[ Back ] [ Bottom ]
91_HB0595
LRB9102370JStm
1 AN ACT to amend the Mobile Home Park Act by changing
2 Sections 4 and 4.2 and adding Section 4.5.
3 Be it enacted by the People of the State of Illinois,
4 represented in the General Assembly:
5 Section 5. The Mobile Home Park Act is amended by
6 changing Sections 4 and 4.2 and adding Section 4.5 as
7 follows:
8 (210 ILCS 115/4) (from Ch. 111 1/2, par. 714)
9 Sec. 4. New construction; permit. In order to obtain a
10 permit to construct a new mobile home park the applicant
11 shall file with the Department a written application and plan
12 documents, including the following:
13 (a) The full name and address of the applicant or
14 applicants, or names and addresses of the partners if the
15 applicant is a partnership, or the names and addresses of the
16 officers if the applicant is a corporation.
17 (b) The address, location and legal description of the
18 tract of land upon which it is proposed to construct, operate
19 and maintain a mobile home park.
20 (c) The name of the mobile home park.
21 (d) Detailed plans and specifications sealed by a
22 registered engineer or architect licensed to practice in the
23 State of Illinois which include a general plot plan of the
24 mobile home park with all sites and structures shown, the
25 underground storm shelter required under Section 4.5, the
26 water supply system, the sewage disposal system, the
27 electrical system, the fuel supply system, the lighting
28 system, the method of disposal of solid waste, all streets
29 and sidewalks, swimming and bathing facilities, fire hydrants
30 and details of all auxiliary structures.
31 (e) The number of mobile home sites proposed to be
-2- LRB9102370JStm
1 constructed or licensed.
2 (f) A statement of the fire-fighting facilities, public
3 or private, which are available to the mobile home park.
4 (g) A plan review fee of $100, which is nonrefundable.
5 (Source: P.A. 85-565.)
6 (210 ILCS 115/4.2) (from Ch. 111 1/2, par. 714.2)
7 Sec. 4.2. Alteration of mobile home park; permit. An
8 application for a permit to alter a licensed mobile home park
9 shall be submitted to the Department for any changes to the
10 water, sewage, fuel, or electrical systems other than normal
11 maintenance, the relocation of sites or the expansion of the
12 number of sites in the park. Detailed plans and
13 specifications shall be provided to show compliance with this
14 Act and the promulgated rules. If the application is for a
15 permit to alter the mobile home park by expanding the number
16 of sites, the plans and specifications must include the
17 underground storm shelter required under Section 4.5. A plan
18 review fee of $50 shall accompany the application. This fee
19 shall not be refundable. Construction shall not commence
20 until a permit is issued.
21 (Source: P.A. 85-565.)
22 (210 ILCS 115/4.5 new)
23 Sec. 4.5. Underground storm shelter. If the application
24 for a permit (i) for new construction or (ii) for alteration
25 of a licensed mobile home park by expanding the number of
26 sites in the park is filed after the effective date of this
27 amendatory Act of the 91st General Assembly, the mobile home
28 park must include an underground storm shelter with a
29 capacity to shelter all residents of the mobile home park.
[ Top ]