SB2686 - 104th General Assembly
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning regulation. | |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||
| 4 | Section 1. Short title. This Act may be cited as the Energy | |||||||||||||||||||
| 5 | Production Zones Act. | |||||||||||||||||||
| 6 | Section 5. Definitions. As used in this Act: | |||||||||||||||||||
| 7 | "Commercial solar energy system" means any device or | |||||||||||||||||||
| 8 | assembly of devices that (i) is ground installed and (ii) uses | |||||||||||||||||||
| 9 | solar energy from the sun for generating electricity for the | |||||||||||||||||||
| 10 | primary purpose of wholesale or retail sale and not primarily | |||||||||||||||||||
| 11 | for consumption on the property on which the device or devices | |||||||||||||||||||
| 12 | reside. | |||||||||||||||||||
| 13 | "Electric generation facility" means a facility or | |||||||||||||||||||
| 14 | infrastructure associated with a facility for the generation | |||||||||||||||||||
| 15 | of electricity. "Electric generation facility" does not | |||||||||||||||||||
| 16 | include a wind power device or a commercial solar energy | |||||||||||||||||||
| 17 | system. | |||||||||||||||||||
| 18 | "Energy production zone" means a premise of land on which | |||||||||||||||||||
| 19 | either of the following was located as of January 1, 2026: | |||||||||||||||||||
| 20 | (1) an electric generation facility with a generating | |||||||||||||||||||
| 21 | capacity of at least 80 megawatts, regardless of whether | |||||||||||||||||||
| 22 | the electric generation facility is operational; or | |||||||||||||||||||
| 23 | (2) a surface or underground mine at which mining | |||||||||||||||||||
| |||||||
| |||||||
| 1 | operations are no longer occurring. | ||||||
| 2 | "Energy production zone" does not include a premise of land on | ||||||
| 3 | which one or more wind power devices that are integrated into | ||||||
| 4 | an electric generation facility or one or more commercial | ||||||
| 5 | solar energy systems were located as of January 1, 2026. | ||||||
| 6 | "Local authority" means any agency, officer, board, or | ||||||
| 7 | commission of a unit of local government that may issue a | ||||||
| 8 | permit or an approval of a land use for the construction of a | ||||||
| 9 | development, a building, or another structure. | ||||||
| 10 | "Permit" means any of the following: | ||||||
| 11 | (1) an improvement location permit; | ||||||
| 12 | (2) a building permit; | ||||||
| 13 | (3) a certificate of occupancy; | ||||||
| 14 | (4) an approval of a site-specific development plan; | ||||||
| 15 | (5) an approval of a primary or secondary plat; | ||||||
| 16 | (6) an approval of a variance, contingent use, | ||||||
| 17 | conditional use, special exception, or special use; or | ||||||
| 18 | (7) an approval of a planned unit of local government | ||||||
| 19 | development. | ||||||
| 20 | "Premise of land" means property comprising a tract of | ||||||
| 21 | land on which a project owner proposes to construct an | ||||||
| 22 | electric generation facility, including land within the | ||||||
| 23 | perimeter of the tract of land that was not owned by the | ||||||
| 24 | project owner as of January 1, 2026. | ||||||
| 25 | "Project owner" means a person that proposes to construct | ||||||
| 26 | an electric generation facility. | ||||||
| |||||||
| |||||||
| 1 | "Retail electric service" means electric service furnished | ||||||
| 2 | to a customer, including a residential, commercial, or | ||||||
| 3 | industrial customer, for consumption by the customer. "Retail | ||||||
| 4 | electric service" does not include wholesale electric service. | ||||||
| 5 | "Wholesale electric service" means the provision of | ||||||
| 6 | electricity to another person for resale, including in | ||||||
| 7 | wholesale markets. | ||||||
| 8 | "Wind power device" means a device, including a windmill | ||||||
| 9 | or a wind turbine, that is designed to use the kinetic energy | ||||||
| 10 | of moving air to provide mechanical energy or to produce | ||||||
| 11 | electricity. | ||||||
| 12 | Section 10. Electric generation facility permit. | ||||||
| 13 | (a) Notwithstanding any other provision of law to the | ||||||
| 14 | contrary, a project owner is not required to obtain a permit or | ||||||
| 15 | any other land use or zoning approval from a local authority | ||||||
| 16 | for the construction of an electric generation facility if: | ||||||
| 17 | (1) the Illinois Commerce Commission grants the | ||||||
| 18 | project owner a certificate under Section 8-406 of the | ||||||
| 19 | Public Utilities Act for the construction, the Commission | ||||||
| 20 | declines jurisdiction over the construction under Section | ||||||
| 21 | 8-406 of the Public Utilities Act, or the electric | ||||||
| 22 | generation facility files notice with the Commission to | ||||||
| 23 | not use a certificate under Section 8-406 of the Public | ||||||
| 24 | Utilities Act; | ||||||
| 25 | (2) the electric generating facility will be located | ||||||
| |||||||
| |||||||
| 1 | on a premise of land that is an energy production zone; and | ||||||
| 2 | (3) the project owner complies with subsections (b) | ||||||
| 3 | and (c) of this Section. | ||||||
| 4 | (b) No later than 270 days before beginning any | ||||||
| 5 | construction to which subsection (a) of this Section applies, | ||||||
| 6 | a project owner shall provide notice of the construction to | ||||||
| 7 | the local authority with planning authority for the premise of | ||||||
| 8 | land on which the construction will occur. The notice must | ||||||
| 9 | include all of the following information with regard to the | ||||||
| 10 | construction and the electric generation facility to be | ||||||
| 11 | constructed: | ||||||
| 12 | (1) A comprehensive description of the electric | ||||||
| 13 | generation facility, including the following: | ||||||
| 14 | (A) the planned generation capacity of the | ||||||
| 15 | electric generation facility, expressed in megawatts; | ||||||
| 16 | (B) the energy source or technology that will be | ||||||
| 17 | used by the electric generation facility to generate | ||||||
| 18 | electricity; and | ||||||
| 19 | (C) the expected operational lifespan of the | ||||||
| 20 | electric generation facility. | ||||||
| 21 | (2) The expected date on which the construction will | ||||||
| 22 | begin. | ||||||
| 23 | (3) The expected date on which the electric generation | ||||||
| 24 | facility will begin operation. | ||||||
| 25 | (4) Whether the electric generation facility will | ||||||
| 26 | provide retail electric service, wholesale electric | ||||||
| |||||||
| |||||||
| 1 | service, or both. | ||||||
| 2 | (5) The project owner's plan for the eventual | ||||||
| 3 | decommissioning of the electric generation facility. | ||||||
| 4 | (6) If construction of the electric generation | ||||||
| 5 | facility will entail decommissioning an existing electric | ||||||
| 6 | generation facility that is located on the premise of land | ||||||
| 7 | on which the electric generation facility will be located, | ||||||
| 8 | the project owner's plan for decommissioning the existing | ||||||
| 9 | electric generation facility, including financial | ||||||
| 10 | assurances for the decommissioning. | ||||||
| 11 | (7) A detailed site plan that includes the location of | ||||||
| 12 | the following within or adjacent to the premise of land on | ||||||
| 13 | which the electric generation facility will be | ||||||
| 14 | constructed: | ||||||
| 15 | (A) The structures associated with the electric | ||||||
| 16 | generation facility. | ||||||
| 17 | (B) Any of the following that are located on the | ||||||
| 18 | premise of land on which the electric generation | ||||||
| 19 | facility will be constructed: | ||||||
| 20 | (i) any existing electric generation facility | ||||||
| 21 | and any structures associated with the existing | ||||||
| 22 | electric generation facility; or | ||||||
| 23 | (ii) any surface or underground mine and any | ||||||
| 24 | structures associated with the surface or | ||||||
| 25 | underground mine. | ||||||
| 26 | (C) Existing and proposed access roads. | ||||||
| |||||||
| |||||||
| 1 | (D) Regulated drains or ditches. | ||||||
| 2 | (E) Flood plains. | ||||||
| 3 | (F) Wetlands. | ||||||
| 4 | (G) Historic sites or other areas of cultural or | ||||||
| 5 | environmental significance. | ||||||
| 6 | (8) An economic development plan detailing the | ||||||
| 7 | expected economic effect of the electric generation | ||||||
| 8 | facility on the unit of local government within which the | ||||||
| 9 | electric generation facility will be located, including | ||||||
| 10 | all of the following: | ||||||
| 11 | (A) The anticipated number and types of jobs to be | ||||||
| 12 | created during the construction of the electric | ||||||
| 13 | generation facility and in the operation of the | ||||||
| 14 | electric generation facility. | ||||||
| 15 | (B) The estimated property tax revenue the | ||||||
| 16 | electric generation facility will produce for the unit | ||||||
| 17 | of local government. | ||||||
| 18 | (C) An estimate of the overall cost to the unit of | ||||||
| 19 | local government and the overall effect on the unit of | ||||||
| 20 | local government's revenue associated with the | ||||||
| 21 | electric generation facility. | ||||||
| 22 | (9) A safety, security, and emergency response plan | ||||||
| 23 | describing measures to ensure the following with regard to | ||||||
| 24 | the construction and operation of the electric generation | ||||||
| 25 | facility: | ||||||
| 26 | (A) site security and safety; | ||||||
| |||||||
| |||||||
| 1 | (B) coordination with the unit of local | ||||||
| 2 | government's services; and | ||||||
| 3 | (C) the safeguarding of the public. | ||||||
| 4 | (c) No later than 60 days after a project owner's | ||||||
| 5 | provision of notice under subsection (b) of this Section, the | ||||||
| 6 | project owner shall hold a public hearing in the unit of local | ||||||
| 7 | government in which the electric generation facility will be | ||||||
| 8 | located, during which the project owner shall provide | ||||||
| 9 | information to the public and receive public comment regarding | ||||||
| 10 | the electric generation facility and the construction of the | ||||||
| 11 | electric generation facility. The project owner shall publish | ||||||
| 12 | notice of the date, time, location, and subject of the public | ||||||
| 13 | hearing. | ||||||
| 14 | (d) After providing notice to a local authority under | ||||||
| 15 | subsection (b) of this Section, a project owner shall notify | ||||||
| 16 | the local authority regarding any substantive changes in the | ||||||
| 17 | information provided by the project owner under subsection (b) | ||||||
| 18 | of this Section that occur before construction begins on the | ||||||
| 19 | electric generation facility to which the notice pertains. | ||||||
| 20 | Section 15. Local authority. This Act may not be construed | ||||||
| 21 | to increase or modify the authority of a local authority or a | ||||||
| 22 | unit of local government to regulate the siting, construction, | ||||||
| 23 | or deployment of an electric generation facility that is not | ||||||
| 24 | located in an energy production zone. | ||||||
| 25 | Section 99. Effective date. This Act takes effect upon | ||||||
| |||||||
| |||||||
| 1 | becoming law. | ||||||