Appropriates $201,489,000 in FY97 funds from the Capital
Development Fund to the Capital Development Board for
specified Department of Corrections projects. Effective
immediately.
LRB9000874WHmg
LRB9000874WHmg
1 AN ACT regarding appropriations.
2 Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
4 Section 5. "An Act making appropriations and
5 reappropriations", Public Act 89-501, approved June 28, 1996,
6 is amended by adding Sections 3B, 3C, 3D, 3E, 3F, 3G, and 3H
7 to Article 77 as follows:
8 (P.A. 89-501, Article 77, Section 3B new)
9 Sec. 3B. In addition to any funds otherwise
10 appropriated, the sum of $42,750,000, or so much of that sum
11 as may be necessary, is appropriated from the Capital
12 Development Fund to the Capital Development Board for the
13 Department of Corrections for planning, design, construction,
14 equipment, and other necessary costs for a correctional
15 facility for juveniles.
16 (P.A. 89-501, Article 77, Section 3C new)
17 Sec. 3C. In addition to any funds otherwise appropriated,
18 the sum of $23,000,000, or so much of that sum as may be
19 necessary, is appropriated from the Capital Development Fund
20 to the Capital Development Board for the Department of
21 Corrections for planning and conversion of the Meyer Mental
22 Health Center to a correctional facility.
23 (P.A. 89-501, Article 77, Section 3D new)
24 Sec. 3D. In addition to any funds otherwise appropriated,
25 the sum of $400,000, or so much of that sum as may be
26 necessary, is appropriated from the Capital Development Fund
27 to the Capital Development Board for the Department of
28 Corrections for upgrading the plumbing system at Menard
29 Correctional Center.
-2- LRB9000874WHmg
1 (P.A. 89-501, Article 77, Section 3E new)
2 Sec. 3E. In addition to any funds otherwise appropriated,
3 the sum of $950,000, or so much of that sum as may be
4 necessary, is appropriated from the Capital Development Fund
5 to the Capital Development Board for the Department of
6 Corrections for upgrading the coal handling system and
7 repairing or replacing the boiler system at Menard
8 Correctional Center.
9 (P.A. 89-501, Article 77, Section 3F new)
10 Sec. 3F. In addition to any funds otherwise appropriated,
11 the sum of $16,800,000, or so much of that sum as may be
12 necessary, is appropriated from the Capital Development Fund
13 to the Capital Development Board for the Department of
14 Corrections for completion of planning, site improvements,
15 utility upgrade, equipment, and construction of 2 housing
16 units, one at Graham Correctional Center and one at Logan
17 Correctional Center.
18 (P.A. 89-501, Article 77, Section 3G new)
19 Sec. 3G. In addition to any funds otherwise appropriated,
20 the sum of $7,000,000, or so much of that sum as may be
21 necessary, is appropriated from the Capital Development Fund
22 to the Capital Development Board for the Department of
23 Corrections for completion of planning, site improvements,
24 utility upgrade, equipment, and construction of a housing
25 unit at the Illinois Youth Center at Joliet.
26 (P.A. 89-501, Article 77, Section 3H new)
27 Section 3H. The following named amounts, or so much of
28 those amounts as may be necessary, are appropriated from the
29 Capital Development Fund to the Capital Development Board for
30 the Department of Corrections for the projects hereinafter
31 enumerated:
-3- LRB9000874WHmg
1 STATEWIDE
2 For correction of deficiencies in water systems
3 at three correctional facilities ........... $ 100,000
4 For replacement of locks, windows and doors at
5 the following locations as set forth below: . 4,000,000
6 Dwight .........................291,400
7 IYC Harrisburg .................943,000
8 IYC Joliet .....................367,500
9 Menard .......................1,350,000
10 Pontiac .........................77,100
11 IYC Valley View ................500,000
12 Vienna .........................471,000
13 For planning, design, construction, equipment
14 and other necessary costs for the
15 Pinckneyville Medium Security Correctional
16 Facility ................................... 73,000,000
17 DANVILLE CORRECTIONAL CENTER
18 For renovation of interior and exterior walls,
19 in addition to funds previously appropriated
20 ............................................ 4,000,000
21 DIXON CORRECTIONAL CENTER
22 For renovation of the groundwater storage tank
23 and abatement of crawl space pipes in Bldgs.
24 26, 27 and 29 .............................. 700,000
25 DWIGHT CORRECTIONAL CENTER
26 For completion of medical unit, in addition to
27 funds previously appropriated .............. 3,500,000
28 For expansion of the Education Building and
29 Dietary and construction of a warehouse .... 4,700,000
30 EAST MOLINE CORRECTIONAL CENTER
31 For upgrading locking system, in addition to
32 funds previously appropriated .............. 800,000
33 ILLINOIS YOUTH CENTER - HARRISBURG
34 For upgrading the domestic water system ........ 675,000
-4- LRB9000874WHmg
1 For upgrading the HVAC system .................. 532,000
2 ILLINOIS YOUTH CENTER - PERE MARQUETTE
3 For upgrading the electrical distribution
4 system ..................................... 215,000
5 ILLINOIS YOUTH CENTER - VALLEY VIEW
6 For upgrading dormitory restrooms and fixtures,
7 in addition to funds previously
8 appropriated ............................... 550,000
9 JOLIET CORRECTIONAL CENTER
10 For upgrading the power house and installation
11 of a generator ............................. 407,000
12 STATEVILLE CORRECTIONAL CENTER - JOLIET
13 For replacement of the MSU ..................... 6,500,000
14 LINCOLN CORRECTIONAL CENTER
15 For upgrading the water softener system ........ 150,000
16 MENARD CORRECTIONAL CENTER - CHESTER
17 For upgrading roads and sidewalks .............. 310,000
18 For conversion of the Maintenance Building to an
19 inmate dormitory ........................... 250,000
20 For conversion of the Administration Building
21 basement to a courtroom and attorney
22 offices .................................... 100,000
23 For upgrading the steam and water distribution
24 systems, in addition to funds previously
25 appropriated ............................... 2,400,000
26 PONTIAC CORRECTIONAL CENTER
27 For renovation of main sally port .............. 300,000
28 VANDALIA CORRECTIONAL CENTER
29 For renovation of dormitory shower rooms ....... 450,000
30 VIENNA CORRECTIONAL CENTER
31 For upgrading the steam distribution system and
32 renovation of Powerhouse, in addition to
33 funds previously appropriated .............. 4,000,000
34 For installation of security fencing ........... 1,000,000
-5- LRB9000874WHmg
1 For upgrading air conditioning system and
2 replacement of cooling tower ............... 1,100,000
3 For upgrading the electrical, plumbing and HVAC
4 systems in four buildings .................. 850,000
5 Section 99. Effective date. This Act takes effect upon
6 becoming law.