TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE F: PUBLIC WATER SUPPLIES CHAPTER I: POLLUTION CONTROL BOARD PART 604 DESIGN, OPERATION AND MAINTENANCE CRITERIA SECTION 604.1000 PRESEDIMENTATION
Section 604.1000 Presedimentation
a) Basin Design: presedimentation basins must have the capability for dewatering. These basins may include hopper bottoms or a continuous mechanical sludge removal apparatus;
b) Inlet: short-circuiting must be prevented;
c) Bypass: provisions for bypassing presedimentation basins must be included; and
d) Detention time must be adequate. Unless otherwise approved by the Agency under Section 604.145(b), three hours detention is the minimum period. |