TITLE 77: PUBLIC HEALTH
CHAPTER II: HEALTH FACILITIES AND SERVICES REVIEW BOARD
SUBCHAPTER b: OTHER BOARD RULES
PART 1120 HEALTH FACILITIES AND SERVICES FINANCIAL AND ECONOMIC FEASIBILITY REVIEW
SECTION 1120.APPENDIX A FINANCIAL AND ECONOMIC REVIEW STANDARDS



Section 1120.APPENDIX A   Financial and Economic Review Standards

 

a)         Reasonableness of Project and Related Costs Standards

 

1)         Preplanning

Costs shall not exceed 1.8% of construction and modernization contracts plus contingencies plus equipment costs.

 

2)         Site Survey and Preparation

Costs shall not exceed 5.0% of construction and contingency costs.

 

3)         New Construction and Modernization Costs per Gross Square Foot (GSF) Hospital and long-term care (LTC) cost standards are derived from the RSMeans Building Construction Cost Data (Means) publication (RSMeans, 63 Smiths Lane, PO Box 800, Kingston MA 02364-9988, 800/334-3509; 2015, no later amendments or editions included) and will be adjusted (for inflation and location) for each project to the current year (www.rsmeans.com).  Cost standards for the other types of facilities are derived from the third quartile costs of previously approved projects and are to be adjusted to the current year based upon historic inflation rates from RSMeans.

 

HFSRB NOTE:  HFSRB staff will review the cost per square foot data submitted in the application, to determine compliance with the latest available cost standards of the RSMeans publication. 

 

HFSRB NOTE:  Modernization includes the build out of leased space and shall include the cost of all capital improvements contained in the terms of the lease.  These standards are based on 2015 data.

 

Type of Facility

New Construction

Modernization

Hospital

Adjusted Means 3rd Quartile

70% of Adjusted Means 3rd Quartile

LTC (includes ICF/DD facilities)

Adjusted Means 3rd Quartile

70% of Adjusted Means 3rd Quartile

ESRD

$254.58 per gsf

$178.33 per gsf

ASTC

$357.89 per gsf

$249.66 per gsf

 

4)         Contingencies

Contingency costs for projects (or for components of projects) are based upon a percentage of new construction or modernization costs and are based upon the status of a project's architectural contract documents.

 

Status of Project

New Construction

Modernization

Contract Documents

Components

Components

Schematics

10%

10-15%

Preliminary

7%

7-10%

Final

3-5%

5-7%

 

5)         New Construction or Modernization Fees & Architectural/Engineering (A&E) Fees

Current fees for services for projects or components of projects involving new construction or modernization (total amount of construction and contingencies, A&E fees for hospitals, LTC facilities and ASTCs, A&E fees for ESRDs and outpatient clinical service facilities, and total fees for site work) can be found in the Centralized Fee Negotiation Professional Services and Fees Handbook (available at www.cdb.state.il.us or by contacting the Capital Development Board, 401 South Spring Street, Springfield, Illinois 62706). HFSRB shall, for all calculations, consider the latest version of the handbook as released on the Capital Development Board website.

 

A)        Projects or Components of Projects Involving New Construction

 

Total Amount of Construction and Contingencies

A&E Fees for Hospitals, LTC Facilities, ASTCs

A&E Fees for ESRDs, Outpatient Clinical Service Facilities

Total Fees for

Site Work

 

under $100,000

10.59-15.89%

9.75-14.63%

7.99-13.70%

$200,000

9.99-14.99%

9.15-13.73%

7.46-12.78%

$300,000

9.48-14.22%

8.64-12.96%

6.99-11.99%

$400,000

9.03-13.55%

8.19-12.29%

6.59-11.30%

$500,000

8.65-12.99%

7.80-11.72%

6.26-10.72%

$700,000

8.21-12.33%

7.36-11.06%

5.86-10.05%

$900,000

7.89-11.85%

7.05-10.59%

5.57-9.55%

$1,000,000

7.79-11.69%

6.95-10.43%

5.48-9.40%

$1,250,000

7.62-11.44%

6.77-10.17%

5.33-9.14%

$1,500,000

7.49-11.25%

6.649.98%

5.21-8.94%

$1,750,000

7.36-11.06%

6.53-9.81%

5.10-8.74%

$2,500,000

7.06-10.60%

6.22-9.34%

4.83-8.27%

$3,000,000

6.89-10.35%

6.04-9.08%

4.67-8.00%

$5,000,000

6.42-9.64%

5.57-8.37%

4.25-7.29%

$7,000,000

6.11-9.17%

5.27-7.91%

3.97-6.80%

$9,000,000

5.94-8.92%

5.09-7.65%

3.82-6.55%

$10,000,000

5.90-8.86%

5.05-7.59%

3.78-6.48%

$15,000,000

5.76-8.66%

4.94-7.42%

3.69-6.33%

$20,000,000

5.64-8.48%

4.84-7.28%

3.62-6.20%

$25,000,000

5.52-8.28%

4.75-7.13%

3.56-6.10%

$30,000,000

5.37-8.07%

4.63-6.95%

3.48-5.96%

$40,000,000

5.12-7.68%

4.42-6.64%

3.34-5.73%

$50,000,000

4.86-7.30%

4.22-6.34%

3.19-5.48%

$100,000,000 and over

3.59-5.39%

3.16-4.74%

2.46-4.21%

 

B)        Projects or Components of Projects Involving Modernization

 

Total Amount of Construction and Contingencies

A&E Fees for Hospitals, LTC facilities, ASTCs

A&E Fees for ESRDs, Outpatient Clinical Service facilities

Total Fees for Site Work

 

under $100,000

10.76-16.16%

9.92-14.88%

8.12-13.92%

$200,000

10.16-15.26%

9.31-13.97%

7.58-13.00%

$300,000

9.65-14.49%

8.80-13.20%

7.12-12.21%

$400,000

9.20-13.80%

8.34-12.52%

6.71-11.51%

$500,000

8.81-13.23%

7.96-11.94%

6.37-10.92%

$700,000

8.36-12.56%

7.50-11.26%

5.97-10.23%

$900,000

8.04-12.06%

7.18-10.78%

5.67-9.73%

$1,000,000

7.93-11.91%

7.08-10.62%

5.58-9.57%

$1,250,000

7.76-11.66%

6.90-10.36%

5.43-9.31%

$1,500,000

7.63-11.45%

6.76-10.16%

5.31-9.10%

$1,750,000

7.50-11.26%

6.65-9.99%

5.20-8.91%

$2,000,000

7.40-11.12%

6.54-9.82%

5.10-8.75%

$2,500,000

7.19-10.79%

6.34-9.52%

4.91-8.43%

$3,000,000

7.02-10.54%

6.16-9.24%

4.76-8.15%

$5,000,000

6.54-9.82%

5.68-8.52%

4.33-7.42%

$7,000,000

6.22-9.34%

5.36-8.06%

4.04-6.93%

$9,000,000

6.04-9.08%

5.19-7.79%

3.89-6.67%

$10,000,000

6.00-9.02%

5.15-7.73%

3.85-6.61%

$15,000,000

5.87-8.81%

5.04-7.56%

3.76-6.45%

$20,000,000

5.74-8.62%

4.93-7.41%

3.69-6.32%

$25,000,000

5.62-8.44%

4.84-7.26%

3.63-6.21%

$30,000,000

5.48-8.22%

4.72-7.08%

3.54-6.07%

$40,000,000

5.21-7.83%

4.50-6.76%

3.41-5.84%

$50,000,000

4.95-7.43%

4.30-6.46%

3.25-5.58%

$100,000,000 and over

3.65-5.49%

3.22-4.84%

2.50-4.29%

 

6)         Capital Equipment Not Included in Construction Contracts

Standards for capital equipment not included in construction contracts are established by type of facility and are derived from the third quartile costs of previously approved projects for which data are available.  The standards apply only to the following types of projects: establishment of new facilities, expansion of existing facilities (e.g., bed additions, station additions, or operating/treatment room additions), and modernization of existing facilities involving replacement of existing beds, relocation of existing facilities, replacement of ASTC operating or procedure room equipment, etc. The standards below are calculated for the year 2008. These will be inflated to the current year using the inflation of major medical equipment by the department. (Long Term Care standard includes ICF/DD.)

 

HFSRB NOTE: Modernization includes the build out of leased space and shall include the cost of capital equipment included in the terms of the lease.

 

Hospitals

LTCs

ESRDs

ASTCs

 

Per Bed

Per Station

Per Room

N/A

$6,491

$39,945

$353,802

 

7)         Inflation Factor

Costs for construction and modernization contracts and equipment are to be adjusted for projected inflation. The projected inflation rate is to be calculated to the midpoint of construction. For construction midpoint of up to 3 years, the inflation rate shall be an average of the previous 3 years annual inflation rates for construction as determined by RSMeans. For construction midpoints beyond 3 years, the inflation rate shall be the lesser of this rate or 3% for the period of time beyond 3 years.

 

b)         Financial Viability Standards

 

1)         Current Ratio = Current Assets/Current Liabilities

 

Type of Hospital:

Standard

Not-For-Profit, System

2.0 or more

Not-For-Profit, Non-System

2.0 or more

For Profit, System

2.0 or more

For-Profit, Non-system

2.0 or more

Governmental

2.0 or more

Type of Long-Term Care (including ICF/DD) Facilities:

Not-For-Profit, System

1.5 or more

Not-For-Profit, Non-System

1.5 or more

For-Profit, System

1.5 or more

For-Profit, Non-System

1.5 or more

Governmental

1.5 or more

End Stage Renal Dialysis Facilities

1.5 or more

Ambulatory Surgical Treatment Centers

1.5 or more

 

2)         Net Margin Percentage = (Net Income/Net Operating Revenues) X 100

 

Type of Hospital:

Standard

Not-For-Profit, System

3.0% or more

Not-For-Profit, Non-System

3.0% or more

For Profit, System

3.0% or more

For-Profit, Non-system

3.0% or more

Governmental

0% or more

Type of Long-Term Care (including ICF/DD) Facilities:

Not-For-Profit, System

2.5% or more

Not-For-Profit, Non-system

2.5% or more

For-Profit, System

2.5% or more

For-Profit, Non-system

2.5% or more

Governmental

0% or more

 

End Stage Renal Dialysis Facilities

3.5% or more

Ambulatory Surgical Treatment Centers

3.5% or more

 

HFSRB NOTE: Net Margin Percentage for FOR-PROFITS is before the provision for income taxes. Net income is the excess of revenues over expenses from operations, before non-recurring income or expense.

 

3)         Long-Term Debt to Capitalization = (Long-Term Debt/Long-Term Debt plus Net Assets) X 100

 

Type of Hospital:

Standard

Not-For-Profit, System

50% or less

Not-For-Profit, Non-System

50% or less

For-Profit, System

50% or less

For-Profit, Non-System

50% or less

Governmental

NA

Type of Long-Term Care (including ICF/DD) Facilities:

Not-For-Profit, System

80% or less

Not-For-Profit, Non-system

80% or less

For-Profit, System

50% or less

For-Profit, Non-system

50% or less

Governmental

NA

 

End Stage Renal Dialysis Facilities

80% or less

Ambulatory Surgical Treatment Centers

80% or less

 

HFSRB NOTE: For long-term care facilities and for-profit facilities, the applicant shall explain the rationale of the use of debt rather than the issuance of stock (if this is the case).

 

4)         Projected Debt Service Coverage = Net Income plus (Depreciation plus Interest plus Amortization)/Principal Payments plus Interest Expense for the Year of Maximum Debt Service after Project Completion

 

Type of Hospital:

Standard

Not-For-Profit, System

2.5 or more

Not-For-Profit, Non-System

2.5 or more

For-Profit, System

2.5 or more

For-Profit, Non-System

2.5 or more

Governmental

2.5 or more

Type of Long-Term Care (including ICF/DD) Facilities:

Not-For-Profit, System

1.5 or more 

Not-For-Profit, Non-system

1.5 or more

For-Profit, System

1.5 or more

For-Profit, Non-system

1.5 or more

Governmental

1.5 or more

 

End Stage Renal Dialysis Facilities

1.75 or more

Ambulatory Surgical Treatment Centers

1.75 or more

 

HFSRB NOTE: Net Income is the excess of revenues over expenses from operations, before non-recurring income or expense.

 

5)         Days-Cash-on-Hand = (Cash plus Investments plus Board Designated Funds)/(Operating Expense less Depreciation Expense)/365 days

 

Type of Hospital:

Standard

Not-For-Profit, System

75.0 or more days

Not-For-Profit, Non-System

75.0 or more days

For-Profit, System

75.0 or more days

For-Profit, Non-System

75.0 or more days

Governmental

NA

Type of Long-Term Care (including ICF/DD) Facilities:

Not-For-Profit, System

45 or more days

Not-For-Profit, Non-system

45 or more days

For-Profit, System

45 or more days

For-Profit, Non-system

45 or more days

Governmental

45 or more days

 

End Stage Renal Dialysis Facilities

45 or more days

Ambulatory Surgical Treatment Centers

45 or more days

 

HFSRB NOTE: Days Cash On Hand ratio can be a combination of cash and investments held by the facilities or available funds from the backup line of credit. 

 

6)         Cushion Ratio = (Cash plus Investments plus Board Designated Funds)/(Principal Payments plus Interest Expense) for the year of maximum debt service after project completion

 

Type of Hospital:

Standard

Not-For-Profit, System

7.0 or more

Not-For-Profit, Non-System

7.0 or more

For-Profit, System

7.0 or more

For-Profit, Non-System

7.0 or more

Governmental

NA

Type of Long-Term Care (including ICF/DD) Facilities:

Not-For-Profit, System

3.0 or more

Not-For-Profit, Non-system

3.0 or more

For-Profit, System

3.0 or more

For-Profit, Non-system

3.0 or more

Governmental

NA

 

End Stage Renal Dialysis Facilities

3.0 or more

Ambulatory Surgical Treatment Centers

3.0 or more

 

HFSRB NOTE:  The applicant may also include in the numerator the amount of funds available from an existing or proposed backup line of credit.  If the applicant includes funds available from a line of credit, documentation shall be provided regarding the terms and conditions of the line.

 

(Source:  Amended at 40 Ill. Reg. 14067, effective September 27, 2016)