State of Illinois
92nd General Assembly
Legislation

   [ Search ]   [ PDF text ]   [ Legislation ]   
[ Home ]   [ Back ]   [ Bottom ]



92_SB1352

 
 1                                                        BOB-CDB02

 2        AN ACT making appropriations and reappropriations.

 3        Be  it  enacted  by  the People of the State of Illinois,
 4    represented in the General Assembly:

 5                              ARTICLE 1

 6        Section 1.  The  following  named  amounts,  or  so  much
 7    thereof  as  may  be  necessary,  are  appropriated  from the
 8    Capital Development Fund to the Capital Development Board for
 9    the Department of Agriculture for  the  projects  hereinafter
10    enumerated:

11                ILLINOIS STATE FAIRGROUNDS - DU QUOIN
12    For replacing horse barn roofs ................. $    300,000
13    For upgrading electrical utilities, in
14     addition to funds previously
15      appropriated .................................      700,000
16    For renovating the Hayes House, in addition
17     to funds previously appropriated ..............      600,000
18              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
19    For renovating comfort stations, in addition
20      to funds previously appropriated .............    1,100,000
21    For upgrading the electrical system ............    1,000,000
22    For renovating the grandstand area .............    1,120,000
23        Total, Section 1                               $4,820,000

24        Section  1.1.  The  following  named  amounts, or so much
25    thereof as  may  be  necessary,  are  appropriated  from  the
26    General Revenue Fund to the Capital Development Board for the
27    Department   of  Agriculture  for  the  projects  hereinafter
28    enumerated:

29                ILLINOIS STATE FAIRGROUNDS - DU QUOIN
 
                           -2-                      BOB-CDB02
 1    For upgrading the telecommunications
 2      system ....................................... $    400,000
 3              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
 4    For upgrading the chemistry/seed
 5      laboratory systems ...........................      344,000
 6        Total                                            $744,000

 7        Section 2.  The  following  named  amounts,  or  so  much
 8    thereof  as  may  be  necessary,  are  appropriated  from the
 9    Capital Development Fund to the Capital Development Board for
10    the  Department  of  Central  Management  Services  for   the
11    projects hereinafter enumerated:

12                       CARBONDALE STATE GARAGE
13    For upgrading the drainage system .............. $    110,000
14                         DIXON STATE GARAGE
15    For replacing lighting and roof
16      drainage .....................................      260,000
17          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
18                        (ROOSEVELT) - CHICAGO
19    For replacing the roofing system ...............      305,000
20    For upgrading the kitchen and plumbing .........      565,000
21                 JAMES R. THOMPSON CENTER - CHICAGO
22    For upgrading mechanical systems, in
23      addition to funds previously appropriated..... $  1,400,000
24                         PARIS STATE GARAGE
25    For replacing the roof and improving
26     the exterior ..................................      380,000
27                  ROCKFORD REGIONAL OFFICE BUILDING
28    For upgrading the HVAC system ..................      100,000
29        SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
30    For rehabilitating the exterior and
31      upgrading the atrium .........................      970,000
32        Total, Section 2                               $4,090,000
 
                           -3-                      BOB-CDB02
 1        Section  2.1.  The  following  named  amounts, or so much
 2    thereof as  may  be  necessary,  are  appropriated  from  the
 3    General Revenue Fund to the Capital Development Board for the
 4    Department  of  Central  Management Services for the projects
 5    hereinafter enumerated:

 6          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
 7                        (ROOSEVELT) - CHICAGO
 8    For tuckpointing exterior ...................... $  1,165,000
 9        Total, Section 2.1                             $1,165,000

10        Section 3.  The  following  named  amounts,  or  so  much
11    thereof  as  may  be  necessary,  are  appropriated  from the
12    Capital Development Fund to the Capital Development Board for
13    the Department of Corrections for  the  projects  hereinafter
14    enumerated:

15                              STATEWIDE
16    For construction, equipment and all other
17      necessary costs for a medium security
18      facility, in addition to funds previously
19      appropriated .................................  $73,000,000
20    For planning, construction, equipment
21      and all other necessary costs for a
22      juvenile facility ............................   53,000,000
23    For replacing doors and locks
24      at the following locations at the
25      approximate costs set forth below ............    4,100,000
26       Dixon Correctional Center ..........1,300,000
27       Hill Correctional Center .............500,000
28       Sheridan Correctional Center .......1,300,000
29       Vienna Correctional Center .........1,000,000
30    For replacing roofing systems at
31      the following locations at the
 
                           -4-                      BOB-CDB02
 1      approximate cost set forth below .............      690,000
 2       Illinois Youth Center -
 3        St. Charles .........................100,000
 4       Illinois Youth Center -
 5       Warrenville ..........................330,000
 6       Logan Correctional Center ............260,000
 7    For upgrading showers at the following
 8      locations at the approximate
 9      cost set forth below .........................    3,255,000
10       Hill Correctional
11        Center ............................1,140,000
12       Illinois River Correctional
13        Center ..............................635,000
14       Taylorville Correctional
15        Center ..............................845,000
16       Western Illinois Correctional
17        Center ..............................635,000
18    For upgrading water distribution systems at
19      the following locations at the approximate
20      cost set forth below .........................    2,980,000
21       Dixon Correctional
22        Center ............................2,000,000
23       Joliet Correctional
24        Center ..............................980,000
25    For upgrading water towers at
26      the following locations at the approximate
27      cost set forth below .........................    4,400,000
28       Dixon Correctional
29        Center ............................2,800,000
30       Illinois Youth Center -
31        St. Charles .......................1,300,000
32       Illinois Youth Center -
33        Valley View .........................300,000
34                    CENTRALIA CORRECTIONAL CENTER
 
                           -5-                      BOB-CDB02
 1    For upgrading electrical system ................    1,800,000
 2    For upgrading building automation system .......    1,100,000
 3                    DANVILLE CORRECTIONAL CENTER
 4    For upgrading the boilers ......................    2,500,000
 5                      DIXON CORRECTIONAL CENTER
 6    For planning the upgrade and expansion
 7      of the medical care facility .................    1,200,000
 8                   EAST MOLINE CORRECTIONAL CENTER
 9    For replacing windows ..........................      605,000
10                     GRAHAM CORRECTIONAL CENTER
11    For upgrading building automation system
12      and fire alarm system ........................    1,100,000
13    For upgrading electrical system ................    2,000,000
14                 ILLINOIS YOUTH CENTER - HARRISBURG
15    For constructing a multi-purpose medical,
16      vocational and confinement building ..........   10,250,000
17                   ILLINOIS YOUTH CENTER - JOLIET
18    For replacing rooftop units at
19      Administration Building ......................      195,000
20                 ILLINOIS YOUTH CENTER - WARRENVILLE
21    For upgrading site utilities ...................      345,000
22                     JOLIET CORRECTIONAL CENTER
23    For replacing the transfer switch and
24      emergency generator ..........................      980,000
25                     LINCOLN CORRECTIONAL CENTER
26    For replacing water supply lines ...............    1,145,000
27                     MENARD CORRECTIONAL CENTER
28    For replacing the Administration
29      Building .....................................    8,300,000
30    For replacing the sally port ...................      925,000
31                    SHERIDAN CORRECTIONAL CENTER
32    For upgrading electrical system and
33      installing a generator .......................      905,000
34                  SOUTHWESTERN CORRECTIONAL CENTER
 
                           -6-                      BOB-CDB02
 1    For replacing sewer lines ......................      405,000
 2                   STATEVILLE CORRECTIONAL CENTER
 3    For replacing windows in Cellhouse B,
 4      in addition to funds previously
 5      appropriated .................................    2,500,000
 6                     VIENNA CORRECTIONAL CENTER
 7    For upgrading the HVAC system and replacing
 8      water lines in six housing units .............    1,800,000
 9        Total, Section 3                             $179,480,000

10        Section  4.  The  following  named  amounts,  or  so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    Capital Development Fund to the Capital Development Board for
13    the Historic Preservation Agency for the projects hereinafter
14    enumerated:
15          ABRAHAM LINCOLN PRESIDENTIAL LIBRARY, SPRINGFIELD
16    For constructing library and museum, in
17      addition to funds previously appropriated .... $ 50,000,000
18              BISHOP HILL HISTORIC SITE - HENRY COUNTY
19    For restoring interior and exterior ............    1,000,000
20          LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
21    For rehabilitating the saw and grist mill, in
22      addition to funds previously appropriated.....      750,000
23          SHAWNEETOWN BANK HISTORIC SITE - GALLATIN COUNTY
24    For rehabilitating exterior ....................    1,620,000
25        Total, Section 4                              $53,370,000

26        Section  4.1.  The  following  named  amounts, or so much
27    thereof as  may  be  necessary,  are  appropriated  from  the
28    General  Revenue  Fund   to the Capital Development Board for
29    the Historic Preservation Agency for the projects hereinafter
30    enumerated:
31           LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
32    For providing roads, parking areas, lighting
 
                           -7-                      BOB-CDB02
 1      plaza and pedestrian bridges, in addition
 2      to funds previously appropriated  ............ $    400,000
 3                  STATE JOURNAL-REGISTER BUILDING/
 4                   OLD STATE CAPITOL - SPRINGFIELD
 5    For repairing elevators ........................      480,000
 6        Total, Section 4.1                               $880,000

 7        Section 5.  The  following  named  amounts,  or  so  much
 8    thereof  as  may  be  necessary,  are  appropriated  from the
 9    Capital Development Fund to the Capital Development Board for
10    the Illinois Medical District  Commission  for  the  projects
11    hereinafter enumerated:
12           ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
13    For upgrading core utilities ................... $    800,000
14    For upgrading research center ..................      710,000
15        Total, Section 5                               $1,510,000

16        Section  6.  The  following  named  amounts,  or  so much
17    thereof as  may  be  necessary,  are  appropriated  from  the
18    Capital Development Fund to the Capital Development Board for
19    the Department of Human Services for the projects hereinafter
20    enumerated:
21                          STATEWIDE PROGRAM
22    For planning and beginning construction
23      of a facility for the treatment and
24      detention of sexually violent persons, in
25     addition to funds previously appropriated .....    4,000,000
26    For replacing and repairing roofing
27      systems at the following locations, at
28      the approximate cost set forth below ......... $  3,335,000
29       Alton Mental Health Center ...........150,000
30       Chicago-Read Mental Health
31        Center ..............................800,000
32       Howe Developmental Center -
 
                           -8-                      BOB-CDB02
 1        Tinley Park .......................1,300,000
 2       Shapiro Developmental Center -
 3        Kankakee ............................415,000
 4       Illinois School for the
 5        Deaf - Jacksonville .................370,000
 6       Kiley Developmental
 7        Center - Waukegan ...................300,000
 8             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
 9    For renovating the Forensic Complex and
10      constructing two building additions, in
11      addition to funds previously appropriated ....    3,900,000
12                    CHESTER MENTAL HEALTH CENTER
13    For renovating support and residential areas,
14      in addition to funds previously
15      appropriated .................................      996,000
16    For replacing smoke/heat detectors .............      395,000
17                  FOX DEVELOPMENTAL CENTER - DWIGHT
18    For replacing interior doors and flooring
19      and repairing walls in the Main and
20      Administration Buildings .....................    2,205,000
21               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
22    For replacing HVAC and duct work ...............      500,000
23             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
24    For renovating High School Building ............    1,200,000
25    For tuckpointing and replacing windows,
26      sprinklers and door closures .................      730,000
27      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
28    For renovating the Girls' Dormitory ............      950,000
29                  JACKSONVILLE DEVELOPMENTAL CENTER
30    For planning and beginning the renovation
31      of the power house ...........................      800,000
32                 MABLEY DEVELOPMENTAL CENTER - DIXON
33    For renovating residential buildings ...........    1,930,000
34               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
 
                           -9-                      BOB-CDB02
 1    For planning and beginning boiler house
 2      renovation ...................................      250,000
 3               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
 4    For replacing water mains and valves,
 5      in addition to funds previously
 6      appropriated .................................    1,900,000
 7               SINGER MENTAL HEALTH CENTER - ROCKFORD
 8    For renovating dietary .........................    1,200,000
 9        Total, Section 6                              $24,291,000

10        Section  6.1.  The  following  named  amounts, or so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    General Revenue Fund to the Capital Development Board for the
13    Department  of  Human  Services  for the projects hereinafter
14    enumerated:
15                          STATEWIDE PROGRAM
16    For tuckpointing at the following locations
17     at the approximate cost set forth below ....... $    515,000
18      Howe Developmental Center -
19       Tinley Park ..........................115,000
20      Madden Mental Health
21       Center - Hines .......................100,000
22      Tinley Park Mental
23       Health Center ........................300,000
24                ZELLER MENTAL HEALTH CENTER - PEORIA
25    For upgrading the energy management
26      system .......................................      245,000
27        Total, Section 6.1                               $760,000

28        Section 7.  The  following  named  amounts,  or  so  much
29    thereof  as  may  be  necessary,  are  appropriated  from the
30    Capital Development Fund to the Capital Development Board for
31    the  Department  of  Military  Affairs   for   the   projects
32    hereinafter enumerated:
 
                           -10-                     BOB-CDB02
 1                          CHAMPAIGN ARMORY
 2    For upgrading mechanical and electrical
 3      systems and installing a kitchen ............. $  1,196,000
 4                            ELGIN ARMORY
 5    For replacing the roof and upgrading the
 6      interior and exterior ........................      603,000
 7                            GALVA ARMORY
 8    For replacing the roof and upgrading the
 9      interior and exterior ........................      600,000
10                           KEWANEE ARMORY
11    For upgrading electrical and mechanical
12      systems and installing a kitchen .............    2,524,000
13                            MACOMB ARMORY
14    For replacing the mechanical and electrical
15      systems and installing a kitchen .............    2,521,000
16                       NORTH RIVERSIDE ARMORY
17    For rehabilitating the interior and
18      exterior .....................................      618,000
19                          NORTHWEST ARMORY
20    For replacing the mechanical systems ...........    3,045,000
21                          ROCK FALLS ARMORY
22    For replacing the mechanical and
23      electrical systems and upgrading
24      the interior .................................    2,631,000
25        Total, Section 7                              $13,738,000

26        Section  8.  The  following  named  amounts,  or  so much
27    thereof as  may  be  necessary,  are  appropriated  from  the
28    Capital Development Fund to the Capital Development Board for
29    the   Department   of  Natural  Resources  for  the  projects
30    hereinafter enumerated:
31                          STATEWIDE PROGRAM
32    For constructing and renovating lodges ......... $  5,624,000
33    For replacing and renovating concession
 
                           -11-                     BOB-CDB02
 1      buildings ....................................    1,000,000
 2    For replacing roofs at the following locations,
 3     at the approximate cost set forth below .......      525,000
 4      Shabbona Lake State
 5       Park .................................155,000
 6      Hennepin Canal Parkway
 7       State Park ...........................115,000
 8      Randolph Fish &
 9       Wildlife Area .........................65,000
10      Dixon Springs State
11       Park .................................190,000
12               BEAVER DAM STATE PARK - MACOUPIN COUNTY
13    For replacing the sewage system ................      665,000
14                CASTLE ROCK STATE PARK - OGLE COUNTY
15    For rehabilitating the scenic
16      overlook and water system ....................    1,825,000
17               EAGLE CREEK STATE PARK - SHELBY COUNTY
18    For providing lake access and
19      constructing a dock ..........................    1,000,000
20              ELDON HAZLET STATE PARK - CLINTON COUNTY
21    For replacing the main waterline ...............      575,000
22            LASALLE FISH & WILDLIFE AREA - LASALLE COUNTY
23    For renovating the pond and installing
24      a well and treatment system ..................    1,720,000
25               MORAINE VIEW STATE PARK - MCLEAN COUNTY
26    For upgrading the water plant ..................      180,000
27                 NATURAL HISTORY SURVEY - CHAMPAIGN
28    For renovating storage building #1 .............      310,000
29                      PERE MARQUETTE STATE PARK
30    For upgrading youth camp sewer system ..........      140,000
31              SOUTHERN ILLINOIS MINING OFFICE - BENTON
32    For rehabilitating the facility ................      150,000
33         STARVED ROCK STATE PARK AND LODGE - LASALLE COUNTY
34    For upgrading water and sewer systems ..........      600,000
 
                           -12-                     BOB-CDB02
 1        WILLIAM W. POWERS FISH & WILDLIFE AREA - COOK COUNTY
 2    For replacing sanitary sewer lines and
 3      lift station .................................      890,000
 4        Total, Section 8                              $15,204,000

 5        Section 8.1.  The following named  amounts,  or  so  much
 6    thereof  as  may  be  necessary,  are  appropriated  from the
 7    General Revenue Fund to the Capital Development Board for the
 8    Department of Natural Resources for the projects  hereinafter
 9    enumerated:
10                          STATEWIDE PROGRAM
11    For maintaining lodge and concession
12      facilities ................................... $    494,400
13               ILLINOIS BEACH STATE PARK - LAKE COUNTY
14    For stabilizing the shoreline ..................      400,000
15           WAYNE FITZGERRELL STATE PARK - JEFFERSON COUNTY
16    For stabilizing the watershed shoreline ........      675,000
17        Total, Section 8.1                             $1,569,400

18        Section  9.  The  following  named  amounts,  or  so much
19    thereof as  may  be  necessary,  are  appropriated  from  the
20    Capital Development Fund to the Capital Development Board for
21    the  Department  of  Revenue  for  the  projects  hereinafter
22    enumerated:
23                 WILLARD ICE BUILDING - SPRINGFIELD
24    For upgrading the plumbing system .............. $  3,000,000
25    For upgrading parking lot/parking deck
26      structural repair ............................    1,250,000
27    For renovating the interior and
28      upgrading HVAC................................    3,855,000
29      For upgrading fire and voice activated
30      alarm system .................................      960,000
31        Total, Section 9                               $7,815,001
 
                           -13-                     BOB-CDB02
 1        Section  9.1.  The  following  named  amounts, or so much
 2    thereof as  may  be  necessary,  are  appropriated  from  the
 3    General Revenue Fund to the Capital Development Board for the
 4    Department   of   Revenue   for   the   projects  hereinafter
 5    enumerated:
 6                 WILLARD ICE BUILDING - SPRINGFIELD
 7    For completing security system upgrade, in
 8      addition to funds previously appropriated .... $    200,000
 9        Total, Section 9.1                               $200,000

10        Section 10.  The following  named  amounts,  or  so  much
11    thereof  as  may  be  necessary,  are  appropriated  from the
12    Capital Development Fund to the Capital Development Board for
13    the Department of State Police for the  projects  hereinafter
14    enumerated:
15                          STATEWIDE PROGRAM
16    For upgrading firing ranges, range
17      buildings and equipment ...................... $  2,000,000
18                    CAPITOL COMPLEX - SPRINGFIELD
19    For constructing a central administrative
20      office building and purchasing equipment, in
21      addition to funds previously appropriated ....   47,000,000
22        Total, Section 10                             $49,000,000

23        Section  11.  The  following  named  amounts,  or so much
24    thereof as  may  be  necessary,  are  appropriated  from  the
25    Capital Development Fund to the Capital Development Board for
26    the   Department   of  Veterans'  Affairs  for  the  projects
27    hereinafter enumerated:
28                 QUINCY VETERANS HOME - ADAMS COUNTY
29    For replacing roofing systems ..................      185,000
30        Total, Section 11                                $185,000

31        Section 11.1.  The following named amounts,  or  so  much
 
                           -14-                     BOB-CDB02
 1    thereof  as  may  be  necessary,  are  appropriated  from the
 2    General Revenue Fund to the Capital Development Board for the
 3    Department of Veterans' Affairs for the projects  hereinafter
 4    enumerated:
 5               LASALLE VETERANS' HOME - LASALLE COUNTY
 6    For installing wall protection ................. $    120,000
 7    For upgrading tempered water systems ...........       50,000
 8    For replacing lighting .........................       90,000
 9              MANTENO VETERANS' HOME - KANKAKEE COUNTY
10    For installing humidifiers and
11      dehumidifiers ................................    1,515,000
12                QUINCY VETERANS' HOME - ADAMS COUNTY
13    For renovating power plant equipment ...........      715,000
14        Total, Section 11.1                            $2,490,000

15        Section  12.  The  following  named  amounts,  or so much
16    thereof as  may  be  necessary,  are  appropriated  from  the
17    Capital Development Fund to the Capital Development Board for
18    the   Courts   of   Illinois  for  the  projects  hereinafter
19    enumerated:
20               APPELLATE COURT SECOND DISTRICT - ELGIN
21    For miscellaneous improvements ................. $    547,000
22        Total, Section 12                                $547,000

23        Section 12.1.  The following named amounts,  or  so  much
24    thereof  as  may  be  necessary,  are  appropriated  from the
25    General Revenue Fund to the Capital Development Board for the
26    Courts of Illinois for the projects hereinafter enumerated:
27               APPELLATE COURT THIRD DISTRICT - OTTAWA
28    For tuckpointing, repairing the exterior
29      and replacing the roof, in addition to
30      funds previously appropriated ................ $    191,600
31        Total, Section 12.1                              $191,600
 
                           -15-                     BOB-CDB02
 1        Section 13.  The following  named  amounts,  or  so  much
 2    thereof  as  may  be  necessary,  are  appropriated  from the
 3    Capital Development Fund to the Capital Development Board for
 4    the Office  of  the  Secretary  of  State  for  the  projects
 5    hereinafter enumerated:
 6                              STATEWIDE
 7    For replacing windows at the following
 8     locations at the approximate cost set
 9     forth below ................................... $  1,750,000
10      Lexington Avenue Motor
11       Vehicle Facility .....................583,000
12      Martin Luther King, Jr. Dr.
13       Motor Vehicle Facility ...............583,000
14      North Elston Motor
15       Vehicle Facility .....................584,000
16                   CAPITOL BUILDING - SPRINGFIELD
17    For upgrading the HVAC and mechanical
18      systems ......................................    6,950,000
19                    CAPITOL COMPLEX - SPRINGFIELD
20    For completing the stone restoration, in
21      addition to funds previously appropriated ....    3,000,000
22                   STATE POWER PLANT - SPRINGFIELD
23    For installing new water service and
24      repairing power plant systems ................       80,000
25             WILLIAM G. STRATTON BUILDING - SPRINGFIELD
26    For upgrading the electrical system, in
27      addition to funds previously appropriated ....    4,220,000
28        Total, Section 13                             $16,000,000

29        Section  14.  The  following  named  amounts,  or so much
30    thereof as  may  be  necessary,  are  appropriated  from  the
31    Capital Development Fund to the Capital Development Board for
32    the projects hereinafter enumerated:
33                              STATEWIDE
 
                           -16-                     BOB-CDB02
 1    For abating hazardous materials ................ $  2,050,000
 2    For retrofitting or upgrading mechanized
 3      refrigeration equipment (CFCs) ...............    1,650,000
 4    For surveys and modifications to buildings
 5      to meet requirements of the federal
 6      Americans with Disabilitites Act (ADA) .......    4,000,000
 7                   EXECUTIVE MANSION - SPRINGFIELD
 8    For building improvements ......................      600,000
 9        Total, Section 14                              $8,300,000

10        Section  14.1.  The  following  named amounts, or so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    General Revenue Fund to the Capital Development Board for the
13    projects hereinafter enumerated:
14                              STATEWIDE
15    Survey for and abate hazardous
16      materials .................................... $  2,000,000
17    For demolition of buildings ....................    1,000,000
18    For repairing minor problems and
19      emergencies ..................................    1,000,000
20        Total, Section 14.1                            $4,000,000

21        Section  15.     The  following named amounts, or so much
22    thereof as  may  be  necessary,  are  appropriated  from  the
23    Capital Development Fund to the Capital Development Board for
24    the   Illinois  Community  College  Board  for  the  projects
25    hereinafter enumerated:
26                              STATEWIDE
27    For miscellaneous capital improvements
28      including construction, capital facilities,
29      cost of planning, supplies, equipment,
30      materials, services and all other expenses
31      required to complete the work at the
32      various community colleges.  This appropriated
 
                           -17-                     BOB-CDB02
 1      amount shall be in addition to any other
 2      appropriated amounts which can be
 3      expended for these purposes ...................$  6,071,700

 4        Section 16.    The following named amounts,  or  so  much
 5    thereof  as  may  be  necessary,  are  appropriated  from the
 6    Capital Development Fund to the Capital Development Board for
 7    the Illinois Board  of  Higher  Education  for  the  projects
 8    hereinafter enumerated:
 9                              STATEWIDE
10    For miscellaneous capital improvements
11      including construction, capital
12      facilities, cost of  planning, supplies,
13      equipment, materials, services and
14      all other expenses required to complete
15      the work at the various universities
16      This appropriated  amount shall be in
17      addition to any other appropriated amounts
18      which can be expended for these purposes...... $ 13,928,300
19       Chicago State University .............322,700
20       Eastern Illinois University ..........515,500
21       Governors State University ...........189,700
22       Illinois State University ..........1,021,300
23       Northeastern Illinois
24        University ..........................383,700
25       Northern Illinois University .......1,159,000
26       Western Illinois University ..........792,200
27       Southern Illinois University -
28        Carbondale ........................1,624,700
29       Southern Illinois University -
30        Edwardsville ........................763,100
31       University of Illinois -
32        Chicago ...........................2,777,300
33       University of Illinois -
 
                           -18-                     BOB-CDB02
 1        Springfield .........................229,100
 2       University of Illinois -
 3        Urbana/Champaign ..................4,150,000
 4                      CHICAGO STATE UNIVERSITY
 5    For constructing a new library facility,
 6      site improvements, utilities, and
 7      purchasing equipment, in addition
 8      to funds previously appropriated .............   16,000,000
 9                     EASTERN ILLINOIS UNIVERSITY
10    For renovating and expanding the
11      Fine Arts Center, in addition to
12      funds previously appropriated ................   40,003,000
13                  NORTHEASTERN ILLINOIS UNIVERSITY
14    For renovating Building "C" and
15      remodeling and expanding Building "E"
16      and Building "F" .............................    9,064,300
17                UNIVERSITY OF ILLINOIS - SPRINGFIELD
18    For constructing a classroom and office
19      building, in addition to funds
20      previously appropriated ......................   30,000,000
21        Total, Section 19                            $108,995,600

22        Section  17.     The  following named amounts, or so much
23    thereof as  may  be  necessary,  are  appropriated  from  the
24    Capital Development Fund to the Capital Development Board for
25    the projects hereinafter enumerated:
26                    SOUTHERN ILLINOIS UNIVERSITY
27    For planning, construction and equipment
28      for a cancer center .......................... $ 14,500,000
29             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
30    For planning, construction and equipment
31      for an advanced technical worker
32      training facility ............................    1,100,000
33                  UNIVERSITY OF ILLINOIS - CHICAGO
 
                           -19-                     BOB-CDB02
 1    For planning, construction and equipment
 2      for a chemical sciences building .............    6,400,000
 3    For planning, construction and equipment
 4      for a medical imaging research
 5      clinical facility ............................    9,875,000
 6              UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
 7    For planning, construction and equipment
 8      for a biotechnology genomic facility .........   41,250,000
 9    For planning, construction and equipment
10      for a supercomputing application facility ....   30,000,000
11    For planning, construction and equipment
12      for a technology transfer incubator
13      facility .....................................    3,000,000
14        Total, Section 17                            $106,125,000

15        Section  18.  The  amount  of  $10,000,000,  or  so  much
16    thereof as may be necessary, is appropriated from the Tobacco
17    Settlement Recovery Fund to the Capital Development Board for
18    a grant to Northwestern University for planning, construction
19    and equipment for a biomedical research facility.

20        Section  19.  The  amount  of  $32,000,000,  or  so  much
21    thereof as may be necessary, is appropriated from the Capital
22    Development  Fund  to the Board of Trustees of the University
23    of Illinois for planning, construction and  equipment  for  a
24    computer science in engineering facility.

25        Section  20.  The  amount  of  $10,000,000,  or  so  much
26    thereof as may be necessary, is appropriated from the Tobacco
27    Settlement Recovery Fund to the Capital Development Board for
28    a   grant   to   the  University  of  Chicago  for  planning,
29    construction and equipment for an advanced research building.

30        Section 21.  The amount of $1,000,000, or so much thereof
 
                           -20-                     BOB-CDB02
 1    as  may  be  necessary,  is  appropriated  from  the  Tobacco
 2    Settlement Recovery Fund to the Capital Development Board for
 3    a grant to IIT for planning, construction and equipment for a
 4    biomedical research center.

 5        Section 22.  The amount of $4,000,000, or so much thereof
 6    as  may  be  necessary,  is  appropriated  from  the  Tobacco
 7    Settlement Recovery Fund to the Capital Development Board for
 8    a grant to Argonne for planning, construction  and  equipment
 9    for a nanotechnology research institute.

10        Section 23.  The amount of $2,000,000, or so much thereof
11    as  may  be  necessary,  is  appropriated  from  the  Tobacco
12    Settlement Recovery Fund to the Capital Development Board for
13    a grant to Northwestern University for planning, construction
14    and equipment for a nanofabrication and molecular center.

15        Section 24.  The amount of $5,000,000, or so much thereof
16    as  may  be  necessary,  is  appropriated  from  the  Tobacco
17    Settlement Recovery Fund to the Capital Development Board for
18    a  grant  to  Rush Presbyterian St. Luke's Medical Center for
19    planning, construction and equipment for the Cohn Bio-Medical
20    Research Building.

21        Section 25.  The amount of $3,500,000, or so much thereof
22    as  may  be  necessary,  is  appropriated  from  the  Tobacco
23    Settlement Recovery Fund to the Capital Development Board for
24    planning,  construction,  equipment  and   grants   for   the
25    VentureTECH program.

26                      STATE BOARD OF EDUCATION
27        Section  26.  The sum of $500,000,000, or so much thereof
28    as  may  be  necessary,  is  appropriated  from  the   School
29    Construction Fund to the Capital Development Board for school
 
                           -21-                     BOB-CDB02
 1    construction  grants pursuant to the School Construction Law,
 2    in addition  to  amounts  previously  appropriated  for  such
 3    purposes.

 4        Section  95.   No  contract  shall  be  entered  into  or
 5    obligation  incurred for any expenditures from appropriations
 6    made in this Article until after  the  purposes  and  amounts
 7    have been approved by the Governor.

 8                              ARTICLE 2

 9        Section  1.  The  following  named  amounts,  or  so much
10    thereof as may be necessary  and  remain  unexpended  at  the
11    close  of  business on June 30, 2001, from appropriations and
12    reappropriations heretofore made for such purposes in Article
13    1, Section 1, and Article 2, Section 1 of Public Act  91-708,
14    are  reappropriated  from the Capital Development Fund to the
15    Capital Development Board for the Department  of  Agriculture
16    for the projects hereinafter enumerated:

17                ANIMAL DISEASE LABORATORY - CENTRALIA
18    (From Article 2, Section 1 of Public Act 91-708)
19    For upgrading the diagnostic laboratory
20      facility, in addition to funds previously
21      appropriated ................................. $     42,905
22                      DUQUOIN STATE FAIRGROUNDS
23    (From Article 1, Section 1 of Public Act 91-708)
24    For upgrading electrical utilities .............      146,000
25    For constructing a multi-purpose
26      building .....................................    8,000,000
27    (From Article 2, Section 1 of Public Act 91-708)
28    For renovating roundhouses .....................      128,396
29    For constructing livestock
30      facilities ...................................      159,918
 
                           -22-                     BOB-CDB02
 1    For upgrading the racetrack, including the
 2      racetrack walls ..............................      879,177
 3                   GALESBURG DIAGNOSTIC LABORATORY
 4    For purchasing the facility ....................    3,200,000
 5              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
 6    (From Article 1, Section 1 of Public Act 91-708)
 7    For renovating or replacing racehorse
 8      barns - Phase IV .............................    1,648,200
 9    For renovating the Emmerson Building ...........    2,086,150
10    For renovating or replacing #26 Barn ...........      789,673
11    For completing the HVAC system in the
12      Administration Building, in addition to
13      funds previously appropriated ................      340,000
14    For renovating the Junior Home Economics
15      Building .....................................    1,131,000
16    (From Article 2, Section 1 of Public Act 91-708)
17    For completing the HVAC replacement
18      in the Administration Building, in
19      addition to funds previously appropriated ....      405,358
20    For replacing and repairing roofs,
21      Phase II .....................................      196,583
22    For extending the fiber optics system ..........      221,153
23    For installing HVAC system and
24      restrooms in the Orr Building ................      294,828
25    For designing and constructing a complex to
26      accommodate various outdoor events,
27      including site development, utilities,
28      permanent grandstands and portable
29      bleachers, support facilities, vehicle
30      and pedestrian access and related
31      work .........................................      537,570
32    For replacing and renovating
33      racehorse barns (Phase II) ...................      134,561
34    For replacing and rehabilitating roofs .........       25,578
 
                           -23-                     BOB-CDB02
 1    For replacing Series 14 Barns (Phase I) ........       10,653
 2    For replacing the HVAC system in the
 3      Administration Building ......................       73,895
 4    For renovation or replacement of
 5      comfort stations, in addition
 6      to funds previously appropriated .............      122,767
 7    For renovation of the comfort stations-
 8      Phase I ......................................       37,212
 9    For planning and beginning the renovation
10      of the show horse barns ......................       42,284
11        Total, Section 1                              $20,653,861

12        Section  2.  The  following  named  amounts,  or  so much
13    thereof as may be necessary  and  remain  unexpended  at  the
14    close  of  business on June 30, 2001, from appropriations and
15    reappropriations heretofore made for such purposes in Article
16    1, Section 13 and Article 2, Section 2 of Public Act  91-708,
17    as  amended,  are reappropriated from the Capital Development
18    Fund to the Capital  Development  Board  for  the  Courts  of
19    Illinois for the projects hereinafter enumerated:

20                 MT. VERNON APPELLATE COURT BUILDING
21    (From Article 2, Section 2 of Public Act 91-708, as amended)
22    For expanding the courthouse ...................    1,531,730
23    For expanding the courthouse, in
24      addition to funds previously
25      appropriated .................................      792,000
26                SPRINGFIELD - SUPREME COURT BUILDING
27    (From Article 1, Section 13 of Public Act 91-708)
28    For replacing the roof .........................      812,600
29    For renovating the HVAC system on
30      the 3rd Floor ................................      140,000
31    (From Article 2, Section 2 of Public Act 91-708)
32    For installing humidifier and water
 
                           -24-                     BOB-CDB02
 1      filtration systems ...........................    1,570,950
 2    For upgrading the library, in
 3      addition to funds previously appropriated ....      323,721
 4    For replacing plumbing system ..................      363,712
 5    For planning and beginning the
 6      library upgrade ..............................       38,996
 7               THIRD DISTRICT APPELLATE COURT - OTTAWA
 8    For replacing the Annex roof ...................       44,180
 9        Total, Section 2                               $5,617,889

10        Section  2.1.  The  following  named  amounts, or so much
11    thereof as may be necessary  and  remain  unexpended  at  the
12    close  of  business  on  June 30, 2001, from reappropriations
13    heretofore made for such purposes in Article 2,  Section  2.1
14    of  Public  Act  91-708,  are reappropriated from the General
15    Revenue  Fund  to  the  Capital  Development  Board  for  the
16    projects hereinafter enumerated:

17          SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
18    (From Article 2, Section 2.1 of Public Act 91-708)
19    For upgrading mechanical systems
20      and building exterior ........................ $      9,944
21               THIRD DISTRICT APPELLATE COURT - OTTAWA
22    For tuckpointing and repairing exterior ........       98,888
23             FIFTH DISTRICT APPELLATE COURT - MT. VERNON
24    For repairing plaster and painting .............       81,606
25                SUPREME COURT BUILDING - SPRINGFIELD
26    For tuckpointing and cleaning exterior .........       35,490
27        Total, Section 2.1                               $225,928

28        Section 3.  The  following  named  amounts,  or  so  much
29    thereof  as  may  be  necessary  and remain unexpended at the
30    close of business on June 30, 2001, from  appropriations  and
31    reappropriations heretofore made in Article 1, Section 14 and
 
                           -25-                     BOB-CDB02
 1    Article  2,  Section 3 of Public Act 91-708, approved May 17,
 2    2000, are reappropriated from the Capital Development Fund to
 3    the Capital Development Board for the Office of the Secretary
 4    of State for the projects hereinafter enumerated:

 5             WILLIAM G. STRATTON BUILDING - SPRINGFIELD
 6    (From Article 1, Section 14 of Public Act 91-708)
 7    For replacing windows and tuckpointing ......... $  5,925,000
 8                    CAPITOL COMPLEX - SPRINGFIELD
 9    (From Article 2, Section 3 of Public Act 91-708)
10    For upgrading electrical lighting and replacing
11      ceilings - Stratton Office Building ..........    5,416,239
12    For replacing mechanical piping - Klein
13      and Mason Warehouse...........................      278,100
14    For renovating the exterior of the Capitol
15      and Howlett Buildings ........................    1,337,174
16    For demolition of 222 S. College,
17      and landscaping of Capitol Complex
18      in addition to funds previously
19      appropriated .................................    1,200,000
20    For demolition of 222 South College
21      Building and landscaping of
22      Capitol Complex ..............................    2,387,894
23        Total, Section 3                              $16,544,407

24        Section 3.1.  The sum of $825,000, or so much thereof  as
25    may  be  necessary  and  remains unexpended on June 30, 2001,
26    from a reappropriation heretofore made for such  purposes  in
27    Article 2, Section 17 of Public Act 91-708, is reappropriated
28    from  the Capital Development Fund to the Capital Development
29    Board for the Secretary of State for a grant to the Edgebrook
30    Library for all costs associated with the miscellaneous costs
31    incurred for construction or other purposes.
32        Section 3.2.  The sum of $8,300,000, or so  much  thereof
 
                           -26-                     BOB-CDB02
 1    as  may  be necessary, and remains unexpended at the close of
 2    business on June 30, 2001, from an  appropriation  heretofore
 3    made  in  Article  1,  Section  14.1 of Public Act 91-708, as
 4    amended, is reappropriated from the Capital Development  Fund
 5    to  the  Capital  Development  Board  for  the  Office of the
 6    Secretary of State to construct a parking garage.

 7        Section 4.  The  following  named  amounts,  or  so  much
 8    thereof  as  may  be  necessary  and remain unexpended at the
 9    close of business on June 30, 2001, from  appropriations  and
10    reappropriations heretofore made for such purposes in Article
11    1,  Section  2 and Article 2, Section 4 of Public Act 91-708,
12    are reappropriated from the Capital Development Fund  to  the
13    Capital  Development  Board  for  the  Department  of Central
14    Management Services for the projects hereinafter enumerated:

15                 JAMES R. THOMPSON CENTER - CHICAGO
16    (From Article 1, Section 2 of Public Act 91-708)
17    For upgrading mechanical systems ............... $  1,466,396
18           MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
19    For replacing roof and upgrading
20      mechanical and electrical systems ............    1,249,680
21           PEORIA REGIONAL OFFICE BUILDING - PEORIA COUNTY
22    For rehabilitating the HVAC system .............      135,000
23                  ROCKFORD REGIONAL OFFICE BUILDING
24    For upgrading utilities ........................       80,000
25                      SPRINGFIELD STATE GARAGE
26    For renovating the interior of the
27      central garage ...............................      653,360
28            RESEARCH AND COLLECTION CENTER - SPRINGFIELD
29    For expanding surplus warehouse ................    3,184,803
30                   ELGIN REGIONAL OFFICE BUILDING
31    (From Article 2, Section 4 of Public Act 91-708)
32    For replacing the utility system ...............      854,356
 
                           -27-                     BOB-CDB02
 1          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
 2                      ROOSEVELT ROAD - CHICAGO
 3    (From Article 1, Section 2 of Public Act 91-708)
 4    For upgrading electrical systems ...............      940,000
 5    (From Article 2, Section 4 of Public Act 91-708)
 6    For converting and renovating tub rooms ........      409,500
 7    For upgrading the HVAC system ..................      367,798
 8               ILLINOIS CENTER FOR REHABILITATION AND
 9                     EDUCATION (WOOD) - CHICAGO
10    (From Article 1, Section 2 of Public Act 91-708)
11    For upgrading fire and safety systems ..........      335,000
12                STATE OF ILLINOIS BUILDING - CHICAGO
13    (From Article 1, Section 2 of Public Act 91-708)
14    For restoring exterior and rebuilding
15      foundation ...................................    1,580,000
16                 CHICAGO - STATE OF ILLINOIS CENTER
17    (From Article 2, Section 4 of Public Act 91-708)
18    For replacing roofing system and
19      insulation, in addition to funds
20      previously appropriated ......................       17,779
21    For the correction of design/construction
22      deficiencies, including remedial work in
23      the heating, refrigeration, temperature
24      control and ventilation systems at the
25      State of Illinois Center at Chicago ..........       26,478
26           OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
27    For planning and beginning the renovation
28      of the facility ..............................    2,166,020
29              SUBURBAN NORTH REGIONAL OFFICE BUILDING -
30                             DES PLAINES
31    For renovating offices for Environmental
32      Protection Agency, in addition to funds
33      previously appropriated ......................      750,895
34    For renovation of Suburban North Regional
 
                           -28-                     BOB-CDB02
 1      Office Building (formerly Maine Township
 2      North High School building), in addition
 3      to funds previously appropriated for such
 4      purpose, Phase III ...........................      328,299
 5                         OTTAWA STATE GARAGE
 6    For replacing state garage .....................    1,334,504
 7                    SPRINGFIELD - CAPITOL COMPLEX
 8    For construction of a day care center, in
 9      addition to funds previously appropriated
10      for such purpose .............................      950,000
11    For construction of a day care center in the
12      Capitol Complex in Springfield ...............      244,348
13                   COMPUTER FACILITY - SPRINGFIELD
14    For installing a cooling tower and fire alarm
15      system and various other improvements ........      550,354
16    For replacement of the halon fire
17      suppression system ...........................      130,990
18                        ASH STREET COMPLEX -
19                   MUSEUM AND COLLECTION CENTER -
20                             SPRINGFIELD
21    For replacement of the roofing system ..........      438,346
22                   MARION REGIONAL OFFICE BUILDING
23    For replacing HVAC system and interior
24      lighting .....................................      582,369
25    For construction of a Regional Office
26      Building Addition ............................      282,513
27                SPRINGFIELD REGIONAL OFFICE BUILDING
28    For replacing the potable water system .........      747,059
29    For upgrading the parking lot ..................      160,864
30        Total, Section 4                              $19,966,711

31        Section 4.1.  The following named  amounts,  or  so  much
32    thereof  as  may  be  necessary  and remain unexpended at the
33    close of business on June  30,  2001,  from  reappropriations
 
                           -29-                     BOB-CDB02
 1    heretofore  made  for such purposes in Article 2, Section 4.1
 2    of Public Act 91-708, are  reappropriated  from  the  General
 3    Revenue  Fund  to  the  Capital  Development  Board  for  the
 4    Department  of  Central  Management Services for the projects
 5    hereinafter enumerated:

 6                 JAMES R. THOMPSON CENTER - CHICAGO
 7    (From Article 2, Section 4.1 of Public Act 91-708)
 8    For restoring the exterior plaza ...............       78,933
 9           CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
10    For rehabilitating exterior ....................      214,884
11                       CHICAGO MEDICAL CENTER
12          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
13    For rehabilitating the pool area ...............      143,950
14                STATE OF ILLINOIS BUILDING - CHICAGO
15    For restoring exterior limestone and
16      masonry ......................................      505,991
17                         PARIS STATE GARAGE
18    For replacing overhead lighting and
19      pneumatic system .............................      192,532
20        Total, Section 4.1                             $1,136,290

21        Section 5.  The  following  named  amounts,  or  so  much
22    thereof  as  may  be  necessary  and remain unexpended at the
23    close of business on June 30, 2001, from  appropriations  and
24    reappropriations heretofore made for such purposes in Article
25    1,  Section 7, and Article 2, Section 5 of Public Act 91-708,
26    are reappropriated from the Capital Development Fund  to  the
27    Capital  Development  Board  for  the  Department  of Natural
28    Resources for the projects hereinafter enumerated:

29                 BABE WOODYARD STATE NATURAL AREA -
30                          VERMILION COUNTY
31    (From Article 2, Section 5 of Public Act 91-708)
 
                           -30-                     BOB-CDB02
 1    For developing the site and associated
 2      land acquisition ............................. $  2,828,451
 3                BEALL WOODS STATE CONSERVATION AREA -
 4                            WABASH COUNTY
 5    For replacing a visitors center ................      228,012
 6               BEAVER DAM STATE PARK - MACOUPIN COUNTY
 7    For rehabilitating dams, spillway, and
 8      boat access facilities .......................      402,632
 9                      CARLYLE LAKE STATE PARKS
10    For cabin construction and site
11      improvements at Eldon
12      Hazlet State Park, Phase II ..................    1,463,185
13    For road and site improvements at
14      Carlyle Lake .................................    1,500,000
15    For infrastructure and site
16      improvements at Carlyle Lake .................    2,776,997
17                CASTLE ROCK STATE PARK - OGLE COUNTY
18    (From Article 1, Section 7 of Public Act 91-708)
19    For replacing maintenance building .............      413,803
20               CAVE-IN-ROCK STATE PARK - HARDIN COUNTY
21    (From Article 2, Section 5 of Public Act 91-708)
22    For constructing a shower building
23      and upgrading the campground .................       51,259
24             CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
25    For upgrading sewage treatment system ..........    1,049,219
26    For construction of a concession building
27      and upgrading the horse concession, in
28      addition to funds previously appropriated ....       25,954
29    For planning and beginning the replacement
30      of concession buildings ......................       10,180
31               EAGLE CREEK STATE PARK - SHELBY COUNTY
32    For rehabilitation of the sewage treatment
33      system, in addition to funds previously
34      appropriated .................................      175,281
 
                           -31-                     BOB-CDB02
 1               FORT MASSAC STATE PARK - MASSAC COUNTY
 2    (From Article 1, Section 7 of Public Act 91-708)
 3    For reconstructing the fort ....................    4,300,000
 4    (From Article 2, Section 5 of Public Act 91-708)
 5    For planning and beginning the
 6      reconstruction of the fort ...................       35,314
 7                     GEOLOGICAL SURVEY-CHAMPAIGN
 8    (From Article 1, Section 7 of Public Act 91-708)
 9    For constructing two pole
10      storage buildings ............................      312,500
11          HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
12    For rehabilitating aqueducts
13      #3, #4 and #8 ................................      750,000
14    (From Article 2, Section 5 of Public Act 91-708)
15    For stabilizing the feeder canal bank ..........       44,484
16    For replacement and rehabilitation
17      of arch culverts and canal ...................      261,190
18         HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
19    For dam rehabilitation and the State's share
20      to implement the ecological restoration
21      plan in cooperation with the U.S.
22      Army Corps of Engineers, and
23      land acquisition .............................      858,655
24    For construction of a pole building
25      and hunter check station .....................       41,284
26                 ILLINOIS-MICHIGAN CANAL STATE TRAIL
27    For stabilization of the aqueduct ..............      173,139
28               ILLINOIS BEACH STATE PARK - LAKE COUNTY
29    (From Article 1, Section 7 of Public Act 91-708)
30    For replacing sanitary sewer line ..............      545,300
31    (From Article 2, Section 5 of Public Act 91-708)
32    For rehabilitating lodge entrance ..............       73,463
33    For constructing an office building ............       45,626
34    For replacing sanitary sewer lines .............      474,347
 
                           -32-                     BOB-CDB02
 1            JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
 2    For upgrading campground electrical ............      209,574
 3    For rehabilitation of the concession
 4      building, in addition to funds
 5      previously appropriated ......................       85,499
 6    For rehabilitation of the concession building ..       40,558
 7         KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
 8    For constructing sanitary sewer system, in
 9      addition to funds previously appropriated ....    5,000,000
10                KANKAKEE STATE PARK - KANKAKEE COUNTY
11    For planning and constructing a
12      sanitary sewer system ........................       80,854
13                KASKASKIA RIVER FISH & WILDLIFE AREA
14    (From Article 1, Section 7 of Public Act 91-708)
15    For providing electrical service ...............      106,000
16               KICKAPOO STATE PARK - VERMILION COUNTY
17    For rehabilitating the water
18      system and day-use areas .....................    1,041,000
19           LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
20    (From Article 2, Section 5 of Public Act 91-708)
21    For replacing sewage treatment plant ...........      539,270
22            LAKE MURPHYSBORO STATE PARK - JACKSON COUNTY
23    (From Article 1, Section 7 of Public Act 91-708)
24    For replacing the district office
25      building .....................................      485,299
26         LINCOLN TRAIL STATE RECREATION AREA - CLARK COUNTY
27    For renovating the concession
28      building .....................................      815,000
29    For upgrading campground electrical
30      and drainage .................................      460,000
31    (From Article 2, Section 5 of Public Act 91-708)
32    For rehabilitating the day use area
33      and site .....................................    1,183,776
34           LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
 
                           -33-                     BOB-CDB02
 1    (From Article 1, Section 7 of Public Act 91-708)
 2    For improving drainage discharge ...............      250,000
 3                   MASON STATE FOREST TREE NURSERY
 4    For expanding the cold storage facility ........      638,000
 5    For expanding the seed cleaning facility .......      662,000
 6            MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
 7    (From Article 2, Section 5 of Public Act 91-708)
 8    For rehabilitating levee and well, in
 9      addition to funds previously appropriated ....    2,404,021
10              MORAINE HILLS STATE PARK - MCHENRY COUNTY
11    For renovation of the trail ....................       89,337
12    For replacement of restrooms and upgrading
13      the water system .............................      139,731
14                    MORRISON-ROCKWOOD STATE PARK
15    (From Article 1, Section 7 of Public Act 91-708)
16    For improving the water system and
17      rehabilitating the campground water ..........      418,000
18                   NATURAL HISTORY SURVEY - HAVANA
19    For renovating Forbes Biological Station .......      683,000
20                  NORTH POINT MARINA - LAKE COUNTY
21    (From Article 2, Section 5 of Public Act 91-708)
22    For construction of a breakwater structure .....    1,012,492
23    For modifying the marina's docking system ......    1,471,710
24                 NAUVOO STATE PARK - HANCOCK COUNTY
25    For replacing water distribution
26      system .......................................      128,990
27              PERE MARQUETTE STATE PARK - JERSEY COUNTY
28    For replacing the lodge HVAC condensing unit, in
29      addition to funds previously appropriated ....      158,475
30                PRAIRIE RIDGE SANCTUARY NATURAL AREA
31    (From Article 1, Section 7 of Public Act 91-708)
32    For replacing the Service & Hazardous
33      Materials buildings and installing a fuel
34      tank .........................................      366,000
 
                           -34-                     BOB-CDB02
 1             RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
 2    (From Article 1, Section 7 of Public Act 91-708)
 3    For renovating the interior ....................      991,000
 4               ROCK CUT STATE PARK - WINNEBAGO COUNTY
 5    For upgrading the sewage system ................    2,365,300
 6                  NEW OFFICE BUILDING - SPRINGFIELD
 7    For completing construction of an
 8      office building, in addition to funds
 9      previously appropriated ......................    2,000,000
10                    SANGANOIS CONSERVATION AREA -
11                  CASS, MASON AND SCHUYLER COUNTIES
12    (From Article 2, Section 5 of Public Act 91-708)
13    For rehabilitating the levee system ............      197,895
14               SANGCHRIS STATE PARK - SANGAMON COUNTY
15    For upgrading campground electrical
16      system .......................................      180,111
17           SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
18    For planning and beginning renovation
19      of hatchery ..................................      442,608
20                             SPRINGFIELD
21    For constructing an office building and
22      interpretive center ..........................   12,332,481
23              STARVED ROCK STATE PARK - LASALLE COUNTY
24    For construction of a visitors center, in
25      addition to funds previously appropriated ....    3,978,987
26    For rehabilitating the sewer system ............    1,038,833
27    For rehabilitating trails, in addition
28      to funds previously appropriated .............      500,000
29    For upgrading the HVAC system ..................       93,704
30    For construction of a Visitors'
31      Center, in addition to funds
32      previously appropriated ......................      365,000
33    For rehabilitation of trails, in addition
34      to funds previously appropriated .............      175,769
 
                           -35-                     BOB-CDB02
 1    For rehabilitation of the sewer
 2      system - Phase I .............................       79,636
 3             TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES
 4    For planning and beginning
 5      construction of a park .......................       48,602
 6                 WASTE MANAGEMENT & RESEARCH CENTER
 7    (From Article 1, Section 7 of Public Act 91-708)
 8    For constructing a garage and
 9      storage area .................................      394,000
10           WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY
11    (From Article 2, Section 5 of Public Act 91-708)
12    For rehabilitation of the sewage
13      treatment plant ..............................      149,908
14             WHITE PINES FOREST STATE PARK - OGLE COUNTY
15    For planning and beginning lodge and cabin
16      restoration ..................................      150,000
17                        WILDLIFE PRAIRIE PARK
18    (From Article 1, Section 7 of Public Act 91-708)
19    For planning and beginning the upgrade
20      of the park ..................................    1,000,000
21             TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
22    (From Article 2, Section 5 of Public Act 91-708)
23    For constructing a visitor center and
24      purchasing land ..............................    3,119,323
25      NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
26                     (FORMERLY BURNHAM HOSPITAL)
27    For construction of a Natural History
28      Research Center for the space needs of
29      the Illinois Natural History Survey on
30      the campus of the University of Illinois......    6,000,000
31    For planning and construction of the
32      Natural History Research Center
33      for the space needs of the
34      Illinois Natural History Survey
 
                           -36-                     BOB-CDB02
 1      on the campus of the University
 2      of Illinois in Champaign .....................    2,103,800
 3                   STATE WATER SURVEY - CHAMPAIGN
 4    (From Article 1, Section 7 of Public Act 91-708)
 5    For constructing a vehicle maintenance
 6      and shop building ............................    3,568,000
 7    (From Article 2, Section 5 of Public Act 91-708)
 8    For upgrading and replacing the mechanical
 9      system, in addition to funds
10      previously appropriated ......................    2,090,148
11    For planning and replacement of vehicle
12      storage/shop facilities ......................       21,150
13                     DICKSON MOUNDS - LEWISTOWN
14    For renovating Canton Liverpool
15      Toll Booth ...................................       28,902
16      STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
17    For the completion of site improvements ........      190,582
18                     STATE MUSEUM - SPRINGFIELD
19    For renovating or replacing exhibits, in
20      addition to funds previously appropriated ....    5,500,000
21    For planning and beginning replacement
22      of the state museum ..........................      469,146
23    For planning and replacement of the main
24      museum exhibits, in addition to funds
25      previously appropriated ......................      351,000
26    For planning renovation of main museum
27      exhibits and for renovation of basement
28      galleries ....................................       24,350
29                              STATEWIDE
30    (From Article 1, Section 7 of Public Act 91-708)
31    For fabrication of visitors centers
32      exhibit ......................................      700,000
33    For replacing and constructing vault
34      toilets at the following locations,
 
                           -37-                     BOB-CDB02
 1      at the approximate cost set forth
 2      below ........................................    1,805,000
 3       Wayne Fitzgerrell State Park .........414,000
 4       Goose Lake Prairie State Park .........71,000
 5       Wolf Creek State Park ................805,000
 6       Hennepin Canal Parkway
 7       State Trail ..........................435,000
 8       Kaskaskia River Fish &
 9       Wildlife Area .........................80,000
10       For providing dump stations..................      200,000
11    For rehabilitating bridges at the
12      following locations, at the approximate
13      cost set forth below .........................    1,056,060
14       Rock Island Trail ....................661,060
15       Frank Holten State Park ..............300,000
16       Horseshoe Lake State Park .............70,000
17       Castle Rock State Park ................25,000
18    For rehabilitating dams at the
19      following locations, at the
20      approximate cost set forth below .............    1,421,887
21       Ramsey Lake State Park ...............521,887
22       Rock Cut State Park ..................450,000
23       Snakeden Hollow State Park ...........450,000
24    For replacing roofs at the following
25      locations, at the approximate
26      cost set forth below .........................    1,384,000
27       Southern IL Arts &
28        Crafts Center .......................290,000
29       Frank Holten State Park ...............28,000
30       DNR Geological Survey-
31        Champaign ...........................124,000
32       Sangchris Lake State
33        Park .................................50,000
34       Illini State Park ....................125,000
 
                           -38-                     BOB-CDB02
 1       Shelbyville Fish &
 2        Wildlife Area .......................100,000
 3       Trail of Tears State
 4        Forest ..............................219,000
 5       Sanganois Conservation Area ...........48,000
 6       Rice Lake State Park .................125,000
 7       Hidden Spring State Park ..............67,000
 8       Siloam Springs State Park .............48,000
 9       Mississippi Palisades
10        State Park ..........................160,000
11    (From Article 2, Section 5 of Public Act 91-708)
12    For replacing roofing systems at the
13      following locations, at the approximate
14      cost set forth below .........................    1,684,260
15        Beall Woods Conservation Area -
16         Wabash County .......................30,000
17        Eagle Creek State Park -
18         Shelby County ..........................100
19        Eldon Hazlet State Park -
20         Clinton County ......................61,296
21        Fox Ridge State Park -
22         Coles County ........................34,000
23        Giant City State Park -
24         Jackson/Union Counties ..............89,969
25        Goose Lake Prairie State Park -
26         Grundy County ......................109,519
27        Hennepin Canal Parkway State Trail ...97,485
28        Illinois Beach State Park -
29         Lake County ........................478,008
30        Illinois Caverns Natural Area -
31         Monroe County .......................74,000
32        Kankakee River State Park -
33         Kankakee/Will Counties ..............74,000
34        Kickapoo State Park -
 
                           -39-                     BOB-CDB02
 1         Vermilion County ....................36,320
 2        Middle Fork State Fish & Wildlife
 3         Area - Vermilion County .............12,900
 4        Moraine Hills State Park -
 5         McHenry County ......................52,456
 6        Moraine View State Park -
 7         McLean County.......................148,415
 8        Ramsey Lake State Park -
 9         Fayette County ......................63,203
10        Randolph County Conservation Area ....53,236
11        Red Hills State Park -
12         Lawrence County ........................100
13        Saline County Conservation Area ......20,000
14        Sam Dale Lake Conservation Area -
15         Wayne County ...........................100
16        Spitler Woods State Natural Area -
17         Macon County ...........................425
18        Stephen A. Forbes State Park -
19         Marion County .......................36,547
20        Ten Mile Creek State Fish &
21         Wildlife Area - Jefferson/
22         Hamilton Counties....................76,000
23        Union County Conservation Area ........6,694
24        Washington County Conservation Area ..45,546
25        Waste Management & Research Center -
26         Champaign ..............................100
27        William W. Powers Conservation Area -
28         Cook County .........................37,841
29        Wolf Creek State Park -
30         Shelby County .......................46,000
31    For replacing vault toilets at the following
32      locations, at the approximate cost set forth
33      below ........................................      613,343
34        Anderson Lake Conservation Area -
 
                           -40-                     BOB-CDB02
 1         Fulton/Schuyler Counties ...........156,000
 2        Giant City State Park -
 3         Jackson/Union Counties .............294,498
 4        Randolph County Conservation Area ...150,630
 5        Silver Springs State Park -
 6          Kendall County .....................12,215
 7    For replacing roofing systems at the
 8      following locations at the approximate
 9      costs set forth below ........................       91,146
10        Silver Springs State Park, Three
11         Buildings .......................... 76,146
12        Weldon Springs State Park, Nine
13         Buildings .......................... 15,000
14    For constructing vault toilets at the following
15      locations at the approximate costs set forth
16      below ........................................      443,507
17        Cave-In-Rock State Park ............ 156,072
18        Golconda/Rauchfuss Hill ............ 122,998
19        I&M Canal - Gebhard Woods State
20         Park ................................ 5,000
21        Prophetstown State Park ............. 53,437
22        William W. Powers State Park ....... 106,000
23    For constructing hazardous material storage
24      buildings ....................................      262,324
25    For replacing concession buildings and
26      upgrading support facilities at the following
27      locations at the approximate costs set
28      forth below: .................................    1,261,749
29       Kickapoo State Park ..................387,818
30       Rock Cut State Park ..................521,525
31       Stephen A. Forbes State Park .........352,406
32    For constructing vault toilets at the
33      following locations at the approximate
34      cost set forth below: ........................      519,925
 
                           -41-                     BOB-CDB02
 1       Apple River Canyon State Park ........228,145
 2       Des Plaines Conservation Area .........66,000
 3       Kankakee River State Park .............31,780
 4       Lake Le-Aqua-Na State Park ...........115,000
 5       Marshall County Conservation Area .....30,000
 6       Morrison-Rockwood State Park ..........12,000
 7       Rice Lake Conservation Area ...........37,000
 8    For replacing roofing systems and structural
 9      repairs at the following locations at the
10      approximate costs set forth below: ...........       40,452
11       Mine Rescue Station, One building .....13,858
12       Castle Rock State Park,
13        One building ..........................2,120
14       Dixon Springs State Park,
15        Three buildings .......................1,060
16       Cave-In-Rock State Park,
17        One building ..........................1,060
18       Ferne Clyffe State Park,
19        One building ..........................1,060
20       Hamilton County Conservation
21        Area, One building ...................15,370
22       Lake Murphysboro State Park
23        Two buildings .........................1,060
24       Red Hills State Park, Two
25        buildings .............................1,060
26       Fox Ridge State Park, Six
27        buildings .............................1,060
28       Shelbyville Fish and Wildlife
29        Area, Two buildings ...................1,060
30       Newton Lake Fish and Wildlife
31        Area, One building ....................1,684
32    For repair or replacement of roofs and
33      parapet walls and reconstruction of
34      chimneys at the following locations
 
                           -42-                     BOB-CDB02
 1      at the approximate costs set forth below .....      517,905
 2       Geological Survey - Applied Lab ......186,375
 3       Water Survey - Eight Buildings ........46,000
 4       Natural History Survey - Natural
 5        Resources Studies Annex ..............67,000
 6       Geological Survey - Natural
 7        Resources Building ...................64,000
 8       Water Survey - Parapet walls at
 9        Buildings No. 4, 5 and 6 .............10,000
10       Dickson Mounds - Exterior restroom
11        and picnic shelter ...................14,530
12       Jake Wolf Fish Hatchery ..............130,000
13    For land acquisition ...........................      490,648
14    For maintaining the lodge and concession
15      facilities ...................................       12,106
16    For construction of hazardous material
17      storage buildings ............................       67,557
18    For abating hazards caused by the presence
19      of asbestos-containing materials .............       51,622
20    For planning, construction, reconstruction,
21      land acquisition and related costs,
22      utilities, site improvements, and all other
23      expenses necessary for various capital
24      improvements at parks, conservation areas,
25      and other facilities under the jurisdiction
26      of the Department of Natural Resources .......    3,408,548
27        Total, Section 5                             $103,291,135

28        Section 5.1.  The sum of $3,000,000, or so  much  thereof
29    as  may  be necessary, and remains unexpended at the close of
30    business on June 30, 2001, from an  appropriation  heretofore
31    made  in  Article  1,  Section  7.3  of Public Act 91-708, as
32    amended, is reappropriated from the Capital Development  Fund
33    to  the  Capital Development Board for a grant to the City of
 
                           -43-                     BOB-CDB02
 1    Chicago  for   acquiring   land,   planning   and   beginning
 2    construction of a visitor center at Lake Calumet.

 3        Section  5.2.  The  following  named  amounts, or so much
 4    thereof as  may  be  necessary  and  remain  unexpended  from
 5    reappropriations heretofore made for such purposes in Article
 6    2,  Section 5.1 of Public Act 91-708, are reappropriated from
 7    the General Revenue Fund to the Capital Development Board for
 8    the  Department  of  Natural  Resources  for   the   projects
 9    hereinafter enumerated:

10    (From Article 2, Section 5.1 of Public Act 91-708)
11                  DICKSON MOUNDS MUSEUM - LEWISTOWN
12    For planning and beginning repair of
13      exterior walls ............................... $     78,245
14                 FOX RIDGE STATE PARK - COLES COUNTY
15    For rehabilitating historic structures .........      210,000
16             HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
17    For rehabilitating Aqueduct #6 .................      572,625
18               ILLINOIS BEACH STATE PARK - LAKE COUNTY
19    For stabilizing shoreline ......................      200,727
20               SPRING GROVE HATCHERY - MCHENRY COUNTY
21    For upgrading the septic system ................       30,000
22                              STATEWIDE
23    For maintaining lodge/concession program .......       58,640
24    For rehabilitating or replacing
25      playground equipment .........................      160,757
26    For maintaining lodge and concession
27      facilities ...................................      158,874
28    For rehabilitating or replacing playground
29      equipment ....................................       84,068
30    For maintaining lodge and concession
31      facilities at various DNR locations ..........       28,230
32    For rehabilitating or replacing
 
                           -44-                     BOB-CDB02
 1      playground equipment, in addition
 2      to funds previously appropriated .............      172,430
 3    For rehabilitation or replacement
 4      of playground equipment ......................       12,457
 5    For rehabilitation of trail systems ............       73,019
 6    For rehabilitation and replacement of
 7      playground equipment .........................       17,473
 8        Total, Section 5.2                             $1,857,545

 9        Section  5.3.  The sum of $200,000, or so much thereof as
10    may be necessary and  remains  unexpended  at  the  close  of
11    business  on  June 30, 2001, from an appropriation heretofore
12    made in Article 1, Section  7.2  of  Public  Act  91-708,  is
13    reappropriated  from  the  Capital  Development  Fund  to the
14    Capital Development Board for a grant to the City of  Carlyle
15    for development of a health center in association with resort
16    development at Carlyle Lake.

17        Section  6.  The  following  named  amounts,  or  so much
18    thereof as may be necessary  and  remain  unexpended  at  the
19    close  of  business on June 30, 2001, from appropriations and
20    reappropriations heretofore made for such purposes in Article
21    1, Section 3, and Article 2, Section 6 of Public Act  91-708,
22    as  amended,  are reappropriated from the Capital Development
23    Fund to the Capital Development Board for the  Department  of
24    Corrections for the projects hereinafter enumerated:

25    (From Article 2, Section 6 of Public Act 91-708)
26                 DECATUR WOMEN'S CORRECTIONAL CENTER
27    For the planning and conversion of
28      Meyer Mental Health Center into a
29      correctional facility ........................ $    221,445
30                      DIXON CORRECTIONAL CENTER
31    (From Article 1, Section 3 of Public Act 91-708)
 
                           -45-                     BOB-CDB02
 1    For constructing a gun range and
 2      classroom building ...........................      500,000
 3                     DWIGHT CORRECTIONAL CENTER
 4    (From Article 1, Section 3 of Public Act 91-708)
 5    For renovating C9 and Old Hospital .............    3,810,000
 6    For renovating Housing Unit C8, in
 7      addition to funds previously
 8      appropriated .................................      270,000
 9    (From Article 2, Section 6 of Public Act 91-708)
10    For upgrading the water treatment plant ........    1,000,000
11    For upgrading water and sewer systems ..........       23,790
12    For renovating buildings, in addition
13      to funds previously appropriated .............      274,847
14    For constructing a gatehouse and
15      sally port and upgrading the
16      security system ..............................      674,223
17    For completion of medical unit,
18      in addition to funds previously
19      appropriated .................................       38,694
20    For renovation of buildings ....................       68,161
21                   EAST MOLINE CORRECTIONAL CENTER
22    (From Article 1, Section 3 of Public Act 91-708)
23    For replacing the chiller/absorber .............      400,000
24    (From Article 2, Section 6 of Public Act 91-708)
25    For upgrading fire alarm and building
26      automation systems ...........................      852,805
27    For upgrading the electrical
28      system .......................................    1,012,651
29                        HANNA CITY WORK CAMP
30    For upgrading electrical system ................      563,742
31                HILL CORRECTIONAL CENTER - GALESBURG
32    (From Article 1, Section 3 of Public Act 91-708)
33    For upgrading electrical system ................      185,000
34    (From Article 2, Section 6 of Public Act 91-708)
 
                           -46-                     BOB-CDB02
 1    For replacing domestic water lines .............      126,264
 2                            HOPKINS PARK
 3    (From Article 1, Section 3 of Public Act 91-708)
 4    For infrastructure improvements
 5      in connection with the Hopkins Park
 6      Correctional Center ..........................    8,300,000
 7             ILLINOIS RIVER CORRECTIONAL CENTER - CANTON
 8    For replacing warehouse freezers ...............      150,000
 9           ILLINOIS YOUTH CENTER - KEWANEE - HENRY COUNTY
10    For constructing a 60-bed inmate
11      housing addition .............................    4,000,000
12                 ILLINOIS YOUTH CENTER - ST. CHARLES
13    For constructing an R & C building
14      and other improvements .......................   34,000,000
15    For upgrading plumbing system and replacing
16      toilets and sinks ............................      651,115
17    (From Article 2, Section 6 of Public Act 91-708)
18    For planning and beginning the upgrade
19      of existing facility .........................      328,875
20                 ILLINOIS YOUTH CENTER - HARRISBURG
21    For upgrading mechanical control system ........      478,078
22                   ILLINOIS YOUTH CENTER - JOLIET
23    For planning, site improvements,
24      utility upgrade, equipment and all
25      costs necessary to construct a
26      housing unit and dietary facility ............       29,274
27                  ILLINOIS YOUTH CENTER - RUSHVILLE
28    (From Article 1, Section 3 of Public Act 91-708)
29    For planning, design, construction, equipment
30      and all other necessary costs to add
31      a cellhouse ..................................   14,000,000
32                 ILLINOIS YOUTH CENTER - VALLEY VIEW
33    (From Article 2, Section 6 of Public Act 91-708)
34    For replacing boilers, controls, hot
 
                           -47-                     BOB-CDB02
 1      water heaters and softeners in
 2      residential units and administration
 3      building .....................................      447,917
 4                 ILLINOIS YOUTH CENTER - WARRENVILLE
 5    For rehabilitation of the administration
 6      building .....................................      744,432
 7                     JOLIET CORRECTIONAL CENTER
 8    For correcting erosion and
 9      stabilizing the masonry wall .................    1,689,240
10    For completing the west cellhouse renovation,
11      including asbestos abatement, in addition
12      to funds previously appropriated .............       19,565
13         LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
14    For constructing two cellhouses, in
15      addition to funds previously appropriated ....    7,570,627
16                     LINCOLN CORRECTIONAL CENTER
17    For renovation of the Dietary, construction
18      of a cooler addition and installation
19      of blast chillers ............................       33,843
20                      LOGAN CORRECTIONAL CENTER
21    (From Article 1, Section 3 of Public Act 91-708)
22    For constructing a medical building
23      and dietary building .........................   11,000,000
24    (From Article 2, Section 6 of Public Act 91-708)
25    For planning and beginning replacement
26      of the Dietary and Medical Buildings .........      240,331
27    For renovation of sewer system .................       57,982
28                MENARD CORRECTIONAL CENTER - CHESTER
29    (From Article 1, Section 3 of Public Act 91-708)
30    For stabilizing dam, in addition to funds
31      previously appropriated ......................      510,000
32    For correcting slope failure & MSU
33      improvements .................................      875,000
34    For upgrading electrical distribution
 
                           -48-                     BOB-CDB02
 1      system .......................................    2,424,959
 2    For replacing the HVAC system ..................      550,000
 3    (From Article 2, Section 6 of Public Act 91-708)
 4    For improving ventilation and dehumidification
 5      systems in the kitchen and dining rooms ......      482,282
 6    For replacing shower room and guard tower ......      481,397
 7    For upgrading mechanical bar screen and storm
 8      and sanitary sewer system ....................    1,206,548
 9    For completing upgrade of North Cellhouse
10      plumbing system, in addition to funds
11      previously appropriated ......................      207,248
12    For replacing toilets and waste lines
13      at E/W Cellhouse and upgrade
14      North Cellhouse plumbing .....................    1,584,078
15    For renovation or replacement of the
16      Old Hospital Building, in addition to
17      funds previously appropriated ................    4,530,372
18    For replacing and installing
19      water storage tank ...........................      367,333
20    For replacing Boiler #2, in addition
21      to funds previously appropriated .............      199,199
22    For replacement of the chimney stack and
23      boilers, in addition to funds previously
24      appropriated .................................       87,501
25    For replacement of hot water heaters and
26      deairing tanks ...............................       21,945
27    For planning and construction of the
28      Administration Building ......................    1,200,000
29                     PONTIAC CORRECTIONAL CENTER
30    (From Article 1, Section 3 of Public Act 91-708)
31    For expanding the main sally port ..............      400,000
32    For renovating the exterior of North/
33      South Cellhouses .............................      600,000
34    (From Article 2, Section 6 of Public Act 91-708)
 
                           -49-                     BOB-CDB02
 1    For completing replacement of hot water
 2      lines, in addition to funds previously
 3      appropriated .................................      612,300
 4    For renovation of main sally port ..............      270,405
 5                    SHERIDAN CORRECTIONAL CENTER
 6    (From Article 1, Section 3 of Public Act 91-708)
 7    For upgrading the storm sewers .................      115,000
 8    (From Article 2, Section 6 of Public Act 91-708)
 9    For replacing doors and locks ..................      145,936
10               STATEVILLE CORRECTIONAL CENTER - JOLIET
11    (From Article 1, Section 3 of Public Act 91-708)
12    For planning and beginning renovation of
13      H & I houses .................................      500,000
14    For replacing the water line ...................    3,320,000
15    For upgrading electrical system in
16      "B" House ....................................    1,500,000
17    (From Article 2, Section 6 of Public Act 91-708)
18    For constructing a housing unit, cellhouse,
19      vehicle maintenance building and
20      warehouse for the reception and
21      classification center, in addition to
22      funds previously appropriated ................   24,065,628
23    For replacing windows in B House ...............    2,876,644
24    For replacing cell fronts in F House ...........      957,924
25    For upgrading plumbing system in F House,
26      in addition to funds previously
27      appropriated .................................    3,497,820
28    For replacing power plant and
29      utility distribution system ..................    9,580,135
30    For planning, design, construction,
31      equipment and all other necessary costs
32      for an Adult Reception and Classification
33      Center .......................................   34,345,768
34    For upgrading storm drainage and
 
                           -50-                     BOB-CDB02
 1      wastewater systems ...........................    1,100,503
 2    For upgrading electrical system and elevator
 3      and installing HVAC system ...................    1,179,600
 4    For replacement of the MSU .....................    4,339,281
 5                   TAYLORVILLE CORRECTIONAL CENTER
 6    For upgrading shower ventilation system ........      234,944
 7                     THOMSON CORRECTIONAL CENTER
 8    For constructing three cellhouses and
 9      expanding educational and vocational
10      space, in addition to funds previously
11      appropriated .................................   24,591,248
12                    VANDALIA CORRECTIONAL CENTER
13    (From Article 1, Section 3 of Public Act 91-708)
14    For constructing a multi-purpose program
15      building .....................................    1,300,000
16    For converting Administration Building and
17      planning construction of an Administration/
18      Health Care Unit .............................      800,000
19    For upgrading the primary water
20      distribution system ..........................    1,268,198
21    (From Article 2, Section 6 of Public Act 91-708)
22    For planning and beginning construction
23      for a slaughter house and meat plant .........      466,456
24    For repairing exterior masonry, in addition
25      to funds previously appropriated .............      723,392
26                     VIENNA CORRECTIONAL CENTER
27    For replacing windows, in addition to
28      funds previously appropriated ................      779,030
29    For completing upgrade of the steam
30      distribution system, in addition to
31      funds previously appropriated ................      254,131
32    For upgrading electrical system and
33      installing emergency generator ...............      179,828
34    For renovating the kitchen .....................    1,808,596
 
                           -51-                     BOB-CDB02
 1    For upgrading the steam distribution system
 2      and renovation of Powerhouse, in addition
 3      to funds previously appropriated .............      131,139
 4    For upgrading air conditioning system
 5      and replacement of cooling tower .............      227,878
 6    For completing the rehabilitation of duct
 7      systems and walls, in addition to funds
 8      previously appropriated ......................      196,628
 9         WESTERN ILLINOIS CORRECTIONAL CENTER - MT. STERLING
10    (From Article 1, Section 3 of Public Act 91-708)
11    For replacing warehouse freezers ...............      150,000
12                              STATEWIDE
13    For planning, design, construction, equipment
14      and all other necessary costs for a
15      maximum security facility ....................  129,000,000
16    For planning a medium security facility
17      and land acquisition .........................    6,000,000
18    For replacing locks and control panels
19      at the following locations at the
20      approximate costs set forth below ............    2,700,000
21       Illinois River
22        Correctional Center .................850,000
23       Western Illinois
24        Correctional Center .................850,000
25       Danville Correctional
26        Center ............................1,000,000
27    For replacing roofing systems at
28      the following locations at the
29      approximate cost set forth below .............    1,720,022
30       Menard Correctional Center ...........170,000
31       Vienna Correctional Center ...........155,000
32       Illinois Youth Center -
33        Harrisburg ...........................95,000
34       Dixon Correctional Center ............500,000
 
                           -52-                     BOB-CDB02
 1       Pontiac Correctional Center ..........440,000
 2       Illinois Youth Center - Joliet .......360,022
 3    For replacing or upgrading security and
 4      monitoring systems at the following
 5      locations at the approximate cost set
 6      forth below ..................................      755,000
 7       Vienna Correctional
 8        Center ..............................250,000
 9       Pontiac Correctional
10        Center ..............................200,000
11       Joliet Correctional
12        Center ..............................305,000
13    For planning and replacing windows at the
14      following locations at the approximate cost
15      set forth below ..............................    3,278,791
16       Vienna Correctional
17        Center ............................1,780,000
18       Sheridan Correctional
19        Center ..............................418,791
20       Illinois Youth Center -
21        Valley View .........................500,000
22       Illinois Youth Center -
23        Joliet ..............................165,000
24       Dixon Correctional
25        Center ..............................235,000
26       Shawnee Correctional
27        Center ..............................180,000
28    For upgrading and renovating showers at
29      the following locations at the approximate
30      cost set forth below .........................    1,975,000
31       Shawnee Correctional
32        Center ..............................800,000
33       Danville Correctional
34        Center ..............................800,000
 
                           -53-                     BOB-CDB02
 1       Graham Correctional
 2        Center ..............................200,000
 3       Centralia Correctional
 4        Center ..............................175,000
 5    For replacing security fencing at the
 6      following locations at the approximate
 7      cost set forth below .........................    1,498,165
 8       Hill Correctional
 9        Center ..............................398,165
10       Western IL Correctional
11        Center ..............................300,000
12       Joliet Correctional
13        Center ..............................186,922
14       Logan Correctional
15        Center ..............................200,000
16       Dixon Correctional
17        Center ..............................100,000
18       Shawnee Correctional
19        Center ..............................100,000
20       Graham Correctional
21        Center ..............................100,000
22       Danville Correctional
23        Center ..............................100,000
24    For upgrading roads and parking lots at
25      the following locations at the approximate
26      cost set forth below .........................      978,100
27       Dwight Correctional
28        Center ..............................483,840
29       Illinois Youth Center -
30        Valley View .........................494,260
31    (From Article 2, Section 6 of Public Act 91-708)
32    For planning, design, construction, equipment
33      and all other necessary costs for a
34      female multi-security level
 
                           -54-                     BOB-CDB02
 1      correctional center ..........................   78,702,968
 2    For replacing roofing systems at the
 3      following locations at the approximate
 4      cost set forth below .........................      637,986
 5        Vienna Correctional Center ..........469,664
 6        Sheridan Correctional Center ........168,322
 7    For replacing or installing mechanical bar
 8      screens at the following locations at the
 9      approximate cost set forth below .............      605,823
10        Graham Correctional Center -
11         Hillsboro ..........................317,545
12        Western Illinois Correctional
13         Center - Mt. Sterling ..............288,278
14    For upgrading security control systems and
15      panels in housing units at the following
16      locations at the approximate cost set
17      forth below ..................................    4,620,014
18        Danville Correctional Center ........500,000
19        Hill Correctional Center -
20         Galesburg ........................1,500,000
21        Western Illinois Correctional
22         Center - Mt. Sterling ..............675,000
23        Illinois River Correctional
24         Center - Canton ....................675,000
25        Shawnee Correctional Center -
26         Vienna ...........................1,270,014
27    For planning, design, construction,
28      equipment and all other necessary costs
29      for a juvenile facility ......................   19,016,529
30    For replacing locks and doors at the
31      following locations at the approximate
32      cost set forth below .........................      766,403
33        Dwight Correctional Center ......... 103,239
34        Illinois River Correctional
 
                           -55-                     BOB-CDB02
 1         Center - Canton ..................... 3,610
 2        IYC - Joliet ....................... 646,568
 3        IYC - Pere Marquette - Grafton ...... 12,986
 4    For replacing roofing systems at the following
 5      locations at the approximate cost set forth
 6      below ........................................      675,103
 7        Dixon Correctional Center,
 8         four buildings .................... 270,813
 9        IYC - St. Charles, two buildings ... 197,498
10        Joliet Correctional Center,
11         six buildings ..................... 142,779
12        Logan Correctional Center - Lincoln
13         three buildings ..................... 8,086
14        Menard Correctional Center - Chester
15         six buildings ...................... 24,738
16        Pontiac Correctional Center,
17         one building ....................... 31,189
18    For inspecting and upgrading water towers
19      at the following locations at the approximate
20      costs set forth below ........................    1,556,313
21        Dixon Correctional Center,
22         Upgrade Water Tower ............... 369,928
23        Graham Correctional Center - Hillsboro
24         Upgrade Water Tower  ............... 62,524
25        Joliet Correctional Center,
26         Upgrade Water Tower ............... 130,328
27        Logan Correctional Center - Lincoln
28         Complete Water Tower Upgrade  ..... 103,536
29        Menard Correctional Center - Chester
30         Upgrade Water Tower  ............... 22,443
31        Stateville Correctional Center - Joliet
32         Upgrade Water Tower  .............. 663,578
33        Statewide, Inspect and Upgrade
34         Water Towers ...................... 117,099
 
                           -56-                     BOB-CDB02
 1    For upgrading fire and safety systems at
 2      the following locations at the approximate
 3      costs set forth below, in addition to
 4      funds previously appropriated ................    3,025,696
 5        Menard Correctional Center -
 6         Chester ......................... 1,884,584
 7        Sheridan Correctional Center ....... 312,246
 8        Vienna Correctional Center ......... 828,866
 9    For replacing roofing systems at the
10      following locations at the approximate
11      costs set forth below: .......................      215,071
12       East Moline Correctional Center,
13        Three buildings ..................... 79,929
14       Graham Correctional Center, Hillsboro
15        Seven buildings .................... 117,699
16       Sheridan Correctional Center, LaSalle
17        Three buildings ..................... 17,443
18    For replacing doors and locks at the
19      following locations at the approximate
20      costs set forth below: .......................      585,101
21       IYC - St. Charles ................... 221,452
22       Lincoln Correctional Center ......... 272,473
23       Jacksonville Correctional Center ..... 12,473
24       Sheridan Correctional Center ......... 78,703
25    For upgrading fire safety systems at the
26      following locations at the approximate
27      costs set forth below, in addition to
28      funds previously appropriated: ...............    4,454,272
29       Menard Correctional Center ........... 63,476
30       Pontiac Correctional Center ....... 2,960,453
31       Stateville Correctional Center .... 1,430,343
32    For upgrading water and wastewater
33      systems at the following locations
34      at the approximate costs set forth below: ....      692,276
 
                           -57-                     BOB-CDB02
 1       Big Muddy Correctional Center
 2        for installing mechanical
 3        bar screen ........................... 7,347
 4       Centralia Correctional Center
 5        for upgrading water
 6        treatment plant .................... 183,702
 7       East Moline Correctional Center
 8        for upgrading sewer system ........... 4,310
 9       Ed Jenison Work Camp (Paris)
10        for installing mechanical
11        bar screen ........................... 2,530
12       IYC - Harrisburg for upgrading
13        water distribution system ........... 59,198
14       Kankakee MSU for constructing
15        well #2 ............................ 288,550
16       IYC - St. Charles for upgrading
17        sewage/storm system ................ 134,865
18       IYC - Valley View for installing
19        mechanical bar screen ............... 11,774
20    For correction of deficiencies in
21      water systems at three correctional
22      facilities ...................................       81,228
23    For replacement of locks, windows and
24      doors at the following locations
25      as set forth below: ..........................      368,672
26       IYC Harrisburg ....................... 44,053
27       IYC Joliet ........................... 14,426
28       Menard .............................. 213,471
29       IYC Valley View ...................... 95,722
30       Vienna ................................ 1,000
31    For planning, design, construction,
32      equipment and other necessary costs
33      for a Maximum Security Correctional
34      Center, in addition to funds previously
 
                           -58-                     BOB-CDB02
 1      appropriated .................................   16,488,520
 2    For planning, design, construction,
 3      equipment and other necessary costs
 4      for a Correctional Facility for
 5      juveniles ....................................    4,770,240
 6    For planning, design, construction,
 7      equipment and other necessary costs
 8      for a Medium Security Correctional
 9      Facility .....................................    6,423,155
10    For correcting defects in the food preparation
11      areas, including roofs .......................      108,588
12    For replacement of roofs at various Department of
13      Corrections locations ........................       70,407
14    For roof replacement at the following
15      locations at the approximate costs
16      set forth below: .............................      179,437
17       Graham Correctional Center
18        Five buildings ........................6,543
19       Graham Correctional Center
20        Thirty-two buildings ..................6,000
21       Menard Correctional Center
22        Warehouse Building ...................26,000
23       Menard Correctional Center
24        Five buildings .......................55,068
25       Pontiac Correctional Center
26        Eight buildings .......................6,500
27       Illinois Youth Center-St. Charles
28        Three buildings ......................15,326
29       Sheridan Correctional Center
30        Six buildings ........................16,000
31       Stateville Correctional Center
32        Seven buildings ......................24,000
33       Ill Youth Center-Valley View
34        Administration Building and
 
                           -59-                     BOB-CDB02
 1         Kitchen Addition ....................24,000 ____________
 2        Total, Section 6                             $522,958,055

 3        Section  6.1.  The  following  named  amounts, or so much
 4    thereof as may be necessary  and  remain  unexpended  at  the
 5    close  of  business  on  June 30, 2001, from reappropriations
 6    heretofore made for such purposes in Article 2,  Section  6.1
 7    of  Public  Act  91-708,  are reappropriated from the General
 8    Revenue  Fund  to  the  Capital  Development  Board  for  the
 9    Department  of  Corrections  for  the  projects   hereinafter
10    enumerated:

11    (From Article 2, Section 6.1 of Public Act 91-708)
12               STATEVILLE CORRECTIONAL CENTER - JOLIET
13    For tuckpointing buildings .....................       65,086
14                    VANDALIA CORRECTIONAL CENTER
15    For replacing showers in six buildings, in
16      addition to funds previously appropriated ....      473,426
17                              STATEWIDE
18    For energy conservation improvements at the
19      following locations at the approximate
20      costs set forth below: .......................       39,718
21       Dwight Correctional Center ............ 7,000
22       Joliet Correctional Center
23        School Building ...................... 1,000
24       Menard Psychiatric Center
25        Randolph Hall ........................ 7,500
26       Stateville Correctional Center
27        Law Library .......................... 7,400
28       Pontiac Correctional Center .......... 15,093
29       Vienna Correctional Center ............ 1,725
30    For upgrading doors and locking systems at
31      the following locations at the approximate
32      costs set forth below: .......................      577,182
 
                           -60-                     BOB-CDB02
 1       Illinois Youth Center-Warrenville
 2        For replacement of doors
 3         and locking systems ............... 577,182 ____________
 4        Total, Section 6.1                             $1,155,412

 5        Section  6.2.  The amount of $586,423, or so much thereof
 6    as may be necessary and remains unexpended at  the  close  of
 7    business  on June 30, 2001, from a reappropriation heretofore
 8    made for such purposes in Article 2, Section  6.3  of  Public
 9    Act  91-708,  is reappropriated from the General Revenue Fund
10    to the  Capital  Development  Board  for  the  Department  of
11    Corrections  for  the  projects hereinafter enumerated at the
12    approximate costs set forth below:

13    Danville Correctional Center -
14      For upgrading the hot water
15       distribution system ...................$1,000
16    Stateville Correctional Center-
17      For upgrading the plumbing systems in
18       four buildings .......................509,555
19    Menard Correctional Center -
20      For planning and to begin upgrading
21       the plumbing systems in two
22       buildings .............................37,934
23    Pontiac Correctional Center -
24      For upgrading the mechanical systems
25       and renovation of shower rooms ........37,934

26        Section 7.  The  following  named  amounts,  or  so  much
27    thereof  as  may  be  necessary  and remain unexpended at the
28    close of business on June 30, 2001, from  appropriations  and
29    reappropriations heretofore made for such purposes in Article
30    1,  Section 4, and Article 2, Section 7 of Public Act 91-708,
31    are reappropriated from the Capital Development Fund  to  the
 
                           -61-                     BOB-CDB02
 1    Capital  Development  Board  for  the  Historic  Preservation
 2    Agency for the projects hereinafter enumerated:

 3              BISHOP HILL HISTORIC SITE - HENRY COUNTY
 4    (From Article 2, Section 7 of Public Act 91-708)
 5    For rehabilitating Bjorkland Hotel ............. $    939,819
 6                    BLACKHAWK STATE HISTORIC SITE
 7    (From Article 1, Section 4 of Public Act 91-708)
 8    For rehabilitating lodge .......................    1,166,000
 9    (From Article 2, Section 7 of Public Act 91-708)
10    For a grant to the City of Rock Island
11      to relocate the existing sewer line ..........      660,000
12               BRYANT COTTAGE STATE MEMORIAL - BEMENT
13    (From Article 1, Section 4 of Public Act 91-708)
14    For rehabilitating interior and exterior .......      217,000
15             CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
16    For providing structural stabilization .........      308,000
17    (From Article 2, Section 7 of Public Act 91-708)
18    For renovation of the Cahokia Courthouse
19      and the Jarrot House .........................       72,953
20             CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
21    For replacement of Monk's Mounds stairs ........      339,695
22    For restoration of Monk's Mound ................    1,045,251
23    For purchasing private land within historic
24      site boundary ................................      209,314
25    For replacement of Monk's Mounds stairs ........       22,006
26                          DAVID DAVIS HOME
27    To acquire a residence to be
28      converted to a Visitors Center ...............      249,400
29          FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
30    (From Article 1, Section 4 of Public Act 91-708)
31    For rehabilitating the stone gatehouse
32      wall and foundation ..........................      763,000
33    (From Article 2, Section 7 of Public Act 91-708)
 
                           -62-                     BOB-CDB02
 1    For restoring the powder magazine ..............      294,840
 2    For replacing Maintenance Building .............        1,566
 3                        GALENA HISTORIC SITE
 4    For structural stabilization and
 5      rehabilitation of five historic
 6      structures in the Grant Home District
 7      including the Biesman, Nolan, Gill,
 8      Coville, and Donegan houses ..................      400,300
 9                JARROT MANSION STATE HISTORICAL SITE
10    (From Article 1, Section 4 of Public Act 91-708)
11    For restoring the mansion, in addition
12      to funds previously appropriated .............    1,650,000
13                  LEWIS AND CLARK STATE MEMORIAL -
14                           MADISON COUNTY
15    (From Article 2, Section 7 of Public Act 91-708)
16    For constructing interpretive center,
17      and development of the historic site
18      in addition to funds previously
19      appropriated .................................    1,138,931
20            LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
21    For rehabilitating site and providing
22      irrigation system ............................      413,332
23              LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
24    For rehabilitating interior and exterior .......      738,096
25                  LINCOLN LOG CABIN HISTORIC SITE -
26                            COLES COUNTY
27    For constructing visitors center, Phase II,
28      and developing day use area ..................    1,225,174
29            LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
30    For renovating village entrance and
31      completing visitors center ...................      313,628
32              LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
33    (From Article 1, Section 4 of Public Act 91-708)
34    For constructing a Lincoln Presidential
 
                           -63-                     BOB-CDB02
 1      Library ......................................   40,000,000
 2    (From Article 2, Section 7 of Public Act 91-708)
 3    For planning and beginning the Lincoln
 4      Presidential Center, in addition to
 5      funds previously appropriated ................    4,200,208
 6                POSTVILLE COURTHOUSE HISTORIC SITE -
 7                               LINCOLN
 8    For rehabilitating Courthouse and site .........      103,095
 9               PULLMAN FACTORY HISTORIC SITE - CHICAGO
10    For stabilization of the structure and for planning
11      and beginning restoration ....................       46,963
12                   OLD STATE CAPITOL - SPRINGFIELD
13    For providing structural stabilization .........    1,439,821
14    For rehabilitating Old State Capitol ...........      477,073
15                     UNION STATION - SPRINGFIELD
16    For purchasing and rehabilitating ..............    2,531,218
17                         VACHEL LINDSAY HOME
18    For rehabilitating home ........................      689,333
19                        VANDALIA STATE HOUSE
20    For replacing roof and rehabilitating
21      exterior .....................................      163,138
22    For rehabilitating HVAC and electrical
23      systems and interior .........................      351,240
24                              STATEWIDE
25    (From Article 1, Section 4 of Public Act 91-708)
26    For statewide ISTEA 21 Match ...................      637,000
27    (From Article 2, Section 7 of Public Act 91-708)
28    For replacing roofing systems at the
29      following locations at the approximate
30      costs set forth below: .......................      158,819
31       Fort De Chartres, Randolph County .... 43,198
32       Washburne House, Galena ............... 5,378
33       David Davis Mansion, Bloomington ..... 22,051
34       Bishop Hill House, Henry County ...... 88,192
 
                           -64-                     BOB-CDB02
 1    For matching ISTEA federal grant funds .........      470,176
 2        Total, Section 7                              $63,436,389

 3        Section  7.1.  The  amount of $52,326, or so much thereof
 4    as may be necessary and remains unexpended at  the  close  of
 5    business  on June 30, 2001, from a reappropriation heretofore
 6    made for such purpose in Article 2, Section 7.1 of Public Act
 7    91-708, is reappropriated from the Capital  Development  Fund
 8    to   the   Capital   Development   Board   for  the  Historic
 9    Preservation   Agency    for    acquiring    the    Zimmerman
10    archaeological  site  in  LaSalle  County  and for associated
11    costs, planning, stabilization,  restoration  and  all  other
12    expenses   necessary  to  comply  with  the  intent  of  this
13    appropriation.

14        Section 7.2.  The sum of $800,000, or so much thereof  as
15    may  be  necessary  and as remains unexpended at the close of
16    business on June 30, 2001, from a reappropriation  heretofore
17    made  in  Article  2,  Section  7.3  of Public Act 91-708, is
18    reappropriated from  the  Capital  Development  Fund  to  the
19    Capital  Development  Board  for  the  Historic  Preservation
20    Agency  for  the  construction  of an interpretive center and
21    development of the historic  site  at  the  Lewis  and  Clark
22    National Trail Site No. 1 in Madison County.

23        Section  7.3.  The  following  named  amounts, or so much
24    thereof as may be necessary  and  remain  unexpended  at  the
25    close  of  business  on  June 30, 2001, from reappropriations
26    heretofore made for such purposes in Article 2,  Section  7.4
27    of  Public  Act  91-708,  are reappropriated from the General
28    Revenue  Fund  to  the  Capital  Development  Board  for  the
29    Historic Preservation Agency  for  the  projects  hereinafter
30    enumerated:
 
                           -65-                     BOB-CDB02
 1                   DANA THOMAS HOUSE - SPRINGFIELD
 2    (From Article 2, Section 7.4 of Public Act 91-708)
 3    For restoring exterior and interior ............ $    357,274
 4                        GALENA HISTORIC SITE
 5    For rehabilitating Washburne House .............      564,000
 6                 LINCOLN'S NEW SALEM HISTORIC SITE -
 7                             PETERSBURG
 8    For resurfacing village and service roads ......      115,740
 9    For rehabilitating lift stations ...............      336,637
10    For rehabilitating saw mill and grist
11      mill .........................................      208,075
12                  METAMORA COURTHOUSE HISTORIC SITE
13    For rehabilitating courthouse ..................      436,370
14               JOURNAL REGISTER BUILDING - SPRINGFIELD
15    For renovating building ........................       41,962
16                   OLD STATE CAPITOL - SPRINGFIELD
17    For replacing the bottom cylinder of
18      the hydraulic elevator .......................       50,000
19        Total, Section 7.3                             $2,110,058

20        Section  9.  The  following  named  amounts,  or  so much
21    thereof as may be necessary  and  remain  unexpended  at  the
22    close  of  business on June 30, 2001, from appropriations and
23    reappropriations heretofore made for such purposes in Article
24    1, Section 5, and Article 2, Section 9 of Public Act  91-708,
25    as  amended,  are reappropriated from the Capital Development
26    Fund to the Capital Development Board for the  Department  of
27    Human Services for the projects hereinafter enumerated:

28             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
29    (From Article 1, Section 5 of Public Act 91-708)
30    For renovating the central dietary,
31      Phase II, in addition to funds previously
32      appropriated ................................. $  1,485,000
 
                           -66-                     BOB-CDB02
 1    (From Article 2, Section 9 of Public Act 91-708)
 2    For constructing two building additions
 3      at the Forensic Complex ......................   11,343,698
 4    For rehabilitation of the central dietary ......    1,666,574
 5                    CHESTER MENTAL HEALTH CENTER
 6    (From Article 1, Section 5 of Public Act 91-708)
 7    For upgrading energy management system .........      489,500
 8    For replacing sewer lines ......................      686,347
 9    (From Article 2, Section 9 of Public Act 91-708)
10    For upgrading access control/duress system .....    1,471,165
11    For renovating kitchen area ....................      911,784
12    For replacing fencing and upgrading
13      recreational yard ............................      249,355
14    For renovating support and residential
15      area .........................................    2,247,947
16    For construction of a storage building  ........       14,080
17          SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE
18    For planning and renovation of residential
19      and program units for children and
20      adolescent services ..........................      794,770
21             CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
22    For upgrading fire/life safety systems, in
23      addition to funds previously appropriated ....      162,271
24    For renovating residential units, in
25      addition to funds previously
26      appropriated .................................    2,171,000
27    For renovation of utility rooms and installation
28      of drinking fountains ........................       36,975
29    For renovation of the West Campus Nurses'
30      Stations .....................................      260,825
31    For renovation of Henry Horner Children's
32      Center and West Campus for fire and
33      life safety codes ............................       95,231
34    For renovation of the West Campus shower
 
                           -67-                     BOB-CDB02
 1      and toilet rooms .............................      253,620
 2        CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA