TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE B: AIR POLLUTION
CHAPTER I: POLLUTION CONTROL BOARD
SUBCHAPTER c: EMISSIONS STANDARDS AND LIMITATIONS FOR STATIONARY SOURCES
PART 215 ORGANIC MATERIAL EMISSION STANDARDS AND LIMITATIONS
SECTION 215.211 COMPLIANCE DATES AND GEOGRAPHICAL AREAS


 

Section 215.211  Compliance Dates and Geographical Areas

 

a)         Except as otherwise stated in subsection (b), every owner or operator of an emission unit subject to Section 215.204(j), (k), (l), or (m) shall comply with those subsections in accordance with the following dates:

 

1)         For Section 215.204(j) and (k)(2) Extreme performance prime coat and Final repair coat - air dried, by December 31, 1983.

 

2)         For Section 215.204(k)(l) and (m), by December 31, 1987.

 

3)         For Section 215.204(k)(2) Extreme performance top coat - air dried, in accordance with Section 215.210.

 

4)         For Section 215.204(l), by December 31, 1985.

 

b)         If an emission unit is not located in one of the nonattainment counties or counties contiguous to nonattainment counties listed below, the owner or operator of the emission unit shall comply with the requirements of Section 215.204(j), (k) or (l) no later than December 31, 1987:

 

Bond

Madison

Clinton

McHenry

Cook

Monroe

DeKalb

Montgomery

DuPage

Morgan

Franklin

Pope

Greene

Randolph

Jackson

Saline

Jersey

Sangamon

Johnson

St. Clair

Kane

Union

Kendall

Washington

Lake

Will

Macoupin

Williamson

 

(BOARD NOTE:  Counties are designated as attainment or nonattainment for ozone by the United States Environmental Protection Agency (USEPA).  The USEPA noted in its redesignation rulemaking, that it will publish a rulemaking notice on Williamson County's attainment status.  (45 Fed. Reg. 21949, May 16, 1983.)  Should Williamson County be redesignated as attainment prior to October 31, 1985, it and the counties contiguous to it will be considered deleted from the above list.)

c)         Notwithstanding subsection (b), if any county is designated as nonattainment by the USEPA at any time subsequent to the effective date of this rule, the owner or operator of an emission source located in that county or any county contiguous to that county who would otherwise be subject to the compliance date in subsection (b) shall comply with the requirements of Section 215.204(j), (k) or (l) within one year from the date of redesignation but in no case later than December 31, 1987.

 

(Source:  Amended at 22 Ill. Reg. 11427, effective June 19, 1998)