1 AN ACT concerning competition in the natural gas
2 industry.
3 Be it enacted by the People of the State of Illinois,
4 represented in the General Assembly:
5 Section 5. The Public Utilities Act is amended by
6 changing Section 8-501 as follows:
7 (220 ILCS 5/8-501) (from Ch. 111 2/3, par. 8-501)
8 Sec. 8-501. Interconnection of intrastate gas pipelines.
9 Whenever the Commission, after a hearing had upon its own
10 motion or upon complaint, shall find that the rules,
11 regulations, practices, equipment, appliances, facilities or
12 service of any public utility, or the methods of manufacture,
13 distribution, transmission, storage or supply employed by it,
14 are unjust, unreasonable, unsafe, improper, inadequate or
15 insufficient, the Commission shall determine the just,
16 reasonable, safe, proper, adequate or sufficient rules,
17 regulations, practices, equipment, appliances, facilities,
18 service or methods to be observed, furnished, constructed,
19 enforced or employed and it shall fix the same by its order,
20 decision, rule or regulation. The Commission shall prescribe
21 rules and regulations for the performance of any service or
22 the furnishing of any commodity of the character furnished or
23 supplied by any public utility.
24 Whenever the Commission shall determine, after a hearing,
25 that the public convenience and necessity requires that
26 interconnection or extension of intrastate gas distribution
27 or transmission pipelines or facilities is necessary to
28 insure that natural gas service is made available to Illinois
29 natural gas customers at rates which are just and reasonable,
30 the Commission shall determine the interconnection or
31 extension of pipelines or facilities which is necessary to
-2- LRB9008832JSgc
1 provide such service and shall direct that such facilities be
2 established, according to a schedule set by the Commission.
3 The Commission shall direct that any utility supplying
4 natural gas for such interconnection or extension of
5 intrastate gas distribution or transmission pipelines or
6 facilities shall recover all costs and charges related to the
7 interconnection or extension from the utility receiving such
8 gas at no increased cost to the customers of any utility
9 supplying the gas. The Commission is directed to report to
10 the General Assembly by September 20, 1984, detailing its
11 findings and the steps which it has taken to provide for such
12 intrastate interconnections or extensions.
13 (Source: P.A. 84-617.)