HB4371 - 104th General Assembly
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning regulation. | |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||
| 4 | Section 5. The Public Utilities Act is amended by adding | |||||||||||||||||||
| 5 | Section 16-107.5a as follows: | |||||||||||||||||||
| 6 | (220 ILCS 5/16-107.5a new) | |||||||||||||||||||
| 7 | Sec. 16-107.5a. Portable solar generation devices. | |||||||||||||||||||
| 8 | (a) As used in this Section: | |||||||||||||||||||
| 9 | "Electricity provider" has the meaning given to that term | |||||||||||||||||||
| 10 | in Section 16-107.5. | |||||||||||||||||||
| 11 | "Eligible customer" has the meaning given to that term in | |||||||||||||||||||
| 12 | Section 16-107.5. | |||||||||||||||||||
| 13 | "Net electricity metering" has the meaning given to that | |||||||||||||||||||
| 14 | term in Section 16-107.5. | |||||||||||||||||||
| 15 | "Portable solar generation device" means a moveable | |||||||||||||||||||
| 16 | photovoltaic generation device that: | |||||||||||||||||||
| 17 | (1) has a maximum power output of 1,200 watts or less; | |||||||||||||||||||
| 18 | (2) is designed to be connected to a building's | |||||||||||||||||||
| 19 | electrical system through a standard 120-volt alternating | |||||||||||||||||||
| 20 | current outlet; | |||||||||||||||||||
| 21 | (3) is intended primarily to offset part of an | |||||||||||||||||||
| 22 | eligible customer's electricity consumption; | |||||||||||||||||||
| 23 | (4) meets the standards of the current edition of the | |||||||||||||||||||
| |||||||
| |||||||
| 1 | National Electrical Code; and | ||||||
| 2 | (5) is certified by Underwriters Laboratories or an | ||||||
| 3 | equivalent nationally recognized testing laboratory. | ||||||
| 4 | (b) A portable solar generation device shall be exempt | ||||||
| 5 | from (i) net electricity metering program and interconnection | ||||||
| 6 | requirements under Section 16-107.5 and (ii) any rules adopted | ||||||
| 7 | pursuant to Section 16-107.5. | ||||||
| 8 | (c) A portable solar generation device shall include a | ||||||
| 9 | device or feature that prevents the portable solar generation | ||||||
| 10 | device from energizing a building's electrical system during a | ||||||
| 11 | power outage. | ||||||
| 12 | (d) An electricity provider shall not require an eligible | ||||||
| 13 | customer who uses, or intends to install and use, a portable | ||||||
| 14 | solar generation device to do any of the following: | ||||||
| 15 | (1) obtain the electricity provider's approval before | ||||||
| 16 | installing or using the portable solar generation device; | ||||||
| 17 | (2) pay a fee or charge related to the installation or | ||||||
| 18 | use of the portable solar generation device; or | ||||||
| 19 | (3) install additional controls or equipment beyond | ||||||
| 20 | what is integrated into the portable solar generation | ||||||
| 21 | device. | ||||||
| 22 | (e) An electricity provider shall not be liable for any | ||||||
| 23 | damage or injury caused by an eligible customer's portable | ||||||
| 24 | solar generation device. | ||||||