90_SB1167
Makes appropriations and reappropriations to the Capital
Development Board for permanent improvements, minor capital
improvements, repair and maintenance, and related purposes
for the fiscal year beginning July 1, 1997. Makes
reappropriations to various state agencies for continuing
Build Illinois projects for the fiscal year beginning July 1,
1997.
CAPITAL PROJECTS - TO CDB
FUND NEW APPROPS. REAPPROPS. TOTAL
General Revenue $20,000.0 $37,527.2 $57,527.2
School
Construction 0 1,972.2 1,972.2
Capital
Development 318,613.9 814,161.3 1,132,775.2
Asbestos
Abatement 0 318.7 318.7
Historic Sites
Fund 0 2,300.0 2,300.0
TOTAL 338,613.9 856,279.4 1,194,893.3
CAPITAL PROJECTS - TO AGENCIES
CAPITAL DEVELOPMENT FUND
Sec. of St. $0 $6.8 $6.8
Space Needs
Comm. 0 5.7 5.7
Bd. of Higher Ed. 0 3,636.7 3,636.7
SIU 0 102.5 102.5
U of I 0 301.1 301.1
TOTAL 0 4,052.8 4,052.8
BUILD ILLINOIS PROJECTS
FUND REAPPROPRIATIONS
Build Illinois Purposes $5,355.2
Build Illinois Bond 173,505.7
TOTAL $178,860.9
BOB-CAPITAL98
BOB-CAPITAL98
1 AN ACT making appropriations and reappropriations.
2 Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
4 ARTICLE 1
5 Section 1. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 Capital Development Fund to the Capital Development Board for
8 the Department of Agriculture for the projects hereinafter
9 enumerated:
10 ILLINOIS STATE FAIRGROUNDS - DUQUOIN
11 For planning the renovation of the
12 Round Houses ................................. $ 40,000
13 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
14 For replacing the HVAC system in the
15 Administration Building ...................... 929,000
16 Total, Section 1 $969,000
17 Section 2. The following named amounts, or so much
18 thereof as may be necessary, are appropriated from the
19 Capital Development Fund to the Capital Development Board for
20 the Department of Central Management Services for the
21 projects hereinafter enumerated:
22 ILLINOIS REHABILITATION AND
23 EDUCATION CENTER (WOOD) - CHICAGO
24 For replacing the skylight system
25 and roof flashing ............................ $ 45,000
26 For installing security system and
27 perimeter lighting ........................... 375,000
28 ELGIN REGIONAL OFFICE BUILDING
29 For replacing the utility system ............... 2,625,000
30 CENTRAL STATE GARAGE - SPRINGFIELD
-2- BOB-CAPITAL98
1 For replacing the roof and drainage system ..... 425,000
2 Total, Section 2 $3,470,000
3 Section 2a. The following named amounts, or so much
4 thereof as may be necessary, are appropriated from the
5 General Revenue Fund to the Capital Development Board for the
6 Department of Central Management Services for the projects
7 hereinafter enumerated:
8 JAMES R. THOMPSON CENTER - CHICAGO
9 For restoring the exterior plaza ............... $ 890,000
10 EAST ST. LOUIS - REGIONAL OFFICE
11 For replacing windows .......................... 65,500
12 Total, Section 2a $955,500
13 Section 3. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 Capital Development Fund to the Capital Development Board for
16 the Department of Corrections for the projects hereinafter
17 enumerated:
18 DWIGHT CORRECTIONAL CENTER
19 For upgrading water and sewer systems .......... $ 1,000,000
20 For renovating buildings, in addition
21 funds previously appropriated ................ 600,000
22 For constructing a gatehouse and
23 sallyport and upgrading the
24 security system .............................. 2,375,000
25 EAST MOLINE CORRECTIONAL CENTER
26 For upgrading the electrical
27 system ....................................... 2,300,000
28 JOLIET CORRECTIONAL CENTER
29 For correcting erosion and
30 stabilizing the masonry wall ................. 1,800,000
31 MENARD CORRECTIONAL CENTER - CHESTER
32 For renovating the Old Hospital
-3- BOB-CAPITAL98
1 Building, in addition to funds
2 previously appropriated ...................... 4,700,000
3 For replacing and installing
4 water storage tank ........................... 1,200,000
5 For replacing Boiler #2, in addition
6 to funds previously appropriated ............. 800,000
7 For converting a room into a shower room ....... 395,000
8 STATEWIDE
9 For replacing roofing systems at the
10 following locations at the approximate
11 costs set forth below: ....................... $2,100,000
12 Big Muddy Correctional Center, Ina
13 Two buildings ......................$425,000
14 East Moline Correctional Center,
15 Three buildings .....................500,000
16 Graham Correctional Center, Hillsboro
17 Seven buildings .....................600,000
18 Sheridan Correctional Center, LaSalle
19 Three buildings .....................410,000
20 Stateville Correctional Center, Joliet
21 One building ........................165,000
22 For replacing doors and locks at the
23 following locations at the approximate
24 costs set forth below: ....................... 2,575,000
25 IYC - St. Charles ...................$585,000
26 Lincoln Correctional Center ...........50,000
27 Jacksonville Correctional Center .....975,000
28 Sheridan Correctional Center .........965,000
29 For upgrading fire safety systems at the
30 following locations at the approximate
31 costs set forth below, in addition to
32 funds previously appropriated : .............. 6,500,000
33 Menard Correctional Center .........2,000,000
34 Pontiac Correctional Center ........3,000,000
-4- BOB-CAPITAL98
1 Stateville Correctional Center .....1,500,000
2 For upgrading water and wastewater
3 systems at the following locations
4 at the approximate costs set forth below:..... 4,465,000
5 Big Muddy Correctional Center
6 for installing mechanical
7 bar screen ..........................300,000
8 Centralia Correctional Center
9 for upgrading water
10 treatment plant ...................1,500,000
11 East Moline Correctional Center
12 for upgrading sewage system .........655,000
13 Ed Jenison Work Camp (Paris)
14 for installing mechanical
15 bar screen ..........................120,000
16 IYC - Harrisburg for upgrading
17 water distribution system ...........500,000
18 Kankakee MSU for constructing
19 well #2 .............................300,000
20 IYC - St. Charles for upgrading
21 sewage/storm system .................850,000
22 IYC - Valley View for installing
23 mechanical bar screen ...............240,000
24 For planning, design, construction,
25 equipment and other necessary costs
26 for a Maximum Security Correctional
27 Center, in addition to funds previously
28 appropriated ................................. 95,000,000
29 VIENNA CORRECTIONAL CENTER
30 For renovating the kitchen ..................... 2,000,000
31 Total, Section 3 $127,810,000
32 Section 3a. The following named amounts, or so much
33 thereof as may be necessary, are appropriated from the
-5- BOB-CAPITAL98
1 General Revenue Fund to the Capital Development Board for the
2 Department of Corrections for the projects hereinafter
3 numerated:
4 MENARD CORRECTIONAL CENTER - CHESTER
5 For stabilizing dams ........................... $ 100,000
6 For repairing masonry and
7 waterproofing exterior ....................... 245,000
8 STATEVILLE CORRECTIONAL CENTER - JOLIET
9 For tuckpointing buildings ..................... 200,000
10 VANDALIA CORRECTIONAL CENTER
11 For tuckpointing, waterproofing and
12 replacing facade ............................. 165,000
13 Total, Section 3a $710,000
14 Section 4. The following named amounts, or so much
15 thereof as may be necessary, are appropriated from the
16 Capital Development Fund to the Capital Development Board for
17 the Historic Preservation Agency for the projects hereinafter
18 enumerated:
19 FORT DE CHARTRES - RANDOLPH COUNTY
20 For replacing Maintenance Building ............. $ 264,000
21 OLD STATE CAPITOL - SPRINGFIELD
22 For renovating garage ramp ..................... 419,000
23 STATEWIDE
24 For replacing roofing systems at the
25 following locations at the approximate
26 costs set forth below: ....................... 462,000
27 Fort De Chartres, Randolph County .....93,000
28 Washburne House, Galena ...............50,000
29 David Davis Mansion, Bloomington ......25,000
30 Bishop Hill House, Henry County ......294,000
31 VANDALIA STATE HOUSE
32 For rehabilitating HVAC and electrical
33 systems and interior ........................ 378,000
-6- BOB-CAPITAL98
1 Total, Section 4 $1,523,000
2 Section 4a. The following named amounts, or so much
3 thereof as may be necessary, are appropriated from the
4 General Revenue Fund to the Capital Development Board for the
5 Historic Preservation Agency for the projects hereinafter
6 enumerated:
7 JOURNAL REGISTER BUILDING - SPRINGFIELD
8 For renovating building ........................ $ 702,000
9 DANA-THOMAS HOUSE - SPRINGFIELD
10 For restoring the exterior and interior ........ 417,000
11 Total, Section 4a $1,119,000
12 Section 5. The following named amounts, or so much thereof
13 as may be necessary, are appropriated from the Capital
14 Development Fund to the Capital Development Board for the
15 Department of Human Services (formerly the Department of
16 Mental Health and Developmental Disabilities) for the
17 projects hereinafter enumerated:
18 ALTON MENTAL HEALTH CENTER
19 For constructing two building additions
20 at the Forensic Complex ...................... $ 11,924,000
21 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
22 For completing HVAC system upgrade,
23 in addition to funds previously
24 appropriated ................................. 1,433,000
25 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
26 For rehabilitating the emergency
27 electrical system ............................ 314,000
28 For renovating Elm Cottage ..................... 3,082,000
29 CHESTER MENTAL HEALTH CENTER
30 For replacing fencing and upgrading
31 recreational yard ............................ 1,400,000
32 For renovating support and residential
-7- BOB-CAPITAL98
1 area ......................................... 3,910,000
2 ELGIN MENTAL HEALTH CENTER
3 For renovating the central dietary
4 and kitchen .................................. 3,994,000
5 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
6 For extending chilled water line ............... 327,000
7 KILEY DEVELOPMENTAL CENTER - WAUKEGAN
8 For renovating homes ........................... 741,000
9 MADDEN MENTAL HEALTH CENTER - HINES
10 For renovating dietary ......................... 930,000
11 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
12 For replacing cooling towers and
13 rehabilitating absorbers ..................... 1,040,000
14 SINGER MENTAL HEALTH CENTER - ROCKFORD
15 For renovating mechanicals and
16 residential areas ............................ 2,736,000
17 STATEWIDE
18 For replacing roofing systems at the
19 following locations at the approximate
20 costs set forth below: ....................... 392,000
21 Elgin Mental Health Center,
22 five buildings ......................256,000
23 Jacksonville Mental Health and
24 Developmental Center, two buildings .136,000 ____________
25 Total, Section 5 $32,223,000
26 Section 5.1. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Department of Human Services (formerly the Department of
30 Rehabilitation Services) for the projects hereinafter
31 enumerated:
32 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
33 For completing the HVAC system upgrade,
-8- BOB-CAPITAL98
1 in addition to funds previously
2 appropriated ................................. $ 300,000
3 For replacing the storm and sanitary
4 system ....................................... 2,000,000
5 For renovating Unit 5 .......................... 215,000
6 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
7 For rehabilitating the power house ............. 275,000
8 Total, Section 5.1 $2,790,000
9 Section 5a. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 General Revenue Fund to the Capital Development Board for the
12 Department of Human Services (formerly the Department of
13 Mental Health and Developmental Disabilities) for the
14 projects hereinafter enumerated:
15 ALTON MENTAL HEALTH CENTER
16 For replacing windows in four buildings ........ $1,181,000
17 CHESTER MENTAL HEALTH CENTER
18 For replacing backflow prevention
19 devices ...................................... 160,000
20 LINCOLN DEVELOPMENTAL CENTER
21 For replacing windows .......................... 756,000
22 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
23 For replacing windows in complex
24 buildings .................................... 486,000
25 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
26 For installing windows in residential
27 buildings .................................... 775,000
28 ZELLER MENTAL HEALTH CENTER - PEORIA
29 For replacing windows .......................... 1,499,000
30 Total, Section 5a $4,857,000
31 Section 5a.1. The following named amounts, or so much
32 thereof as may be necessary, are appropriated from the
-9- BOB-CAPITAL98
1 General Revenue Fund to the Capital Development Board for the
2 Department of Human Services (formerly the Department of
3 Rehabilitation Services) for the projects hereinafter
4 enumerated:
5 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
6 For installing an emergency generator .......... $ 550,000
7 For installing security systems in
8 three buildings .............................. 50,000
9 Total, Section 5a.1 $600,000
10 Section 6. The following named amount, or so much
11 thereof as may be necessary, is appropriated from the Capital
12 Development Fund to the Capital Development Board for the
13 Department of Military Affairs for the project hereinafter
14 enumerated:
15 CARBONDALE ARMORY
16 For upgrading mechanical systems ............... $ 1,440,000
17 Total, Section 6 $1,440,000
18 Section 6a. The following named amount, or so much
19 thereof as may be necessary, is appropriated from the General
20 Revenue Fund to the Capital Development Board for the
21 Department of Military Affairs for the project hereinafter
22 enumerated:
23 LAWRENCEVILLE ARMORY
24 For renovating interior ........................ $ 180,000
25 Total, Section 6a $180,000
26 Section 7. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Department of Natural Resources for the projects
30 hereinafter enumerated:
31 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
-10- BOB-CAPITAL98
1 For stabilizing the feeder canal bank .......... $ 500,000
2 KANKAKEE RIVER STATE PARK - KANKAKEE COUNTY
3 For planning and constructing a
4 sanitary sewer system ........................ 200,000
5 DICKSON MOUNDS - LEWISTOWN
6 For renovating Canton Liverpool
7 Toll Booth ................................... 73,000
8 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
9 For rehabilitating the levee system ............ 225,000
10 RED HILLS STATE PARK - LAWRENCE COUNTY
11 For replacing the sewage treatment system,
12 in addition to funds previously appropriated . 510,000
13 For rehabilitating the dam ..................... 90,000
14 SANGANOIS CONSERVATION AREA -
15 CASS, MASON AND SCHUYLER COUNTIES
16 For rehabilitating the levee system ............ 315,000
17 STATEWIDE
18 For replacing concession buildings and
19 upgrading support facilities at the following
20 locations at the approximate costs set
21 forth below: ................................. 2,895,000
22 Kickapoo State Park ..................538,000
23 Rock Cut State Park ..................525,000
24 Stephen A. Forbes State Park .......1,832,000
25 STATEWIDE
26 For constructing vault toilets at the
27 following locations at the approximate
28 costs set forth below: ...................... 1,593,000
29 Apple River Canyon State Park .......285,000
30 Des Plaines Conservation Area .......240,000
31 Kankakee River State Park ...........410,000
32 Lake Le-Aqua-Na State Park ..........295,000
33 Marshall County Conservation Area ....83,000
34 Morrison-Rockwood State Park ........195,000
-11- BOB-CAPITAL98
1 Rice Lake Conservation Area ..........85,000
2 STATEWIDE
3 For replacing roofing systems and structural
4 repairs at the following locations at the
5 approximate costs set forth below: ........... 452,000
6 Mine Rescue Station, One building .....36,000
7 Castle Rock State Park,
8 One building .........................37,000
9 Dixon Springs State Park,
10 Three buildings ......................49,000
11 Cave-In-Rock State Park,
12 Two buildings ........................30,000
13 Ferne Clyffe State Park,
14 One building .........................30,000
15 Hamilton County Conservation
16 Area, One building ...................30,000
17 Lake Murphysboro State Park,
18 Two buildings ........................54,000
19 Red Hills State Park, Two
20 buildings ............................34,000
21 Fox Ridge State Park, Six
22 buildings ............................73,000
23 Shelbyville Fish and Wildlife
24 Area, Two buildings ..................49,000
25 Newton Lake Fish and Wildlife
26 Area, One building ...................30,000 ____________
27 Total, Section 7 $6,853,000
28 Section 7a. The following named amounts, or so much
29 thereof as may be necessary, are appropriated from the
30 General Revenue Fund to the Capital Development Board for the
31 Department of Natural Resources for the projects hereinafter
32 enumerated:
33 ILLINOIS BEACH STATE PARK
-12- BOB-CAPITAL98
1 For stabilizing the shoreline .................. $ 400,000
2 STATEWIDE
3 For maintaining lodge and concession
4 facilities at various DNR locations .......... 400,000
5 For rehabilitating or replacing
6 playground equipment, in addition
7 to funds previously appropriated ............. 300,000
8 Total, Section 7a $1,100,000
9 Section 8. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 Capital Development Fund to the Capital Development Board for
12 the Department of Revenue for the projects hereinafter
13 enumerated:
14 WILLARD ICE BUILDING - SPRINGFIELD
15 For upgrading the uninterruptible power
16 system, in addition to funds previously
17 appropriated ................................. $ 1,200,000
18 For replacing the halon fire suppression
19 system ....................................... 344,000
20 Total, Section 8 $1,544,000
21 Section 9. The following named amounts, or so much
22 thereof as may be necessary, are appropriated from the
23 Capital Development Fund to the Capital Development Board for
24 the Department of State Police for the projects hereinafter
25 enumerated:
26 STATEWIDE
27 For replacing the roofs and roof
28 drainage systems at various locations,
29 at the approximate costs
30 set forth below:.............................. $ 182,000
31 DuQuoin, District #13 .................85,000
32 Springfield, District #9 and
-13- BOB-CAPITAL98
1 Supply Building ......................97,000
2 For replacing radio communication
3 towers and equipment buildings and
4 installing emergency power
5 generators at Andover, Eaton,
6 Pecatonica, and Cypress ...................... 1,150,000
7 Total, Section 9 $1,332,000
8 Section 10. The following named amount, or so much
9 thereof as may be necessary, is appropriated from the Capital
10 Development Fund to the Capital Development Board for the
11 Department of Veterans' Affairs for the project hereinafter
12 enumerated:
13 ILLINOIS VETERANS' HOME - QUINCY
14 For renovating Lippincott Hall ................. $ 215,000
15 Total, Section 10 $215,000
16 Section 10a. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 General Revenue Fund to the Capital Development Board for the
19 Department of Veterans' Affairs for the projects hereinafter
20 enumerated:
21 ILLINOIS VETERANS' HOME - LASALLE
22 For relocating security alarm
23 system ....................................... $ 37,800
24 For installing an exit door
25 alarm system ................................. 52,500
26 ILLINOIS VETERANS' HOME - MANTENO
27 For replacing wiring in light poles ............ 153,900
28 For replacing exterior doors and frames ........ 200,000
29 Total, Section 10a $444,200
30 Section 11.01. The following named amounts, or so much
31 thereof as may be necessary, are appropriated from the
-14- BOB-CAPITAL98
1 Capital Development Fund to the Capital Development Board for
2 the projects hereinafter enumerated:
3 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
4 For replacing the roof ......................... $ 104,000
5 SUPREME COURT BUILDING - SPRINGFIELD
6 For planning the library upgrade ............... 127,000
7 Total, Section 11.01 $231,000
8 Section 11.01a. The following named amount, or so much
9 thereof as may be necessary, is appropriated from the General
10 Revenue Fund to the Capital Development Board for the project
11 hereinafter enumerated:
12 SUPREME COURT BUILDING - SPRINGFIELD
13 For tuckpointing and cleaning exterior ......... $ 220,000
14 Total, Section 11.01a $220,000
15 Section 11.02. The following named amounts, or so much
16 thereof as may be necessary, are appropriated from the
17 Capital Development Fund to the Capital Development Board for
18 the projects hereinafter enumerated:
19 STATE CAPITOL BUILDING - SPRINGFIELD
20 For upgrading the life/safety and
21 security systems, in addition to
22 funds previously appropriated ................ $ 2,600,000
23 CAPITOL COMPLEX - SPRINGFIELD
24 For stabilizing the parking ramp ............... 3,000,000
25 For installing fire/security alarm
26 system ....................................... 1,100,000
27 STRATTON OFFICE BUILDING - SPRINGFIELD
28 For installing fire alarm system ............... 400,000
29 Total, Section 11.02 $7,100,000
30 Section 11.03. The following named amounts, or so much
31 thereof as may be necessary, are appropriated from the
-15- BOB-CAPITAL98
1 Capital Development Fund to the Capital Development Board for
2 the projects hereinafter enumerated:
3 STATEWIDE
4 For surveys and modifications to
5 buildings to meet requirements of the
6 federal Americans with Disabilities Act ...... $ 5,000,000
7 For abatement of hazardous materials ........... 5,000,000
8 For upgrading/retrofitting mechanized
9 refrigeration equipment (CFC's) .............. 5,000,000
10 For upgrade and remediation of underground
11 storage tanks ................................ 5,000,000
12 Total, Section 11.03 $20,000,000
13 Section 11.03a. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 General Revenue Fund to the Capital Development Board for the
16 projects hereinafter enumerated:
17 STATEWIDE
18 For repair of minor problems and
19 emergencies .................................. $ 3,614,300
20 For construction site archaeological
21 studies ...................................... 200,000
22 For surveys for and abatement of
23 asbestos-containing material ................. 1,000,000
24 For demolition of buildings .................... 5,000,000
25 Total, Section 11.03a $9,814,300
26 Section 12. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the Illinois Community College Board for the projects
30 hereinafter enumerated:
31 WILLIAM RAINEY HARPER COLLEGE - PALATINE
32 For constructing a Multi-purpose
-16- BOB-CAPITAL98
1 Instructional Center and renovating
2 Building A Cafeteria ......................... $ 6,823,200
3 HEARTLAND COMMUNITY COLLEGE - NORMAL
4 For constructing buildings and making
5 site improvements, including equipment ....... 21,015,900
6 SHAWNEE COMMUNITY COLLEGE - ULLIN
7 For constructing additions, parking
8 facilities, and renovating buildings,
9 including equipment .......................... 7,403,200
10 Total, Section 12 $35,242,300
11 Section 13. The following named amounts, or so much
12 thereof as may be necessary, are appropriated from the
13 Capital Development Fund to the Capital Development Board for
14 the Board of Higher Education for the projects hereinafter
15 enumerated:
16 CHICAGO STATE UNIVERSITY - CHICAGO
17 For renovating buildings and upgrading
18 mechanical systems ........................... $ 3,300,000
19 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
20 For constructing an addition and
21 renovating Booth Library ..................... 16,764,500
22 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
23 For renovating the auditorium in
24 Building E ................................... 7,156,700
25 NORTHERN ILLINOIS UNIVERSITY - DEKALB
26 For renovating Altgeld Hall and
27 purchasing equipment ......................... 19,150,400
28 UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN
29 For constructing an Agricultural
30 Library ...................................... 9,500,000
31 Total, Section 13 $55,871,600
32 Section 14. The sum of $14,992,000, or so much thereof
-17- BOB-CAPITAL98
1 as may be necessary, is appropriated from the Capital
2 Development Fund to the Capital Development Board for the
3 Board of Higher Education for miscellaneous capital
4 improvements including construction, capital facilities, cost
5 of planning, supplies, equipment, materials, services and all
6 other expenses required to complete the work at the various
7 universities set forth below. This appropriation shall be in
8 addition to any other appropriated amounts which can be
9 expended for these purposes.
10 For Chicago State University ..........301,400
11 For Eastern Illinois University .......564,100
12 For Governors State University ........181,600
13 For Illinois State University .......1,150,600
14 For Northeastern Illinois University ..423,700
15 For Northern Illinois University ....1,287,700
16 For Western Illinois University .......862,400
17 For Southern Illinois University -
18 Carbondale ........................1,991,500
19 For Southern Illinois University -
20 Edwardsville ........................751,500
21 For University of Illinois -
22 Chicago ...........................3,280,400
23 For University of Illinois -
24 Springfield .........................216,800
25 For University of Illinois -
26 Urbana-Champaign ..................3,980,300
27 Section 15. The sum of $5,008,000, or so much thereof as
28 may be necessary, is appropriated from the Capital
29 Development Fund to the Capital Development Board for the
30 Illinois Community College Board for miscellaneous capital
31 improvements including construction, reconstruction,
32 remodeling, improvement, repair and installation of capital
33 facilities, cost of planning, supplies, equipment, materials,
-18- BOB-CAPITAL98
1 services and all other expenses required to complete the work
2 at the various community colleges. This appropriation shall
3 be in addition to any other appropriated amounts which can be
4 expended for these purposes.
5 Section 16. No contract shall be entered into or
6 obligation incurred for any expenditures from appropriations
7 made in this Article until after the purposes and amounts
8 have been approved in writing by the Governor.
9 ARTICLE 2
10 Section 1. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 1997, from reappropriations
13 heretofore made for such purposes in Article 77, Section 1
14 and Article 78, Section 1 of Public Act 89-0501, are
15 reappropriated from the Capital Development Fund to the
16 Capital Development Board for the Department of Agriculture
17 for the projects hereinafter enumerated:
18 (From Article 78, Section 1 of Public Act 89-0501):
19 CENTRALIA ANIMAL DISEASE LABORATORY
20 For purchasing and upgrading diagnostic
21 laboratory ................................... $ 909,666
22 DUQUOIN STATE FAIRGROUNDS
23 (From Article 77, Section 1 of Public Act 89-0501):
24 For replacement of the grandstand
25 bleachers .................................... 1,716,000
26 (From Article 78, Section 1 of Public Act 89-0501):
27 For planning and construction of
28 a livestock complex .......................... 171,655
29 For rehabilitation of the Grandstand ........... 13,403
30 For construction of an All-Purpose Building .... 2,621,797
31 ILLINOIS STATE FAIRGROUNDS
-19- BOB-CAPITAL98
1 For renovation of the laboratory and print
2 shop - Phase II, in addition to funds
3 previously appropriated ...................... 22,299
4 For installation of the ventilation system, in
5 addition to funds previously appropriated .... 11,692
6 For repairing the exterior and replacing the
7 roofing system ............................... 62,625
8 For planning and upgrading the storm/
9 sanitary and water systems ................... 13,634
10 For renovation of the comfort stations-
11 Phase I ...................................... 102,537
12 For upgrading the Administration Building ...... 159,822
13 For upgrading Building #13 ..................... 84,984
14 For renovation of the Coliseum ................. 17,122
15 For renovation of the Emmerson Building ....... 18,598
16 For construction of a volumetric calibration
17 laboratory ................................... 7,469
18 For renovation of the Jr. Livestock Building,
19 including the cover over the outdoor
20 arena, roof, HVAC, plumbing and electrical
21 systems and installation of an elevator
22 for accessibility, and for upgrading
23 the sewer system ............................. 404,709
24 For rehabilitation of the Administration
25 Building, including planning & upgrading
26 laboratories ................................. 55,114
27 For planning the renovation of the show
28 horse barns .................................. 257,229
29 For rehabilitation of six racehorse barns-
30 Phase I ...................................... 217,318
31 For planning the rehabilitation of sidewalks,
32 curbs, gutters and streets ................... 173,371
33 For renovation of Building #33, including the
34 roofing system ............................... 10,810
-20- BOB-CAPITAL98
1 Total, Section 1 $7,051,854
2 Section 1A. The following named amounts, or so much
3 thereof as may be necessary, and remain unexpended at the
4 close of business on June 30, 1997, from appropriations
5 heretofore made for such purposes in Article 77, Section 1A
6 of Public Act 89-0501, as amended, are reappropriated from
7 the Capital Development Fund to the Capital Development Board
8 for the Department of Agriculture for the projects
9 hereinafter enumerated:
10 ANIMAL DISEASE LABORATORY - CENTRALIA
11 For upgrading the diagnostic laboratory
12 facility, in addition to funds previously
13 appropriated ................................. $ 200,000
14 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
15 For replacing and/or repairing sidewalks,
16 curbs, gutters and streets, in addition
17 to funds previously appropriated ............. 1,050,000
18 For completing the installation of fiber
19 optics system, in addition to funds
20 previously appropriated ...................... 25,000
21 For upgrading the storm/sanitary and water
22 systems, in addition to funds previously
23 appropriated ................................. 1,600,000
24 For renovation or replacement of
25 comfort stations, in addition
26 to funds previously appropriated ............. 1,273,000
27 For upgrading Building 13, in addition to
28 funds previously appropriated ................ 733,000
29 Total, Section 1A $4,881,000
30 Section 2. The following named amounts, or so much
31 thereof as may be necessary and remain unexpended at the
32 close of business on June 30, 1997, from reappropriations
33 heretofore made for such purposes in Article 78, Section 2 of
-21- BOB-CAPITAL98
1 Public Act 89-0501, are reappropriated from the Capital
2 Development Fund to the Capital Development Board for the
3 Courts of Illinois for the projects hereinafter enumerated:
4 SPRINGFIELD - SUPREME COURT BUILDING
5 For installation of an elevator and
6 replacement of the exterior lights ........... $ 53,764
7 For repairing the ramp, drainage system,
8 retaining wall and landscaping ............... 55,960
9 Total, Section 2 $109,724
10 Section 3. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 1997, from reappropriations
13 heretofore made for such purposes in Article 77, Section 2
14 and Article 78, Section 3 of Public Act 89-0501, are
15 reappropriated from the Capital Development Fund to the
16 Capital Development Board for the Department of Central
17 Management Services for the projects hereinafter enumerated:
18 (From Article 78, Section 3 of Public Act 89-0501):
19 CHICAGO - STATE OF ILLINOIS CENTER
20 For completing the installation of elevators, in
21 addition to funds previously
22 appropriated ................................. $ 650,760
23 For the correction of design/construction
24 deficiencies, including remedial work in
25 the heating, refrigeration, temperature
26 control and ventilation systems at the
27 State of Illinois Center at Chicago .......... 355,645
28 CHICAGO - STATE OF ILLINOIS BUILDING
29 For planning, renovation, equipment and all
30 other costs associated with the renovation
31 of the State of Illinois Building located
32 at 160 North LaSalle in Chicago, in addition
33 to any other amounts heretofore
-22- BOB-CAPITAL98
1 appropriated for such purpose ................ 53,345
2 For planning for renovation of the building
3 at 160 North LaSalle ......................... 48,170
4 CHICAGO MEDICAL CENTER
5 ILLINOIS REHABILITATION AND EDUCATION CENTER
6 For completing the upgrade of HVAC system, in
7 addition to funds previously appropriated .... 97,303
8 For construction of an independent living
9 apartment building ........................... 457,593
10 For rehabilitation of the parking lot,
11 driveway and installation of fencing ......... 13,464
12 For rehabilitation of the air conditioning
13 system, installation of a sprinkler system
14 and improvements for handicapped
15 accessibility ................................ 105,913
16 CHICAGO MEDICAL CENTER
17 EVELYN EDWARDS CENTER
18 For replacement of the heating system .......... 25,274
19 CHICAGO MEDICAL CENTER
20 LAWNDALE DAY CARE
21 For renovation of the Lawndale Day Care
22 Center ....................................... 111,394
23 CHICAGO MEDICAL CENTER
24 OFFICE AND LABORATORY FACILITY
25 For replacement of the electric autoclave
26 boilers ...................................... 13,222
27 CHICAGO MEDICAL CENTER
28 VISUALLY HANDICAPPED INSTITUTE
29 For completing heating and cooling systems
30 renovation, in addition to funds
31 previously appropriated ...................... 17,088
32 For renovation of the loading dock ............. 89,573
33 For rehabilitation of the chiller and
34 replacement of the cooling tower ............. 7,288
-23- BOB-CAPITAL98
1 CHAMPAIGN STATE GARAGE
2 For replacement of the electrical system and
3 windows and installation of restrooms ........ 74,303
4 (From Article 77, Section 2 of Public Act 89-0501):
5 REGIONAL OFFICE BUILDING - CHAMPAIGN
6 For replacement of roofing system and
7 rooftop heating and cooling unit ............. 381,112
8 (From Article 78, Section 3 of Public Act 89-0501):
9 SUBURBAN NORTH REGIONAL
10 OFFICE -
11 DES PLAINES
12 For designing the renovation, phase III ........ 726,169
13 For the purchase and renovation of the high
14 school ....................................... 57,995
15 OTTAWA STATE GARAGE
16 For rehabilitation of the lighting and
17 electrical systems ........................... 106,694
18 PEORIA STATE GARAGE
19 For planning, design, land acquisition,
20 construction, equipment, and all costs
21 related to the relocation of the Peoria
22 State Garage ................................. 38,663
23 SPRINGFIELD - CAPITOL COMPLEX
24 For construction of a day care center, in
25 addition to funds previously appropriated
26 for such purpose ............................. 950,000
27 For construction of a day care center in the
28 Capitol Complex in Springfield ............... 244,348
29 SPRINGFIELD COMPUTER FACILITY
30 For replacement of the uninterruptible
31 power system ................................. 18,838
32 (From Article 77, Section 2 of Public Act 89-0501):
33 ASH STREET COMPLEX-
34 MUSEUM AND COLLECTION CENTER -
-24- BOB-CAPITAL98
1 SPRINGFIELD
2 For replacement of the roofing system .......... 850,036
3 (From Article 78, Section 3 of Public Act 89-0501):
4 11TH AND ASH STREET - SPRINGFIELD
5 For improving the Warehouse Complex ............ 25,146
6 Total, Section 3 $5,519,336
7 Section 3A. The following named amounts, or so much
8 thereof as may be necessary, and remain unexpended at the
9 close of business on June 30, 1997, from appropriations
10 heretofore made for such purposes in Article 77, Section 2A
11 of Public Act 89-0501, as amended, are reappropriated from
12 the Capital Development Fund to the Capital Development Board
13 for the Department of Central Management Services for the
14 projects hereinafter enumerated:
15 ILLINOIS REHABILITATION AND
16 EDUCATION CENTER (ROOSEVELT) - CHICAGO
17 For upgrading the HVAC system .................. $ 2,250,000
18 SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
19 For renovation of Suburban North Regional
20 Office Building (formerly Maine Township
21 North High School building), in addition
22 to funds previously appropriated for such
23 purpose, Phase III ........................... 5,400,000
24 For renovation and expansion of garage ......... 375,000
25 MARION REGIONAL OFFICE BUILDING
26 For construction of a Regional Office
27 Building Addition ............................ 2,000,000
28 COMPUTER FACILITY - SPRINGFIELD
29 For replacement of the halon fire
30 suppression system ........................... 875,000
31 Total, Section 3A $10,900,000
32 Section 3.1. The following named amounts, or so much
33 thereof as may be necessary and remain unexpended at the
-25- BOB-CAPITAL98
1 close of business on June 30, 1997, from reappropriations
2 heretofore made for such purposes in Article 78, Section 3.1
3 of Public Act 89-0501, are reappropriated from the General
4 Revenue Fund to the Capital Development Board for the
5 Department of Central Management Services for the projects
6 hereinafter enumerated:
7 CHICAGO MEDICAL CENTER
8 ILLINOIS REHABILITATION AND EDUCATION CENTER
9 For rehabilitation for fire safety and
10 accessibility ................................ $ 11,086
11 CHICAGO MEDICAL CENTER
12 OFFICE AND LABORATORY BUILDING
13 For rehabilitation of the electrical vault
14 ceiling and exterior concrete deck ........... 3,373
15 CHICAGO MEDICAL CENTER
16 JUVENILE RESEARCH INSTITUTE
17 For rehabilitation of the interior and
18 exterior walls, planning the rehabilitation
19 of the HVAC system and renovation of
20 the elevator ................................. 23,433
21 CHICAGO MEDICAL CENTER
22 VISUALLY HANDICAPPED INSTITUTE
23 For upgrading the fire alarm and safety
24 system ....................................... 31,209
25 Total, Section 3.1 $69,101
26 Section 4. The following named amounts, or so much
27 thereof as may be necessary and remain unexpended at the
28 close of business on June 30, 1997, from appropriations
29 heretofore made for such purposes in Article 77, Section 6
30 and Article 78, Section 4 of Public Act 89-0501, are
31 reappropriated from the Capital Development Fund to the
32 Capital Development Board for the Department of Natural
33 Resources for the projects hereinafter enumerated:
-26- BOB-CAPITAL98
1 (From Article 78, Section 4 of Public Act 89-0501):
2 For Beall Woods Conservation Area for
3 construction of a bridge and Class C
4 campground ................................... $ 42,488
5 For Chain O'Lakes State Park for replacement
6 of overhead power lines ...................... 153,810
7 For Chain O'Lakes State Park for planning
8 the replacement of concession buildings ...... 46,107
9 For Clinton Lake for construction of a
10 sewage treatment system ...................... 93,209
11 For Eagle Creek State Park for planning and
12 rehabilitation of the sewage treatment
13 system ....................................... 309,769
14 For Eagle Creek State Park for construction
15 of restrooms and providing playground
16 equipment .................................... 137,537
17 For Fort Massac State Park for planning the
18 reconstruction of the fort .................. 150,000
19 For Hennepin Canal Parkway State Park for
20 rehabilitation of Lock 33 Taintor
21 gates ........................................ 13,619
22 For Hennepin Canal Parkway State Park for
23 rehabilitation of canal ...................... 2,860
24 For Heron Pond-Little Black Slough for
25 improvements for erosion control ............. 219,876
26 For Horseshoe Lake Conservation Area for
27 dam rehabilitation and land acquisition ...... 858,655
28 For Horseshoe Lake State Fish and Wildlife
29 Area for construction of a pole building
30 and hunter check station ..................... 83,816
31 For Illinois Beach State Park for
32 stabilization of the shoreline ............... 177,565
33 For Illinois Beach State Park for renovation
34 of the lodge basement floor and drainage
-27- BOB-CAPITAL98
1 system ....................................... 152,973
2 For Illinois-Michigan Canal State Park for
3 stabilization of the aqueduct ................ 887,585
4 For Jake Wolf Memorial Fish Hatchery for
5 installation of expansion joints ............. 7,727
6 For Jake Wolf Memorial Fish Hatchery for
7 upgrading the water supply ................... 39,105
8 For Johnson Sauk Trail State Park for
9 rehabilitation of the concession building .... 87,975
10 For Kickapoo State Park for planning
11 construction of a sewage treatment plant ..... 41,706
12 For Lake Murphysboro State Park for
13 rehabilitation of the concession/shower
14 building ..................................... 31,309
15 For Lake Murphysboro State Park for
16 upgrading the sewage system .................. 14,053
17 For Little Grassy Hatchery for the
18 construction of a storage building ........... 8,610
19 For Mason State Forest Tree Nursery for
20 installation of an emergency power system
21 and upgrading the irrigation system .......... 305,099
22 For Matthiessen State Park for rehabilitation
23 of five buildings ............................ 15,402
24 For Moraine Hills State Park for replacement
25 of restrooms and upgrading the
26 water system ................................. 909,000
27 For North Point Marina for construction of
28 a breakwater structure ....................... 3,057,696
29 For North Point Marina for modifying
30 the marina's docking system .................. 2,161,721
31 For Pere Marquette State Park for rehabilitation
32 of the water and sewer ....................... 72,532
33 For Pere Marquette State Park for upgrading
34 the water and electrical systems ............. 10,229
-28- BOB-CAPITAL98
1 For Region V Office for replacement of roofs ... 30,112
2 For Sam Dale Lake Conservation Area for
3 construction of a sewage disposal system ..... 78,363
4 For Springfield Illinois State Fairgrounds
5 for the upgrade of access roads,
6 parking lots, and visitor trails at
7 Conservation World and the Conservation
8 Service Center ............................... 55,173
9 For Starved Rock State Park for planning the
10 rehabilitation of the trails ................. 71,900
11 For Starved Rock State Park for planning the
12 reconstruction of the seawall ................ 68,348
13 For Stephen A. Forbes State Park for extending
14 water and electrical services ................ 271,391
15 For Trail of Tears State Forest for
16 replacement of a bridge ...................... 36,238
17 For Tri-County Park for planning
18 a park ....................................... 300,000
19 For Volo Bog Natural Area for rehabilitation
20 of the visitors' center ...................... 408,887
21 For Wayne Fitzgerrell State Park for
22 rehabilitation of the sewage treatment
23 plant ........................................ 323,100
24 For Wayne Fitzgerrell State Park for
25 planning and construction of a marina,
26 installation of additional sewage lines,
27 recreational development and overnight
28 accommodations to be located on Rend
29 Lake ......................................... 14,599
30 GEOLOGICAL SURVEY - CHAMPAIGN
31 For upgrading the Applied Research Laboratory
32 previously appropriated ...................... 47,088
33 For planning and upgrading the Research
34 Laboratory ................................... 22,670
-29- BOB-CAPITAL98
1 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
2 (FORMERLY BURNHAM HOSPITAL)
3 For planning and initiating the renovation of the
4 Natural History Research Center (formerly
5 Burnham Hospital) ............................ 3,173,451
6 For acquisition, planning, construction,
7 reconstruction, rehabilitation, and all
8 costs for the conversion of the Natural
9 History Research Center (formerly Burnham
10 Hospital) to a laboratory facility
11 for the Natural History Survey ............... 75,385
12 HAZARDOUS WASTE R & I CENTER - CHAMPAIGN
13 For upgrading the decontamination facilities
14 to improve operating efficiency and
15 life/safety .................................. 78,184
16 NATURAL HISTORY SURVEY - CHAMPAIGN
17 For completing the the Pesticide Storage
18 and Mixing facility .......................... 237,094
19 For upgrading laboratories and installation
20 of storage units ............................. 863,084
21 For renovation of the Natural Resources
22 Building ..................................... 43,067
23 For planning the chemical storage
24 building ..................................... 2,005
25 STATE WATER SURVEY - CHAMPAIGN
26 For planning replacement of vehicle
27 storage/shop facilities ...................... 21,150
28 DICKSON MOUNDS - LEWISTOWN
29 For renovation and expansion of the building,
30 including exhibits ........................... 228,902
31 For replacement of the cooling tower ........... 6,756
32 SPRINGFIELD - STATE MUSEUM
33 For planning renovation of main museum
34 exhibits and For renovation of basement
-30- BOB-CAPITAL98
1 galleries .................................... 36,266
2 For renovation of the lobby and gift shop ...... 12,567
3 SPRINGFIELD - STATE MUSEUM COLLECTIONS CENTER
4 For installation of a boiler ................... 60,053
5 BENTON - SOUTHERN ILLINOIS MINING OFFICE
6 (FORMERLY MINE RESCUE STATION)
7 (From Article 77, Section 6 of Public Act 89-0501):
8 For upgrading the roofing and HVAC systems
9 and replacing exterior doors ................. 72,520
10 (From Article 78, Section 4 of Public Act 89-0501):
11 For upgrading the parking areas ................ 50,574
12 For renovation of the laboratory and purchase
13 equipment and for supplementing funds
14 previously appropriated to construct an
15 addition ..................................... 16,460
16 For acquiring property and construction of
17 a parking area ............................... 15,819
18 STATEWIDE
19 (From Article 77, Section 6 of Public Act 89-0501):
20 For repair or replacement of roofs and
21 parapet walls and and reconstruction
22 of chimneys at the following locations
23 at the approximate costs set forth below ..... 1,595,542
24 Geological Survey - Applied Lab ......234,000
25 Water Survey - Eight Buildings .......227,259
26 Natural History Survey - Natural
27 Resources Studies Annex .............330,630
28 Geological Survey - Natural
29 Resources Building ..................295,000
30 Water Survey - Parapet walls at
31 Buildings No. 4, 5 and 6 .............24,000
32 Dickson Mounds - Exterior restroom
33 and picnic shelter ...................14,530
34 Jake Wolf Fish Hatchery -
-31- BOB-CAPITAL98
1 one building ........................470,123
2 (From Article 78, Section 4 of Public Act 89-0501):
3 For land acquisition ........................... 983,755
4 For maintaining the lodge and concession
5 facilities ................................... 227,707
6 For repairing and maintaining facilities ....... 271,713
7 For replacement of vault toilets at the
8 following locations at the
9 approximate costs set forth below: ........... 60,955
10 Delabar State Park ....................9,153
11 Illini State Park ....................51,138
12 Johnson Sauk Trail State Park ...........264
13 For construction of hazardous material
14 storage buildings ............................ 430,807
15 For abating hazards caused by the presence
16 of asbestos-containing materials ............. 76,445
17 For planning, construction, reconstruction,
18 land acquisition and related costs,
19 utilities, site improvements, and all other
20 expenses necessary for various capital
21 improvements at parks, conservation areas,
22 and other facilities under the jurisdiction
23 of the Department of Natural Resources ....... 22,129,889
24 For replacing roofs at the following locations
25 at the approximate costs set forth below: .... 13,608
26 Mason State Forest Tree
27 Nursery-Two buildings ...............4,098
28 Starved Rock State Park-
29 Nine buildings ........................613
30 Illini State Park-Five
31 buildings ...........................8,897
32 For rehabilitation of the recreational
33 vehicle campground electrical systems at
34 the following locations at the approximate
-32- BOB-CAPITAL98
1 costs set forth below: ....................... 178,146
2 Kankakee River State Park ...........178,146
3 For planning, construction, reconstruction,
4 land, utilities, site improvements, and
5 all other expenses necessary for various
6 capital improvements at parks and
7 conservation areas ........................... 14,269
8 For construction and development of
9 multiple use facilities on lands owned
10 or managed by the Department of
11 Natural Resources, including all costs
12 for supplies, materials, labor, and
13 services required for the completion
14 of the following projects at the
15 approximate costs set forth below: ........... 137,610
16 For Volo Bog Natural Area
17 for replacement of a roof
18 and rehabilitation of the
19 emergency exit stairs at the
20 visitor center ....................108,220
21 For Volo Bog Natural Area for
22 the upgrading of the
23 Interpretive Center, including
24 the heating, ventilation, and
25 air conditioning system ............29,390 ____________
26 Total, Section 4 $42,933,685
27 Section 4A. The following named amounts, or so much
28 thereof as may be necessary, and remain unexpended at the
29 close of business on June 30, 1997, from appropriations
30 heretofore made for such purposes in Article 77, Section 6B
31 of Public Act 89-0501, as amended, are reappropriated from
32 the Capital Development Fund to the Capital Development Board
33 for the Department of Natural Resources for the projects
-33- BOB-CAPITAL98
1 hereinafter enumerated:
2 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
3 For construction of a concession building
4 and upgrading the horse concession, in
5 addition to funds previously appropriated .... 500,000
6 CHAMPAIGN - STATE WATER SURVEY
7 For planning the renovation of the central
8 utilities plant .............................. 30,000
9 For renovation of office and
10 laboratory buildings ......................... 793,000
11 For replacement and upgrade of the exterior
12 lighting system .............................. 146,000
13 CHAMPAIGN - STATE NATURAL HISTORY SURVEY
14 For renovation of Natural History
15 Research Center (formerly Burnham
16 Hospital) in Champaign ....................... 6,000,000
17 DELABAR STATE PARK - HENDERSON COUNTY
18 For replacement of waterlines and
19 fountains .................................... 110,000
20 EAGLE CREEK STATE PARK - SHELBY COUNTY
21 For rehabilitation of the sewage treatment
22 system, in addition to funds previously
23 appropriated ................................. 312,000
24 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
25 For replacement and rehabilitation
26 of arch culverts and canal ................... 600,000
27 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
28 For rehabilitation of the concession
29 building, in addition to funds
30 previously appropriated ...................... 140,000
31 KICKAPOO STATE PARK - VERMILION COUNTY
32 For construction of a sewage treatment
33 plant, in addition to funds
34 previously appropriated ...................... 1,110,000
-34- BOB-CAPITAL98
1 MORAINE HILLS STATE PARK - MCHENRY COUNTY
2 For renovation of the trail .................... 345,000
3 MORAINE VIEW STATE PARK - MCLEAN COUNTY
4 For construction of a sewage treatment
5 system and plant ............................. 1,625,000
6 PERE MARQUETTE STATE PARK - JERSEY COUNTY
7 For renovation of two buildings and
8 replacement of a storage building ............ 180,000
9 STARVED ROCK STATE PARK - LASALLE COUNTY
10 For construction of a visitors'
11 center, in addition to funds
12 previously appropriated ...................... 365,000
13 For rehabilitation of trails, in addition
14 to funds previously appropriated ............ 1,000,000
15 For reconstruction of the seawall, in
16 addition to funds previously
17 appropriated ................................. 500,000
18 For rehabilitation of the sewer
19 system - Phase I ............................. 180,000
20 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
21 For the completion of site improvements ........ 559,000
22 STATE MUSEUM - SPRINGFIELD
23 For planning and replacement of the main
24 museum exhibits, in addition to funds
25 previously appropriated ...................... 700,000
26 Total, Section 4A $15,195,000
27 Section 4.1. The following named amounts, or so much
28 thereof as may be necessary and remain unexpended at the
29 close of business on June 30, 1997, from appropriations and
30 reappropriations heretofore made for such purposes in Article
31 77, Section 6A and Article 78, Section 4.1 of Public Act
32 89-0501 are reappropriated from the General Revenue Fund to
33 the Capital Development Board for the Department of Natural
-35- BOB-CAPITAL98
1 Resources for the projects hereinafter enumerated:
2 (From Article 77, Section 6A of Public Act 89-0501):
3 STATEWIDE
4 For maintenance of lodge and
5 concession facilities ........................ $ 260,000
6 For rehabilitation or replacement
7 of playground equipment ...................... 250,000
8 For rehabilitation of trail systems ............ 140,000
9 ILLINOIS BEACH STATE PARK
10 For stabilization of the shoreline.............. 400,000
11 STATEWIDE
12 (From Article 78, Section 4.1 of Public Act 89-0501):
13 For maintenance of the lodge and
14 concession facilities ........................ 29,981
15 For rehabilitation and replacement of
16 playground equipment ......................... 323,000
17 For Chain O'Lakes State Park for replacement
18 of windows and floor tile in Region 2
19 headquarters ................................. 87,000
20 For Illinois Beach State Park for
21 stabilization of the shoreline ............... 75,990
22 For Spring Grove Hatchery for upgrading the
23 septic system ................................ 30,000
24 Total, Section 4.1 $1,595,971
25 Section 5. The following named amounts, or so much
26 thereof as may be necessary and remain unexpended at the
27 close of business on June 30, 1997, from reappropriations
28 heretofore made for such purposes in Article 78, Section 5,
29 of Public Act 89-0501, as amended by Public Act 90-0002, are
30 reappropriated from the Capital Development Fund to the
31 Capital Development Board for the Department of Corrections
32 for the projects hereinafter enumerated:
33 CENTRALIA CORRECTIONAL CENTER
-36- BOB-CAPITAL98
1 For renovation of the Dietary .................. $ 19,379
2 DANVILLE CORRECTIONAL CENTER
3 For installation of a water softener system ... 17,341
4 For renovation of interior walls and
5 exterior masonry walls ....................... 113,131
6 For correction of construction defects ......... 362,252
7 For planning, utilities, site improvements,
8 and other expenses necessary for the
9 construction of a correctional facility ...... 32,511
10 DIXON CORRECTIONAL CENTER
11 For completing the upgrade of Sewage Treatment
12 Plant, in addition to funds previously
13 appropriated ................................. 27,163
14 For upgrading the steam distribution system
15 and replacement of the boiler system
16 including asbestos abatement ................. 111,140
17 DWIGHT CORRECTIONAL CENTER
18 For renovation of buildings ................... 715,322
19 EAST MOLINE CORRECTIONAL CENTER
20 For planning the upgrade of locking
21 systems in nine buildings .................... 34,995
22 For upgrading the steam distribution system
23 and replacement of boilers, including
24 asbestos abatement ........................... 23,764
25 SOUTHWESTERN ILL. CORRECTIONAL FACILITY
26 For providing equipment and telecom,
27 constructing a warehouse and upgrading
28 a parking lot, in addition to funds
29 previously appropriated ...................... 130,007
30 For completing the conversion of existing
31 buildings into a minimum security
32 correctional facility, in addition to funds
33 previously appropriated ...................... 19,776
34 ILLINOIS YOUTH CENTER - HARRISBURG
-37- BOB-CAPITAL98
1 For purchasing and installation of equipment
2 to complete the dietary expansion ........... 25,607
3 For replacement of absorption chiller units
4 and boiler systems in three buildings ........ 13,978
5 JOLIET CORRECTIONAL CENTER
6 For completing the west cellhouse renovation,
7 including asbestos abatement, in addition
8 to funds previously appropriated ............. 3,495,065
9 For renovation of the west cellhouse, in
10 addition to funds previously appropriated .... 27,575
11 For renovation of steam, water, sewage and
12 electrical systems ........................... 1,306
13 For planning the rehabilitation of the
14 West Cellhouse ............................... 172,011
15 ILLINOIS YOUTH CENTER - JOLIET
16 For completing the upgrade of electrical
17 systems, in addition to funds
18 previously appropriated ...................... 1,805,650
19 For upgrading the fire alarm system ............ 275,557
20 For upgrading the storm and sanitary sewers .... 353,627
21 For completing the upgrade of the utilities, in
22 addition to funds previously appropriated .... 40,647
23 For completion of the steam system upgrade
24 and initiation of the electrical
25 system upgrade ............................... 6,239
26 KANKAKEE MSU
27 For providing equipment, telecom, lighting
28 and freezer units, in addition to funds
29 previously appropriated ...................... 53,468
30 For planning, construction, utilities,
31 renovation, site improvements, and
32 other expenses necessary for a minimum
33 security women's prison ...................... 4,133
34 For rehabilitation of the heating and air
-38- BOB-CAPITAL98
1 handling system in the resident buildings .... 2,737
2 LINCOLN CORRECTIONAL CENTER
3 For upgrading the locking systems and doors ... 77,700
4 For upgrading the water supply ................. 356,077
5 For renovation of the Dietary, construction
6 of a cooler addition and installation
7 of blast chillers ........................... 487,520
8 LOGAN CORRECTIONAL CENTER
9 For renovation of sewer system ................. 854,229
10 For renovation of the water tower .............. 124,144
11 For rehabilitation of the roof ventilation
12 systems ...................................... 77,948
13 MENARD CORRECTIONAL CENTER
14 For planning, completion and rehabilitation
15 or replacement of the MSU "C" Building ....... 91,994
16 For replacement of East and West
17 Cellhouse windows and boilers................. 276,442
18 For improving the south yard for outdoor
19 recreation ................................... 32,606
20 For repairs due to the Great Flood of
21 1993 and projects to protect the facility
22 from future floods ........................... 250,362
23 For upgrading the steam and water distribution
24 systems and replacement of the MSU
25 "C" Building ................................. 183,254
26 For replacement of the chimney stack and
27 boilers, in addition to funds previously
28 appropriated ................................. 400,000
29 For replacement of hot water heaters and
30 deairing tanks ............................... 110,000
31 For planning the renovation of the old
32 hospital building ............................ 207,540
33 For renovation of elements of the power
34 plant, including the main generator .......... 22,982
-39- BOB-CAPITAL98
1 For planning for renovation of the
2 Administration Building ...................... 15,604
3 For completing the renovation of the
4 Psychiatric Cellhouse ........................ 5,247
5 ILLINOIS YOUTH CENTER - PERE MARQUETTE
6 For completing the renovation of control
7 center and construction of a confinement
8 addition, in addition to funds previously
9 appropriated ................................. 39,691
10 For upgrading the dormitory restrooms ......... 31,814
11 SHAWNEE CORRECTIONAL CENTER
12 For upgrading the heating and hot
13 water system ................................. 581,309
14 SHERIDAN CORRECTIONAL CENTER
15 For completion of water and sewer systems
16 upgrade, in addition to funds previously
17 appropriated ................................. 2,699
18 For planning the upgrade of sewer and
19 water utilities .............................. 6,954
20 STATEVILLE CORRECTIONAL CENTER
21 For upgrading the the gatehouse ................ 100,117
22 For completing the upgrade of the security
23 system, in addition to funds previously
24 appropriated ................................. 23,650
25 For rehabilitation of plumbing in Dietary ..... 27,593
26 For upgrading the doors, locks and hardware
27 in B Cellhouse ............................... 59,940
28 For upgrading the water supply to B house ..... 187,633
29 For upgrade of the utility system .............. 7,177
30 ILLINOIS YOUTH CENTER - ST. CHARLES
31 For completing the upgrade of the water
32 distribution system, in addition to funds
33 previously appropriated ...................... 192,872
34 For replacement of Madison Cottage ............. 136,527
-40- BOB-CAPITAL98
1 ILLINOIS YOUTH CENTER - VALLEY VIEW
2 For planning the upgrade of dormitory restrooms
3 and fixtures ................................. 68,560
4 VIENNA CORRECTIONAL CENTER
5 For completing the rehabilitation of duct
6 system and walls, in addition to
7 funds previously appropriated ................ 1,300,592
8 For upgrading the electrical system ............ 80,094
9 For planning the upgrade of the steam
10 distribution system .......................... 190,881
11 For planning the replacement of the
12 absorption chiller and cooling tower ......... 40,848
13 For upgrading the library and school
14 buildings .................................... 107,592
15 For planning the rehabilitation of the
16 duct system and walls ........................ 15,910
17 For upgrading the water and sewer
18 utilities .................................... 187,609
19 STATEWIDE
20 For planning, design, construction,
21 equipment and all other necessary
22 costs for a youth boot camp at a
23 site to be chosen from the list of
24 finalists not selected for the
25 super maximum security prison ............... 322,891
26 For completion of planning, site improvements,
27 utility upgrade, equipment and construction
28 of three housing units to add 672 cells
29 to the adult correctional system ............. 73,354
30 For planning, construction, utilities, site
31 improvements, equipment and other expenses
32 necessary for the construction of a close
33 supervision super maximum security prison .... 18,904,536
34 For upgrading for fire safety at five
-41- BOB-CAPITAL98
1 locations and replacing boilers............... 1,767,333
2 For correcting defects in the food preparation
3 areas, including roofs ....................... 128,591
4 For planning, construction, utilities,
5 site improvements, and other expenses
6 necessary for the construction of two
7 minimum and one medium security
8 prisons ...................................... 29,224
9 For utilities, construction, planning,
10 design, site improvements, rehabilitation,
11 equipment, or any other means of acquiring
12 community correctional centers, adult work
13 camps, and boot camps ........................ 9,078
14 For renovation and improvements at various
15 correctional facilities at the approximate
16 costs set forth below: ....................... 117,693
17 Roof Replacement .....................70,000
18 Road Repavement ......................47,693
19 For replacement of cell doors and locks
20 and rehabilitation of locking systems at
21 the following locations at the approximate
22 costs set forth below: ....................... 118,902
23 Kankakee MSU
24 For rehabilitation of locking
25 systems ...........................118,902
26 For renovation of roads and parking lots
27 and replacement of boilers at the
28 following locations at the approximate
29 costs set forth below ........................ 119,503
30 Dixon Correctional Center
31 For roads and parking ..............30,000
32 Hanna City Work Camp
33 For roads and parking ..............37,000
34 Logan Correctional Center
-42- BOB-CAPITAL98
1 For roads and parking ..............10,000
2 Menard Correctional Center
3 For roads and parking and
4 replacement of boilers............168,832
5 Vienna Correctional Center
6 For roads ..........................30,000
7 For replacement of roofs at various Department of
8 Corrections locations ........................ 415,977
9 For roof replacement at the following
10 locations at the approximate costs
11 set forth below: ............................. 670,404
12 Dixon Correctional Center
13 Five Buildings .....................25,000
14 Dwight Correctional Center
15 Three buildings ...................122,000
16 Dwight Correctional Center
17 Multi-Purpose Building .............85,000
18 Graham Correctional Center
19 Five buildings ....................125,000
20 Graham Correctional Center
21 Thirty-two buildings ..............150,000
22 Hanna City Work Camp
23 Thirteen buildings .................7,000
24 Joliet Correctional Center
25 Five buildings ....................160,000
26 Logan Correctional Center
27 Two buildings .....................200,000
28 Menard Psychiatric Center
29 Six buildings .....................485,000
30 Menard Correctional Center
31 Warehouse Building .................70,000
32 Menard Correctional Center
33 Five buildings ....................700,000
34 Pontiac Correctional Center
-43- BOB-CAPITAL98
1 Nine buildings .....................40,000
2 Pontiac Correctional Center
3 Eight buildings ....................75,000
4 Illinois Youth Center-St. Charles
5 Three buildings ...................175,000
6 Sheridan Correctional Center
7 Six buildings ......................50,000
8 Stateville Correctional Center
9 Sixteen buildings .................50,000
10 Stateville Correctional Center
11 Seven buildings ...................135,000
12 Ill Youth Center-Valley View
13 Administration Building and
14 Kitchen Addition ..................100,688
15 Illinois Youth Center-Warrenville
16 One residential building ..........150,000 ____________
17 Total, Section 5 $37,525,578
18 Section 5A. The following named amounts, or so much
19 thereof as may be necessary, and remain unexpended at the
20 close of business on June 30, 1997, from appropriations
21 heretofore made for such purposes in Article 77, Section 3B
22 of Public Act 89-0501, as amended, are reappropriated from
23 the Capital Development Fund to the Capital Development Board
24 for the Department of Corrections for the projects
25 hereinafter enumerated:
26 STATEWIDE
27 For correction of deficiencies in
28 water systems at three correctional
29 facilities ................................... $ 100,000
30 For replacement of locks, windows and
31 doors at the following locations
32 as set forth below: .......................... 4,000,000
33 Dwight ...............................291,400
-44- BOB-CAPITAL98
1 IYC Harrisburg .......................943,000
2 IYC Joliet ...........................367,500
3 Menard .............................1,350,000
4 Pontiac ...............................77,100
5 IYC Valley View ......................500,000
6 Vienna ...............................471,000
7 For planning, design, construction,
8 equipment and other necessary costs
9 for a Correctional Facility for
10 juveniles .................................... 42,750,000
11 For planning, design, construction,
12 equipment and other necessary costs
13 for a Medium Security Correctional
14 Facility ..................................... 69,000,000
15 DANVILLE CORRECTIONAL CENTER
16 For renovation of interior and
17 exterior walls, in addition to
18 funds previously appropriated ................ 4,000,000
19 DECATUR WOMEN'S CORRECTIONAL CENTER
20 For the planning and conversion of
21 Meyer Mental Health Center into a
22 correctional facility ........................ 23,000,000
23 DIXON CORRECTIONAL CENTER
24 For renovation of the groundwater
25 storage tank and abatement of crawl-
26 space pipes in Bldgs. 26, 27 and 29 .......... 700,000
27 DWIGHT CORRECTIONAL CENTER
28 For completion of medical unit,
29 in addition to funds previously
30 appropriated ................................. 3,500,000
31 For expansion of the Education Building
32 and Dietary and construction of
33 a warehouse .................................. 4,700,000
34 EAST MOLINE CORRECTIONAL CENTER
-45- BOB-CAPITAL98
1 For upgrading locking system, in addition
2 to funds previously appropriated ............. 800,000
3 ILLINOIS YOUTH CENTER - HARRISBURG
4 For upgrading the domestic water system ........ 675,000
5 For upgrading the HVAC system .................. 532,000
6 ILLINOIS YOUTH CENTER - JOLIET
7 For planning, site improvements,
8 utility upgrade, equipment and all
9 costs necessary to construct a
10 housing unit and dietary facility............. 7,000,000
11 ILLINOIS YOUTH CENTER - PERE MARQUETTE
12 For upgrading the electrical
13 distribution system .......................... 215,000
14 ILLINOIS YOUTH CENTER - VALLEY VIEW
15 For upgrading dormitory restrooms
16 and fixtures, in addition to
17 funds previously appropriated ................ 550,000
18 JOLIET CORRECTIONAL CENTER
19 For upgrading the power house and
20 installation of a generator .................. 407,000
21 STATEVILLE CORRECTIONAL CENTER - JOLIET
22 For replacement of the MSU ..................... 6,500,000
23 LINCOLN CORRECTIONAL CENTER
24 For upgrading the water softener system ........ 150,000
25 MENARD CORRECTIONAL CENTER - CHESTER
26 For upgrading roads and sidewalks .............. 310,000
27 For upgrading the plumbing systems in
28 two buildings ................................ 400,000
29 For upgrading the coal handling system
30 and repair or replace boiler system .......... 950,000
31 For conversion of the Maintenance Building
32 to an inmate dormitory ....................... 250,000
33 For conversion of the Administration
34 Building basement to a courtroom and
-46- BOB-CAPITAL98
1 attorney offices ............................. 100,000
2 For upgrading the steam and water distribution
3 systems, in addition to funds previously
4 appropriated ................................. 2,400,000
5 PONTIAC CORRECTIONAL CENTER
6 For renovation of main sally port .............. 300,000
7 VANDALIA CORRECTIONAL CENTER
8 For renovation of dormitory shower rooms ....... 450,000
9 VIENNA CORRECTIONAL CENTER
10 For upgrading the steam distribution system
11 and renovation of Powerhouse, in addition
12 to funds previously appropriated ............. 4,000,000
13 For installation of security fencing ........... 1,000,000
14 For upgrading air conditioning system
15 and replacement of cooling tower ............. 1,100,000
16 For upgrading the electrical, plumbing and
17 HVAC systems in four buildings ............... 850,000
18 Total, Section 5A $180,689,000
19 Section 5.1. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1997, from appropriations and
22 reappropriations heretofore made for such purposes in Article
23 78, Section 5.1 of Public Act 89-0501 are reappropriated from
24 the General Revenue Fund to the Capital Development Board for
25 the Department of Corrections for the projects hereinafter
26 enumerated:
27 DIXON CORRECTIONAL CENTER
28 For replacement of two freezer compressors
29 and motors ................................... $ 150,757
30 EAST MOLINE CORRECTIONAL CENTER
31 For retubing boiler #3 ......................... 345,650
32 STATEVILLE CORRECTIONAL CENTER
33 For upgrading the security system .............. 9,907
-47- BOB-CAPITAL98
1 STATEWIDE
2 For energy conservation improvements at the
3 following locations at the approximate
4 costs set forth below: ....................... 56,018
5 Dwight Correctional Center ............7,000
6 Joliet Correctional Center
7 School Building .....................4,500
8 Menard Psychiatric Center
9 Randolph Hall .......................7,500
10 Stateville Correctional Center
11 Law Library .........................7,400
12 Pontiac Correctional Center ..........35,394
13 Vienna Correctional Center ............1,725
14 For upgrading doors and locking systems at
15 the following locations at the approximate
16 costs set forth below: ....................... 577,182
17 Illinois Youth Center-Warrenville
18 For replacement of doors
19 and locking systems ...............577,182 ____________
20 Total, Section 5.1 $1,139,514
21 Section 5.2. The sum of $2,666,667, or so much thereof
22 as may be necessary and remains unexpended at the close of
23 business on June 30, 1997, from a reappropriation heretofore
24 made for such purposes in Article 78, Section 5.2 of Public
25 Act 89-0501, is reappropriated from the Capital Development
26 Fund to the Capital Development Board for the State's
27 one-third share of land acquisition, equipment and
28 construction of a boot camp in the Cook County area.
29 Section 5.3. The amount of $21,874, or so much thereof
30 as may be necessary and remains unexpended at the close of
31 business on June 30, 1997, from a reappropriation heretofore
32 made for such purposes in Article 78, Section 5.3 of Public
-48- BOB-CAPITAL98
1 Act 89-0501, is reappropriated from the Capital Development
2 Fund to the Capital Development Board for the Department of
3 Corrections for planning and other expenses necessary for a
4 medical unit facility at Dwight Correctional Center.
5 Section 5.4. The amount of $11,898,037, or so much
6 thereof as may be necessary and remains unexpended from the
7 General Revenue Fund at the close of business on June 30,
8 1997, from an appropriation heretofore made for such purposes
9 in Article 78, Section 5.5 of Public Act 89-0501, is
10 reappropriated to the Capital Development Board for the
11 Department of Corrections for all costs associated with the
12 completion of the super maximum security prison at Tamms,
13 Illinois.
14 Section 5.5. The amount of $11,110,948, or so much
15 thereof as may be necessary and remains unexpended at the
16 close of business on June 30, 1997, from an appropriation
17 heretofore made for such purposes in Article 77, Section 3 of
18 Public Act 89-0501, is reappropriated from the General
19 Revenue Fund to the Capital Development Board for the
20 Department of Corrections for the projects hereinafter
21 enumerated at the approximate costs set forth below:
22 Danville Correctional Center -
23 For upgrading the hot water
24 distribution system ................$2,227,613
25 Joliet Correctional Center -
26 For replacement of the deep well ........350,000
27 Stateville Correctional Center-
28 For upgrading the plumbing systems in
29 four buildings ......................5,178,740
30 Menard Correctional Center -
31 For planning and to begin upgrading
32 the plumbing systems in two
-49- BOB-CAPITAL98
1 buildings .............................189,100
2 Pontiac Correctional Center -
3 For upgrading the mechanical systems
4 and renovation of shower rooms ........995,000
5 Shawnee Correctional Center -
6 For upgrading the hot water
7 distribution system .................2,170,495
8 Section 5.6. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1997, from appropriations
11 heretofore made for such purposes in Article 77, Section 3A
12 of Public Act 89-0501, are reappropriated from the General
13 Revenue Fund to the Capital Development Board for the
14 Department of Corrections for the projects hereinafter
15 enumerated:
16 DIXON CORRECTIONAL CENTER
17 For tuckpointing two buildings ................. $ 65,000
18 STATEVILLE CORRECTIONAL CENTER - JOLIET
19 For tuckpointing seven buildings ............... 300,000
20 Total $365,000
21 Section 6. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 1997, from reappropriations
24 heretofore made for such purposes in Article 78, Section 6
25 of Public Act 89-0501, are reappropriated from the Capital
26 Development Fund to the Capital Development Board for the
27 Historic Preservation Agency for the projects hereinafter
28 enumerated:
29 CAHOKIA MOUNDS HISTORIC SITE
30 To extend a water line for providing
31 reliable water service ....................... $ 284,094
32 For purchasing private land within historic
-50- BOB-CAPITAL98
1 site boundary ................................ 280,600
2 For replacement of Monk's Mounds stairs ........ 243,148
3 DAVID DAVIS HOME
4 To acquire a residence to be
5 converted to a Visitors' Center .............. 250,000
6 FT. KASKASKIA HISTORIC SITE
7 For providing a new water supply ............... 138,463
8 GALENA COMPLEX - JO DAVIESS COUNTY
9 For providing handicapped accessibility and
10 site improvements ............................ 5,610
11 LEWIS AND CLARK STATE HISTORIC SITE
12 For the construction of an interpretive
13 center ....................................... 440,000
14 LINCOLN LOG CABIN HISTORIC SITE - CAMPBELL
15 For rehabilitation of historic structures ...... 57,491
16 For construction of a visitor center and
17 museum, Phase I .............................. 134,909
18 For the stabilization of the Moore House ....... 27,981
19 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
20 For completing the restoration of the
21 outdoor theater .............................. 3,431
22 For construction of a day use area ............. 207,767
23 For replacement of a barn and site
24 improvements ................................. 106,526
25 For rehabilitation of the sewage treatment
26 plant ........................................ 92,668
27 For rehabilitation of the bridge ............... 2,021
28 For rehabilitation of the outdoor theater ...... 8,083
29 LINCOLN'S TOMB HISTORIC SITE - SPRINGFIELD
30 For stabilization of storm water penetration
31 and repairing water damage ................... 28,707
32 For planning the correction of Lincoln's
33 Tomb exterior and repair the interior ........ 32,052
34 For rehabilitation of three buildings .......... 6,449
-51- BOB-CAPITAL98
1 MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY
2 For restoration of the exterior, replacement
3 of the windows, restoration of damaged
4 areas and the HVAC system .................... 72,264
5 PULLMAN FACTORY HISTORIC SITE - CHICAGO
6 For stabilization of the structure and for planning
7 and beginning restoration .................... 824,316
8 For stabilization of critical areas of the
9 structure .................................... 7,031
10 SPRINGFIELD - OLD STATE CAPITOL
11 For replacement of the heating and cooling
12 system ....................................... 130,943
13 For remodeling and rehabilitation of the
14 mechanical, electrical and security
15 systems, fire-safety improvements, other
16 interior modifications and repairs to
17 the garage ................................... 23,305
18 VACHEL LINDSAY HOME
19 For mechanical/system replacement,
20 restoration of the foundation and other
21 structural improvements ...................... 191,637
22 STATEWIDE
23 For land acquisition and related costs ......... 19,411
24 Total, Section 6 $3,618,907
25 Section 6A. The following named amounts, or so much
26 thereof as may be necessary, and remain unexpended at the
27 close of business on June 30, 1997, from appropriations
28 heretofore made for such purposes in Article 77, Section 11A
29 of Public Act 89-0501, as amended, are reappropriated from
30 the Capital Development Fund to the Capital Development Board
31 for the Historic Preservation Agency for the projects
32 hereinafter enumerated:
33 STATEWIDE HISTORIC SITE
-52- BOB-CAPITAL98
1 For matching ISTEA federal grant funds ......... $ 500,000
2 DAVID DAVIS MANSION - BLOOMINGTON
3 For renovation of the David Davis Mansion
4 to eliminate basement leakage ................ 231,000
5 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
6 For renovation of the Cahokia Courthouse
7 and the Jarrot House ......................... 387,000
8 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
9 For replacement of Monk's Mound stairs ......... 465,000
10 For restoration of Monk's Mound ................ 1,800,000
11 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
12 For construction of a visitors' center ......... 1,625,000
13 For replacement of bridges ..................... 180,000
14 LINCOLN'S NEW SALEM - PETERSBURG
15 For renovation of the River Ridge
16 Restaurant and improvements to the
17 domestic water system ........................ 273,000
18 OLD STATE CAPITOL - SPRINGFIELD
19 For renovation of the Old State
20 Capitol to eliminate basement
21 leakage ...................................... 620,000
22 Total, Section 6A $6,081,000
23 Section 6.1. The amount of $54,510, or so much thereof
24 as may be necessary and remains unexpended at the close of
25 business on June 30, 1997, from a reappropriation heretofore
26 made for such purpose in Article 78, Section 6.1 of Public
27 Act 89-0501, is reappropriated from the Capital Development
28 Fund to the Capital Development Board for the Historic
29 Preservation Agency for the purchase and rehabilitation of
30 the State Journal Register Building in Springfield.
31 Section 6.2. The amount of $52,705, or so much thereof
32 as may be necessary and remains unexpended at the close of
-53- BOB-CAPITAL98
1 business on June 30, 1997, from a reappropriation heretofore
2 made for such purpose in Article 78, Section 6.2 of Public
3 Act 89-0501, is reappropriated from the Capital Development
4 Fund to the Capital Development Board for the Historic
5 Preservation Agency for acquiring the Zimmerman
6 archaeological site in LaSalle County and for associated
7 costs, planning, stabilization, restoration and all other
8 expenses necessary to comply with the intent of this
9 appropriation.
10 Section 6.3. The amount of $2,300,000, or so much
11 thereof as may be necessary and remains unexpended at the
12 close of business on June 30, 1997, from appropriations
13 heretofore made for such purposes in Article 77, Section 11
14 of Public Act 89-0501, is reappropriated from the Capital
15 Development Fund to the Capital Development Board and the
16 amount of $2,300,000, or so much thereof as may be necessary
17 and remains unexpended from the Illinois Historic Sites Fund
18 at the close of business on June 30, 1997, from
19 appropriations heretofore made for such purposes in Article
20 78, Section 6.3 of Public Act 89-0501, is reappropriated to
21 the Capital Development Board for planning a new historical
22 library and Lincoln Center. The moneys from the Capital
23 Development Fund may be spent only if matched by moneys from
24 the Illinois Historic Sites Fund resulting from private
25 donations.
26 Section 6.4. The amount of $2,300,000, or so much
27 thereof as may be necessary and remains unexpended from the
28 General Revenue Fund, less $1,900,000, from the
29 appropriations heretofore made for such purposes in Article
30 78, Section 6.3 of Public Act 89-0501, is reappropriated to
31 the Capital Development Board for the Historic Preservation
32 Agency for planning a new historical library and Lincoln
-54- BOB-CAPITAL98
1 Center.
2 Section 7. The amount of $3,183, or so much thereof as
3 may be necessary and remains unexpended at the close of
4 business on June 30, 1997, from a reappropriation heretofore
5 made for such purpose in Article 78, Section 7 of Public Act
6 89-0501, is reappropriated from the Capital Development Fund
7 to the Capital Development Board for the Legislative Space
8 Needs Commission for planning, construction, land
9 acquisition, site development and other related expenses as
10 may be necessary to construct a Parking and Visitor Center in
11 the Capitol Complex Area.
12 Section 8. The sum of $132,500, or so much thereof as
13 may be necessary and remains unexpended at the close of
14 business on June 30, 1997, from a reappropriation heretofore
15 made for such purposes in Article 78, Section 8 of Public Act
16 89-0501, is reappropriated from the Capital Development Fund
17 to the Capital Development Board for the Legislative Space
18 Needs Commission for architectural/engineering fees,
19 planning, construction, reconstruction, rehabilitation, and
20 all other necessary costs for remodeling and relocation of
21 various legislative services agencies located in the Capitol
22 and Stratton Office buildings at the approximate costs set
23 forth below:
24 For the Joint Committee on
25 Administrative Rules .......................$ 132,500
26 Section 9. The following named amounts, or so much
27 thereof as may be necessary and remain unexpended at the
28 close of business on June 30, 1997, from reappropriations
29 heretofore made for such purposes in Article 78, Section 9,
30 as amended by Public Act 90-0002, and Article 77, Section 4
31 of Public Act 89-0501, are reappropriated from the Capital
-55- BOB-CAPITAL98
1 Development Fund to the Capital Development Board for the
2 Department of Human Services (formerly the Department of
3 Mental Health and Developmental Disabilities) for the
4 projects hereinafter enumerated:
5 (From Article 78, Section 9 of Public Act 89-0501):
6 ALTON MENTAL HEALTH CENTER
7 For rehabilitation of storm and sanitary
8 sewers, in addition to funds previously
9 appropriated ................................ $ 121,432
10 For rehabilitation of storm and sanitary
11 sewers, in addition to funds previously
12 appropriated ................................. 11,194
13 For installation of security screens ........... 75,000
14 For replacement of domestic hot water
15 lines in seven buildings ..................... 4,859
16 For upgrading fire safety systems in
17 eight buildings ............................ 43,900
18 For renovation of ceilings in Holly, Maple,
19 Locust and Elm ............................... 42,444
20 For replacement of the chiller and
21 connection of the HVAC to the energy
22 management system ............................ 19,280
23 For replacement of two cooling towers in
24 the Willow Building .......................... 45,463
25 For rehabilitation of bathrooms for
26 handicapped accessibility .................... 21,605
27 For rehabilitation of the electrical
28 distribution system .......................... 77,957
29 CHESTER MENTAL HEALTH CENTER
30 For construction of a storage building ........ 803,585
31 For renovation of the HVAC system .............. 38,887
32 For upgrading the security system .............. 44,083
33 For construction of a Rehabilitative
34 Services building ............................ 78,900
-56- BOB-CAPITAL98
1 For replacement of the emergency generator ..... 73,040
2 CHICAGO METRO C&A
3 For renovation of ISPI building ................ 4,500,000
4 For planning and renovation of residential
5 and program units for children and
6 adolescent services .......................... 872,648
7 CHICAGO READ MENTAL HEALTH CENTER
8 For renovation of utility rooms and installation
9 of drinking fountains ........................ 218,000
10 For renovation of the West Campus Nurses'
11 Stations ..................................... 1,304,000
12 For renovation of Henry Horner Children's
13 Center and West Campus for fire and
14 life safety codes ............................ 1,384,273
15 For renovation of the West Campus shower
16 and toilet rooms ............................. 643,488
17 For replacement of penthouse louvers at
18 the West Campus .............................. 63,696
19 For rehabilitation of the bathroom shower
20 walls in ten buildings ....................... 96,690
21 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
22 For upgrading the mechanical equipment,
23 in addition to funds previously
24 appropriated ................................. 522,080
25 For planning and beginning the renovation of a
26 residential building ......................... 70,714
27 For renovation of the kitchen and residential
28 units for rethermalization and air
29 condition the kitchen, in addition to
30 funds previously appropriated ............... 25,044
31 For separating and upgrading of the combined
32 sewer system, in addition to funds
33 previously appropriated ...................... 154,660
34 For rehabilitation of resident buildings
-57- BOB-CAPITAL98
1 and upgrading of temperature controls ........ 620,501
2 ELGIN MENTAL HEALTH CENTER
3 (From Article 77, Section 4 of Public Act 89-0501):
4 For construction of a forensic services
5 complex, in addition to funds previously
6 appropriated ................................. 1,784,500
7 (From Article 78, Section 9 of Public Act 89-0501):
8 For upgrading and expanding the mechanical
9 infrastructure, in addition to funds
10 previously appropriated ...................... 1,245,921
11 For renovation of the HVAC systems,
12 replacement of windows and installation
13 of security screens, in addition
14 to funds previously appropriated ............. 2,092,543
15 For construction of a Forensic Services
16 Facility, in addition to funds
17 previously appropriated ..................... 13,346,590
18 For upgrading and expanding mechanical
19 infrastructure, in addition to funds
20 previously appropriated ...................... 772,051
21 For upgrading for fire and life safety ......... 880,849
22 For planning the renovation of the Forensic
23 Building and abating asbestos ................ 251,946
24 For renovation of the Central Stores
25 Building ..................................... 114,914
26 For upgrading the Medical Building HVAC
27 system and replacement of the cooling
28 towers ....................................... 2,501
29 For upgrading the security systems and
30 constructing a multi-purpose building
31 for the Forensic Complex ..................... 64,550
32 For the demolition of the Old Main Building
33 and construction of an Adult
34 Psychiatric Center ........................... 3,221,865
-58- BOB-CAPITAL98
1 FOX DEVELOPMENTAL CENTER
2 For renovation of Building #8 and
3 window replacement of Building
4 #1, in addition to funds
5 previously appropriated ...................... 472,267
6 For renovation of the exterior of
7 Building #1, in addition to funds
8 previously appropriated ...................... 97,042
9 For planning the renovation of Building #8 ..... 8,276
10 For installation of an elevator and
11 rehabilitation of corridor exits ............. 8,712
12 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
13 For renovation of residences ................... 159,398
14 For replacement of steam and
15 condensate lines ............................. 357,281
16 For renovation of the boilers in the power
17 plant ........................................ 29,856
18 For renovation of bathrooms and utility rooms
19 in ten residences ............................ 6,913
20 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
21 For replacement of code compliance
22 generators ................................... 25,273
23 For planning and beginning electrical
24 distribution renovation ...................... 21,950
25 For replacement of piping and heating units .... 144,665
26 For rehabilitation of bathrooms and replacement
27 of doors ..................................... 159,297
28 For rehabilitation of the boilers, turbine
29 generator and switchgear ..................... 5,611
30 For installation of fire safety systems in
31 four buildings and replacement of a
32 code compliance generator .................... 274,259
33 KILEY DEVELOPMENTAL CENTER
34 For renovation of homes ........................ 587,735
-59- BOB-CAPITAL98
1 For renovation of bathrooms in homes ........... 309,992
2 LINCOLN DEVELOPMENTAL CENTER
3 For upgrading the architectural and mechanical
4 systems, in addition to funds
5 previously appropriated ...................... 1,447,272
6 For installation of a code compliance
7 generator .................................... 104,396
8 For rehabilitation of the coal bunker
9 in the Powerhouse ............................ 261,000
10 For installation of rethermalization food
11 service system ............................... 634,439
12 For expansion of the sprinkler system in
13 four buildings ............................... 185,080
14 For renovation of the boilers, replacement of
15 controls and tuckpointing the exterior ....... 131,945
16 For installation of air conditioning in
17 Coty and Dietary Buildings ................... 44,883
18 For upgrading the HVAC systems, including
19 chillers ..................................... 32,362
20 LUDEMAN DEVELOPMENTAL CENTER
21 For renovation of residences ................... 690,135
22 For renovation of residences ................... 783,000
23 For renovation of restrooms for accessibility
24 in two buildings ............................. 114,608
25 For renovation of bathrooms in 15 residences ... 157,589
26 For installation of automatic sprinkler
27 and fire alarm system ........................ 9,133
28 MADDEN MENTAL HEALTH CENTER - HINES
29 For renovation of pavilions .................... 370,000
30 For upgrading residences for safety and
31 security ..................................... 296,744
32 For replacement of a cooling tower and
33 chiller ...................................... 247,435
34 For installation of return air fan systems ..... 10,095
-60- BOB-CAPITAL98
1 For replacement of hot water heaters ........... 121,899
2 For upgrade of the central kitchen and
3 renovation of eight pavilions ................ 1,949
4 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
5 For renovation of a residential building ....... 481,890
6 For replacement of the HVAC control panel ...... 183,612
7 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
8 For replacement of cooling towers .............. 21,161
9 For installation of fire safety systems ........ 803,861
10 For replacement of the boiler shell and
11 controls ..................................... 5,747
12 For rehabilitation of the hot water
13 distribution system .......................... 48,665
14 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
15 For replacement of the roof and masonry repair,
16 in addition to funds previously
17 appropriated ................................. 62,953
18 For replacement of valves in the powerhouse .... 110,208
19 For replacement of electrical feeder cable ..... 167,385
20 For planning and beginning sewer and
21 manhole renovation ........................... 57,645
22 For rehabilitation of the boilers .............. 556,100
23 For planning and replacement of windows ........ 234,721
24 For installation of an emergency generator ..... 190,421
25 For upgrading fire safety systems in the
26 support buildings ............................ 240,671
27 For upgrading the HVAC system and installation
28 air conditioning in the Dietary Building ..... 36,733
29 For replacement of expansion joints in the
30 utility tunnels .............................. 86,267
31 For installation of air conditioning in
32 Building #704, in addition to funds
33 previously appropriated ...................... 108,049
34 For replacement of hot water tanks in the
-61- BOB-CAPITAL98
1 Laundry Building ............................. 89,146
2 For replacement of switches and switchgear,
3 in addition to funds previously
4 appropriated ................................. 29,460
5 For replacement of the water softener
6 system in the powerhouse ..................... 82,093
7 For replacement of cooling towers in
8 Buildings #100A and #100B .................... 107,298
9 For replacement of roofing systems and
10 renovation of the exterior in two
11 buildings .................................... 39,711
12 For replacement of the electrical switchgear
13 in the Power Plant ........................... 7,563
14 For planning the installation of an air
15 conditioning system for Building #704 ........ 45,376
16 For upgrading the HVAC system in the
17 Administration building and other
18 buildings .................................... 31,424
19 For installation of air conditioning in
20 Buildings #502 and #514 ...................... 186,259
21 For upgrading the electrical system ............ 15,706
22 For upgrade of the electrical distribution
23 system ....................................... 62,102
24 SINGER MENTAL HEALTH CENTER
25 For replacement of cooling tower, expansion
26 tanks and test absorbers ..................... 37,311
27 For replacement of the water main .............. 281,938
28 TINLEY PARK MENTAL HEALTH CENTER/
29 HOWE DEVELOPMENTAL CENTER
30 For renovating and making mechanical
31 improvements to Spruce Hall and Maple Hall ... 160,218
32 For planning the rehabilitation of the
33 electrical distribution system ............... 62,378
34 For installation of security screens, in
-62- BOB-CAPITAL98
1 addition to funds previously appropriated .... 59,414
2 For renovation for accessibility in four
3 buildings .................................... 559,415
4 For planning the sewer system renovation and
5 replacement of the rag catcher ............... 290,032
6 For renovation for fire and life safety in
7 three residences ............................. 460,646
8 For replacement of piping in Maple Hall ........ 28,576
9 For renovation of nursing stations and
10 medication rooms in three residences ......... 164,829
11 For replacement of the windows in nine
12 buildings .................................... 70,125
13 ZELLER MENTAL HEALTH CENTER
14 For renovation of Nurses' Stations and
15 seclusion rooms .............................. 872,540
16 For replacement of the heating and cooling
17 pumps ........................................ 10,803
18 STATEWIDE
19 ALTON/ELGIN
20 For construction of a forensic services complex
21 at Alton Mental Health Center and Elgin
22 Mental Health Center, in addition to funds
23 previously appropriated ...................... 433,152
24 For conducting the preliminary design to
25 construct, convert and/or rehabilitate
26 a forensic facility .......................... 94,918
27 STATEWIDE
28 For upgrading and rehabilitation of roads,
29 parking lots and drainage systems at the
30 following locations at the approximate
31 costs set forth below: ....................... 59,885
32 Chester Mental Health Center
33 For rehabilitation of the
34 drainage system and upgrading
-63- BOB-CAPITAL98
1 parking lots .......................59,885
2 For upgrading roads and parking lots at
3 the following locations at the
4 approximate costs set forth below: ........... 40,544
5 McFarland Mental Health Ctr ...........5,544
6 Shapiro Developmental Center .........35,000
7 For rehabilitation of water towers -
8 Murray and Chester ........................... 454,813
9 For replacement of roofs at the following
10 locations at the approximate costs set
11 forth below: ................................. 1,985,151
12 Alton Mental Health Center -
13 Five buildings ....................342,687
14 Choate Mental Health Center -
15 Three buildings ....................17,479
16 Choate Mental Health and
17 Developmental Center -
18 Five buildings .....................15,034
19 Chester Mental Health Center -
20 21 buildings .......................39,775
21 Elgin Mental Health Center -
22 Three buildings ....................52,000
23 Elgin Mental Health Center -
24 Six Buildings .....................115,000
25 Lincoln Developmental Center -
26 Three buildings ...................240,613
27 Lincoln Developmental Center -
28 Four buildings ......................6,601
29 Ludeman Developmental Center -
30 Support buildings ..................91,447
31 Ludeman Developmental Center-
32 Residences .........................22,158
33 Mabley Developmental Center -
34 One building ......................103,517
-64- BOB-CAPITAL98
1 Madden Mental Health Center -
2 Buildings and covered walkways .....72,822
3 McFarland Mental Health Center -
4 Three buildings ...................144,240
5 Meyer Mental Health Center -
6 One building ......................315,514
7 Shapiro Developmental Center -
8 Three buildings ...................187,000
9 Shapiro Developmental Center -
10 Two buildings ......................16,351
11 Shapiro Developmental Center -
12 Five buildings .....................67,831
13 Tinley Park Mental Health Center -
14 One building .......................26,048
15 Tinley Park Mental Health Center -
16 Oak Hall ..........................109,034
17 STATEWIDE - FIRE SAFETY
18 To renovate fire safety systems, including
19 installation of sprinklers, at the following
20 locations at the approximate costs set
21 forth below: ................................. 354,529
22 Anna Mental Health and
23 Developmental Center ...............12,318
24 Singer Mental Health and
25 Developmental Center ..............335,021
26 For fire safety and other work necessary to meet
27 state and federal certification standards for
28 the following projects:
29 For installation of sprinkler systems at
30 Chicago-Read Mental Health Center ............ 125,209
31 For installation of sprinkler systems at
32 Murray Developmental Center .................. 2,000
33 For installation of sprinkler systems at
34 Waukegan Developmental Center ................ 15,448
-65- BOB-CAPITAL98
1 Total, Section 9 $54,784,245
2 Section 9A. The following named amounts, or so much
3 thereof as may be necessary, and remain unexpended at the
4 close of business on June 30, 1997, from appropriations
5 heretofore made for such purposes in Article 77, Section 4B
6 of Public Act 89-0501, as amended, are reappropriated from
7 the Capital Development Fund to the Capital Development Board
8 for the Department of Human Services (formerly the Department
9 of Mental Health and Developmental Disabilities) for the
10 projects hereinafter enumerated:
11 STATEWIDE
12 For replacement of roofing systems at the
13 following locations at the approximate costs
14 set forth below: ............................. $ 2,333,900
15 Alton Mental Health Center ..........217,000
16 Choate Mental Health Center .........134,900
17 Chester Mental Health Center ......1,350,000
18 Fox Developmental Center ............101,000
19 Howe Developmental Center ...........166,000
20 Jacksonville Developmental Center ....21,000
21 Lincoln Developmental Center ........344,000
22 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
23 For rehabilitation of the central dietary ...... 1,950,000
24 For replacement of life/safety and
25 security system in a residential
26 building ..................................... 246,000
27 CHESTER MENTAL HEALTH CENTER - CHESTER
28 For installation of emergency generator
29 and upgrading EMS system ..................... 350,000
30 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
31 For renovating residential units, in
32 addition to funds previously
33 appropriated ................................. 2,171,000
-66- BOB-CAPITAL98
1 CHOATE MENTAL HEALTH CENTER - ANNA
2 For upgrading mechanical equipment, in
3 addition to funds previously
4 appropriated ................................... 837,000
5 For renovating a residential building,
6 in addition to funds previously
7 appropriated ................................. 2,334,000
8 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
9 For construction of an Adult Psychiatric
10 Building, in addition to funds previously
11 appropriated ................................. 3,681,000
12 For construction of roads, parking lots
13 and street lights ............................ 2,500,000
14 For upgrading and expanding the mechanical
15 infrastructure, in addition to funds
16 previously appropriated ...................... 4,500,000
17 For construction of a forensic services complex
18 at Elgin Mental Health Center, in addition
19 to funds previously appropriated ............. 4,815,500
20 FOX DEVELOPMENTAL CENTER - DWIGHT
21 For replacement of absorbers and
22 upgrading HVAC system ........................ 738,000
23 For renovation of dietary ...................... 843,000
24 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
25 For renovation of residential buildings ........ 2,561,000
26 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
27 For rehabilitation of bathrooms and
28 replacing doors .............................. 1,575,000
29 For rehabilitation of the electrical
30 distribution system, in addition to funds
31 previously appropriated ...................... 1,257,000
32 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
33 For installation of a rethermalization food
34 service system, in addition to funds
-67- BOB-CAPITAL98
1 previously appropriated ...................... 732,000
2 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
3 For renovation of residential buildings,
4 in addition to funds previously
5 appropriated ................................. 1,888,500
6 For rehabilitation of the roads and parking
7 areas and constructing walks ................. 800,000
8 MADDEN MENTAL HEALTH CENTER - HINES
9 For renovation of pavilions, in addition
10 to funds previously appropriated ............. 844,000
11 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
12 For replacement of the HVAC management
13 control panel, in addition to funds
14 previously appropriated ...................... 150,000
15 For rehabilitation of the dietary facility ..... 413,000
16 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
17 For replacement of the boiler
18 shells and controls, in addition
19 to funds previously appropriated ............. 132,000
20 For rehabilitation of the hot water
21 distribution system, in addition to
22 funds previously appropriated ................ 514,000
23 For replacement of cooling towers and
24 support beams, in addition to funds
25 previously appropriated ...................... 335,000
26 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
27 For completion of the HVAC system, in
28 addition to funds previously
29 appropriated ................................. 598,000
30 For replacement of boiler, in
31 addition to funds previously
32 appropriated ................................. 765,000
33 For replacement of electrical feeder
34 cable, in addition to the funds
-68- BOB-CAPITAL98
1 previously appropriated ...................... 586,000
2 For rehabilitation of sewers and
3 manholes, in addition to funds
4 previously appropriated ...................... 777,000
5 For replacement of water mains
6 and valves ................................... 1,826,000
7 SINGER MENTAL HEALTH CENTER - ROCKFORD
8 For replacement of absorbers ................... 746,000
9 TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY
10 For replacement of the bar screen and
11 renovating the sewer system, in
12 addition to funds previously appropriated .... 655,000
13 For rehabilitation of the electrical
14 distribution system, in addition to
15 funds previously appropriated ................ 2,250,000
16 ZELLER MENTAL HEALTH CENTER - PEORIA
17 For renovation of the nurses' stations,
18 in addition to funds previously
19 appropriated ................................. 1,720,000
20 Total, Section 9A $48,423,900
21 Section 9.1. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 1997, from appropriations and
24 reappropriations heretofore made for such purposes in
25 Article 77, Section 4A and Article 78, Section 9.1 of Public
26 Act 89-0501, are reappropriated from the General Revenue Fund
27 to the Capital Development Board for the Department of Human
28 Services (formerly the Department of Mental Health and
29 Developmental Disabilities) for the projects hereinafter
30 enumerated:
31 (From Article 77, Section 4A of Public Act 89-0501):
32 STATEWIDE
33 For repair of the exterior masonry
-69- BOB-CAPITAL98
1 walls, in addition to funds previously
2 appropriated ................................. $ 677,000
3 TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY
4 For rehabilitating exterior of
5 residential building at Tinley ............... 215,000
6 (From Article 78, Section 9.1 of Public Act 89-0501):
7 ALTON MENTAL HEALTH AND DEVELOPMENTAL CENTER
8 For upgrading the security system and
9 replacement of exit signs .................... 102,765
10 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
11 For renovation of turbines in the powerhouse ... 38,781
12 ELGIN MENTAL HEALTH CENTER
13 For repairing the exterior in five
14 buildings .................................... 42,287
15 JACKSONVILLE MENTAL HEALTH
16 AND DEVELOPMENTAL CENTER
17 For the demolition of Carriel Hall,
18 rerouting utility lines,
19 providing parking lot, and planning
20 the demolition of Building 41 ................ 136,050
21 LUDEMAN DEVELOPMENTAL CENTER
22 For renovation of 15 residences ................ 4,539
23 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
24 For replacement of the windows,
25 in addition to funds previously
26 appropriated ................................. 200,631
27 MCFARLAND MENTAL HEALTH CENTER
28 For replacement of doors, floor tile and
29 water pumps .................................. 15,749
30 TINLEY PARK MENTAL HEALTH
31 For repairing the exterior of Spruce Hall ...... 56,521
32 For installation of security screens in
33 Maple Hall ................................... 29,623
34 For replacement of windows in Spruce Hall
-70- BOB-CAPITAL98
1 (Building #28) ............................... 40,774
2 STATEWIDE
3 For repair of the exterior masonry walls
4 at Fox, Shapiro and Tinley Park/Howe ......... 288,920
5 For the following projects at the approximate
6 costs set forth below: ....................... 40,733
7 Elgin Mental Health Center
8 For improvements to roads and
9 parking areas ......................14,658
10 Madden Mental Health Center
11 For handicapped accessibility
12 improvements in the
13 Administration Building ............42,000
14 STATEWIDE
15 For road resurfacing and parking lots at
16 the following locations at the approximate
17 costs set forth below: ....................... 27,891
18 Meyer Mental Health and
19 Developmental Center ...............27,891
20 STATEWIDE - FIRE SAFETY
21 For renovation of fire safety systems at the
22 following locations at the approximate
23 costs set forth below: ....................... 144,170
24 Choate Mental Health and
25 Developmental Center ................1,547
26 Chicago Read Mental Health Ctr .......83,125
27 Madden Mental Health Center ..........39,977
28 Murray Developmental Center ..........17,400
29 Singer Mental Health and
30 Developmental Center ..................200
31 Kiley Developmental Center ............1,921
32 For fire safety and other work necessary to meet
33 state and federal certification standards for
34 the following projects:
-71- BOB-CAPITAL98
1 For installation of smoke detection systems,
2 fire doors, and other fire safety and
3 certification improvements at Chicago
4 Read Mental Health Center .................... 9,574
5 For installation of smoke detection systems,
6 smoke compartmentation, and other fire
7 safety and certification improvements at
8 Murray Developmental Center .................. 324,774
9 For installation of smoke detection systems,
10 extension of corridor walls to roof deck,
11 and certification improvements at Kiley
12 Developmental Center ......................... 1,894
13 Total, Section 9.1 $2,397,676
14 Section 10. The following named amounts, or so much
15 thereof as may be necessary and remain unexpended at the
16 close of business on June 30, 1997, from reappropriations
17 heretofore made for such purposes in Article 77, Section 5,
18 and Article 78, Section 10 of Public Act 89-0501, are
19 reappropriated from the Capital Development Fund to the
20 Capital Development Board for the Department of Military
21 Affairs for the projects hereinafter enumerated:
22 (From Article 78, Section 10 of Public Act 89-0501):
23 AURORA ARMORY
24 For planning an armory ......................... $ 85,528
25 BLOOMINGTON ARMORY
26 For rehabilitation of the exterior and
27 upgrading interior ........................... 40,179
28 BROADWAY AVENUE ARMORY
29 For replacement of the steam distribution
30 system, including two boilers ................ 154,256
31 CAMP LINCOLN - SPRINGFIELD
32 For site improvements and construction for
33 a military academy facility, including
-72- BOB-CAPITAL98
1 repair and reconstruction of access
2 roads and drives at Camp Lincoln ............. 24,062
3 For planning, design, site improvements, and
4 other costs associated with the conversion
5 of the old "Castle" or Commissary Building
6 for use as a military museum ................. 160,013
7 DANVILLE ARMORY
8 For planning and construction of a new armory .. 1,070,000
9 DECATUR ARMORY
10 For the state's share for additional planning
11 and construction of a new armory and
12 Organizational Maintenance Shop .............. 18,890
13 DIXON ARMORY
14 For rehabilitation of the parking lot,
15 including the drive and walks ................ 128,007
16 DONNELLEY BUILDING
17 For the rehabilitation and renovation of
18 the Donnelley Building and purchase of
19 land for parking ............................. 582,894
20 GENERAL JONES ARMORY
21 For renovation of the exterior and interior,
22 mechanical areas and expansion of the
23 parking lot, in addition to amounts
24 previously appropriated ...................... 3,087,903
25 For renovation of the exterior, including
26 windows ...................................... 139,856
27 For replacement of the Assembly Hall
28 roofing system including its structural
29 system ....................................... 606,528
30 For renovation of the armory, including
31 equipment, in addition to amounts
32 previously appropriated ...................... 51,216
33 For renovation of the armory, including
34 equipment, in addition to amounts
-73- BOB-CAPITAL98
1 previously appropriated for this purpose ..... 13,655
2 For the state's share for renovation ........... 11,964
3 KANKAKEE ARMORY
4 For providing the State's share for
5 construction of an Armory and Army
6 Reserve Center, including equipment .......... 14,752
7 For the state's share for planning an
8 armory and Army Reserve Center ............... 2,064
9 KEWANEE ARMORY
10 For replacement of windows ..................... 4,091
11 LITCHFIELD ARMORY
12 For rehabilitation of exterior and upgrading
13 the interior ................................. 253,930
14 MACHESNEY PARK ARMORY (ROCKFORD)
15 For moveable equipment for the new armory ...... 12,864
16 For the state's share for additional planning
17 and construction of an armory and
18 Organizational Maintenance Shop .............. 226,706
19 MARSEILLES ARMORY
20 For planning four buildings and
21 wastewater facilities ........................ 8,403
22 NORTHWEST ARMORY - CHICAGO
23 For planning interior and exterior renovation .. 3,000
24 PARIS ARMORY
25 For rehabilitation of the exterior and
26 upgrading the interior ....................... 393,000
27 PEORIA ARMORY
28 For providing the State's share for
29 construction of an armory and Army
30 Reserve Center, including equipment .......... 5,596
31 ROCK FALLS ARMORY
32 For replacement of windows and exterior
33 doors ........................................ 5,693
34 ROCK ISLAND ARMORY
-74- BOB-CAPITAL98
1 For construction of an armory and
2 maintenance shop ............................. 230,028
3 SAUK AREA CAREER SCHOOL - CRESTWOOD
4 For the purchase and renovation of the
5 former Sauk Area Career School, converting
6 to an armory and upgrading the parking
7 lot .......................................... 262,752
8 SPRINGFIELD - CAMP LINCOLN
9 For construction of a military academy
10 facility ..................................... 642,870
11 For rehabilitation of the mechanical systems
12 and interior ................................. 101,210
13 STREATOR ARMORY
14 For renovation of mechanical systems ........... 288,776
15 SYCAMORE ARMORY
16 For rehabilitation of the mechanical systems ... 60,374
17 URBANA ARMORY
18 For the state's share for rehabilitation
19 of the armory, including asbestos
20 abatement, in addition to amounts
21 previously appropriated for such
22 purpose ...................................... 2,630
23 WAUKEGAN ARMORY
24 For renovation of exterior walls, and
25 replacement of doors and windows ............. 445,263
26 WEST FRANKFORT ARMORY
27 For remodeling and installation of a kitchen ... 73,678
28 WILLIAMSON COUNTY ARMORY
29 For providing the State's share for planning
30 and construction of a new armory, in
31 addition to amounts previously
32 appropriated ................................. 15,686
33 WOODSTOCK ARMORY
34 For construction of an armory and purchase
-75- BOB-CAPITAL98
1 of equipment ................................. 46,019
2 For the state's share for additional planning
3 and construction of an armory ................ 7,940
4 STATEWIDE
5 (From Article 77, Section 5 of Public Act 89-0501):
6 For replacement of roofs at the
7 following locations at the
8 approximate costs set forth below: ........... 477,000
9 Paris Armory ........................101,000
10 Joliet Armory .......................103,000
11 Litchfield Armory ...................102,000
12 Springfield Military Academy ........171,000
13 (From Article 78, Section 10 of Public Act 89-0501):
14 For replacement of roofs at the following
15 locations at the approximate costs set
16 forth below .................................. 219,462
17 Camp Lincoln - AGO Building .......100,000
18 Mt. Vernon Armory .................125,485
19 For installation of kitchens and renovation
20 of the interiors at the following locations
21 at the approximate costs set forth below: .... 175,008
22 Carbondale Armory ..................29,756
23 Dixon Armory ......................120,000
24 Elgin Armory .......................50,000 ____________
25 Total, Section 10 $10,153,746
26 Section 10A. The following named amounts, or so much
27 thereof as may be necessary, and remain unexpended at the
28 close of business on June 30, 1997, from appropriations
29 heretofore made for such purposes in Article 77, Section 5A
30 of Public Act 89-0501, as amended, are reappropriated from
31 the Capital Development Fund to the Capital Development Board
32 for the Department of Military Affairs for the projects
33 hereinafter enumerated:
-76- BOB-CAPITAL98
1 NORTHWEST ARMORY - CHICAGO
2 For renovation of interior and exterior,
3 in addition to funds previously
4 appropriated for such purposes ............... 1,200,000
5 DIXON ARMORY - LEE COUNTY
6 For construction of an addition,
7 remodeling, extending utilities and
8 installing a kitchen ......................... 280,000
9 SALEM ARMORY - MARION COUNTY
10 For replacement of the boiler and
11 all domestic plumbing, piping and
12 fixtures ..................................... 800,000
13 STREATOR ARMORY - LASALLE COUNTY
14 For renovation of the mechanical
15 systems, in addition to funds
16 previously appropriated ...................... 450,000
17 Total, Section 10A $2,730,000
18 Section 10.1. The following named amounts, or so much
19 thereof as may be necessary and remain unexpended at the
20 close of business on June 30, 1997, from reappropriations
21 heretofore made for such purposes in Article 78, Section 10.1
22 of Public Act 89-0501, are reappropriated from the General
23 Revenue Fund to the Capital Development Board for the
24 Department of Military Affairs for the projects hereinafter
25 enumerated:
26 STATEWIDE
27 For the following projects at the approximate
28 costs set forth below: ....................... $ 86,000
29 Broadway Armory - Chicago
30 For repair of the heating
31 system .............................50,000
32 Freeport Armory
33 For renovation of the armory
-77- BOB-CAPITAL98
1 and parking area, including
2 installation of a security
3 fence ..............................36,000 ____________
4 Total, Section 10.1 $86,000
5 Section 11. The following named amounts, or so much
6 thereof as may be necessary and remain unexpended at the
7 close of business on June 30, 1997, from reappropriations
8 heretofore made for such purposes in Article 78, Section 11
9 of Public Act 89-0501, are reappropriated from the Capital
10 Development Fund to the Capital Development Board for the
11 Department of Human Services (formerly the Department of
12 Rehabilitation Services for the projects hereinafter
13 enumerated:
14 ILLINOIS SCHOOL FOR THE DEAF
15 JACKSONVILLE
16 For retubing boilers ........................... $ 30,978
17 For construction of a Vocational Auto Body
18 and Service Facility ......................... 403,161
19 For replacement of the HVAC system ............. 430,111
20 For replacement of water lines and fire
21 hydrants ..................................... 325,962
22 For replacement of HVAC system in
23 Building #6 .................................. 167,900
24 For construction of an addition to Unit #5 ..... 2,009,319
25 For rehabilitation of the domestic hot and
26 cold water piping in six buildings ........... 653,705
27 For replacement of domestic hot water tanks
28 in seven buildings ........................... 34,157
29 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED
30 JACKSONVILLE
31 For completion of the boiler system
32 conversion, in addition to funds
33 previously appropriated ...................... 8,222
-78- BOB-CAPITAL98
1 For replacement of Buildings 5 and 6 for
2 an Independent Living Center ................. 1,322,023
3 Total, Section 11 $5,385,538
4 Section 11A. The following named amounts, or so much
5 thereof as may be necessary, and remain unexpended at the
6 close of business on June 30, 1997, from appropriations
7 heretofore made for such purposes in Article 77, Section 7A
8 of Public Act 89-0501, as amended, are reappropriated from
9 the Capital Development Fund to the Capital Development Board
10 for the Department of Human Services (formerly the Department
11 of Rehabilitation Services) for the projects hereinafter
12 enumerated:
13 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
14 For upgrading campus lighting .................. $ 150,000
15 For the renovation of Building No. 4 ........... 700,000
16 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
17 For replacement of roofing systems ............. 535,000
18 For planning the upgrade of the heat
19 and smoke detection system ................... 100,000
20 For the renovation of Cullom Hall .............. 2,100,000
21 Total, Section 11A $3,585,000
22 Section 11.1. The following named amounts, or so much
23 thereof as may be necessary and remain unexpended at the
24 close of business on June 30, 1997, from appropriations in
25 Article 77, Section 7, and Article 78, Section 11.1 of Public
26 Act 89-0501, are reappropriated from the General Revenue Fund
27 to the Capital Development Board for the Department of Human
28 Services (formerly the Department of Rehabilitation Services)
29 for the project hereinafter enumerated:
30 (From Article 77, Section 7 of Public Act 89-0501):
31 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
32 For replacing gutters and downspouts
-79- BOB-CAPITAL98
1 and tuckpointing at the Gym/Pool
2 Building ..................................... $ 25,000
3 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
4 For retubing boiler, in addition
5 to funds previously appropriated ............. 250,000
6 For renovation of buildings and lead
7 paint abatement .............................. 700,000
8 (From Article 78, Section 11.1 of Public Act 89-0501):
9 STATEWIDE
10 For energy conservation improvements
11 for the Illinois School for the Deaf,
12 Jacksonville and the Illinois School
13 for the Visually Impaired, Jacksonville ...... 150,000
14 Total, Section 11.1 $1,125,000
15 Section 12. The following named amount, or so much
16 thereof as may be necessary and remain unexpended at the
17 close of business on June 30, 1997, from a reappropriation
18 heretofore made for such purposes in Article 78, Section 12
19 of Public Act 89-0501, is reappropriated from the Capital
20 Development Fund to the Capital Development Board for the
21 Department of Revenue for the project hereinafter enumerated:
22 REVENUE BUILDING - SPRINGFIELD
23 For planning for UPS upgrade and for renovation
24 of an interior landscape structure ........... $ 16,336
25 Total, Section 12 $16,336
26 Section 12A. The following named amounts, or so much
27 thereof as may be necessary, and remain unexpended at the
28 close of business on June 30, 1997, from appropriations
29 heretofore made for such purposes in Article 77, Section 8A
30 of Public Act 89-0501, as amended, are reappropriated from
31 the Capital Development Fund to the Capital Development Board
32 for the Department of Revenue for the project hereinafter
-80- BOB-CAPITAL98
1 enumerated:
2 WILLARD ICE BUILDING - SPRINGFIELD
3 For completion of the replacement of the
4 fire alarm and security system ............... $ 70,000
5 For upgrade of the uninterruptible
6 power system ................................. 1,300,000
7 For completion of the renovation of
8 the atrium landscaping ....................... 100,000
9 Total, Section 12A $1,470,000
10 Section 12.1. The following named amount, or so much
11 thereof as may be necessary and remains unexpended at the
12 close of business on June 30, 1997, from a reappropriation
13 heretofore made for such purposes in Article 77, Section 8 of
14 Public Act 89-0501, is reappropriated from the General
15 Revenue Fund to the Capital Development Board for the
16 Department of Revenue for the project hereinafter enumerated:
17 WILLARD ICE BUILDING - SPRINGFIELD
18 For planning to eliminate atrium
19 window leakage ............................... $ 15,000
20 Total, Section 12.1 $15,000
21 Section 13. The following named amount, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 1997, from reappropriations
24 heretofore made for such purposes in Article 77, Section 29
25 and Article 78, Section 13 of Public Act 89-0501, is
26 reappropriated from the Capital Development Fund to the
27 Capital Development Board for the Secretary of State for the
28 project hereinafter enumerated:
29 (From Article 78, Section 13 of Public Act 89-0501):
30 SPRINGFIELD - RECORDS CENTER
31 For correcting water infiltration in the
32 basement ..................................... $ 7,012
-81- BOB-CAPITAL98
1 Total, Section 13 $7,012
2 Section 14. The following named amounts, or so much
3 thereof as may be necessary and remain unexpended at the
4 close of business on June 30, 1997, from reappropriations
5 heretofore made for such purposes in Article 77, Section 9
6 and Article 78, Section 14 of Public Act 89-0501, are
7 reappropriated from the Capital Development Fund to the
8 Capital Development Board for the Department of State Police
9 for the projects hereinafter enumerated:
10 (From Article 77, Section 9 of Public Act 89-0501):
11 STATEWIDE
12 For replacing the roofing and roof
13 drainage systems at various facilities
14 at the approximate costs set forth
15 below ........................................ $ 198,000
16 District #8, Metamora ................105,000
17 District #10, Pesotum .................93,000
18 DISTRICT 1, HEADQUARTERS - STERLING
19 For planning, construction, reconstruction,
20 demolition of existing buildings, and
21 all costs related to the relocation of
22 the headquarters, in addition to funds
23 previously appropriated ...................... 3,811,000
24 (From Article 78, Section 14 of Public Act 89-0501):
25 CAIRO (ULLIN) - DISTRICT 22
26 For construction of a firing range and radio
27 tower ........................................ 537,480
28 For planning, land acquisition, construction
29 and equipment for a new headquarters ......... 10,031
30 CARMI - DISTRICT 19 HEADQUARTERS
31 (From Article 77, Section 9 of Public Act 89-0501):
32 For rehabilitation of headquarters
33 facilities ................................... 350,000
-82- BOB-CAPITAL98
1 (From Article 78, Section 14 of Public Act 89-0501):
2 For planning rehabilitation of
3 Headquarters facilities ...................... 60,000
4 CHICAGO FORENSIC LABORATORY
5 For construction of a laboratory and
6 parking facilities ........................... 567,408
7 DU QUOIN - DISTRICT 13
8 For planning the rehabilitation of the
9 headquarters, including the parking
10 lot and range ................................ 66,901
11 EAST MOLINE - DISTRICT 7
12 For rehabilitation of the headquarters
13 facilities and replacement of the
14 radio garage ................................. 112,873
15 JOLIET - DISTRICT 5
16 For rehabilitation of the headquarters
17 facilities .................................. 18,188
18 LITCHFIELD - DISTRICT 18 HEADQUARTERS
19 For planning rehabilitation of
20 Headquarters facilities ...................... 38,218
21 SPRINGFIELD - STATE POLICE TRAINING ACADEMY
22 For rehabilitation of the facility, including
23 replacement of the HVAC system and
24 installation of an elevator .................. 257,022
25 STERLING - DISTRICT 1
26 For land acquisition, planning, construction,
27 reconstruction, demolition of existing
28 buildings, and all costs related to the
29 relocation of the District 1 Police
30 Headquarters in Sterling ..................... 335,755
31 Total, Section 14 $6,362,876
32 Section 14A. The following named amounts, or so much
33 thereof as may be necessary, and remain unexpended at the
-83- BOB-CAPITAL98
1 close of business on June 30, 1997, from appropriations
2 heretofore made for such purposes in Article 77, Section 9A
3 of Public Act 89-0501, as amended, are reappropriated from
4 the Capital Development Fund to the Capital Development Board
5 for the Department of State Police for the projects
6 hereinafter enumerated:
7 For replacing radio communication
8 towers, equipment, buildings and
9 installing emergency power
10 generators at various locations .............. $ 1,150,000
11 District #22, Effingham (Mason site)
12 District #10, Pesotum
13 District #21, Askum
14 District #6, Pontiac
15 DISTRICT 18 HEADQUARTERS - LITCHFIELD
16 For rehabilitation of headquarters facilities .. 377,000
17 Total, Section 14A $1,527,000
18 Section 15. The following named amounts, or so much
19 thereof as may be necessary and remain unexpended at the
20 close of business on June 30, 1997, from reappropriations
21 heretofore made for such purposes in Article 78, Section 15
22 of Public Act 89-0501, are reappropriated from the Capital
23 Development Fund to the Capital Development Board for the
24 Department of Veterans' Affairs for the projects hereinafter
25 enumerated:
26 ANNA CENTER
27 For purchasing equipment, in addition to funds
28 previously appropriated ...................... $ 56,160
29 For renovating or constructing new facilities
30 to serve as a Veterans' Center at the Anna
31 Mental Health and Developmental Center ....... 4,825
32 LASALLE VETERANS CARE FACILITY
33 For weatherproofing the building and providing
-84- BOB-CAPITAL98
1 storage space ................................ 178,380
2 For installation of a medical gas system
3 and for additional funding for a
4 Special Care Unit ............................ 74,237
5 For installation of door alarm systems ......... 40,000
6 ILLINOIS VETERANS' HOME - MANTENO
7 For planning the construction of a special
8 care facility ................................ 99,845
9 For replacement of roofs and upgrade
10 of sewer system, in addition to funds
11 previously appropriated ...................... 516,685
12 For rehabilitation of the fire alarm system .... 21,752
13 For reinforcement and sealing off of sections
14 of utility tunnels ........................... 126,884
15 For air conditioning the interconnects ......... 45,280
16 For replacement of the roof on Kilbourne,
17 Meyers and Billings and upgrade
18 of sewer system, in addition to
19 funds previously appropriated ................ 88,363
20 ILLINOIS VETERANS' HOME - QUINCY
21 For repairing streets and a bridge ............. 147,163
22 For renovation and replacement of power plant
23 equipment .................................... 489,162
24 For providing a chilled water cooling system
25 loop ......................................... 18,898
26 For installation of humidification in two
27 buildings .................................... 25,000
28 For construction of a Therapy Building and
29 renovation of the Kent Building entrance,
30 in addition to funds previously
31 appropriated ................................. 28,536
32 Total, Section 15 $1,961,170
33 Section 15A. The following named amounts, or so much
-85- BOB-CAPITAL98
1 thereof as may be necessary, and remain unexpended at the
2 close of business on June 30, 1997, 0rom appropriations
3 heretofore made for such purposes in Article 77, Section 24A
4 of Public Act 89-0501, as amended, are reappropriated from
5 the Capital Development Fund to the Capital Development Board
6 for the Department of Veterans' Affairs for the project
7 hereinafter enumerated:
8 ILLINOIS VETERANS' HOME - MANTENO
9 For construction of a special care facility .... $5,550,000
10 ILLINOIS VETERANS' HOME - QUINCY
11 For upgrading HVAC system ...................... 254,000
12 For replacing steam lines ...................... 83,000
13 For replacing the domestic hot water loop ...... 305,000
14 For renovating the elevator .................... 197,000
15 Total, Section 15A $6,389,000
16 Section 15.1. The following named amounts, or so much
17 thereof as may be necessary and remains unexpended at the
18 close of business on June 30, 1997, from reappropriations
19 heretofore made for such purpose in Article 78, Section 15.1
20 of Public Act 89-0501, are reappropriated from the General
21 Revenue Fund to the Capital Development Board for the
22 Department of Veterans' Affairs for the project hereinafter
23 enumerated:
24 ILLINOIS VETERANS' HOME - MANTENO
25 For stabilization of the Billings, Kilbourne,
26 and Meyers Buildings and upgrade of
27 sewer system, in addition to funds
28 previously appropriated ...................... $ 40,231
29 For replacement of sewer lines, repair and
30 replacement of bar screens, and
31 rehabilitation of the water tower and
32 reservoir .................................... 292,000
33 Total, Section 15.1 $332,231
-86- BOB-CAPITAL98
1 Section 16. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1997, from appropriations and
4 reappropriations heretofore made for such purposes in Article
5 77, Section 10 and Article 78, Section 16 of Public Act
6 89-0501, are reappropriated from the Capital Development Fund
7 to the Capital Development Board for the projects hereinafter
8 enumerated:
9 (From Article 78, Section 16 of Public Act 89-0501):
10 ATTORNEY GENERAL BUILDING - SPRINGFIELD
11 For planning energy improvements and upgrading
12 HVAC and electrical systems .................. $ 76,535
13 CHICAGO
14 For public library construction, acquisition,
15 development, reconstruction and improvements
16 to the Logan Square Branch Library ........... 41,477
17 For the planning, construction, and
18 improvement of the Hegewish Branch
19 Library ...................................... 43,051
20 For the planning, construction, and
21 improvement of the Legler Branch
22 Library ...................................... 16,129
23 ELGIN APPELLATE COURT BUILDING
24 For upgrading the HVAC system .................. 27,532
25 MT. VERNON APPELLATE COURT BUILDING
26 For installation of a security system .......... 27,284
27 For rehabilitation of the exterior, in addition
28 to funds previously appropriated ............. 19,193
29 SPRINGFIELD - SUPREME COURT BUILDING
30 For replacement of side walls and steps, in addition
31 to funds previously appropriated ............. 203,495
32 For rehabilitation of the facility ............. 208,208
33 SPRINGFIELD - EXECUTIVE MANSION
34 For renovation of the interior, exterior
-87- BOB-CAPITAL98
1 and site ..................................... 12,337
2 SPRINGFIELD - CAPITOL COMPLEX
3 (From Article 77, Section 10 of Public Act 89-0501):
4 For upgrading the life/safety and security
5 systems - Capitol Building ................... 2,200,000
6 For upgrading the refrigeration equipment -
7 Capitol Complex .............................. 3,466,000
8 For renovating mechanical system -
9 Capitol Complex, in addition to funds
10 previously appropriated ...................... 3,473,000
11 (From Article 78, Section 16 of Public Act 89-0501):
12 For planning the upgrade of environmental
13 equipment and HVAC ........................... 67,380
14 For renovation of mechanical systems, in
15 addition to funds previously appropriated .... 1,078,236
16 For upgrading the elevators .................... 1,090,105
17 For planning and beginning sewer
18 rehabilitation ............................... 34,625
19 For planning the mechanical system
20 renovation ................................... 56,705
21 For upgrading the refrigeration equipment ...... 90,117
22 For renovation of the second floor of the
23 Old Powerhouse for the Emergency Manage-
24 ment Agency .................................. 30,861
25 For completion of an emission control system
26 at the Power Plant, in addition to funds
27 previously appropriated ...................... 23,913
28 For providing a parking facility for the
29 Bloom and Harris Buildings, including
30 land acquisition ............................. 280,975
31 For all costs associated with the design
32 and planning for asbestos abatement,
33 window replacement, energy conservation
34 improvements, replacement of carpeting and
-88- BOB-CAPITAL98
1 ceiling tiles, handicap accessibility
2 improvements, and rehabilitation of the
3 water and air distribution systems in the
4 Stratton Office Building ..................... 3,933,020
5 For planning and design of the rehabilitation
6 of the Springfield Armory .................... 1,056,638
7 For renovation of the Waterways Building for
8 the Fourth District of the Appellate Court ... 3,701,859
9 SPRINGFIELD - SIU CONSOLIDATED LABORATORIES
10 For construction of an addition to the
11 laboratory facility for Southern Illinois
12 University, Environmental Protection Agency
13 and Department of Public Health .............. 727,459
14 STATEWIDE
15 (From Article 77, Section 10 of Public Act 89-0501):
16 For abatement of hazardous materials ........... 5,935,894
17 For upgrade and remediation of
18 underground storage tanks .................... 9,888,330
19 For survey for and abatement of
20 asbestos-containing materials ................ 2,000,000
21 For upgrade/retrofit of mechanized
22 refrigeration equipment (CFC's) .............. 7,000,000
23 (From Article 78, Section 16 of Public Act 89-0501):
24 For abatement of hazardous conditions,
25 including underground storage tanks,
26 in addition to funds previously
27 appropriated ................................. 2,750,560
28 For surveys and modifications to buildings
29 to meet requirements of the federal
30 Americans with Disabilities Act .............. 54,507,413
31 For demolition of buildings .................... 4,884,914
32 For retrofitting/upgrading mechanical
33 refrigeration equipment ...................... 3,283,653
34 For planning quick chill food factories ........ 154,678
-89- BOB-CAPITAL98
1 STATEWIDE - UNDERGROUND STORAGE TANKS
2 For abating hazardous conditions, including
3 underground storage tanks, in addition to
4 funds previously appropriated ................ 220,563
5 For the planning, upgrade and replacement of
6 potentially hazardous underground storage
7 tanks ........................................ 1,325,572
8 STATEWIDE - ASBESTOS SURVEY
9 For surveys and abatement of asbestos-
10 containing materials ......................... 1,518,716
11 STATEWIDE - ASBESTOS ABATEMENT
12 For asbestos abatement located during
13 Asbestos Abatement Authority and other
14 surveys to eliminate significant health
15 hazards ...................................... 520,795
16 For planning and abatement of asbestos, and
17 replenishment of initial project
18 construction costs in bondable projects
19 at various state owned facilities ............ 627,492
20 Total, Section 16 $116,604,714
21 Section 16A. The following named amounts, or so much
22 thereof as may be necessary, and remain unexpended at the
23 close of business on June 30, 1997, from appropriations
24 heretofore made for such purposes in Article 77, Section 10B
25 of Public Act 89-0501, as amended, are reappropriated from
26 the Capital Development Fund to the Capital Development Board
27 for the Capital Development Board for the projects
28 hereinafter enumerated:
29 STATEWIDE
30 For renovation to meet the requirements
31 of the Americans with Disabilities Act ....... $ 3,000,000
32 CAPITOL COMPLEX - SPRINGFIELD
33 For energy improvements and upgrading the
-90- BOB-CAPITAL98
1 HVAC, security and electrical systems,
2 in addition to funds previously
3 appropriated - Attorney General's
4 Building ..................................... 225,000
5 To renovate the interior, exterior and
6 site improvements, in addition to
7 funds previously appropriated -
8 Executive Mansion ............................ 190,000
9 For upgrading environmental equipment
10 and HVAC, in addition to funds previously
11 appropriated - Archives Building ............. 2,150,000
12 For planning and beginning the rehabilitation
13 of the Power Plant ........................... 3,805,000
14 For upgrading sewer system - Capitol Complex,
15 in addition to funds previously
16 appropriated ................................. 2,100,000
17 For renovation of the lower level and
18 ground floor, in addition to funds
19 previously appropriated - Old Power Plant .... 2,180,000
20 Total, Section 16A $13,650,000
21 Section 16.1. The amount of $14,122, or so much thereof
22 as may be necessary and remains unexpended at the close of
23 business on June 30, 1997, from a reappropriation heretofore
24 made for such purpose in Article 78, Section 16.1 of Public
25 Act 89-0501, is reappropriated from the Capital Development
26 Fund to the Capital Development Board for a grant to the
27 Village of Bath for costs associated with sewer development.
28 Section 16.2. The amount of $51,193, or so much thereof
29 as may be necessary and remains unexpended at the close of
30 business on June 30, 1997, from a reappropriation heretofore
31 made for such purpose in Article 78, Section 16.2 of Public
32 Act 89-0501, is reappropriated from the Capital Development
-91- BOB-CAPITAL98
1 Fund to the Capital Development Board for planning,
2 construction and equipment for a joint laboratory facility
3 for the Illinois Environmental Protection Agency, the
4 Department of Public Health, and the Southern Illinois
5 University School of Medicine at the SIU Medical Facility in
6 Springfield.
7 Section 16.3. The amount of $35,153, or so much thereof
8 as may be necessary and remains unexpended at the close of
9 business on June 30, 1997, from a reappropriation heretofore
10 made for such purpose in Article 78, Section 16.3 of Public
11 Act 89-0501, is reappropriated from the Capital Development
12 Fund to the Capital Development Board for miscellaneous
13 capital improvements at any state supported university and
14 community college including construction, reconstruction,
15 remodeling, improvement, repair and installation of capital
16 facilities, costs of planning, supplies, equipment,
17 materials, services, and all other expenses required to
18 complete the work. This appropriation shall be in addition to
19 any other appropriated amounts which can be expended for
20 these purposes.
21 Section 17. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 1997, from appropriations and
24 reappropriations heretofore made for such purposes in Article
25 77, Section 10A and Article 78, Section 17 of Public Act
26 89-0501, are reappropriated from the General Revenue Fund to
27 the Capital Development Board for the projects hereinafter
28 enumerated:
29 STATEWIDE
30 (From Article 77, Section 10A of Public Act 89-0501):
31 For repair of minor problems and
32 emergencies .................................. $ 3,484,742
-92- BOB-CAPITAL98
1 For tuckpointing and exterior repair
2 of state buildings ........................... 613,000
3 For surveys for asbestos containing
4 material ..................................... 500,000
5 For construction site archaeological
6 studies ...................................... 140,822
7 (From Article 78, Section 17 of Public Act 89-0501):
8 For survey of asbestos-containing
9 materials .................................... $ 473,014
10 For repairing minor problems and for
11 emergencies, in addition to funds
12 previously appropriated ...................... 518,013
13 For repairing minor problems and emergencies
14 for agencies ................................. 405,604
15 For the planning and abatement of asbestos
16 hazards, and replenishment of initial
17 project construction costs in
18 non-bondable projects at various
19 state owned facilities ....................... 579,194
20 Total, Section 17 $6,714,389
21 Section 17.4. The sum of $244,925, or so much of that
22 amount as may be necessary and remains unexpended at the
23 close of business on June 30, 1997, from an appropriation
24 heretofore made for such purposes in Article 77, Section 24
25 of Public Act 89-0501, is reappropriated to the Capital
26 Development Board from the General Revenue Fund for the
27 planning and construction of the Anna Veterans Home visitor
28 center.
29 Section 18. The following named amounts, or so much
30 thereof as may be necessary and remain unexpended at the
31 close of business on June 30, 1997, from reappropriations
32 heretofore made for such purposes in Article 78, Section 18
-93- BOB-CAPITAL98
1 of Public Act 89-0501, are reappropriated from the School
2 Construction Fund to the Capital Development Board for school
3 construction:
4 For school districts having a population
5 exceeding 500,000 ............................ $ 541,156
6 For school districts having a population
7 of less than 500,000 ......................... 72,093
8 Total, Section 18 $613,249
9 Section 18.1 The amount of $1,358,950, or so much
10 thereof as may be necessary and remains unexpended at the
11 close of business on June 30, 1997 from a reappropriation
12 heretofore made for such purposes in Article 78, Section 18.1
13 of Public Act 89-0501, is reappropriated from the School
14 Construction Fund to the Capital Development Board for the
15 State Board of Education for grants to Chicago School
16 District 299 for planning, purchase and construction of
17 additions to schools and all other expenses associated with
18 such, at overcrowded subdistricts.
19 Section 19. The sum of $318,675, or so much thereof as
20 may be necessary and remains unexpended at the close of
21 business on June 30, 1997, from a reappropriation heretofore
22 made for such purposes in Article 78, Section 19 of Public
23 Act 89-0501, is reappropriated from the Asbestos Abatement
24 Fund to the Capital Development Board for asbestos surveys in
25 relation to the asbestos abatement of State Governmental
26 Buildings.
27 Section 20. The following named amounts, or so much
28 thereof as may be necessary and remain unexpended at the
29 close of business on June 30, 1997, from reappropriations
30 heretofore made for such purposes in Article 78, Section 20
31 of Public Act 89-0501, are reappropriated from the Capital
-94- BOB-CAPITAL98
1 Development Fund to the Capital Development Board for the
2 Board of Higher Education for the projects hereinafter
3 enumerated:
4 ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
5 For remodeling the Information Resource
6 Technology Center ............................ $ 144,327
7 For renovation of the laboratory areas,
8 including a greenhouse ....................... 88,700
9 For the purchase, renovation and improvement
10 of the North Campus High School site of
11 the Aurora West School District 129,
12 including construction of four dormitories,
13 equipment purchases and other expenses for
14 use by the Illinois Mathematics and Science
15 Academy ...................................... 2,512,863
16 For planning, renovation and improvements,
17 correction of defects, construction of
18 dormitories including equipment and all
19 other expenses necessary to upgrade and
20 develop the North Campus High School
21 site of the Aurora West School District
22 for use by the Math Science Academy .......... 1,355
23 Total, Section 20 $2,747,245
24 Section 21. The following named amounts, or so much
25 thereof as may be necessary and remain unexpended at the
26 close of business on June 30, 1997, from reappropriations
27 heretofore made for such purposes in Article 78, Section 21
28 of Public Act 89-0501, as amended by Public Act 90-0002, are
29 reappropriated from the Capital Development Fund to the
30 Capital Development Board for the Illinois Community College
31 Board for the projects hereinafter enumerated:
32 BELLEVILLE AREA COLLEGE
33 For planning buildings, additions and
-95- BOB-CAPITAL98
1 site improvements ............................ $ 1,726,574
2 DANVILLE AREA COMMUNITY COLLEGE
3 For rehabilitation of infrastructure
4 and beginning construction of a
5 classroom facility ........................... 1,876,784
6 For rehabilitation of the infrastructure and
7 planning campus buildings .................... 1,045,091
8 COLLEGE OF DUPAGE
9 For completing the addition to
10 the Student Resource Center .................. 2,081,818
11 ILLINOIS EASTERN COMMUNITY COLLEGE
12 For replacement of the roofing system .......... 27,612
13 ELGIN COMMUNITY COLLEGE
14 For construction of addition, site improvements,
15 remodeling and purchasing equipment .......... 2,626,162
16 For planning, design, site improvements, utility
17 adjustments, and any other costs associated
18 with construction of a new Instructional
19 Building at Elgin Community College .......... 223,121
20 JOHN A. LOGAN COMMUNITY COLLEGE
21 For planning an addition and site
22 improvements ................................. 44,620
23 For construction of classroom additions
24 and remodeling the existing facility,
25 including utilities and site improvements .... 33,745
26 JOHN WOOD COMMUNITY COLLEGE
27 For construction of a science and technology
28 center and access road ....................... 1,533,085
29 JOLIET JUNIOR COLLEGE
30 For construction of a business and technology
31 center and remodeling the main campus
32 building ..................................... 871,558
33 For planning, design and site preparation of
34 a Business Technology Center ................. 10,746
-96- BOB-CAPITAL98
1 KISHWAUKEE COMMUNITY COLLEGE
2 For construction and reconstruction at
3 the library .................................. 100,055
4 COLLEGE OF LAKE COUNTY
5 For construction of a multi-use Instructional
6 Center, including acquisition of equipment
7 and remodeling of existing facilities ........ 109,008
8 For initial costs associated with planning,
9 design, construction, site improvements,
10 utilities, remodeling and equipment for
11 a multi-use instructional facility ........... 107,293
12 LEWIS AND CLARK COMMUNITY COLLEGE
13 For renovation of buildings, construction of an
14 addition and site improvements ............... 750,205
15 For construction of health, mathematics and
16 science laboratory facilities and
17 remodeling Fobes Hall ........................ 2,801,529
18 For renovation of the main complex ............. 40,809
19 For planning, design, and site preparation,
20 and construction of a multi-purpose
21 building ..................................... 22,932
22 MCHENRY COUNTY COLLEGE
23 For construction of an addition, including
24 equipment, a parking area and
25 site improvements ............................ 133,774
26 For expansion of existing library facilities
27 and construction of classrooms at McHenry
28 County College ............................... 17,024
29 MORAINE VALLEY COMMUNITY COLLEGE
30 For planning and constructing a new classroom
31 facility ..................................... 434,212
32 For providing for an architectural engineering
33 study, renovations, construction,
34 reconstruction and remodeling of Buildings
-97- BOB-CAPITAL98
1 A, B and L ................................... 417,365
2 MORTON COMMUNITY COLLEGE - COOK COUNTY
3 For construction of an addition and
4 site improvements ............................ 121,130
5 PRAIRIE STATE COMMUNITY COLLEGE
6 For construction of a Learning Resource
7 Center addition .............................. 175,444
8 REND LAKE COLLEGE
9 For construction of an aquatic and
10 rehabilitation center ........................ 1,602,193
11 For replacement of the roof .................... 19,952
12 SOUTHEASTERN ILLINOIS COLLEGE
13 For construction of humanities,
14 administration, and child care facilities
15 and remodeling campus buildings .............. 1,543,815
16 TRITON COMMUNITY COLLEGE - RIVER GROVE
17 For planning, site improvements, construction
18 and other expenses necessary for the
19 construction of an addition to the Learning
20 Resource Center .............................. 135,091
21 WILLIAM RAINEY HARPER COMMUNITY COLLEGE -PALATINE
22 For planning, developing, and designing a multi-
23 purpose telecommunications
24 instructional delivery center ................ 339,200
25 STATEWIDE - CONSTRUCTION DEFECTS
26 For planning, construction and renovation
27 to correct defectively designed or
28 constructed community college facilities,
29 provided that monies recovered based upon
30 claims arising out of such defective design
31 or construction shall be paid to the state
32 as required by Section 105.12 of the Public
33 Community College Act as reimbursement for
34 monies expended pursuant to this
-98- BOB-CAPITAL98
1 appropriation ................................ 4,187,752
2 Total, Section 21 $25,159,699
3 Section 21A. The following named amounts, or so much
4 thereof as may be necessary, and remain unexpended at the
5 close of business on June 30, 1997, from appropriations
6 heretofore made for such purposes in Article 77, Section 28A
7 of Public Act 89-0501, as amended, are reappropriated from
8 the Capital Development Fund to the Capital Development Board
9 for the Illinois Community College Board for the projects
10 hereinafter enumerated:
11 BELLEVILLE AREA COLLEGE
12 For constructing a building, additions
13 and site improvements at the
14 Belleville and Red Bud campuses,
15 in addition to funds previously
16 appropriated ................................. $ 10,797,100
17 DANVILLE COMMUNITY COLLEGE - VERMILION COUNTY
18 To rehabilitate infrastructure,
19 construct a classroom facility
20 and a day care center, in addition
21 to funds previously appropriated ............. 4,770,200
22 HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
23 For planning buildings, parking areas,
24 utilities, and site development and
25 preliminary site preparation
26 required to establish permanent
27 campus facilities ............................ 2,500,000
28 JOHN A. LOGAN COMMUNITY COLLEGE
29 For constructing additions and site
30 improvements, in addition to funds
31 previously appropriated ...................... 12,315,900
32 SHAWNEE COMMUNITY COLLEGE - ULLIN
33 For planning additions to the main
-99- BOB-CAPITAL98
1 building, parking areas, site
2 improvements and roofing
3 replacements ................................. 310,000
4 Total, Section 21A $30,693,200
5 Section 21B. The sum of $8,750,000, or so much thereof
6 as may be necessary, and remain unexpended at the close of
7 business on June 30, 1997, from appropriations heretofore
8 made for such purposes in Article 77, Section 28D of Public
9 Act 89-0501, as amended, are reappropriated from the Capital
10 Development Fund to the Capital Development Board for the
11 Illinois Community College Board for miscellaneous capital
12 improvements including construction, reconstruction,
13 remodeling, improvement, repair and installation of capital
14 facilities, cost of planning, supplies, equipment, materials,
15 services and all other expenses required to complete the work
16 at the various community colleges. This appropriation shall
17 be in addition to any other appropriated amounts which can be
18 expended for these purposes.
19 Section 21.1. The sum of $4,853,437, or so much thereof
20 as may be necessary and remains unexpended at the close of
21 business on June 30, 1997, from reappropriations heretofore
22 made for such purposes in Article 78, Section 21.1 of Public
23 Act 89-0501, is reappropriated from the Capital Development
24 Fund to the Capital Development Board for the Illinois
25 Community College Board for grants to community colleges for
26 miscellaneous capital improvements including construction,
27 reconstruction, remodeling, improvements, repair and
28 installation of capital facilities, cost of planning,
29 supplies, equipment, materials, services, and all other
30 expenses required to complete the work. This appropriation
31 shall be in addition to any other appropriated amounts which
32 can be expended for these purposes.
-100- BOB-CAPITAL98
1 Section 22. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1997, from reappropriations
4 heretofore made for such purposes in Article 78, Section 22
5 of Public Act 89-0501, as amended, are reappropriated from
6 the Capital Development Fund to the Capital Development Board
7 for the Board of Higher Education for the projects
8 hereinafter enumerated:
9 CHICAGO STATE UNIVERSITY
10 For providing campus health and safety
11 improvements ................................. $ 805,254
12 For upgrading fire alarm systems ............... 10,458
13 For remodeling the Cook Administration
14 Building ..................................... 12,128
15 EASTERN ILLINOIS UNIVERSITY
16 For construction of an addition and
17 remodeling Buzzard Building .................. 4,104,381
18 For upgrading the energy management system
19 and HVAC systems and installation of a chilled
20 water loop between various buildings ......... 1,937,912
21 For completing conversion to a coal-fired
22 power plant .................................. 244,911
23 For completion of the construction and
24 renovation of the heating system ............. 37,703
25 For planning, equipment, site improvements,
26 construction and renovation of the heating
27 system to restore coal burning capability .... 30,429
28 GOVERNORS STATE UNIVERSITY - PARK FOREST
29 For renovation of the main building ............ 462,500
30 For remodeling Main Building ................... 346,063
31 For replacement of the main building roof
32 and renovation of the interior of the
33 main building ................................ 541,923
34 For renovation of the main building ............ 237,761
-101- BOB-CAPITAL98
1 For planning, design, construction,
2 reconstruction, remodeling, and any other
3 necessary costs for the Governors State
4 University Center for the Performing Arts .... 4,244
5 For remodeling the main building ............... 310,682
6 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
7 For upgrading the boilers and related
8 control systems .............................. 91,582
9 For fire safety modifications at the
10 facility ..................................... 1,401,761
11 For renovation of Buildings E, F, and
12 the auditorium, and demolition and
13 replacement of Buildings G, J and M,
14 in addition to amounts previously
15 appropriated ................................. 17,287,896
16 For renovation of Building D in addition to
17 funds previously appropriated for such
18 purpose ...................................... 3,551
19 For remodeling the library ..................... 176,018
20 WESTERN ILLINOIS UNIVERSITY - MACOMB
21 For planning and constructing a ram testing
22 facility ..................................... 282,908
23 For upgrading the power house equipment ........ 4,725
24 For remodeling Memorial and Sallee Halls ....... 35,785
25 For planning and beginning the completion
26 of the conversion to a coal-fired power
27 plant ........................................ 5,000
28 For renovation of Knoblauch Hall ............... 420,163
29 For construction of a steam and electrical
30 utility tunnel ............................... 307,108
31 WESTERN ILLINOIS UNIVERSITY - ROCK ISLAND COUNTY
32 For purchasing land and a building and
33 converting to an educational center .......... 1,195,419
34 Total, Section 22 $30,298,265
-102- BOB-CAPITAL98
1 Section 22A. The following named amounts, or so much
2 thereof as may be necessary, and remain unexpended at the
3 close of business on June 30, 1997, from appropriations
4 heretofore made for such purposes in Article 77, Section 28B
5 of Public Act 89-0501, as amended, are reappropriated from
6 the Capital Development Fund to the Capital Development Board
7 for the Board of Higher Education for the projects
8 hereinafter enumerated:
9 MATH AND SCIENCE ACADEMY
10 For replacing air conditioning units,
11 controls and upgrading the energy
12 management system ............................ $ 2,370,000
13 CHICAGO STATE UNIVERSITY
14 For renovating campus buildings and
15 upgrading mechanical systems.................. 2,432,200
16 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
17 For planning an addition and renovation
18 of Booth Library ............................. 1,000,000
19 GOVERNORS STATE UNIVERSITY
20 For upgrading and replacing cooling
21 and refrigeration systems and
22 equipment .................................... 2,299,400
23 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
24 For purchasing equipment
25 for the Fine Arts Complex .................... 4,000,000
26 WESTERN ILLINOIS UNIVERSITY - MACOMB
27 For converting Simpkins Hall
28 gymnasium and adjacent areas into
29 a performing arts facility ................... 2,309,300
30 ILLINOIS STATE UNIVERSITY - NORMAL
31 For purchasing equipment for
32 the Science Laboratory building .............. 4,000,000
33 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
34 For site improvements and purchasing
-103- BOB-CAPITAL98
1 equipment for the Engineering and
2 Technology Building .......................... 1,259,000
3 For planning addition, remodeling and
4 upgrading the HVAC system in Altgeld Hall ...... 574,000
5 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
6 For construction of the Engineering Facility
7 building and related site improvements ....... 21,256,200
8 UNIVERSITY OF ILLINOIS - SPRINGFIELD
9 For upgrading and completing the south
10 access roadway ............................... 451,600
11 UNIVERSITY OF ILLINOIS - CHICAGO
12 For the renovation of the court area and
13 Lecture Center, in addition to funds
14 previously appropriated ...................... 5,900,000
15 UNIVERSITY OF ILLINOIS - CHAMPAIGN
16 For completion of campus flood control ......... 6,000,000
17 Total, Section 22A $53,851,700
18 Section 22.1. The sum of $1,252,370, or so much thereof
19 as may be necessary and remains unexpended at the close of
20 business on June 30, 1997, from a reappropriation heretofore
21 made for such purposes in Article 78, Section 22.1 of Public
22 Act 89-0501, is reappropriated from the Capital Development
23 Fund to the Capital Development Board for the Board of Higher
24 Education for miscellaneous capital improvements including
25 construction, reconstruction, remodeling, improvement, repair
26 and installation of capital facilities, cost of planning,
27 supplies, equipment, materials, services and all other
28 expenses required for completing the the work at the colleges
29 and universities. This appropriation shall be in addition to
30 any other appropriated amounts which can be expended for
31 these purposes.
32 Section 22.2. The following named amounts, or so much
-104- BOB-CAPITAL98
1 thereof as may be necessary and remain unexpended at the
2 close of business on June 30, 1997, from reappropriations
3 heretofore made for such purposes in Article 78, Section 22.2
4 of Public Act 89-0501, are reappropriated from the Capital
5 Development Fund to the Capital Development Board for the
6 Board of Higher Education for miscellaneous capital
7 improvements including construction, reconstruction,
8 remodeling, improvement, repair and installation of capital
9 facilities, cost of planning, supplies, equipment, materials,
10 services and all other expenses required to complete the work
11 at the colleges and universities hereinafter enumerated. This
12 appropriation shall be in addition to any other appropriated
13 amounts which can be expended for these purposes:
14 Chicago State University ..................... $ 8,021
15 Eastern Illinois University .................. 49,556
16 Governors State University ................... 26,748
17 Northeastern Illinois University ............. 345,895
18 Western Illinois University .................. 890,174
19 Total, Section 22.2 $1,320,394
20 Section 22.3. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 1997, from reappropriations
23 heretofore made for such purposes in Article 78, Section 22
24 of Public Act 89-0501, are reappropriated from the Capital
25 Development Fund to the Board of Higher Education for the
26 projects hereinafter enumerated:
27 EASTERN ILLINOIS UNIVERSITY
28 For purchasing Buzzard Building equipment ...... $ 1,750,000
29 NORTHERN ILLINOIS UNIVERSITY
30 For purchasing Engineering
31 Building equipment ........................... 1,876,856
32 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD
33 For purchasing Rockford Center Building
-105- BOB-CAPITAL98
1 equipment .................................... 9,867
2 Total, Section 22.3 $3,636,723
3 Section 23. The following named amounts, or so much
4 thereof as may be necessary and remain unexpended at the
5 close of business on June 30, 1997, from reappropriations
6 heretofore made for such purposes in Article 78, Section 23
7 and Article 78, Section 25 of Public Act 89-0501, are
8 reappropriated from the Capital Development Fund to the
9 Capital Development Board for the Board of Higher Education
10 for the projects hereinafter enumerated:
11 ILLINOIS STATE UNIVERSITY - NORMAL
12 For construction of science laboratory
13 facilities ................................... $ 3,553,531
14 NORTHERN ILLINOIS UNIVERSITY
15 For upgrading the storm waterway controls
16 and campus drives ............................ 1,221,456
17 For construction of tunnels and installation
18 of utility piping ............................ 65,648
19 For renovation of heating plants and the
20 HVAC system .................................. 404,067
21 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD
22 For construction of the Rockford Center
23 facilities ................................... 37,128
24 UNIVERSITY OF ILLINOIS AT SPRINGFIELD
25 For upgrading the chillers, energy management
26 system and exterior lighting ................. 115,939
27 For campus improvements, including
28 remodeling of Brookens Library, the Public
29 Affairs Center, and rooftop HVAC systems ..... 30,720
30 Total, Section 23 $5,428,489
31 Section 23.1. The sum of $2,509,407, or so much thereof
32 as may be necessary and remains unexpended at the close of
-106- BOB-CAPITAL98
1 business on June 30, 1997, from a reappropriation heretofore
2 made for such purposes in Article 78, Section 23.1 of Public
3 Act 89-0501, is reappropriated from the Capital Development
4 Fund to the Capital Development Board for the Board of Higher
5 Education for miscellaneous capital improvements including
6 construction, reconstruction, remodeling, improvement, repair
7 and installation of capital facilities, cost of planning,
8 supplies, equipment, materials, services and all other
9 expenses required for completing the the work at the colleges
10 and universities. This appropriation shall be in addition to
11 any other appropriated amounts which can be expended for
12 these purposes.
13 Section 23.2. The following named amounts, or so much
14 thereof as may be necessary and remain unexpended at the
15 close of business on June 30, 1997, from reappropriations
16 heretofore made for such purposes in Article 78, Section 23.2
17 of Public Act 89-0501, are reappropriated from the Capital
18 Development Fund to the Capital Development Board for the
19 Board of Higher Education for miscellaneous capital
20 improvements including construction, reconstruction,
21 remodeling, improvements, repair and installation of capital
22 facilities, cost of planning, supplies, equipment, materials,
23 services, and all other expenses required to complete the
24 work at the colleges and universities hereinafter enumerated.
25 This appropriation shall be in addition to any other
26 appropriated amounts which can be expended for these
27 purposes:
28 Illinois State University ...................... $ 87,560
29 Northern Illinois University ................... 1,485,800
30 Total, Section 23.2 $1,573,360
31 Section 23.3. The sum of $22,215, or so much thereof as
32 may be necessary and remains unexpended at the close of
-107- BOB-CAPITAL98
1 business on June 30, 1997, from a reappropriation heretofore
2 made for such purposes in Article 78, Section 23.3 of Public
3 Act 89-0501, is reappropriated from the Capital Development
4 Fund to the Capital Development Board for the Board of Higher
5 Education for Northern Illinois University, for the planning,
6 architectural engineering, purchase, site improvements and
7 construction or remodeling of a site in Rockford for use as a
8 campus.
9 Section 23.4. The following named amounts, or so much
10 thereof as may be necessary, and remain unexpended at the
11 close of business on June 30, 1997, from appropriations
12 heretofore made for such purposes in Article 77, Section 28C
13 of Public Act 89-0501, as amended, are reappropriated from
14 the Capital Development Fund to the Capital Development Board
15 for the Board of Higher Education for miscellaneous capital
16 improvements including construction, capital facilities, cost
17 of planning, supplies, equipment, materials, services and all
18 other expenses required to complete the work at the various
19 universities set forth below. This appropriation shall be in
20 addition to any other appropriated amounts which can be
21 expended for these purposes.
22 For Chicago State University ..........525,000
23 For Eastern Illinois University .......980,000
24 For Governors State University ........315,000
25 For Illinois State University .......2,030,000
26 For Northeastern Illinois University ..735,000
27 For Northern Illinois University ....2,240,000
28 For Southern Illinois University ....4,830,000
29 For University of Illinois .........13,090,000
30 For Western Illinois University .....1,505,000
31 Section 24. The following named amounts, or so much
32 thereof as may be necessary and remain unexpended at the
-108- BOB-CAPITAL98
1 close of business on June 30, 1997, from reappropriations
2 heretofore made for such purposes in Article 78, Section 24
3 of Public Act 89-0501, are reappropriated from the Capital
4 Development Fund to the Capital Development Board for the
5 Board of Trustees of Southern Illinois University for the
6 projects hereinafter enumerated:
7 CARBONDALE CAMPUS
8 For construction of an engineering building
9 annex ........................................ $ 1,675,283
10 For construction of an environmental control
11 and hazardous waste management facility ...... 105,917
12 For remodeling the Communications Building ..... 24,729
13 EDWARDSVILLE CAMPUS
14 For replacement of the high temperature water
15 distribution system .......................... 188,842
16 For planning an engineering facility ........... 120,282
17 For infrastructure, site development, and
18 other necessary costs associated with
19 the development of University Park ........... 35,013
20 For costs associated with the consolidation
21 of the music facilities ...................... 26,652
22 For planning and construction of an Art and
23 Design Facility .............................. 25,089
24 Total, Section 24 $2,201,807
25 Section 24.1. The sum of $3,722,389, or so much thereof
26 as may be necessary and remains unexpended at the close of
27 business on June 30, 1997, from reappropriations heretofore
28 made for such purposes in Article 78, Section 24.1 of Public
29 Act 89-0501, is reappropriated from the Capital Development
30 Fund to the Capital Development Board for Southern Illinois
31 University for miscellaneous capital improvements including
32 construction, reconstruction, remodeling, improvements,
33 repair and installation of capital facilities, cost of
-109- BOB-CAPITAL98
1 planning, supplies, equipment, materials, services, and all
2 other expenses required to complete the work. This
3 appropriation shall be in addition to any other appropriated
4 amounts which can be expended for these purposes.
5 Section 24.2. The following named amount, or so much
6 thereof as may be necessary and remains unexpended at the
7 close of business on June 30, 1997, from a reappropriation
8 heretofore made for such purposes in Article 78, Section 24
9 of Public Act 89-0501, is reappropriated from the Capital
10 Development Fund to the Board of Trustees of Southern
11 Illinois University for the projects hereinafter enumerated:
12 CARBONDALE CAMPUS
13 For purchasing Bio-Science building
14 equipment ........................................$ 102,532
15 Section 25. The following named amounts, or so much
16 thereof as may be necessary and remain unexpended at the
17 close of business on June 30, 1997, from reappropriations
18 heretofore made for such purposes in Article 78, Section 25
19 of Public Act 89-0501, are reappropriated from the Capital
20 Development Fund to the Capital Development Board for the
21 Board of Trustees of the University of Illinois for the
22 projects hereinafter enumerated:
23 UNIVERSITY CENTER - CHICAGO
24 For construction and all other costs
25 necessary for site development and
26 utilities systems extensions, upgrades and
27 modifications for a new Molecular Biology
28 Building in addition to any other amounts
29 previously appropriated ...................... $ 103,529
30 For renovation of the court area and Lecture
31 Center ....................................... 96
32 For remodeling Alumni Hall, Phase II,
-110- BOB-CAPITAL98
1 including utilities .......................... 4,360,633
2 For construction of an instruction and
3 research facility for the College of
4 Engineering .................................. 21,270
5 HEALTH SCIENCE CENTER
6 For remodeling the Neuropsychiatric
7 Institute .................................... 2,839,129
8 For remodeling the Clinical Sciences
9 Building ..................................... 130,546
10 For planning the upgrade of the ventilating
11 and air conditioning systems in the
12 Pharmacy Building ............................ 23,605
13 For upgrading the ventilating and air
14 conditioning system in the Pharmacy
15 Building ..................................... 3,985
16 URBANA-CHAMPAIGN CAMPUS
17 For initiating a campus flood
18 control project .............................. 2,814,645
19 For construction of a special materials
20 storage facility, including equipment ........ 128,552
21 Total, Section 25 $10,425,990
22 Section 25.1. The sum of $10,213,774, or so much thereof
23 as may be necessary and remains unexpended at the close of
24 business on June 30, 1997, from a reappropriation heretofore
25 made for such purposes in Article 78, Section 25.1 of Public
26 Act 89-0501, is reappropriated from the Capital Development
27 Fund to the Capital Development Board for the Board of
28 Trustees of the University of Illinois for miscellaneous
29 capital improvements including construction, reconstruction,
30 remodeling, improvement, repair and installation of capital
31 facilities, cost of planning, supplies, equipment, materials,
32 services and all other expenses required for completing the
33 the work at the colleges and universities. This
-111- BOB-CAPITAL98
1 appropriation shall be in addition to any other appropriated
2 amounts which can be expended for these purposes.
3 Section 25.2. The following named amounts, or so much
4 thereof as may be necessary and remain unexpended at the
5 close of business on June 30, 1997, from reappropriations
6 heretofore made for such purposes in Article 78, Section 25.2
7 of Public Act 89-0501, are reappropriated from the General
8 Revenue Fund to the Capital Development Board for the Board
9 of Trustees of the University of Illinois for the projects
10 hereinafter enumerated:
11 HEALTH SCIENCE CENTER - CHICAGO
12 For energy conservation improvements ........... $ 8,592
13 For energy conservation improvements at
14 Taylor Street Hospital, the College of
15 Pharmacy Building, and the Clinical
16 Science Building ............................. 24,780
17 Total, Section 25.2 $33,372
18 Section 25.3. The following named amount, or so much
19 thereof as may be necessary and remains unexpended at the
20 close of business on June 30, 1997, from a reappropriation
21 heretofore made for such purposes in Article 78, Section 25
22 of Public Act 89-0501, is reappropriated from the Capital
23 Development Fund to the Board of Trustees of the University
24 of Illinois for the projects hereinafter enumerated:
25 URBANA - CHAMPAIGN CAMPUS
26 For purchasing equipment for Temple
27 Hoyne Buell Hall ..............................$ 301,072
28 Section 26. In addition to any amounts heretofore
29 appropriated for such purposes, the sum of $6,803, or so much
30 thereof as may be necessary and remains unexpended at the
31 close of business on June 30, 1997 from a reappropriation
-112- BOB-CAPITAL98
1 heretofore made for such purposes in Article 78, Section 27
2 of Public Act 89-0501, is reappropriated from the Capital
3 Development Fund to the Secretary of State for planning,
4 remodeling, relocation, permanent equipment, and any other
5 related expenses, including architectural and engineering
6 fees associated with construction and remodeling of office
7 space and other support areas under the jurisdiction of the
8 House of Representatives, and to various legislative services
9 agencies in both the Capitol and Stratton Office Buildings.
10 Section 27. In addition to any amounts heretofore
11 appropriated for such purposes, the sum of $5,737, or so much
12 thereof as may be necessary and remains unexpended at the
13 close of business on June 30, 1997 from a reappropriation
14 heretofore made for such purposes in Article 78, Section 28
15 of Public Act 89-0501, is reappropriated from the Capital
16 Development Fund to the Space Needs Commission for planning,
17 remodeling, relocation, permanent equipment, and any other
18 related expenses, including architectural and engineering
19 fees associated with construction of a non-sectarian
20 meditation room in the Capitol Office Building.
21 Section 28. No contract shall be entered into or
22 obligation incurred for any expenditures from appropriations
23 made in this Article until after the purposes and amounts
24 have been approved in writing by the Governor.
25 ARTICLE 3
26 Division A. The reappropriations in this Division
27 continue certain appropriations initially made for the fiscal
28 year beginning July 1, 1996, for the purposes of the Build
29 Illinois Program as set forth below.
-113- BOB-CAPITAL98
1 Section 4. The sum of $250,000, or so much thereof as
2 may be necessary and remains unexpended on June 30, 1997,
3 from appropriations heretofore made for such purposes in
4 Section 4 of Public Act 89-0501, Article 79, is
5 reappropriated to the Illinois Department of Natural
6 Resources from the Build Illinois Fund for a grant to Lincoln
7 Park Zoo.
8 Section 5. The sum of $1,000,000, or so much thereof as
9 may be necessary and remains unexpended on June 30, 1997,
10 from appropriations heretofore made for such purposes in
11 Section 5 of Public Act 89-0501, Article 79, is
12 reappropriated to the Department of Natural Resources from
13 the Build Illinois Bond Fund for expenditure by the Division
14 of Water Resources for infrastructure improvements to the
15 Wood Dale/Itasca Reservoir.
16 Section 7. The sum of $500,000, or so much thereof as
17 may be necessary and remains unexpended on June 30, 1997 from
18 appropriations made for such purposes in Section 7 of Public
19 Act 89-0501, Article 79, is reappropriated to the Department
20 of Natural Resources from the Build Illinois Bond Fund for
21 expenditure by the Division of Water Resources for
22 infrastructure repairs of the Batavia Dam in Batavia,
23 Illinois.
24 Section 8. The sum of $250,000, or so much thereof as
25 may be necessary and remains unexpended on June 30, 1997,
26 from appropriations heretofore made for such purposes in
27 Section 8 of Public Act 89-0501, Article 79, is
28 reappropriated to the Illinois Department of Natural
29 Resources from the Build Illinois Bond Fund for access road
30 improvements at Eagle Creek State Park.
-114- BOB-CAPITAL98
1 Section 14. The sum of $600,000, or so much thereof as
2 may be necessary and remains unexpended on June 30, 1997,
3 from appropriations heretofore made for such purposes in
4 Section 14 of Public Act 89-0501, Article 79, is
5 reappropriated to the Environmental Protection Agency from
6 the Build Illinois Bond Fund for a grant to the Village of
7 Pecatonica for a water tower.
8 Section 15. The sum of $488,000, or so much thereof as
9 may be necessary and remains unexpended on June 30, 1997,
10 from appropriations heretofore made for such purposes in
11 Section 15 of Public Act 89-0501, Article 79, is
12 reappropriated to the Environmental Protection Agency from
13 the Build Illinois Bond Fund for a grant to the Village of
14 Maple Park for infrastructure improvements.
15 Section 16. The sum of $200,000, or so much thereof as
16 may be necessary and remains unexpended on June 30, 1997,
17 from the appropriations heretofore made for such purposed in
18 Section 16 of Public Act 89-0501, Article 79, is
19 reappropriated to the Environmental Protection Agency from
20 the Build Illinois Bond Fund for a grant to the Village of
21 Homer for infrastructure improvements.
22 Section 18. The sum of $120,000, or so much thereof as
23 may be necessary and remains unexpended on June 30, 1997,
24 from appropriations heretofore made for such purposes in
25 Section 18 of Public Act 89-0501, Article 79, as amended by
26 Public Act 90-0003, is reappropriated from the Build Illinois
27 Bond Fund to the Department of Transportation for all the
28 costs associated with the signalization improvements at Des
29 Plaines Avenue and Country Club Lane in North Riverside.
30 Section 19. The sum of $150,000, or so much thereof as
-115- BOB-CAPITAL98
1 may be necessary and remains unexpended on June 30, 1997,
2 from appropriations heretofore made for such purposes in
3 Section 19 of Public Act 89-0501, Article 79, is
4 reappropriated from the Build Illinois Bond Fund to the
5 Department of Transportation for all costs associated with
6 signalization improvements at 26th Street and 50th Avenue in
7 Cicero.
8 Section 21. The sum of $250,000, or so much thereof as
9 may be necessary and remains unexpended on June 30, 1997,
10 from appropriations heretofore made for such purposes in
11 Section 21 of Public Act 89-0501, Article 79, as amended by
12 Public Act 90-0003, is reappropriated from the Build Illinois
13 Bond Fund to the Department of Natural Resources for
14 rehabilitation of the concession building and other park
15 improvements at Johnson Sauk Trail State Park in Henry
16 County.
17 Section 22. The sum of $300,000, or so much thereof as
18 may be necessary and remains unexpended on June 30, 1997 from
19 appropriations heretofore made for such purposes in Section
20 22 of Public Act 89-0501, Article 79, as amended by Public
21 Act 90-0003, is reappropriated from the Build Illinois Bond
22 Fund to the Department of Transportation for all costs
23 associated with installing signalization of U.S. 34 and
24 Eleventh Street in the City of Monmouth.
25 Section 32. The sum of $1,500,000, or
26 so much thereof as may be necessary and remains unexpended on
27 June 30, 1997, from appropriations heretofore made for such
28 purposes in Section 32 of Public Act 89-0501, Article 79, is
29 reappropriated from the Build Illinois Bond Fund to the
30 Department of Natural Resources for all costs associated with
31 flood control projects for the DuPage County Forest Preserve
32 District.
-116- BOB-CAPITAL98
1 Section 34. The sum of $150,000, or so much thereof as
2 may be necessary and remains unexpended on June 30, 1997,
3 from appropriations heretofore made for such purposes in
4 Section 34 of Public Act 89-0501, Article 79, as amended by
5 Public Act 90-0003, is reappropriated from the Build Illinois
6 Bond Fund to the Illinois Environmental Protection Agency for
7 all costs associated with waste water and drinking water
8 systems development and improvements in the Village of
9 LaGrange Park.
10 Section 36. The sum of $1,100,000, or so much thereof as
11 may be necessary and remains unexpended on June 30, 1997,
12 from appropriations heretofore made for such purposes in
13 Section 36 of Public Act 89-0501, Article 79, is
14 reappropriated from the Build Illinois Bond Fund to the
15 Illinois Environmental Protection Agency for a grant to the
16 Fox River Water Reclamation District for improvements for the
17 South Plant, the Skyline Treatment Plant and the Skyline
18 Water Plant.
19 Division II. The reappropriations in this Division
20 continue certain appropriations initially made for the fiscal
21 year beginning July 1, 1995, for the purpose of the Build
22 Illinois program set forth below.
23 Section 1-2. The amount of $450,000, or so much thereof
24 as may be necessary and remains unexpended on June 30, 1997,
25 from appropriations heretofore made for such purposes in
26 Article 79, Section 1-2 of Public Act 89-0501, is
27 reappropriated from the Build Illinois Bond Fund to the
28 Department of Natural Resources for a grant to the DuPage
29 County Forest Preserve District for dredging the Salt Creek
30 at the Fullersburg Dam.
-117- BOB-CAPITAL98
1 Section 1-4. The amount of $150,000, or so much thereof
2 as may be necessary and remains unexpended on June 30, 1997,
3 from appropriations heretofore made for such purposes in
4 Article 79, Section 1-4 of Public Act 89-0501, is
5 reappropriated from the Build Illinois Bond Fund to the
6 Historic Preservation Agency for planning, design,
7 construction and all other necessary costs associated with
8 the construction of an Information Center at the Old Market
9 House in Galena.
10 Section 1-5. The amount of $50,000, or so much thereof
11 as may be necessary and remains unexpended on June 30, 1997,
12 from appropriations heretofore made for such purposes in
13 Article 79, Section 1-5 of Public Act 89-0501, is
14 reappropriated from the Build Illinois Bond Fund to the
15 Capital Development Board for planning, design, construction
16 and all other necessary costs for construction of a Porcine
17 Nursery at Western Illinois University.
18 Section 1-8. The amount $125,000, or so much thereof as
19 may be necessary and remains unexpended on June 30, 1997,
20 from appropriations heretofore made for such purposes in
21 Article 79, Section 1-8 of Public Act 89-0501, is
22 reappropriated from the Build Illinois Bond Fund to the
23 Department of Commerce and Community Affairs for a grant to
24 Northwestern University for programs supporting small
25 business.
26 Section 1-9. The amount of $500,000, or so much thereof
27 as may be necessary and remains unexpended on June 30, 1997,
28 from appropriations heretofore made for such purposes in
29 Article 79, Section 1-9 of Public Act 89-0501, is
30 reappropriated from the Build Illinois Bond Fund to the
31 Environmental Protection Agency for a grant to the Fox River
-118- BOB-CAPITAL98
1 Water Reclamation District for improvements for the South
2 Plant, the Skyline Treatment Plant and the Skyline Water
3 Plant.
4 Section 1-10. The amount of $500,000, or so much thereof
5 as may be necessary and remains unexpended on June 30, 1997,
6 from appropriations heretofore made for such purposes in
7 Article 79, Section 1-10 of Public Act 89-0501, is
8 reappropriated from the Build Illinois Bond Fund to the
9 Department of Natural Resources for phase one construction of
10 a Visitors' Center at Kline Creek Farms in conjunction with
11 the DuPage County Forest Preserve District
12 Division III. The reappropriations in this Division
13 continue certain appropriations initially made for the fiscal
14 year beginning July 1, 1990, for the purposes of the Build
15 Illinois Program as set forth below.
16 Section 2-6. The following named amounts, or so much
17 thereof as may be necessary, and remain unexpended on June
18 30, 1997 from appropriations heretofore made for such
19 purposes in Article 79, Section 2-6 of Public Act 89-0501,
20 are reappropriated from the Build Illinois Bond Fund to the
21 Capital Development Board for the Board of Higher Education
22 for the projects hereinafter enumerated:
23 NORTHERN ILLINOIS UNIVERSITY - DEKALB
24 To construct and equip the Engineering
25 Building ..................................... $ 307,395
26 To purchase equipment and complete
27 construction for Faraday Hall Addition ....... 629,044
28 Total, Build Illinois Bond Fund $936,439
29 Section 2-7. The following named amounts, or so much
30 thereof as may be necessary, and remain unexpended on June
-119- BOB-CAPITAL98
1 30, 1997 from appropriations heretofore made for such
2 purposes in Article 79, Section 2-7 of Public Act 89-0501,
3 are reappropriated from the Build Illinois Bond Fund to the
4 Capital Development Board for Southern Illinois University
5 for the projects hereinafter enumerated:
6 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
7 To construct an addition and remodel the
8 existing Steam Plant ......................... $ 953,174
9 To construct and equip the Biological
10 Sciences Facilities .......................... 1,149,556
11 Total, Build Illinois Bond Fund $2,102,730
12 Section 2-8. The following named amounts, or so much
13 thereof as may be necessary, and remain unexpended on June
14 30, 1997 from appropriations heretofore made for such
15 purposes in Article 79, Section 2-8 of Public Act 89-0501,
16 are reappropriated from the Build Illinois Bond Fund to the
17 Capital Development Board for the University of Illinois for
18 the projects hereinafter enumerated:
19 UNIVERSITY OF ILLINOIS URBANA-CHAMPAIGN
20 To construct and equip the Chemical and Life
21 Sciences Building ............................ $ 1,585,255
22 Total, Build Illinois Bond Fund $1,585,255
23 Section 2-18H. The amount of $31,194, or so much thereof
24 as may be necessary, and remains unexpended on June 30, 1997
25 from appropriations heretofore made for such purposes in
26 Article 79, Section 2-18H of Public Act 89-0501, is
27 reappropriated from the Build Illinois Bond Fund to the
28 Capital Development Board for the Illinois Community College
29 Board for the remodeling and reconstruction of a building for
30 a Vocational Technology Center at the Belleville Area College
31 Granite City Campus.
-120- BOB-CAPITAL98
1 Section 2-19B. The following named amount, or so much
2 thereof as may be necessary, and remains unexpended on June
3 30, 1997 from an appropriation heretofore made for such
4 purposes in Article 79, Section 2-19B of Public Act 89-0501,
5 is reappropriated from the Build Illinois Bond Fund to the
6 Capital Development Board for the Board of Higher Education
7 for the project hereinafter enumerated:
8 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
9 For repair of exterior masonry walls and
10 replacement of the roof on the Science
11 Building .........................................$ 290,884
12 Section 2-20.1. The following named amounts, or so much
13 thereof as may be necessary, and remain unexpended on June
14 30, 1997 from appropriations heretofore made for such
15 purposes in Article 79, Section 2-20.1 of Public Act 89-0501,
16 are reappropriated from the Build Illinois Bond Fund to the
17 Capital Development Board for the Board of Higher Education
18 for the projects hereinafter enumerated:
19 NORTHERN ILLINOIS UNIVERSITY - DE KALB
20 For construction of the Engineering Building
21 including extension of utilities, in
22 addition to funds previously appropriated
23 for such purpose ...................................100,619
24 Section 2-21A. The following named amounts, or so much
25 thereof as may be necessary, and remain unexpended on June
26 30, 1997 from appropriations heretofore made for such
27 purposes in Article 79, Section 2-21A of Public Act 89-0501,
28 are reappropriated from the Build Illinois Bond Fund to the
29 Capital Development Board for Southern Illinois University
30 for the projects hereinafter enumerated:
31 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
32 For construction and all other costs
-121- BOB-CAPITAL98
1 necessary for an addition and remodeling
2 of the existing steam plant, in addition to
3 funds previously appropriated for such
4 purpose ..........................................$ 703,203
5 Division IV. The reappropriations in this Division
6 continue certain appropriations initially made for the fiscal
7 year beginning July 1, 1989, for the purpose of the Build
8 Illinois Program set forth below.
9 Section 3-1.2a. The amount of $1,000,000, or so much
10 thereof as may be necessary and remains unexpended on June
11 30, 1997, from appropriations heretofore made for such
12 purposes in Article 79, Section 3-1.2a of Public Act 89-0501,
13 is reappropriated from the Build Illinois Purposes Fund to
14 the Department of Commerce and Community Affairs for loans
15 and grants to units of local government for infrastructure
16 improvements.
17 Section 3-1.3. The following named amounts, or so much
18 thereof as may be necessary and remain unexpended on June 30,
19 1997, from appropriations heretofore made for such purposes
20 in Article 79, Section 3-1.3 of Public Act 89-0501, are
21 reappropriated from the Build Illinois Bond Fund to the
22 Department of Transportation for land acquisition,
23 engineering, and contract costs for construction,
24 reconstruction, extension, and improvement of State highways.
25 FAP 412 (U.S. 51)........................... $ 564,189
26 FAP 426 (Thorndale Avenue).................. 45,150
27 Total $609,339
28 Section 3-1.12b. The following named amounts, or so much
29 thereof as may be necessary, and remain unexpended on June
30 30, 1997 from appropriations heretofore made for such
-122- BOB-CAPITAL98
1 purposes in Article 79, Section 3-1.12b of Public Act
2 89-0501, are reappropriated from the Build Illinois Bond Fund
3 to the Capital Development Board for the Board of Higher
4 Education for the projects hereinafter enumerated:
5 NORTHERN ILLINOIS UNIVERSITY - DE KALB
6 To construct an addition to Faraday Hall ....... $ 810,628
7 SANGAMON STATE UNIVERSITY
8 To construct a Health Sciences Building,
9 including utilities .......................... 56,765
10 Total, Build Illinois Bond Fund $867,393
11 Section 3-1.12c. The following named amounts, or so much
12 thereof as may be necessary, and remain unexpended on June
13 30, 1997 from appropriations heretofore made for such
14 purposes in Article 79, Section 3-1.12c of Public Act
15 89-0501, are reappropriated from the Build Illinois Bond Fund
16 to the Capital Development Board for Southern Illinois
17 University for the projects hereinafter enumerated:
18 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
19 To renovate Wheeler Hall, including equipment .....$ 12,745
20 Section 3-1.13. The following named amounts, or so much
21 thereof as may be necessary, and remain unexpended on June
22 30, 1997 from appropriations heretofore made for such
23 purposes in Article 79, Section 3-1.13 of Public Act 89-0501,
24 are reappropriated from the Build Illinois Bond Fund to the
25 Capital Development Board for University of Illinois for the
26 project hereinafter enumerated:
27 UNIVERSITY OF ILLINOIS - URBANA
28 To remodel Noyes Laboratory ......................$ 46,533
29 Section 3-6.2a. The amount of $500,000, or so much
30 thereof as may be necessary and remains unexpended on June
31 30, 1997, from appropriations heretofore made for such
-123- BOB-CAPITAL98
1 purposes in Section 3-6.2a of Public Act 89-0501, Article 79,
2 is reappropriated from the Build Illinois Purposes Fund to
3 the Department of Commerce and Community Affairs for a grant
4 to the City of Chicago for infrastructure improvements and
5 large equipment purchase at the Crawford Industrial Park
6 located at 47th Street and Pulaski Road.
7 Section 3-6.2c. The amount of $486,699, or so much
8 thereof as may be necessary and remains unexpended on June
9 30, 1997, from appropriations heretofore made for such
10 purposes in Section 3-6.2c of Public Act 89-0501, Article 79,
11 is reappropriated from the Build Illinois Bond Fund to the
12 Department of Natural Resources for grants to the City of
13 Chicago Park District for all costs associated with the
14 development and improvement of park field houses and site
15 improvements to related structures, at the following
16 locations:
17 Garfield Park at 100 North Central Park,
18 Humboldt Park at 1400 North Sacramento,
19 Douglas Park at West 14th Street and South Albany,
20 Washington Park at 5531 South King Drive,
21 Grant Park from East Randolph Street to East
22 McFetridge Drive at Lake Michigan,
23 Columbus Park at 500 South Central Avenue,
24 Eckhart Park at 1330 West Chicago Avenue,
25 Sherman Park at 1301 West 52nd Street,
26 Fuller Park at 331 West 45th Street,
27 Hamilton Park at 513 West 72nd Street,
28 McKinley Park at 2210 West Pershing Road,
29 Palmer Park at East 111th Street and South Indiana,
30 Marquette Park at 6700 South Kedzie Avenue,
31 Dvorek Park at 1119 West Cullerton Street,
32 Union Park at 1501 West Randolph Street.
-124- BOB-CAPITAL98
1 Section 3-6.2e. The amount of $20,400, or so much
2 thereof as may be necessary and remains unexpended on June
3 30, 1997, from appropriations heretofore made for such
4 purposes in Section 3-6.2e of Public Act 89-0501, Article 79,
5 is reappropriated from the Build Illinois Bond Fund to the
6 Secretary of State for making grants to the City of Chicago
7 for planning, construction, reconstruction, rehabilitation,
8 and all necessary costs for the following branches of the
9 Chicago Public Library at the approximate costs set forth
10 below:
11 North Austin Branch Library ................ $ 1,150,025
12 Legler Library ............................. 26,886
13 Auburn/Hamilton Park Library ............... 879,056
14 Near West Side Branch Library .............. 1,136,419
15 Carter G. Woodson Regional Library ......... 68,696
16 Clearing Branch Library .................... 258,398
17 McKinley Park Branch Library ............... 829,124
18 South Chicago Branch Library ............... 551,657
19 North Pulaski/Humboldt Library ............. 2,753,474
20 Roosevelt Branch ........................... 204,000
21 Rockwell Gardens Reading &
22 Study Center ............................. 0
23 Pullman Branch Library ..................... 632,063
24 Total $8,489,798
25 Section 3-6.2g. The amount of $3,840,215, or so much
26 thereof as may be necessary and remains unexpended on June
27 30, 1997, from appropriations heretofore made for such
28 purposes in Section 3-6.2g of Public Act 89-0501, Article 79,
29 is reappropriated from the Build Illinois Bond Fund to the
30 Department of Natural Resources for a grant to the City of
31 Chicago Park District for development and improvements at the
32 Lincoln Park Zoo.
-125- BOB-CAPITAL98
1 Section 3-6.2h. The amount of $159,563, or so much
2 thereof as may be necessary and remains unexpended on June
3 30, 1997, from appropriations heretofore made for such
4 purposes in Section 3-6.2h of Public Act 89-0501, Article 79,
5 is reappropriated from the Build Illinois Bond Fund to the
6 Department of Natural Resources for grants to units of local
7 governments as provided in the "Open Space Lands Acquisition
8 and Development Act."
9 Division V. The reappropriations in this Division
10 continue certain appropriations initially made for the fiscal
11 year beginning July 1, 1988, for the purposes of the Build
12 Illinois Program set forth below.
13 Section 4-1.4. The amount of $104,000, or so much
14 thereof as may be necessary and remains unexpended on June
15 30, 1997, from appropriations heretofore made for such
16 purposes in Section 4-1.4 of Public Act 89-0501, Article 79,
17 is reappropriated from the Build Illinois Purposes Fund to
18 the Department of Commerce and Community Affairs for loans
19 and grants to units of local government for infrastructure
20 improvements.
21 Section 4-1.11. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended on June 30,
23 1997, from appropriations heretofore made for such purposes
24 in Section 4-1.11 of Public Act 89-0501, Article 79, are
25 reappropriated from the Build Illinois Bond Fund to the
26 Department of Transportation for land acquisition,
27 engineering, and contract costs for construction,
28 reconstruction, extension, and improvement of State highways,
29 including bridges, structures separating highways and
30 railroads, rest areas, interchanges, and access roads to and
31 from any State or local highway and such other necessary or
-126- BOB-CAPITAL98
1 appropriate purposes as provided by the "Illinois Highway
2 Code" as follows:
3 FAP 412 (U.S. 51)........................... $ 216,008
4 FAP 426 (Thorndale Avenue).................. 1,872
5 Access roads and interchanges .............. 1,093,282
6 Total $1,311,162
7 Section 4-1.13. The amount of $627,858, or so much
8 thereof as may be necessary and remains unexpended on June
9 30, 1997, from appropriations heretofore made for such
10 purposes in Section 4-1.13 of Public Act 89-0501, Article 79,
11 is reappropriated from the Build Illinois Bond Fund to the
12 Department of Natural Resources for the following projects at
13 the approximate costs set forth below:
14 Des Plaines Watershed Mitigation - Cook,
15 DuPage, and Lake Counties - For
16 implementation of flood hazard mitigation
17 plans, developed in cooperation with units
18 of local government in the Des Plaines
19 Watershed, filed in accordance with Section
20 5 of the Flood Control Act of 1945, as
21 amended (Ill. Rev. Stat., Ch. 19, par.
22 126e) ..................................... $ 100,000
23 Indian Creek - Kane County - For implementation
24 of the Indian Creek flood control project
25 in Kane County in cooperation with the City
26 of Aurora ................................. 48,089
27 Midlothian Creek - Cook County - Improvement of
28 Midlothian Creek channel to provide flood
29 damage reduction for Fernway Subdivision in
30 cooperation with the Villages of Orland
31 Park and Tinley Park ...................... 479,769
32 Total $627,858
-127- BOB-CAPITAL98
1 Division VI. The reappropriations in this Division
2 continue certain appropriations initially made for the fiscal
3 year beginning July 1, 1987, for the purposes of the Build
4 Illinois Program set forth below.
5 Section 5-1.10. The amount of $139,149, or so much
6 thereof as may be necessary and remains unexpended on June
7 30, 1997, from appropriations heretofore made for such
8 purposes in Section 5-1.10 of Public Act 89-0501, Article 79,
9 is reappropriated from the Build Illinois Purposes Fund to
10 the Department of Commerce and Community Affairs for loans
11 and grants to units of local government for infrastructure
12 improvements.
13 Section 5-1.11. The amount of $116,045, or so much
14 thereof as may be necessary and remains unexpended on June
15 30, 1997, from appropriations heretofore made for such
16 purposes in Section 5-1.11 of Public Act 89-0501, Article 79,
17 is reappropriated from the Build Illinois Purposes Fund to
18 the Department of Commerce and Community Affairs for grants
19 and loans to establish and operate small business incubators
20 under the Small Business Incubator Program.
21 Section 5-1.16. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended on June 30,
23 1997, from appropriations heretofore made for such purposes
24 in Section 5-1.16 of Public Act 89-0501, Article 79, are
25 reappropriated from the Build Illinois Bond Fund to the
26 Department of Transportation for land acquisition,
27 engineering and contract costs for construction,
28 reconstruction, extension and improvement of state highways,
29 including bridges, structures separating highways and
30 railroads, rest areas, interchanges, and access roads to and
31 from any state or local highway and such other necessary or
-128- BOB-CAPITAL98
1 appropriate purposes as provided by the "Illinois Highway
2 Code" as follows:
3 FAP 426 (Thorndale Avenue).................. 3,416
4 Access roads, interchanges, and
5 rest areas................................ 426,953
6 Total $430,369
7 Division VII. The Reappropriations in this Division
8 continue certain appropriations initially made for the fiscal
9 year beginning July 1, 1986, for the purposes of the Build
10 Illinois Program set forth below.
11 Section 6-1.13. The amount of $144,887, or so much
12 thereof as may be necessary and remains unexpended on June
13 30, 1997, from appropriations heretofore made for such
14 purposes in Section 6-1.13 of Public Act 89-0501, Article 79,
15 is reappropriated from the Build Illinois Bond Fund to the
16 Environmental Protection Agency for making grants to units of
17 local government for the planning, design, construction,
18 rehabilitation and any other necessary costs for wastewater
19 treatment facilities and for plans, construction, repairs,
20 improvements and any other necessary costs for sewer and
21 water supply systems, at the locations listed below:
22 Elgin S.D.
23 East Peoria
24 Livingston
25 Section 6-1.16. The following named amounts, or so much
26 thereof as may be necessary and remain unexpended on June 30,
27 1997, from appropriations heretofore made for such purposes
28 in Section 6-1.16 of Public Act 89-0501, Article 79, are
29 reappropriated from the Build Illinois Bond Fund to the
30 Department of Transportation for land acquisition,
31 engineering and contract costs for construction,
-129- BOB-CAPITAL98
1 reconstruction, extension and improvement of state highways,
2 including bridges, structures separating highways and
3 railroads, rest areas, interchanges, and access roads to and
4 from any state or local highway and such other necessary or
5 appropriate purposes as provided by the "Illinois Highway
6 Code" as follows:
7 FAP 412 (U.S. 51) .......................... $ 293,775
8 Total $293,775
9 Section 6-1.21. The amount of $20,058, or so much
10 thereof as may be necessary and remains unexpended on June
11 30, 1997, from appropriations heretofore made for such
12 purposes in Section 6-1.21 of Public Act 89-0501, Article 79,
13 is reappropriated from the Build Illinois Bond Fund to the
14 Department of Natural Resources for costs associated with
15 drainage, flood control and related improvements.
16 Section 6-2.7. The amount of $425,000, or so much
17 thereof as may be necessary and remains unexpended on June
18 30, 1997, from appropriations heretofore made for such
19 purposes in Section 6-2.7 of Public Act 89-0501, Article 79,
20 is reappropriated from the Build Illinois Bond Fund to the
21 Environmental Protection Agency for the planning and
22 improvement of a water system in Edinburg.
23 Section 6-2.8. The amount of $50,000, or so much thereof
24 as may be necessary and remains unexpended on June 30, 1997,
25 from appropriations heretofore made for such purposes in
26 Section 6-2.8 of Public Act 89-0501, Article 79, is
27 reappropriated from the Build Illinois Bond Fund to the
28 Environmental Protection Agency for the planning and
29 construction of a waterworks components system in the Village
30 of Elburn.
-130- BOB-CAPITAL98
1 Section 6-2.14. The amount of $100,000, or so much
2 thereof as may be necessary and remains unexpended on June
3 30, 1997, from appropriations heretofore made for such
4 purposes in Section 6-2.14 of Public Act 89-0501, Article 79,
5 is reappropriated from the Build Illinois Bond Fund to the
6 Environmental Protection Agency for planning, design and
7 construction of Crystal Lake sewer.
8 Section 6-2.25. The amount of $310,000, or so much
9 thereof as may be necessary and remains unexpended on June
10 30, 1997, from appropriations heretofore made for such
11 purposes in Section 6-2.25 of Public Act 89-0501, Article 79,
12 is reappropriated from the Build Illinois Bond Fund to the
13 Environmental Protection Agency for a grant to the
14 Brookfield-North Riverside Water Commission, serving the
15 towns of Brookfield, North Riverside, La Grange Park, Lyons
16 and Riverside for water supply system improvements.
17 Section 6-2.27. The amount of $136,000, or so much
18 thereof as may be necessary and remains unexpended on June
19 30, 1997, from appropriations heretofore made for such
20 purposes in Section 6-2.27 of Public Act 89-0501, Article 79,
21 is reappropriated from the Build Illinois Bond Fund to the
22 Department of Natural Resources for the design, construction
23 and land acquisition of a retention basin in East Chicago
24 Heights.
25 Section 6-3.22. The amount of $50,000, or so much
26 thereof as may be necessary and remains unexpended on June
27 30, 1997, from appropriations heretofore made for such
28 purposes in Section 6-3.22 of Public Act 89-0501, Article 79,
29 is reappropriated from the Build Illinois Bond Fund to the
30 Department of Natural Resources for the purpose of a grant to
31 the Rockford Park District for land acquisition and
-131- BOB-CAPITAL98
1 development of a park near the Illinois Central train depot
2 in downtown Rockford.
3 Section 6-3.32. The amount of $140,000, or so much
4 thereof as may be necessary and remains unexpended on June
5 30, 1997, from appropriations heretofore made for such
6 purposes in Section 6-3.32 of Public Act 89-0501, Article 79,
7 is reappropriated from the Build Illinois Bond Fund to the
8 Department of Commerce and Community Affairs for the purpose
9 of a grant to the City of Elgin for extension of sewer lines
10 to the Northeast Subarea.
11 Section 6-3.104. The amount of $47,000, or so much
12 thereof as may be necessary and remains unexpended on June
13 30, 1997, from appropriations heretofore made for such
14 purposes in Section 6-3.104 of Public Act 89-0501, Article
15 79, is reappropriated from the Build Illinois Bond Fund to
16 the Environmental Protection Agency for the purpose of a
17 grant to the Village of Roselle for expansion of the
18 Botterman Sewage Treatment Plant.
19 Section 6-4.3. The amount of $175,000, or so much
20 thereof as may be necessary and remains unexpended on June
21 30, 1997, from appropriations heretofore made for such
22 purposes in Section 6-4.3 of Public Act 89-0501, Article 79,
23 is reappropriated from the Build Illinois Bond Fund to the
24 Department of Commerce and Community Affairs for grants to
25 local governments for use in economic development,
26 revitalization and community development at the approximate
27 costs as set forth below:
28 Melrose..................................... $ 50,000
29 Franklin Park............................... 50,000
30 Hillside.................................... 75,000
31 Total $175,000
-132- BOB-CAPITAL98
1 Section 6-4.4. The amount of $49,500, or so much thereof
2 as may be necessary and remains unexpended on June 30, 1997,
3 from appropriations heretofore made for such purposes in
4 Section 6-4.4 of Public Act 89-0501, Article 79, is
5 reappropriated from the Build Illinois Purposes Fund to the
6 Department of Transportation for a grant to Canteen Township
7 in St. Clair County for road repairs.
8 Section 6-4.8. The amount of $198,000, or so much
9 thereof as may be necessary and remains unexpended on June
10 30, 1997, from appropriations heretofore made for such
11 purposes in Section 6-4.8 of Public Act 89-0501, Article 79,
12 is reappropriated from the Build Illinois Purposes Fund to
13 the Department of Natural Resources for a recreational and
14 flood control project and retention basin in the City of
15 Sycamore.
16 Section 6-4.18. The amount of $99,000, or so much
17 thereof as may be necessary and remains unexpended on June
18 30, 1997, from appropriations heretofore made for such
19 purposes in Section 6-4.18 of Public Act 89-0501, Article 79,
20 is reappropriated from the Build Illinois Purposes Fund to
21 the Department of Transportation for a grant to the Village
22 of Swansea to resurface local roads and repair and replace
23 gutters and curbs.
24 Section 6-4.28. The amount of $49,500, or so much
25 thereof as may be necessary and remains unexpended on June
26 30, 1997, from appropriations heretofore made for such
27 purposes in Section 6-4.28 of Public Act 89-0501, Article 79,
28 is reappropriated from the Build Illinois Purposes Fund to
29 the Department of Transportation for a study to determine the
30 feasibility of establishing an airport in Kankakee County.
-133- BOB-CAPITAL98
1 Section 6-4.33. The amount of $91,802, or so much
2 thereof as may be necessary and remains unexpended on June
3 30, 1997, from appropriations heretofore made for such
4 purposes in Section 6-4.33 of Public Act 89-0501, Article 79,
5 is reappropriated from the Build Illinois Bond Fund to the
6 Department of Transportation for the costs associated with
7 construction, reconstruction and rehabilitation of Eagle
8 Creek Road and Findlay Road.
9 Section 6-5.24. The amount of $25,000, or so much
10 thereof as may be necessary and remains unexpended on June
11 30, 1997, from appropriations heretofore made for such
12 purposes in Section 6-5.24 of Public Act 89-0501, Article 79,
13 is reappropriated from the Build Illinois Bond Fund to the
14 Department of Natural Resources for a grant to the City of
15 Benld for recreation and park facilities.
16 Section 6-5.39. The amount of $127,000, or so much
17 thereof as may be necessary and remains unexpended on June
18 30, 1997, from appropriations heretofore made for such
19 purposes in Section 6-5.39 of Public Act 89-0501, Article 79,
20 is reappropriated from the Build Illinois Bond Fund to the
21 Department of Natural Resources for the Village of Midlothian
22 for flood control and drainage improvements.
23 Section 6-5.44a. The amount of $144,937, or so much
24 thereof as may be necessary and remains unexpended on June
25 30, 1997, from appropriations heretofore made for such
26 purposes in Section 6-5.44a of Public Act 89-0501, Article
27 79, is reappropriated from the Build Illinois Bond Fund to
28 the Environmental Protection Agency for grants to units of
29 local government for the planning, design, construction,
30 rehabilitation, repair, improvement, expansion, and any other
31 necessary costs for storm water, sewer, sewage treatment and
-134- BOB-CAPITAL98
1 water supply systems, at the approximate cost set forth
2 below:
3 La Grange Highlands Sanitary District...........$ 127,053
4 Section 6-5.44b. The amount of $40,000, or so much
5 thereof as may be necessary and remains unexpended on June
6 30, 1997, from appropriations heretofore made for such
7 purposes in Section 6-5.44b of Public Act 89-0501, Article
8 79, is reappropriated from the Build Illinois Bond Fund to
9 the Department of Natural Resources for units of local
10 government for storm drainage at the approximate cost set
11 forth below:
12 Bonnie ........................................$ 40,000
13 Section 6-5.44f. The amount of $300,000, or so much
14 thereof as may be necessary and remains unexpended on June
15 30, 1997, from appropriations heretofore made for such
16 purposes in Section 6-5.44f of Public Act 89-0501, Article
17 79, is reappropriated from the Build Illinois Bond Fund to
18 the Department of Natural Resources for a grant to the
19 Village of Summit for planning, design, construction and any
20 other necessary costs for flood control.
21 Section 6-6.6. The amount of $3,000,000, or so much
22 thereof as may be necessary and remains unexpended on June
23 30, 1997, from appropriations heretofore made for such
24 purposes in Section 6-6.6 of Public Act 89-0501, Article 79,
25 is reappropriated from the Build Illinois Purposes Fund to
26 the Illinois Community College Board for the City Colleges of
27 Chicago for costs associated with planning, utilities, site
28 improvements, repairs, renovation, remodeling, and
29 construction of Job Training Centers.
30 Section 6-6.10. The amount of $1,338,800, or so much
-135- BOB-CAPITAL98
1 thereof as may be necessary and remains unexpended on June
2 30, 1997, from appropriations heretofore made for such
3 purposes in Section 6-6.10 of Public Act 89-0501, Article 79,
4 is reappropriated from the Build Illinois Bond Fund to the
5 Department of Transportation for a grant to the City of
6 Chicago for the viaduct and roadway improvement program.
7 Section 6-6.14. The amount of $1,227,028, or so much
8 thereof as may be necessary and remains unexpended on June
9 30, 1997, from appropriations heretofore made for such
10 purposes in Section 6-6.14 of Public Act 89-0501, Article 79,
11 is reappropriated to the Department of Transportation from
12 the Build Illinois Bond Fund for the paving, upgrading or
13 construction:
14 (a) of streets and curbs at the following locations
15 within the City of Chicago:
16 1. The 4300 block of West Wrightwood;
17 2. The 3600 block of West Byron;
18 3. The 3200 block of West Waveland;
19 4. The 4200 block of North Hamlin;
20 5. The 4200 block of West Grace;
21 6. The 4200 block of North Springfield;
22 7. The 3200 block of North Lawndale;
23 8. East 117th from Avenue O to Avenue H;
24 9. Avenue N from 131st to 132nd;
25 10. State Line Road from 106th to 112th;
26 11. Princeton Street from 30th Street to 31st Street;
27 12. South Wells from 27th Street through 29th Street;
28 13. 23rd Place from Princeton to Wentworth;
29 14. Sayre Avenue between Higgins and Kennedy Expressway;
30 15. Keystone Avenue from North Avenue to Armitage
31 Avenue;
32 16. Harding Avenue from North Avenue to Armitage Avenue;
33 17. Lawndale Avenue from North Avenue to Armitage
-136- BOB-CAPITAL98
1 Avenue; and
2 18. The 1300 block of Monticello Avenue.
3 (b) of curbs at the following locations within
4 the City of Chicago:
5 1. The 3000 and 3100 blocks of North Elbridge Street;
6 2. The 2800, 2900 and 3000 blocks of West
7 Fletcher Street;
8 3. The 2800, 2900 and 3000 blocks of West
9 Wellington Street;
10 4. The 2800, 2900 and 3000 blocks of West
11 Nelson Street;
12 5. The 5600 and 5700 blocks of West Henderson;
13 6. The 5600 and 5700 blocks of West Cornelia;
14 7. The 3300 block of North Major;
15 8. The 3300, 3400 and 3500 blocks of North Linder;
16 9. The 3300 and 3500 blocks of North Lockwood;
17 10. The 2000, 2100 and 2200 blocks of Leland Avenue;
18 11. The 2000, 2100, 2200 and 2300 blocks of Giddings;
19 12. The 6100 block of North Artesian;
20 13. The 4400 block of North Francisco;
21 14. The 2500 block of West Hollywood;
22 15. The 6100 block of North Rockwell;
23 16. The 2400 block of West Winona;
24 17. The 2300 block of West Superior;
25 18. The 2000, 2100 and 2200 blocks of West Thomas;
26 19. The 2200 block of West Cortez;
27 20. The 2000 and 2100 blocks of West Iowa;
28 21. The 1200 block of North Noble;
29 22. The 700 block of North Campbell;
30 23. The 5600, 5700 and 5800 blocks of Kostner
31 from Bryn Mawr to Rodgers;
32 24. North Kostner from Hollywood to Rodgers;
33 25. North Kedvale from Leland to Lawrence;
34 26. Leland from Kedvale to Kildare;
-137- BOB-CAPITAL98
1 27. Leland from Kimball to Pulaski;
2 28. Monticello from Wilson to Lawrence;
3 29. St. Louis from Wilson to Lawrence;
4 30. Bernard from Leland to Lawrence;
5 31. Kasson from Kennicott to Keystone;
6 32. West Ainslie from Kimball to Bernard;
7 33. The west side of the 1800 block of North Austin;
8 34. The west side of the 2300 block of North Austin;
9 35. The 3000 and 3100 blocks of North Marmora;
10 36. The north side of the 7100 block of West Cornelia;
11 37. The 5600 block of West Barry;
12 38. The east side of the 3000 block of Norragansett;
13 39. The 6100 block of Diversey;
14 40. The west side of the 2500 block of Neva;
15 41. The 3300 and 3400 blocks of Neva;
16 42. The 6200 and 6300 blocks of West Barry;
17 43. The 6600 block of West Barry;
18 44. The west side of the 3100 block of North Mobile;
19 45. The south side of 17th Street from Ashland to
20 Paulina;
21 46. 17th Street from Paulina to Damen;
22 47. 3600 to 3800 block of Cumberland;
23 48. Sacramento Avenue from Addison to Cornelia;
24 49. Cornelia Avenue from Sacramento to Albany;
25 50. The 8300, 8400 and 8500 blocks of South
26 Francisco Avenue;
27 51. The 8300, 8400 and 8500 blocks of South
28 Whipple Avenue;
29 52. 82nd Street from Western Avenue to California
30 Avenue;
31 53. 85th Street from Kenneth Avenue to Cicero Avenue;
32 54. The 8500, 8600 and 8700 blocks of South Ramsey Road;
33 55. The 4300, 4400, 4500, 4600 and 4700 blocks of South
34 Normal Avenue;
-138- BOB-CAPITAL98
1 56. The 3500, 3600, 3700 and 3800 blocks of South
2 Lituanica Avenue;
3 57. Eleanor Street from Throop to Loomis Avenue; and
4 58. Pershing Road from Wentworth to Wood.
5 Section 6-6.18. The amount of $350,000, or so much
6 thereof as may be necessary and remains unexpended on June
7 30, 1997, from appropriations heretofore made for such
8 purposes in Section 6-6.18 of Public Act 89-0501, Article 79,
9 is reappropriated from the Build Illinois Bond Fund to the
10 Environmental Protection Agency for a grant to the Central
11 Stickney Sanitary District of Cook County for improvements to
12 the sewer system and the water system.
13 Section 6-6.19. The amount of $559,250, or so much
14 thereof as may be necessary and remains unexpended on June
15 30, 1997, from appropriations heretofore made for such
16 purposes in Section 6-6.19 of Public Act 89-0501, Article 79,
17 is reappropriated from the Build Illinois Bond Fund to the
18 Department of Natural Resources to pay for a portion of the
19 costs associated with the planning and construction of Lake
20 Michigan shoreline erosion controls in the City of Chicago.
21 Section 6-6.20. The amount of $250,000, or so much
22 thereof as may be necessary and remains unexpended on June
23 30, 1997, from appropriations heretofore made for such
24 purposes in Section 6-6.20 of Public Act 89-0501, Article 79,
25 is reappropriated from the Build Illinois Bond Fund to the
26 Department of Transportation for a grant to the City of
27 Chicago for the preliminary engineering for road improvements
28 on St. Louis Avenue, from 51st Street to 59th Street.
29 Section 6-6.21. The amount of $50,000, or so much
30 thereof as may be necessary and remains unexpended on June
-139- BOB-CAPITAL98
1 30, 1997, from appropriations heretofore made for such
2 purposes in Section 6-6.21 of Public Act 89-0501, Article 79,
3 is reappropriated from the Build Illinois Bond Fund to the
4 Department of Transportation to study the straightening of
5 Ogden Avenue, from First Street to Harlem Avenue.
6 Section 6-6.22. The amount of $500,000, or so much
7 thereof as may be necessary and remains unexpended on June
8 30, 1997, from appropriations heretofore made for such
9 purposes in Section 6-6.22 of Public Act 89-0501, Article 79,
10 is reappropriated from the Build Illinois Bond Fund to the
11 Department of Transportation for a grant to the City of
12 Chicago for the repair and replacement of roadway curbs in
13 the area bounded by Cicero Avenue, Central Avenue, Armitage
14 Avenue and Diversey Avenue, and the area bounded by Central
15 Avenue, Austin Avenue, Fullerton Avenue, and Grand Avenue.
16 Section 6-6.23. The amount of $500,000, or so much
17 thereof as may be necessary and remains unexpended on June
18 30, 1997, from appropriations heretofore made for such
19 purposes in Section 6-6.23 of Public Act 89-0501, Article 79,
20 is reappropriated from the Build Illinois Bond Fund to the
21 Department of Transportation for a grant to the City of
22 Chicago for the following roadway resurfacing improvements:
23 Francisco St. - 5100 S. to 5500 S.
24 Francisco St. - 5700 S. to 5900 S.
25 Mozart St. - 5100 S. to 5900 S.
26 54th Place - 3000 W. to 3200 W.
27 Carpenter St. - 3230 S. to 3400 S.
28 Wood St. - Stevenson Expressway to 3900 S.
29 Keeley St. - Archer Ave. to 3100 S.
30 Section 6-6.24. The amount of $450,000, or so much
31 thereof as may be necessary and remains unexpended on June
-140- BOB-CAPITAL98
1 30, 1997, from appropriations heretofore made for such
2 purposes in Section 6-6.24 of Public Act 89-0501, Article 79,
3 is reappropriated from the Build Illinois Bond Fund to the
4 Department of Transportation for a grant to the City of
5 Chicago for the following roadway resurfacing improvements:
6 For Drake Ave. - 1600 N. to 2400 N.
7 Hamlin Ave. - 2000 N. to 2200 N.
8 Dickens Ave. - 3200 W. to 4000 W.
9 Belden Ave. - 3200 W. to 3600 W.
10 Medill Ave. - 3400 W. to 3600 W.
11 Avers Ave. - 2000 N. to 2200 N.
12 Section 6-6.25. The amount of $558,719, or so much
13 thereof as may be necessary and remains unexpended on June
14 30, 1997, from appropriations heretofore made for such
15 purposes in Section 6-6.25 of Public Act 89-0501, Article 79,
16 is reappropriated from the Build Illinois Bond Fund to the
17 Department of Transportation for a grant to the City of
18 Chicago for roadway resurfacing improvements:
19 Farwell Ave. - Ridge Ave. to Western Ave.
20 Morse Ave. - Ridge Ave. to Western Ave.
21 Greenleaf Ave. - Ridge to Western Ave.
22 Estes Ave. - Ridge Ave. to Western Ave.
23 Rosemont - Western to Kedzie
24 Leavitt - Norwood to Granville
25 Granville Ave. from Western Ave. to Kedzie
26 Section 6-6.31. The amount of $400,000, or so much
27 thereof as may be necessary and remains unexpended on June
28 30, 1997, from appropriations heretofore made for such
29 purposes in Section 6-6.31 of Public Act 89-0501, Article 79,
30 is reappropriated from the Build Illinois Bond Fund to the
31 Department of Natural Resources for a grant to the Chicago
32 Park District for planning, site improvements and
-141- BOB-CAPITAL98
1 construction of a swimming pool in Fernwood Park at 10438
2 South Lowe Street in the City of Chicago.
3 Division VIII. The reappropriations in this Division
4 continue certain appropriations initially made for the
5 purpose of the renewal of the rural areas of Illinois for the
6 fiscal year beginning July 1, 1986.
7 Section 7-2.3. The amount of $62,621, or so much thereof
8 as may be necessary and remains unexpended on June 30, 1997,
9 from appropriations heretofore made for such purposes in
10 Section 7-2.3 of Public Act 89-0501, Article 79, is
11 reappropriated from the Build Illinois Bond Fund to the
12 Environmental Protection Agency for a grant to the City of
13 DuQuoin for planning, design and construction of a sanitary
14 sewer extension to the DuQuoin State Fair and nearby areas.
15 Section 7-3.1a. The amount of $296,840, or so much
16 thereof as may be necessary and remains unexpended on June
17 30, 1997, from appropriations heretofore made for such
18 purposes in Section 7-3.1a of Public Act 89-0501, Article 79,
19 is reappropriated from the Build Illinois Bond Fund to the
20 Environmental Protection Agency for making grants to units of
21 local government for the planning, design, construction,
22 rehabilitation and any other necessary costs for wastewater
23 treatment facilities and for plans, construction, repairs,
24 improvements and any other necessary costs for sewer and
25 water supply systems, at the approximate costs as set forth
26 below:
27 Old Shawneetown............................. $ 3,750
28 East Cape Girardeau......................... 8,750
29 Equality.................................... 50,000
30 Benton...................................... 81,538
31 Sims........................................ 45,000
-142- BOB-CAPITAL98
1 Belle Rive.................................. 20,000
2 New Lenox................................... 67,588
3 Fairmont City............................... 75,000
4 Washington Park............................. 75,000
5 Brooklyn.................................... 50,000
6 Carmi....................................... 385,778
7 Section 7-3.1b. The amount of $50,000, or so much
8 thereof as may be necessary and remains unexpended on June
9 30, 1997, from appropriations heretofore made for such
10 purposes in Section 7-3.1b of Public Act 89-0501, Article 79,
11 is reappropriated from the Build Illinois Bond Fund to the
12 Department of Natural Resources for plans, construction,
13 repairs, improvements and any other necessary costs for storm
14 drainage, at the approximate costs set forth below:
15 East Carondelet ............................ $ 50,000
16 Section 6-3.110. The amount of $70,000, or so much
17 thereof as may be necessary and remains unexpended on June
18 30, 1997, from appropriations heretofore made for such
19 purposes in Section 6-3.110 of Public Act 89-0501, Article
20 79, is reappropriated from the Build Illinois Bond Fund to
21 the Environmental Protection Agency for the purpose of a
22 grant to the City of Bloomington for extension and expansion
23 of sewers.
24 Division IX. The reappropriations in this Division
25 continue certain appropriations initially made for the fiscal
26 years beginning July 1, 1985, for the purpose of the Build
27 Illinois Program set forth below.
28 Section 8-1.11. The following named amounts, or so much
29 thereof as may be necessary and remain unexpended on June 30,
30 1997, from appropriations heretofore made for such purposes
-143- BOB-CAPITAL98
1 in Section 8-1.11 of Public Act 89-0501, Article 79, are
2 reappropriated from the Build Illinois Bond Fund to the
3 Department of Natural Resources for the purposes hereinafter
4 enumerated:
5 For grants to units of local government
6 as provided in the "Open Space Lands
7 Acquisition and Development Act" ...............$ 110,000
8 Section 8-1.19. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended on June 30,
10 1997, from appropriations heretofore made for such purposes
11 in Section 8-1.19 of Public Act 89-0501, Article 79, are
12 reappropriated from the Build Illinois Bond Fund to the
13 Department of Transportation for land acquisition,
14 engineering and contract costs for construction,
15 reconstruction, extension and improvement of State highways,
16 including bridges, structures separating highways and
17 railroads, rest areas, interchanges, and access roads to and
18 from any State or local highway and such other necessary or
19 appropriate purposes as provided by the "Illinois Highway
20 Code" as follows:
21 Access Roads, interchanges, and rest areas.......$ 95,191
22 Section 8-1.21. The amount of $189,520, or so much
23 thereof as may be necessary and remains unexpended on June
24 30, 1997, from appropriations heretofore made for such
25 purposes in Section 8-1.21 of Public Act 89-0501, Article 79,
26 is reappropriated from the Build Illinois Bond Fund to the
27 Department of Natural Resources for the completion of the
28 following projects at the approximate costs set forth below:
29 Lower Des Plaines River at Tributaries Watershed
30 - Cook and DuPage Counties - For
31 construction of drainage, flood control,
32 recreation and related improvements and
-144- BOB-CAPITAL98
1 facilities in the Lower Des Plaines
2 Watershed; and for necessary land
3 acquisition, relocation, and related
4 expenses, all in general conformance with
5 the Lower Des Plaines River and Tributaries
6 Watershed Work plan in cooperation with the
7 U.S. Soil Conservation Service and local
8 governments sponsoring this Federal
9 Flood Control project ...........................$189,520
10 Section 8-1.22. The amount of $33,311, or so much
11 thereof as may be necessary and remains unexpended on June
12 30, 1997, from appropriations heretofore made for such
13 purposes in Section 8-1.22 of Public Act 89-0501, Article 79,
14 is reappropriated from the Build Illinois Bond Fund to the
15 Department of Natural Resources for costs associated with
16 drainage, flood control and related improvements.
17 Section 8-2.18. The amount of $552,048, or so much
18 thereof as may be necessary and remains unexpended on June
19 30, 1997, from appropriations heretofore made for such
20 purposes in Section 8-2.18 of Public Act 89-0501, Article 79,
21 is reappropriated from the Build Illinois Bond Fund to the
22 Environmental Protection Agency for the purpose of a grant to
23 the Village of Palos Park for the design, engineering and
24 construction of sewers.
25 Section 8-2.28. The amount of $500,000, or so much
26 thereof as may be necessary and remains unexpended on June
27 30, 1997, from appropriations heretofore made for such
28 purposes in Section 8-2.28 of Public Act 89-0501, Article 79,
29 is reappropriated from the Build Illinois Bond Fund to the
30 Department of Natural Resources to assist in planning and
31 construction of a water retention project on Tyler Creek.
-145- BOB-CAPITAL98
1 Section 8-2.29. The amount of $198, or so much thereof
2 as may be necessary and remains unexpended on June 30, 1997,
3 from appropriations heretofore made for such purposes in
4 Section 8-2.29 of Public Act 89-0501, Article 79, is
5 reappropriated from the Build Illinois Bond Fund to the
6 Department of Transportation for planning and engineering and
7 construction of an interchange at Interstate 80 and Houbolt
8 Road in Will County.
9 Section 8-2.33. The amount of $50,000, or so much
10 thereof as may be necessary and remains unexpended on June
11 30, 1997, from appropriations heretofore made for such
12 purposes in Section 8-2.33 of Public Act 89-0501, Article 79,
13 is reappropriated from the Build Illinois Bond Fund to the
14 Department of Natural Resources for feasibility, engineering,
15 and economic and environmental studies on the LaMoine Lake
16 Project.
17 Section 8-4.5. The amount of $500,000, or so much
18 thereof as may be necessary and remains unexpended on June
19 30, 1997, from appropriations heretofore made for such
20 purposes in Section 8-4.5 of Public Act 89-0501, Article 79,
21 is reappropriated from the Build Illinois Bond Fund to the
22 Department of Commerce and Community Affairs for a grant to
23 the City of North Chicago for all costs associated with the
24 planning and construction of a building and parking facility
25 to house a Community Cultural Art Center.
26 Section 8-4.6. The amount of $100,000, or so much
27 thereof as may be necessary and remains unexpended on June
28 30, 1997, from appropriations heretofore made for such
29 purposes in Section 8-4.6 of Public Act 89-0501, Article 79,
30 is reappropriated from the Build Illinois Purposes Fund to
31 the Department of Commerce and Community Affairs for a grant
-146- BOB-CAPITAL98
1 to the Metro East Solid Waste Disposal and Energy Producing
2 Service for its ordinary and contingent expenses.
3 Section 8-5.3. The amount of $2,000,000, or so much
4 thereof as may be necessary and remains unexpended on June
5 30, 1997, from appropriations heretofore made for such
6 purposes in Section 8-5.3 of Public Act 89-0501, Article 79,
7 is reappropriated from the Build Illinois Bond Fund to the
8 Illinois Community College Board for the City Colleges of
9 Chicago for costs associated with planning, utilities, site
10 improvements, repairs, renovation, remodeling, and
11 construction of Job Training Centers.
12 Section 8-5.6. The amount of $658,241, or so much
13 thereof as may be necessary and remains unexpended on June
14 30, 1997, from appropriations heretofore made for such
15 purposes in Section 8-5.6 of Public Act 89-0501, Article 79,
16 is reappropriated from the Build Illinois Bond Fund to the
17 Department of Transportation as a grant to the City of
18 Chicago for a viaduct and roadway improvement program.
19 Division X. The reappropriations in this Division
20 continue certain appropriations initially made for the fiscal
21 years beginning July 1, 1985 through 1992, combined for the
22 purpose of the Build Illinois Program set forth below.
23 Section 10A. The amount of $11,295,368, or so much
24 thereof as may be necessary and remains unexpended on June
25 30, 1997, from appropriations heretofore made for such
26 purposes in Section 10A of Public Act 89-0501, Article 79, is
27 reappropriated from the Build Illinois Bond Fund to the
28 Environmental Protection Agency for grants to units of local
29 government for sewer systems and wastewater treatment
30 facilities pursuant to rules and procedures established under
-147- BOB-CAPITAL98
1 the Anti-Pollution Bond Act.
2 Section 10B. The amount of $120,094,975, or so much
3 thereof as may be necessary, and remains unexpended on June
4 30, 1997, from appropriations heretofore made for such
5 purposes in Section 10B of Public Act 89-0501, Article 79, is
6 reappropriated from the Build Illinois Bond Fund to the
7 Environmental Protection Agency for wastewater compliance
8 grants to units of local government for sewer systems and
9 wastewater treatment facilities pursuant to procedures and
10 rules established under the Anti-Pollution Bond Act. These
11 grants are limited to projects for which the local government
12 provides at least 30% of the project cost. There is an
13 approved project compliance plan, and there is an enforceable
14 compliance schedule prior to the grant award. The grant
15 award will be based on eligible project cost contained in the
16 approved compliance plan.
17 Section 10C. The following named amounts, or so much
18 thereof as may be necessary, and remain unexpended on June
19 30, 1997 from appropriations heretofore made for such
20 purposes in Article 79, Section 10C of Public Act 89-0501,
21 are reappropriated from the Build Illinois Bond Fund to the
22 Capital Development Board for the Board of Higher Education
23 for miscellaneous capital improvements including
24 construction, reconstruction, remodeling, improvement, repair
25 and installation of capital facilities, costs of planning,
26 supplies, equipment, materials, services, and all other
27 expenses required to complete the work at the colleges and
28 universities hereinafter enumerated:
29 Chicago State University ....................... $ 51,160
30 Eastern Illinois University .................... 92,221
31 Western Illinois University .................... 15,152
32 Northeastern Illinois University ............... 7,454
-148- BOB-CAPITAL98
1 Total, Build Illinois Bond Fund $165,987
2 Section 10D. The following named amounts, or so much
3 thereof as may be necessary, and remain unexpended on June
4 30, 1997 from appropriations heretofore made for such
5 purposes in Article 79, Section 10D of Public Act 89-0501,
6 are reappropriated from the Build Illinois Bond Fund to the
7 Capital Development Board for the Board of Higher Education
8 for miscellaneous capital improvements including
9 construction, reconstruction, remodeling, improvement, repair
10 and installation of capital facilities, costs of planning,
11 supplies, equipment, materials, services, and all other
12 expenses required to complete the work at the colleges and
13 universities hereinafter enumerated:
14 Illinois State University ...................... $ 156,024
15 Northern Illinois University ................... 121,871
16 University of Illinois at Springfield .......... 1,698
17 Total, Build Illinois Bond Fund $279,593
18 Section 10E. The amount of $2,720,095, or so much
19 thereof as may be necessary, and remains unexpended on June
20 30, 1997 from appropriations heretofore made for such
21 purposes in Article 79, Section 10E of Public Act 89-0501, is
22 reappropriated from the Build Illinois Bond Fund to the
23 Capital Development Board for the University of Illinois for
24 miscellaneous capital improvements including construction,
25 reconstruction, remodeling, improvement, repair and
26 installation of capital facilities, costs of planning,
27 supplies, equipment, materials, services, and all other
28 expenses required to complete the work. This appropriation
29 shall be in addition to any other appropriated amounts which
30 can be expended for these purposes.
31 Section 10F. The amount of $480,964, or so much thereof
-149- BOB-CAPITAL98
1 as may be necessary, and remains unexpended on June 30, 1997
2 from appropriations heretofore made for such purposes in
3 Article 79, Section 10F of Public Act 89-0501, is
4 reappropriated from the Build Illinois Bond Fund to the
5 Capital Development Board for Southern Illinois University
6 for miscellaneous capital improvements including
7 construction, reconstruction, remodeling, improvement, repair
8 and installation of capital facilities, costs of planning,
9 supplies, equipment, materials, services, and all other
10 expenses required to complete the work. This appropriation
11 shall be in addition to any other appropriated amounts which
12 can be expended for these purposes.
13 Section 10G. The amount of $1,700,920, or so much
14 thereof as may be necessary, and remains unexpended on June
15 30, 1997 from appropriations heretofore made for such
16 purposes in Article 79, Section 10G of Public Act 89-0501, is
17 reappropriated from the Build Illinois Bond Fund to the
18 Capital Development Board for the Illinois Community College
19 Board for grants to community colleges repair, renovation,
20 and miscellaneous capital improvements including
21 construction, reconstruction, remodeling, improvement, repair
22 and installation of capital facilities, costs of planning,
23 supplies, equipment, materials, services, and all other
24 expenses required to complete the work. This appropriation
25 shall be in addition to any other appropriated amounts which
26 can be expended for these purposes.
27 Division XI. This Division contains provisions governing
28 the expenditure of funds appropriated in this Article.
29 Section 10-1.1. No contract shall be entered into or
30 obligation incurred for any expenditures from the
31 appropriations made in this Article until after the purposes
-150- BOB-CAPITAL98
1 and amounts have been approved in writing by the Governor.
2 ARTICLE 4
3 Section 99.This Act takes effect on July 1, 1997.