TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE B: AIR POLLUTION
CHAPTER I: POLLUTION CONTROL BOARD
SUBCHAPTER c: EMISSIONS STANDARDS AND LIMITATIONS FOR STATIONARY SOURCES
PART 215 ORGANIC MATERIAL EMISSION STANDARDS AND LIMITATIONS
SECTION 215.445 LEAKS: GENERAL REQUIREMENTS


 

Section 215.445  Leaks:  General Requirements

 

a)         The owner or operator of a petroleum refinery shall:

 

1)         Develop a monitoring program plan consistent with the provisions of Section 215.446;

 

2)         Conduct a monitoring program consistent with the provisions of Section 215.447;

 

3)         Conduct all tests for leaks in accordance with Method 21, 40 CFR 60, Appendix A, incorporated by reference in Section 215.105.

 

4)         Record all leaking components which have a volatile organic material concentration exceeding 10,000 ppm consistent with the provisions of Section 215.448;

 

5)         Identify each component consistent with the monitoring program plan submitted pursuant to Section 215.446;

 

6)         Repair and retest the leaking components as soon as possible within 22 days after the leak is found, but no later than June 1 for the purposes of Section 215.447(a)(1), unless the leaking components cannot be repaired until the unit is shut down for turnaround; and

 

7)         Report to the Agency consistent with the provisions of Section 215.449.

 

b)         A component shall be considered to be leaking if the volatile organic material concentration exceeds 10,000 ppm when measured at a distance of 0 cm from the component as determined by Method 21, 40 CFR 60, Appendix A, incorporated by reference in Section 215.105.

 

(Source:  Amended at 14 Ill. Reg. 9173, effective May 23, 1990)