[ Back ] [ Bottom ]
90_SB0088enr
Makes appropriations and reappropriations to the Capital
Development Board by amending Public Act 89-0501. Also makes
appropriations to the Department of Central Management
Services, Department of Natural Resources, Department of
Transportation, and Environmental Protection Agency by
amending Public Act 89-0501.
FUND NEW REAPPROPS. TOTAL
To Capital Development Board
Capital Development $415,065.8 $2,578.4 $417,644.2
To Department of Central Management Services
Capital Development $89,800.0 $0.0 $89,800.0
To Department of Natural Resources
Capital Development $8,000.0 $0.0 $8,000.0
Conservation 2000 $3,000.0 $0.0 $3,000.0
Projects
To Department of Transportation
Transportation $48,000.0 $0.0 $48,000.0
Series B
To Environmental Protection Agency
Anti-Pollution $50,000.0 $0.0 $50,000.0
SRA90S0011MWcb
SB88 Enrolled SRA90S0011MWcb
1 AN ACT making appropriations and reappropriations by
2 amending Public Act 89-0501.
3 Be it enacted by the People of the State of Illinois,
4 represented in the General Assembly:
5 Section 1. "AN ACT making appropriations and
6 reappropriations," Public Act 89-0501, approved June 28,
7 1996, is amended by adding new Sections 1A, 2A, 3B, 4B, 5A,
8 6B, 7A, 8A, 9A, 10B, 11A, 24A, 28A, 28B, 28C, and 28D to
9 Article 77 as follows:
10 (P.A. 89-0501, Art. 77, Sec. 1A new)
11 Sec. 1A. The following named amounts, or so much thereof
12 as may be necessary, are appropriated from the Capital
13 Development Fund to the Capital Development Board for the
14 Department of Agriculture for the projects hereinafter
15 enumerated:
16 ANIMAL DISEASE LABORATORY - CENTRALIA
17 For upgrading the diagnostic laboratory
18 facility, in addition to funds previously
19 appropriated ................................. $ 200,000
20 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
21 For replacing and/or repairing sidewalks,
22 curbs, gutters and streets, in addition
23 to funds previously appropriated ............. 1,050,000
24 For completing the installation of fiber
25 optics system, in addition to funds
26 previously appropriated ...................... 25,000
27 For upgrading the storm/sanitary and water
28 systems, in addition to funds previously
29 appropriated ................................. 1,600,000
30 For renovation or replacement of
31 comfort stations, in addition
32 to funds previously appropriated ............. 1,273,000
SB88 Enrolled -2- SRA90S0011MWcb
1 For upgrading Building 13, in addition to
2 funds previously appropriated ................ 733,000
3 Total, Section 1A $4,881,000
4 (P.A. 89-0501, Art. 77, Sec. 2A new)
5 Sec. 2A. The following named amounts, or so much thereof
6 as may be necessary, are appropriated from the Capital
7 Development Fund to the Capital Development Board for the
8 Department of Central Management Services for the projects
9 hereinafter enumerated:
10 ILLINOIS REHABILITATION AND
11 EDUCATION CENTER (ROOSEVELT) - CHICAGO
12 For upgrading the HVAC system .................. 2,250,000
13 SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
14 For renovation of Suburban North Regional
15 Office Building (formerly Maine Township
16 North High School building), in addition
17 to funds previously appropriated for such
18 purpose, Phase III ........................... 5,400,000
19 For renovation and expansion of garage ......... 375,000
20 MARION REGIONAL OFFICE BUILDING
21 For construction of a Regional Office
22 Building Addition ............................ 2,000,000
23 COMPUTER FACILITY - SPRINGFIELD
24 For replacement of the halon fire
25 suppression system ........................... 875,000
26 Total, Section 2A $10,900,000
27 (P.A. 89-0501, Art. 77, Sec. 3B new)
28 Sec 3B. The following named amounts, or so much thereof
29 as may be necessary, are appropriated from the Capital
30 Development Fund to the Capital Development Board for the
31 Department of Corrections for the projects hereinafter
32 enumerated:
33 STATEWIDE
SB88 Enrolled -3- SRA90S0011MWcb
1 For correction of deficiencies in
2 water systems at three correctional
3 facilities ................................... $ 100,000
4 For replacement of locks, windows and
5 doors at the following locations
6 as set forth below: .......................... 4,000,000
7 Dwight ...............................291,400
8 IYC Harrisburg .......................943,000
9 IYC Joliet ...........................367,500
10 Menard .............................1,350,000
11 Pontiac ...............................77,100
12 IYC Valley View ......................500,000
13 Vienna ...............................471,000
14 For planning, design, construction,
15 equipment and other necessary costs
16 for a Correctional Facility for
17 juveniles .................................... 42,750,000
18 For planning, design, construction,
19 equipment and other necessary costs
20 for a Medium Security Correctional
21 Facility ..................................... 69,000,000
22 DANVILLE CORRECTIONAL CENTER
23 For renovation of interior and
24 exterior walls, in addition to
25 funds previously appropriated ................ 4,000,000
26 DECATUR WOMEN'S CORRECTIONAL CENTER
27 For the planning and conversion of
28 Meyer Mental Health Center into a
29 correctional facility ........................ 23,000,000
30 DIXON CORRECTIONAL CENTER
31 For renovation of the groundwater
32 storage tank and abatement of crawl-
33 space pipes in Bldgs. 26, 27 and 29 .......... 700,000
34 DWIGHT CORRECTIONAL CENTER
SB88 Enrolled -4- SRA90S0011MWcb
1 For completion of medical unit,
2 in addition to funds previously
3 appropriated ................................. 3,500,000
4 For expansion of the Education Building
5 and Dietary and construction of
6 a warehouse .................................. 4,700,000
7 EAST MOLINE CORRECTIONAL CENTER
8 For upgrading locking system, in addition
9 to funds previously appropriated ............. 800,000
10 ILLINOIS YOUTH CENTER - HARRISBURG
11 For upgrading the domestic water system ........ 675,000
12 For upgrading the HVAC system .................. 532,000
13 ILLINOIS YOUTH CENTER - JOLIET
14 For planning, site improvements,
15 utility upgrade, equipment and all
16 costs necessary to construct a
17 housing unit and dietary facility............. 7,000,000
18 ILLINOIS YOUTH CENTER - PERE MARQUETTE
19 For upgrading the electrical
20 distribution system .......................... 215,000
21 ILLINOIS YOUTH CENTER - VALLEY VIEW
22 For upgrading dormitory restrooms
23 and fixtures, in addition to
24 funds previously appropriated ................ 550,000
25 JOLIET CORRECTIONAL CENTER
26 For upgrading the power house and
27 installation of a generator .................. 407,000
28 STATEVILLE CORRECTIONAL CENTER - JOLIET
29 For replacement of the MSU ..................... 6,500,000
30 LINCOLN CORRECTIONAL CENTER
31 For upgrading the water softener system ........ 150,000
32 MENARD CORRECTIONAL CENTER - CHESTER
33 For upgrading roads and sidewalks .............. 310,000
34 For upgrading the plumbing systems in
SB88 Enrolled -5- SRA90S0011MWcb
1 two buildings ................................ 400,000
2 For upgrading the coal handling system
3 and repair or replace boiler system .......... 950,000
4 For conversion of the Maintenance Building
5 to an inmate dormitory ....................... 250,000
6 For conversion of the Administration
7 Building basement to a courtroom and
8 attorney offices ............................. 100,000
9 For upgrading the steam and water distribution
10 systems, in addition to funds previously
11 appropriated ................................. 2,400,000
12 PONTIAC CORRECTIONAL CENTER
13 For renovation of main sally port .............. 300,000
14 VANDALIA CORRECTIONAL CENTER
15 For renovation of dormitory shower rooms ....... 450,000
16 VIENNA CORRECTIONAL CENTER
17 For upgrading the steam distribution system
18 and renovation of Powerhouse, in addition
19 to funds previously appropriated ............. 4,000,000
20 For installation of security fencing ........... 1,000,000
21 For upgrading air conditioning system
22 and replacement of cooling tower ............. 1,100,000
23 For upgrading the electrical, plumbing and
24 HVAC systems in four buildings ............... 850,000
25 Total, Section 3B $180,689,000
26 (P.A. 89-0501, Art. 77, Sec. 4B new)
27 Sec. 4B. The following named amounts, or so much thereof
28 as may be necessary, are appropriated from the Capital
29 Development Fund to the Capital Development Board for the
30 Department of Mental Health and Developmental Disabilities
31 for the projects hereinafter enumerated:
32 STATEWIDE
33 For replacement of roofing systems at the
34 following locations at the approximate costs
SB88 Enrolled -6- SRA90S0011MWcb
1 set forth below: ............................. $ 2,333,900
2 Alton Mental Health Center ..........217,000
3 Choate Mental Health Center .........134,900
4 Chester Mental Health Center ......1,350,000
5 Fox Developmental Center ............101,000
6 Howe Developmental Center ...........166,000
7 Jacksonville Developmental Center ....21,000
8 Lincoln Developmental Center ........344,000
9 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
10 For rehabilitation of the central dietary ...... 1,950,000
11 For replacement of life/safety and
12 security system in a residential
13 building ..................................... 246,000
14 CHESTER MENTAL HEALTH CENTER - CHESTER
15 For installation of emergency generator
16 and upgrading EMS system ..................... 350,000
17 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
18 For renovating residential units, in
19 addition to funds previously
20 appropriated ................................. 2,171,000
21 CHOATE MENTAL HEALTH CENTER - ANNA
22 For upgrading mechanical equipment, in
23 addition to funds previously
24 appropriated ................................... 837,000
25 For renovating a residential building,
26 in addition to funds previously
27 appropriated ................................. 2,334,000
28 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
29 For construction of an Adult Psychiatric
30 Building, in addition to funds previously
31 appropriated ................................. 3,681,000
32 For construction of roads, parking lots
33 and street lights ............................ 2,500,000
34 For upgrading and expanding the mechanical
SB88 Enrolled -7- SRA90S0011MWcb
1 infrastructure, in addition to funds
2 previously appropriated ...................... 4,500,000
3 For construction of a forensic services complex
4 at Elgin Mental Health Center, in addition
5 to funds previously appropriated ............. 4,815,500
6 FOX DEVELOPMENTAL CENTER - DWIGHT
7 For replacement of absorbers and
8 upgrading HVAC system ........................ 738,000
9 For renovation of dietary ...................... 843,000
10 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
11 For renovation of residential buildings ........ 2,561,000
12 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
13 For rehabilitation of bathrooms and
14 replacing doors .............................. 1,575,000
15 For rehabilitation of the electrical
16 distribution system, in addition to funds
17 previously appropriated ...................... 1,257,000
18 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
19 For installation of a rethermalization food
20 service system, in addition to funds
21 previously appropriated ...................... 732,000
22 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
23 For renovation of residential buildings,
24 in addition to funds previously
25 appropriated ................................. 1,888,500
26 For rehabilitation of the roads and parking
27 areas and constructing walks ................. 800,000
28 MADDEN MENTAL HEALTH CENTER - HINES
29 For renovation of pavilions, in addition
30 to funds previously appropriated ............. 844,000
31 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
32 For replacement of the HVAC management
33 control panel, in addition to funds
34 previously appropriated ...................... 150,000
SB88 Enrolled -8- SRA90S0011MWcb
1 For rehabilitation of the dietary facility ..... 413,000
2 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
3 For replacement of the boiler
4 shells and controls, in addition
5 to funds previously appropriated ............. 132,000
6 For rehabilitation of the hot water
7 distribution system, in addition to
8 funds previously appropriated ................ 514,000
9 For replacement of cooling towers and
10 support beams, in addition to funds
11 previously appropriated ...................... 335,000
12 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
13 For completion of the HVAC system, in
14 addition to funds previously
15 appropriated ................................. 598,000
16 For replacement of boiler, in
17 addition to funds previously
18 appropriated ................................. 765,000
19 For replacement of electrical feeder
20 cable, in addition to the funds
21 previously appropriated ...................... 586,000
22 For rehabilitation of sewers and
23 manholes, in addition to funds
24 previously appropriated ...................... 777,000
25 For replacement of water mains
26 and valves ................................... 1,826,000
27 SINGER MENTAL HEALTH CENTER - ROCKFORD
28 For replacement of absorbers ................... 746,000
29 TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY
30 For replacement of the bar screen and
31 renovating the sewer system, in
32 addition to funds previously appropriated .... 655,000
33 For rehabilitation of the electrical
34 distribution system, in addition to
SB88 Enrolled -9- SRA90S0011MWcb
1 funds previously appropriated ................ 2,250,000
2 ZELLER MENTAL HEALTH CENTER - PEORIA
3 For renovation of the nurses' stations,
4 in addition to funds previously
5 appropriated ................................. 1,720,000
6 Total, Section 4B $48,423,900
7 (P.A. 89-0501, Art. 77, Sec. 5A new)
8 Sec. 5A. The following named amounts, or so much thereof
9 as may be necessary, are appropriated from the Capital
10 Development Fund to the Capital Development Board for the
11 Department of Military Affairs for the projects hereinafter
12 enumerated:
13 NORTHWEST ARMORY - CHICAGO
14 For renovation of interior and exterior,
15 in addition to funds previously
16 appropriated for such purposes ............... 1,200,000
17 DIXON ARMORY - LEE COUNTY
18 For construction of an addition,
19 remodeling, extending utilities and
20 installing a kitchen ......................... 280,000
21 SALEM ARMORY - MARION COUNTY
22 For replacement of the boiler and
23 all domestic plumbing, piping and
24 fixtures ..................................... 800,000
25 STREATOR ARMORY - LASALLE COUNTY
26 For renovation of the mechanical
27 systems, in addition to funds
28 previously appropriated ...................... 450,000
29 Total, Section 5A $2,730,000
30 (P.A. 89-0501, Art. 77, Sec. 6B new)
31 Sec. 6B. The following named amounts, or so much thereof
32 as may be necessary, are appropriated from the Capital
33 Development Fund to the Capital Development Board for the
SB88 Enrolled -10- SRA90S0011MWcb
1 Department of Natural Resources for the projects hereinafter
2 enumerated:
3 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
4 For construction of a concession building
5 and upgrading the horse concession, in
6 addition to funds previously appropriated .... 500,000
7 CHAMPAIGN - STATE WATER SURVEY
8 For planning the renovation of the central
9 utilities plant .............................. 30,000
10 For renovation of office and
11 laboratory buildings ......................... 793,000
12 For replacement and upgrade of the exterior
13 lighting system .............................. 146,000
14 CHAMPAIGN - STATE NATURAL HISTORY SURVEY
15 For renovation of Natural History
16 Research Center (formerly Burnham
17 Hospital) in Champaign ....................... 6,000,000
18 DELABAR STATE PARK - HENDERSON COUNTY
19 For replacement of waterlines and
20 fountains .................................... 110,000
21 EAGLE CREEK STATE PARK - SHELBY COUNTY
22 For rehabilitation of the sewage treatment
23 system, in addition to funds previously
24 appropriated ................................. 312,000
25 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
26 For replacement and rehabilitation
27 of arch culverts and canal ................... 600,000
28 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
29 For rehabilitation of the concession
30 building, in addition to funds
31 previously appropriated ...................... 140,000
32 KICKAPOO STATE PARK - VERMILION COUNTY
33 For construction of a sewage treatment
34 plant, in addition to funds
SB88 Enrolled -11- SRA90S0011MWcb
1 previously appropriated ...................... 1,110,000
2 MORAINE HILLS STATE PARK - MCHENRY COUNTY
3 For renovation of the trail .................... 345,000
4 MORAINE VIEW STATE PARK - MCLEAN COUNTY
5 For construction of a sewage treatment
6 system and plant ............................. 1,625,000
7 PERE MARQUETTE STATE PARK - JERSEY COUNTY
8 For renovation of two buildings and
9 replacement of a storage building ............ 180,000
10 STARVED ROCK STATE PARK - LASALLE COUNTY
11 For construction of a visitors'
12 center, in addition to funds
13 previously appropriated ...................... 365,000
14 For rehabilitation of trails, in addition
15 to funds previously appropriated ............ 1,000,000
16 For reconstruction of the seawall, in
17 addition to funds previously
18 appropriated ................................. 500,000
19 For rehabilitation of the sewer
20 system - Phase I ............................. 180,000
21 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
22 For the completion of site improvements ........ 559,000
23 STATE MUSEUM - SPRINGFIELD
24 For planning and replacement of the main
25 museum exhibits, in addition to funds
26 previously appropriated ...................... 700,000
27 Total, Section 6B $15,195,000
28 (P.A. 89-0501, Art. 77, Sec. 7A new)
29 Sec. 7A. The following named amounts, or so much thereof
30 as may be necessary, are appropriated from the Capital
31 Development Fund to the Capital Development Board for the
32 Department of Rehabilitation Services for the projects
33 hereinafter enumerated:
34 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
SB88 Enrolled -12- SRA90S0011MWcb
1 For upgrading campus lighting .................. 150,000
2 For the renovation of Building No. 4 ........... 700,000
3 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
4 For replacement of roofing systems ............. 535,000
5 For planning the upgrade of the heat
6 and smoke detection system ................... 100,000
7 For the renovation of Cullom Hall .............. 2,100,000
8 Total, Section 7A $3,585,000
9 (P.A. 89-0501, Art. 77, Sec. 8A new)
10 Sec. 8A. The following named amounts, or so much thereof
11 as may be necessary, are appropriated from the Capital
12 Development Fund to the Capital Development Board for the
13 Department of Revenue for the project hereinafter enumerated:
14 WILLARD ICE BUILDING - SPRINGFIELD
15 For completion of the replacement of the
16 fire alarm and security system ............... $ 70,000
17 For upgrade of the uninterruptible
18 power system ................................. 1,300,000
19 For completion of the renovation of
20 the atrium landscaping ....................... 100,000
21 Total, Section 8A $1,470,000
22 (P.A. 89-0501, Art. 77, Sec. 9A new)
23 Sec. 9A. The following named amounts, or so much thereof
24 as may be necessary, are appropriated from the Capital
25 Development Fund to the Capital Development Board for the
26 Department of State Police for the projects hereinafter
27 enumerated:
28 For replacing radio communication
29 towers, equipment, buildings and
30 installing emergency power
31 generators at various locations .............. 1,150,000
32 District #22, Effingham (Mason site)
33 District #10, Pesotum
SB88 Enrolled -13- SRA90S0011MWcb
1 District #21, Askum
2 District #6, Pontiac
3 DISTRICT 18 HEADQUARTERS - LITCHFIELD
4 For rehabilitation of headquarters facilities .. 377,000
5 Total, Section 9A $1,527,000
6 (P.A. 89-0501, Art. 77, Sec. 10B new)
7 Sec. 10B. The following named amounts, or so much
8 thereof as may be necessary, are appropriated from the
9 Capital Development Fund to the Capital Development Board for
10 the Capital Development Board for the projects hereinafter
11 enumerated:
12 STATEWIDE
13 For renovation to meet the requirements
14 of the Americans with Disabilities Act ....... 3,000,000
15 CAPITOL COMPLEX - SPRINGFIELD
16 For energy improvements and upgrading the
17 HVAC, security and electrical systems,
18 in addition to funds previously
19 appropriated - Attorney General's
20 Building ..................................... 225,000
21 To renovate the interior, exterior and
22 site improvements, in addition to
23 funds previously appropriated -
24 Executive Mansion ............................ 190,000
25 For upgrading environmental equipment
26 and HVAC, in addition to funds previously
27 appropriated - Archives Building ............. 2,150,000
28 For planning and beginning the rehabilitation
29 of the Power Plant ........................... 3,805,000
30 For upgrading sewer system - Capitol Complex,
31 in addition to funds previously
32 appropriated ................................. 2,100,000
33 For renovation of the lower level and
34 ground floor, in addition to funds
SB88 Enrolled -14- SRA90S0011MWcb
1 previously appropriated - Old Power Plant .... 2,180,000
2 Total, Section 10B $13,650,000
3 (P.A. 89-0501, Art. 77, Sec. 11A new)
4 Sec. 11A. The following named amounts, or so much
5 thereof as may be necessary, are appropriated from the
6 Capital Development Fund to the Capital Development Board for
7 the Historic Preservation Agency for the projects hereinafter
8 enumerated:
9 STATEWIDE HISTORIC SITE
10 For matching ISTEA federal grant funds ......... $ 500,000
11 DAVID DAVIS MANSION - BLOOMINGTON
12 For renovation of the David Davis Mansion
13 to eliminate basement leakage ................ 231,000
14 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
15 For renovation of the Cahokia Courthouse
16 and the Jarrot House ......................... 387,000
17 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
18 For replacement of Monk's Mound stairs ......... 465,000
19 For restoration of Monk's Mound ................ 1,800,000
20 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
21 For construction of a visitors' center ......... 1,625,000
22 For replacement of bridges ..................... 180,000
23 LINCOLN'S NEW SALEM - PETERSBURG
24 For renovation of the River Ridge
25 Restaurant and improvements to the
26 domestic water system ........................ 273,000
27 OLD STATE CAPITOL - SPRINGFIELD
28 For renovation of the Old State
29 Capitol to eliminate basement
30 leakage ...................................... 620,000
31 Total, Section 11A $6,081,000
32 (P.A. 89-0501, Art. 77, Sec. 24A new)
33 Sec. 24A. The following named amounts, or so much
SB88 Enrolled -15- SRA90S0011MWcb
1 thereof as may be necessary, are appropriated from the
2 Capital Development Fund to the Capital Development Board for
3 the Department of Veterans' Affairs for the project
4 hereinafter enumerated:
5 ILLINOIS VETERANS' HOME - MANTENO
6 For construction of a special care facility .... $5,550,000
7 ILLINOIS VETERANS' HOME - QUINCY
8 For upgrading HVAC system ...................... 254,000
9 For replacing steam lines ...................... 83,000
10 For replacing the domestic hot water loop ...... 305,000
11 For renovating the elevator .................... 197,000
12 Total, Section 24A $6,389,000
13 (P.A. 89-0501, Art. 77, Sec. 28A new)
14 Sec. 28A. The following named amounts, or so much
15 thereof as may be necessary, are appropriated from the
16 Capital Development Fund to the Capital Development Board for
17 the Illinois Community College Board for the projects
18 hereinafter enumerated:
19 BELLEVILLE AREA COLLEGE
20 For constructing a building, additions
21 and site improvements at the
22 Belleville and Red Bud campuses,
23 in addition to funds previously
24 appropriated ................................. $ 10,797,100
25 DANVILLE COMMUNITY COLLEGE - VERMILION COUNTY
26 To rehabilitate infrastructure,
27 construct a classroom facility
28 and a day care center, in addition
29 to funds previously appropriated ............. 4,770,200
30 HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
31 For planning buildings, parking areas,
32 utilities, and site development and
33 preliminary site preparation
34 required to establish permanent
SB88 Enrolled -16- SRA90S0011MWcb
1 campus facilities ............................ 2,500,000
2 JOHN A. LOGAN COMMUNITY COLLEGE
3 For constructing additions and site
4 improvements, in addition to funds
5 previously appropriated ...................... 12,315,900
6 SHAWNEE COMMUNITY COLLEGE - ULLIN
7 For planning additions to the main
8 building, parking areas, site
9 improvements and roofing
10 replacements ................................. 310,000
11 Total, Section 28A $30,693,200
12 (P.A. 89-0501, Art. 77, Sec. 28B new)
13 Sec. 28B. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 Capital Development Fund to the Capital Development Board for
16 the Board of Higher Education for the projects hereinafter
17 enumerated:
18 MATH AND SCIENCE ACADEMY
19 For replacing air conditioning units,
20 controls and upgrading the energy
21 management system ............................ $ 2,370,000
22 CHICAGO STATE UNIVERSITY
23 For renovating campus buildings and
24 upgrading mechanical systems.................. 2,432,200
25 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
26 For planning an addition and renovation
27 of Booth Library ............................. 1,000,000
28 GOVERNORS STATE UNIVERSITY
29 For upgrading and replacing cooling
30 and refrigeration systems and
31 equipment .................................... 2,299,400
32 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
33 For purchasing equipment
34 for the Fine Arts Complex .................... 4,000,000
SB88 Enrolled -17- SRA90S0011MWcb
1 WESTERN ILLINOIS UNIVERSITY - MACOMB
2 For converting Simpkins Hall
3 gymnasium and adjacent areas into
4 a performing arts facility ................... 2,309,300
5 ILLINOIS STATE UNIVERSITY - NORMAL
6 For purchasing equipment for
7 the Science Laboratory building .............. 4,000,000
8 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
9 For site improvements and purchasing
10 equipment for the Engineering and
11 Technology Building .......................... 1,259,000
12 For planning addition, remodeling and
13 upgrading the HVAC system in Altgeld Hall ...... 574,000
14 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
15 For construction of the Engineering Facility
16 building and related site improvements ....... 21,256,200
17 UNIVERSITY OF ILLINOIS - SPRINGFIELD
18 For upgrading and completing the south
19 access roadway ............................... 451,600
20 UNIVERSITY OF ILLINOIS - CHICAGO
21 For the renovation of the court area and
22 Lecture Center, in addition to funds
23 previously appropriated ...................... 5,900,000
24 UNIVERSITY OF ILLINOIS - CHAMPAIGN
25 For completion of campus flood control ......... 6,000,000
26 Total, Section 14 $53,851,700
27 (P.A. 89-0501, Art. 77, Sec. 28C new)
28 Sec. 28C. The following named amounts, or so much
29 thereof as may be necessary, is appropriated from the Capital
30 Development Fund to the Capital Development Board for the
31 Board of Higher Education for miscellaneous capital
32 improvements including construction, capital facilities,
33 cost of planning, supplies, equipment, materials, services
34 and all other expenses required to complete the work at the
SB88 Enrolled -18- SRA90S0011MWcb
1 various universities set forth below. This appropriation
2 shall be in addition to any other appropriated amounts which
3 can be expended for these purposes.
4 For Chicago State University ..........525,000
5 For Eastern Illinois University .......980,000
6 For Governors State University ........315,000
7 For Illinois State University .......2,030,000
8 For Northeastern Illinois University ..735,000
9 For Northern Illinois University ....2,240,000
10 For Southern Illinois University ....4,830,000
11 For University of Illinois .........13,090,000
12 For Western Illinois University .....1,505,000
13 (P.A. 89-0501, Art. 77, Sec. 28D new)
14 Sec. 28D. The sum of $8,750,000, or so much thereof as
15 may be necessary, is appropriated from the Capital
16 Development Fund to the Capital Development Board for the
17 Illinois Community College Board for miscellaneous capital
18 improvements including construction, reconstruction,
19 remodeling, improvement, repair and installation of capital
20 facilities, cost of planning, supplies, equipment, materials,
21 services and all other expenses required to complete the work
22 at the various community colleges. This appropriation shall
23 be in addition to any other appropriated amounts which can be
24 expended for these purposes.
25 Section 2. "AN ACT making appropriations, Public Act
26 89-0501, approved June 28, 1996, is amended by changing
27 Sections 5, 9 and 21 of Article 78 as follows:
28 (P.A. 89-0501, Art. 78, Sec. 5)
29 Sec. 5. The following named amounts, or so much thereof
30 as may be necessary and remain unexpended at the close of
31 business on June 30, 1996, from reappropriations heretofore
32 made for such purposes in Article 80, Section 5, of Public
SB88 Enrolled -19- SRA90S0011MWcb
1 Act 89-0022, are reappropriated from the Capital Development
2 Fund to the Capital Development Board for the Department of
3 Corrections for the projects hereinafter enumerated:
4 CENTRALIA CORRECTIONAL CENTER
5 For renovation of the Dietary .................. $ 576,008
6 DANVILLE CORRECTIONAL CENTER
7 For installation of a water softener system ... 80,000
8 For renovation of interior walls and
9 exterior masonry walls ....................... 743,387
10 For correction of construction defects ......... 363,136
11 For planning, utilities, site improvements,
12 and other expenses necessary for the
13 construction of a correctional facility ...... 32,511
14 DIXON CORRECTIONAL CENTER
15 For completing the upgrade of Sewage Treatment
16 Plant, in addition to funds previously
17 appropriated ................................. 805,336
18 For renovation of the Dietary and
19 replacement of the blast chillers ............ 220,918
20 For replacement of the cooling tower in
21 the medical unit ............................. 7,030
22 For upgrading the steam distribution system
23 and replacement of the boiler system
24 including asbestos abatement ................. 304,916
25 For replacement of the cooling tower ........... 14,864
26 DU QUOIN WORK CAMP
27 For construction of classroom space and
28 maintenance building, and
29 site improvement ............................. 83,026
30 DWIGHT CORRECTIONAL CENTER
31 For renovation of buildings ................... 1,255,872
32 For tuckpointing and renovation of walls for
33 17 buildings ................................. 5,223
34 For installation of handicapped lifts and
SB88 Enrolled -20- SRA90S0011MWcb
1 construction of ramps ........................ 58,899
2 For renovation of the basement walls and
3 correction of water infiltration of
4 eight housing units ......................... 6,552
5 For rehabilitation of the water and sewer
6 systems ...................................... 86,877
7 EAST MOLINE CORRECTIONAL CENTER
8 For planning the upgrade of locking
9 systems in nine buildings .................... 34,995
10 For stabilization of the slopes ................ 150,121
11 For upgrading the steam distribution system
12 and replacement of boilers, including
13 asbestos abatement ........................... 264,888
14 SOUTHWESTERN ILL. CORRECTIONAL FACILITY
15 For providing equipment and telecom,
16 constructing a warehouse and upgrading
17 a parking lot, in addition to funds
18 previously appropriated ...................... 1,278,823
19 For completing the conversion of existing
20 buildings into a minimum security
21 correctional facility, in addition to funds
22 previously appropriated ...................... 44,937
23 HANNA CITY WORK CAMP
24 For the purchase and upgrade of the
25 water system ................................. 5,051
26 ILLINOIS YOUTH CENTER - HARRISBURG
27 For purchasing and installation of equipment
28 to complete the dietary expansion ........... 25,607
29 For replacement of absorption chiller units
30 and boiler systems in three buildings ........ 239,985
31 JOLIET CORRECTIONAL CENTER
32 For completing the west cellhouse renovation,
33 including asbestos abatement, in addition
34 to funds previously appropriated ............. 8,503,812
SB88 Enrolled -21- SRA90S0011MWcb
1 For renovation of the west cellhouse, in
2 addition to funds previously appropriated .... 45,445
3 For rehabilitation of the electrical
4 distribution system and renovation
5 of the sanitary system at the
6 barscreen .................................... 12,041
7 For renovation of steam, water, sewage and
8 electrical systems ........................... 11,048
9 For planning the rehabilitation of
10 West Cellhouses .............................. 172,010
11 ILLINOIS YOUTH CENTER - JOLIET
12 For completing the upgrade of electrical
13 systems, in addition to funds
14 previously appropriated ...................... 2,090,299
15 For upgrading the fire alarm system ............ 893,150
16 For upgrading the storm and sanitary sewers .... 965,000
17 For completing the upgrade of the utilities, in
18 addition to funds previously appropriated .... 83,738
19 For completion of the steam system upgrade
20 and initiation of the electrical
21 system upgrade ............................... 6,239
22 KANKAKEE MSU
23 For providing equipment, telecom, lighting
24 and freezer units, in addition to funds
25 previously appropriated ...................... 94,419
26 For planning, construction, utilities,
27 renovation, site improvements, and
28 other expenses necessary for a minimum
29 security women's prison ...................... 4,133
30 For rehabilitation of the heating and air
31 handling system in the resident buildings .... 4,817
32 LINCOLN CORRECTIONAL CENTER
33 For upgrading the locking systems and doors ... 77,700
34 For upgrading the water supply ................. 356,077
SB88 Enrolled -22- SRA90S0011MWcb
1 For renovation of the Dietary, construction
2 of a cooler addition and installation
3 of blast chillers ........................... 487,520
4 LOGAN CORRECTIONAL CENTER
5 For renovation of sewer system ................. 881,858
6 For renovation of the water tower .............. 125,088
7 For rehabilitation of the roof ventilation
8 systems ...................................... 77,948
9 MENARD CORRECTIONAL CENTER
10 For planning, completion and rehabilitation
11 or replacement of the MSU "C" Building ......... 2,525,680
12 For replacement of East and West
13 Cellhouse windows and boilers................. 511,346
14 For improving the south yard for outdoor
15 recreation ................................... 34,346
16 For repairs due to the Great Flood of
17 1993 and projects to protect the facility
18 from future floods ........................... 825,890
19 For upgrading the steam and water distribution
20 systems and replacement of the MSU
21 "C" Building ................................. 576,422
22 For replacement of the chimney stack and
23 boilers, in addition to funds previously
24 appropriated ................................. 400,000
25 For replacement of hot water heaters and
26 deairing tanks ............................... 110,000
27 For planning the renovation of the old
28 hospital building ............................ 207,540
29 For renovation of the North Cellhouse II,
30 Phase II ..................................... 5,512
31 For renovation of elements of the power
32 plant, including the main generator .......... 52,501
33 For planning for renovation of the
34 Administration Building ...................... 15,604
SB88 Enrolled -23- SRA90S0011MWcb
1 For completing the renovation of the
2 Psychiatric Cellhouse ........................ 5,247
3 ILLINOIS YOUTH CENTER - PERE MARQUETTE
4 For completing the renovation of control
5 center and construction of a confinement
6 addition, in addition to funds previously
7 appropriated ................................. 250,279
8 For upgrading the dormitory restrooms ......... 65,380
9 PONTIAC CORRECTIONAL CENTER
10 For upgrading selected utilities and planning
11 the rehabilitation and upgrade of the total
12 system ....................................... 31,129
13 For renovation of steam, water, sewage and
14 electrical systems ........................... 5,875
15 ROBINSON CORRECTIONAL CENTER
16 For Health and Life Safety improvements ........ 8,875
17 SHAWNEE CORRECTIONAL CENTER
18 For upgrading the heating and hot
19 water system ................................. 581,309
20 SHERIDAN CORRECTIONAL CENTER
21 For completion of water and sewer systems
22 upgrade, in addition to funds previously
23 appropriated ................................. 2,699
24 For planning the upgrade of sewer and
25 water utilities .............................. 6,954
26 STATEVILLE CORRECTIONAL CENTER
27 For upgrading the the gatehouse ................ 464,185
28 For completing the upgrade of the security
29 system, in addition to funds previously
30 appropriated ................................. 200,000
31 For rehabilitation of plumbing in Dietary ..... 79,710
32 For upgrading the doors, locks and hardware
33 in B Cellhouse ............................... 59,940
34 For rehabilitation of the intercom system ..... 380,924
SB88 Enrolled -24- SRA90S0011MWcb
1 For upgrading the water supply to B house ..... 187,633
2 For upgrade of the utility system .............. 7,177
3 ILLINOIS YOUTH CENTER - ST. CHARLES
4 For completing the upgrade of the water distribution
5 system, in addition to funds previously
6 appropriated ................................. 308,328
7 For replacement of Madison Cottage ............. 504,802
8 For rehabilitation of the utilities ............ 42,004
9 TAYLORVILLE CORRECTIONAL CENTER
10 For Health and Life Safety improvements ....... 2,115
11 ILLINOIS YOUTH CENTER - VALLEY VIEW
12 For planning the upgrade of dormitory restrooms
13 and fixtures ................................. 68,560
14 (From Article 80, Section 6 of Public Act 89-0022):
15 For upgrading locking systems and doors
16 in J Hall .................................... 13,520
17 VANDALIA CORRECTIONAL CENTER
18 For completing Dormitory G renovation and
19 replacement of the cold storage facility, in
20 addition to funds previously appropriated .... 3,230
21 For rehabilitation of the south wall of
22 Dormitory G .................................. 35,833
23 VIENNA CORRECTIONAL CENTER
24 For completing the rehabilitation of duct
25 system and walls, in addition to
26 funds previously appropriated ................ 2,909,382
27 For upgrading the electrical system ............ 455,994
28 For planning the upgrade of the steam
29 distribution system .......................... 200,471
30 For planning the replacement of the
31 absorption chiller and cooling tower ......... 42,625
32 For upgrading the library and school
33 buildings .................................... 107,592
34 For planning the rehabilitation of the
SB88 Enrolled -25- SRA90S0011MWcb
1 duct system and walls ........................ 138,027
2 For upgrading the water and sewer
3 utilities .................................... 396,000
4 ILLINOIS YOUTH CENTER - WARRENVILLE
5 For installation of bathroom fixtures in
6 cottages ..................................... 11,523
7 STATEWIDE
8 For planning, design, construction,
9 equipment and all other necessary
10 costs for a youth boot camp at a
11 site to be chosen from the list of
12 finalists not selected for the
13 super maximum security prison ............... 5,198,856
14 For planning the construction of
15 two work camps at sites to be
16 chosen from the list of finalists not
17 selected for the super maximum
18 security prison .............................. 153,941
19 For completion of planning, site improvements,
20 utility upgrade, equipment and construction of
21 three housing units to add 672 cells
22 to the adult correctional system ............. 317,978
23 For planning, construction, utilities, site
24 improvements, equipment and other expenses
25 necessary for the construction of a close
26 supervision super maximum security prison .... 43,312,099
27 For upgrading for fire safety at five
28 locations and replacing boilers............... 3,799,775
29 For correcting defects in the food preparation
30 areas, including roofs ....................... 215,323
31 For planning, construction, utilities,
32 site improvements, and other expenses
33 necessary for the construction of two
34 minimum and one medium security
SB88 Enrolled -26- SRA90S0011MWcb
1 prisons ...................................... 204,213
2 For utilities, construction, planning,
3 design, site improvements, rehabilitation,
4 equipment, or any other means of acquiring
5 community correctional centers, adult work
6 camps, and boot camps ........................ 26,609
7 For replacement of boiler systems at the
8 following locations at the approximate
9 costs set forth below: ....................... 17,704
10 Illinois Youth Center -
11 Joliet .............................17,704
12 For renovation and improvements at various
13 correctional facilities at the approximate
14 costs set forth below: ....................... 117,693
15 Roof Replacement .....................70,000
16 Road Repavement ......................47,693
17 For replacement of cell doors and locks
18 and rehabilitation of locking systems at
19 the following locations at the approximate
20 costs set forth below: ....................... 118,902
21 Kankakee MSU
22 For rehabilitation of locking
23 systems ...........................118,902
24 For renovation of roads and parking lots
25 and replacement of boilers at the
26 following locations at the approximate
27 costs set forth below ........................ 176,152
28 Dixon Correctional Center
29 For roads and parking ..............30,000
30 Hanna City Work Camp
31 For roads and parking ..............37,000
32 Logan Correctional Center
33 For roads and parking ..............10,000
34 Menard Correctional Center
SB88 Enrolled -27- SRA90S0011MWcb
1 For roads and parking and
2 replacement of boilers............168,832
3 Vienna Correctional Center
4 For roads ..........................30,000
5 For replacement of roofs at various Department of
6 Corrections locations ........................ 500,000
7 For roof replacement at the following
8 locations at the approximate costs
9 set forth below: ............................. 1,109,004
10 Dixon Correctional Center
11 Five Buildings .....................25,000
12 Dwight Correctional Center
13 Three buildings ...................122,000
14 Dwight Correctional Center
15 Multi-Purpose Building .............85,000
16 Graham Correctional Center
17 Five buildings ....................125,000
18 Graham Correctional Center
19 Thirty-two buildings ..............150,000
20 Hanna City Work Camp
21 13 buildings ........................7,000
22 Joliet Correctional Center
23 Five buildings ....................160,000
24 Logan Correctional Center
25 Two buildings .....................200,000
26 Menard Psychiatric Center
27 Six buildings .....................485,000
28 Menard Correctional Center
29 Warehouse Building .................70,000
30 Menard Correctional Center
31 Five buildings ....................700,000
32 Pontiac Correctional Center
33 Nine buildings .....................40,000
34 Pontiac Correctional Center
SB88 Enrolled -28- SRA90S0011MWcb
1 Eight buildings ....................75,000
2 Illinois Youth Center-
3 St. Charles
4 three buildings ...................175,000
5 Sheridan Correctional Ctr
6 Six buildings ......................50,000
7 Stateville Correctional Ctr
8 16 buildings .......................50,000
9 Stateville Correctional Ctr
10 Seven buildings ...................135,000
11 Ill Youth Center-
12 Valley View
13 Administration Building and
14 Kitchen Addition ..................100,688
15 Illinois Youth Center-
16 Warrenville
17 One residential building ..........150,000
18 Total, Section 5 $89,691,716 $89,519,706
19 (P.A. 89-0501, Art. 78, Sec. 9)
20 Sec. 9. The following named amounts, or so much thereof
21 as may be necessary and remain unexpended at the close of
22 business on June 30, 1996, from reappropriations heretofore
23 made for such purposes in Article 80, Section 9 of Public
24 Act 89-0022, as amended, are reappropriated from the Capital
25 Development Fund to the Capital Development Board for the
26 Department of Mental Health and Developmental Disabilities
27 for the projects hereinafter enumerated:
28 ALTON MENTAL HEALTH CENTER
29 For rehabilitation of storm and sanitary sewers, in
30 addition to funds previously appropriated .... $ 528,468
31 For rehabilitation of storm and sanitary
32 sewers, in addition to funds previously
33 appropriated ................................. 11,579
34 For installation of security screens ........... 75,000
SB88 Enrolled -29- SRA90S0011MWcb
1 For replacement of domestic hot water
2 lines in seven buildings ..................... 19,048
3 For upgrading fire safety systems in
4 eight buildings ............................ 43,900
5 For renovation of ceilings in Holly, Maple,
6 Locust and Elm ............................... 42,444
7 For replacement of the chiller and
8 connection of the HVAC to the energy
9 management system ............................ 149,551
10 For replacement of two cooling towers in
11 the Willow Building .......................... 68,639
12 For installation of emergency generators
13 in four buildings ............................ 14,137
14 For rehabilitation of bathrooms for
15 handicapped accessibility .................... 25,847
16 For rehabilitation of the electrical
17 distribution system .......................... 105,257
18 CHESTER MENTAL HEALTH CENTER
19 For replacement of windows and door frames, in
20 addition to funds previously appropriated ... 34,509
21 For construction of a storage building ........ 803,585
22 For renovation of the HVAC system .............. 148,822
23 For upgrading the security system .............. 390,000
24 For planning the replacement of the
25 security windows ............................. 15,607
26 For construction of a Rehabilitative
27 Services building ............................ 79,400
28 For replacement of the emergency generator ..... 167,651
29 CHICAGO METRO C&A
30 For renovation of ISPI building ................ 4,500,000
31 For planning and renovation of residential
32 and program units for children and
33 adolescent services .......................... 1,039,329
34 CHICAGO READ MENTAL HEALTH CENTER
SB88 Enrolled -30- SRA90S0011MWcb
1 For renovation of utility rooms and installation of
2 drinking fountains ........................... 218,000
3 For renovation of the West Campus Nurses'
4 Stations ..................................... 1,304,000
5 For renovation of Henry Horner Children's Center
6 and West Campus for fire and life safety
7 codes ........................................ 1,421,941
8 For renovation of the West Campus shower
9 and toilet rooms ............................. 685,520
10 For replacement of penthouse louvers at
11 the West Campus .............................. 65,347
12 For installation of an emergency generator
13 in Henry Horner Children's Center ............ 15,158
14 For rehabilitation of the bathroom shower
15 walls in ten buildings ....................... 96,691
16 For improvement of the site drainage and
17 for upgrading the fire lane .................. 62,698
18 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
19 For upgrading the mechanical
20 equipment, in addition to funds
21 previously appropriated ........ 522,080 92,668
22 For planning and beginning the renovation of a
23 residential building ......................... 75,131
24 For renovation of the kitchen and residential
25 units for rethermalization and air
26 condition the kitchen, in addition to
27 funds previously appropriated ............... 101,678
28 For separating and upgrading of the combined
29 sewer system, in addition to funds
30 previously appropriated ...................... 194,466
31 For rehabilitation of resident buildings
32 and upgrading of temperature controls ........ 793,150
33 For renovation of the kitchen for
34 rethermalization and air conditioning ........ 102,476
SB88 Enrolled -31- SRA90S0011MWcb
1 For planning the separation and beginning
2 the renovation of the combined sewers ....... 35,634
3 For construction of a coal pile retaining
4 wall ......................................... 18,748
5 ELGIN MENTAL HEALTH CENTER
6 For upgrading and expanding the mechanical
7 infrastructure, in addition to funds
8 previously appropriated ...................... 3,300,000
9 For renovation of the HVAC systems,
10 replacement of windows and installation
11 of security screens, in addition
12 to funds previously appropriated ............. 2,092,543
13 For construction of a Forensic Services
14 Facility, in addition to funds
15 previously appropriated ..................... 24,612,256
16 For upgrading and expanding mechanical
17 infrastructure, in addition to funds
18 previously appropriated ...................... 1,350,571
19 For upgrading for fire and life safety ......... 902,122
20 For planning the renovation of the Forensic
21 Building and abating asbestos ................ 251,946
22 For renovation of the Central Stores
23 Building ..................................... 181,034
24 For upgrading the Medical Building HVAC
25 system and replacement of the cooling
26 towers ....................................... 21,336
27 For upgrading the security systems and
28 constructing a multi-purpose building
29 for the Forensic Complex ..................... 64,550
30 For the demolition of the Old Main Building
31 and construction of an Adult
32 Psychiatric Center ........................... 14,751,842
33 FOX DEVELOPMENTAL CENTER
34 For renovation of Building #8, in addition
SB88 Enrolled -32- SRA90S0011MWcb
1 to funds previously appropriated ............. 1,619,590
2 For renovation of the exterior of Building #1,
3 in addition to funds previously
4 appropriated ................................. 499,782
5 For planning the renovation of Building #8 ..... 44,709
6 For installation of an elevator and
7 rehabilitation of corridor exits ............. 25,140
8 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
9 For renovation of residences ................... 797,135
10 For replacement of steam and
11 condensate lines ............................. 565,000
12 For renovation of homes and walkways ........... 581,784
13 For renovation of the boilers in the power
14 plant ........................................ 241,583
15 For renovation of bathrooms and utility rooms
16 in ten residences ............................ 11,904
17 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
18 For replacement of code compliance
19 generators ................................... 158,336
20 For providing storage space .................... 154,718
21 For planning and beginning electrical
22 distribution renovation ...................... 21,950
23 For replacement of piping and heating units .... 495,095
24 For rehabilitation of bathrooms and replacement
25 of doors ..................................... 595,847
26 For rehabilitation of the boilers, turbine
27 generator and switchgear ..................... 40,851
28 For installation of fire safety systems in
29 four buildings and replacement of a
30 code compliance generator .................... 545,074
31 For replacement of two water softeners and
32 four heaters ................................. 41,100
33 KILEY DEVELOPMENTAL CENTER
34 For renovation of homes ........................ 630,000
SB88 Enrolled -33- SRA90S0011MWcb
1 For renovation of bathrooms in homes ........... 637,788
2 For installation of fire safety systems in
3 six buildings ................................ 187,025
4 LINCOLN DEVELOPMENTAL CENTER
5 For replacement of an absorber, in addition to
6 funds previously appropriated ................ 120,000
7 For upgrading the architectural and mechanical
8 systems, in addition to funds
9 previously appropriated ...................... 1,528,728
10 For installation of a code compliance generator . 107,000
11 For rehabilitation of the coal bunker
12 in the Powerhouse ............................ 261,000
13 For installation of rethermalization food
14 service system ............................... 707,034
15 For expansion of the sprinkler system in
16 four buildings ............................... 185,081
17 For renovation of the boilers, replacement of
18 controls and tuckpointing the exterior ....... 194,718
19 For installation of air conditioning in
20 Coty and Dietary Buildings ................... 49,508
21 For upgrading the HVAC systems, including
22 chillers ..................................... 104,852
23 LUDEMAN DEVELOPMENTAL CENTER
24 For renovation of residences ................... 709,410
25 For renovation of residences ................... 783,000
26 For renovation of restrooms for accessibility
27 in two buildings ............................. 178,501
28 For renovation of bathrooms in 15 residences ... 157,589
29 For installation of automatic sprinkler
30 and fire alarm system ........................ 9,133
31 MABLEY DEVELOPMENTAL CENTER - DIXON
32 For installation of a sewer screening system .. 79,101
33 For construction of a dietary and stores
34 building ..................................... 19,002
SB88 Enrolled -34- SRA90S0011MWcb
1 MADDEN MENTAL HEALTH CENTER - HINES
2 For renovation of pavilions .................... 370,000
3 For upgrading residences for safety and
4 security ..................................... 330,898
5 For replacing controls for sewage ejector ...... 39,000
6 For replacement of a cooling tower and
7 chiller ...................................... 288,922
8 For installation of return air fan systems ..... 42,195
9 For replacement of hot water heaters ........... 129,975
10 For upgrade of the central kitchen and
11 renovation of eight pavilions ................ 6,062
12 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
13 For renovation of a residential building ....... 483,226
14 For replacement of the HVAC control panel ...... 191,759
15 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
16 For replacement of cooling towers .............. 581,288
17 For installation of fire safety systems ........ 1,366,824
18 For rehabilitation of the electrical
19 distribution system .......................... 237,000
20 For replacement of the sewage ejector
21 equipment and bar screen ..................... 24,971
22 For replacement of the boiler shell and
23 controls ..................................... 5,747
24 For rehabilitation of the hot water
25 distribution system .......................... 48,665
26 For renovation of Daisy Cottage ................ 125,349
27 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
28 For replacement of the roof and masonry repair,
29 in addition to funds previously
30 appropriated ................................. 128,000
31 For replacement of valves in the powerhouse .... 276,000
32 For replacement of electrical feeder cable ..... 212,000
33 For planning and beginning sewer and
34 manhole renovation ........................... 57,645
SB88 Enrolled -35- SRA90S0011MWcb
1 as amended):
2 For rehabilitation of the boilers .............. 587,000
3 For planning and replacement of windows ........ 234,721
4 For installation of an emergency generator ..... 646,000
5 For upgrading fire safety systems in the
6 support buildings ............................ 677,677
7 For upgrading the HVAC system and installation
8 air conditioning in the Dietary Building ..... 225,383
9 For replacement of expansion joints in the
10 utility tunnels .............................. 107,208
11 For installation of emergency generators in
12 three residences ............................. 330,000
13 For installation of air conditioning in
14 Building #704, in addition to funds
15 previously appropriated ...................... 108,049
16 For replacement of hot water tanks in the
17 Laundry Building ............................. 191,431
18 For replacement of switches and switchgear,
19 in addition to funds previously
20 appropriated ................................. 183,051
21 For replacement of the water softener
22 system in the powerhouse ..................... 107,000
23 For replacement of cooling towers in
24 Buildings #100A and #100B .................... 132,813
25 For replacement of roofing systems and
26 renovation of the exterior in two
27 buildings .................................... 49,253
28 For replacement of the electrical switchgear
29 in the Power Plant ........................... 29,421
30 For replacement of the heating system in
31 the Work Activity Center ..................... 37,210
32 For planning the installation of an air
33 conditioning system for Building #704 ........ 45,376
34 For upgrading the HVAC system in the
SB88 Enrolled -36- SRA90S0011MWcb
1 Administration building and other
2 buildings .................................... 233,321
3 For installation of air conditioning in
4 Buildings #502 and #514 ...................... 238,756
5 For upgrading the electrical system ............ 124,571
6 For upgrade of the electrical distribution
7 system ....................................... 62,102
8 SINGER MENTAL HEALTH CENTER
9 For replacement of cooling tower, expansion
10 tanks and test absorbers ..................... 179,923
11 For replacement of the water main .............. 570,258
12 For replacement of HVAC pumps and valves ....... 258,409
13 For replacement of mechanical equipment ........ 34,638
14 TINLEY PARK MENTAL HEALTH CENTER/
15 HOWE DEVELOPMENTAL CENTER
16 For renovating and making mechanical
17 improvements to Spruce Hall .................. 302,823
18 For planning the rehabilitation of the
19 electrical distribution system ............... 101,337
20 For installation of security screens, in
21 addition to funds previously appropriated .... 142,161
22 For renovation for accessibility in four
23 buildings .................................... 703,813
24 For planning the sewer system renovation and
25 replacement of the rag catcher ............... 390,886
26 For renovation for fire and life safety in
27 three residences ............................. 625,000
28 For replacement of piping in Maple Hall ........ 234,158
29 For renovation of nursing stations and
30 medication rooms in three residences ......... 591,298
31 For rehabilitation of the domestic hot water
32 system for Willow and Pine Halls ............. 108,263
33 For rehabilitation of the washrooms in
34 Spruce Hall .................................. 108,000
SB88 Enrolled -37- SRA90S0011MWcb
1 For replacement of the windows in nine
2 buildings .................................... 70,125
3 ZELLER MENTAL HEALTH CENTER
4 For renovation of Nurses' Stations and
5 seclusion rooms .............................. 1,223,000
6 For replacement of the heating and cooling
7 pumps ........................................ 12,465
8 STATEWIDE
9 ALTON/ELGIN
10 For construction of a forensic services complex
11 at Alton Mental Health Center and Elgin
12 Mental Health Center, in addition to funds
13 previously appropriated ...................... 8,346,593
14 For conducting the preliminary design to
15 construct, convert and/or rehabilitate
16 a forensic facility .......................... 212,483
17 STATEWIDE
18 For replacement of the roofing systems,
19 upgrading the ventilation systems, and
20 enclosure of HVAC units at the following
21 locations at the approximate costs set
22 forth below: ................................. 5,763
23 Jacksonville Mental Health Ctr
24 Gillespie and Drake buildings
25 including the enclosure of the
26 rooftop HVAC unit on Gillespie ......5,763
27 For upgrading and rehabilitation of roads,
28 parking lots and drainage systems at the
29 following locations at the approximate
30 costs set forth below: ....................... 105,769
31 Chester Mental Health Center
32 For rehabilitation of the
33 drainage system and upgrading
34 parking lots ......................113,986
SB88 Enrolled -38- SRA90S0011MWcb
1 For upgrading roads and parking lots at
2 the following locations at the
3 approximate costs set forth below: ........... 40,544
4 McFarland Mental Health Ctr ...........5,544
5 Shapiro Developmental Center .........35,000
6 For rehabilitation of water towers -
7 Murray and Chester ........................... 500,000
8 For replacement of roofs at the following
9 locations at the approximate costs set
10 forth below: ................................. 3,031,603
11 Alton Mental Health Center -
12 five buildings ....................342,687
13 Choate Mental Health Center -
14 three buildings ....................17,479
15 Choate Mental Health and
16 Developmental Center
17 Five buildings .....................15,034
18 Chester Mental Health Ctr
19 21 buildings .......................49,555
20 Elgin Mental Health Center -
21 three buildings ....................52,000
22 Elgin Mental Health Center
23 Six Buildings .....................115,000
24 Jacksonville Developmental Center -
25 one building .......................53,750
26 Lincoln Developmental Center -
27 three buildings ...................413,510
28 Lincoln Developmental Center
29 four buildings ......................6,601
30 Ludeman Developmental Center
31 Support buildings ..................91,447
32 Ludeman Developmental Center
33 residences .........................22,158
34 Mabley Developmental Center -
SB88 Enrolled -39- SRA90S0011MWcb
1 one building ......................103,517
2 Madden Mental Health Center -
3 buildings and covered walkways .....72,822
4 McFarland Mental Health Center -
5 three buildings ...................144,240
6 Meyer Mental Health Center -
7 one building ......................315,514
8 Shapiro Developmental Center -
9 three buildings ...................187,000
10 Shapiro Developmental Center
11 two buildings ......................16,351
12 Shapiro Developmental Center
13 Five buildings .....................67,831
14 Tinley Park Mental Health Center -
15 one building .......................26,048
16 Tinley Park Mental Health Ctr
17 Oak Hall ..........................109,034
18 STATEWIDE - FIRE SAFETY
19 To renovate fire safety systems, including
20 installation of sprinklers, at the following
21 locations at the approximate costs set
22 forth below: ................................. 354,529
23 Anna Mental Health and
24 Developmental Center ...............12,318
25 Singer Mental Health and
26 Developmental Center ..............335,021
27 For fire safety and other work necessary to meet
28 state and federal certification standards for
29 the following projects:
30 For installation of sprinkler systems at
31 Chicago-Read Mental Health Center ............ 148,010
32 For installation of sprinkler systems at
33 Murray Developmental Center .................. 2,000
34 For installation of sprinkler systems at
SB88 Enrolled -40- SRA90S0011MWcb
1 Waukegan Developmental Center ................ 18,547
2 Total, Section 9 $102,309,844 $103,689,207
3 (P.A. 89-0501, Art. 78, Sec. 21)
4 Sec. 21. The following named amounts, or so much thereof
5 as may be necessary and remain unexpended at the close of
6 business on June 30, 1996, from reappropriations heretofore
7 made for such purposes in Article 80, Section 21 of Public
8 Act 89-0022, are reappropriated from the Capital Development
9 Fund to the Capital Development Board for the Illinois
10 Community College Board for the projects hereinafter
11 enumerated:
12 BELLEVILLE AREA COLLEGE
13 For planning buildings, additions and
14 site improvements ............................ $ 1,746,900
15 DANVILLE AREA COMMUNITY COLLEGE
16 For rehabilitation of infrastructure
17 and beginning construction of a
18 classroom facility ........................... 2,305,427
19 For rehabilitation of the infrastructure and
20 planning campus buildings .................... 1,522,392
21 COLLEGE OF DUPAGE
22 For completing the addition to
23 the Student Resource Center .................. 2,180,400
24 ILLINOIS EASTERN COMMUNITY COLLEGE
25 For remodeling the Student Services Office
26 facilities ................................... 26,557
27 For replacement of the roofing system .......... 104,172
28 ELGIN COMMUNITY COLLEGE
29 For construction of addition, site improvements,
30 remodeling and purchasing equipment .......... 9,192,689
31 (From Article 80, Section 23 of Public Act 89-0022):
32 For planning, design, site improvements, utility
33 adjustments, and any other costs associated
34 with construction of a new Instructional
SB88 Enrolled -41- SRA90S0011MWcb
1 Building at Elgin Community College .......... 428,894
2 JOHN A. LOGAN COMMUNITY COLLEGE
3 For planning an addition and site improvements . 409,400
4 For construction of classroom additions
5 and remodeling the existing facility,
6 including utilities and site improvements .... 33,745
7 JOHN WOOD COMMUNITY COLLEGE
8 For construction of a science and technology
9 center and access road ....................... 1,697,465
10 JOLIET JUNIOR COLLEGE
11 For construction of a business and technology
12 center and remodeling the main campus
13 building ..................................... 1,343,174
14 For planning, design and site preparation of
15 a Business Technology Center ................. 12,744
16 KISHWAUKEE COMMUNITY COLLEGE
17 For construction and reconstruction at
18 the library .................................. 100,055
19 COLLEGE OF LAKE COUNTY
20 For construction of a multi-use Instructional
21 Center, including acquisition of equipment
22 and remodeling of existing facilities ........ 5,421,861
23 For initial costs associated with planning,
24 design, construction, site improvements,
25 utilities, remodeling and equipment for
26 a multi-use instructional facility ........... 774,155
27 For planning a multi-use instructional
28 building ..................................... 159,865
29 LAKE LAND COLLEGE - EFFINGHAM
30 For construction of an education and
31 technology center ............................ 29,622
32 LEWIS AND CLARK COMMUNITY COLLEGE
33 For renovation of buildings, construction of an
34 addition and site improvements ............... 815,800
SB88 Enrolled -42- SRA90S0011MWcb
1 For construction of health,
2 mathematics and science
3 laboratory facilities and
4 remodeling Fobes Hall .......... 2,801,529 824,549
5 For renovation of the main complex ............. 464,317
6 For planning, design, and site preparation,
7 and construction of a multi-purpose
8 building ..................................... 24,932
9 MCHENRY COUNTY COLLEGE
10 For construction of an addition, including
11 equipment, a parking area and
12 site improvements ............................ 291,590
13 For expansion of existing library facilities
14 and construction of classrooms at McHenry
15 County College ............................... 45,736
16 MORAINE VALLEY COMMUNITY COLLEGE
17 For planning and constructing a new classroom
18 facility ..................................... 500,000
19 For providing for an architectural engineering
20 study, renovations, construction,
21 reconstruction and remodeling of Buildings
22 A, B and L ................................... 483,482
23 MORTON COMMUNITY COLLEGE - COOK COUNTY
24 For construction of an addition and
25 site improvements ............................ 272,000
26 PARKLAND COLLEGE - CHAMPAIGN
27 For construction of a child care center
28 and access drives ............................ 9,820
29 PRAIRIE STATE COMMUNITY COLLEGE
30 For construction of a Learning Resource
31 Center addition .............................. 942,828
32 REND LAKE COLLEGE
33 For construction of an aquatic and
34 rehabilitation center ........................ 1,694,587
SB88 Enrolled -43- SRA90S0011MWcb
1 For replacement of the roof .................... 30,889
2 SOUTHEASTERN ILLINOIS COLLEGE
3 For construction of humanities,
4 administration, and child care facilities
5 and remodeling campus buildings .............. 4,552,440
6 For the planning, design and site preparation
7 of a Humanities/Administration Building ...... 60,426
8 TRITON COMMUNITY COLLEGE - RIVER GROVE
9 For planning, site improvements, construction
10 and other expenses necessary for the
11 construction of an addition to the Learning
12 Resource Center .............................. 182,692
13 WILLIAM RAINEY HARPER COMMUNITY COLLEGE -PALATINE
14 For planning, developing, and designing a multi-
15 purpose telecommunications
16 instructional delivery center ................ 350,000
17 STATEWIDE - CONSTRUCTION DEFECTS
18 For planning, construction and renovation
19 to correct defectively designed or
20 constructed community college facilities,
21 provided that monies recovered based upon
22 claims arising out of such defective design
23 or construction shall be paid to the state
24 as required by Section 105.12 of the Public
25 Community College Act as reimbursement for
26 monies expended pursuant to this
27 appropriation ................................ 5,300,930
28 Total, Section 21 $46,313,515 $44,336,535
29 Section 3. "AN ACT making appropriations," Public Act
30 89-0501, approved June 28, 1996, is amended by adding
31 Sections 9A, 9B and 23A to Article 49 as follows:
32 (P.A. 89-0501, Art. 49, Sec. 9A new)
33 Sec. 9A. The amount of $3,000,000, is appropriated from
SB88 Enrolled -44- SRA90S0011MWcb
1 the Capital Development Fund to the Department of Natural
2 Resources for deposit into the Conservation 2000 Projects
3 Fund.
4 (P.A. 89-0501, Art. 49, Sec. 9B new)
5 Sec. 9B. The amount of $3,000,000, or so much thereof as
6 may be necessary, is appropriated from the Conservation 2000
7 Projects Fund to the Department of Natural Resources for the
8 following projects as the approximate costs set forth below:
9 Site M planning and development ................ $ 2,500,000
10 Acquisition of land and long-term
11 easements for ecosystem-based
12 management of Illinois'
13 natural resources ............................ 500,000
14 Total $3,000,000
15 (P.A. 89-0501, Art. 49, Sec. 23A new)
16 Sec. 23A. The amount of $5,000,000, or so much thereof
17 as may be necessary, is appropriated from the Capital
18 Development Fund to the Department of Natural Resources for
19 the Office of Water Resources for the following projects at
20 the approximate costs set forth below, in addition to funds
21 previously appropriated.
22 East Peoria
23 East Peoria Levee construction
24 cost share ..........................2,000,000
25 Loves Park
26 Construction cost share ...............750,000
27 Metro East Sanitary District
28 Cost share for two pump stations
29 and closure structures ................850,000
30 Fox River
31 Flood control at Algonquin
32 and McHenry Dams ......................600,000
33 Granite City
SB88 Enrolled -45- SRA90S0011MWcb
1 Reduce urban groundwater flooding .....300,000
2 Chicago Harbor/Lake Michigan
3 Control leakage - mouth
4 of Chicago River ......................500,000
5 Section 4. "AN ACT making appropriations, Public Act
6 89-0501, approved June 28, 1996, is amended by adding Section
7 57A to Article 51 as follows:
8 (P.A. 89-0501, Art. 51, Sec. 57A new)
9 Sec. 57A. The following named sums, or so much thereof
10 as may be necessary, are appropriated from the Transportation
11 Bond Series B Fund to the Department of Transportation for
12 construction costs, making grants and providing project
13 assistance to municipalities, special transportation
14 districts, private non-profit carriers, mass transportation
15 carriers, and the Intercity Rail Program for the acquisition,
16 construction, extension, reconstruction and improvement of
17 mass transportation facilities, including rapid transit,
18 intercity rail, bus and other equipment used in connection
19 therewith, as provided by law, as follows:
20 Pursuant to Section 4(b)(1) of
21 the General Obligation Bond Act,
22 as amended................................... $ 35,000,000
23 For the counties of the State
24 outside of Cook, DuPage, Kane,
25 McHenry, and Will pursuant to
26 Section 4(b)(1) of the General
27 Obligation Bond Act, as amended ............. 3,000,000
28 For the Department of Transportations's
29 Operation Greenlight Program
30 pursuant to Section 4(b)(1)
31 of the General Obligation Bond
32 Act, as amended ............................. 10,000,000
33 Total $48,000,000
SB88 Enrolled -46- SRA90S0011MWcb
1 Section 5. "AN ACT making appropriations and
2 reappropriations," Public Act 89-0501, approved June 28,
3 1996, is amended by adding Sections 10 and 11 to Article 67,
4 as follows:
5 (P.A. 89-0501, Art. 67, Sec. 10 new)
6 Sec. 10. The amount of $73,000,000, or so much thereof
7 as may be necessary, is appropriated from the Capital
8 Development Fund to the Department of Central Management
9 Services on behalf of the Department of Corrections for the
10 payment on the contract for purchase, improvement and any
11 other costs associated with the acquisition of a new
12 correctional facility at Pinckneyville, Illinois.
13 (P.A. 89-0501, Art. 67, Sec. 11 new)
14 Sec. 11. The amount of $16,800,000, or so much thereof
15 as may be necessary, is appropriated from the Capital
16 Development Fund to the Department of Central Management
17 Services on behalf of the Department of Corrections for the
18 payment on the contract for purchase, improvement and any
19 other costs associated with the acquisition of a new
20 correctional facility at Graham and Logan Correctional
21 Centers.
22 Section 6. "AN ACT making appropriations and
23 reappropriations," Public Act 89-0501, approved June 28,
24 1996, is amended by adding Section 56 to Article 47 as
25 follows:
26 (P.A. 89-0501, Art. 47, Sec. 56 new)
27 Sec. 56. The amount of $50,000,000, or so much thereof
28 as may be necessary, is appropriated to the Illinois
29 Environmental Protection Agency from the Anti-Pollution Bond
30 Fund for payment of claims submitted, including claims
31 submitted in prior years, to the State and approved for
32 payment under the Leaking Underground Storage Tank Program
SB88 Enrolled -47- SRA90S0011MWcb
1 established in Title XVI of the Environmental Protection Act.
2 Section 7. This Act takes effect immediately upon
3 becoming law.
[ Top ]