park for
3 stabilization of the aqueduct ................ 887,585
4 For Jake Wolf Memorial Fish Hatchery for
5 installation of expansion joints ............. 7,727
6 For Jake Wolf Memorial Fish Hatchery for
7 upgrading the water supply ................... 39,105
8 For Johnson Sauk Trail State Park for
9 rehabilitation of the concession building .... 87,975
10 For Kickapoo State Park for planning
11 construction of a sewage treatment plant ..... 41,706
12 For Lake Murphysboro State Park for
13 rehabilitation of the concession/shower
14 building ..................................... 31,309
15 For Lake Murphysboro State Park for
16 upgrading the sewage system .................. 14,053
17 For Little Grassy Hatchery for the
18 construction of a storage building ........... 8,610
19 For Mason State Forest Tree Nursery for
20 installation of an emergency power system
21 and upgrading the irrigation system .......... 305,099
22 For Matthiessen State Park for rehabilitation
23 of five buildings ............................ 15,402
24 For Moraine Hills State Park for replacement
25 of restrooms and upgrading the
26 water system ................................. 909,000
27 For North Point Marina for construction of
28 a breakwater structure ....................... 3,057,696
29 For North Point Marina for modifying
30 the marina's docking system .................. 2,161,721
31 For Pere Marquette State Park for rehabilitation
32 of the water and sewer ....................... 72,532
33 For Pere Marquette State Park for upgrading
34 the water and electrical systems ............. 10,229
-28- LRB9005264WHsb
1 For Region V Office for replacement of roofs ... 30,112
2 For Sam Dale Lake Conservation Area for
3 construction of a sewage disposal system ..... 78,363
4 For Springfield Illinois State Fairgrounds
5 for the upgrade of access roads,
6 parking lots, and visitor trails at
7 Conservation World and the Conservation
8 Service Center ............................... 55,173
9 For Starved Rock State Park for planning the
10 rehabilitation of the trails ................. 71,900
11 For Starved Rock State Park for planning the
12 reconstruction of the seawall ................ 68,348
13 For Stephen A. Forbes State Park for extending
14 water and electrical services ................ 271,391
15 For Trail of Tears State Forest for
16 replacement of a bridge ...................... 36,238
17 For Tri-County Park for planning
18 a park ....................................... 300,000
19 For Volo Bog Natural Area for rehabilitation
20 of the visitors' center ...................... 408,887
21 For Wayne Fitzgerrell State Park for
22 rehabilitation of the sewage treatment
23 plant ........................................ 323,100
24 For Wayne Fitzgerrell State Park for
25 planning and construction of a marina,
26 installation of additional sewage lines,
27 recreational development and overnight
28 accommodations to be located on Rend
29 Lake ......................................... 14,599
30 GEOLOGICAL SURVEY - CHAMPAIGN
31 For upgrading the Applied Research Laboratory
32 previously appropriated ...................... 47,088
33 For planning and upgrading the Research
34 Laboratory ................................... 22,670
-29- LRB9005264WHsb
1 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
2 (FORMERLY BURNHAM HOSPITAL)
3 For planning and initiating the renovation of the
4 Natural History Research Center (formerly
5 Burnham Hospital) ............................ 3,173,451
6 For acquisition, planning, construction,
7 reconstruction, rehabilitation, and all
8 costs for the conversion of the Natural
9 History Research Center (formerly Burnham
10 Hospital) to a laboratory facility
11 for the Natural History Survey ............... 75,385
12 HAZARDOUS WASTE R & I CENTER - CHAMPAIGN
13 For upgrading the decontamination facilities
14 to improve operating efficiency and
15 life/safety .................................. 78,184
16 NATURAL HISTORY SURVEY - CHAMPAIGN
17 For completing the the Pesticide Storage
18 and Mixing facility .......................... 237,094
19 For upgrading laboratories and installation
20 of storage units ............................. 863,084
21 For renovation of the Natural Resources
22 Building ..................................... 43,067
23 For planning the chemical storage
24 building ..................................... 2,005
25 STATE WATER SURVEY - CHAMPAIGN
26 For planning replacement of vehicle
27 storage/shop facilities ...................... 21,150
28 DICKSON MOUNDS - LEWISTOWN
29 For renovation and expansion of the building,
30 including exhibits ........................... 228,902
31 For replacement of the cooling tower ........... 6,756
32 SPRINGFIELD - STATE MUSEUM
33 For planning renovation of main museum
34 exhibits and For renovation of basement
-30- LRB9005264WHsb
1 galleries .................................... 36,266
2 For renovation of the lobby and gift shop ...... 12,567
3 SPRINGFIELD - STATE MUSEUM COLLECTIONS CENTER
4 For installation of a boiler ................... 60,053
5 BENTON - SOUTHERN ILLINOIS MINING OFFICE
6 (FORMERLY MINE RESCUE STATION)
7 (From Article 77, Section 6 of Public Act 89-0501):
8 For upgrading the roofing and HVAC systems
9 and replacing exterior doors ................. 72,520
10 (From Article 78, Section 4 of Public Act 89-0501):
11 For upgrading the parking areas ................ 50,574
12 For renovation of the laboratory and purchase
13 equipment and for supplementing funds
14 previously appropriated to construct an
15 addition ..................................... 16,460
16 For acquiring property and construction of
17 a parking area ............................... 15,819
18 STATEWIDE
19 (From Article 77, Section 6 of Public Act 89-0501):
20 For repair or replacement of roofs and
21 parapet walls and and reconstruction
22 of chimneys at the following locations
23 at the approximate costs set forth below ..... 1,595,542
24 Geological Survey - Applied Lab ......234,000
25 Water Survey - Eight Buildings .......227,259
26 Natural History Survey - Natural
27 Resources Studies Annex .............330,630
28 Geological Survey - Natural
29 Resources Building ..................295,000
30 Water Survey - Parapet walls at
31 Buildings No. 4, 5 and 6 .............24,000
32 Dickson Mounds - Exterior restroom
33 and picnic shelter ...................14,530
34 Jake Wolf Fish Hatchery -
-31- LRB9005264WHsb
1 one building ........................470,123
2 (From Article 78, Section 4 of Public Act 89-0501):
3 For land acquisition ........................... 983,755
4 For maintaining the lodge and concession
5 facilities ................................... 227,707
6 For repairing and maintaining facilities ....... 271,713
7 For replacement of vault toilets at the
8 following locations at the
9 approximate costs set forth below: ........... 60,955
10 Delabar State Park ....................9,153
11 Illini State Park ....................51,138
12 Johnson Sauk Trail State Park ...........264
13 For construction of hazardous material
14 storage buildings ............................ 430,807
15 For abating hazards caused by the presence
16 of asbestos-containing materials ............. 76,445
17 For planning, construction, reconstruction,
18 land acquisition and related costs,
19 utilities, site improvements, and all other
20 expenses necessary for various capital
21 improvements at parks, conservation areas,
22 and other facilities under the jurisdiction
23 of the Department of Natural Resources ....... 22,129,889
24 For replacing roofs at the following locations
25 at the approximate costs set forth below: .... 13,608
26 Mason State Forest Tree
27 Nursery-Two buildings ...............4,098
28 Starved Rock State Park-
29 Nine buildings ........................613
30 Illini State Park-Five
31 buildings ...........................8,897
32 For rehabilitation of the recreational
33 vehicle campground electrical systems at
34 the following locations at the approximate
-32- LRB9005264WHsb
1 costs set forth below: ....................... 178,146
2 Kankakee River State Park ...........178,146
3 For planning, construction, reconstruction,
4 land, utilities, site improvements, and
5 all other expenses necessary for various
6 capital improvements at parks and
7 conservation areas ........................... 14,269
8 For construction and development of
9 multiple use facilities on lands owned
10 or managed by the Department of
11 Natural Resources, including all costs
12 for supplies, materials, labor, and
13 services required for the completion
14 of the following projects at the
15 approximate costs set forth below: ........... 137,610
16 For Volo Bog Natural Area
17 for replacement of a roof
18 and rehabilitation of the
19 emergency exit stairs at the
20 visitor center ....................108,220
21 For Volo Bog Natural Area for
22 the upgrading of the
23 Interpretive Center, including
24 the heating, ventilation, and
25 air conditioning system ............29,390 ____________
26 Total, Section 4 $42,933,685
27 Section 4A. The following named amounts, or so much
28 thereof as may be necessary, and remain unexpended at the
29 close of business on June 30, 1997, from appropriations
30 heretofore made for such purposes in Article 77, Section 6B
31 of Public Act 89-0501, as amended, are reappropriated from
32 the Capital Development Fund to the Capital Development Board
33 for the Department of Natural Resources for the projects
-33- LRB9005264WHsb
1 hereinafter enumerated:
2 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
3 For construction of a concession building
4 and upgrading the horse concession, in
5 addition to funds previously appropriated .... 500,000
6 CHAMPAIGN - STATE WATER SURVEY
7 For planning the renovation of the central
8 utilities plant .............................. 30,000
9 For renovation of office and
10 laboratory buildings ......................... 793,000
11 For replacement and upgrade of the exterior
12 lighting system .............................. 146,000
13 CHAMPAIGN - STATE NATURAL HISTORY SURVEY
14 For renovation of Natural History
15 Research Center (formerly Burnham
16 Hospital) in Champaign ....................... 6,000,000
17 DELABAR STATE PARK - HENDERSON COUNTY
18 For replacement of waterlines and
19 fountains .................................... 110,000
20 EAGLE CREEK STATE PARK - SHELBY COUNTY
21 For rehabilitation of the sewage treatment
22 system, in addition to funds previously
23 appropriated ................................. 312,000
24 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
25 For replacement and rehabilitation
26 of arch culverts and canal ................... 600,000
27 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
28 For rehabilitation of the concession
29 building, in addition to funds
30 previously appropriated ...................... 140,000
31 KICKAPOO STATE PARK - VERMILION COUNTY
32 For construction of a sewage treatment
33 plant, in addition to funds
34 previously appropriated ...................... 1,110,000
-34- LRB9005264WHsb
1 MORAINE HILLS STATE PARK - MCHENRY COUNTY
2 For renovation of the trail .................... 345,000
3 MORAINE VIEW STATE PARK - MCLEAN COUNTY
4 For construction of a sewage treatment
5 system and plant ............................. 1,625,000
6 PERE MARQUETTE STATE PARK - JERSEY COUNTY
7 For renovation of two buildings and
8 replacement of a storage building ............ 180,000
9 STARVED ROCK STATE PARK - LASALLE COUNTY
10 For construction of a visitors'
11 center, in addition to funds
12 previously appropriated ...................... 365,000
13 For rehabilitation of trails, in addition
14 to funds previously appropriated ............ 1,000,000
15 For reconstruction of the seawall, in
16 addition to funds previously
17 appropriated ................................. 500,000
18 For rehabilitation of the sewer
19 system - Phase I ............................. 180,000
20 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
21 For the completion of site improvements ........ 559,000
22 STATE MUSEUM - SPRINGFIELD
23 For planning and replacement of the main
24 museum exhibits, in addition to funds
25 previously appropriated ...................... 700,000
26 Total, Section 4A $15,195,000
27 Section 4.1. The following named amounts, or so much
28 thereof as may be necessary and remain unexpended at the
29 close of business on June 30, 1997, from appropriations and
30 reappropriations heretofore made for such purposes in Article
31 77, Section 6A and Article 78, Section 4.1 of Public Act
32 89-0501 are reappropriated from the General Revenue Fund to
33 the Capital Development Board for the Department of Natural
-35- LRB9005264WHsb
1 Resources for the projects hereinafter enumerated:
2 (From Article 77, Section 6A of Public Act 89-0501):
3 STATEWIDE
4 For maintenance of lodge and
5 concession facilities ........................ $ 260,000
6 For rehabilitation or replacement
7 of playground equipment ...................... 250,000
8 For rehabilitation of trail systems ............ 140,000
9 ILLINOIS BEACH STATE PARK
10 For stabilization of the shoreline.............. 400,000
11 STATEWIDE
12 (From Article 78, Section 4.1 of Public Act 89-0501):
13 For maintenance of the lodge and
14 concession facilities ........................ 29,981
15 For rehabilitation and replacement of
16 playground equipment ......................... 323,000
17 For Chain O'Lakes State Park for replacement
18 of windows and floor tile in Region 2
19 headquarters ................................. 87,000
20 For Illinois Beach State Park for
21 stabilization of the shoreline ............... 75,990
22 For Spring Grove Hatchery for upgrading the
23 septic system ................................ 30,000
24 Total, Section 4.1 $1,595,971
25 Section 5. The following named amounts, or so much
26 thereof as may be necessary and remain unexpended at the
27 close of business on June 30, 1997, from reappropriations
28 heretofore made for such purposes in Article 78, Section 5,
29 of Public Act 89-0501, as amended by Public Act 90-0002, are
30 reappropriated from the Capital Development Fund to the
31 Capital Development Board for the Department of Corrections
32 for the projects hereinafter enumerated:
33 CENTRALIA CORRECTIONAL CENTER
-36- LRB9005264WHsb
1 For renovation of the Dietary .................. $ 19,379
2 DANVILLE CORRECTIONAL CENTER
3 For installation of a water softener system ... 17,341
4 For renovation of interior walls and
5 exterior masonry walls ....................... 113,131
6 For correction of construction defects ......... 362,252
7 For planning, utilities, site improvements,
8 and other expenses necessary for the
9 construction of a correctional facility ...... 32,511
10 DIXON CORRECTIONAL CENTER
11 For completing the upgrade of Sewage Treatment
12 Plant, in addition to funds previously
13 appropriated ................................. 27,163
14 For upgrading the steam distribution system
15 and replacement of the boiler system
16 including asbestos abatement ................. 111,140
17 DWIGHT CORRECTIONAL CENTER
18 For renovation of buildings ................... 715,322
19 EAST MOLINE CORRECTIONAL CENTER
20 For planning the upgrade of locking
21 systems in nine buildings .................... 34,995
22 For upgrading the steam distribution system
23 and replacement of boilers, including
24 asbestos abatement ........................... 23,764
25 SOUTHWESTERN ILL. CORRECTIONAL FACILITY
26 For providing equipment and telecom,
27 constructing a warehouse and upgrading
28 a parking lot, in addition to funds
29 previously appropriated ...................... 130,007
30 For completing the conversion of existing
31 buildings into a minimum security
32 correctional facility, in addition to funds
33 previously appropriated ...................... 19,776
34 ILLINOIS YOUTH CENTER - HARRISBURG
-37- LRB9005264WHsb
1 For purchasing and installation of equipment
2 to complete the dietary expansion ........... 25,607
3 For replacement of absorption chiller units
4 and boiler systems in three buildings ........ 13,978
5 JOLIET CORRECTIONAL CENTER
6 For completing the west cellhouse renovation,
7 including asbestos abatement, in addition
8 to funds previously appropriated ............. 3,495,065
9 For renovation of the west cellhouse, in
10 addition to funds previously appropriated .... 27,575
11 For renovation of steam, water, sewage and
12 electrical systems ........................... 1,306
13 For planning the rehabilitation of the
14 West Cellhouse ............................... 172,011
15 ILLINOIS YOUTH CENTER - JOLIET
16 For completing the upgrade of electrical
17 systems, in addition to funds
18 previously appropriated ...................... 1,805,650
19 For upgrading the fire alarm system ............ 275,557
20 For upgrading the storm and sanitary sewers .... 353,627
21 For completing the upgrade of the utilities, in
22 addition to funds previously appropriated .... 40,647
23 For completion of the steam system upgrade
24 and initiation of the electrical
25 system upgrade ............................... 6,239
26 KANKAKEE MSU
27 For providing equipment, telecom, lighting
28 and freezer units, in addition to funds
29 previously appropriated ...................... 53,468
30 For planning, construction, utilities,
31 renovation, site improvements, and
32 other expenses necessary for a minimum
33 security women's prison ...................... 4,133
34 For rehabilitation of the heating and air
-38- LRB9005264WHsb
1 handling system in the resident buildings .... 2,737
2 LINCOLN CORRECTIONAL CENTER
3 For upgrading the locking systems and doors ... 77,700
4 For upgrading the water supply ................. 356,077
5 For renovation of the Dietary, construction
6 of a cooler addition and installation
7 of blast chillers ........................... 487,520
8 LOGAN CORRECTIONAL CENTER
9 For renovation of sewer system ................. 854,229
10 For renovation of the water tower .............. 124,144
11 For rehabilitation of the roof ventilation
12 systems ...................................... 77,948
13 MENARD CORRECTIONAL CENTER
14 For planning, completion and rehabilitation
15 or replacement of the MSU "C" Building ....... 91,994
16 For replacement of East and West
17 Cellhouse windows and boilers................. 276,442
18 For improving the south yard for outdoor
19 recreation ................................... 32,606
20 For repairs due to the Great Flood of
21 1993 and projects to protect the facility
22 from future floods ........................... 250,362
23 For upgrading the steam and water distribution
24 systems and replacement of the MSU
25 "C" Building ................................. 183,254
26 For replacement of the chimney stack and
27 boilers, in addition to funds previously
28 appropriated ................................. 400,000
29 For replacement of hot water heaters and
30 deairing tanks ............................... 110,000
31 For planning the renovation of the old
32 hospital building ............................ 207,540
33 For renovation of elements of the power
34 plant, including the main generator .......... 22,982
-39- LRB9005264WHsb
1 For planning for renovation of the
2 Administration Building ...................... 15,604
3 For completing the renovation of the
4 Psychiatric Cellhouse ........................ 5,247
5 ILLINOIS YOUTH CENTER - PERE MARQUETTE
6 For completing the renovation of control
7 center and construction of a confinement
8 addition, in addition to funds previously
9 appropriated ................................. 39,691
10 For upgrading the dormitory restrooms ......... 31,814
11 SHAWNEE CORRECTIONAL CENTER
12 For upgrading the heating and hot
13 water system ................................. 581,309
14 SHERIDAN CORRECTIONAL CENTER
15 For completion of water and sewer systems
16 upgrade, in addition to funds previously
17 appropriated ................................. 2,699
18 For planning the upgrade of sewer and
19 water utilities .............................. 6,954
20 STATEVILLE CORRECTIONAL CENTER
21 For upgrading the the gatehouse ................ 100,117
22 For completing the upgrade of the security
23 system, in addition to funds previously
24 appropriated ................................. 23,650
25 For rehabilitation of plumbing in Dietary ..... 27,593
26 For upgrading the doors, locks and hardware
27 in B Cellhouse ............................... 59,940
28 For upgrading the water supply to B house ..... 187,633
29 For upgrade of the utility system .............. 7,177
30 ILLINOIS YOUTH CENTER - ST. CHARLES
31 For completing the upgrade of the water
32 distribution system, in addition to funds
33 previously appropriated ...................... 192,872
34 For replacement of Madison Cottage ............. 136,527
-40- LRB9005264WHsb
1 ILLINOIS YOUTH CENTER - VALLEY VIEW
2 For planning the upgrade of dormitory restrooms
3 and fixtures ................................. 68,560
4 VIENNA CORRECTIONAL CENTER
5 For completing the rehabilitation of duct
6 system and walls, in addition to
7 funds previously appropriated ................ 1,300,592
8 For upgrading the electrical system ............ 80,094
9 For planning the upgrade of the steam
10 distribution system .......................... 190,881
11 For planning the replacement of the
12 absorption chiller and cooling tower ......... 40,848
13 For upgrading the library and school
14 buildings .................................... 107,592
15 For planning the rehabilitation of the
16 duct system and walls ........................ 15,910
17 For upgrading the water and sewer
18 utilities .................................... 187,609
19 STATEWIDE
20 For planning, design, construction,
21 equipment and all other necessary
22 costs for a youth boot camp at a
23 site to be chosen from the list of
24 finalists not selected for the
25 super maximum security prison ............... 322,891
26 For completion of planning, site improvements,
27 utility upgrade, equipment and construction
28 of three housing units to add 672 cells
29 to the adult correctional system ............. 73,354
30 For planning, construction, utilities, site
31 improvements, equipment and other expenses
32 necessary for the construction of a close
33 supervision super maximum security prison .... 18,904,536
34 For upgrading for fire safety at five
-41- LRB9005264WHsb
1 locations and replacing boilers............... 1,767,333
2 For correcting defects in the food preparation
3 areas, including roofs ....................... 128,591
4 For planning, construction, utilities,
5 site improvements, and other expenses
6 necessary for the construction of two
7 minimum and one medium security
8 prisons ...................................... 29,224
9 For utilities, construction, planning,
10 design, site improvements, rehabilitation,
11 equipment, or any other means of acquiring
12 community correctional centers, adult work
13 camps, and boot camps ........................ 9,078
14 For renovation and improvements at various
15 correctional facilities at the approximate
16 costs set forth below: ....................... 117,693
17 Roof Replacement .....................70,000
18 Road Repavement ......................47,693
19 For replacement of cell doors and locks
20 and rehabilitation of locking systems at
21 the following locations at the approximate
22 costs set forth below: ....................... 118,902
23 Kankakee MSU
24 For rehabilitation of locking
25 systems ...........................118,902
26 For renovation of roads and parking lots
27 and replacement of boilers at the
28 following locations at the approximate
29 costs set forth below ........................ 119,503
30 Dixon Correctional Center
31 For roads and parking ..............30,000
32 Hanna City Work Camp
33 For roads and parking ..............37,000
34 Logan Correctional Center
-42- LRB9005264WHsb
1 For roads and parking ..............10,000
2 Menard Correctional Center
3 For roads and parking and
4 replacement of boilers............168,832
5 Vienna Correctional Center
6 For roads ..........................30,000
7 For replacement of roofs at various Department of
8 Corrections locations ........................ 415,977
9 For roof replacement at the following
10 locations at the approximate costs
11 set forth below: ............................. 670,404
12 Dixon Correctional Center
13 Five Buildings .....................25,000
14 Dwight Correctional Center
15 Three buildings ...................122,000
16 Dwight Correctional Center
17 Multi-Purpose Building .............85,000
18 Graham Correctional Center
19 Five buildings ....................125,000
20 Graham Correctional Center
21 Thirty-two buildings ..............150,000
22 Hanna City Work Camp
23 Thirteen buildings .................7,000
24 Joliet Correctional Center
25 Five buildings ....................160,000
26 Logan Correctional Center
27 Two buildings .....................200,000
28 Menard Psychiatric Center
29 Six buildings .....................485,000
30 Menard Correctional Center
31 Warehouse Building .................70,000
32 Menard Correctional Center
33 Five buildings ....................700,000
34 Pontiac Correctional Center
-43- LRB9005264WHsb
1 Nine buildings .....................40,000
2 Pontiac Correctional Center
3 Eight buildings ....................75,000
4 Illinois Youth Center-St. Charles
5 Three buildings ...................175,000
6 Sheridan Correctional Center
7 Six buildings ......................50,000
8 Stateville Correctional Center
9 Sixteen buildings .................50,000
10 Stateville Correctional Center
11 Seven buildings ...................135,000
12 Ill Youth Center-Valley View
13 Administration Building and
14 Kitchen Addition ..................100,688
15 Illinois Youth Center-Warrenville
16 One residential building ..........150,000 ____________
17 Total, Section 5 $37,525,578
18 Section 5A. The following named amounts, or so much
19 thereof as may be necessary, and remain unexpended at the
20 close of business on June 30, 1997, from appropriations
21 heretofore made for such purposes in Article 77, Section 3B
22 of Public Act 89-0501, as amended, are reappropriated from
23 the Capital Development Fund to the Capital Development Board
24 for the Department of Corrections for the projects
25 hereinafter enumerated:
26 STATEWIDE
27 For correction of deficiencies in
28 water systems at three correctional
29 facilities ................................... $ 100,000
30 For replacement of locks, windows and
31 doors at the following locations
32 as set forth below: .......................... 4,000,000
33 Dwight ...............................291,400
-44- LRB9005264WHsb
1 IYC Harrisburg .......................943,000
2 IYC Joliet ...........................367,500
3 Menard .............................1,350,000
4 Pontiac ...............................77,100
5 IYC Valley View ......................500,000
6 Vienna ...............................471,000
7 For planning, design, construction,
8 equipment and other necessary costs
9 for a Correctional Facility for
10 juveniles .................................... 42,750,000
11 For planning, design, construction,
12 equipment and other necessary costs
13 for a Medium Security Correctional
14 Facility ..................................... 69,000,000
15 DANVILLE CORRECTIONAL CENTER
16 For renovation of interior and
17 exterior walls, in addition to
18 funds previously appropriated ................ 4,000,000
19 DECATUR WOMEN'S CORRECTIONAL CENTER
20 For the planning and conversion of
21 Meyer Mental Health Center into a
22 correctional facility ........................ 23,000,000
23 DIXON CORRECTIONAL CENTER
24 For renovation of the groundwater
25 storage tank and abatement of crawl-
26 space pipes in Bldgs. 26, 27 and 29 .......... 700,000
27 DWIGHT CORRECTIONAL CENTER
28 For completion of medical unit,
29 in addition to funds previously
30 appropriated ................................. 3,500,000
31 For expansion of the Education Building
32 and Dietary and construction of
33 a warehouse .................................. 4,700,000
34 EAST MOLINE CORRECTIONAL CENTER
-45- LRB9005264WHsb
1 For upgrading locking system, in addition
2 to funds previously appropriated ............. 800,000
3 ILLINOIS YOUTH CENTER - HARRISBURG
4 For upgrading the domestic water system ........ 675,000
5 For upgrading the HVAC system .................. 532,000
6 ILLINOIS YOUTH CENTER - JOLIET
7 For planning, site improvements,
8 utility upgrade, equipment and all
9 costs necessary to construct a
10 housing unit and dietary facility............. 7,000,000
11 ILLINOIS YOUTH CENTER - PERE MARQUETTE
12 For upgrading the electrical
13 distribution system .......................... 215,000
14 ILLINOIS YOUTH CENTER - VALLEY VIEW
15 For upgrading dormitory restrooms
16 and fixtures, in addition to
17 funds previously appropriated ................ 550,000
18 JOLIET CORRECTIONAL CENTER
19 For upgrading the power house and
20 installation of a generator .................. 407,000
21 STATEVILLE CORRECTIONAL CENTER - JOLIET
22 For replacement of the MSU ..................... 6,500,000
23 LINCOLN CORRECTIONAL CENTER
24 For upgrading the water softener system ........ 150,000
25 MENARD CORRECTIONAL CENTER - CHESTER
26 For upgrading roads and sidewalks .............. 310,000
27 For upgrading the plumbing systems in
28 two buildings ................................ 400,000
29 For upgrading the coal handling system
30 and repair or replace boiler system .......... 950,000
31 For conversion of the Maintenance Building
32 to an inmate dormitory ....................... 250,000
33 For conversion of the Administration
34 Building basement to a courtroom and
-46- LRB9005264WHsb
1 attorney offices ............................. 100,000
2 For upgrading the steam and water distribution
3 systems, in addition to funds previously
4 appropriated ................................. 2,400,000
5 PONTIAC CORRECTIONAL CENTER
6 For renovation of main sally port .............. 300,000
7 VANDALIA CORRECTIONAL CENTER
8 For renovation of dormitory shower rooms ....... 450,000
9 VIENNA CORRECTIONAL CENTER
10 For upgrading the steam distribution system
11 and renovation of Powerhouse, in addition
12 to funds previously appropriated ............. 4,000,000
13 For installation of security fencing ........... 1,000,000
14 For upgrading air conditioning system
15 and replacement of cooling tower ............. 1,100,000
16 For upgrading the electrical, plumbing and
17 HVAC systems in four buildings ............... 850,000
18 Total, Section 5A $180,689,000
19 Section 5.1. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1997, from appropriations and
22 reappropriations heretofore made for such purposes in Article
23 78, Section 5.1 of Public Act 89-0501 are reappropriated from
24 the General Revenue Fund to the Capital Development Board for
25 the Department of Corrections for the projects hereinafter
26 enumerated:
27 DIXON CORRECTIONAL CENTER
28 For replacement of two freezer compressors
29 and motors ................................... $ 150,757
30 EAST MOLINE CORRECTIONAL CENTER
31 For retubing boiler #3 ......................... 345,650
32 STATEVILLE CORRECTIONAL CENTER
33 For upgrading the security system .............. 9,907
-47- LRB9005264WHsb
1 STATEWIDE
2 For energy conservation improvements at the
3 following locations at the approximate
4 costs set forth below: ....................... 56,018
5 Dwight Correctional Center ............7,000
6 Joliet Correctional Center
7 School Building .....................4,500
8 Menard Psychiatric Center
9 Randolph Hall .......................7,500
10 Stateville Correctional Center
11 Law Library .........................7,400
12 Pontiac Correctional Center ..........35,394
13 Vienna Correctional Center ............1,725
14 For upgrading doors and locking systems at
15 the following locations at the approximate
16 costs set forth below: ....................... 577,182
17 Illinois Youth Center-Warrenville
18 For replacement of doors
19 and locking systems ...............577,182 ____________
20 Total, Section 5.1 $1,139,514
21 Section 5.2. The sum of $2,666,667, or so much thereof
22 as may be necessary and remains unexpended at the close of
23 business on June 30, 1997, from a reappropriation heretofore
24 made for such purposes in Article 78, Section 5.2 of Public
25 Act 89-0501, is reappropriated from the Capital Development
26 Fund to the Capital Development Board for the State's
27 one-third share of land acquisition, equipment and
28 construction of a boot camp in the Cook County area.
29 Section 5.3. The amount of $21,874, or so much thereof
30 as may be necessary and remains unexpended at the close of
31 business on June 30, 1997, from a reappropriation heretofore
32 made for such purposes in Article 78, Section 5.3 of Public
-48- LRB9005264WHsb
1 Act 89-0501, is reappropriated from the Capital Development
2 Fund to the Capital Development Board for the Department of
3 Corrections for planning and other expenses necessary for a
4 medical unit facility at Dwight Correctional Center.
5 Section 5.4. The amount of $11,898,037, or so much
6 thereof as may be necessary and remains unexpended from the
7 General Revenue Fund at the close of business on June 30,
8 1997, from an appropriation heretofore made for such purposes
9 in Article 78, Section 5.5 of Public Act 89-0501, is
10 reappropriated to the Capital Development Board for the
11 Department of Corrections for all costs associated with the
12 completion of the super maximum security prison at Tamms,
13 Illinois.
14 Section 5.5. The amount of $11,110,948, or so much
15 thereof as may be necessary and remains unexpended at the
16 close of business on June 30, 1997, from an appropriation
17 heretofore made for such purposes in Article 77, Section 3 of
18 Public Act 89-0501, is reappropriated from the General
19 Revenue Fund to the Capital Development Board for the
20 Department of Corrections for the projects hereinafter
21 enumerated at the approximate costs set forth below:
22 Danville Correctional Center -
23 For upgrading the hot water
24 distribution system ................$2,227,613
25 Joliet Correctional Center -
26 For replacement of the deep well ........350,000
27 Stateville Correctional Center-
28 For upgrading the plumbing systems in
29 four buildings ......................5,178,740
30 Menard Correctional Center -
31 For planning and to begin upgrading
32 the plumbing systems in two
-49- LRB9005264WHsb
1 buildings .............................189,100
2 Pontiac Correctional Center -
3 For upgrading the mechanical systems
4 and renovation of shower rooms ........995,000
5 Shawnee Correctional Center -
6 For upgrading the hot water
7 distribution system .................2,170,495
8 Section 5.6. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1997, from appropriations
11 heretofore made for such purposes in Article 77, Section 3A
12 of Public Act 89-0501, are reappropriated from the General
13 Revenue Fund to the Capital Development Board for the
14 Department of Corrections for the projects hereinafter
15 enumerated:
16 DIXON CORRECTIONAL CENTER
17 For tuckpointing two buildings ................. $ 65,000
18 STATEVILLE CORRECTIONAL CENTER - JOLIET
19 For tuckpointing seven buildings ............... 300,000
20 Total $365,000
21 Section 6. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 1997, from reappropriations
24 heretofore made for such purposes in Article 78, Section 6
25 of Public Act 89-0501, are reappropriated from the Capital
26 Development Fund to the Capital Development Board for the
27 Historic Preservation Agency for the projects hereinafter
28 enumerated:
29 CAHOKIA MOUNDS HISTORIC SITE
30 To extend a water line for providing
31 reliable water service ....................... $ 284,094
32 For purchasing private land within historic
-50- LRB9005264WHsb
1 site boundary ................................ 280,600
2 For replacement of Monk's Mounds stairs ........ 243,148
3 DAVID DAVIS HOME
4 To acquire a residence to be
5 converted to a Visitors' Center .............. 250,000
6 FT. KASKASKIA HISTORIC SITE
7 For providing a new water supply ............... 138,463
8 GALENA COMPLEX - JO DAVIESS COUNTY
9 For providing handicapped accessibility and
10 site improvements ............................ 5,610
11 LEWIS AND CLARK STATE HISTORIC SITE
12 For the construction of an interpretive
13 center ....................................... 440,000
14 LINCOLN LOG CABIN HISTORIC SITE - CAMPBELL
15 For rehabilitation of historic structures ...... 57,491
16 For construction of a visitor center and
17 museum, Phase I .............................. 134,909
18 For the stabilization of the Moore House ....... 27,981
19 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
20 For completing the restoration of the
21 outdoor theater .............................. 3,431
22 For construction of a day use area ............. 207,767
23 For replacement of a barn and site
24 improvements ................................. 106,526
25 For rehabilitation of the sewage treatment
26 plant ........................................ 92,668
27 For rehabilitation of the bridge ............... 2,021
28 For rehabilitation of the outdoor theater ...... 8,083
29 LINCOLN'S TOMB HISTORIC SITE - SPRINGFIELD
30 For stabilization of storm water penetration
31 and repairing water damage ................... 28,707
32 For planning the correction of Lincoln's
33 Tomb exterior and repair the interior ........ 32,052
34 For rehabilitation of three buildings .......... 6,449
-51- LRB9005264WHsb
1 MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY
2 For restoration of the exterior, replacement
3 of the windows, restoration of damaged
4 areas and the HVAC system .................... 72,264
5 PULLMAN FACTORY HISTORIC SITE - CHICAGO
6 For stabilization of the structure and for planning
7 and beginning restoration .................... 824,316
8 For stabilization of critical areas of the
9 structure .................................... 7,031
10 SPRINGFIELD - OLD STATE CAPITOL
11 For replacement of the heating and cooling
12 system ....................................... 130,943
13 For remodeling and rehabilitation of the
14 mechanical, electrical and security
15 systems, fire-safety improvements, other
16 interior modifications and repairs to
17 the garage ................................... 23,305
18 VACHEL LINDSAY HOME
19 For mechanical/system replacement,
20 restoration of the foundation and other
21 structural improvements ...................... 191,637
22 STATEWIDE
23 For land acquisition and related costs ......... 19,411
24 Total, Section 6 $3,618,907
25 Section 6A. The following named amounts, or so much
26 thereof as may be necessary, and remain unexpended at the
27 close of business on June 30, 1997, from appropriations
28 heretofore made for such purposes in Article 77, Section 11A
29 of Public Act 89-0501, as amended, are reappropriated from
30 the Capital Development Fund to the Capital Development Board
31 for the Historic Preservation Agency for the projects
32 hereinafter enumerated:
33 STATEWIDE HISTORIC SITE
-52- LRB9005264WHsb
1 For matching ISTEA federal grant funds ......... $ 500,000
2 DAVID DAVIS MANSION - BLOOMINGTON
3 For renovation of the David Davis Mansion
4 to eliminate basement leakage ................ 231,000
5 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
6 For renovation of the Cahokia Courthouse
7 and the Jarrot House ......................... 387,000
8 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
9 For replacement of Monk's Mound stairs ......... 465,000
10 For restoration of Monk's Mound ................ 1,800,000
11 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
12 For construction of a visitors' center ......... 1,625,000
13 For replacement of bridges ..................... 180,000
14 LINCOLN'S NEW SALEM - PETERSBURG
15 For renovation of the River Ridge
16 Restaurant and improvements to the
17 domestic water system ........................ 273,000
18 OLD STATE CAPITOL - SPRINGFIELD
19 For renovation of the Old State
20 Capitol to eliminate basement
21 leakage ...................................... 620,000
22 Total, Section 6A $6,081,000
23 Section 6.1. The amount of $54,510, or so much thereof
24 as may be necessary and remains unexpended at the close of
25 business on June 30, 1997, from a reappropriation heretofore
26 made for such purpose in Article 78, Section 6.1 of Public
27 Act 89-0501, is reappropriated from the Capital Development
28 Fund to the Capital Development Board for the Historic
29 Preservation Agency for the purchase and rehabilitation of
30 the State Journal Register Building in Springfield.
31 Section 6.2. The amount of $52,705, or so much thereof
32 as may be necessary and remains unexpended at the close of
-53- LRB9005264WHsb
1 business on June 30, 1997, from a reappropriation heretofore
2 made for such purpose in Article 78, Section 6.2 of Public
3 Act 89-0501, is reappropriated from the Capital Development
4 Fund to the Capital Development Board for the Historic
5 Preservation Agency for acquiring the Zimmerman
6 archaeological site in LaSalle County and for associated
7 costs, planning, stabilization, restoration and all other
8 expenses necessary to comply with the intent of this
9 appropriation.
10 Section 6.3. The amount of $2,300,000, or so much
11 thereof as may be necessary and remains unexpended at the
12 close of business on June 30, 1997, from appropriations
13 heretofore made for such purposes in Article 77, Section 11
14 of Public Act 89-0501, is reappropriated from the Capital
15 Development Fund to the Capital Development Board and the
16 amount of $2,300,000, or so much thereof as may be necessary
17 and remains unexpended from the Illinois Historic Sites Fund
18 at the close of business on June 30, 1997, from
19 appropriations heretofore made for such purposes in Article
20 78, Section 6.3 of Public Act 89-0501, is reappropriated to
21 the Capital Development Board for planning a new historical
22 library and Lincoln Center. The moneys from the Capital
23 Development Fund may be spent only if matched by moneys from
24 the Illinois Historic Sites Fund resulting from private
25 donations.
26 Section 6.4. The amount of $2,300,000, or so much
27 thereof as may be necessary and remains unexpended from the
28 General Revenue Fund, less $1,900,000, from the
29 appropriations heretofore made for such purposes in Article
30 78, Section 6.3 of Public Act 89-0501, is reappropriated to
31 the Capital Development Board for the Historic Preservation
32 Agency for planning a new historical library and Lincoln
-54- LRB9005264WHsb
1 Center.
2 Section 7. The amount of $3,183, or so much thereof as
3 may be necessary and remains unexpended at the close of
4 business on June 30, 1997, from a reappropriation heretofore
5 made for such purpose in Article 78, Section 7 of Public Act
6 89-0501, is reappropriated from the Capital Development Fund
7 to the Capital Development Board for the Legislative Space
8 Needs Commission for planning, construction, land
9 acquisition, site development and other related expenses as
10 may be necessary to construct a Parking and Visitor Center in
11 the Capitol Complex Area.
12 Section 8. The sum of $132,500, or so much thereof as
13 may be necessary and remains unexpended at the close of
14 business on June 30, 1997, from a reappropriation heretofore
15 made for such purposes in Article 78, Section 8 of Public Act
16 89-0501, is reappropriated from the Capital Development Fund
17 to the Capital Development Board for the Legislative Space
18 Needs Commission for architectural/engineering fees,
19 planning, construction, reconstruction, rehabilitation, and
20 all other necessary costs for remodeling and relocation of
21 various legislative services agencies located in the Capitol
22 and Stratton Office buildings at the approximate costs set
23 forth below:
24 For the Joint Committee on
25 Administrative Rules .......................$ 132,500
26 Section 9. The following named amounts, or so much
27 thereof as may be necessary and remain unexpended at the
28 close of business on June 30, 1997, from reappropriations
29 heretofore made for such purposes in Article 78, Section 9,
30 as amended by Public Act 90-0002, and Article 77, Section 4
31 of Public Act 89-0501, are reappropriated from the Capital
-55- LRB9005264WHsb
1 Development Fund to the Capital Development Board for the
2 Department of Human Services (formerly the Department of
3 Mental Health and Developmental Disabilities) for the
4 projects hereinafter enumerated:
5 (From Article 78, Section 9 of Public Act 89-0501):
6 ALTON MENTAL HEALTH CENTER
7 For rehabilitation of storm and sanitary
8 sewers, in addition to funds previously
9 appropriated ................................ $ 121,432
10 For rehabilitation of storm and sanitary
11 sewers, in addition to funds previously
12 appropriated ................................. 11,194
13 For installation of security screens ........... 75,000
14 For replacement of domestic hot water
15 lines in seven buildings ..................... 4,859
16 For upgrading fire safety systems in
17 eight buildings ............................ 43,900
18 For renovation of ceilings in Holly, Maple,
19 Locust and Elm ............................... 42,444
20 For replacement of the chiller and
21 connection of the HVAC to the energy
22 management system ............................ 19,280
23 For replacement of two cooling towers in
24 the Willow Building .......................... 45,463
25 For rehabilitation of bathrooms for
26 handicapped accessibility .................... 21,605
27 For rehabilitation of the electrical
28 distribution system .......................... 77,957
29 CHESTER MENTAL HEALTH CENTER
30 For construction of a storage building ........ 803,585
31 For renovation of the HVAC system .............. 38,887
32 For upgrading the security system .............. 44,083
33 For construction of a Rehabilitative
34 Services building ............................ 78,900
-56- LRB9005264WHsb
1 For replacement of the emergency generator ..... 73,040
2 CHICAGO METRO C&A
3 For renovation of ISPI building ................ 4,500,000
4 For planning and renovation of residential
5 and program units for children and
6 adolescent services .......................... 872,648
7 CHICAGO READ MENTAL HEALTH CENTER
8 For renovation of utility rooms and installation
9 of drinking fountains ........................ 218,000
10 For renovation of the West Campus Nurses'
11 Stations ..................................... 1,304,000
12 For renovation of Henry Horner Children's
13 Center and West Campus for fire and
14 life safety codes ............................ 1,384,273
15 For renovation of the West Campus shower
16 and toilet rooms ............................. 643,488
17 For replacement of penthouse louvers at
18 the West Campus .............................. 63,696
19 For rehabilitation of the bathroom shower
20 walls in ten buildings ....................... 96,690
21 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
22 For upgrading the mechanical equipment,
23 in addition to funds previously
24 appropriated ................................. 522,080
25 For planning and beginning the renovation of a
26 residential building ......................... 70,714
27 For renovation of the kitchen and residential
28 units for rethermalization and air
29 condition the kitchen, in addition to
30 funds previously appropriated ............... 25,044
31 For separating and upgrading of the combined
32 sewer system, in addition to funds
33 previously appropriated ...................... 154,660
34 For rehabilitation of resident buildings
-57- LRB9005264WHsb
1 and upgrading of temperature controls ........ 620,501
2 ELGIN MENTAL HEALTH CENTER
3 (From Article 77, Section 4 of Public Act 89-0501):
4 For construction of a forensic services
5 complex, in addition to funds previously
6 appropriated ................................. 1,784,500
7 (From Article 78, Section 9 of Public Act 89-0501):
8 For upgrading and expanding the mechanical
9 infrastructure, in addition to funds
10 previously appropriated ...................... 1,245,921
11 For renovation of the HVAC systems,
12 replacement of windows and installation
13 of security screens, in addition
14 to funds previously appropriated ............. 2,092,543
15 For construction of a Forensic Services
16 Facility, in addition to funds
17 previously appropriated ..................... 13,346,590
18 For upgrading and expanding mechanical
19 infrastructure, in addition to funds
20 previously appropriated ...................... 772,051
21 For upgrading for fire and life safety ......... 880,849
22 For planning the renovation of the Forensic
23 Building and abating asbestos ................ 251,946
24 For renovation of the Central Stores
25 Building ..................................... 114,914
26 For upgrading the Medical Building HVAC
27 system and replacement of the cooling
28 towers ....................................... 2,501
29 For upgrading the security systems and
30 constructing a multi-purpose building
31 for the Forensic Complex ..................... 64,550
32 For the demolition of the Old Main Building
33 and construction of an Adult
34 Psychiatric Center ........................... 3,221,865
-58- LRB9005264WHsb
1 FOX DEVELOPMENTAL CENTER
2 For renovation of Building #8 and
3 window replacement of Building
4 #1, in addition to funds
5 previously appropriated ...................... 472,267
6 For renovation of the exterior of
7 Building #1, in addition to funds
8 previously appropriated ...................... 97,042
9 For planning the renovation of Building #8 ..... 8,276
10 For installation of an elevator and
11 rehabilitation of corridor exits ............. 8,712
12 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
13 For renovation of residences ................... 159,398
14 For replacement of steam and
15 condensate lines ............................. 357,281
16 For renovation of the boilers in the power
17 plant ........................................ 29,856
18 For renovation of bathrooms and utility rooms
19 in ten residences ............................ 6,913
20 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
21 For replacement of code compliance
22 generators ................................... 25,273
23 For planning and beginning electrical
24 distribution renovation ...................... 21,950
25 For replacement of piping and heating units .... 144,665
26 For rehabilitation of bathrooms and replacement
27 of doors ..................................... 159,297
28 For rehabilitation of the boilers, turbine
29 generator and switchgear ..................... 5,611
30 For installation of fire safety systems in
31 four buildings and replacement of a
32 code compliance generator .................... 274,259
33 KILEY DEVELOPMENTAL CENTER
34 For renovation of homes ........................ 587,735
-59- LRB9005264WHsb
1 For renovation of bathrooms in homes ........... 309,992
2 LINCOLN DEVELOPMENTAL CENTER
3 For upgrading the architectural and mechanical
4 systems, in addition to funds
5 previously appropriated ...................... 1,447,272
6 For installation of a code compliance
7 generator .................................... 104,396
8 For rehabilitation of the coal bunker
9 in the Powerhouse ............................ 261,000
10 For installation of rethermalization food
11 service system ............................... 634,439
12 For expansion of the sprinkler system in
13 four buildings ............................... 185,080
14 For renovation of the boilers, replacement of
15 controls and tuckpointing the exterior ....... 131,945
16 For installation of air conditioning in
17 Coty and Dietary Buildings ................... 44,883
18 For upgrading the HVAC systems, including
19 chillers ..................................... 32,362
20 LUDEMAN DEVELOPMENTAL CENTER
21 For renovation of residences ................... 690,135
22 For renovation of residences ................... 783,000
23 For renovation of restrooms for accessibility
24 in two buildings ............................. 114,608
25 For renovation of bathrooms in 15 residences ... 157,589
26 For installation of automatic sprinkler
27 and fire alarm system ........................ 9,133
28 MADDEN MENTAL HEALTH CENTER - HINES
29 For renovation of pavilions .................... 370,000
30 For upgrading residences for safety and
31 security ..................................... 296,744
32 For replacement of a cooling tower and
33 chiller ...................................... 247,435
34 For installation of return air fan systems ..... 10,095
-60- LRB9005264WHsb
1 For replacement of hot water heaters ........... 121,899
2 For upgrade of the central kitchen and
3 renovation of eight pavilions ................ 1,949
4 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
5 For renovation of a residential building ....... 481,890
6 For replacement of the HVAC control panel ...... 183,612
7 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
8 For replacement of cooling towers .............. 21,161
9 For installation of fire safety systems ........ 803,861
10 For replacement of the boiler shell and
11 controls ..................................... 5,747
12 For rehabilitation of the hot water
13 distribution system .......................... 48,665
14 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
15 For replacement of the roof and masonry repair,
16 in addition to funds previously
17 appropriated ................................. 62,953
18 For replacement of valves in the powerhouse .... 110,208
19 For replacement of electrical feeder cable ..... 167,385
20 For planning and beginning sewer and
21 manhole renovation ........................... 57,645
22 For rehabilitation of the boilers .............. 556,100
23 For planning and replacement of windows ........ 234,721
24 For installation of an emergency generator ..... 190,421
25 For upgrading fire safety systems in the
26 support buildings ............................ 240,671
27 For upgrading the HVAC system and installation
28 air conditioning in the Dietary Building ..... 36,733
29 For replacement of expansion joints in the
30 utility tunnels .............................. 86,267
31 For installation of air conditioning in
32 Building #704, in addition to funds
33 previously appropriated ...................... 108,049
34 For replacement of hot water tanks in the
-61- LRB9005264WHsb
1 Laundry Building ............................. 89,146
2 For replacement of switches and switchgear,
3 in addition to funds previously
4 appropriated ................................. 29,460
5 For replacement of the water softener
6 system in the powerhouse ..................... 82,093
7 For replacement of cooling towers in
8 Buildings #100A and #100B .................... 107,298
9 For replacement of roofing systems and
10 renovation of the exterior in two
11 buildings .................................... 39,711
12 For replacement of the electrical switchgear
13 in the Power Plant ........................... 7,563
14 For planning the installation of an air
15 conditioning system for Building #704 ........ 45,376
16 For upgrading the HVAC system in the
17 Administration building and other
18 buildings .................................... 31,424
19 For installation of air conditioning in
20 Buildings #502 and #514 ...................... 186,259
21 For upgrading the electrical system ............ 15,706
22 For upgrade of the electrical distribution
23 system ....................................... 62,102
24 SINGER MENTAL HEALTH CENTER
25 For replacement of cooling tower, expansion
26 tanks and test absorbers ..................... 37,311
27 For replacement of the water main .............. 281,938
28 TINLEY PARK MENTAL HEALTH CENTER/
29 HOWE DEVELOPMENTAL CENTER
30 For renovating and making mechanical
31 improvements to Spruce Hall and Maple Hall ... 160,218
32 For planning the rehabilitation of the
33 electrical distribution system ............... 62,378
34 For installation of security screens, in
-62- LRB9005264WHsb
1 addition to funds previously appropriated .... 59,414
2 For renovation for accessibility in four
3 buildings .................................... 559,415
4 For planning the sewer system renovation and
5 replacement of the rag catcher ............... 290,032
6 For renovation for fire and life safety in
7 three residences ............................. 460,646
8 For replacement of piping in Maple Hall ........ 28,576
9 For renovation of nursing stations and
10 medication rooms in three residences ......... 164,829
11 For replacement of the windows in nine
12 buildings .................................... 70,125
13 ZELLER MENTAL HEALTH CENTER
14 For renovation of Nurses' Stations and
15 seclusion rooms .............................. 872,540
16 For replacement of the heating and cooling
17 pumps ........................................ 10,803
18 STATEWIDE
19 ALTON/ELGIN
20 For construction of a forensic services complex
21 at Alton Mental Health Center and Elgin
22 Mental Health Center, in addition to funds
23 previously appropriated ...................... 433,152
24 For conducting the preliminary design to
25 construct, convert and/or rehabilitate
26 a forensic facility .......................... 94,918
27 STATEWIDE
28 For upgrading and rehabilitation of roads,
29 parking lots and drainage systems at the
30 following locations at the approximate
31 costs set forth below: ....................... 59,885
32 Chester Mental Health Center
33 For rehabilitation of the
34 drainage system and upgrading
-63- LRB9005264WHsb
1 parking lots .......................59,885
2 For upgrading roads and parking lots at
3 the following locations at the
4 approximate costs set forth below: ........... 40,544
5 McFarland Mental Health Ctr ...........5,544
6 Shapiro Developmental Center .........35,000
7 For rehabilitation of water towers -
8 Murray and Chester ........................... 454,813
9 For replacement of roofs at the following
10 locations at the approximate costs set
11 forth below: ................................. 1,985,151
12 Alton Mental Health Center -
13 Five buildings ....................342,687
14 Choate Mental Health Center -
15 Three buildings ....................17,479
16 Choate Mental Health and
17 Developmental Center -
18 Five buildings .....................15,034
19 Chester Mental Health Center -
20 21 buildings .......................39,775
21 Elgin Mental Health Center -
22 Three buildings ....................52,000
23 Elgin Mental Health Center -
24 Six Buildings .....................115,000
25 Lincoln Developmental Center -
26 Three buildings ...................240,613
27 Lincoln Developmental Center -
28 Four buildings ......................6,601
29 Ludeman Developmental Center -
30 Support buildings ..................91,447
31 Ludeman Developmental Center-
32 Residences .........................22,158
33 Mabley Developmental Center -
34 One building ......................103,517
-64- LRB9005264WHsb
1 Madden Mental Health Center -
2 Buildings and covered walkways .....72,822
3 McFarland Mental Health Center -
4 Three buildings ...................144,240
5 Meyer Mental Health Center -
6 One building ......................315,514
7 Shapiro Developmental Center -
8 Three buildings ...................187,000
9 Shapiro Developmental Center -
10 Two buildings ......................16,351
11 Shapiro Developmental Center -
12 Five buildings .....................67,831
13 Tinley Park Mental Health Center -
14 One building .......................26,048
15 Tinley Park Mental Health Center -
16 Oak Hall ..........................109,034
17 STATEWIDE - FIRE SAFETY
18 To renovate fire safety systems, including
19 installation of sprinklers, at the following
20 locations at the approximate costs set
21 forth below: ................................. 354,529
22 Anna Mental Health and
23 Developmental Center ...............12,318
24 Singer Mental Health and
25 Developmental Center ..............335,021
26 For fire safety and other work necessary to meet
27 state and federal certification standards for
28 the following projects:
29 For installation of sprinkler systems at
30 Chicago-Read Mental Health Center ............ 125,209
31 For installation of sprinkler systems at
32 Murray Developmental Center .................. 2,000
33 For installation of sprinkler systems at
34 Waukegan Developmental Center ................ 15,448
-65- LRB9005264WHsb
1 Total, Section 9 $54,784,245
2 Section 9A. The following named amounts, or so much
3 thereof as may be necessary, and remain unexpended at the
4 close of business on June 30, 1997, from appropriations
5 heretofore made for such purposes in Article 77, Section 4B
6 of Public Act 89-0501, as amended, are reappropriated from
7 the Capital Development Fund to the Capital Development Board
8 for the Department of Human Services (formerly the Department
9 of Mental Health and Developmental Disabilities) for the
10 projects hereinafter enumerated:
11 STATEWIDE
12 For replacement of roofing systems at the
13 following locations at the approximate costs
14 set forth below: ............................. $ 2,333,900
15 Alton Mental Health Center ..........217,000
16 Choate Mental Health Center .........134,900
17 Chester Mental Health Center ......1,350,000
18 Fox Developmental Center ............101,000
19 Howe Developmental Center ...........166,000
20 Jacksonville Developmental Center ....21,000
21 Lincoln Developmental Center ........344,000
22 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
23 For rehabilitation of the central dietary ...... 1,950,000
24 For replacement of life/safety and
25 security system in a residential
26 building ..................................... 246,000
27 CHESTER MENTAL HEALTH CENTER - CHESTER
28 For installation of emergency generator
29 and upgrading EMS system ..................... 350,000
30 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
31 For renovating residential units, in
32 addition to funds previously
33 appropriated ................................. 2,171,000
-66- LRB9005264WHsb
1 CHOATE MENTAL HEALTH CENTER - ANNA
2 For upgrading mechanical equipment, in
3 addition to funds previously
4 appropriated ................................... 837,000
5 For renovating a residential building,
6 in addition to funds previously
7 appropriated ................................. 2,334,000
8 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
9 For construction of an Adult Psychiatric
10 Building, in addition to funds previously
11 appropriated ................................. 3,681,000
12 For construction of roads, parking lots
13 and street lights ............................ 2,500,000
14 For upgrading and expanding the mechanical
15 infrastructure, in addition to funds
16 previously appropriated ...................... 4,500,000
17 For c