6 Section 1. The following named amounts, or so much
7 thereof as may be necessary, are appropriated from the
8 Capital Development Fund to the Capital Development Board for
9 the Department of Agriculture for the projects hereinafter
10 enumerated:
11 ILLINOIS STATE FAIRGROUNDS - DU QUOIN
12 For replacing horse barn roofs ................. $ 300,000
13 For upgrading electrical utilities, in
14 addition to funds previously
15 appropriated ................................. 700,000
16 For renovating the Hayes House, in addition
17 to funds previously appropriated .............. 600,000
18 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
19 For renovating comfort stations, in addition
20 to funds previously appropriated ............. 1,100,000
21 For upgrading the electrical system ............ 1,000,000
22 For renovating the grandstand area ............. 1,120,000
23 Total, Section 1 $4,820,000
24 Section 1.1. The following named amounts, or so much
25 thereof as may be necessary, are appropriated from the
26 General Revenue Fund to the Capital Development Board for the
27 Department of Agriculture for the projects hereinafter
28 enumerated:
29 ILLINOIS STATE FAIRGROUNDS - DU QUOIN
-2- BOB-CDB02
1 For upgrading the telecommunications
2 system ....................................... $ 400,000
3 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
4 For upgrading the chemistry/seed
5 laboratory systems ........................... 344,000
6 Total $744,000
7 Section 2. The following named amounts, or so much
8 thereof as may be necessary, are appropriated from the
9 Capital Development Fund to the Capital Development Board for
10 the Department of Central Management Services for the
11 projects hereinafter enumerated:
12 CARBONDALE STATE GARAGE
13 For upgrading the drainage system .............. $ 110,000
14 DIXON STATE GARAGE
15 For replacing lighting and roof
16 drainage ..................................... 260,000
17 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
18 (ROOSEVELT) - CHICAGO
19 For replacing the roofing system ............... 305,000
20 For upgrading the kitchen and plumbing ......... 565,000
21 JAMES R. THOMPSON CENTER - CHICAGO
22 For upgrading mechanical systems, in
23 addition to funds previously appropriated..... $ 1,400,000
24 PARIS STATE GARAGE
25 For replacing the roof and improving
26 the exterior .................................. 380,000
27 ROCKFORD REGIONAL OFFICE BUILDING
28 For upgrading the HVAC system .................. 100,000
29 SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
30 For rehabilitating the exterior and
31 upgrading the atrium ......................... 970,000
32 Total, Section 2 $4,090,000
-3- BOB-CDB02
1 Section 2.1. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 General Revenue Fund to the Capital Development Board for the
4 Department of Central Management Services for the projects
5 hereinafter enumerated:
6 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
7 (ROOSEVELT) - CHICAGO
8 For tuckpointing exterior ...................... $ 1,165,000
9 Total, Section 2.1 $1,165,000
10 Section 3. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 Capital Development Fund to the Capital Development Board for
13 the Department of Corrections for the projects hereinafter
14 enumerated:
15 STATEWIDE
16 For construction, equipment and all other
17 necessary costs for a medium security
18 facility, in addition to funds previously
19 appropriated ................................. $73,000,000
20 For planning, construction, equipment
21 and all other necessary costs for a
22 juvenile facility ............................ 53,000,000
23 For replacing doors and locks
24 at the following locations at the
25 approximate costs set forth below ............ 4,100,000
26 Dixon Correctional Center ..........1,300,000
27 Hill Correctional Center .............500,000
28 Sheridan Correctional Center .......1,300,000
29 Vienna Correctional Center .........1,000,000
30 For replacing roofing systems at
31 the following locations at the
-4- BOB-CDB02
1 approximate cost set forth below ............. 690,000
2 Illinois Youth Center -
3 St. Charles .........................100,000
4 Illinois Youth Center -
5 Warrenville ..........................330,000
6 Logan Correctional Center ............260,000
7 For upgrading showers at the following
8 locations at the approximate
9 cost set forth below ......................... 3,255,000
10 Hill Correctional
11 Center ............................1,140,000
12 Illinois River Correctional
13 Center ..............................635,000
14 Taylorville Correctional
15 Center ..............................845,000
16 Western Illinois Correctional
17 Center ..............................635,000
18 For upgrading water distribution systems at
19 the following locations at the approximate
20 cost set forth below ......................... 2,980,000
21 Dixon Correctional
22 Center ............................2,000,000
23 Joliet Correctional
24 Center ..............................980,000
25 For upgrading water towers at
26 the following locations at the approximate
27 cost set forth below ......................... 4,400,000
28 Dixon Correctional
29 Center ............................2,800,000
30 Illinois Youth Center -
31 St. Charles .......................1,300,000
32 Illinois Youth Center -
33 Valley View .........................300,000
34 CENTRALIA CORRECTIONAL CENTER
-5- BOB-CDB02
1 For upgrading electrical system ................ 1,800,000
2 For upgrading building automation system ....... 1,100,000
3 DANVILLE CORRECTIONAL CENTER
4 For upgrading the boilers ...................... 2,500,000
5 DIXON CORRECTIONAL CENTER
6 For planning the upgrade and expansion
7 of the medical care facility ................. 1,200,000
8 EAST MOLINE CORRECTIONAL CENTER
9 For replacing windows .......................... 605,000
10 GRAHAM CORRECTIONAL CENTER
11 For upgrading building automation system
12 and fire alarm system ........................ 1,100,000
13 For upgrading electrical system ................ 2,000,000
14 ILLINOIS YOUTH CENTER - HARRISBURG
15 For constructing a multi-purpose medical,
16 vocational and confinement building .......... 10,250,000
17 ILLINOIS YOUTH CENTER - JOLIET
18 For replacing rooftop units at
19 Administration Building ...................... 195,000
20 ILLINOIS YOUTH CENTER - WARRENVILLE
21 For upgrading site utilities ................... 345,000
22 JOLIET CORRECTIONAL CENTER
23 For replacing the transfer switch and
24 emergency generator .......................... 980,000
25 LINCOLN CORRECTIONAL CENTER
26 For replacing water supply lines ............... 1,145,000
27 MENARD CORRECTIONAL CENTER
28 For replacing the Administration
29 Building ..................................... 8,300,000
30 For replacing the sally port ................... 925,000
31 SHERIDAN CORRECTIONAL CENTER
32 For upgrading electrical system and
33 installing a generator ....................... 905,000
34 SOUTHWESTERN CORRECTIONAL CENTER
-6- BOB-CDB02
1 For replacing sewer lines ...................... 405,000
2 STATEVILLE CORRECTIONAL CENTER
3 For replacing windows in Cellhouse B,
4 in addition to funds previously
5 appropriated ................................. 2,500,000
6 VIENNA CORRECTIONAL CENTER
7 For upgrading the HVAC system and replacing
8 water lines in six housing units ............. 1,800,000
9 Total, Section 3 $179,480,000
10 Section 4. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 Capital Development Fund to the Capital Development Board for
13 the Historic Preservation Agency for the projects hereinafter
14 enumerated:
15 ABRAHAM LINCOLN PRESIDENTIAL LIBRARY, SPRINGFIELD
16 For constructing library and museum, in
17 addition to funds previously appropriated .... $ 50,000,000
18 BISHOP HILL HISTORIC SITE - HENRY COUNTY
19 For restoring interior and exterior ............ 1,000,000
20 LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
21 For rehabilitating the saw and grist mill, in
22 addition to funds previously appropriated..... 750,000
23 SHAWNEETOWN BANK HISTORIC SITE - GALLATIN COUNTY
24 For rehabilitating exterior .................... 1,620,000
25 Total, Section 4 $53,370,000
26 Section 4.1. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 General Revenue Fund to the Capital Development Board for
29 the Historic Preservation Agency for the projects hereinafter
30 enumerated:
31 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
32 For providing roads, parking areas, lighting
-7- BOB-CDB02
1 plaza and pedestrian bridges, in addition
2 to funds previously appropriated ............ $ 400,000
3 STATE JOURNAL-REGISTER BUILDING/
4 OLD STATE CAPITOL - SPRINGFIELD
5 For repairing elevators ........................ 480,000
6 Total, Section 4.1 $880,000
7 Section 5. The following named amounts, or so much
8 thereof as may be necessary, are appropriated from the
9 Capital Development Fund to the Capital Development Board for
10 the Illinois Medical District Commission for the projects
11 hereinafter enumerated:
12 ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
13 For upgrading core utilities ................... $ 800,000
14 For upgrading research center .................. 710,000
15 Total, Section 5 $1,510,000
16 Section 6. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 Capital Development Fund to the Capital Development Board for
19 the Department of Human Services for the projects hereinafter
20 enumerated:
21 STATEWIDE PROGRAM
22 For planning and beginning construction
23 of a facility for the treatment and
24 detention of sexually violent persons, in
25 addition to funds previously appropriated ..... 4,000,000
26 For replacing and repairing roofing
27 systems at the following locations, at
28 the approximate cost set forth below ......... $ 3,335,000
29 Alton Mental Health Center ...........150,000
30 Chicago-Read Mental Health
31 Center ..............................800,000
32 Howe Developmental Center -
-8- BOB-CDB02
1 Tinley Park .......................1,300,000
2 Shapiro Developmental Center -
3 Kankakee ............................415,000
4 Illinois School for the
5 Deaf - Jacksonville .................370,000
6 Kiley Developmental
7 Center - Waukegan ...................300,000
8 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
9 For renovating the Forensic Complex and
10 constructing two building additions, in
11 addition to funds previously appropriated .... 3,900,000
12 CHESTER MENTAL HEALTH CENTER
13 For renovating support and residential areas,
14 in addition to funds previously
15 appropriated ................................. 996,000
16 For replacing smoke/heat detectors ............. 395,000
17 FOX DEVELOPMENTAL CENTER - DWIGHT
18 For replacing interior doors and flooring
19 and repairing walls in the Main and
20 Administration Buildings ..................... 2,205,000
21 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
22 For replacing HVAC and duct work ............... 500,000
23 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
24 For renovating High School Building ............ 1,200,000
25 For tuckpointing and replacing windows,
26 sprinklers and door closures ................. 730,000
27 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
28 For renovating the Girls' Dormitory ............ 950,000
29 JACKSONVILLE DEVELOPMENTAL CENTER
30 For planning and beginning the renovation
31 of the power house ........................... 800,000
32 MABLEY DEVELOPMENTAL CENTER - DIXON
33 For renovating residential buildings ........... 1,930,000
34 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
-9- BOB-CDB02
1 For planning and beginning boiler house
2 renovation ................................... 250,000
3 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
4 For replacing water mains and valves,
5 in addition to funds previously
6 appropriated ................................. 1,900,000
7 SINGER MENTAL HEALTH CENTER - ROCKFORD
8 For renovating dietary ......................... 1,200,000
9 Total, Section 6 $24,291,000
10 Section 6.1. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 General Revenue Fund to the Capital Development Board for the
13 Department of Human Services for the projects hereinafter
14 enumerated:
15 STATEWIDE PROGRAM
16 For tuckpointing at the following locations
17 at the approximate cost set forth below ....... $ 515,000
18 Howe Developmental Center -
19 Tinley Park ..........................115,000
20 Madden Mental Health
21 Center - Hines .......................100,000
22 Tinley Park Mental
23 Health Center ........................300,000
24 ZELLER MENTAL HEALTH CENTER - PEORIA
25 For upgrading the energy management
26 system ....................................... 245,000
27 Total, Section 6.1 $760,000
28 Section 7. The following named amounts, or so much
29 thereof as may be necessary, are appropriated from the
30 Capital Development Fund to the Capital Development Board for
31 the Department of Military Affairs for the projects
32 hereinafter enumerated:
-10- BOB-CDB02
1 CHAMPAIGN ARMORY
2 For upgrading mechanical and electrical
3 systems and installing a kitchen ............. $ 1,196,000
4 ELGIN ARMORY
5 For replacing the roof and upgrading the
6 interior and exterior ........................ 603,000
7 GALVA ARMORY
8 For replacing the roof and upgrading the
9 interior and exterior ........................ 600,000
10 KEWANEE ARMORY
11 For upgrading electrical and mechanical
12 systems and installing a kitchen ............. 2,524,000
13 MACOMB ARMORY
14 For replacing the mechanical and electrical
15 systems and installing a kitchen ............. 2,521,000
16 NORTH RIVERSIDE ARMORY
17 For rehabilitating the interior and
18 exterior ..................................... 618,000
19 NORTHWEST ARMORY
20 For replacing the mechanical systems ........... 3,045,000
21 ROCK FALLS ARMORY
22 For replacing the mechanical and
23 electrical systems and upgrading
24 the interior ................................. 2,631,000
25 Total, Section 7 $13,738,000
26 Section 8. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Department of Natural Resources for the projects
30 hereinafter enumerated:
31 STATEWIDE PROGRAM
32 For constructing and renovating lodges ......... $ 5,624,000
33 For replacing and renovating concession
-11- BOB-CDB02
1 buildings .................................... 1,000,000
2 For replacing roofs at the following locations,
3 at the approximate cost set forth below ....... 525,000
4 Shabbona Lake State
5 Park .................................155,000
6 Hennepin Canal Parkway
7 State Park ...........................115,000
8 Randolph Fish &
9 Wildlife Area .........................65,000
10 Dixon Springs State
11 Park .................................190,000
12 BEAVER DAM STATE PARK - MACOUPIN COUNTY
13 For replacing the sewage system ................ 665,000
14 CASTLE ROCK STATE PARK - OGLE COUNTY
15 For rehabilitating the scenic
16 overlook and water system .................... 1,825,000
17 EAGLE CREEK STATE PARK - SHELBY COUNTY
18 For providing lake access and
19 constructing a dock .......................... 1,000,000
20 ELDON HAZLET STATE PARK - CLINTON COUNTY
21 For replacing the main waterline ............... 575,000
22 LASALLE FISH & WILDLIFE AREA - LASALLE COUNTY
23 For renovating the pond and installing
24 a well and treatment system .................. 1,720,000
25 MORAINE VIEW STATE PARK - MCLEAN COUNTY
26 For upgrading the water plant .................. 180,000
27 NATURAL HISTORY SURVEY - CHAMPAIGN
28 For renovating storage building #1 ............. 310,000
29 PERE MARQUETTE STATE PARK
30 For upgrading youth camp sewer system .......... 140,000
31 SOUTHERN ILLINOIS MINING OFFICE - BENTON
32 For rehabilitating the facility ................ 150,000
33 STARVED ROCK STATE PARK AND LODGE - LASALLE COUNTY
34 For upgrading water and sewer systems .......... 600,000
-12- BOB-CDB02
1 WILLIAM W. POWERS FISH & WILDLIFE AREA - COOK COUNTY
2 For replacing sanitary sewer lines and
3 lift station ................................. 890,000
4 Total, Section 8 $15,204,000
5 Section 8.1. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 General Revenue Fund to the Capital Development Board for the
8 Department of Natural Resources for the projects hereinafter
9 enumerated:
10 STATEWIDE PROGRAM
11 For maintaining lodge and concession
12 facilities ................................... $ 494,400
13 ILLINOIS BEACH STATE PARK - LAKE COUNTY
14 For stabilizing the shoreline .................. 400,000
15 WAYNE FITZGERRELL STATE PARK - JEFFERSON COUNTY
16 For stabilizing the watershed shoreline ........ 675,000
17 Total, Section 8.1 $1,569,400
18 Section 9. The following named amounts, or so much
19 thereof as may be necessary, are appropriated from the
20 Capital Development Fund to the Capital Development Board for
21 the Department of Revenue for the projects hereinafter
22 enumerated:
23 WILLARD ICE BUILDING - SPRINGFIELD
24 For upgrading the plumbing system .............. $ 3,000,000
25 For upgrading parking lot/parking deck
26 structural repair ............................ 1,250,000
27 For renovating the interior and
28 upgrading HVAC................................ 3,855,000
29 For upgrading fire and voice activated
30 alarm system ................................. 960,000
31 Total, Section 9 $7,815,001
-13- BOB-CDB02
1 Section 9.1. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 General Revenue Fund to the Capital Development Board for the
4 Department of Revenue for the projects hereinafter
5 enumerated:
6 WILLARD ICE BUILDING - SPRINGFIELD
7 For completing security system upgrade, in
8 addition to funds previously appropriated .... $ 200,000
9 Total, Section 9.1 $200,000
10 Section 10. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 Capital Development Fund to the Capital Development Board for
13 the Department of State Police for the projects hereinafter
14 enumerated:
15 STATEWIDE PROGRAM
16 For upgrading firing ranges, range
17 buildings and equipment ...................... $ 2,000,000
18 CAPITOL COMPLEX - SPRINGFIELD
19 For constructing a central administrative
20 office building and purchasing equipment, in
21 addition to funds previously appropriated .... 47,000,000
22 Total, Section 10 $49,000,000
23 Section 11. The following named amounts, or so much
24 thereof as may be necessary, are appropriated from the
25 Capital Development Fund to the Capital Development Board for
26 the Department of Veterans' Affairs for the projects
27 hereinafter enumerated:
28 QUINCY VETERANS HOME - ADAMS COUNTY
29 For replacing roofing systems .................. 185,000
30 Total, Section 11 $185,000
31 Section 11.1. The following named amounts, or so much
-14- BOB-CDB02
1 thereof as may be necessary, are appropriated from the
2 General Revenue Fund to the Capital Development Board for the
3 Department of Veterans' Affairs for the projects hereinafter
4 enumerated:
5 LASALLE VETERANS' HOME - LASALLE COUNTY
6 For installing wall protection ................. $ 120,000
7 For upgrading tempered water systems ........... 50,000
8 For replacing lighting ......................... 90,000
9 MANTENO VETERANS' HOME - KANKAKEE COUNTY
10 For installing humidifiers and
11 dehumidifiers ................................ 1,515,000
12 QUINCY VETERANS' HOME - ADAMS COUNTY
13 For renovating power plant equipment ........... 715,000
14 Total, Section 11.1 $2,490,000
15 Section 12. The following named amounts, or so much
16 thereof as may be necessary, are appropriated from the
17 Capital Development Fund to the Capital Development Board for
18 the Courts of Illinois for the projects hereinafter
19 enumerated:
20 APPELLATE COURT SECOND DISTRICT - ELGIN
21 For miscellaneous improvements ................. $ 547,000
22 Total, Section 12 $547,000
23 Section 12.1. The following named amounts, or so much
24 thereof as may be necessary, are appropriated from the
25 General Revenue Fund to the Capital Development Board for the
26 Courts of Illinois for the projects hereinafter enumerated:
27 APPELLATE COURT THIRD DISTRICT - OTTAWA
28 For tuckpointing, repairing the exterior
29 and replacing the roof, in addition to
30 funds previously appropriated ................ $ 191,600
31 Total, Section 12.1 $191,600
-15- BOB-CDB02
1 Section 13. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 Capital Development Fund to the Capital Development Board for
4 the Office of the Secretary of State for the projects
5 hereinafter enumerated:
6 STATEWIDE
7 For replacing windows at the following
8 locations at the approximate cost set
9 forth below ................................... $ 1,750,000
10 Lexington Avenue Motor
11 Vehicle Facility .....................583,000
12 Martin Luther King, Jr. Dr.
13 Motor Vehicle Facility ...............583,000
14 North Elston Motor
15 Vehicle Facility .....................584,000
16 CAPITOL BUILDING - SPRINGFIELD
17 For upgrading the HVAC and mechanical
18 systems ...................................... 6,950,000
19 CAPITOL COMPLEX - SPRINGFIELD
20 For completing the stone restoration, in
21 addition to funds previously appropriated .... 3,000,000
22 STATE POWER PLANT - SPRINGFIELD
23 For installing new water service and
24 repairing power plant systems ................ 80,000
25 WILLIAM G. STRATTON BUILDING - SPRINGFIELD
26 For upgrading the electrical system, in
27 addition to funds previously appropriated .... 4,220,000
28 Total, Section 13 $16,000,000
29 Section 14. The following named amounts, or so much
30 thereof as may be necessary, are appropriated from the
31 Capital Development Fund to the Capital Development Board for
32 the projects hereinafter enumerated:
33 STATEWIDE
-16- BOB-CDB02
1 For abating hazardous materials ................ $ 2,050,000
2 For retrofitting or upgrading mechanized
3 refrigeration equipment (CFCs) ............... 1,650,000
4 For surveys and modifications to buildings
5 to meet requirements of the federal
6 Americans with Disabilitites Act (ADA) ....... 4,000,000
7 EXECUTIVE MANSION - SPRINGFIELD
8 For building improvements ...................... 600,000
9 Total, Section 14 $8,300,000
10 Section 14.1. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 General Revenue Fund to the Capital Development Board for the
13 projects hereinafter enumerated:
14 STATEWIDE
15 Survey for and abate hazardous
16 materials .................................... $ 2,000,000
17 For demolition of buildings .................... 1,000,000
18 For repairing minor problems and
19 emergencies .................................. 1,000,000
20 Total, Section 14.1 $4,000,000
21 Section 15. The following named amounts, or so much
22 thereof as may be necessary, are appropriated from the
23 Capital Development Fund to the Capital Development Board for
24 the Illinois Community College Board for the projects
25 hereinafter enumerated:
26 STATEWIDE
27 For miscellaneous capital improvements
28 including construction, capital facilities,
29 cost of planning, supplies, equipment,
30 materials, services and all other expenses
31 required to complete the work at the
32 various community colleges. This appropriated
-17- BOB-CDB02
1 amount shall be in addition to any other
2 appropriated amounts which can be
3 expended for these purposes ...................$ 6,071,700
4 Section 16. The following named amounts, or so much
5 thereof as may be necessary, are appropriated from the
6 Capital Development Fund to the Capital Development Board for
7 the Illinois Board of Higher Education for the projects
8 hereinafter enumerated:
9 STATEWIDE
10 For miscellaneous capital improvements
11 including construction, capital
12 facilities, cost of planning, supplies,
13 equipment, materials, services and
14 all other expenses required to complete
15 the work at the various universities
16 This appropriated amount shall be in
17 addition to any other appropriated amounts
18 which can be expended for these purposes...... $ 13,928,300
19 Chicago State University .............322,700
20 Eastern Illinois University ..........515,500
21 Governors State University ...........189,700
22 Illinois State University ..........1,021,300
23 Northeastern Illinois
24 University ..........................383,700
25 Northern Illinois University .......1,159,000
26 Western Illinois University ..........792,200
27 Southern Illinois University -
28 Carbondale ........................1,624,700
29 Southern Illinois University -
30 Edwardsville ........................763,100
31 University of Illinois -
32 Chicago ...........................2,777,300
33 University of Illinois -
-18- BOB-CDB02
1 Springfield .........................229,100
2 University of Illinois -
3 Urbana/Champaign ..................4,150,000
4 CHICAGO STATE UNIVERSITY
5 For constructing a new library facility,
6 site improvements, utilities, and
7 purchasing equipment, in addition
8 to funds previously appropriated ............. 16,000,000
9 EASTERN ILLINOIS UNIVERSITY
10 For renovating and expanding the
11 Fine Arts Center, in addition to
12 funds previously appropriated ................ 40,003,000
13 NORTHEASTERN ILLINOIS UNIVERSITY
14 For renovating Building "C" and
15 remodeling and expanding Building "E"
16 and Building "F" ............................. 9,064,300
17 UNIVERSITY OF ILLINOIS - SPRINGFIELD
18 For constructing a classroom and office
19 building, in addition to funds
20 previously appropriated ...................... 30,000,000
21 Total, Section 19 $108,995,600
22 Section 17. The following named amounts, or so much
23 thereof as may be necessary, are appropriated from the
24 Capital Development Fund to the Capital Development Board for
25 the projects hereinafter enumerated:
26 SOUTHERN ILLINOIS UNIVERSITY
27 For planning, construction and equipment
28 for a cancer center .......................... $ 14,500,000
29 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
30 For planning, construction and equipment
31 for an advanced technical worker
32 training facility ............................ 1,100,000
33 UNIVERSITY OF ILLINOIS - CHICAGO
-19- BOB-CDB02
1 For planning, construction and equipment
2 for a chemical sciences building ............. 6,400,000
3 For planning, construction and equipment
4 for a medical imaging research
5 clinical facility ............................ 9,875,000
6 UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
7 For planning, construction and equipment
8 for a biotechnology genomic facility ......... 41,250,000
9 For planning, construction and equipment
10 for a supercomputing application facility .... 30,000,000
11 For planning, construction and equipment
12 for a technology transfer incubator
13 facility ..................................... 3,000,000
14 Total, Section 17 $106,125,000
15 Section 18. The amount of $10,000,000, or so much
16 thereof as may be necessary, is appropriated from the Tobacco
17 Settlement Recovery Fund to the Capital Development Board for
18 a grant to Northwestern University for planning, construction
19 and equipment for a biomedical research facility.
20 Section 19. The amount of $32,000,000, or so much
21 thereof as may be necessary, is appropriated from the Capital
22 Development Fund to the Board of Trustees of the University
23 of Illinois for planning, construction and equipment for a
24 computer science in engineering facility.
25 Section 20. The amount of $10,000,000, or so much
26 thereof as may be necessary, is appropriated from the Tobacco
27 Settlement Recovery Fund to the Capital Development Board for
28 a grant to the University of Chicago for planning,
29 construction and equipment for an advanced research building.
30 Section 21. The amount of $1,000,000, or so much thereof
-20- BOB-CDB02
1 as may be necessary, is appropriated from the Tobacco
2 Settlement Recovery Fund to the Capital Development Board for
3 a grant to IIT for planning, construction and equipment for a
4 biomedical research center.
5 Section 22. The amount of $4,000,000, or so much thereof
6 as may be necessary, is appropriated from the Tobacco
7 Settlement Recovery Fund to the Capital Development Board for
8 a grant to Argonne for planning, construction and equipment
9 for a nanotechnology research institute.
10 Section 23. The amount of $2,000,000, or so much thereof
11 as may be necessary, is appropriated from the Tobacco
12 Settlement Recovery Fund to the Capital Development Board for
13 a grant to Northwestern University for planning, construction
14 and equipment for a nanofabrication and molecular center.
15 Section 24. The amount of $5,000,000, or so much thereof
16 as may be necessary, is appropriated from the Tobacco
17 Settlement Recovery Fund to the Capital Development Board for
18 a grant to Rush Presbyterian St. Luke's Medical Center for
19 planning, construction and equipment for the Cohn Bio-Medical
20 Research Building.
21 Section 25. The amount of $3,500,000, or so much thereof
22 as may be necessary, is appropriated from the Tobacco
23 Settlement Recovery Fund to the Capital Development Board for
24 planning, construction, equipment and grants for the
25 VentureTECH program.
26 STATE BOARD OF EDUCATION
27 Section 26. The sum of $500,000,000, or so much thereof
28 as may be necessary, is appropriated from the School
29 Construction Fund to the Capital Development Board for school
-21- BOB-CDB02
1 construction grants pursuant to the School Construction Law,
2 in addition to amounts previously appropriated for such
3 purposes.
4 Section 95. No contract shall be entered into or
5 obligation incurred for any expenditures from appropriations
6 made in this Article until after the purposes and amounts
7 have been approved by the Governor.
8 ARTICLE 2
9 Section 1. The following named amounts, or so much
10 thereof as may be necessary and remain unexpended at the
11 close of business on June 30, 2001, from appropriations and
12 reappropriations heretofore made for such purposes in Article
13 1, Section 1, and Article 2, Section 1 of Public Act 91-708,
14 are reappropriated from the Capital Development Fund to the
15 Capital Development Board for the Department of Agriculture
16 for the projects hereinafter enumerated:
17 ANIMAL DISEASE LABORATORY - CENTRALIA
18 (From Article 2, Section 1 of Public Act 91-708)
19 For upgrading the diagnostic laboratory
20 facility, in addition to funds previously
21 appropriated ................................. $ 42,905
22 DUQUOIN STATE FAIRGROUNDS
23 (From Article 1, Section 1 of Public Act 91-708)
24 For upgrading electrical utilities ............. 146,000
25 For constructing a multi-purpose
26 building ..................................... 8,000,000
27 (From Article 2, Section 1 of Public Act 91-708)
28 For renovating roundhouses ..................... 128,396
29 For constructing livestock
30 facilities ................................... 159,918
-22- BOB-CDB02
1 For upgrading the racetrack, including the
2 racetrack walls .............................. 879,177
3 GALESBURG DIAGNOSTIC LABORATORY
4 For purchasing the facility .................... 3,200,000
5 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
6 (From Article 1, Section 1 of Public Act 91-708)
7 For renovating or replacing racehorse
8 barns - Phase IV ............................. 1,648,200
9 For renovating the Emmerson Building ........... 2,086,150
10 For renovating or replacing #26 Barn ........... 789,673
11 For completing the HVAC system in the
12 Administration Building, in addition to
13 funds previously appropriated ................ 340,000
14 For renovating the Junior Home Economics
15 Building ..................................... 1,131,000
16 (From Article 2, Section 1 of Public Act 91-708)
17 For completing the HVAC replacement
18 in the Administration Building, in
19 addition to funds previously appropriated .... 405,358
20 For replacing and repairing roofs,
21 Phase II ..................................... 196,583
22 For extending the fiber optics system .......... 221,153
23 For installing HVAC system and
24 restrooms in the Orr Building ................ 294,828
25 For designing and constructing a complex to
26 accommodate various outdoor events,
27 including site development, utilities,
28 permanent grandstands and portable
29 bleachers, support facilities, vehicle
30 and pedestrian access and related
31 work ......................................... 537,570
32 For replacing and renovating
33 racehorse barns (Phase II) ................... 134,561
34 For replacing and rehabilitating roofs ......... 25,578
-23- BOB-CDB02
1 For replacing Series 14 Barns (Phase I) ........ 10,653
2 For replacing the HVAC system in the
3 Administration Building ...................... 73,895
4 For renovation or replacement of
5 comfort stations, in addition
6 to funds previously appropriated ............. 122,767
7 For renovation of the comfort stations-
8 Phase I ...................................... 37,212
9 For planning and beginning the renovation
10 of the show horse barns ...................... 42,284
11 Total, Section 1 $20,653,861
12 Section 2. The following named amounts, or so much
13 thereof as may be necessary and remain unexpended at the
14 close of business on June 30, 2001, from appropriations and
15 reappropriations heretofore made for such purposes in Article
16 1, Section 13 and Article 2, Section 2 of Public Act 91-708,
17 as amended, are reappropriated from the Capital Development
18 Fund to the Capital Development Board for the Courts of
19 Illinois for the projects hereinafter enumerated:
20 MT. VERNON APPELLATE COURT BUILDING
21 (From Article 2, Section 2 of Public Act 91-708, as amended)
22 For expanding the courthouse ................... 1,531,730
23 For expanding the courthouse, in
24 addition to funds previously
25 appropriated ................................. 792,000
26 SPRINGFIELD - SUPREME COURT BUILDING
27 (From Article 1, Section 13 of Public Act 91-708)
28 For replacing the roof ......................... 812,600
29 For renovating the HVAC system on
30 the 3rd Floor ................................ 140,000
31 (From Article 2, Section 2 of Public Act 91-708)
32 For installing humidifier and water
-24- BOB-CDB02
1 filtration systems ........................... 1,570,950
2 For upgrading the library, in
3 addition to funds previously appropriated .... 323,721
4 For replacing plumbing system .................. 363,712
5 For planning and beginning the
6 library upgrade .............................. 38,996
7 THIRD DISTRICT APPELLATE COURT - OTTAWA
8 For replacing the Annex roof ................... 44,180
9 Total, Section 2 $5,617,889
10 Section 2.1. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 2001, from reappropriations
13 heretofore made for such purposes in Article 2, Section 2.1
14 of Public Act 91-708, are reappropriated from the General
15 Revenue Fund to the Capital Development Board for the
16 projects hereinafter enumerated:
17 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
18 (From Article 2, Section 2.1 of Public Act 91-708)
19 For upgrading mechanical systems
20 and building exterior ........................ $ 9,944
21 THIRD DISTRICT APPELLATE COURT - OTTAWA
22 For tuckpointing and repairing exterior ........ 98,888
23 FIFTH DISTRICT APPELLATE COURT - MT. VERNON
24 For repairing plaster and painting ............. 81,606
25 SUPREME COURT BUILDING - SPRINGFIELD
26 For tuckpointing and cleaning exterior ......... 35,490
27 Total, Section 2.1 $225,928
28 Section 3. The following named amounts, or so much
29 thereof as may be necessary and remain unexpended at the
30 close of business on June 30, 2001, from appropriations and
31 reappropriations heretofore made in Article 1, Section 14 and
-25- BOB-CDB02
1 Article 2, Section 3 of Public Act 91-708, approved May 17,
2 2000, are reappropriated from the Capital Development Fund to
3 the Capital Development Board for the Office of the Secretary
4 of State for the projects hereinafter enumerated:
5 WILLIAM G. STRATTON BUILDING - SPRINGFIELD
6 (From Article 1, Section 14 of Public Act 91-708)
7 For replacing windows and tuckpointing ......... $ 5,925,000
8 CAPITOL COMPLEX - SPRINGFIELD
9 (From Article 2, Section 3 of Public Act 91-708)
10 For upgrading electrical lighting and replacing
11 ceilings - Stratton Office Building .......... 5,416,239
12 For replacing mechanical piping - Klein
13 and Mason Warehouse........................... 278,100
14 For renovating the exterior of the Capitol
15 and Howlett Buildings ........................ 1,337,174
16 For demolition of 222 S. College,
17 and landscaping of Capitol Complex
18 in addition to funds previously
19 appropriated ................................. 1,200,000
20 For demolition of 222 South College
21 Building and landscaping of
22 Capitol Complex .............................. 2,387,894
23 Total, Section 3 $16,544,407
24 Section 3.1. The sum of $825,000, or so much thereof as
25 may be necessary and remains unexpended on June 30, 2001,
26 from a reappropriation heretofore made for such purposes in
27 Article 2, Section 17 of Public Act 91-708, is reappropriated
28 from the Capital Development Fund to the Capital Development
29 Board for the Secretary of State for a grant to the Edgebrook
30 Library for all costs associated with the miscellaneous costs
31 incurred for construction or other purposes.
32 Section 3.2. The sum of $8,300,000, or so much thereof
-26- BOB-CDB02
1 as may be necessary, and remains unexpended at the close of
2 business on June 30, 2001, from an appropriation heretofore
3 made in Article 1, Section 14.1 of Public Act 91-708, as
4 amended, is reappropriated from the Capital Development Fund
5 to the Capital Development Board for the Office of the
6 Secretary of State to construct a parking garage.
7 Section 4. The following named amounts, or so much
8 thereof as may be necessary and remain unexpended at the
9 close of business on June 30, 2001, from appropriations and
10 reappropriations heretofore made for such purposes in Article
11 1, Section 2 and Article 2, Section 4 of Public Act 91-708,
12 are reappropriated from the Capital Development Fund to the
13 Capital Development Board for the Department of Central
14 Management Services for the projects hereinafter enumerated:
15 JAMES R. THOMPSON CENTER - CHICAGO
16 (From Article 1, Section 2 of Public Act 91-708)
17 For upgrading mechanical systems ............... $ 1,466,396
18 MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
19 For replacing roof and upgrading
20 mechanical and electrical systems ............ 1,249,680
21 PEORIA REGIONAL OFFICE BUILDING - PEORIA COUNTY
22 For rehabilitating the HVAC system ............. 135,000
23 ROCKFORD REGIONAL OFFICE BUILDING
24 For upgrading utilities ........................ 80,000
25 SPRINGFIELD STATE GARAGE
26 For renovating the interior of the
27 central garage ............................... 653,360
28 RESEARCH AND COLLECTION CENTER - SPRINGFIELD
29 For expanding surplus warehouse ................ 3,184,803
30 ELGIN REGIONAL OFFICE BUILDING
31 (From Article 2, Section 4 of Public Act 91-708)
32 For replacing the utility system ............... 854,356
-27- BOB-CDB02
1 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
2 ROOSEVELT ROAD - CHICAGO
3 (From Article 1, Section 2 of Public Act 91-708)
4 For upgrading electrical systems ............... 940,000
5 (From Article 2, Section 4 of Public Act 91-708)
6 For converting and renovating tub rooms ........ 409,500
7 For upgrading the HVAC system .................. 367,798
8 ILLINOIS CENTER FOR REHABILITATION AND
9 EDUCATION (WOOD) - CHICAGO
10 (From Article 1, Section 2 of Public Act 91-708)
11 For upgrading fire and safety systems .......... 335,000
12 STATE OF ILLINOIS BUILDING - CHICAGO
13 (From Article 1, Section 2 of Public Act 91-708)
14 For restoring exterior and rebuilding
15 foundation ................................... 1,580,000
16 CHICAGO - STATE OF ILLINOIS CENTER
17 (From Article 2, Section 4 of Public Act 91-708)
18 For replacing roofing system and
19 insulation, in addition to funds
20 previously appropriated ...................... 17,779
21 For the correction of design/construction
22 deficiencies, including remedial work in
23 the heating, refrigeration, temperature
24 control and ventilation systems at the
25 State of Illinois Center at Chicago .......... 26,478
26 OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
27 For planning and beginning the renovation
28 of the facility .............................. 2,166,020
29 SUBURBAN NORTH REGIONAL OFFICE BUILDING -
30 DES PLAINES
31 For renovating offices for Environmental
32 Protection Agency, in addition to funds
33 previously appropriated ...................... 750,895
34 For renovation of Suburban North Regional
-28- BOB-CDB02
1 Office Building (formerly Maine Township
2 North High School building), in addition
3 to funds previously appropriated for such
4 purpose, Phase III ........................... 328,299
5 OTTAWA STATE GARAGE
6 For replacing state garage ..................... 1,334,504
7 SPRINGFIELD - CAPITOL COMPLEX
8 For construction of a day care center, in
9 addition to funds previously appropriated
10 for such purpose ............................. 950,000
11 For construction of a day care center in the
12 Capitol Complex in Springfield ............... 244,348
13 COMPUTER FACILITY - SPRINGFIELD
14 For installing a cooling tower and fire alarm
15 system and various other improvements ........ 550,354
16 For replacement of the halon fire
17 suppression system ........................... 130,990
18 ASH STREET COMPLEX -
19 MUSEUM AND COLLECTION CENTER -
20 SPRINGFIELD
21 For replacement of the roofing system .......... 438,346
22 MARION REGIONAL OFFICE BUILDING
23 For replacing HVAC system and interior
24 lighting ..................................... 582,369
25 For construction of a Regional Office
26 Building Addition ............................ 282,513
27 SPRINGFIELD REGIONAL OFFICE BUILDING
28 For replacing the potable water system ......... 747,059
29 For upgrading the parking lot .................. 160,864
30 Total, Section 4 $19,966,711
31 Section 4.1. The following named amounts, or so much
32 thereof as may be necessary and remain unexpended at the
33 close of business on June 30, 2001, from reappropriations
-29- BOB-CDB02
1 heretofore made for such purposes in Article 2, Section 4.1
2 of Public Act 91-708, are reappropriated from the General
3 Revenue Fund to the Capital Development Board for the
4 Department of Central Management Services for the projects
5 hereinafter enumerated:
6 JAMES R. THOMPSON CENTER - CHICAGO
7 (From Article 2, Section 4.1 of Public Act 91-708)
8 For restoring the exterior plaza ............... 78,933
9 CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
10 For rehabilitating exterior .................... 214,884
11 CHICAGO MEDICAL CENTER
12 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
13 For rehabilitating the pool area ............... 143,950
14 STATE OF ILLINOIS BUILDING - CHICAGO
15 For restoring exterior limestone and
16 masonry ...................................... 505,991
17 PARIS STATE GARAGE
18 For replacing overhead lighting and
19 pneumatic system ............................. 192,532
20 Total, Section 4.1 $1,136,290
21 Section 5. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 2001, from appropriations and
24 reappropriations heretofore made for such purposes in Article
25 1, Section 7, and Article 2, Section 5 of Public Act 91-708,
26 are reappropriated from the Capital Development Fund to the
27 Capital Development Board for the Department of Natural
28 Resources for the projects hereinafter enumerated:
29 BABE WOODYARD STATE NATURAL AREA -
30 VERMILION COUNTY
31 (From Article 2, Section 5 of Public Act 91-708)
-30- BOB-CDB02
1 For developing the site and associated
2 land acquisition ............................. $ 2,828,451
3 BEALL WOODS STATE CONSERVATION AREA -
4 WABASH COUNTY
5 For replacing a visitors center ................ 228,012
6 BEAVER DAM STATE PARK - MACOUPIN COUNTY
7 For rehabilitating dams, spillway, and
8 boat access facilities ....................... 402,632
9 CARLYLE LAKE STATE PARKS
10 For cabin construction and site
11 improvements at Eldon
12 Hazlet State Park, Phase II .................. 1,463,185
13 For road and site improvements at
14 Carlyle Lake ................................. 1,500,000
15 For infrastructure and site
16 improvements at Carlyle Lake ................. 2,776,997
17 CASTLE ROCK STATE PARK - OGLE COUNTY
18 (From Article 1, Section 7 of Public Act 91-708)
19 For replacing maintenance building ............. 413,803
20 CAVE-IN-ROCK STATE PARK - HARDIN COUNTY
21 (From Article 2, Section 5 of Public Act 91-708)
22 For constructing a shower building
23 and upgrading the campground ................. 51,259
24 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
25 For upgrading sewage treatment system .......... 1,049,219
26 For construction of a concession building
27 and upgrading the horse concession, in
28 addition to funds previously appropriated .... 25,954
29 For planning and beginning the replacement
30 of concession buildings ...................... 10,180
31 EAGLE CREEK STATE PARK - SHELBY COUNTY
32 For rehabilitation of the sewage treatment
33 system, in addition to funds previously
34 appropriated ................................. 175,281
-31- BOB-CDB02
1 FORT MASSAC STATE PARK - MASSAC COUNTY
2 (From Article 1, Section 7 of Public Act 91-708)
3 For reconstructing the fort .................... 4,300,000
4 (From Article 2, Section 5 of Public Act 91-708)
5 For planning and beginning the
6 reconstruction of the fort ................... 35,314
7 GEOLOGICAL SURVEY-CHAMPAIGN
8 (From Article 1, Section 7 of Public Act 91-708)
9 For constructing two pole
10 storage buildings ............................ 312,500
11 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
12 For rehabilitating aqueducts
13 #3, #4 and #8 ................................ 750,000
14 (From Article 2, Section 5 of Public Act 91-708)
15 For stabilizing the feeder canal bank .......... 44,484
16 For replacement and rehabilitation
17 of arch culverts and canal ................... 261,190
18 HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
19 For dam rehabilitation and the State's share
20 to implement the ecological restoration
21 plan in cooperation with the U.S.
22 Army Corps of Engineers, and
23 land acquisition ............................. 858,655
24 For construction of a pole building
25 and hunter check station ..................... 41,284
26 ILLINOIS-MICHIGAN CANAL STATE TRAIL
27 For stabilization of the aqueduct .............. 173,139
28 ILLINOIS BEACH STATE PARK - LAKE COUNTY
29 (From Article 1, Section 7 of Public Act 91-708)
30 For replacing sanitary sewer line .............. 545,300
31 (From Article 2, Section 5 of Public Act 91-708)
32 For rehabilitating lodge entrance .............. 73,463
33 For constructing an office building ............ 45,626
34 For replacing sanitary sewer lines ............. 474,347
-32- BOB-CDB02
1 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
2 For upgrading campground electrical ............ 209,574
3 For rehabilitation of the concession
4 building, in addition to funds
5 previously appropriated ...................... 85,499
6 For rehabilitation of the concession building .. 40,558
7 KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
8 For constructing sanitary sewer system, in
9 addition to funds previously appropriated .... 5,000,000
10 KANKAKEE STATE PARK - KANKAKEE COUNTY
11 For planning and constructing a
12 sanitary sewer system ........................ 80,854
13 KASKASKIA RIVER FISH & WILDLIFE AREA
14 (From Article 1, Section 7 of Public Act 91-708)
15 For providing electrical service ............... 106,000
16 KICKAPOO STATE PARK - VERMILION COUNTY
17 For rehabilitating the water
18 system and day-use areas ..................... 1,041,000
19 LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
20 (From Article 2, Section 5 of Public Act 91-708)
21 For replacing sewage treatment plant ........... 539,270
22 LAKE MURPHYSBORO STATE PARK - JACKSON COUNTY
23 (From Article 1, Section 7 of Public Act 91-708)
24 For replacing the district office
25 building ..................................... 485,299
26 LINCOLN TRAIL STATE RECREATION AREA - CLARK COUNTY
27 For renovating the concession
28 building ..................................... 815,000
29 For upgrading campground electrical
30 and drainage ................................. 460,000
31 (From Article 2, Section 5 of Public Act 91-708)
32 For rehabilitating the day use area
33 and site ..................................... 1,183,776
34 LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
-33- BOB-CDB02
1 (From Article 1, Section 7 of Public Act 91-708)
2 For improving drainage discharge ............... 250,000
3 MASON STATE FOREST TREE NURSERY
4 For expanding the cold storage facility ........ 638,000
5 For expanding the seed cleaning facility ....... 662,000
6 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
7 (From Article 2, Section 5 of Public Act 91-708)
8 For rehabilitating levee and well, in
9 addition to funds previously appropriated .... 2,404,021
10 MORAINE HILLS STATE PARK - MCHENRY COUNTY
11 For renovation of the trail .................... 89,337
12 For replacement of restrooms and upgrading
13 the water system ............................. 139,731
14 MORRISON-ROCKWOOD STATE PARK
15 (From Article 1, Section 7 of Public Act 91-708)
16 For improving the water system and
17 rehabilitating the campground water .......... 418,000
18 NATURAL HISTORY SURVEY - HAVANA
19 For renovating Forbes Biological Station ....... 683,000
20 NORTH POINT MARINA - LAKE COUNTY
21 (From Article 2, Section 5 of Public Act 91-708)
22 For construction of a breakwater structure ..... 1,012,492
23 For modifying the marina's docking system ...... 1,471,710
24 NAUVOO STATE PARK - HANCOCK COUNTY
25 For replacing water distribution
26 system ....................................... 128,990
27 PERE MARQUETTE STATE PARK - JERSEY COUNTY
28 For replacing the lodge HVAC condensing unit, in
29 addition to funds previously appropriated .... 158,475
30 PRAIRIE RIDGE SANCTUARY NATURAL AREA
31 (From Article 1, Section 7 of Public Act 91-708)
32 For replacing the Service & Hazardous
33 Materials buildings and installing a fuel
34 tank ......................................... 366,000
-34- BOB-CDB02
1 RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
2 (From Article 1, Section 7 of Public Act 91-708)
3 For renovating the interior .................... 991,000
4 ROCK CUT STATE PARK - WINNEBAGO COUNTY
5 For upgrading the sewage system ................ 2,365,300
6 NEW OFFICE BUILDING - SPRINGFIELD
7 For completing construction of an
8 office building, in addition to funds
9 previously appropriated ...................... 2,000,000
10 SANGANOIS CONSERVATION AREA -
11 CASS, MASON AND SCHUYLER COUNTIES
12 (From Article 2, Section 5 of Public Act 91-708)
13 For rehabilitating the levee system ............ 197,895
14 SANGCHRIS STATE PARK - SANGAMON COUNTY
15 For upgrading campground electrical
16 system ....................................... 180,111
17 SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
18 For planning and beginning renovation
19 of hatchery .................................. 442,608
20 SPRINGFIELD
21 For constructing an office building and
22 interpretive center .......................... 12,332,481
23 STARVED ROCK STATE PARK - LASALLE COUNTY
24 For construction of a visitors center, in
25 addition to funds previously appropriated .... 3,978,987
26 For rehabilitating the sewer system ............ 1,038,833
27 For rehabilitating trails, in addition
28 to funds previously appropriated ............. 500,000
29 For upgrading the HVAC system .................. 93,704
30 For construction of a Visitors'
31 Center, in addition to funds
32 previously appropriated ...................... 365,000
33 For rehabilitation of trails, in addition
34 to funds previously appropriated ............. 175,769
-35- BOB-CDB02
1 For rehabilitation of the sewer
2 system - Phase I ............................. 79,636
3 TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES
4 For planning and beginning
5 construction of a park ....................... 48,602
6 WASTE MANAGEMENT & RESEARCH CENTER
7 (From Article 1, Section 7 of Public Act 91-708)
8 For constructing a garage and
9 storage area ................................. 394,000
10 WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY
11 (From Article 2, Section 5 of Public Act 91-708)
12 For rehabilitation of the sewage
13 treatment plant .............................. 149,908
14 WHITE PINES FOREST STATE PARK - OGLE COUNTY
15 For planning and beginning lodge and cabin
16 restoration .................................. 150,000
17 WILDLIFE PRAIRIE PARK
18 (From Article 1, Section 7 of Public Act 91-708)
19 For planning and beginning the upgrade
20 of the park .................................. 1,000,000
21 TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
22 (From Article 2, Section 5 of Public Act 91-708)
23 For constructing a visitor center and
24 purchasing land .............................. 3,119,323
25 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
26 (FORMERLY BURNHAM HOSPITAL)
27 For construction of a Natural History
28 Research Center for the space needs of
29 the Illinois Natural History Survey on
30 the campus of the University of Illinois...... 6,000,000
31 For planning and construction of the
32 Natural History Research Center
33 for the space needs of the
34 Illinois Natural History Survey
-36- BOB-CDB02
1 on the campus of the University
2 of Illinois in Champaign ..................... 2,103,800
3 STATE WATER SURVEY - CHAMPAIGN
4 (From Article 1, Section 7 of Public Act 91-708)
5 For constructing a vehicle maintenance
6 and shop building ............................ 3,568,000
7 (From Article 2, Section 5 of Public Act 91-708)
8 For upgrading and replacing the mechanical
9 system, in addition to funds
10 previously appropriated ...................... 2,090,148
11 For planning and replacement of vehicle
12 storage/shop facilities ...................... 21,150
13 DICKSON MOUNDS - LEWISTOWN
14 For renovating Canton Liverpool
15 Toll Booth ................................... 28,902
16 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
17 For the completion of site improvements ........ 190,582
18 STATE MUSEUM - SPRINGFIELD
19 For renovating or replacing exhibits, in
20 addition to funds previously appropriated .... 5,500,000
21 For planning and beginning replacement
22 of the state museum .......................... 469,146
23 For planning and replacement of the main
24 museum exhibits, in addition to funds
25 previously appropriated ...................... 351,000
26 For planning renovation of main museum
27 exhibits and for renovation of basement
28 galleries .................................... 24,350
29 STATEWIDE
30 (From Article 1, Section 7 of Public Act 91-708)
31 For fabrication of visitors centers
32 exhibit ...................................... 700,000
33 For replacing and constructing vault
34 toilets at the following locations,
-37- BOB-CDB02
1 at the approximate cost set forth
2 below ........................................ 1,805,000
3 Wayne Fitzgerrell State Park .........414,000
4 Goose Lake Prairie State Park .........71,000
5 Wolf Creek State Park ................805,000
6 Hennepin Canal Parkway
7 State Trail ..........................435,000
8 Kaskaskia River Fish &
9 Wildlife Area .........................80,000
10 For providing dump stations.................. 200,000
11 For rehabilitating bridges at the
12 following locations, at the approximate
13 cost set forth below ......................... 1,056,060
14 Rock Island Trail ....................661,060
15 Frank Holten State Park ..............300,000
16 Horseshoe Lake State Park .............70,000
17 Castle Rock State Park ................25,000
18 For rehabilitating dams at the
19 following locations, at the
20 approximate cost set forth below ............. 1,421,887
21 Ramsey Lake State Park ...............521,887
22 Rock Cut State Park ..................450,000
23 Snakeden Hollow State Park ...........450,000
24 For replacing roofs at the following
25 locations, at the approximate
26 cost set forth below ......................... 1,384,000
27 Southern IL Arts &
28 Crafts Center .......................290,000
29 Frank Holten State Park ...............28,000
30 DNR Geological Survey-
31 Champaign ...........................124,000
32 Sangchris Lake State
33 Park .................................50,000
34 Illini State Park ....................125,000
-38- BOB-CDB02
1 Shelbyville Fish &
2 Wildlife Area .......................100,000
3 Trail of Tears State
4 Forest ..............................219,000
5 Sanganois Conservation Area ...........48,000
6 Rice Lake State Park .................125,000
7 Hidden Spring State Park ..............67,000
8 Siloam Springs State Park .............48,000
9 Mississippi Palisades
10 State Park ..........................160,000
11 (From Article 2, Section 5 of Public Act 91-708)
12 For replacing roofing systems at the
13 following locations, at the approximate
14 cost set forth below ......................... 1,684,260
15 Beall Woods Conservation Area -
16 Wabash County .......................30,000
17 Eagle Creek State Park -
18 Shelby County ..........................100
19 Eldon Hazlet State Park -
20 Clinton County ......................61,296
21 Fox Ridge State Park -
22 Coles County ........................34,000
23 Giant City State Park -
24 Jackson/Union Counties ..............89,969
25 Goose Lake Prairie State Park -
26 Grundy County ......................109,519
27 Hennepin Canal Parkway State Trail ...97,485
28 Illinois Beach State Park -
29 Lake County ........................478,008
30 Illinois Caverns Natural Area -
31 Monroe County .......................74,000
32 Kankakee River State Park -
33 Kankakee/Will Counties ..............74,000
34 Kickapoo State Park -
-39- BOB-CDB02
1 Vermilion County ....................36,320
2 Middle Fork State Fish & Wildlife
3 Area - Vermilion County .............12,900
4 Moraine Hills State Park -
5 McHenry County ......................52,456
6 Moraine View State Park -
7 McLean County.......................148,415
8 Ramsey Lake State Park -
9 Fayette County ......................63,203
10 Randolph County Conservation Area ....53,236
11 Red Hills State Park -
12 Lawrence County ........................100
13 Saline County Conservation Area ......20,000
14 Sam Dale Lake Conservation Area -
15 Wayne County ...........................100
16 Spitler Woods State Natural Area -
17 Macon County ...........................425
18 Stephen A. Forbes State Park -
19 Marion County .......................36,547
20 Ten Mile Creek State Fish &
21 Wildlife Area - Jefferson/
22 Hamilton Counties....................76,000
23 Union County Conservation Area ........6,694
24 Washington County Conservation Area ..45,546
25 Waste Management & Research Center -
26 Champaign ..............................100
27 William W. Powers Conservation Area -
28 Cook County .........................37,841
29 Wolf Creek State Park -
30 Shelby County .......................46,000
31 For replacing vault toilets at the following
32 locations, at the approximate cost set forth
33 below ........................................ 613,343
34 Anderson Lake Conservation Area -
-40- BOB-CDB02
1 Fulton/Schuyler Counties ...........156,000
2 Giant City State Park -
3 Jackson/Union Counties .............294,498
4 Randolph County Conservation Area ...150,630
5 Silver Springs State Park -
6 Kendall County .....................12,215
7 For replacing roofing systems at the
8 following locations at the approximate
9 costs set forth below ........................ 91,146
10 Silver Springs State Park, Three
11 Buildings .......................... 76,146
12 Weldon Springs State Park, Nine
13 Buildings .......................... 15,000
14 For constructing vault toilets at the following
15 locations at the approximate costs set forth
16 below ........................................ 443,507
17 Cave-In-Rock State Park ............ 156,072
18 Golconda/Rauchfuss Hill ............ 122,998
19 I&M Canal - Gebhard Woods State
20 Park ................................ 5,000
21 Prophetstown State Park ............. 53,437
22 William W. Powers State Park ....... 106,000
23 For constructing hazardous material storage
24 buildings .................................... 262,324
25 For replacing concession buildings and
26 upgrading support facilities at the following
27 locations at the approximate costs set
28 forth below: ................................. 1,261,749
29 Kickapoo State Park ..................387,818
30 Rock Cut State Park ..................521,525
31 Stephen A. Forbes State Park .........352,406
32 For constructing vault toilets at the
33 following locations at the approximate
34 cost set forth below: ........................ 519,925
-41- BOB-CDB02
1 Apple River Canyon State Park ........228,145
2 Des Plaines Conservation Area .........66,000
3 Kankakee River State Park .............31,780
4 Lake Le-Aqua-Na State Park ...........115,000
5 Marshall County Conservation Area .....30,000
6 Morrison-Rockwood State Park ..........12,000
7 Rice Lake Conservation Area ...........37,000
8 For replacing roofing systems and structural
9 repairs at the following locations at the
10 approximate costs set forth below: ........... 40,452
11 Mine Rescue Station, One building .....13,858
12 Castle Rock State Park,
13 One building ..........................2,120
14 Dixon Springs State Park,
15 Three buildings .......................1,060
16 Cave-In-Rock State Park,
17 One building ..........................1,060
18 Ferne Clyffe State Park,
19 One building ..........................1,060
20 Hamilton County Conservation
21 Area, One building ...................15,370
22 Lake Murphysboro State Park
23 Two buildings .........................1,060
24 Red Hills State Park, Two
25 buildings .............................1,060
26 Fox Ridge State Park, Six
27 buildings .............................1,060
28 Shelbyville Fish and Wildlife
29 Area, Two buildings ...................1,060
30 Newton Lake Fish and Wildlife
31 Area, One building ....................1,684
32 For repair or replacement of roofs and
33 parapet walls and reconstruction of
34 chimneys at the following locations
-42- BOB-CDB02
1 at the approximate costs set forth below ..... 517,905
2 Geological Survey - Applied Lab ......186,375
3 Water Survey - Eight Buildings ........46,000
4 Natural History Survey - Natural
5 Resources Studies Annex ..............67,000
6 Geological Survey - Natural
7 Resources Building ...................64,000
8 Water Survey - Parapet walls at
9 Buildings No. 4, 5 and 6 .............10,000
10 Dickson Mounds - Exterior restroom
11 and picnic shelter ...................14,530
12 Jake Wolf Fish Hatchery ..............130,000
13 For land acquisition ........................... 490,648
14 For maintaining the lodge and concession
15 facilities ................................... 12,106
16 For construction of hazardous material
17 storage buildings ............................ 67,557
18 For abating hazards caused by the presence
19 of asbestos-containing materials ............. 51,622
20 For planning, construction, reconstruction,
21 land acquisition and related costs,
22 utilities, site improvements, and all other
23 expenses necessary for various capital
24 improvements at parks, conservation areas,
25 and other facilities under the jurisdiction
26 of the Department of Natural Resources ....... 3,408,548
27 Total, Section 5 $103,291,135
28 Section 5.1. The sum of $3,000,000, or so much thereof
29 as may be necessary, and remains unexpended at the close of
30 business on June 30, 2001, from an appropriation heretofore
31 made in Article 1, Section 7.3 of Public Act 91-708, as
32 amended, is reappropriated from the Capital Development Fund
33 to the Capital Development Board for a grant to the City of
-43- BOB-CDB02
1 Chicago for acquiring land, planning and beginning
2 construction of a visitor center at Lake Calumet.
3 Section 5.2. The following named amounts, or so much
4 thereof as may be necessary and remain unexpended from
5 reappropriations heretofore made for such purposes in Article
6 2, Section 5.1 of Public Act 91-708, are reappropriated from
7 the General Revenue Fund to the Capital Development Board for
8 the Department of Natural Resources for the projects
9 hereinafter enumerated:
10 (From Article 2, Section 5.1 of Public Act 91-708)
11 DICKSON MOUNDS MUSEUM - LEWISTOWN
12 For planning and beginning repair of
13 exterior walls ............................... $ 78,245
14 FOX RIDGE STATE PARK - COLES COUNTY
15 For rehabilitating historic structures ......... 210,000
16 HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
17 For rehabilitating Aqueduct #6 ................. 572,625
18 ILLINOIS BEACH STATE PARK - LAKE COUNTY
19 For stabilizing shoreline ...................... 200,727
20 SPRING GROVE HATCHERY - MCHENRY COUNTY
21 For upgrading the septic system ................ 30,000
22 STATEWIDE
23 For maintaining lodge/concession program ....... 58,640
24 For rehabilitating or replacing
25 playground equipment ......................... 160,757
26 For maintaining lodge and concession
27 facilities ................................... 158,874
28 For rehabilitating or replacing playground
29 equipment .................................... 84,068
30 For maintaining lodge and concession
31 facilities at various DNR locations .......... 28,230
32 For rehabilitating or replacing
-44- BOB-CDB02
1 playground equipment, in addition
2 to funds previously appropriated ............. 172,430
3 For rehabilitation or replacement
4 of playground equipment ...................... 12,457
5 For rehabilitation of trail systems ............ 73,019
6 For rehabilitation and replacement of
7 playground equipment ......................... 17,473
8 Total, Section 5.2 $1,857,545
9 Section 5.3. The sum of $200,000, or so much thereof as
10 may be necessary and remains unexpended at the close of
11 business on June 30, 2001, from an appropriation heretofore
12 made in Article 1, Section 7.2 of Public Act 91-708, is
13 reappropriated from the Capital Development Fund to the
14 Capital Development Board for a grant to the City of Carlyle
15 for development of a health center in association with resort
16 development at Carlyle Lake.
17 Section 6. The following named amounts, or so much
18 thereof as may be necessary and remain unexpended at the
19 close of business on June 30, 2001, from appropriations and
20 reappropriations heretofore made for such purposes in Article
21 1, Section 3, and Article 2, Section 6 of Public Act 91-708,
22 as amended, are reappropriated from the Capital Development
23 Fund to the Capital Development Board for the Department of
24 Corrections for the projects hereinafter enumerated:
25 (From Article 2, Section 6 of Public Act 91-708)
26 DECATUR WOMEN'S CORRECTIONAL CENTER
27 For the planning and conversion of
28 Meyer Mental Health Center into a
29 correctional facility ........................ $ 221,445
30 DIXON CORRECTIONAL CENTER
31 (From Article 1, Section 3 of Public Act 91-708)
-45- BOB-CDB02
1 For constructing a gun range and
2 classroom building ........................... 500,000
3 DWIGHT CORRECTIONAL CENTER
4 (From Article 1, Section 3 of Public Act 91-708)
5 For renovating C9 and Old Hospital ............. 3,810,000
6 For renovating Housing Unit C8, in
7 addition to funds previously
8 appropriated ................................. 270,000
9 (From Article 2, Section 6 of Public Act 91-708)
10 For upgrading the water treatment plant ........ 1,000,000
11 For upgrading water and sewer systems .......... 23,790
12 For renovating buildings, in addition
13 to funds previously appropriated ............. 274,847
14 For constructing a gatehouse and
15 sally port and upgrading the
16 security system .............................. 674,223
17 For completion of medical unit,
18 in addition to funds previously
19 appropriated ................................. 38,694
20 For renovation of buildings .................... 68,161
21 EAST MOLINE CORRECTIONAL CENTER
22 (From Article 1, Section 3 of Public Act 91-708)
23 For replacing the chiller/absorber ............. 400,000
24 (From Article 2, Section 6 of Public Act 91-708)
25 For upgrading fire alarm and building
26 automation systems ........................... 852,805
27 For upgrading the electrical
28 system ....................................... 1,012,651
29 HANNA CITY WORK CAMP
30 For upgrading electrical system ................ 563,742
31 HILL CORRECTIONAL CENTER - GALESBURG
32 (From Article 1, Section 3 of Public Act 91-708)
33 For upgrading electrical system ................ 185,000
34 (From Article 2, Section 6 of Public Act 91-708)
-46- BOB-CDB02
1 For replacing domestic water lines ............. 126,264
2 HOPKINS PARK
3 (From Article 1, Section 3 of Public Act 91-708)
4 For infrastructure improvements
5 in connection with the Hopkins Park
6 Correctional Center .......................... 8,300,000
7 ILLINOIS RIVER CORRECTIONAL CENTER - CANTON
8 For replacing warehouse freezers ............... 150,000
9 ILLINOIS YOUTH CENTER - KEWANEE - HENRY COUNTY
10 For constructing a 60-bed inmate
11 housing addition ............................. 4,000,000
12 ILLINOIS YOUTH CENTER - ST. CHARLES
13 For constructing an R & C building
14 and other improvements ....................... 34,000,000
15 For upgrading plumbing system and replacing
16 toilets and sinks ............................ 651,115
17 (From Article 2, Section 6 of Public Act 91-708)
18 For planning and beginning the upgrade
19 of existing facility ......................... 328,875
20 ILLINOIS YOUTH CENTER - HARRISBURG
21 For upgrading mechanical control system ........ 478,078
22 ILLINOIS YOUTH CENTER - JOLIET
23 For planning, site improvements,
24 utility upgrade, equipment and all
25 costs necessary to construct a
26 housing unit and dietary facility ............ 29,274
27 ILLINOIS YOUTH CENTER - RUSHVILLE
28 (From Article 1, Section 3 of Public Act 91-708)
29 For planning, design, construction, equipment
30 and all other necessary costs to add
31 a cellhouse .................................. 14,000,000
32 ILLINOIS YOUTH CENTER - VALLEY VIEW
33 (From Article 2, Section 6 of Public Act 91-708)
34 For replacing boilers, controls, hot
-47- BOB-CDB02
1 water heaters and softeners in
2 residential units and administration
3 building ..................................... 447,917
4 ILLINOIS YOUTH CENTER - WARRENVILLE
5 For rehabilitation of the administration
6 building ..................................... 744,432
7 JOLIET CORRECTIONAL CENTER
8 For correcting erosion and
9 stabilizing the masonry wall ................. 1,689,240
10 For completing the west cellhouse renovation,
11 including asbestos abatement, in addition
12 to funds previously appropriated ............. 19,565
13 LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
14 For constructing two cellhouses, in
15 addition to funds previously appropriated .... 7,570,627
16 LINCOLN CORRECTIONAL CENTER
17 For renovation of the Dietary, construction
18 of a cooler addition and installation
19 of blast chillers ............................ 33,843
20 LOGAN CORRECTIONAL CENTER
21 (From Article 1, Section 3 of Public Act 91-708)
22 For constructing a medical building
23 and dietary building ......................... 11,000,000
24 (From Article 2, Section 6 of Public Act 91-708)
25 For planning and beginning replacement
26 of the Dietary and Medical Buildings ......... 240,331
27 For renovation of sewer system ................. 57,982
28 MENARD CORRECTIONAL CENTER - CHESTER
29 (From Article 1, Section 3 of Public Act 91-708)
30 For stabilizing dam, in addition to funds
31 previously appropriated ...................... 510,000
32 For correcting slope failure & MSU
33 improvements ................................. 875,000
34 For upgrading electrical distribution
-48- BOB-CDB02
1 system ....................................... 2,424,959
2 For replacing the HVAC system .................. 550,000
3 (From Article 2, Section 6 of Public Act 91-708)
4 For improving ventilation and dehumidification
5 systems in the kitchen and dining rooms ...... 482,282
6 For replacing shower room and guard tower ...... 481,397
7 For upgrading mechanical bar screen and storm
8 and sanitary sewer system .................... 1,206,548
9 For completing upgrade of North Cellhouse
10 plumbing system, in addition to funds
11 previously appropriated ...................... 207,248
12 For replacing toilets and waste lines
13 at E/W Cellhouse and upgrade
14 North Cellhouse plumbing ..................... 1,584,078
15 For renovation or replacement of the
16 Old Hospital Building, in addition to
17 funds previously appropriated ................ 4,530,372
18 For replacing and installing
19 water storage tank ........................... 367,333
20 For replacing Boiler #2, in addition
21 to funds previously appropriated ............. 199,199
22 For replacement of the chimney stack and
23 boilers, in addition to funds previously
24 appropriated ................................. 87,501
25 For replacement of hot water heaters and
26 deairing tanks ............................... 21,945
27 For planning and construction of the
28 Administration Building ...................... 1,200,000
29 PONTIAC CORRECTIONAL CENTER
30 (From Article 1, Section 3 of Public Act 91-708)
31 For expanding the main sally port .............. 400,000
32 For renovating the exterior of North/
33 South Cellhouses ............................. 600,000
34 (From Article 2, Section 6 of Public Act 91-708)
-49- BOB-CDB02
1 For completing replacement of hot water
2 lines, in addition to funds previously
3 appropriated ................................. 612,300
4 For renovation of main sally port .............. 270,405
5 SHERIDAN CORRECTIONAL CENTER
6 (From Article 1, Section 3 of Public Act 91-708)
7 For upgrading the storm sewers ................. 115,000
8 (From Article 2, Section 6 of Public Act 91-708)
9 For replacing doors and locks .................. 145,936
10 STATEVILLE CORRECTIONAL CENTER - JOLIET
11 (From Article 1, Section 3 of Public Act 91-708)
12 For planning and beginning renovation of
13 H & I houses ................................. 500,000
14 For replacing the water line ................... 3,320,000
15 For upgrading electrical system in
16 "B" House .................................... 1,500,000
17 (From Article 2, Section 6 of Public Act 91-708)
18 For constructing a housing unit, cellhouse,
19 vehicle maintenance building and
20 warehouse for the reception and
21 classification center, in addition to
22 funds previously appropriated ................ 24,065,628
23 For replacing windows in B House ............... 2,876,644
24 For replacing cell fronts in F House ........... 957,924
25 For upgrading plumbing system in F House,
26 in addition to funds previously
27 appropriated ................................. 3,497,820
28 For replacing power plant and
29 utility distribution system .................. 9,580,135
30 For planning, design, construction,
31 equipment and all other necessary costs
32 for an Adult Reception and Classification
33 Center ....................................... 34,345,768
34 For upgrading storm drainage and
-50- BOB-CDB02
1 wastewater systems ........................... 1,100,503
2 For upgrading electrical system and elevator
3 and installing HVAC system ................... 1,179,600
4 For replacement of the MSU ..................... 4,339,281
5 TAYLORVILLE CORRECTIONAL CENTER
6 For upgrading shower ventilation system ........ 234,944
7 THOMSON CORRECTIONAL CENTER
8 For constructing three cellhouses and
9 expanding educational and vocational
10 space, in addition to funds previously
11 appropriated ................................. 24,591,248
12 VANDALIA CORRECTIONAL CENTER
13 (From Article 1, Section 3 of Public Act 91-708)
14 For constructing a multi-purpose program
15 building ..................................... 1,300,000
16 For converting Administration Building and
17 planning construction of an Administration/
18 Health Care Unit ............................. 800,000
19 For upgrading the primary water
20 distribution system .......................... 1,268,198
21 (From Article 2, Section 6 of Public Act 91-708)
22 For planning and beginning construction
23 for a slaughter house and meat plant ......... 466,456
24 For repairing exterior masonry, in addition
25 to funds previously appropriated ............. 723,392
26 VIENNA CORRECTIONAL CENTER
27 For replacing windows, in addition to
28 funds previously appropriated ................ 779,030
29 For completing upgrade of the steam
30 distribution system, in addition to
31 funds previously appropriated ................ 254,131
32 For upgrading electrical system and
33 installing emergency generator ............... 179,828
34 For renovating the kitchen ..................... 1,808,596
-51- BOB-CDB02
1 For upgrading the steam distribution system
2 and renovation of Powerhouse, in addition
3 to funds previously appropriated ............. 131,139
4 For upgrading air conditioning system
5 and replacement of cooling tower ............. 227,878
6 For completing the rehabilitation of duct
7 systems and walls, in addition to funds
8 previously appropriated ...................... 196,628
9 WESTERN ILLINOIS CORRECTIONAL CENTER - MT. STERLING
10 (From Article 1, Section 3 of Public Act 91-708)
11 For replacing warehouse freezers ............... 150,000
12 STATEWIDE
13 For planning, design, construction, equipment
14 and all other necessary costs for a
15 maximum security facility .................... 129,000,000
16 For planning a medium security facility
17 and land acquisition ......................... 6,000,000
18 For replacing locks and control panels
19 at the following locations at the
20 approximate costs set forth below ............ 2,700,000
21 Illinois River
22 Correctional Center .................850,000
23 Western Illinois
24 Correctional Center .................850,000
25 Danville Correctional
26 Center ............................1,000,000
27 For replacing roofing systems at
28 the following locations at the
29 approximate cost set forth below ............. 1,720,022
30 Menard Correctional Center ...........170,000
31 Vienna Correctional Center ...........155,000
32 Illinois Youth Center -
33 Harrisburg ...........................95,000
34 Dixon Correctional Center ............500,000
-52- BOB-CDB02
1 Pontiac Correctional Center ..........440,000
2 Illinois Youth Center - Joliet .......360,022
3 For replacing or upgrading security and
4 monitoring systems at the following
5 locations at the approximate cost set
6 forth below .................................. 755,000
7 Vienna Correctional
8 Center ..............................250,000
9 Pontiac Correctional
10 Center ..............................200,000
11 Joliet Correctional
12 Center ..............................305,000
13 For planning and replacing windows at the
14 following locations at the approximate cost
15 set forth below .............................. 3,278,791
16 Vienna Correctional
17 Center ............................1,780,000
18 Sheridan Correctional
19 Center ..............................418,791
20 Illinois Youth Center -
21 Valley View .........................500,000
22 Illinois Youth Center -
23 Joliet ..............................165,000
24 Dixon Correctional
25 Center ..............................235,000
26 Shawnee Correctional
27 Center ..............................180,000
28 For upgrading and renovating showers at
29 the following locations at the approximate
30 cost set forth below ......................... 1,975,000
31 Shawnee Correctional
32 Center ..............................800,000
33 Danville Correctional
34 Center ..............................800,000
-53- BOB-CDB02
1 Graham Correctional
2 Center ..............................200,000
3 Centralia Correctional
4 Center ..............................175,000
5 For replacing security fencing at the
6 following locations at the approximate
7 cost set forth below ......................... 1,498,165
8 Hill Correctional
9 Center ..............................398,165
10 Western IL Correctional
11 Center ..............................300,000
12 Joliet Correctional
13 Center ..............................186,922
14 Logan Correctional
15 Center ..............................200,000
16 Dixon Correctional
17 Center ..............................100,000
18 Shawnee Correctional
19 Center ..............................100,000
20 Graham Correctional
21 Center ..............................100,000
22 Danville Correctional
23 Center ..............................100,000
24 For upgrading roads and parking lots at
25 the following locations at the approximate
26 cost set forth below ......................... 978,100
27 Dwight Correctional
28 Center ..............................483,840
29 Illinois Youth Center -
30 Valley View .........................494,260
31 (From Article 2, Section 6 of Public Act 91-708)
32 For planning, design, construction, equipment
33 and all other necessary costs for a
34 female multi-security level
-54- BOB-CDB02
1 correctional center .......................... 78,702,968
2 For replacing roofing systems at the
3 following locations at the approximate
4 cost set forth below ......................... 637,986
5 Vienna Correctional Center ..........469,664
6 Sheridan Correctional Center ........168,322
7 For replacing or installing mechanical bar
8 screens at the following locations at the
9 approximate cost set forth below ............. 605,823
10 Graham Correctional Center -
11 Hillsboro ..........................317,545
12 Western Illinois Correctional
13 Center - Mt. Sterling ..............288,278
14 For upgrading security control systems and
15 panels in housing units at the following
16 locations at the approximate cost set
17 forth below .................................. 4,620,014
18 Danville Correctional Center ........500,000
19 Hill Correctional Center -
20 Galesburg ........................1,500,000
21 Western Illinois Correctional
22 Center - Mt. Sterling ..............675,000
23 Illinois River Correctional
24 Center - Canton ....................675,000
25 Shawnee Correctional Center -
26 Vienna ...........................1,270,014
27 For planning, design, construction,
28 equipment and all other necessary costs
29 for a juvenile facility ...................... 19,016,529
30 For replacing locks and doors at the
31 following locations at the approximate
32 cost set forth below ......................... 766,403
33 Dwight Correctional Center ......... 103,239
34 Illinois River Correctional
-55- BOB-CDB02
1 Center - Canton ..................... 3,610
2 IYC - Joliet ....................... 646,568
3 IYC - Pere Marquette - Grafton ...... 12,986
4 For replacing roofing systems at the following
5 locations at the approximate cost set forth
6 below ........................................ 675,103
7 Dixon Correctional Center,
8 four buildings .................... 270,813
9 IYC - St. Charles, two buildings ... 197,498
10 Joliet Correctional Center,
11 six buildings ..................... 142,779
12 Logan Correctional Center - Lincoln
13 three buildings ..................... 8,086
14 Menard Correctional Center - Chester
15 six buildings ...................... 24,738
16 Pontiac Correctional Center,
17 one building ....................... 31,189
18 For inspecting and upgrading water towers
19 at the following locations at the approximate
20 costs set forth below ........................ 1,556,313
21 Dixon Correctional Center,
22 Upgrade Water Tower ............... 369,928
23 Graham Correctional Center - Hillsboro
24 Upgrade Water Tower ............... 62,524
25 Joliet Correctional Center,
26 Upgrade Water Tower ............... 130,328
27 Logan Correctional Center - Lincoln
28 Complete Water Tower Upgrade ..... 103,536
29 Menard Correctional Center - Chester
30 Upgrade Water Tower ............... 22,443
31 Stateville Correctional Center - Joliet
32 Upgrade Water Tower .............. 663,578
33 Statewide, Inspect and Upgrade
34 Water Towers ...................... 117,099
-56- BOB-CDB02
1 For upgrading fire and safety systems at
2 the following locations at the approximate
3 costs set forth below, in addition to
4 funds previously appropriated ................ 3,025,696
5 Menard Correctional Center -
6 Chester ......................... 1,884,584
7 Sheridan Correctional Center ....... 312,246
8 Vienna Correctional Center ......... 828,866
9 For replacing roofing systems at the
10 following locations at the approximate
11 costs set forth below: ....................... 215,071
12 East Moline Correctional Center,
13 Three buildings ..................... 79,929
14 Graham Correctional Center, Hillsboro
15 Seven buildings .................... 117,699
16 Sheridan Correctional Center, LaSalle
17 Three buildings ..................... 17,443
18 For replacing doors and locks at the
19 following locations at the approximate
20 costs set forth below: ....................... 585,101
21 IYC - St. Charles ................... 221,452
22 Lincoln Correctional Center ......... 272,473
23 Jacksonville Correctional Center ..... 12,473
24 Sheridan Correctional Center ......... 78,703
25 For upgrading fire safety systems at the
26 following locations at the approximate
27 costs set forth below, in addition to
28 funds previously appropriated: ............... 4,454,272
29 Menard Correctional Center ........... 63,476
30 Pontiac Correctional Center ....... 2,960,453
31 Stateville Correctional Center .... 1,430,343
32 For upgrading water and wastewater
33 systems at the following locations
34 at the approximate costs set forth below: .... 692,276
-57- BOB-CDB02
1 Big Muddy Correctional Center
2 for installing mechanical
3 bar screen ........................... 7,347
4 Centralia Correctional Center
5 for upgrading water
6 treatment plant .................... 183,702
7 East Moline Correctional Center
8 for upgrading sewer system ........... 4,310
9 Ed Jenison Work Camp (Paris)
10 for installing mechanical
11 bar screen ........................... 2,530
12 IYC - Harrisburg for upgrading
13 water distribution system ........... 59,198
14 Kankakee MSU for constructing
15 well #2 ............................ 288,550
16 IYC - St. Charles for upgrading
17 sewage/storm system ................ 134,865
18 IYC - Valley View for installing
19 mechanical bar screen ............... 11,774
20 For correction of deficiencies in
21 water systems at three correctional
22 facilities ................................... 81,228
23 For replacement of locks, windows and
24 doors at the following locations
25 as set forth below: .......................... 368,672
26 IYC Harrisburg ....................... 44,053
27 IYC Joliet ........................... 14,426
28 Menard .............................. 213,471
29 IYC Valley View ...................... 95,722
30 Vienna ................................ 1,000
31 For planning, design, construction,
32 equipment and other necessary costs
33 for a Maximum Security Correctional
34 Center, in addition to funds previously
-58- BOB-CDB02
1 appropriated ................................. 16,488,520
2 For planning, design, construction,
3 equipment and other necessary costs
4 for a Correctional Facility for
5 juveniles .................................... 4,770,240
6 For planning, design, construction,
7 equipment and other necessary costs
8 for a Medium Security Correctional
9 Facility ..................................... 6,423,155
10 For correcting defects in the food preparation
11 areas, including roofs ....................... 108,588
12 For replacement of roofs at various Department of
13 Corrections locations ........................ 70,407
14 For roof replacement at the following
15 locations at the approximate costs
16 set forth below: ............................. 179,437
17 Graham Correctional Center
18 Five buildings ........................6,543
19 Graham Correctional Center
20 Thirty-two buildings ..................6,000
21 Menard Correctional Center
22 Warehouse Building ...................26,000
23 Menard Correctional Center
24 Five buildings .......................55,068
25 Pontiac Correctional Center
26 Eight buildings .......................6,500
27 Illinois Youth Center-St. Charles
28 Three buildings ......................15,326
29 Sheridan Correctional Center
30 Six buildings ........................16,000
31 Stateville Correctional Center
32 Seven buildings ......................24,000
33 Ill Youth Center-Valley View
34 Administration Building and
-59- BOB-CDB02
1 Kitchen Addition ....................24,000 ____________
2 Total, Section 6 $522,958,055
3 Section 6.1. The following named amounts, or so much
4 thereof as may be necessary and remain unexpended at the
5 close of business on June 30, 2001, from reappropriations
6 heretofore made for such purposes in Article 2, Section 6.1
7 of Public Act 91-708, are reappropriated from the General
8 Revenue Fund to the Capital Development Board for the
9 Department of Corrections for the projects hereinafter
10 enumerated:
11 (From Article 2, Section 6.1 of Public Act 91-708)
12 STATEVILLE CORRECTIONAL CENTER - JOLIET
13 For tuckpointing buildings ..................... 65,086
14 VANDALIA CORRECTIONAL CENTER
15 For replacing showers in six buildings, in
16 addition to funds previously appropriated .... 473,426
17 STATEWIDE
18 For energy conservation improvements at the
19 following locations at the approximate
20 costs set forth below: ....................... 39,718
21 Dwight Correctional Center ............ 7,000
22 Joliet Correctional Center
23 School Building ...................... 1,000
24 Menard Psychiatric Center
25 Randolph Hall ........................ 7,500
26 Stateville Correctional Center
27 Law Library .......................... 7,400
28 Pontiac Correctional Center .......... 15,093
29 Vienna Correctional Center ............ 1,725
30 For upgrading doors and locking systems at
31 the following locations at the approximate
32 costs set forth below: ....................... 577,182
-60- BOB-CDB02
1 Illinois Youth Center-Warrenville
2 For replacement of doors
3 and locking systems ............... 577,182 ____________
4 Total, Section 6.1 $1,155,412
5 Section 6.2. The amount of $586,423, or so much thereof
6 as may be necessary and remains unexpended at the close of
7 business on June 30, 2001, from a reappropriation heretofore
8 made for such purposes in Article 2, Section 6.3 of Public
9 Act 91-708, is reappropriated from the General Revenue Fund
10 to the Capital Development Board for the Department of
11 Corrections for the projects hereinafter enumerated at the
12 approximate costs set forth below:
13 Danville Correctional Center -
14 For upgrading the hot water
15 distribution system ...................$1,000
16 Stateville Correctional Center-
17 For upgrading the plumbing systems in
18 four buildings .......................509,555
19 Menard Correctional Center -
20 For planning and to begin upgrading
21 the plumbing systems in two
22 buildings .............................37,934
23 Pontiac Correctional Center -
24 For upgrading the mechanical systems
25 and renovation of shower rooms ........37,934
26 Section 7. The following named amounts, or so much
27 thereof as may be necessary and remain unexpended at the
28 close of business on June 30, 2001, from appropriations and
29 reappropriations heretofore made for such purposes in Article
30 1, Section 4, and Article 2, Section 7 of Public Act 91-708,
31 are reappropriated from the Capital Development Fund to the
-61- BOB-CDB02
1 Capital Development Board for the Historic Preservation
2 Agency for the projects hereinafter enumerated:
3 BISHOP HILL HISTORIC SITE - HENRY COUNTY
4 (From Article 2, Section 7 of Public Act 91-708)
5 For rehabilitating Bjorkland Hotel ............. $ 939,819
6 BLACKHAWK STATE HISTORIC SITE
7 (From Article 1, Section 4 of Public Act 91-708)
8 For rehabilitating lodge ....................... 1,166,000
9 (From Article 2, Section 7 of Public Act 91-708)
10 For a grant to the City of Rock Island
11 to relocate the existing sewer line .......... 660,000
12 BRYANT COTTAGE STATE MEMORIAL - BEMENT
13 (From Article 1, Section 4 of Public Act 91-708)
14 For rehabilitating interior and exterior ....... 217,000
15 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
16 For providing structural stabilization ......... 308,000
17 (From Article 2, Section 7 of Public Act 91-708)
18 For renovation of the Cahokia Courthouse
19 and the Jarrot House ......................... 72,953
20 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
21 For replacement of Monk's Mounds stairs ........ 339,695
22 For restoration of Monk's Mound ................ 1,045,251
23 For purchasing private land within historic
24 site boundary ................................ 209,314
25 For replacement of Monk's Mounds stairs ........ 22,006
26 DAVID DAVIS HOME
27 To acquire a residence to be
28 converted to a Visitors Center ............... 249,400
29 FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
30 (From Article 1, Section 4 of Public Act 91-708)
31 For rehabilitating the stone gatehouse
32 wall and foundation .......................... 763,000
33 (From Article 2, Section 7 of Public Act 91-708)
-62- BOB-CDB02
1 For restoring the powder magazine .............. 294,840
2 For replacing Maintenance Building ............. 1,566
3 GALENA HISTORIC SITE
4 For structural stabilization and
5 rehabilitation of five historic
6 structures in the Grant Home District
7 including the Biesman, Nolan, Gill,
8 Coville, and Donegan houses .................. 400,300
9 JARROT MANSION STATE HISTORICAL SITE
10 (From Article 1, Section 4 of Public Act 91-708)
11 For restoring the mansion, in addition
12 to funds previously appropriated ............. 1,650,000
13 LEWIS AND CLARK STATE MEMORIAL -
14 MADISON COUNTY
15 (From Article 2, Section 7 of Public Act 91-708)
16 For constructing interpretive center,
17 and development of the historic site
18 in addition to funds previously
19 appropriated ................................. 1,138,931
20 LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
21 For rehabilitating site and providing
22 irrigation system ............................ 413,332
23 LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
24 For rehabilitating interior and exterior ....... 738,096
25 LINCOLN LOG CABIN HISTORIC SITE -
26 COLES COUNTY
27 For constructing visitors center, Phase II,
28 and developing day use area .................. 1,225,174
29 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
30 For renovating village entrance and
31 completing visitors center ................... 313,628
32 LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
33 (From Article 1, Section 4 of Public Act 91-708)
34 For constructing a Lincoln Presidential
-63- BOB-CDB02
1 Library ...................................... 40,000,000
2 (From Article 2, Section 7 of Public Act 91-708)
3 For planning and beginning the Lincoln
4 Presidential Center, in addition to
5 funds previously appropriated ................ 4,200,208
6 POSTVILLE COURTHOUSE HISTORIC SITE -
7 LINCOLN
8 For rehabilitating Courthouse and site ......... 103,095
9 PULLMAN FACTORY HISTORIC SITE - CHICAGO
10 For stabilization of the structure and for planning
11 and beginning restoration .................... 46,963
12 OLD STATE CAPITOL - SPRINGFIELD
13 For providing structural stabilization ......... 1,439,821
14 For rehabilitating Old State Capitol ........... 477,073
15 UNION STATION - SPRINGFIELD
16 For purchasing and rehabilitating .............. 2,531,218
17 VACHEL LINDSAY HOME
18 For rehabilitating home ........................ 689,333
19 VANDALIA STATE HOUSE
20 For replacing roof and rehabilitating
21 exterior ..................................... 163,138
22 For rehabilitating HVAC and electrical
23 systems and interior ......................... 351,240
24 STATEWIDE
25 (From Article 1, Section 4 of Public Act 91-708)
26 For statewide ISTEA 21 Match ................... 637,000
27 (From Article 2, Section 7 of Public Act 91-708)
28 For replacing roofing systems at the
29 following locations at the approximate
30 costs set forth below: ....................... 158,819
31 Fort De Chartres, Randolph County .... 43,198
32 Washburne House, Galena ............... 5,378
33 David Davis Mansion, Bloomington ..... 22,051
34 Bishop Hill House, Henry County ...... 88,192
-64- BOB-CDB02
1 For matching ISTEA federal grant funds ......... 470,176
2 Total, Section 7 $63,436,389
3 Section 7.1. The amount of $52,326, or so much thereof
4 as may be necessary and remains unexpended at the close of
5 business on June 30, 2001, from a reappropriation heretofore
6 made for such purpose in Article 2, Section 7.1 of Public Act
7 91-708, is reappropriated from the Capital Development Fund
8 to the Capital Development Board for the Historic
9 Preservation Agency for acquiring the Zimmerman
10 archaeological site in LaSalle County and for associated
11 costs, planning, stabilization, restoration and all other
12 expenses necessary to comply with the intent of this
13 appropriation.
14 Section 7.2. The sum of $800,000, or so much thereof as
15 may be necessary and as remains unexpended at the close of
16 business on June 30, 2001, from a reappropriation heretofore
17 made in Article 2, Section 7.3 of Public Act 91-708, is
18 reappropriated from the Capital Development Fund to the
19 Capital Development Board for the Historic Preservation
20 Agency for the construction of an interpretive center and
21 development of the historic site at the Lewis and Clark
22 National Trail Site No. 1 in Madison County.
23 Section 7.3. The following named amounts, or so much
24 thereof as may be necessary and remain unexpended at the
25 close of business on June 30, 2001, from reappropriations
26 heretofore made for such purposes in Article 2, Section 7.4
27 of Public Act 91-708, are reappropriated from the General
28 Revenue Fund to the Capital Development Board for the
29 Historic Preservation Agency for the projects hereinafter
30 enumerated:
-65- BOB-CDB02
1 DANA THOMAS HOUSE - SPRINGFIELD
2 (From Article 2, Section 7.4 of Public Act 91-708)
3 For restoring exterior and interior ............ $ 357,274
4 GALENA HISTORIC SITE
5 For rehabilitating Washburne House ............. 564,000
6 LINCOLN'S NEW SALEM HISTORIC SITE -
7 PETERSBURG
8 For resurfacing village and service roads ...... 115,740
9 For rehabilitating lift stations ............... 336,637
10 For rehabilitating saw mill and grist
11 mill ......................................... 208,075
12 METAMORA COURTHOUSE HISTORIC SITE
13 For rehabilitating courthouse .................. 436,370
14 JOURNAL REGISTER BUILDING - SPRINGFIELD
15 For renovating building ........................ 41,962
16 OLD STATE CAPITOL - SPRINGFIELD
17 For replacing the bottom cylinder of
18 the hydraulic elevator ....................... 50,000
19 Total, Section 7.3 $2,110,058
20 Section 9. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 2001, from appropriations and
23 reappropriations heretofore made for such purposes in Article
24 1, Section 5, and Article 2, Section 9 of Public Act 91-708,
25 as amended, are reappropriated from the Capital Development
26 Fund to the Capital Development Board for the Department of
27 Human Services for the projects hereinafter enumerated:
28 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
29 (From Article 1, Section 5 of Public Act 91-708)
30 For renovating the central dietary,
31 Phase II, in addition to funds previously
32 appropriated ................................. $ 1,485,000
-66- BOB-CDB02
1 (From Article 2, Section 9 of Public Act 91-708)
2 For constructing two building additions
3 at the Forensic Complex ...................... 11,343,698
4 For rehabilitation of the central dietary ...... 1,666,574
5 CHESTER MENTAL HEALTH CENTER
6 (From Article 1, Section 5 of Public Act 91-708)
7 For upgrading energy management system ......... 489,500
8 For replacing sewer lines ...................... 686,347
9 (From Article 2, Section 9 of Public Act 91-708)
10 For upgrading access control/duress system ..... 1,471,165
11 For renovating kitchen area .................... 911,784
12 For replacing fencing and upgrading
13 recreational yard ............................ 249,355
14 For renovating support and residential
15 area ......................................... 2,247,947
16 For construction of a storage building ........ 14,080
17 SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE
18 For planning and renovation of residential
19 and program units for children and
20 adolescent services .......................... 794,770
21 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
22 For upgrading fire/life safety systems, in
23 addition to funds previously appropriated .... 162,271
24 For renovating residential units, in
25 addition to funds previously
26 appropriated ................................. 2,171,000
27 For renovation of utility rooms and installation
28 of drinking fountains ........................ 36,975
29 For renovation of the West Campus Nurses'
30 Stations ..................................... 260,825
31 For renovation of Henry Horner Children's
32 Center and West Campus for fire and
33 life safety codes ............................ 95,231
34 For renovation of the West Campus shower
-67- BOB-CDB02
1 and toilet rooms ............................. 253,620
2 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA