[ Back ] [ Bottom ]
91_HB2647ham001
LRB9100291ACtmam01
1 AMENDMENT TO HOUSE BILL 2647
2 AMENDMENT NO. . Amend House Bill 2647 on page 9,
3 line 4, after "his", by inserting "or her"; and
4 on page 11, line 2, after "his", by inserting "or her"; and
5 on page 12, by replacing lines 7 through 22 with the
6 following:
7 "(a) pre-design (environmental analysis,
8 architectural programming, and application of principles
9 of project management and coordination), environmental
10 analysis and programming;
11 (b) site planning (site analysis, design and
12 development, parking, and application of zoning
13 requirements) design;
14 (c) building planning (conceptual planning of
15 functional and space relationships, building design,
16 interior space layout, barrier-free design, and the
17 application of the life safety code requirements and
18 principles of energy efficient design) design;
19 (d) building technology (application of structural
20 systems, building components, and mechanical and
21 electrical systems) structural technology (general, long
22 span, and lateral);
23 (e) general structures (identification, resolution,
-2- LRB9100291ACtmam01
1 and incorporation of structural systems and the long span
2 design on the technical aspects of the design of
3 buildings and the process and construction) life safety
4 codes and technology, and energy efficient design;
5 (f) lateral forces (identification and resolution
6 of the effects of lateral forces on the technical aspects
7 of the design of buildings and the process of
8 construction) barrier free design;
9 (g) mechanical, plumbing, and electrical systems
10 (as applied to the design of buildings, including
11 plumbing and acoustical systems) (principles of
12 sanitation and ventilation as applied to buildings);
13 (h) materials and methods (as related to the design
14 of buildings and the technical aspects of construction);
15 and
16 (i) construction documents and services (conduct of
17 architectural practice as it relates to construction
18 documents, bidding, and construction administration and
19 contractual documents from beginning to end of a building
20 project)., technical submissions, and professional
21 practice, including the contractual duties of an
22 architect; and"; and
23 on page 21, line 15, after "his", by inserting "or her"; and
24 on page 49, line 3, by replacing "impression" with "print
25 impression"; and
26 on page 49, line 7, by replacing "seal or" with "reproducible
27 seal or"; and
28 on page 56, line 24, after "his", by inserting "or her"; and
29 on page 66, line 6, after "his", by inserting "or her"; and
30 on page 69, line 15, after "his", by inserting "or her"; and
31 on page 70, line 19, after "his", by inserting "or her"; and
-3- LRB9100291ACtmam01
1 on page 72, line 19, after "his", by inserting "or her"; and
2 on page 79, line 9, after "his", by inserting "or her"; and
3 on page 86, line 14, after "his", by inserting "or her"; and
4 on page 90, line 31, after "his", by inserting "or her"; and
5 on page 96, line 9, after "his", by inserting "or her".
[ Top ]