Public Act 0271 102ND GENERAL ASSEMBLY |
Public Act 102-0271 |
| HB0653 Enrolled | LRB102 10973 CPF 16305 b |
|
|
AN ACT concerning safety.
|
Be it enacted by the People of the State of Illinois,
|
represented in the General Assembly:
|
Section 5. The Environmental Protection Act is amended by |
changing Section 22.51b as follows: |
(415 ILCS 5/22.51b) |
Sec. 22.51b. Fees for permitted facilities accepting clean |
construction or demolition debris or uncontaminated soil. |
(a) The Agency shall assess and collect a fee from the |
owner or operator of each clean construction or demolition |
debris fill operation that is permitted or required to be |
permitted by the Agency. The fee assessed and collected under |
this subsection shall be 28 20 cents per cubic yard of clean |
construction or demolition debris or uncontaminated soil |
accepted by the clean construction or demolition debris fill |
operation, or, alternatively, the owner or operator may weigh |
the quantity of the clean construction or demolition debris or |
uncontaminated soil with a device for which certification has |
been obtained under the Weights and Measures Act and pay a fee |
of 20 14 cents per ton of clean construction or demolition |
debris or uncontaminated soil. The fee shall apply to |
construction or demolition debris or uncontaminated soil if |
(i) the clean construction or demolition debris fill operation |
|
is located off the site where the clean construction or |
demolition debris or uncontaminated soil was generated and |
(ii) the clean construction or demolition debris fill |
operation is owned, controlled, and operated by a person other |
than the generator of the clean construction or demolition |
debris or uncontaminated soil. |
(b) The Agency shall establish rules relating to the |
collection of the fees authorized by subsection (a) of this |
Section. These rules shall include, but are not limited to, |
the following: |
(1) Records identifying the quantities of clean |
construction or demolition debris and uncontaminated soil |
received. |
(2) The form and submission of reports to accompany |
the payment of fees to the Agency. |
(3) The time and manner of payment of fees to the |
Agency, which payments shall not be more often than |
quarterly. |
(c) Fees collected under this Section shall be in addition |
to any other fees collected under any other Section. |
(d) The Agency shall not refund any fee paid to it under |
this Section. |
(e) The Agency shall deposit all fees collected under this |
subsection into the Environmental Protection Permit and |
Inspection Fund. Pursuant to appropriation, all moneys |
collected under this Section shall be used by the Agency for |
|
the implementation of this Section and for permit and |
inspection activities. |
(f) A unit of local government, as defined in the Local |
Solid Waste Disposal Act, in which a clean construction or |
demolition debris fill operation is located and which has |
entered into a delegation agreement with the Agency pursuant |
to subsection (r) of Section 4 of this Act for inspection, |
investigation, or enforcement functions related to clean |
construction or demolition debris fill operations may |
establish a fee, tax, or surcharge with regard to clean |
construction or demolition debris or uncontaminated soil |
accepted by clean construction or demolition debris fill |
operations. All fees, taxes, and surcharges collected under |
this subsection shall be used for inspection, investigation, |
and enforcement functions performed by the unit of local |
government pursuant to the delegation agreement with the |
Agency and for environmental safety purposes. Fees, taxes, and |
surcharges established under this subsection (f) shall not |
exceed a total of 20 10 cents per cubic yard of clean |
construction or demolition debris or uncontaminated soil |
accepted by the clean construction or demolition debris fill |
operation, unless the owner or operator weighs the quantity of |
the clean construction or demolition debris or uncontaminated |
soil with a device for which certification has been obtained |
under the Weights and Measures Act, in which case the fee shall |
not exceed 14 7 cents per ton of clean construction or |
|
demolition debris or uncontaminated soil. |
(g) For the purposes of this Section: |
(1) The term "uncontaminated soil" shall have the same |
meaning as uncontaminated soil under Section 3.160 of this |
Act. |
(2) The term "clean construction or demolition debris |
fill operation" shall have the same meaning as clean |
construction or demolition debris fill operation under |
Section 22.51 of this Act.
|
(Source: P.A. 96-1416, eff. 7-30-10.)
|