1 AN ACT making appropriations and reappropriations.
2 Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
4 ARTICLE 1
5 Section 1. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 Capital Development Fund to the Capital Development Board for
8 the Department of Agriculture for the projects hereinafter
9 enumerated:
10 DUQUOIN STATE FAIRGROUNDS
11 For renovating roundhouses ..................... $ 600,000
12 GALESBURG DIAGNOSTIC LABORATORY
13 For purchasing the facility .................... 3,200,000
14 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
15 For completing the HVAC replacement
16 in the Administration Building, in
17 addition to funds previously appropriated .... 485,000
18 For replacing and repairing roofs,
19 Phase II ..................................... 810,000
20 For extending the fiber optics system .......... 250,000
21 For installing HVAC system and
22 restrooms in the Orr Building ................ 1,100,000
23 Total, Section 1 $6,445,000
24 Section 1a. The following named amount, or so much
25 thereof as may be necessary, is appropriated from the General
26 Revenue Fund to the Capital Development Board for the
27 Department of Agriculture for the project hereinafter
28 enumerated:
29 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
30 For upgrading infield lighting on one mile
-2- BOB-CDBnew-re2000
1 and one-half mile tracks .......................$ 335,000
2 Section 2. The following named amounts, or so much
3 thereof as may be necessary, are appropriated from the
4 Capital Development Fund to the Capital Development Board for
5 the Department of Central Management Services for the
6 projects hereinafter enumerated:
7 CENTRAL COMPUTER FACILITY
8 For installing a cooling tower and fire alarm
9 system and various other improvements ........ $ 581,000
10 OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
11 For planning and beginning the renovation
12 of the facility .............................. 2,500,000
13 SPRINGFIELD REGIONAL OFFICE BUILDING
14 For replacing the potable water system ......... 825,000
15 For upgrading the parking lot .................. 175,000
16 Total, Section 2 $4,081,000
17 Section 2a. The following named amounts, or so much
18 thereof as may be necessary, are appropriated from the
19 General Revenue Fund to the Capital Development Board for the
20 Department of Central Management Services for the projects
21 hereinafter enumerated:
22 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
23 (ROOSEVELT ROAD) - CHICAGO
24 For rehabilitating the pool area ............... $ 150,000
25 JAMES R. THOMPSON CENTER - CHICAGO
26 For investigating structural columns
27 deterioration ................................ 50,000
28 STATE OF ILLINOIS BUILDING - CHICAGO
29 For restoring exterior limestone and
30 masonry ...................................... 550,000
31 PARIS STATE GARAGE
32 For replacing overhead lighting and
-3- BOB-CDBnew-re2000
1 pneumatic system ............................. 205,000
2 WATSEKA STATE GARAGE
3 For replacing lighting, windows and
4 overhead doors ............................... 110,000
5 Total, Section 2a $1,065,000
6 Section 3. The following named amounts, or so much
7 thereof as may be necessary, are appropriated from the
8 Capital Development Fund to the Capital Development Board for
9 the Department of Corrections for the projects hereinafter
10 enumerated:
11 DWIGHT CORRECTIONAL CENTER
12 For upgrading the water treatment plant ........ $ 1,000,000
13 EAST MOLINE CORRECTIONAL CENTER
14 For upgrading fire alarm and building
15 automation systems ........................... 900,000
16 ILLINOIS YOUTH CENTER - HARRISBURG
17 For upgrading mechanical control system ........ 515,000
18 ILLINOIS YOUTH CENTER - VALLEY VIEW
19 For replacing boilers, controls, hot
20 water heaters and softeners in
21 residential units and administration
22 building ..................................... 1,300,000
23 ILLINOIS YOUTH CENTER - WARRENVILLE
24 For rehabilitation of the administration
25 building ..................................... 791,000
26 LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
27 For constructing two cellhouses, in
28 addition to funds previously appropriated .... 14,300,000
29 MENARD CORRECTIONAL CENTER - CHESTER
30 For improving ventilation and dehumidification
31 systems in the kitchen and dining rooms ...... 500,000
32 For replacing shower room and guard tower ...... 500,000
33 For upgrading mechanical bar screen and storm
-4- BOB-CDBnew-re2000
1 and sanitary sewer system .................... 1,300,000
2 SHERIDAN CORRECTIONAL CENTER
3 For replacing doors and locks .................. 150,000
4 STATEVILLE CORRECTIONAL CENTER - JOLIET
5 For constructing a housing unit, cellhouse,
6 vehicle maintenance building and
7 warehouse for the reception and
8 classification center, in addition to
9 funds previously appropriated ................ 28,500,000
10 For replacing windows in B House ............... 3,000,000
11 For replacing cell fronts in F House ........... 1,000,000
12 For upgrading plumbing system in F House,
13 in addition to funds previously
14 appropriated ................................. 3,500,000
15 TAYLORVILLE CORRECTIONAL CENTER
16 For upgrading shower ventilation system ........ 250,000
17 THOMSON CORRECTIONAL CENTER
18 For constructing three cellhouses and
19 expanding educational and vocational
20 space, in addition to funds previously
21 appropriated ................................. 38,400,000
22 VANDALIA CORRECTIONAL CENTER
23 For planning and beginning construction
24 for a slaughter house and meat plant ......... 500,000
25 For repairing exterior masonry, in addition
26 to funds previously appropriated ............. 750,000
27 VIENNA CORRECTIONAL CENTER
28 For replacing windows, in addition to
29 funds previously appropriated ................ 800,000
30 STATEWIDE
31 For planning, design, construction, equipment
32 and all other necessary costs for a
33 female multi-security level
34 correctional center .......................... 80,000,000
-5- BOB-CDBnew-re2000
1 For replacing roofing systems at the
2 following locations at the approximate
3 cost set forth below ......................... 1,100,000
4 Vienna Correctional Center ..........500,000
5 Sheridan Correctional Center ........600,000
6 For replacing or installing mechanical bar
7 screens at the following locations at the
8 approximate cost set forth below ............. 840,000
9 Graham Correctional Center -
10 Hillsboro ..........................340,000
11 Western Illinois Correctional
12 Center - Mt. Sterling ..............350,000
13 Shawnee Correctional Center -
14 Vienna .............................150,000
15 For upgrading security control systems and
16 panels in housing units at the following
17 locations at the approximate cost set
18 forth below .................................. 4,850,000
19 Danville Correctional Center ........500,000
20 Hill Correctional Center -
21 Galesburg ........................1,500,000
22 Western Illinois Correctional
23 Center - Mt. Sterling ..............675,000
24 Illinois River Correctional
25 Center - Canton ....................675,000
26 Shawnee Correctional Center -
27 Vienna ...........................1,500,000 ____________
28 Total, Section 3 $184,746,000
29 Section 3a. The following named amounts, or so much
30 thereof as may be necessary, are appropriated from the
31 General Revenue Fund to the Capital Development Board for the
32 Department of Corrections for the projects hereinafter
33 enumerated:
-6- BOB-CDBnew-re2000
1 JACKSONVILLE CORRECTIONAL CENTER
2 For replacing inner perimeter sidewalk ......... $ 330,000
3 VANDALIA CORRECTIONAL CENTER
4 For replacing showers in six buildings, in
5 addition to funds previously appropriated .... 600,000
6 Total, Section 3a $930,000
7 Section 4. The following named amounts, or so much
8 thereof as may be necessary, are appropriated from the
9 Capital Development Fund to the Capital Development Board for
10 the Historic Preservation Agency for the projects hereinafter
11 enumerated:
12 FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
13 For restoring the powder magazine .............. $ 305,000
14 LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
15 For rehabilitating site and providing
16 irrigation system ............................ 445,000
17 LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
18 For rehabilitating interior and exterior ....... 755,000
19 OLD STATE CAPITOL - SPRINGFIELD
20 For providing structural stabilization ......... 2,000,000
21 UNION STATION - SPRINGFIELD
22 For purchasing and rehabilitating .............. 2,810,000
23 Total, Section 4 $6,315,000
24 Section 4a. The following named amounts, or so much
25 thereof as may be necessary, are appropriated from the
26 General Revenue Fund to the Capital Development Board for
27 the Historic Preservation Agency for the projects hereinafter
28 enumerated:
29 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
30 For replacing the Orientation
31 Theater screen ............................... $ 220,000
32 DANA THOMAS HOUSE - SPRINGFIELD
-7- BOB-CDBnew-re2000
1 For restoring exterior and interior ............ 450,000
2 GALENA HISTORIC SITE
3 For rehabilitating Washburne House ............. 564,000
4 LINCOLN'S NEW SALEM HISTORIC SITE - PETERSBURG
5 For resurfacing village and service roads ...... 125,000
6 For rehabilitating lift stations ............... 395,000
7 OLD STATE CAPITOL - SPRINGFIELD
8 For replacing the bottom cylinder of
9 the hydraulic elevator ....................... 50,000
10 Total, Section 4a $1,804,000
11 Section 5. The following named amounts, or so much
12 thereof as may be necessary, are appropriated from the
13 Capital Development Fund to the Capital Development Board for
14 the Department of Human Services for the projects hereinafter
15 enumerated:
16 CHESTER MENTAL HEALTH CENTER
17 For upgrading access control/duress system ..... $ 1,500,000
18 FOX DEVELOPMENTAL CENTER - DWIGHT
19 For upgrading electrical system and installing
20 an emergency generator ....................... 842,000
21 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
22 For renovating residences, in addition to
23 funds previously appropriated ................ 2,792,000
24 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
25 For renovating the fire alarm systems, in
26 addition to funds previously appropriated .... 500,000
27 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
28 For completing the powerhouse rehabilitation, in
29 addition to funds previously appropriated .... 400,000
30 JACKSONVILLE DEVELOPMENTAL CENTER
31 For rehabilitating cooling towers at
32 the power plant .............................. 270,000
33 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
-8- BOB-CDBnew-re2000
1 For renovating residential and neighborhood
2 homes, in addition to funds previously
3 appropriated ................................. 1,850,000
4 MADDEN MENTAL HEALTH CENTER - HINES
5 For renovating pavilions for safety/security,
6 in addition to funds previously appropriated . 1,200,000
7 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
8 For renovating Kennedy Hall .................... 2,500,000
9 MURRAY MENTAL HEALTH CENTER - CENTRALIA
10 For replacing energy management system ......... 815,000
11 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
12 For upgrading HVAC systems in four
13 residential buildings ........................ 1,210,000
14 ZELLER MENTAL HEALTH CENTER - PEORIA
15 For upgrading HVAC and mechanical systems ...... 685,000
16 STATEWIDE
17 For replacing and repairing roofing systems
18 at the following locations at the approximate
19 cost set forth below ......................... 2,310,000
20 Choate Developmental Center -
21 Anna ...............................300,000
22 Chicago-Read Mental Health Center ...100,000
23 Tinley Park Mental Health Center.....185,000
24 Illinois School for the Visually
25 Impaired - Jacksonville ............160,000
26 Shapiro Developmental Center -
27 Kankakee ...........................545,000
28 Kiley Developmental Center -
29 Waukegan ...........................300,000
30 Ludeman Developmental center -
31 Park Forest ........................720,000
32 For upgrading roads at the following
33 locations at the approximate
34 cost set forth below ......................... 1,000,000
-9- BOB-CDBnew-re2000
1 Howe Developmental Center -
2 Tinley Park ........................520,000
3 Shapiro Developmental center -
4 Kankakee ...........................480,000 ____________
5 Total, Section 5 $17,874,000
6 Section 5a. The following named amounts, or so much
7 thereof as may be necessary, are appropriated from the
8 General Revenue Fund to the Capital Development Board for the
9 Department of Human Services for the projects hereinafter
10 enumerated:
11 CHOATE MENTAL HEALTH CENTER - ANNA
12 For life/safety improvements ................... $ 175,000
13 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
14 For upgrading kitchen equipment ................ 750,000
15 JACKSONVILLE DEVELOPMENTAL CENTER
16 For upgrading HVAC systems in the Drake and
17 Gillespie buildings .......................... 245,000
18 STATEWIDE
19 For resurfacing and repairing roads at the
20 following locations at the approximate cost
21 set forth below .............................. 1,000,000
22 Alton Mental Health Center ..........590,000
23 Choate Mental Health Center -
24 Anna ...............................210,000
25 Lincoln Developmental Center ........200,000 ____________
26 Total, Section 5a $2,170,000
27 Section 6. The following named amounts, or so much
28 thereof as may be necessary, are appropriated from the
29 General Revenue Fund to the Capital Development Board for the
30 Medical District Commission for the projects hereinafter
31 enumerated:
32 CHICAGO TECHNOLOGY PARK RESEARCH CENTER
-10- BOB-CDBnew-re2000
1 For renovating the Research Center ............. $ 770,000
2 For upgrading centrifugal chillers ............. 235,000
3 Total, Section 6 $1,005,000
4 Section 7. The following named amounts, or so much
5 thereof as may be necessary, are appropriated from the
6 Capital Development Fund to the Capital Development Board for
7 the Department of Military Affairs for the projects
8 hereinafter enumerated:
9 CHAMPAIGN ARMORY
10 For replacing roofing systems and
11 rehabilitating exterior walls ................ $ 300,000
12 DELAVAN ARMORY
13 For rehabilitating the exterior and
14 replacing roofing system ..................... 700,000
15 PONTIAC ARMORY
16 For rehabilitating the exterior and
17 replacing the roofing system ................. 600,000
18 STREATOR ARMORY
19 For replacing the roofing system and
20 tuckpointing walls ........................... 300,000
21 Total, Section 7 $1,900,000
22 Section 7a. The following named amounts, or so much
23 thereof as may be necessary, are appropriated from the
24 General Revenue Fund to the Capital Development Board for the
25 Department of Military Affairs for the projects hereinafter
26 enumerated:
27 CARBONDALE ARMORY
28 For rehabilitating the exterior and interior ... $ 600,000
29 LAWRENCEVILLE ARMORY
30 For rehabilitating the exterior and
31 replacing the roofing system ................. 450,000
32 LITCHFIELD ARMORY
-11- BOB-CDBnew-re2000
1 For renovating the interior and exterior ....... 600,000
2 Total, Section 7a $1,650,000
3 Section 8. The following named amounts, or so much
4 thereof as may be necessary, are appropriated from the
5 Capital Development Fund to the Capital Development Board for
6 the Department of Natural Resources for the projects
7 hereinafter enumerated:
8 BEAVER DAM STATE PARK - MACOUPIN COUNTY
9 For rehabilitating dams, spillway, and
10 boat access facilities ....................... 450,000
11 CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES
12 For upgrading sewage treatment system .......... 1,070,000
13 ILLINOIS BEACH STATE PARK - LAKE COUNTY
14 For rehabilitating lodge entrance .............. 250,000
15 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
16 For upgrading campground electrical ............ 250,000
17 KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
18 For constructing sanitary sewer system, in
19 addition to funds previously appropriated .... 5,000,000
20 LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
21 For replacing sewage treatment plant ........... 572,000
22 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
23 For rehabilitating levee and well, in
24 addition to funds previously appropriated .... 3,600,000
25 SANGCHRIS STATE PARK - SANGAMON COUNTY
26 For upgrading campground electrical
27 system ....................................... 193,500
28 SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
29 For planning and beginning renovation
30 of hatchery .................................. 496,000
31 WHITE PINES FOREST STATE PARK - OGLE COUNTY
32 For planning and beginning lodge and cabin
33 restoration .................................. 150,000
-12- BOB-CDBnew-re2000
1 STATEWIDE
2 For replacing roofing systems at the
3 following locations, at the approximate
4 cost set forth below ......................... 2,346,300
5 Beall Woods Conservation Area -
6 Wabash County .......................30,000
7 Eagle Creek State Park -
8 Shelby County .......................39,000
9 Eldon Hazlet State Park -
10 Clinton County ......................67,000
11 Fox Ridge State Park -
12 Coles County ........................34,000
13 Giant City State Park -
14 Jackson/Union Counties ..............96,000
15 Goose Lake Prairie State Park -
16 Grundy County ......................123,000
17 Hennepin Canal Parkway State Trail ..136,000
18 Illinois Beach State Park -
19 Lake County ........................787,000
20 Illinois Caverns Natural Area -
21 Monroe County .......................74,000
22 Kankakee River State Park -
23 Kankakee/Will Counties ..............74,000
24 Kickapoo State Park -
25 Vermilion County ....................41,000
26 Middle Fork State Fish & Wildlife
27 Area - Vermilion County .............12,900
28 Moraine Hills State Park -
29 McHenry County ......................91,000
30 Moraine View State Park -
31 McLean County.......................157,000
32 Ramsey Lake State Park -
33 Fayette County ......................69,000
34 Randolph County Conservation Area ....60,000
-13- BOB-CDBnew-re2000
1 Red Hills State Park -
2 Lawrence County .....................17,000
3 Saline County Conservation Area ......20,000
4 Sam Dale Lake Conservation Area -
5 Wayne County ........................15,000
6 Spitler Woods State Natural Area -
7 Macon County .........................8,400
8 Stephen A. Forbes State Park -
9 Marion County .......................37,000
10 Ten Mile Creek State Fish &
11 Wildlife Area - Jefferson/
12 Hamilton Counties....................76,000
13 Union County Conservation Area .......97,000
14 Washington County Conservation Area ..49,000
15 Waste Management & Research Center -
16 Champaign ...........................43,000
17 William W. Powers Conservation Area -
18 Cook County .........................47,000
19 Wolf Creek State Park -
20 Shelby County .......................46,000
21 For replacing vault toilets at the following
22 locations, at the approximate cost set forth
23 below ........................................ 1,000,000
24 Anderson Lake Conservation Area -
25 Fulton/Schuyler Counties ...........156,000
26 Giant City State Park -
27 Jackson/Union Counties .............577,000
28 Randolph County Conservation Area ...230,000
29 Silver Springs State Park -
30 Kendall County .....................37,000 ____________
31 Total, Section 8 $15,377,800
32 Section 8a. The following named amounts, or so much
33 thereof as may be necessary, are appropriated from the
-14- BOB-CDBnew-re2000
1 General Revenue Fund to the Capital Development Board for the
2 Department of Natural Resources for the projects hereinafter
3 enumerated:
4 DICKSON MOUNDS MUSEUM - LEWISTOWN
5 For planning and beginning repair of
6 exterior walls ............................... $ 100,000
7 FOX RIDGE STATE PARK - COLES COUNTY
8 For rehabilitating historic structures ......... 210,000
9 HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
10 For rehabilitating Aqueduct #6 ................. 590,000
11 ILLINOIS BEACH STATE PARK - LAKE COUNTY
12 For stabilizing shoreline ...................... 400,000
13 STATEWIDE
14 For maintaining lodge/concession program ....... 400,000
15 For rehabilitating or replacing
16 playground equipment ......................... 300,000
17 Total Section 8a $2,000,000
18 Section 9. The following named amounts, or so much
19 thereof as may be necessary, are appropriated from the
20 Capital Development Fund to the Capital Development Board for
21 the Department of Revenue for the projects hereinafter
22 enumerated:
23 WILLARD ICE BUILDING - SPRINGFIELD
24 For replacing underground sprinkler system ..... $ 295,000
25 For replacing the roof ......................... 1,385,000
26 Total, Section 9 $1,680,000
27 Section 9a. The following named amounts, or so much
28 thereof as may be necessary, are appropriated from the
29 General Revenue Fund to the Capital Development Board for the
30 Department of Revenue for the projects hereinafter
31 enumerated:
32 WILLARD ICE BUILDING - SPRINGFIELD
-15- BOB-CDBnew-re2000
1 For repairing the exterior of the building ..... $ 425,000
2 For planning and rehabilitating the
3 plumbing system .............................. 50,000
4 For planning and beginning the upgrade of
5 the security and surveillance system ......... 100,000
6 For waterproofing and upgrading ramps .......... 500,000
7 Total, Section 9a $1,075,000
8 Section 10. The following named amounts, or so much
9 thereof as may be necessary, are appropriated from the
10 Capital Development Fund to the Capital Development Board for
11 the Department of State Police for the projects hereinafter
12 enumerated:
13 STATE POLICE TRAINING ACADEMY - SPRINGFIELD
14 For replacing portable classroom building ...... $ 1,000,000
15 STATEWIDE
16 For replacing roofing system at the
17 following locations at the approximate
18 cost set forth below ......................... 452,600
19 District 13 Headquarters,
20 DuQuoin ............................$72,000
21 Joliet Laboratory .....................60,000
22 District 6 Headquarters,
23 Pontiac .............................58,900
24 District 9 Headquarters,
25 Springfield ........................141,700
26 State Police Training Center,
27 Pawnee ..............................30,000
28 District 18 Headquarters,
29 Litchfield ..........................45,000
30 District 19 Headquarters,
31 Carmi ...............................45,000 ____________
32 Total, Section 10 $1,452,600
-16- BOB-CDBnew-re2000
1 Section 10a. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 General Revenue Fund to the Capital Development Board for the
4 Department of State Police for the projects hereinafter
5 enumerated:
6 DISTRICT 22 HEADQUARTERS - ULLIN
7 For upgrading mechanical systems ............... $ 25,000
8 FORENSIC SCIENCE LAB - CHICAGO
9 For upgrading exterior penthouse louvers ....... 210,000
10 Total, Section 10a $235,000
11 Section 11. The following named amounts, or so much
12 thereof as may be necessary, are appropriated from the
13 Capital Development Fund to the Capital Development Board for
14 the projects hereinafter enumerated:
15 SPRINGFIELD SUPREME COURT
16 For installing humidifier and water
17 filtration systems ........................... $ 1,600,000
18 For upgrading the library, in
19 addition to funds previously appropriated .... 450,000
20 THIRD DISTRICT APPELLATE COURT - OTTAWA
21 For replacing the Annex roof ................... 50,000
22 Total, Section 11 $2,100,000
23 Section 11a. The following named amounts, or so much
24 thereof as may be necessary, are appropriated from the
25 General Revenue Fund to the Capital Development Board for the
26 projects hereinafter enumerated:
27 THIRD DISTRICT APPELLATE COURT - OTTAWA
28 For tuckpointing and repairing exterior ........ $ 140,000
29 FIFTH DISTRICT APPELLATE COURT - MT. VERNON
30 For repairing plaster and painting ............. 176,000
31 Total, Section 11a $316,000
-17- BOB-CDBnew-re2000
1 Section 12. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 Capital Development Fund to the Capital Development Board for
4 the Office of the Secretary of State for the projects
5 hereinafter enumerated:
6 CAPITOL COMPLEX - SPRINGFIELD
7 For upgrading electrical lighting and replacing
8 ceilings - Stratton Office Building .......... $ 5,500,000
9 For replacing mechanical piping - Klein
10 and Mason Warehouse........................... 290,000
11 For renovating the exterior of the Capitol
12 and Howlett Buildings ........................ 2,000,000
13 For renovating 222 S. College, in addition
14 to funds previously appropriated ............. 1,200,000
15 Total, Section 12 $8,990,000
16 Section 13. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 Capital Development Fund to the Capital Development Board for
19 the Department of Veterans' Affairs for the projects
20 hereinafter enumerated:
21 ILLINOIS VETERANS' HOME - LASALLE
22 For constructing additional parking areas ...... $ 350,000
23 ILLINOIS VETERANS' HOME - MANTENO
24 For upgrading the electrical system ............ 1,400,000
25 For upgrading storm sewer ...................... 150,000
26 Total, Section 13 $1,900,000
27 Section 13a. The following named amounts, or so much
28 thereof as may be necessary, are appropriated from the
29 General Revenue Fund to the Capital Development Board for the
30 Department of Veterans' Affairs for the projects hereinafter
31 enumerated:
32 ILLINOIS VETERANS' HOME - ANNA
-18- BOB-CDBnew-re2000
1 For repairing, upgrading and maintaining
2 various systems .............................. $ 380,000
3 ILLINOIS VETERANS' HOME - LASALLE
4 For replacing lighting ......................... 75,000
5 ILLINOIS VETERANS' HOME - MANTENO
6 For upgrading generators for emergency power ... 100,000
7 For enlarging doorways ......................... 95,000
8 Total, Section 13a $650,000
9 Section 14. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 Capital Development Fund to the Capital Development Board for
12 the projects hereinafter enumerated:
13 STATEWIDE
14 For surveys and modifications to buildings
15 to meet requirements of the federal
16 Americans with Disabilities Act .............. $ 9,000,000
17 For abating hazardous materials ................ 5,000,000
18 For retrofitting or upgrading mechanized
19 refrigeration equipment (CFCs) ............... 7,000,000
20 For upgrading and remediating aboveground
21 and underground storage tanks ................ 3,500,000
22 Total, Section 14 $24,500,000
23 Section 14a. The following named amounts, or so much
24 thereof as may be necessary, are appropriated from the
25 General Revenue Fund to the Capital Development Board for the
26 projects hereinafter enumerated:
27 STATEWIDE
28 For remediating minor problems and
29 emergencies .................................. $ 3,815,000
30 For conducting construction site
31 archeological studies ........................ 245,000
32 For demolition of buildings .................... 5,000,000
-19- BOB-CDBnew-re2000
1 For surveying and abating asbestos-
2 containing materials ......................... 2,000,000
3 Total, Section 14a $11,060,000
4 Section 14b. The amount of $2,000,000, or so much
5 thereof as may be necessary, is appropriated from the
6 Asbestos Abatement Fund to the Capital Development Board for
7 asbestos surveys and emergency abatement in relation to
8 asbestos abatement in state governmental buildings or higher
9 education residential and auxiliary enterprise buildings.
10 Section 15. The following named amounts, or so much
11 thereof as may be necessary, are appropriated from the
12 Capital Development Fund to the Capital Development Board for
13 the Illinois Community College Board for the projects
14 hereinafter enumerated:
15 BELLEVILLE AREA COLLEGE
16 For renovating campus buildings and site
17 improvements at the Belleville and Red
18 Bud campuses ................................. $ 2,216,000
19 CITY COLLEGES OF CHICAGO
20 For remodeling for Workforce Preparation
21 Centers ...................................... 3,862,000
22 JOHN WOOD COMMUNITY COLLEGE - QUINCY
23 For constructing campus buildings and site
24 improvements, in addition to funds
25 previously appropriated ...................... 12,240,000
26 LAKE LAND COLLEGE - MATTOON
27 For constructing a Technology Building, a
28 parking area and for site improvements ....... 2,992,000
29 PARKLAND COLLEGE - CHAMPAIGN
30 For constructing a classroom/instructional
31 support building, in addition to
32 funds previously appropriated ................ 10,688,000
-20- BOB-CDBnew-re2000
1 PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
2 For constructing an addition to the Adult
3 Training/Outreach Center, in addition to
4 funds previously appropriated ................ 10,961,000
5 RICHLAND COMMUNITY COLLEGE - DECATUR
6 For remodeling and constructing additions ...... 6,939,000
7 TRITON COLLEGE - RIVER GROVE
8 For rehabilitating the Liberal Arts
9 Building ..................................... 3,687,000
10 For rehabilitating the potable water
11 distribution system .......................... 659,000
12 Total, Section 15 $54,244,000
13 Section 16. The following named amounts, or so much
14 thereof as may be necessary, are appropriated from the
15 Capital Development Fund to the Capital Development Board for
16 the Illinois Board of Higher Education for the projects
17 hereinafter enumerated:
18 CHICAGO STATE UNIVERSITY
19 For planning and beginning to remodel
20 Building K and improving site ................ $ 1,100,000
21 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
22 For planning and beginning to renovate
23 and expand the Fine Arts Center .............. 2,000,000
24 GOVERNORS STATE UNIVERSITY - UNIVERSITY PARK
25 For constructing a child development center
26 and an addition to the main building
27 and remodeling Wings E and F ................. 13,403,900
28 ILLINOIS STATE UNIVERSITY - NORMAL
29 For planning and beginning to rehabilitate
30 Schroeder Hall ............................... 1,200,000
31 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
32 For planning and beginning to remodel
33 Buildings A, B and E ......................... 800,000
-21- BOB-CDBnew-re2000
1 NORTHERN ILLINOIS UNIVERSITY - DEKALB
2 For planning a classroom building and
3 developing site in Hoffman Estates ........... $1,314,500
4 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
5 For construction, renovation, and all other
6 costs necessary to replace the East St.
7 Louis Center, in addition to funds
8 previously appropriated ...................... 10,300,000
9 UNIVERSITY CENTER OF LAKE COUNTY
10 For planning and constructing a facility ....... 11,000,000
11 UNIVERSITY OF ILLINOIS - CHAMPAIGN/URBANA
12 For planning and beginning to construct
13 a central chiller plant ...................... 4,500,000
14 WESTERN ILLINOIS UNIVERSITY - MACOMB
15 For constructing a utility tunnel system, in
16 addition to funds previously appropriated .... 3,707,900
17 Total, Section 16 $49,326,300
18 Section 17. The sum of $10,869,200, is appropriated from
19 the Capital Development Fund to the Capital Development Board
20 for the Board of Higher Education for miscellaneous capital
21 improvements including construction, capital facilities, cost
22 of planning, supplies, equipment, materials, services and all
23 other expenses required to complete the work at the various
24 universities set forth below. This appropriated amount shall
25 be in addition to any other appropriated amounts which can be
26 expended for these purposes.
27 Chicago State University ..............218,500
28 Eastern Illinois University ...........409,000
29 Governors State University ............131,700
30 Illinois State University .............834,200
31 Northeastern Illinois University ......307,200
32 Northern Illinois University ..........933,600
-22- BOB-CDBnew-re2000
1 Western Illinois University ...........625,200
2 Southern Illinois University -
3 Carbondale .........................1,443,800
4 Southern Illinois University -
5 Edwardsville .........................544,800
6 University of Illinois -
7 Chicago Campus .....................2,378,300
8 University of Illinois -
9 Springfield Campus ...................157,200
10 University of Illinois -
11 Champaign/Urbana Campus ............2,885,700
12 Section 18. The sum of $3,630,800, is appropriated from
13 the Capital Development Fund to the Capital Development Board
14 for the Illinois Community College Board for miscellaneous
15 capital improvements including construction, capital
16 facilities, cost of planning, supplies, equipment, materials,
17 services and all other expenses required to complete the work
18 at the various community colleges. This appropriated amount
19 shall be in addition to any other appropriated amounts which
20 can be expended for these purposes.
21 Section 19. The sum of $347,000,000, or so much thereof
22 as may be necessary, is appropriated from the School
23 Construction Fund to the Capital Development Board for school
24 construction grants pursuant to the School Construction Law,
25 in addition to amounts previously appropriated for such
26 purposes.
27 Section 20. The sum of $40,000,000, or so much thereof
28 as may be necessary, is appropriated from the School
29 Infrastructure Fund to the Capital Development Board for
30 school construction grants pursuant to the School
31 Construction Law, in addition to amounts previously
-23- BOB-CDBnew-re2000
1 appropriated for such purposes.
2 Section 21. No contract shall be entered into or
3 obligation incurred for any expenditures from appropriations
4 made in this Article until after the purposes and amounts
5 have been approved by the Governor.
6 ARTICLE 2
7 Section 1. The following named amounts, or so much
8 thereof as may be necessary and remain unexpended at the
9 close of business on June 30, 1999, from appropriations and
10 reappropriations heretofore made for such purposes in Article
11 90, Section 1, and Article 91, Section 1 of Public Act
12 90-585, are reappropriated from the Capital Development Fund
13 to the Capital Development Board for the Department of
14 Agriculture for the projects hereinafter enumerated:
15 ANIMAL DISEASE LABORATORY - CENTRALIA
16 (From Article 91, Section 1 of Public Act 90-585)
17 For upgrading the diagnostic laboratory
18 facility, in addition to funds previously
19 appropriated ................................. $ 200,000
20 For purchasing and upgrading
21 diagnostic laboratory ........................ 63,104
22 DUQUOIN STATE FAIRGROUNDS
23 (From Article 90, Section 1 of Public Act 90-585)
24 For constructing four livestock barns
25 (Phase II) ................................... 688,000
26 (From Article 91, Section 1 of Public Act 90-585)
27 For planning and beginning the
28 renovation of the Round Houses ............... 27,024
29 For replacement of the grandstand
30 bleachers .................................... 362,798
31 For planning and construction of
-24- BOB-CDBnew-re2000
1 a livestock complex .......................... 6,837
2 For rehabilitation of the Grandstand ........... 13,403
3 For upgrading the racetrack, including the
4 racetrack walls .............................. 2,621,797
5 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
6 (From Article 90, Section 1 of Public Act 90-585)
7 For replacing and renovating
8 racehorse barns (Phase II) ................... 700,000
9 For replacing and rehabilitating roofs ......... 536,000
10 For replacing Series 14 Barns (Phase I) ........ 3,192,445
11 (From Article 91, Section 1 of Public Act 90-585)
12 For replacing the HVAC system in the
13 Administration Building ...................... 909,249
14 For replacing and/or repairing sidewalks,
15 curbs, gutters and streets, in addition
16 to funds previously appropriated ............. 46,448
17 For upgrading the storm/sanitary and water
18 systems, in addition to funds previously
19 appropriated ................................. 1,028,567
20 For renovation or replacement of
21 comfort stations, in addition
22 to funds previously appropriated ............. 1,273,000
23 For renovation of the comfort stations-
24 Phase I ...................................... 74,803
25 For renovation of the Jr. Livestock Building,
26 including the cover over the outdoor
27 arena, roof, HVAC, plumbing and electrical
28 systems and installation of an elevator
29 for accessibility, and for upgrading
30 the sewer system ............................. 11,009
31 For planning and beginning the renovation
32 of the show horse barns ...................... 192,258
33 For rehabilitation of six racehorse barns-
34 Phase I ...................................... 165,046
-25- BOB-CDBnew-re2000
1 For planning and beginning the
2 rehabilitation of sidewalks, curbs,
3 gutters and streets .......................... 3,831
4 Total, Section 1 $12,115,619
5 Section 1.1. The following named amount, or so much
6 thereof as may be necessary and remains unexpended at the
7 close of business on June 30, 1999, from an appropriation
8 heretofore made for such purposes in Article 90, Section 1a
9 of Public Act 90-585, is reappropriated from the General
10 Revenue Fund to the Capital Development Board for the
11 Department of Agriculture for the project hereinafter
12 enumerated:
13 SPRINGFIELD
14 For surveying the electrical system ............ $ 195,000
15 Total, Section 1.1 $195,000
16 Section 2. The following named amounts, or so much
17 thereof as may be necessary and remain unexpended at the
18 close of business on June 30, 1999, from reappropriations
19 heretofore made for such purposes in Article 91, Section 2 of
20 Public Act 90-585, are reappropriated from the Capital
21 Development Fund to the Capital Development Board for the
22 Courts of Illinois for the projects hereinafter enumerated:
23 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
24 (From Article 91, Section 2 of Public Act 90-585)
25 For replacing the roof ......................... $ 47,639
26 SPRINGFIELD - SUPREME COURT BUILDING
27 For planning and beginning the
28 library upgrade .............................. 106,800
29 For installation of an elevator and
30 replacement of the exterior lights ........... 28,496
31 For repairing the ramp, drainage system,
32 retaining wall and landscaping ............... 12,786
-26- BOB-CDBnew-re2000
1 Total, Section 2 $195,721
2 Section 2.1. The following named amount, or so much
3 thereof as may be necessary and remains unexpended at the
4 close of business on June 30, 1999, from a reappropriation
5 heretofore made for such purposes in Article 91, Section 2.1
6 of Public Act 90-585, is reappropriated from the General
7 Revenue Fund to the Capital Development Board for the project
8 hereinafter enumerated:
9 SUPREME COURT BUILDING - SPRINGFIELD
10 For tuckpointing and cleaning exterior ...........$ 209,781
11 Section 3. The following named amounts, or so much
12 thereof as may be necessary and remain unexpended at the
13 close of business on June 30, 1999, from appropriations and
14 reappropriations heretofore made for such purposes in Article
15 90, Section 2, and Article 91, Section 3 of Public Act
16 90-585, are reappropriated from the Capital Development Fund
17 to the Capital Development Board for the Department of
18 Central Management Services for the projects hereinafter
19 enumerated:
20 ELGIN REGIONAL OFFICE BUILDING
21 (From Article 91, Section 3 of Public Act 90-585)
22 For replacing the utility system ............... $ 2,625,000
23 ILLINOIS CENTER FOR REHABILITATION
24 AND EDUCATION (ROOSEVELT) - CHICAGO
25 (From Article 90, Section 2 of Public Act 90-585)
26 For converting and renovating tub rooms ........ 425,000
27 (From Article 91, Section 3 of Public Act 90-585)
28 For upgrading the HVAC system .................. 2,120,303
29 ILLINOIS CENTER FOR REHABILITATION AND
30 EDUCATION (WOOD) - CHICAGO
31 For replacing the skylight system
32 and roof flashing ............................ 40,775
-27- BOB-CDBnew-re2000
1 For installing security system and
2 perimeter lighting ........................... 237,322
3 CENTRAL STATE GARAGE - SPRINGFIELD
4 For replacing the roof and drainage system ..... 287,827
5 CHICAGO - STATE OF ILLINOIS CENTER
6 (From Article 90, Section 2 of Public Act 90-585)
7 For replacing roofing system and
8 insulation, in addition to funds
9 previously appropriated ...................... 875,335
10 (From Article 91, Section 3 of Public Act 90-585)
11 For completing the installation of elevators, in
12 addition to funds previously appropriated .... 650,760
13 For the correction of design/construction
14 deficiencies, including remedial work in
15 the heating, refrigeration, temperature
16 control and ventilation systems at the
17 State of Illinois Center at Chicago .......... 254,199
18 CHICAGO - STATE OF ILLINOIS BUILDING
19 For planning and beginning the for
20 renovation of the building
21 at 160 North LaSalle ......................... 46,367
22 CHICAGO MEDICAL CENTER
23 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
24 For completing the upgrade of HVAC system, in
25 addition to funds previously appropriated .... 19,933
26 For construction of an independent living
27 apartment building ........................... 65,122
28 For rehabilitation of the air conditioning
29 system, installation of a sprinkler system
30 and improvements for handicapped
31 accessibility ................................ 51,764
32 CHICAGO MEDICAL CENTER
33 EVELYN EDWARDS CENTER
34 For replacement of the heating system .......... 25,274
-28- BOB-CDBnew-re2000
1 CHICAGO MEDICAL CENTER
2 OFFICE AND LABORATORY FACILITY
3 For replacement of the electric autoclave
4 boilers ...................................... 13,093
5 CHICAGO MEDICAL CENTER
6 VISUALLY HANDICAPPED INSTITUTE
7 For renovation of the loading dock ............. 46,058
8 REGIONAL OFFICE BUILDING - CHAMPAIGN
9 For replacement of roofing system and
10 rooftop heating and cooling unit ............. 44,849
11 SUBURBAN NORTH REGIONAL OFFICE BUILDING -
12 DES PLAINES
13 (From Article 90, Section 2 of Public Act 90-585)
14 For renovating offices for Environmental
15 Protection Agency, in addition to funds
16 previously appropriated ...................... 1,635,000
17 (From Article 91, Section 3 of Public Act 90-585)
18 For renovation of Suburban North Regional
19 Office Building (formerly Maine Township
20 North High School building), in addition
21 to funds previously appropriated for such
22 purpose, Phase III ........................... 5,236,999
23 For renovation and expansion of garage ......... 353,586
24 For designing and beginning the
25 renovation, phase III ........................ 269,338
26 For the purchase and renovation of the high
27 school ....................................... 17,210
28 OTTAWA STATE GARAGE
29 (From Article 90, Section 2 of Public Act 90-585)
30 For replacing state garage ..................... 1,400,000
31 (From Article 91, Section 3 of Public Act 90-585)
32 SPRINGFIELD - CAPITOL COMPLEX
33 For construction of a day care center, in
34 addition to funds previously appropriated
-29- BOB-CDBnew-re2000
1 for such purpose ............................. 950,000
2 For construction of a day care center in the
3 Capitol Complex in Springfield ............... 244,348
4 COMPUTER FACILITY - SPRINGFIELD
5 For replacement of the halon fire
6 suppression system ........................... 813,330
7 ASH STREET COMPLEX -
8 MUSEUM AND COLLECTION CENTER -
9 SPRINGFIELD
10 For replacement of the roofing system .......... 667,928
11 MARION REGIONAL OFFICE BUILDING
12 (From Article 90, Section 2 of Public Act 90-585)
13 For replacing HVAC system and interior
14 lighting ..................................... 1,600,000
15 (From Article 91, Section 3 of Public Act 90-585)
16 For construction of a Regional Office
17 Building Addition ............................ 1,920,642
18 Total, Section 3 $22,937,362
19 Section 3.1. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1999, from appropriations and
22 reappropriations heretofore made for such purposes in Article
23 90, Section 2a, and Article 91, Section 3.1 of Public Act
24 90-585, are reappropriated from the General Revenue Fund to
25 the Capital Development Board for the Department of Central
26 Management Services for the projects hereinafter enumerated:
27 JAMES R. THOMPSON CENTER - CHICAGO
28 (From Article 91, Section 3.1 of Public Act 90-585)
29 For restoring the exterior plaza ............... $ 349,010
30 EAST ST. LOUIS - REGIONAL OFFICE
31 For replacing windows .......................... 59,308
32 CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
33 (From Article 90, Section 2a of Public Act 90-585)
-30- BOB-CDBnew-re2000
1 For rehabilitating exterior .................... 390,000
2 CHICAGO MEDICAL CENTER
3 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
4 (From Article 91, Section 3.1 of Public Act 90-585)
5 For rehabilitation for fire safety and
6 accessibility ................................ 11,086
7 Total, Section 3.1 $809,404
8 Section 4. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1999, from appropriations and
11 reappropriations heretofore made for such purposes in Article
12 90, Section 7, and Article 91, Section 4 of Public Act
13 90-585, are reappropriated from the Capital Development Fund
14 to the Capital Development Board for the Department of
15 Natural Resources for the projects hereinafter enumerated:
16 BABE WOODYARD STATE NATURAL AREA -
17 VERMILION COUNTY
18 (From Article 90, Section 7 of Public Act 90-585)
19 For developing the site and associated
20 land acquisition ............................. $ 3,300,000
21 BEALL WOODS STATE CONSERVATION AREA -
22 WABASH COUNTY
23 For replacing a visitors center ................ 488,000
24 CAVE-IN-ROCK STATE PARK - HARDIN COUNTY
25 For constructing a shower building
26 and upgrading the campground ................. 650,000
27 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
28 (From Article 91, Section 4 of Public Act 90-585)
29 For construction of a concession building
30 and upgrading the horse concession, in
31 addition to funds previously appropriated .... 477,590
32 For planning and beginning the replacement
33 of concession buildings ...................... 17,092
-31- BOB-CDBnew-re2000
1 EAGLE CREEK STATE PARK - SHELBY COUNTY
2 For rehabilitation of the sewage treatment
3 system, in addition to funds previously
4 appropriated ................................. 217,750
5 For planning and rehabilitation of the
6 sewage treatment system ...................... 51,261
7 FORT MASSAC STATE PARK - MASSAC COUNTY
8 For planning and beginning the
9 reconstruction of the fort ................... 121,340
10 FERNE CLYFFE STATE PARK -
11 JOHNSON COUNTY
12 (From Article 90, Section 7 of Public Act 90-585)
13 For rehabilitating shower building ............. 215,000
14 FOX RIDGE STATE PARK - COLES COUNTY
15 For upgrading campground ....................... 340,000
16 (From Article 91, Section 4 of Public Act 90-585)
17 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
18 For stabilizing the feeder canal bank .......... 398,085
19 For replacement and rehabilitation
20 of arch culverts and canal ................... 542,636
21 HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
22 For dam rehabilitation and the State's share
23 to implement the ecological restoration
24 plan in cooperation with the U.S.
25 Army Corps of Engineers, and
26 land acquisition ............................. 858,655
27 For construction of a pole building
28 and hunter check station ..................... 83,816
29 (From Article 90, Section 7 of Public Act 90-585)
30 For replacing the hunter check station ......... 150,000
31 ILLINOIS-MICHIGAN CANAL STATE TRAIL
32 (From Article 91, Section 4 of Public Act 90-0585)
33 For stabilization of the aqueduct .............. 438,393
34 ILLINOIS BEACH STATE PARK - LAKE COUNTY
-32- BOB-CDBnew-re2000
1 (From Article 90, Section 7 of Public Act 90-0585)
2 For constructing an office building ............ 650,000
3 For replacing sanitary sewer lines ............. 505,000
4 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
5 (From Article 91, Section 4 of Public Act 90-585)
6 For rehabilitation of the concession
7 building, in addition to funds
8 previously appropriated ...................... 140,000
9 For rehabilitation of the concession building .. 87,975
10 KANKAKEE STATE PARK - KANKAKEE COUNTY
11 For planning and constructing a
12 sanitary sewer system ........................ 182,700
13 KICKAPOO STATE PARK - VERMILION COUNTY
14 For construction of a sewage treatment
15 plant, in addition to funds
16 previously appropriated ...................... 110,575
17 LINCOLN TRAIL STATE RECREATION AREA -
18 CLARK COUNTY
19 (From Article 90, Section 7 of Public Act 90-585)
20 For rehabilitating the day use area
21 and site ..................................... 1,281,000
22 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
23 (From Article 91, Section 4 of Public Act 90-585)
24 For rehabilitating the levee system ............ 15,928
25 MORAINE HILLS STATE PARK - MCHENRY COUNTY
26 For renovation of the trail .................... 322,755
27 For replacement of restrooms and upgrading
28 the water system ............................. 725,811
29 MORAINE VIEW STATE PARK - MCLEAN COUNTY
30 For construction of a sewage treatment
31 system and plant ............................. 1,553,941
32 NORTH POINT MARINA - LAKE COUNTY
33 For construction of a breakwater structure ..... 1,048,259
34 For modifying the marina's docking system ...... 1,527,922
-33- BOB-CDBnew-re2000
1 NAUVOO STATE PARK - HANCOCK COUNTY
2 (From Article 90, Section 7 of Public Act 90-585)
3 For replacing water distribution
4 system ....................................... 241,000
5 PERE MARQUETTE STATE PARK - JERSEY COUNTY
6 (From Article 90, Section 7 of Public Act 90-585)
7 For replacing the lodge HVAC condensing unit, in
8 addition to funds previously appropriated .... 327,344
9 (From Article 91, Section 4 of Public Act 90-585)
10 For renovation of two buildings and
11 replacement of a storage building ............ 132,119
12 RAMSEY LAKE STATE PARK - FAYETTE COUNTY
13 (From Article 90, Section 7 of Public Act 90-585)
14 For rehabilitating shower building ............. 188,000
15 RED HILLS STATE PARK - LAWRENCE COUNTY
16 (From Article 91, Section 4 of Public Act 90-585)
17 For replacing the sewage treatment system,
18 in addition to funds previously appropriated . 510,000
19 For rehabilitating the dam ..................... 90,000
20 SANGANOIS CONSERVATION AREA -
21 CASS, MASON AND SCHUYLER COUNTIES
22 For rehabilitating the levee system ............ 315,000
23 SPRINGFIELD
24 (From Article 90, Section 7 of Public Act 90-585)
25 For constructing an office building and
26 interpretive center .......................... 29,795,641
27 STARVED ROCK STATE PARK - LASALLE COUNTY
28 For rehabilitating the sewer system ............ 1,055,000
29 For rehabilitating trails, in addition
30 to funds previously appropriated ............. 500,000
31 For upgrading the HVAC system .................. 445,000
32 (From Article 91, Section 4 of Public Act 90-585)
33 For construction of a Visitors'
34 Center, in addition to funds
-34- BOB-CDBnew-re2000
1 previously appropriated ...................... 365,000
2 For rehabilitation of trails, in addition
3 to funds previously appropriated ............. 402,777
4 For reconstruction of the seawall, in
5 addition to funds previously
6 appropriated ................................. 58,193
7 For rehabilitation of the sewer
8 system - Phase I ............................. 121,614
9 For planning and beginning the
10 reconstruction of the seawall ................ 39,827
11 TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES
12 For planning and beginning
13 construction of a park ....................... 78,148
14 VOLO BOG NATURAL AREA - LAKE COUNTY
15 For rehabilitation of the visitors' center ..... 9,425
16 WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY
17 For rehabilitation of the sewage
18 treatment plant .............................. 164,072
19 For planning and construction of a marina,
20 installation of additional sewage lines,
21 recreational development and overnight
22 accommodations to be located on Rend
23 Lake ......................................... 14,599
24 TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
25 (From Article 90, Section 7 of Public Act 90-585)
26 For constructing a visitor center and
27 purchasing land .............................. 4,000,000
28 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
29 (FORMERLY BURNHAM HOSPITAL)
30 (From Article 91, Section 4 of Public Act 90-585)
31 For construction of a Natural History
32 Research Center for the space needs of
33 the Illinois Natural History Survey on
34 the campus of the University of Illinois...... 6,000,000
-35- BOB-CDBnew-re2000
1 For planning and construction of the
2 Natural History Research Center
3 for the space needs of the
4 Illinois Natural History Survey
5 on the campus of the University
6 of Illinois in Champaign ..................... 3,074,328
7 For planning and construction of
8 the Natural History Research Center
9 for the space needs of the Illinois
10 Natural History Survey on
11 the campus of the University of
12 Illinois in Champaign ........................ 41,834
13 NATURAL HISTORY SURVEY - CHAMPAIGN
14 For upgrading laboratories and installation
15 of storage units ............................. 96,562
16 STATE WATER SURVEY - CHAMPAIGN
17 (From Article 90, Section 7 of Public Act 90-585)
18 For upgrading and replacing the mechanical
19 system, in addition to funds
20 previously appropriated ...................... 2,200,000
21 (From Article 91, Section 4 of Public Act 90-585)
22 For renovation of office and
23 laboratory buildings ......................... 217,814
24 For replacement and upgrade of the
25 exterior lighting system ..................... 34,495
26 For planning and replacement of vehicle
27 storage/shop facilities ...................... 21,150
28 DICKSON MOUNDS - LEWISTOWN
29 For renovating Canton Liverpool
30 Toll Booth ................................... 68,100
31 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
32 For the completion of site improvements ........ 400,891
33 STATE MUSEUM - SPRINGFIELD
34 (From Article 90, Section 7 of Public Act 90-585)
-36- BOB-CDBnew-re2000
1 For renovating or replacing exhibits, in
2 addition to funds previously appropriated .... 5,500,000
3 For planning and beginning replacement
4 of the state museum .......................... 800,000
5 (From Article 91, Section 4 of Public Act 90-585)
6 For planning and replacement of the main
7 museum exhibits, in addition to funds
8 previously appropriated ...................... 539,400
9 For planning renovation of main museum
10 exhibits and for renovation of basement
11 galleries .................................... 32,611
12 STATEWIDE
13 (From Article 90, Section 7 of Public Act 90-585)
14 For replacing roofing systems at the
15 following locations at the approximate
16 costs set forth below ........................ 370,000
17 Lincoln Trail Homestead State
18 Park, Four buildings ............... 38,000
19 Silver Springs State Park, Three
20 Buildings ......................... 278,000
21 Weldon Springs State Park, Nine
22 Buildings .......................... 54,000
23 For constructing vault toilets at the following
24 locations at the approximate costs set forth
25 below ........................................ 852,000
26 Cave-In-Rock State Park ............ 192,000
27 Frank Holten State Park ............ 285,000
28 Golconda/Rauchfuss Hill ............. 79,000
29 I&M Canal - Gebhard Woods State
30 Park ............................... 35,000
31 Prophetstown State Park ............ 155,000
32 William W. Powers State Park ....... 106,000
33 For constructing hazardous material storage
34 buildings .................................... 275,000
-37- BOB-CDBnew-re2000
1 (From Article 91, Section 4 of Public Act 90-585)
2 For replacing concession buildings and
3 upgrading support facilities at the following
4 locations at the approximate costs set
5 forth below: ................................. 2,840,443
6 Kickapoo State Park ..................527,425
7 Rock Cut State Park ..................512,168
8 Stephen A. Forbes State Park .......1,800,850
9 For constructing vault toilets at the
10 following locations at the approximate
11 cost set forth below: ........................ 1,396,054
12 Apple River Canyon State Park ........285,000
13 Des Plaines Conservation Area ........240,000
14 Kankakee River State Park ............364,054
15 Lake Le-Aqua-Na State Park ...........231,000
16 Marshall County Conservation Area .....37,000
17 Morrison-Rockwood State Park .........202,000
18 Rice Lake Conservation Area ...........37,000
19 For replacing roofing systems and structural
20 repairs at the following locations at the
21 approximate costs set forth below: ........... 392,845
22 Mine Rescue Station, One building .....27,000
23 Castle Rock State Park,
24 One building .........................36,845
25 Dixon Springs State Park,
26 Three buildings ......................40,000
27 Cave-In-Rock State Park,
28 One building .........................25,000
29 Ferne Clyffe State Park,
30 One building .........................25,000
31 Hamilton County Conservation
32 Area, One building ...................29,000
33 Lake Murphysboro State Park
34 Two buildings ........................50,000
-38- BOB-CDBnew-re2000
1 Red Hills State Park, Two
2 buildings ............................30,000
3 Fox Ridge State Park, Six
4 buildings ............................65,000
5 Shelbyville Fish and Wildlife
6 Area, Two buildings ..................40,000
7 Newton Lake Fish and Wildlife
8 Area, One building ...................25,000
9 For repair or replacement of roofs and
10 parapet walls and reconstruction of
11 chimneys at the following locations
12 at the approximate costs set forth below ..... 520,556
13 Geological Survey - Applied Lab ......189,026
14 Water Survey - Eight Buildings .......100,000
15 Natural History Survey - Natural
16 Resources Studies Annex ..............67,000
17 Geological Survey - Natural
18 Resources Building ...................10,000
19 Water Survey - Parapet walls at
20 Buildings No. 4, 5 and 6 .............10,000
21 Dickson Mounds - Exterior restroom
22 and picnic shelter ...................14,530
23 Jake Wolf Fish Hatchery -
24 one building ........................130,000
25 For land acquisition ........................... 576,472
26 For maintaining the lodge and concession
27 facilities ................................... 68,994
28 For repairing and maintaining facilities ....... 42,278
29 For construction of hazardous material
30 storage buildings ............................ 227,024
31 For abating hazards caused by the presence
32 of asbestos-containing materials ............. 51,622
33 For planning, construction, reconstruction,
34 land acquisition and related costs,
-39- BOB-CDBnew-re2000
1 utilities, site improvements, and all other
2 expenses necessary for various capital
3 improvements at parks, conservation areas,
4 and other facilities under the jurisdiction
5 of the Department of Natural Resources ....... 7,368,260
6 For construction and development of
7 multiple use facilities on lands owned
8 or managed by the Department of
9 Natural Resources, including all costs
10 for supplies, materials, labor, and
11 services required for the completion
12 of the following projects at the
13 approximate costs set forth below: ........... 8,913
14 For Volo Bog Natural Area
15 for replacement of a roof
16 and rehabilitation of the
17 emergency exit stairs at the
18 visitor center ........................5,144
19 For Volo Bog Natural Area for
20 the upgrading of the
21 Interpretive Center, including
22 the heating, ventilation, and
23 air conditioning system ...............3,769 ____________
24 Total, Section 4 $89,371,889
25 Section 4.1. The following named amounts, or so much
26 thereof as may be necessary, from appropriations and
27 reappropriations heretofore made for such purposes in Article
28 90, Section 7a, and Article 91, Section 4.1 of Public Act
29 90-585, are reappropriated from the General Revenue Fund to
30 the Capital Development Board for the Department of Natural
31 Resources for the projects hereinafter enumerated:
32 APPLE RIVER CANYON STATE PARK -
33 JO DAVIESS COUNTY
-40- BOB-CDBnew-re2000
1 (From Article 90, Section 7a of Public Act 90-585)
2 For stabilizing the river bank ................. $ 150,000
3 CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES
4 (From Article 91, Section 4.1 of Public Act 90-585)
5 For replacement of windows and floor tile
6 in Region 2 headquarters ..................... 80,585
7 GOLCONDA MARINA - POPE COUNTY
8 (From Article 90, Section 7a of Public Act 90-585)
9 For constructing a sewage lift station ......... 50,000
10 ILLINOIS BEACH STATE PARK - LAKE COUNTY
11 For stabilizing the shoreline .................. 400,000
12 (From Article 91, Section 4.1 of Public Act 90-585)
13 For stabilizing the shoreline .................. 65,477
14 For stabilization of the shoreline ............. 6,052
15 SPRING GROVE HATCHERY - MCHENRY COUNTY
16 For upgrading the septic system ................ 30,000
17 STARVED ROCK STATE PARK - LASALLE COUNTY
18 (From Article 90, Section 7a of Public Act 90-585)
19 For constructing erosion controls .............. 300,000
20 STATEWIDE
21 For maintaining lodge and concession
22 facilities ................................... 331,000
23 For rehabilitating or replacing playground
24 equipment .................................... 300,000
25 (From Article 91, Section 4.1 of Public Act 90-585)
26 For maintaining lodge and concession
27 facilities at various DNR locations .......... 135,508
28 For rehabilitating or replacing
29 playground equipment, in addition
30 to funds previously appropriated ............. 300,000
31 For maintenance of lodge and
32 concession facilities ........................ 63,907
33 For rehabilitation or replacement
34 of playground equipment ...................... 158,506
-41- BOB-CDBnew-re2000
1 For rehabilitation of trail systems ............ 96,232
2 For rehabilitation and replacement of
3 playground equipment ......................... 96,137
4 Total, Section 4.1 $2,563,404
5 Section 5. The following named amounts, or so much
6 thereof as may be necessary and remain unexpended at the
7 close of business on June 30, 1999, from appropriations and
8 reappropriations heretofore made for such purposes in Article
9 90, Section 3, and Article 91, Section 5 of Public Act
10 90-585, are reappropriated from the Capital Development Fund
11 to the Capital Development Board for the Department of
12 Corrections for the projects hereinafter enumerated:
13 (From Article 91, Section 5 of Public Act 90-585)
14 DANVILLE CORRECTIONAL CENTER
15 For renovation of interior and
16 exterior walls, in addition to
17 funds previously appropriated ................ $ 1,194,152
18 For correction of construction defects ......... 249,801
19 For planning, utilities, site improvements,
20 and other expenses necessary for the
21 construction of a correctional facility ...... 32,511
22 DECATUR WOMEN'S CORRECTIONAL CENTER
23 For the planning and conversion of
24 Meyer Mental Health Center into a
25 correctional facility ........................ 12,136,420
26 DIXON CORRECTIONAL CENTER
27 For renovation of the groundwater storage
28 tank and abatement of crawlspace
29 pipes in Buildings 26, 27 and 29 ............. 585,888
30 For upgrading the steam distribution system
31 and replacement of the boiler system
32 including asbestos abatement ................. 87,937
33 DWIGHT CORRECTIONAL CENTER
-42- BOB-CDBnew-re2000
1 For upgrading water and sewer systems .......... 200,988
2 For renovating buildings, in addition
3 funds previously appropriated ................ 596,241
4 For constructing a gatehouse and
5 sally port and upgrading the
6 security system .............................. 2,301,455
7 For completion of medical unit,
8 in addition to funds previously
9 appropriated ................................. 369,489
10 For planning the expansion of the
11 Education Building and constructing
12 a dietary and a warehouse .................... 4,199,118
13 For renovation of buildings .................... 68,161
14 EAST MOLINE CORRECTIONAL CENTER
15 For upgrading the electrical
16 system ....................................... 2,142,024
17 For upgrading locking system, in addition
18 to funds previously appropriated ............. 44,965
19 HANNA CITY WORK CAMP
20 (From Article 90, Section 3 of Public Act 90-585)
21 For upgrading electrical system ................ 600,000
22 HILL CORRECTIONAL CENTER - GALESBURG
23 For upgrading and expanding freezer
24 capacity, in addition to funds
25 previously appropriated ...................... 950,000
26 For replacing domestic water lines ............. 410,000
27 ILLINOIS YOUTH CENTER - ST. CHARLES
28 For planning and beginning the upgrade
29 of existing facility ......................... 600,000
30 (From Article 91, Section 5 of Public Act 90-585)
31 ILLINOIS YOUTH CENTER - HARRISBURG
32 For upgrading the domestic water system ........ 619,149
33 For upgrading the HVAC system .................. 494,932
34 ILLINOIS YOUTH CENTER - JOLIET
-43- BOB-CDBnew-re2000
1 For planning, site improvements,
2 utility upgrade, equipment and all
3 costs necessary to construct a
4 housing unit and dietary facility ............ 352,587
5 For completing the upgrade of electrical
6 systems, in addition to funds
7 previously appropriated ...................... 206,511
8 For upgrading the fire alarm system ............ 191,768
9 For completing the upgrade of the utilities, in
10 addition to funds previously appropriated .... 40,647
11 ILLINOIS YOUTH CENTER - PERE MARQUETTE
12 For upgrading the electrical
13 distribution system .......................... 35,281
14 ILLINOIS YOUTH CENTER - ST. CHARLES
15 For completing the upgrade of the water
16 distribution system, in addition to funds
17 previously appropriated ...................... 71,551
18 ILLINOIS YOUTH CENTER - VALLEY VIEW
19 For upgrading dormitory restrooms
20 and fixtures, in addition to
21 funds previously appropriated ................ 154,070
22 For planning and beginning the
23 upgrade of dormitory restrooms
24 and fixtures ................................. 54,213
25 JOLIET CORRECTIONAL CENTER
26 For correcting erosion and
27 stabilizing the masonry wall ................. 1,782,600
28 For upgrading the power house and
29 installation of a generator .................. 382,400
30 For completing the west cellhouse renovation,
31 including asbestos abatement, in addition
32 to funds previously appropriated ............. 538,762
33 LINCOLN CORRECTIONAL CENTER
34 For upgrading the water softener system ........ 93,258
-44- BOB-CDBnew-re2000
1 For upgrading the locking systems and doors .... 42,374
2 For upgrading the water supply ................. 112,077
3 For renovation of the Dietary, construction
4 of a cooler addition and installation
5 of blast chillers ............................ 487,520
6 LOGAN CORRECTIONAL CENTER
7 (From Article 90, Section 3 of Public Act 90-585)
8 For planning and beginning replacement
9 of the Dietary and Medical Buildings ......... 400,000
10 (From Article 91, Section 5 of Public Act 90-585)
11 For renovation of sewer system ................. 826,383
12 For renovation of the water tower .............. 124,144
13 For rehabilitation of the roof ventilation
14 systems ...................................... 77,948
15 MENARD CORRECTIONAL CENTER - CHESTER
16 (From Article 90, Section 3 of Public Act 90-585)
17 For completing the upgrade of roads and
18 sidewalks, in addition to funds
19 previously appropriated ...................... 300,000
20 For completing upgrade of North Cellhouse
21 plumbing system, in addition to funds
22 previously appropriated ...................... 400,000
23 For planning and beginning upgrade
24 of the storm tunnel .......................... 100,000
25 For replacing toilets and waste lines
26 at E/W Cellhouse ............................. 2,600,000
27 (From Article 91, Section 5 of Public Act 90-585)
28 For renovation or replacement of the
29 Old Hospital Building, in addition to
30 funds previously appropriated ................ 4,700,000
31 For replacing and installing
32 water storage tank ........................... 1,200,000
33 For replacing Boiler #2, in addition
34 to funds previously appropriated ............. 800,000
-45- BOB-CDBnew-re2000
1 For converting a room into a shower room ....... 366,412
2 For upgrading roads and sidewalks .............. 40,207
3 For upgrading the coal handling system
4 and repair or replace boiler system .......... 108,665
5 For conversion of the Maintenance Building
6 to an inmate dormitory ....................... 106,020
7 For conversion of the Administration
8 Building basement to a courtroom and
9 attorney offices ............................. 46,022
10 For upgrading the steam and water distribution
11 systems, in addition to funds previously
12 appropriated ................................. 729,410
13 For upgrading the steam and water distribution
14 systems and replacement of the MSU
15 "C" Building ................................. 67,624
16 For replacement of the chimney stack and
17 boilers, in addition to funds previously
18 appropriated ................................. 87,501
19 For replacement of hot water heaters and
20 deairing tanks ............................... 110,000
21 For planning and beginning the
22 renovation of the old
23 hospital building ............................ 175,135
24 For renovation of elements of the power
25 plants, including the main generator ......... 22,982
26 For planning and beginning the for
27 renovation of the Administration Building .... 15,604
28 PONTIAC CORRECTIONAL CENTER
29 (From Article 90, Section 3 of Public Act 90-585)
30 For completing replacement of hot water
31 lines, in addition to funds previously
32 appropriated ................................. 1,100,000
33 (From Article 91, Section 5 of Public Act 90-585)
34 For renovation of main sally port .............. 279,377
-46- BOB-CDBnew-re2000
1 STATEVILLE CORRECTIONAL CENTER - JOLIET
2 (From Article 90, Section 3 of Public Act 90-585)
3 For replacing power plant ...................... 10,000,000
4 For planning, design, construction,
5 equipment and all other necessary costs
6 for an Adult Reception and Classification
7 Center ....................................... 44,000,000
8 For upgrading storm drainage and
9 wastewater systems ........................... 1,200,000
10 For upgrading electrical system and elevator
11 and installing HVAC system ................... 1,200,000
12 (From Article 91, Section 5 of Public Act 90-585)
13 For replacement of the MSU ..................... 6,456,800
14 For upgrading the doors, locks and hardware
15 in B Cellhouse ............................... 35,682
16 SOUTHWESTERN ILLINOIS CORRECTIONAL FACILITY
17 For completing the conversion of existing
18 buildings into a minimum security
19 correctional facility, in addition to
20 funds previously appropriated ................ 10,601
21 VANDALIA CORRECTIONAL CENTER
22 For renovation of dormitory shower rooms ....... 423,560
23 VIENNA CORRECTIONAL CENTER
24 (From Article 90, Section 3 of Public Act 90-585)
25 For completing upgrade of the steam
26 distribution system, in addition to
27 funds previously appropriated ................ 940,000
28 For upgrading electrical system and
29 installing emergency generator ............... 1,200,000
30 (From Article 91, Section 5 of Public Act 90-585)
31 For renovating the kitchen ..................... 1,942,465
32 For upgrading the steam distribution system
33 and renovation of Powerhouse, in addition
34 to funds previously appropriated ............. 2,465,042
-47- BOB-CDBnew-re2000
1 For installation of security fencing ........... 173,201
2 For upgrading air conditioning system
3 and replacement of cooling tower ............. 1,100,000
4 For upgrading the electrical, plumbing and
5 HVAC systems in four buildings ............... 802,701
6 For completing the rehabilitation of duct
7 systems and walls, in addition to funds
8 previously appropriated ...................... 273,518
9 For planning and beginning the upgrade
10 of the steam distribution system ............. 148,888
11 For planning and beginning the replacement
12 of the absorption chiller and cooling tower .. 40,848
13 STATEWIDE
14 (From Article 90, Section 3 of Public Act 90-585)
15 For planning, design, construction,
16 equipment and all other necessary costs
17 for a juvenile facility ...................... 20,000,000
18 For replacing locks and doors at the
19 following locations at the approximate
20 cost set forth below ......................... 1,090,000
21 Dwight Correctional Center ......... 275,000
22 Illinois River Correctional
23 Center - Canton ................... 150,000
24 IYC - Joliet ....................... 500,000
25 IYC - Pere Marquette - Grafton ..... 165,000
26 For replacing roofing systems at the following
27 locations at the approximate cost set forth
28 below ........................................ 2,842,212
29 Dixon Correctional Center,
30 four buildings .................... 894,212
31 IYC - St. Charles, two buildings ... 440,000
32 Joliet Correctional Center,
33 six buildings ..................... 868,000
34 Logan Correctional Center - Lincoln
-48- BOB-CDBnew-re2000
1 three buildings ................... 115,000
2 Menard Correctional Center - Chester
3 six buildings ..................... 270,000
4 Pontiac Correctional Center,
5 one building ...................... 255,000
6 For inspecting and upgrading water towers
7 at the following locations at the approximate
8 costs set forth below ........................ 3,590,000
9 Dixon Correctional Center,
10 Upgrade Water Tower ............. 1,000,000
11 Graham Correctional Center - Hillsboro
12 Upgrade Water Tower .............. 215,000
13 Joliet Correctional Center,
14 Upgrade Water Tower ............... 150,000
15 Logan Correctional Center - Lincoln
16 Complete Water Tower Upgrade ..... 600,000
17 Menard Correctional Center - Chester
18 Upgrade Water Tower .............. 325,000
19 Stateville Correctional Center - Joliet
20 Upgrade Water Tower ............ 1,000,000
21 Statewide, Inspect and Upgrade
22 Water Towers ...................... 300,000
23 For upgrading fire and safety systems at
24 the following locations at the approximate
25 costs set forth below, in addition to
26 funds previously appropriated ................ 3,370,000
27 Menard Correctional Center -
28 Chester ......................... 2,200,000
29 Sheridan Correctional Center ....... 320,000
30 Vienna Correctional Center ......... 850,000
31 (From Article 91, Section 5 of Public Act 90-585)
32 For replacing roofing systems at the
33 following locations at the approximate
34 costs set forth below: ....................... 1,635,772
-49- BOB-CDBnew-re2000
1 Big Muddy Correctional Center, Ina
2 Two buildings ....................... 98,772
3 East Moline Correctional Center,
4 Three buildings .................... 398,000
5 Graham Correctional Center, Hillsboro
6 Seven buildings .................... 600,000
7 Sheridan Correctional Center, LaSalle
8 Three buildings .................... 379,000
9 Stateville Correctional Center, Joliet
10 One building ....................... 160,000
11 For replacing doors and locks at the
12 following locations at the approximate
13 costs set forth below: ....................... 2,433,795
14 IYC - St. Charles ................... 546,795
15 Lincoln Correctional Center ......... 300,000
16 Jacksonville Correctional Center .... 664,000
17 Sheridan Correctional Center ........ 923,000
18 For upgrading fire safety systems at the
19 following locations at the approximate
20 costs set forth below, in addition to
21 funds previously appropriated: ............... 6,469,442
22 Menard Correctional Center ........ 1,969,442
23 Pontiac Correctional Center ....... 3,000,000
24 Stateville Correctional Center .... 1,500,000
25 For upgrading water and wastewater
26 systems at the following locations
27 at the approximate costs set forth below: .... 4,218,208
28 Big Muddy Correctional Center
29 for installing mechanical
30 bar screen ......................... 300,000
31 Centralia Correctional Center
32 for upgrading water
33 treatment plant .................. 1,436,208
34 East Moline Correctional Center
-50- BOB-CDBnew-re2000
1 for upgrading sewer system ......... 565,000
2 Ed Jenison Work Camp (Paris)
3 for installing mechanical
4 bar screen ......................... 120,000
5 IYC - Harrisburg for upgrading
6 water distribution system .......... 500,000
7 Kankakee MSU for constructing
8 well #2 ............................ 300,000
9 IYC - St. Charles for upgrading
10 sewage/storm system ................ 767,000
11 IYC - Valley View for installing
12 mechanical bar screen .............. 230,000
13 For correction of deficiencies in
14 water systems at three correctional
15 facilities ................................... 100,000
16 For replacement of locks, windows and
17 doors at the following locations
18 as set forth below: .......................... 3,085,103
19 Dwight ............................... 34,000
20 IYC Harrisburg ...................... 849,000
21 IYC Joliet .......................... 310,000
22 Menard .............................. 990,000
23 Pontiac .............................. 78,103
24 IYC Valley View ..................... 460,000
25 Vienna .............................. 364,000
26 For planning, design, construction,
27 equipment and other necessary costs
28 for a Maximum Security Correctional
29 Center, in addition to funds previously
30 appropriated ................................. 95,000,000
31 For planning, design, construction,
32 equipment and other necessary costs
33 for a Correctional Facility for
34 juveniles .................................... 42,577,305
-51- BOB-CDBnew-re2000
1 For planning, design, construction,
2 equipment and other necessary costs
3 for a Medium Security Correctional
4 Facility ..................................... 66,998,938
5 For planning, construction, utilities, site
6 improvements, equipment and other expenses
7 necessary for the construction of a close
8 supervision super maximum security prison .... 1,113,373
9 For upgrading for fire safety at five
10 locations and replacing boilers............... 206,369
11 For correcting defects in the food preparation
12 areas, including roofs ....................... 125,979
13 For planning, construction, utilities,
14 site improvements, and other expenses
15 necessary for the construction of two
16 minimum and one medium security
17 prisons ...................................... 29,224
18 For renovation and improvements at various
19 correctional facilities at the approximate
20 costs set forth below: ....................... 117,693
21 Roof Replacement ......................70,000
22 Road Repavement .......................47,693
23 For replacement of cell doors and locks
24 and rehabilitation of locking systems at
25 the following locations at the approximate
26 costs set forth below: ....................... 118,902
27 Kankakee MSU
28 For rehabilitation of locking
29 systems .............................118,902
30 For renovation of roads and parking lots
31 and replacement of boilers at the
32 following locations at the approximate
33 costs set forth below ........................ 42,785
34 Dixon Correctional Center
-52- BOB-CDBnew-re2000
1 For roads and parking .................6,000
2 Logan Correctional Center
3 For roads and parking .................5,656
4 Menard Correctional Center
5 For roads and parking and
6 replacement of boilers...............22,929
7 Vienna Correctional Center
8 For roads .............................8,200
9 For replacement of roofs at various Department of
10 Corrections locations ........................ 269,592
11 For roof replacement at the following
12 locations at the approximate costs
13 set forth below: ............................. 321,681
14 Graham Correctional Center
15 Five buildings ........................6,268
16 Graham Correctional Center
17 Thirty-two buildings ..................8,439
18 Menard Correctional Center
19 Warehouse Building ...................55,093
20 Menard Correctional Center
21 Five buildings ......................153,394
22 Pontiac Correctional Center
23 Eight buildings .......................6,221
24 Illinois Youth Center-St. Charles
25 Three buildings ......................29,830
26 Sheridan Correctional Center
27 Six buildings ........................15,482
28 Stateville Correctional Center
29 Seven buildings ......................23,000
30 Ill Youth Center-Valley View
31 Administration Building and
32 Kitchen Addition ....................23,954 ____________
33 Total, Section 5 $375,381,963
-53- BOB-CDBnew-re2000
1 Section 5.1. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1999, from reappropriations
4 heretofore made for such purposes in Article 91, Section 5.1
5 of Public Act 90-585, are reappropriated from the General
6 Revenue Fund to the Capital Development Board for the
7 Department of Corrections for the projects hereinafter
8 enumerated:
9 (From Article 91, Section 5.1 of Public Act 90-585)
10 MENARD CORRECTIONAL CENTER - CHESTER
11 For stabilizing dams ........................... 95,600
12 For repairing masonry and
13 waterproofing exterior ....................... 245,000
14 STATEVILLE CORRECTIONAL CENTER - JOLIET
15 For tuckpointing buildings ..................... 200,000
16 VANDALIA CORRECTIONAL CENTER
17 For tuckpointing, waterproofing and
18 replacing facade ............................. 149,719
19 STATEWIDE
20 For energy conservation improvements at the
21 following locations at the approximate
22 costs set forth below: ....................... 56,018
23 Dwight Correctional Center ............ 7,000
24 Joliet Correctional Center
25 School Building ...................... 4,500
26 Menard Psychiatric Center
27 Randolph Hall ........................ 7,500
28 Stateville Correctional Center
29 Law Library .......................... 7,400
30 Pontiac Correctional Center .......... 27,893
31 Vienna Correctional Center ............ 1,725
32 For upgrading doors and locking systems at
33 the following locations at the approximate
34 costs set forth below: ....................... 577,182
-54- BOB-CDBnew-re2000
1 Illinois Youth Center-Warrenville
2 For replacement of doors
3 and locking systems ............... 577,182 ____________
4 Total, Section 5.1 $1,323,519
5 Section 5.2. The amount of $195,615, or so much thereof
6 as may be necessary and remains unexpended from the General
7 Revenue Fund at the close of business on June 30, 1999, from
8 a reappropriation heretofore made for such purposes in
9 Article 91, Section 5.4 of Public Act 90-585, is
10 reappropriated to the Capital Development Board for the
11 Department of Corrections for all costs associated with the
12 completion of the super maximum security prison at Tamms,
13 Illinois.
14 Section 5.3. The amount of $1,570,556, or so much
15 thereof as may be necessary and remains unexpended at the
16 close of business on June 30, 1999, from a reappropriation
17 heretofore made for such purposes in Article 91, Section 5.5
18 of Public Act 90-585, is reappropriated from the General
19 Revenue Fund to the Capital Development Board for the
20 Department of Corrections for the projects hereinafter
21 enumerated at the approximate costs set forth below:
22 Danville Correctional Center -
23 For upgrading the hot water
24 distribution system .................$175,000
25 Joliet Correctional Center -
26 For replacement of the deep well .......13,000
27 Stateville Correctional Center-
28 For upgrading the plumbing systems in
29 four buildings .....................1,216,556
30 Menard Correctional Center -
31 For planning and to begin upgrading
32 the plumbing systems in two
-55- BOB-CDBnew-re2000
1 buildings .............................65,000
2 Pontiac Correctional Center -
3 For upgrading the mechanical systems
4 and renovation of shower rooms ........56,000
5 Shawnee Correctional Center -
6 For upgrading the hot water
7 distribution system ...................45,000
8 Section 5.4. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1999, from appropriations
11 heretofore made for such purposes in Article 91, Section 5.6
12 of Public Act 90-585, are reappropriated from the General
13 Revenue Fund to the Capital Development Board for the
14 Department of Corrections for the projects hereinafter
15 enumerated:
16 DIXON CORRECTIONAL CENTER
17 For tuckpointing two buildings ................. $ 65,000
18 STATEVILLE CORRECTIONAL CENTER - JOLIET
19 For tuckpointing seven buildings ............... 10,617
20 Total, Section 5.4 $75,617
21 Section 6. The following named amounts, or so much
22 thereof as may be necessary and remains unexpended at the
23 close of business on June 30, 1999, from appropriations and
24 reappropriations heretofore made for such purposes in Article
25 90, Section 4, and Article 91, Section 6 of Public Act 90-585
26 are reappropriated from the Capital Development Fund to the
27 Capital Development Board for the Historic Preservation
28 Agency for the projects hereinafter enumerated:
29 BISHOP HILL HISTORIC SITE -
30 HENRY COUNTY
31 (From Article 90, Section 4 of Public Act 90-585)
32 For rehabilitating Bjorkland Hotel ............. $ 1,010,000
-56- BOB-CDBnew-re2000
1 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
2 (From Article 91, Section 6 of Public Act 90-585)
3 For renovation of the Cahokia Courthouse
4 and the Jarrot House ......................... 364,640
5 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
6 For replacement of Monk's Mounds stairs ........ 465,000
7 For restoration of Monk's Mound ................ 1,082,491
8 For purchasing private land within historic
9 site boundary ................................ 209,314
10 For replacement of Monk's Mounds stairs ........ 75,591
11 DAVID DAVIS MANSION - BLOOMINGTON
12 For renovation of the David Davis Mansion
13 to eliminate basement leakage ................ 145,936
14 DAVID DAVIS HOME
15 To acquire a residence to be
16 converted to a Visitors Center ............... 249,400
17 FORT DE CHARTRES - RANDOLPH COUNTY
18 For replacing Maintenance Building ............. 259,116
19 GALENA HISTORIC SITE
20 (From Article 90, Section 4 of Public Act 90-585)
21 For structural stabilization and
22 rehabilitation of five historic
23 structures in the Grant Home District
24 including the Biesman, Nolan, Gill,
25 Coville, and Donegan houses .................. 427,000
26 LEWIS AND CLARK STATE MEMORIAL -
27 MADISON COUNTY
28 For constructing interpretive center,
29 and development of the historic site
30 in addition to funds previously
31 appropriated ................................. 1,700,000
32 (From Article 91, Section 6 of Public Act 90-585)
33 For the construction of an interpretive
34 center and development of the historic
-57- BOB-CDBnew-re2000
1 site ......................................... 440,000
2 LINCOLN LOG CABIN HISTORIC SITE -
3 COLES COUNTY
4 (From Article 90, Section 4 of Public Act 90-585)
5 For constructing visitors center, Phase II,
6 and developing day use area .................. 1,669,000
7 (From Article 91, Section 6 of Public Act 90-585)
8 For construction of a visitors center .......... 71,656
9 For replacement of bridges ..................... 49,137
10 For construction of a visitor center and
11 museum, Phase I .............................. 44,736
12 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
13 (From Article 90, Section 4 of Public Act 90-585)
14 For renovating village entrance and
15 completing visitors center ................... 735,000
16 (From Article 91, Section 6 of Public Act 90-585)
17 For rehabilitation of the sewage treatment
18 plant ........................................ 86,512
19 LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
20 (From Article 90, Section 4 of Public Act 90-585)
21 For planning and beginning the Lincoln
22 Presidential Center, in addition to
23 funds previously appropriated ................ 7,700,000
24 POSTVILLE COURTHOUSE HISTORIC SITE -
25 LINCOLN
26 For rehabilitating Courthouse and site ......... 368,000
27 PULLMAN FACTORY HISTORIC SITE - CHICAGO
28 (From Article 91, Section 6 of Public Act 90-585)
29 For stabilization of the structure and for planning
30 and beginning restoration .................... 751,151
31 OLD STATE CAPITOL - SPRINGFIELD
32 (From Article 90, Section 4 of Public Act 90-585)
33 For rehabilitating Old State Capitol ........... 1,159,000
34 (From Article 91, Section 6 of Public Act 90-585)
-58- BOB-CDBnew-re2000
1 For renovating garage ramp ..................... 158,832
2 For renovation of the Old State
3 Capitol to eliminate basement
4 leakage ...................................... 162,714
5 VACHEL LINDSAY HOME
6 (From Article 90, Section 4 of Public Act 90-585)
7 For rehabilitating home ........................ 762,000
8 VANDALIA STATE HOUSE
9 (From Article 90, Section 4 of Public Act 90-585)
10 For replacing roof and rehabilitating
11 exterior ..................................... 508,000
12 (From Article 91, Section 6 of Public Act 90-585)
13 For rehabilitating HVAC and electrical
14 systems and interior ......................... 378,000
15 STATEWIDE
16 For replacing roofing systems at the
17 following locations at the approximate
18 costs set forth below: ....................... 325,543
19 Fort De Chartres, Randolph County .... 93,000
20 Washburne House, Galena .............. 12,543
21 David Davis Mansion, Bloomington ..... 25,000
22 Bishop Hill House, Henry County ..... 195,000
23 For matching ISTEA federal grant funds ......... 500,000
24 Total, Section 6 $21,857,769
25 Section 6.1. The amount of $54,510, or so much thereof
26 as may be necessary and remains unexpended at the close of
27 business on June 30, 1999, from a reappropriation heretofore
28 made for such purpose in Article 91, Section 6.1 of Public
29 Act 90-585, is reappropriated from the Capital Development
30 Fund to the Capital Development Board for the Historic
31 Preservation Agency for the purchase and rehabilitation of
32 the State Journal Register Building in Springfield.
-59- BOB-CDBnew-re2000
1 Section 6.2. The amount of $52,326, or so much thereof
2 as may be necessary and remains unexpended at the close of
3 business on June 30, 1999, from a reappropriation heretofore
4 made for such purpose in Article 91, Section 6.2 of Public
5 Act 90-585, is reappropriated from the Capital Development
6 Fund to the Capital Development Board for the Historic
7 Preservation Agency for acquiring the Zimmerman
8 archaeological site in LaSalle County and for associated
9 costs, planning, stabilization, restoration and all other
10 expenses necessary to comply with the intent of this
11 appropriation.
12 Section 6.3. The amount of $2,300,000, or so much
13 thereof as may be necessary and remains unexpended at the
14 close of business on June 30, 1999, from a reappropriation
15 heretofore made for such purposes in Article 91, Section 6.3
16 of Public Act 90-585, is reappropriated from the Capital
17 Development Fund to the Capital Development Board for
18 planning and beginning the construction of a new historical
19 library and Lincoln Center.
20 Section 6.4 The sum of $800,000, or so much thereof as
21 may be necessary and as remains unexpended at the close of
22 business on June 30, 1999, from reappropriations heretofore
23 made in Article 78, Section 7 of Public Act 90-0585, is
24 reappropriated from the Capital Development Fund to the
25 Capital Development Board for the Historic Preservation
26 Agency (formerly appropriated to the Historic Preservation
27 Agency) for the construction of an interpretive center and
28 development of the historic site at the Lewis and Clark
29 National Trail Site No. 1 in Madison County.
30 Section 6.5. The following named amounts, or so much
-60- BOB-CDBnew-re2000
1 thereof as may be necessary and remain unexpended at the
2 close of business on June 30, 1999, from appropriations
3 heretofore made for such purposes in Article 90, Section 4a,
4 and Article 91, Section 6.5 of Public Act 90-585, are
5 reappropriated from the General Revenue Fund to the Capital
6 Development Board for the Historic Preservation Agency for
7 the projects hereinafter enumerated:
8 FORT DE CHARTRES HISTORIC SITE -
9 RANDOLPH COUNTY
10 (From Article 90, Section 4a of Public Act 90-585)
11 For planning and beginning restoration
12 of powder magazine ........................... $ 100,000
13 LINCOLN'S NEW SALEM HISTORIC SITE -
14 PETERSBURG
15 For removing sewage lagoon and treatment
16 plant ........................................ 407,000
17 For rehabilitating saw mill and grist
18 mill ......................................... 219,000
19 METAMORA COURTHOUSE HISTORIC SITE
20 For rehabilitating courthouse .................. 474,000
21 (From Article 91, Section 6.5 of Public Act 90-585)
22 JOURNAL REGISTER BUILDING - SPRINGFIELD
23 For renovating building ........................ 648,213
24 DANA THOMAS HOUSE - SPRINGFIELD
25 For restoring the exterior and interior ........ 249,243
26 Total, Section 6.5 $2,097,456
27 Section 7. The sum of $71,890, or so much thereof as may
28 be necessary and remains unexpended at the close of business
29 on June 30, 1999, from a reappropriation heretofore made for
30 such purposes in Article 91, Section 7 of Public Act 90-585,
31 is reappropriated from the Capital Development Fund to the
32 Capital Development Board for the Legislative Space Needs
33 Commission for architectural/engineering fees, planning,
-61- BOB-CDBnew-re2000
1 construction, reconstruction, rehabilitation, and all other
2 necessary costs for remodeling and relocation of various
3 legislative services agencies located in the Capitol and
4 Stratton Office buildings at the approximate costs set forth
5 below:
6 For the Joint Committee on
7 Administrative Rules ..............$ 71,890
8 Section 8. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1999, from appropriations and
11 reappropriations heretofore made for such purposes in Article
12 90, Section 5, and Article 91, Section 8 of Public Act
13 90-585, are reappropriated from the Capital Development Fund
14 to the Capital Development Board for the Department of Human
15 Services (formerly the Department of Mental Health and
16 Developmental Disabilities) for the projects hereinafter
17 enumerated:
18 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
19 (From Article 91, Section 8 of Public Act 90-585)
20 For constructing two building additions
21 at the Forensic Complex ...................... 11,786,174
22 For rehabilitation of the central dietary ...... 1,803,719
23 For replacement of life/safety and
24 security system in a residential
25 building ..................................... 61,011
26 For replacement of the chiller and
27 connection of the HVAC to the energy
28 management system ............................ 5,048
29 For replacement of two cooling towers in
30 the Willow Building .......................... 4,631
31 CHESTER MENTAL HEALTH CENTER - CHESTER
32 (From Article 90, Section 5 of Public Act 90-585)
33 For renovating kitchen area .................... 967,000
-62- BOB-CDBnew-re2000
1 (From Article 91, Section 8 of Public Act 90-585)
2 For replacing fencing and upgrading
3 recreational yard ............................ 1,342,930
4 For renovating support and residential
5 area ......................................... 3,831,353
6 For installation of emergency generator
7 and upgrading EMS system ..................... 57,985
8 For construction of a storage building ........ 25,003
9 For construction of a Rehabilitative
10 Services building ............................ 28,380
11 For replacement of the emergency generator ..... 11,435
12 SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE
13 (FORMERLY THE CHICAGO METRO C&A)
14 For planning and renovation of residential
15 and program units for children and
16 adolescent services .......................... 794,770
17 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
18 (From Article 90, Section 5 of Public Act 90-585)
19 For upgrading fire/life safety systems, in
20 addition to funds previously appropriated .... 235,000
21 (From Article 91, Section 8 of Public Act 90-585)
22 For renovating residential units, in
23 addition to funds previously
24 appropriated ................................. 2,171,000
25 For renovation of utility rooms and installation
26 of drinking fountains ........................ 218,000
27 For renovation of the West Campus Nurses'
28 Stations ..................................... 381,713
29 For renovation of Henry Horner Children's
30 Center and West Campus for fire and
31 life safety codes ............................ 641,912
32 For renovation of the West Campus shower
33 and toilet rooms ............................. 303,615
34 For rehabilitation of the bathroom shower
-63- BOB-CDBnew-re2000
1 walls in ten buildings ....................... 16,780
2 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
3 (From Article 90, Section 5 of Public Act 90-585)
4 For rehabilitating Cypress Building ............ 1,546,000
5 (From Article 91, Section 8 of Public Act 90-585)
6 For completing HVAC system upgrade,
7 in addition to funds previously
8 appropriated ................................. 1,405,677
9 For upgrading the mechanical equipment,
10 in addition to funds previously
11 appropriated ................................. 422,529
12 For renovating a residential building,
13 in addition to funds previously
14 appropriated ................................. 826,447
15 For upgrading the mechanical equipment,
16 in addition to funds previously
17 appropriated ................................. 57,556
18 For planning and beginning the renovation of a
19 residential building ......................... 6,268
20 For separating and upgrading of the combined
21 sewer system, in addition to funds
22 previously appropriated ...................... 20,674
23 For rehabilitation of resident buildings
24 and upgrading of temperature controls ........ 33,786
25 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
26 (From Article 90, Section 5 of Public Act 90-585):
27 For replacing power plant and engineering
28 building ..................................... 8,029,000
29 (From Article 91, Section 8 of Public Act 90-585):
30 For renovating the central dietary
31 and kitchen .................................. 3,958,200
32 For construction of an Adult Psychiatric
33 Building, in addition to funds previously
34 appropriated ................................. 3,681,000
-64- BOB-CDBnew-re2000
1 For construction of roads, parking lots
2 and street lights ............................ 2,414,095
3 For upgrading and expanding the mechanical
4 infrastructure, in addition to funds
5 previously appropriated ...................... 3,361,237
6 For construction of a forensic services complex
7 at Elgin Mental Health Center, in addition
8 to funds previously appropriated ............. 3,909,765
9 For construction of a forensic services
10 complex, in addition to funds previously
11 appropriated ................................. 365,494
12 For renovation of the HVAC systems,
13 replacement of windows and installation
14 of security screens, in addition
15 to funds previously appropriated ............. 2,062,047
16 For construction of a Forensic Services
17 Facility, in addition to funds
18 previously appropriated ..................... 371,116
19 For upgrading and expanding mechanical
20 infrastructure, in addition to funds
21 previously appropriated ...................... 13,918
22 For upgrading for fire and life safety ......... 368,270
23 For planning the renovation of the Forensic
24 Building and abating asbestos ................ 251,946
25 For renovation of the Central Stores
26 Building ..................................... 85,679
27 For upgrading the security systems and
28 constructing a multi-purpose building
29 for the Forensic Complex ..................... 8,910
30 For the demolition of the Old Main Building
31 and construction of an Adult
32 Psychiatric Center ........................... 357,773
33 FOX DEVELOPMENTAL CENTER - DWIGHT
34 (From Article 90, Section 5 of Public Act 90-585)
-65- BOB-CDBnew-re2000
1 For renovating dietary, in addition
2 to funds previously appropriated ............. 842,445
3 (From Article 91, Section 8 of Public Act 90-585)
4 For replacement of absorbers and
5 upgrading HVAC system ........................ 724,467
6 For renovation of dietary ...................... 632,788
7 For renovation of Building #8 and
8 window replacement of Building
9 #1, in addition to funds
10 previously appropriated ...................... 299,963
11 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
12 (From Article 90, Section 5 of Public Act 90-585)
13 For replacing roofs ............................ 81,000
14 For planning and beginning access
15 to water supply from village ................. 78,000
16 For planning and rehabilitation of
17 utility tunnels .............................. 250,000
18 (From Article 91, Section 8 of Public Act 90-585)
19 For renovation of residential buildings ........ 2,513,102
20 For replacement of steam and
21 condensate lines ............................. 79,275
22 For renovation of the boilers in the power
23 plant ........................................ 29,856
24 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
25 For extending chilled water line ............... 312,085
26 For rehabilitation of bathrooms and
27 replacing doors .............................. 382,910
28 For rehabilitation of the electrical
29 distributions system, in addition to
30 Funds previously appropriated ................ 184,895
31 For installation of fire safety systems in
32 four buildings and replacement of a
33 code compliance generator .................... 94,758
34 KILEY DEVELOPMENTAL CENTER - WAUKEGAN
-66- BOB-CDBnew-re2000
1 For renovating homes ........................... 741,000
2 For renovation of homes ........................ 31,718
3 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
4 (From Article 90, Section 5 of Public Act 90-585)
5 For upgrading power plant and installing
6 EMS, in addition to funds previously
7 appropriated ................................. 1,794,838
8 For renovating Elmhurst Cottage ................ 1,905,000
9 (From Article 91, Section 8 of Public Act 90-585)
10 For installation of a rethermalization food
11 service system, in addition to funds
12 previously appropriated ...................... 706,518
13 For upgrading the architectural and mechanical
14 systems, in addition to funds
15 previously appropriated ...................... 504,454
16 For installation of a code compliance
17 generator .................................... 18,466
18 For installation of rethermalization food
19 service system ............................... 40,842
20 For expansion of the sprinkler system in
21 four buildings ............................... 185,080
22 For installation of air conditioning in
23 Coty and Dietary Buildings ................... 37,371
24 For upgrading the HVAC systems, including
25 chillers ..................................... 25,157
26 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
27 (From Article 90, Section 5 of Public Act 90-585)
28 For replacing plumbing, HVAC and
29 boiler systems ............................... 796,000
30 (From Article 91, Section 8 of Public Act 90-585)
31 For renovation of residential buildings,
32 in addition to funds previously
33 appropriated ................................. 1,888,500
34 For rehabilitation of the roads and parking
-67- BOB-CDBnew-re2000
1 areas and constructing walks ................. 597,571
2 For renovation of residences ................... 140,758
3 For renovation of restrooms for accessibility
4 in two buildings ............................. 4,538
5 For renovation of bathrooms in 15 residences ... 79,196
6 MADDEN MENTAL HEALTH CENTER - HINES
7 For renovating dietary ......................... 910,000
8 For renovation of pavilions, in addition
9 to funds previously appropriated ............. 844,000
10 For renovation of pavilions .................... 141,905
11 For upgrading residences for safety and
12 security ..................................... 80,382
13 For replacement of a cooling tower and
14 chiller and installation of an emergency
15 generator .................................... 223,621
16 For replacement of hot water heaters ........... 86,160
17 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
18 (From Article 90, Section 5 of Public Act 90-585)
19 For renovating Stevenson Hall .................. 984,000
20 (From Article 91, Section 8 of Public Act 90-585)
21 For replacement of the HVAC management
22 control panel, in addition to funds
23 previously appropriated ...................... 68,864
24 For rehabilitation of the dietary facility ..... 390,261
25 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
26 For rehabilitating the emergency
27 electrical system ............................ 298,038
28 For renovating Elm Cottage ..................... 2,935,932
29 For installation of fire safety systems ........ 537,167
30 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
31 (From Article 90, Section 5 of Public Act 90-585)
32 For planning and beginning the upgrade
33 of steam and condensate lines ................ 320,000
34 For rehabilitating HVAC system ................. 1,166,000
-68- BOB-CDBnew-re2000
1 (From Article 91, Section 8 of Public Act 90-585)
2 For replacing cooling towers and
3 rehabilitating absorbers ..................... 1,040,000
4 For completion of the HVAC system, in
5 addition to funds previously
6 appropriated ................................. 87,283
7 For replacement of boiler, in
8 addition to funds previously
9 appropriated ................................. 765,000
10 For replacement of water mains
11 and valves ................................... 1,750,205
12 For planning and beginning sewer and
13 manhole renovation ........................... 46,793
14 For rehabilitation of the boilers .............. 184,605
15 For planning and replacement of windows ........ 234,721
16 For installation of an emergency generator ..... 72,104
17 For upgrading fire safety systems in the
18 support buildings ............................ 163,978
19 For installation of air conditioning in
20 Building #704, in addition to funds
21 previously appropriated ...................... 104,551
22 For replacement of cooling towers in
23 Buildings #100A and #100B .................... 26,402
24 For installation of air conditioning in
25 Buildings #502 and #514 ...................... 42,938
26 SINGER MENTAL HEALTH CENTER - ROCKFORD
27 (From Article 90, Section 5 of Public Act 90-585)
28 For replacing roofs ............................ 248,000
29 (From Article 91, Section 8 of Public Act 90-585)
30 For renovating mechanicals and
31 residential areas ............................ 2,691,675
32 For replacement of absorbers ................... 186,339
33 (From Article 90, Section 5 of Public Act 90-585)
34 TINLEY PARK MENTAL HEALTH CENTER
-69- BOB-CDBnew-re2000
1 For upgrading fire/life safety systems
2 and bedroom lighting, in addition to
3 funds previously appropriated ................ 236,000
4 TINLEY PARK MENTAL HEALTH CENTER/
5 HOWE DEVELOPMENTAL CENTER
6 (From Article 91, Section 8 of Public Act 90-585)
7 For replacement of the bar screen and
8 renovating the sewer system, in
9 addition to funds previously appropriated .... 180,005
10 For rehabilitation of the electrical
11 distribution system, in addition to
12 funds previously appropriated ................ 2,158,753
13 For renovating and making mechanical
14 improvements to Spruce Hall and Maple Hall ... 149,650
15 For renovation for accessibility in four
16 buildings .................................... 137,036
17 For planning the sewer system renovation and
18 replacement of the rag catcher ............... 197,071
19 For renovation for fire and life safety in
20 three residences ............................. 211,124
21 For renovation of nursing stations and
22 medication rooms in three residences ......... 17,741
23 For replacement of the windows in nine
24 buildings .................................... 28,935
25 ZELLER MENTAL HEALTH CENTER - PEORIA
26 For renovation of the nurses' stations,
27 in addition to funds previously
28 appropriated ................................. 1,720,000
29 For renovation of Nurses' Stations and
30 seclusion rooms .............................. 148,916
31 For replacement of the heating and cooling
32 pumps ........................................ 8,357
33 STATEWIDE
34 For replacing roofing systems at the
-70- BOB-CDBnew-re2000
1 following locations at the approximate
2 costs set forth below: ....................... 207,600
3 Elgin Mental Health Center,
4 five buildings .....................150,000
5 Jacksonville Mental Health and
6 Developmental Center,
7 two buildings..........................57,600
8 For replacement of roofing systems at the
9 following locations at the approximate costs
10 set forth below: ............................. 1,334,305
11 Alton Mental Health Center ...........75,000
12 Choate Mental Health and
13 Developmental Center ...............45,000
14 Chester Mental Health Center ........663,305
15 Fox Developmental Center .............50,000
16 Howe Developmental Center ...........140,000
17 Jacksonville Developmental Center ....17,000
18 Lincoln Developmental Center ........344,000
19 For construction of a forensic services complex
20 at Alton Mental Health Center and Elgin
21 Mental Health Center, in addition to funds
22 previously appropriated ...................... 36,901
23 For conducting the preliminary design
24 and to begin to construct, convert and/
25 or rehabilitate a forensic facility .......... 94,918
26 For upgrading roads and parking lots at
27 the following locations at the
28 approximate costs set forth below: ........... 38,106
29 McFarland Mental Health Ctr ...........5,544
30 Shapiro Developmental Center .........32,562
31 For rehabilitation of water towers -
32 Murray and Chester ........................... 377,077
33 For replacement of roofs at the following
34 locations at the approximate costs set
-71- BOB-CDBnew-re2000
1 forth below: ................................. 666,480
2 Alton Mental Health Center -
3 Five buildings .....................50,000
4 Elgin Mental Health Center -
5 Three buildings ....................52,000
6 Lincoln Developmental Center -
7 Three buildings ....................80,000
8 Lincoln Developmental Center -
9 Four buildings ......................6,601
10 Ludeman Developmental Center -
11 Support buildings ..................50,000
12 Ludeman Developmental Center-
13 Residences .........................22,158
14 Mabley Developmental Center -
15 One building ......................103,517
16 Madden Mental Health Center -
17 Buildings and covered walkways ......5,000
18 McFarland Mental Health Center -
19 Three buildings .....................5,000
20 Meyer Mental Health Center -
21 One building ........................2,000
22 Shapiro Developmental Center -
23 Three buildings ...................187,000
24 Shapiro Developmental Center -
25 Two buildings ......................16,351
26 Shapiro Developmental Center -
27 Five buildings .....................67,831
28 Tinley Park Mental Health Center -
29 One building ........................7,252
30 Tinley Park Mental Health Center -
31 Oak Hall ...........................11,770
32 STATEWIDE - FIRE SAFETY
33 For installation of fire safety systems
34 (Formerly for Murray Developmental Center) ..... 537,167
-72- BOB-CDBnew-re2000
1 For installation of fire safety systems
2 (Formerly for Lincoln Developmental Center) .... 185,080
3 To renovate fire safety systems, including
4 installation of sprinklers, at the following
5 locations at the approximate costs set
6 forth below: ................................. 335,022
7 Singer Mental Health Center .........335,022
8 For fire safety and other work necessary to meet
9 state and federal certification standards for
10 the following projects:
11 For installation of sprinkler systems at
12 Chicago-Read Mental Health Center .......... 118,099
13 For installation of sprinkler systems at
14 Murray Developmental Center ................ 2,000
15 Total, Section 8 $99,282,417
16 Section 8A. The following named amounts, or so much
17 thereof as may be necessary and remain unexpended at the
18 close of business on June 30, 1999, from appropriations and
19 reappropriations heretofore made for such purposes in
20 Article 90, Section 5.1, and Article 91, Section 8A of Public
21 Act 90-585, are reappropriated from the Capital Development
22 Fund to the Capital Development Board for the Department of
23 Human Services (formerly the Department of Rehabilitation
24 Services) for the projects hereinafter enumerated:
25 ILLINOIS SCHOOL FOR THE DEAF -JACKSONVILLE
26 (From Article 90, Section 5.1 of Public Act 90-585)
27 For installing HVAC and upgrading electrical
28 and replacing doors .......................... $ 1,400,000
29 (From Article 91, Section 8A of Public Act 90-585)
30 For completing the HVAC system upgrade,
31 in addition to funds previously
32 appropriated ................................. 300,000
33 For replacing the storm and sanitary
-73- BOB-CDBnew-re2000
1 system ....................................... 1,922,385
2 For renovating Unit 5 .......................... 201,552
3 For planning and beginning the
4 upgrade of the heat and smoke
5 detection system ............................. 61,087
6 For the renovation of Cullom Hall .............. 1,977,831
7 For construction of an addition to Unit #5 ..... 20,634
8 For rehabilitation of the domestic hot and
9 cold water piping in six buildings ........... 190,056
10 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED -JACKSONVILLE
11 (From Article 90, Section 5.1 of Public Act 90-585)
12 For installing sewers .......................... 1,200,000
13 For constructing a new building to
14 replace buildings 2, 3 and 4,
15 in addition to funds previously
16 appropriated ................................. 3,300,000
17 (From Article 91, Section 8A of Public Act 90-585)
18 For rehabilitating the power house ............. 275,000
19 For the replacement of Buildings
20 #2, #3, and #4 ............................... 628,083
21 For replacement of Buildings 5 and 6 for
22 an Independent Living Center ................. 824,291
23 Total, Section 8A $12,300,919
24 Section 8.1. The following named amounts, or so much
25 thereof as may be necessary and remain unexpended at the
26 close of business on June 30, 1999, from appropriations and
27 reappropriations heretofore made for such purposes in
28 Article 90, Section 5a, and Article 91, Section 8.1 of Public
29 Act 90-585, are reappropriated from the General Revenue Fund
30 to the Capital Development Board for the Department of Human
31 Services (formerly the Department of Mental Health and
32 Developmental Disabilities) for the projects hereinafter
33 enumerated:
-74- BOB-CDBnew-re2000
1 ALTON MENTAL HEALTH CENTER
2 (From Article 91, Section 8.1 of Public Act 90-585)
3 For replacing windows in four buildings ........ $1,162,450
4 CHESTER MENTAL HEALTH CENTER
5 For replacing backflow prevention
6 devices ...................................... 76,864
7 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
8 For renovation of turbines in the powerhouse ... 28,364
9 FOX DEVELOPMENTAL CENTER - DWIGHT
10 (From Article 90, Section 5a of Public Act 90-585)
11 For replacing windows .......................... 578,000
12 JACKSONVILLE DEVELOPMENTAL CENTER
13 For replacing stoker and controls .............. 206,000
14 For planning and beginning the rehabilitation
15 of the water tower and smokestack ............ 80,000
16 (From Article 91, Section 8.1 of Public Act 90-585)
17 For the demolition of Carriel Hall,
18 rerouting utility lines,
19 providing parking lot, and planning
20 the demolition of Building 41 ................ 53,792
21 LINCOLN DEVELOPMENTAL CENTER
22 For replacing windows .......................... 723,511
23 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
24 For replacing windows in complex
25 buildings .................................... 486,000
26 TINLEY PARK MENTAL HEALTH CENTER
27 For installing windows in residential
28 buildings .................................... 748,375
29 For repairing the exterior of Spruce Hall ...... 56,350
30 For rehabilitating exterior of
31 residential building at Tinley ............... 19,683
32 ZELLER MENTAL HEALTH CENTER - PEORIA
33 For replacing windows .......................... 1,434,835
34 STATEWIDE
-75- BOB-CDBnew-re2000
1 (From Article 90, Section 5a of Public Act 90-585)
2 For resurfacing roads at Chicago-Read,
3 Tinley Park and Murray ....................... 2,000,000
4 (From Article 91, Section 8.1 of Public Act 90-585)
5 For repair of the exterior masonry
6 walls, in addition to funds previously
7 appropriated ................................. 142,787
8 For repair of the exterior masonry walls
9 at Fox, Shapiro and Tinley Park/Howe ......... 138,521
10 For renovation of fire safety systems at the
11 following locations at the approximate
12 costs set forth below: ....................... 1,639
13 Singer Mental Health Center ...........1,639
14 For installation of smoke detection systems,
15 smoke compartmentation, and other fire
16 safety and certification improvements at
17 Murray Developmental Center .................. 225,449
18 Total, Section 8.1 $8,162,620
19 Section 8A.1. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1999, from appropriations and
22 reappropriations heretofore made for such purposes in Article
23 90, Section 5a.1, and Article 91, Section 8A.1 of Public Act
24 90-585, are reappropriated from the General Revenue Fund to
25 the Capital Development Board for the Department of Human
26 Services (formerly the Department of Rehabilitation Services)
27 for the projects hereinafter enumerated:
28 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
29 (From Article 90, Section 5a.1 of Public Act 90-585)
30 For installing humidity controls ............... $ 155,000
31 For installing an all-weather
32 running track ................................ 190,000
33 (From Article 91, Section 8A.1 of Public Act 90-585)
-76- BOB-CDBnew-re2000
1 For installing an emergency generator .......... 501,710
2 For installing security systems in
3 three buildings .............................. 28,439
4 For renovation of buildings and lead
5 paint abatement .............................. 213,443
6 Total Section 8A.1 $1,088,592
7 Section 9. The following named amounts, or so much
8 thereof as may be necessary and remain unexpended at the
9 close of business on June 30, 1999, from appropriations and
10 reappropriations heretofore made for such purposes in
11 Article 90, Section 6, and Article 91, Section 9 of Public
12 Act 90-585, are reappropriated from the Capital Development
13 Fund to the Capital Development Board for the Department of
14 Military Affairs for the projects hereinafter enumerated:
15 AURORA ARMORY
16 (From Article 91, Section 9 of Public Act 90-585)
17 For planning and beginning construction of
18 an armory .................................... $ 10,820
19 CAMP LINCOLN - SPRINGFIELD
20 (From Article 90, Section 6 of Public Act 90-585)
21 For renovating heating system and
22 replacing windows ............................ 908,000
23 (From Article 91, Section 9 of Public Act 90-585)
24 For construction of a military academy
25 facility ..................................... 638,820
26 For site improvements and construction for
27 a military academy facility, including
28 repair and reconstruction of access
29 roads and drives at Camp Lincoln ............. 24,062
30 For planning, design, site improvements, and
31 other costs associated with the conversion
32 of the old "Castle" or Commissary Building
33 for use as a military museum ................. 122,068
-77- BOB-CDBnew-re2000
1 CARBONDALE ARMORY
2 For upgrading mechanical systems ............... 1,335,539
3 CRESTWOOD ARMORY
4 (From Article 90, Section 6 of Public Act 90-585)
5 For replacing roofing system and
6 rehabilitating exterior ...................... 1,217,525
7 DANVILLE ARMORY
8 (From Article 91, Section 9 of Public Act 90-585)
9 For planning and construction of a new armory .. 1,070,000
10 DECATUR ARMORY
11 For the state's share for additional planning
12 and construction of a new armory and
13 Organizational Maintenance Shop .............. 9,594
14 DIXON ARMORY - LEE COUNTY
15 (From Article 90, Section 6 of Public Act 90-585)
16 For upgrading mechanical and
17 electrical systems ........................... 1,866,000
18 (From Article 91, Section 9 of Public Act 90-585)
19 For construction of an addition,
20 remodeling, extending utilities and
21 installing a kitchen ......................... 26,321
22 DONNELLEY BUILDING
23 For the rehabilitation and renovation of
24 the Donnelley Building and purchase of
25 land for parking ............................. 184,885
26 GENERAL JONES ARMORY
27 For renovation of the exterior and interior,
28 mechanical areas and expansion of the
29 parking lot, in addition to amounts
30 previously appropriated ...................... 1,165,919
31 For renovation of the exterior, including
32 windows ...................................... 11,405
33 For replacement of the Assembly Hall
34 roofing system including its structural
-78- BOB-CDBnew-re2000
1 system ....................................... 210,904
2 For renovation of the armory, including
3 equipment, in addition to amounts
4 previously appropriated ...................... 33,725
5 For renovation of the armory, including
6 equipment, in addition to amounts
7 previously appropriated for this purpose ..... 11,276
8 For the state's share for renovation ........... 10,796
9 KANKAKEE ARMORY
10 For providing the State's share for
11 construction of an Armory and Army
12 Reserve Center, including equipment .......... 14,752
13 For the state's share for planning
14 and beginning an armory and Army
15 Reserve Center ............................... 2,064
16 LITCHFIELD ARMORY
17 For rehabilitation of exterior and upgrading
18 the interior ................................. 14,933
19 MACHESNEY PARK ARMORY (ROCKFORD)
20 For the state's share for additional planning
21 and construction of an armory and
22 Organizational Maintenance Shop .............. 218,047
23 MARSEILLES ARMORY
24 For planning and beginning four
25 buildings and wastewater facilities .......... 7,444
26 NORTHWEST ARMORY - CHICAGO
27 For renovation of interior and exterior,
28 in addition to funds previously
29 appropriated for such purposes ............... 1,200,000
30 PARIS ARMORY
31 For rehabilitation of the exterior and
32 upgrading the interior ....................... 30,796
33 PEORIA ARMORY
34 For providing the State's share for
-79- BOB-CDBnew-re2000
1 construction of an armory and Army
2 Reserve Center, including equipment .......... 5,596
3 ROCK ISLAND ARMORY
4 For construction of an armory and
5 maintenance shop ............................. 78,850
6 SALEM ARMORY - MARION COUNTY
7 For replacement of the boiler and
8 all domestic plumbing, piping and
9 fixtures, and upgrading of the
10 kitchen, including equipment ................. 289,061
11 SAUK AREA CAREER SCHOOL - CRESTWOOD
12 For the purchase and renovation of the
13 former Sauk Area Career School, converting
14 to an armory and upgrading the parking
15 lot .......................................... 84,023
16 STREATOR ARMORY - LASALLE COUNTY
17 For renovation of the mechanical
18 systems, in addition to funds
19 previously appropriated ...................... 125,321
20 WAUKEGAN ARMORY
21 (From Article 90, Section 6 of Public Act 90-585)
22 For replacing roofing system ................... 415,000
23 (From Article 91, Section 9 of Public Act 90-585)
24 For renovation of exterior walls, and
25 replacement of doors and windows ............. 47,851
26 WEST FRANKFORT ARMORY
27 (From Article 90, Section 6 of Public Act 90-585)
28 For replacing roofs and rehabilitating
29 exterior ..................................... 1,197,000
30 (From Article 91, Section 9 of Public Act 90-585)
31 For remodeling and installation of a kitchen ... 52,428
32 WILLIAMSON COUNTY ARMORY
33 For providing the State's share for planning
34 and construction of a new armory, in
-80- BOB-CDBnew-re2000
1 addition to amounts previously
2 appropriated ................................. 14,316
3 WOODSTOCK ARMORY
4 For the state's share for additional planning
5 and construction of an armory ................ 4,273
6 STATEWIDE
7 For replacement of roofs at the
8 following locations at the
9 approximate costs set forth below: ........... 40,238
10 Litchfield Armory ....................19,193
11 Springfield Military Academy .........21,045
12 For replacement of roofs at the following
13 locations at the approximate costs set
14 forth below .................................. 115,420
15 Camp Lincoln - AGO Building .......115,420 ____________
16 Total, Section 9 $12,815,072
17 Section 9.1. The following named amounts, or so much
18 thereof as may be necessary and remain unexpended at the
19 close of business on June 30, 1999, from reappropriations
20 heretofore made for such purposes in Article 91, Section 9.1
21 of Public Act 90-585, are reappropriated from the General
22 Revenue Fund to the Capital Development Board for the
23 Department of Military Affairs for the projects hereinafter
24 enumerated:
25 LAWRENCEVILLE ARMORY
26 For renovating interior ........................ $ 170,749
27 STATEWIDE
28 For the following projects at the approximate
29 costs set forth below: ....................... 86,000
30 Broadway Armory - Chicago
31 For repair of the heating
32 system .............................50,000
33 Freeport Armory
-81- BOB-CDBnew-re2000
1 For renovation of the armory
2 and parking area, including
3 installation of a security
4 fence ..............................36,000 ____________
5 Total, Section 9.1 $256,749
6 Section 10. The following named amounts, or so much
7 thereof as may be necessary and remain unexpended at the
8 close of business on June 30, 1999, from reappropriations
9 heretofore made for such purposes in Article 91, Section 10
10 of Public Act 90-585, are reappropriated from the Capital
11 Development Fund to the Capital Development Board for the
12 Department of Revenue for the project hereinafter enumerated:
13 WILLARD ICE BUILDING - SPRINGFIELD
14 For upgrading the uninterruptible power
15 system, in addition to funds previously
16 appropriated ................................. $ 1,200,000
17 For replacing the halon fire suppression
18 system ....................................... 344,000
19 For completion of the replacement of the
20 fire alarm and security system ............... 70,000
21 For upgrade of the uninterruptible
22 power system ................................. 1,060,210
23 Total, Section 10 $2,674,210
24 Section 10.1. The following named amount, or so much
25 thereof as may be necessary and remains unexpended at the
26 close of business on June 30, 1999, from an appropriation
27 heretofore made for such purposes in Article 90, Section 8a
28 of Public Act 90-585, is reappropriated from the General
29 Revenue Fund to the Capital Development Board for the
30 Department of Revenue for the project hereinafter enumerated:
31 WILLARD ICE BUILDING - SPRINGFIELD
32 For resealing and replacing atrium windows ..... $ 1,208,000
-82- BOB-CDBnew-re2000
1 Total, Section 10.1 $1,208,000
2 Section 11. The following named amounts, or so much
3 thereof as may be necessary and remain unexpended at the
4 close of business on June 30, 1999, from appropriations and
5 reappropriations heretofore made for such purposes in Article
6 90, Section 9, and Article 91, Section 12 of Public Act
7 90-585, are reappropriated from the Capital Development Fund
8 to the Capital Development Board for the Department of State
9 Police for the projects hereinafter enumerated:
10 (From Article 91, Section 12 of Public Act 90-585)
11 CAIRO (ULLIN) - DISTRICT 22
12 For construction of a firing range and radio
13 tower ........................................ $ 537,480
14 CARMI - DISTRICT 19 HEADQUARTERS
15 For planning and beginning the
16 rehabilitation of Headquarters
17 facilities ................................... 14,944
18 CHICAGO FORENSIC LABORATORY
19 For construction of a laboratory and
20 parking facilities ........................... 86,407
21 EAST MOLINE - DISTRICT 7
22 For rehabilitation of the headquarters
23 facilities and replacement of the
24 radio garage ................................. 70,726
25 LITCHFIELD - DISTRICT 18 HEADQUARTERS
26 For planning and beginning the
27 rehabilitation of Headquarters facilities ... 3,156
28 SPRINGFIELD ARMORY
29 (From Article 90, Section 9 of Public Act 90-585)
30 For planning and design of the rehabilitation
31 and site improvements of the Springfield
32 Armory, in addition to funds previously
33 appropriated ................................. 1,500,000
-83- BOB-CDBnew-re2000
1 SPRINGFIELD - STATE POLICE TRAINING ACADEMY
2 (From Article 91, Section 12 of Public Act 90-585)
3 For rehabilitation of the facility, including
4 replacement of the HVAC system and
5 installation of an elevator .................. 28,818
6 STERLING - DISTRICT 1
7 For planning, construction, reconstruction,
8 demolition of existing buildings, and
9 all costs related to the relocation of
10 the headquarters, in addition to funds
11 previously appropriated ...................... 488,013
12 For land acquisition, planning, construction,
13 reconstruction, demolition of existing
14 buildings, and all costs related to the
15 relocation of the District 1 Police
16 Headquarters in Sterling ..................... 7,149
17 STATEWIDE
18 (From Article 90, Section 9 of Public Act 90-585)
19 For replacing the roofing systems at various
20 facilities at the approximate costs set
21 forth below .................................. 167,000
22 District 17 - LaSalle ............... 41,000
23 Springfield, Radio Repair
24 Laboratory ......................... 36,000
25 Springfield, Communications
26 Building ........................... 90,000
27 For replacing radio communication towers,
28 equipment buildings and installing emergency
29 power generators at the following locations:
30 Pecatonica, Elwood, Kingston, Mason
31 City ......................................... 2,000,000
32 (From Article 91, Section 12 of Public Act 90-585)
33 For replacing radio communication
34 towers and equipment buildings and
-84- BOB-CDBnew-re2000
1 installing emergency power
2 generators at Andover, Eaton,
3 Pecatonica, and Cypress ...................... 1,150,000
4 For replacing the roofs and roof
5 drainage systems at various locations,
6 at the approximate costs set forth below: .... 110,904
7 DuQuoin, District #13 .................79,043
8 Springfield, District #9 and
9 Supply Building ......................31,861
10 For replacing radio communication
11 towers, equipment, buildings and
12 installing emergency power
13 generators at various locations .............. 1,037,536
14 District #22, Effingham (Mason site)
15 District #10, Pesotum
16 District #21, Askum
17 District #6, Pontiac
18 For replacing the roofing and roof
19 drainage systems at various facilities
20 at the approximate costs set forth
21 below ........................................ 1,352
22 District #8, Metamora ..................1,352 ____________
23 Total, Section 11 $7,203,485
24 Section 11.1. The following named amount, or so much
25 thereof as may be necessary and remains unexpended at the
26 close of business on June 30, 1999, from an appropriation
27 heretofore made in Article 90, Section 9a of Public Act
28 90-585, is reappropriated from the General Revenue Fund to
29 the Capital Development Board for the Department of State
30 Police for the project hereinafter enumerated:
31 TRAINING FACILITY - PAWNEE
32 For rehabilitating the driving track ........... $ 513,000
33 Total, Section 11.1 $513,000
-85- BOB-CDBnew-re2000
1 Section 12. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1999, from appropriations and
4 reappropriations heretofore made for such purposes in
5 Article 90, Section 10, and Article 91, Section 13 of Public
6 Act 90-585, are reappropriated from the Capital Development
7 Fund to the Capital Development Board for the Department of
8 Veterans' Affairs for the projects hereinafter enumerated:
9 ILLINOIS VETERANS' HOME - ANNA
10 (From Article 91, Section 13 of Public Act 90-585)
11 For purchasing equipment, in addition to funds
12 previously appropriated ...................... $ 18,095
13 ILLINOIS VETERANS' HOME - LASALLE
14 For construction of a storage building ........ 178,380
15 For installation of a medical gas system
16 and for additional funding for a
17 Special Care Unit ............................ 8,366
18 ILLINOIS VETERANS' HOME - MANTENO
19 (From Article 90, Section 10 of Public Act 90-585)
20 For constructing a multi-purpose
21 building ..................................... 439,000
22 (From Article 91, Section 13 of Public Act 90-585)
23 For construction of a special care facility .... 5,456,887
24 For replacement of roofs and upgrade
25 of sewer system, in addition to funds
26 previously appropriated ...................... 47,886
27 For air conditioning the interconnects ......... 41,964
28 For replacement of the roof on Kilbourne,
29 Meyers and Billings and upgrade
30 of sewer system, in addition to
31 funds previously appropriated ................ 88,363
32 ILLINOIS VETERANS' HOME - QUINCY
33 (From Article 90, Section 10 of Public Act 90-585)
34 For improvements to meet licensure
-86- BOB-CDBnew-re2000
1 standards .................................... 9,000,000
2 (From Article 91, Section 13 of Public Act 90-585)
3 For renovating Lippincott Hall ................. 164,542
4 For replacing steam lines ...................... 83,000
5 For replacing the domestic hot water loop ...... 221,449
6 For renovating the elevator .................... 72,319
7 Total, Section 12 $15,820,251
8 Section 12.1. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1999, from appropriations and
11 reappropriations heretofore made for such purposes in Article
12 90, Section 10a, and Article 91, Section 13.1 of Public Act
13 90-585, are reappropriated from the General Revenue Fund to
14 the Capital Development Board for the Department of Veterans'
15 Affairs for the projects hereinafter enumerated:
16 ILLINOIS VETERANS' HOME - ANNA
17 (From Article 90, Section 10a of Public Act 90-585)
18 Complete visitors center, in addition
19 to funds previously appropriated ............. $ 100,000
20 For installing lighting, benches,
21 landscaping and ADA improvements ............. 934,000
22 ILLINOIS VETERANS' HOME - LASALLE
23 For installing wall protection ................. 107,000
24 (From Article 91, Section 13.1 of Public Act 90-585)
25 For relocating security alarm
26 system ....................................... 37,800
27 ILLINOIS VETERANS' HOME - MANTENO
28 (From Article 90, Section 10a of Public Act 90-585)
29 For tuckpointing and repairing masonry ......... 1,026,000
30 (From Article 91, Section 13.1 of Public Act 90-585)
31 For replacing wiring in light poles ............ 144,615
32 For replacing exterior doors and frames ........ 179,715
33 For replacement of sewer lines, repair and
-87- BOB-CDBnew-re2000
1 replacement of bar screens, and
2 rehabilitation of the water tower and
3 reservoir .................................... 172,532
4 ILLINOIS VETERANS' HOME - QUINCY
5 (From Article 90, Section 10a of Public Act 90-585)
6 For resurfacing Schapers Hospital
7 parking lot .................................. 91,000
8 Total, Section 12.1 $2,792,662
9 Section 13. The following named amounts, or so much
10 thereof as may be necessary and remain unexpended at the
11 close of business on June 30, 1999, from appropriations and
12 reappropriations heretofore made for such purposes in Article
13 90, Sections 11.01, 11.02, and 11.03; and Article 91, Section
14 14 of Public Act 90-585, are reappropriated from the Capital
15 Development Fund to the Capital Development Board for the
16 projects hereinafter enumerated:
17 ATTORNEY GENERAL BUILDING - SPRINGFIELD
18 (From Article 90, Section 11.01 of Public Act 90-585)
19 For planning and annex or addition and
20 beginning construction of
21 parking facilities ........................... $ 200,000
22 (From Article 91, Section 14 of Public Act 90-585)
23 For planning energy improvements and upgrading
24 HVAC and electrical systems .................. 6,329
25 For energy improvements and upgrading the
26 HVAC, security and electrical systems,
27 in addition to funds previously
28 appropriated - Attorney General's
29 Building ..................................... 179,772
30 MT. VERNON APPELLATE COURT BUILDING
31 (From Article 90, Section 11.01 of Public Act 90-585)
32 For expanding the courthouse ................... 1,625,000
33 SPRINGFIELD - SUPREME COURT BUILDING
-88- BOB-CDBnew-re2000
1 (From Article 90, Section 11.01 of Public Act 90-585)
2 For replacing plumbing system .................. 1,000,000
3 (From Article 91, Section 14 of Public Act 90-585)
4 For replacement of side walls and steps, in addition
5 to funds previously appropriated ............. 74,857
6 SPRINGFIELD - CAPITOL COMPLEX
7 (From Article 90, Section 11.02 of Public Act 90-585)
8 For upgrading HVAC system at the Archives
9 Building, in addition to funds previously
10 appropriated ................................. 375,000
11 For renovating 222 South College
12 Building ..................................... 2,500,000
13 (From Article 91, Section 14 of Public Act 90-585)
14 For installing fire/security alarm
15 system ....................................... 1,050,800
16 For stabilizing the parking ramp ............... 493,719
17 For renovating the interior, exterior and
18 site improvements, in addition to
19 funds previously appropriated -
20 Executive Mansion ............................ 79,036
21 For upgrading environmental equipment
22 and HVAC, in addition to funds previously
23 appropriated - Archives Building ............. 2,150,000
24 For planning and beginning the rehabilitation
25 of the Power Plant ........................... 3,757,051
26 For upgrading sewer system - Capitol Complex,
27 in addition to funds previously
28 appropriated ................................. 1,157,366
29 For renovation of the lower level and
30 ground floor, in addition to funds
31 previously appropriated - Old Power Plant .... 367,703
32 For upgrading the life/safety and security
33 systems - Capitol Building ................... 2,105,256
34 For upgrading the refrigeration equipment -
-89- BOB-CDBnew-re2000
1 Capitol Complex .............................. 2,317,409
2 For renovating mechanical system -
3 Capitol Complex, in addition to funds
4 previously appropriated ...................... 1,365,022
5 For planning and beginning the upgrade
6 of environmental equipment and HVAC .......... 54,437
7 For renovation of mechanical systems, in
8 addition to funds previously appropriated .... 19,804
9 For upgrading the elevators .................... 11,906
10 For providing a parking facility for the
11 Bloom and Harris Buildings, including
12 land acquisition ............................. 248,024
13 For all costs associated with the design
14 and planning for asbestos abatement,
15 window replacement, energy conservation
16 improvements, replacement of carpeting and
17 ceiling tiles, handicap accessibility
18 improvements, and rehabilitation of the
19 water and air distribution systems in the
20 Stratton Office Building ..................... 310,572
21 For planning and design and beginning of
22 the rehabilitation of the
23 Springfield Armory ........................... 527,823
24 For renovation of the Waterways Building for
25 the Fourth District of the Appellate Court ... 3,500,240
26 SPRINGFIELD - SIU CONSOLIDATED LABORATORIES
27 For construction of an addition to the
28 laboratory facility for Southern Illinois
29 University, Environmental Protection Agency
30 and Department of Public Health .............. 81,987
31 STATE CAPITOL BUILDING
32 For upgrading the life/safety and
33 security systems, in addition to
34 funds previously appropriated ................ 2,600,000
-90- BOB-CDBnew-re2000
1 STRATTON OFFICE BUILDING - SPRINGFIELD
2 For installing fire alarm system ............... 400,000
3 STATEWIDE
4 (From Article 90, Section 11.03 of Public Act 90-585)
5 For surveys and modifications to buildings
6 to meets requirements of the federal
7 Americans With Disabilities Act .............. 5,000,000
8 For retrofitting or upgrading mechanized
9 refrigeration equipment (CFCs) ............... 7,000,000
10 For abating hazardous materials ................ 5,000,000
11 For upgrading and remediating underground
12 storage tanks ................................ 7,500,000
13 (From Article 91, Section 14 of Public Act 90-585):
14 For surveys and modifications to
15 buildings to meet requirements of the
16 federal Americans with Disabilities Act ...... 5,000,000
17 For abatement of hazardous materials ........... 5,000,000
18 For upgrading/retrofitting mechanized
19 refrigeration equipment (CFC's) .............. 4,598,112
20 For upgrade and remediation of underground
21 storage tanks ................................ 3,332,710
22 For renovation to meet the requirements
23 of the Americans with Disabilities Act ....... 3,000,000
24 For abatement of hazardous materials ........... 2,085,887
25 For upgrade and remediation of
26 underground storage tanks .................... 1,786,578
27 For survey for and abatement of
28 asbestos-containing materials ................ 1,389,934
29 For upgrade/retrofit of mechanized
30 refrigeration equipment (CFC's) .............. 3,984,861
31 For abatement of hazardous conditions,
32 including underground storage tanks,
33 in addition to funds previously
34 appropriated ................................. 895,197
-91- BOB-CDBnew-re2000
1 For surveys and modifications to buildings
2 to meet requirements of the federal
3 Americans with Disabilities Act .............. 21,618,468
4 For demolition of buildings .................... 2,685,078
5 For retrofitting/upgrading mechanical
6 refrigeration equipment ...................... 304,455
7 For planning and beginning construction of
8 quick chill food factories ................... 133,946
9 For abating hazardous conditions, including
10 underground storage tanks, in addition to
11 funds previously appropriated ................ 117,584
12 For the planning, upgrade and replacement of
13 potentially hazardous underground storage
14 tanks ........................................ 607,016
15 For surveys and abatement of asbestos-
16 containing materials ......................... 1,073,533
17 For asbestos abatement located during
18 Asbestos Abatement Authority and other
19 surveys to eliminate significant health
20 hazards ...................................... 324,025
21 For planning and abatement of asbestos, and
22 replenishment of initial project
23 construction costs in bondable projects
24 at various state owned facilities ............ 391,427
25 Total, Section 13 $111,387,924
26 Section 13.1. The sum of $373,000, or so much thereof as
27 may be necessary and remains unexpended at the close of
28 business on June 30, 1999, from a reappropriation heretofore
29 made for such purpose in Article 90, Section 11.04 of Public
30 Act 90-585,is reappropriated from the Capital Development
31 Fund to the Capital Development Board for the Illinois
32 Medical District Commission, to renovate the Commission's
33 office building, including replacing the HVAC system and
-92- BOB-CDBnew-re2000
1 roof.
2 Section 13.2. The amount of $51,193, or so much thereof
3 as may be necessary and remains unexpended at the close of
4 business on June 30, 1999, from a reappropriation heretofore
5 made for such purpose in Article 91, Section 14.1 of Public
6 Act 90-585, is reappropriated from the Capital Development
7 Fund to the Capital Development Board for planning,
8 construction and equipment for a joint laboratory facility
9 for the Illinois Environmental Protection Agency, the
10 Department of Public Health, and the Southern Illinois
11 University School of Medicine at the SIU Medical Facility in
12 Springfield.
13 Section 13.3. The sum of $825,000, or so much thereof as
14 may be necessary and remains unexpended on June 30, 1999,
15 from a reappropriation heretofore made for such purposes in
16 Article 91, Section 14.2 of Public Act 90-585, is
17 reappropriated from the Capital Development Fund to the
18 Capital Development Board for the Secretary of State for a
19 grant to the Edgebrook Library for all costs associated with
20 the miscellaneous costs incurred for construction or other
21 purposes.
22 Section 13.4. The sum of $40,000, or so much thereof as
23 may be necessary and remains unexpended at the close of
24 business on June 30, 1999, from an appropriation heretofore
25 made for such purposes in Article 91, Section 14.3 of Public
26 Act 90-585, is reappropriated from the Capital Development
27 Fund to the Capital Development Board for the Secretary of
28 State for a grant to the Wilmette Library for all costs
29 associated with planning, construction, reconstruction, and
30 rehabilitation or other purposes.
-93- BOB-CDBnew-re2000
1 Section 14. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1999, from appropriations and
4 reappropriations heretofore made for such purposes in Article
5 90, Sections 11.01a and 11.03a, and Article 91, Section 15 of
6 Public Act 90-585, are reappropriated from the General
7 Revenue Fund to the Capital Development Board for the
8 projects hereinafter enumerated:
9 SECOND DISTRICT APPELLATE COURT - ELGIN
10 (From Article 90, Section 11.01a of Public Act 90-585)
11 For upgrading mechanical systems
12 and building exterior ........................ 190,000
13 EXECUTIVE MANSION - SPRINGFIELD
14 For renovating interior, exterior and site, in
15 addition to funds previously appropriated .... 190,000
16 STATEWIDE
17 (From Article 90, Section 11.03a of Public Act 90-585):
18 For surveying and abating asbestos-
19 containing materials ......................... 1,000,000
20 For remediating minor problems
21 and emergencies .............................. 3,002,000
22 For conducting construction site
23 archeological studies ........................ 245,000
24 For demolishing buildings ...................... 4,800,000
25 (From Article 91, Section 15 of Public Act 90-585):
26 For repair of minor problems and
27 emergencies .................................. 3,142,246
28 For construction site archeological
29 studies ...................................... 200,000
30 For surveys for and abatement of
31 asbestos-containing material ................. 915,902
32 For demolition of buildings .................... 5,000,000
33 For repair of minor problems and
34 emergencies .................................. 389,954
-94- BOB-CDBnew-re2000
1 For tuckpointing and exterior repair
2 of state buildings ........................... 415,393
3 For surveys for asbestos containing
4 material ..................................... 131,410
5 For construction site archaeological
6 studies ...................................... 26,347
7 For survey of asbestos-containing
8 materials .................................... 139,312
9 For repairing minor problems and for
10 emergencies, in addition to funds
11 previously appropriated ...................... 31,934
12 For repairing minor problems and emergencies
13 for agencies ................................. 218,017
14 For the planning and abatement of asbestos
15 hazards, and replenishment of initial
16 project construction costs in
17 non-bondable projects at various
18 state owned facilities ....................... 150,055
19 Total, Section 14 $20,187,570
20 Section 14.1. The sum of $203,509, or so much thereof as
21 may be necessary and remains unexpended at the close of
22 business on June 30, 1999, from an appropriation heretofore
23 made for such purposes in Article 91, Section 15.4 of Public
24 Act 90-585, is reappropriated from the General Revenue Fund
25 to the Capital Development Board for a grant to Lincoln Land
26 Community College for all costs associated with the
27 remodeling of Cass Gymnasium.
28 Section 14.2. The sum of $1,408,035, or so much thereof
29 as may be necessary and remains unexpended at the close of
30 business on June 30, 1999, from an appropriation heretofore
31 made for such purposes in Article 91, Section 15.5 of Public
32 Act 90-585, is reappropriated from the General Revenue Fund
-95- BOB-CDBnew-re2000
1 to the Capital Development Board for a grant to Lincoln Land
2 Community College for all costs associated with the
3 construction of a new Rural Education and Technology Center.
4 Section 14.3. The sum of $192,435, or so much of that
5 amount as may be necessary and remains unexpended at the
6 close of business on June 30, 1999, from a reappropriation
7 heretofore made for such purposes in Article 91, Section 15.6
8 of Public Act 90-585, is reappropriated to the Capital
9 Development Board from the General Revenue Fund for the
10 planning and construction of the Anna Veterans Home Visitor
11 Center.
12 Section 14.4. The amount of $121,342, or so much thereof
13 as may be necessary and remains unexpended at the close of
14 business on June 30, 1999, from an appropriation heretofore
15 made for such purposes in Article 91, Section 15.7 of Public
16 Act 90-585, is reappropriated from the General Revenue Fund
17 to the Capital Development Board for planning, design,
18 construction, renovation, and all other necessary costs for
19 the Market House in Galena.
20 Section 14.5. The sum of $738,010, or so much thereof as
21 may be necessary and remains unexpended on June 30, 1999,
22 from an appropriation heretofore made for such purposes in
23 Article 91, Section 15.8 of Public Act 90-585, is
24 reappropriated from the General Revenue Fund to the Capital
25 Development Board for planning and renovation of Founders
26 Memorial Library at Northern Illinois University.
27 Section 15. The amount of $26,942,277, or so much
28 thereof as may be necessary and remains unexpended at the
29 close of business on June 30, 1999, from an appropriation
30 heretofore made for such purposes in Article 91, Section 16
-96- BOB-CDBnew-re2000
1 of Public Act 90-585, is reappropriated from the School
2 Infrastructure Fund to the Capital Development Board for
3 school construction project grants pursuant to the School
4 Construction Law.
5 Section 16. The sum of $67,000,000, or so much thereof
6 as may be necessary and remains unexpended at the close of
7 business on June 30, 1999, from an appropriation heretofore
8 made for such purposes in Article 90, Section 16 of Public
9 Act 90-585, is reappropriated from the School Infrastructure
10 Fund to the Capital Development Board for school construction
11 grants pursuant to the School Construction Law.
12 Section 17. The sum of $243,696,855, or so much thereof
13 as may be necessary and remains unexpended at the close of
14 business on June 30, 1999, from an appropriation heretofore
15 made for such purposes in Article 90, Section 17 of Public
16 Act 90-585, is reappropriated from the School Construction
17 Fund to the Capital Development Board for school construction
18 grants pursuant to the School Construction Law.
19 Section 18. The sum of $270,189, or so much thereof as
20 may be necessary and remains unexpended at the close of
21 business on June 30, 1999, from a reappropriation heretofore
22 made for such purposes in Article 91, Section 17 of Public
23 Act 90-585, is reappropriated from the Asbestos Abatement
24 Fund to the Capital Development Board for asbestos surveys in
25 relation to the asbestos abatement of State Governmental
26 Buildings.
27 Section 19. The following named amounts, or so much
28 thereof as may be necessary and remain unexpended at the
29 close of business on June 30, 1999, from appropriations and
-97- BOB-CDBnew-re2000
1 reappropriations heretofore made for such purposes in Article
2 90, Section 13, and Article 91, Section 18 of Public Act
3 90-585, are reappropriated from the Capital Development Fund
4 to the Capital Development Board for the Board of Higher
5 Education for the projects hereinafter enumerated:
6 ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
7 (From Article 90, Section 13 of Public Act 90-585)
8 For replacing carpeting, constructing storage
9 building and various site improvements,
10 including extending communications
11 conduit system ............................... $ 1,310,000
12 (From Article 91, Section 18 of Public Act 90-585)
13 For replacing air conditioning units,
14 controls and upgrading the energy
15 management system ............................ 2,330,390
16 For remodeling the Information Resource
17 Technology Center ............................ 59,521
18 For renovation of the laboratory areas,
19 including a greenhouse ....................... 59,817
20 For the purchase, renovation and improvement
21 of the North Campus High School site of
22 the Aurora West School District 129,
23 including construction of four dormitories,
24 equipment purchases and other expenses for
25 use by the Illinois Mathematics and Science
26 Academy ...................................... 1,198,505
27 Total, Section 19 $4,958,233
28 Section 20. The following named amounts, or so much
29 thereof as may be necessary and remain unexpended at the
30 close of business on June 30, 1999, from appropriations and
31 reappropriations heretofore made for such purposes in Article
32 90, Section 12, and Article 91, Section 19 of of Public Act
33 90-585, are reappropriated from the Capital Development Fund
-98- BOB-CDBnew-re2000
1 to the Capital Development Board for the Illinois Community
2 College Board for the projects hereinafter enumerated:
3 BELLEVILLE AREA COLLEGE
4 (From Article 91, Section 19 of Public Act 90-585)
5 For constructing a building, additions
6 and site improvements at the
7 Belleville and Red Bud campuses,
8 in addition to funds previously
9 appropriated ................................. $ 9,755,834
10 For planning buildings, additions and
11 site improvements ............................ 545,565
12 CITY COLLEGES OF CHICAGO/KENNEDY KING
13 (From Article 90, Section 12 of Public Act 90-585)
14 For remodeling for a culinary arts
15 educational facility ......................... 10,875,000
16 (From Article 91, Section 19 of Public Act 90-585)
17 DANVILLE AREA COMMUNITY COLLEGE - VERMILION COUNTY
18 To rehabilitate infrastructure,
19 construct a classroom facility
20 and a day care center, in addition
21 to funds previously appropriated ............. 1,722,476
22 For rehabilitation of infrastructure
23 and beginning construction of a
24 classroom facility ........................... 977,353
25 For rehabilitation of the infrastructure and
26 planning campus buildings .................... 727,990
27 COLLEGE OF DUPAGE
28 For completing the addition to
29 the Student Resource Center .................. 141,532
30 ELGIN COMMUNITY COLLEGE
31 For construction of addition, site improvements,
32 remodeling and purchasing equipment .......... 512,362
33 For planning, design, site improvements, utility
34 adjustments, and any other costs associated
-99- BOB-CDBnew-re2000
1 with construction of a new Instructional
2 Building at Elgin Community College .......... 66,600
3 HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
4 For constructing buildings and making
5 site improvements, including equipment ....... 19,208,135
6 For planning buildings, parking areas,
7 utilities, and site development and
8 preliminary site preparation
9 required to establish permanent
10 campus facilities ............................ 1,772,950
11 JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE
12 For constructing additions and site
13 improvements, in addition to funds
14 previously appropriated ...................... 10,840,477
15 For construction of classroom facility,
16 and remodeling the existing facility,
17 including utilities and site improvements .... 24,745
18 JOHN WOOD COMMUNITY COLLEGE - QUINCY
19 (From Article 90, Section 12 of Public Act 90-585)
20 For planning campus buildings and site
21 improvements ................................. 1,871,800
22 (From Article 91, Section 19 of Public Act 90-585)
23 For construction of a science and technology
24 center and access road ....................... 8,978
25 JOLIET JUNIOR COLLEGE
26 (From Article 90, Section 12 of Public Act 90-585)
27 For remodeling campus buildings ................ 220,900
28 (From Article 91, Section 19 of Public Act 90-585)
29 For construction of a business and technology
30 center and remodeling the main campus
31 building ..................................... 107,081
32 For planning, design and site preparation of
33 a Business Technology Center ................. 2,983
34 COLLEGE OF LAKE COUNTY
-100- BOB-CDBnew-re2000
1 For construction of a multi-use Instructional
2 Center, including acquisition of equipment
3 and remodeling of existing facilities ........ 17,407
4 (From Article 90, Section 12 of Public Act 90-585)
5 LAKE LAND COLLEGE - MATTOON
6 For constructing a classroom/administration
7 building and purchasing equipment, in addition
8 to funds previously appropriated ............. 5,336,800
9 LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY
10 For constructing a classroom/administration
11 building ..................................... 10,125,000
12 (From Article 91, Section 19 of Public Act 90-585)
13 For renovation of buildings, construction of an
14 addition and site improvements ............... 27,764
15 For construction of health, mathematics and
16 science laboratory facilities and
17 remodeling Fobes Hall ........................ 259,974
18 For renovation of the main complex ............. 14,925
19 For planning, design, and site preparation,
20 and construction of a multi-purpose
21 building ..................................... 22,932
22 LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
23 (From Article 90, Section 12 of Public Act 90-585)
24 For constructing an addition and remodeling
25 Sangamon and Menard Halls .................... 3,777,700
26 (From Article 91, Section 19 of Public Act 90-585)
27 MCHENRY COUNTY COLLEGE
28 For construction of an addition, including
29 equipment, a parking area and
30 site improvements ............................ 19,993
31 MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
32 (From Article 90, Section 12 of Public Act 90-585)
33 For constructing a classroom/administration
34 building, providing site improvements and
-101- BOB-CDBnew-re2000
1 purchasing equipment, in addition to
2 funds previously appropriated ................ 8,309,200
3 (From Article 91, Section 19 of Public Act 90-585)
4 For planning and constructing a new classroom
5 facility ..................................... 362,212
6 For providing for an architectural engineering
7 study, renovations, construction,
8 reconstruction and remodeling of Buildings
9 A, B and L ................................... 417,365
10 PRAIRIE STATE COMMUNITY COLLEGE - CHICAGO HEIGHTS
11 For construction of a Learning Resource
12 Center addition .............................. 19,180
13 REND LAKE COLLEGE - INA
14 (From Article 90, Section 12 of Public Act 90-585)
15 For constructing a north access road,
16 including security lighting and drainage ..... 365,269
17 For replacing utility piping ................... 1,546,400
18 (From Article 91, Section 19 of Public Act 90-585)
19 For construction of an aquatic and
20 rehabilitation center ........................ 13,443
21 SHAWNEE COMMUNITY COLLEGE - ULLIN
22 For constructing additions, parking
23 facilities, and renovating buildings,
24 including equipment .......................... 7,328,707
25 SOUTHEASTERN ILLINOIS COLLEGE - HARRISBURG
26 For construction of humanities,
27 administration, and child care facilities
28 and remodeling campus buildings .............. 61,417
29 TRITON COMMUNITY COLLEGE - RIVER GROVE
30 For planning, site improvements, construction
31 and other expenses necessary for the
32 construction of an addition to the Learning
33 Resource Center .............................. 115,893
34 WILLIAM RAINEY HARPER COMMUNITY COLLEGE - PALATINE
-102- BOB-CDBnew-re2000
1 For constructing a Multi-purpose
2 Instructional Center and renovating
3 Building A Cafeteria ......................... 6,823,200
4 For planning, developing, and designing a
5 multi-purpose telecommunications
6 instructional delivery center ................ 113,812
7 STATEWIDE - CONSTRUCTION DEFECTS
8 For planning, construction and renovation
9 to correct defectively designed or
10 constructed community college facilities,
11 provided that monies recovered based upon
12 claims arising out of such defective design
13 or construction shall be paid to the state
14 as required by Section 105.12 of the Public
15 Community College Act as reimbursement for
16 monies expended pursuant to this
17 appropriation ................................ 1,016,231
18 Total, Section 20 $105,477,585
19 Section 20A. The sum of $4,941,654, or so much thereof
20 as may be necessary and remains unexpended at the close of
21 business on June 30, 1999, from a reappropriation heretofore
22 made for such purposes in Article 91, Section 19A of Public
23 Act 90-585, is reappropriated from the Capital Development
24 Fund to the Capital Development Board for the Illinois
25 Community College Board for miscellaneous capital
26 improvements including construction, reconstruction,
27 remodeling, improvement, repair and installation of capital
28 facilities, cost of planning, supplies, equipment, materials,
29 services and all other expenses required to complete the work
30 at the various community colleges. This appropriation shall
31 be in addition to any other appropriated amounts which can be
32 expended for these purposes.
-103- BOB-CDBnew-re2000
1 Section 20B. The sum of $6,343,805, or so much thereof
2 as may be necessary and remains unexpended at the close of
3 business on June 30, 1999, from a reappropriation heretofore
4 made for such purposes in Article 91, Section 19B of Public
5 Act 90-585, is reappropriated from the Capital Development
6 Fund to the Capital Development Board for the Illinois
7 Community College Board for miscellaneous capital
8 improvements including construction, reconstruction,
9 remodeling, improvement, repair and installation of capital
10 facilities, cost of planning, supplies, equipment, materials,
11 services and all other expenses required to complete the work
12 at the various community colleges. This appropriation shall
13 be in addition to any other appropriated amounts which can be
14 expended for these purposes.
15 Section 20C. The sum of $2,521,400, or so much thereof
16 as may be necessary and remains unexpended at the close of
17 business on June 30, 1999, from a reappropriation heretofore
18 made for such purposes in Article 91, Section 19C of Public
19 Act 90-585, is reappropriated from the Capital Development
20 Fund to the Capital Development Board for the Illinois
21 Community College Board for grants to community colleges for
22 miscellaneous capital improvements including construction,
23 reconstruction, remodeling, improvements, repair and
24 installation of capital facilities, cost of planning,
25 supplies, equipment, materials, services, and all other
26 expenses required to complete the work. This appropriation
27 shall be in addition to any other appropriated amounts which
28 can be expended for these purposes.
29 Section 20D. The sum of $3,756,000, or so much thereof
30 as may be necessary and remains unexpended at the close of
31 business on June 30, 1999, from an appropriation heretofore
32 made for such purpose in Article 90, Section 15 of Public Act
-104- BOB-CDBnew-re2000
1 90-585 is reappropriated from the Capital Development Fund to
2 the Capital Development Board for the Illinois Community
3 College Board for miscellaneous capital improvements
4 including construction, capital facilities, cost of planning,
5 supplies, equipment, materials, services and all other
6 expenses required to complete the work at the various
7 community colleges. This appropriation shall be in addition
8 to any other appropriated amounts which can be expended for
9 these purposes.
10 Section 21. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 1999, from appropriations and
13 reappropriations heretofore made for such purposes in Article
14 90, Section 13 and Article 91, Section 20 of Public Act
15 90-585, are reappropriated from the Capital Development Fund
16 to the Capital Development Board for the Board of Higher
17 Education for the projects hereinafter enumerated:
18 CHICAGO STATE UNIVERSITY
19 (From Article 90, Section 13 of Public Act 90-585)
20 For upgrading campus infrastructure,
21 in addition to the funds
22 previously appropriated ...................... 2,700,000
23 (From Article 91, Section 20 of Public Act 90-585)
24 For renovating buildings and upgrading
25 mechanical systems ........................... $ 3,300,000
26 For renovating campus buildings and
27 upgrading mechanical systems ................. 2,432,200
28 For providing campus health and safety
29 improvements ................................. 40,221
30 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
31 (From Article 90, Section 13 of Public Act 90-585)
32 For upgrading campus buildings for health,
33 safety and environmental improvements ........ 1,302,100
-105- BOB-CDBnew-re2000
1 (From Article 91, Section 20 of Public Act 90-585)
2 For constructing an addition and
3 renovating Booth Library ..................... 16,764,500
4 For planning an addition and renovation
5 of Booth Library ............................. 771,992
6 For construction of an addition and
7 remodeling Buzzard Building .................. 199,327
8 For upgrading the energy management system
9 and HVAC systems and installation of a chilled
10 water loop between various buildings ......... 31,252
11 For completing conversion to a coal-fired
12 power plant .................................. 52,986
13 For completion of the construction and
14 renovation of the heating system ............. 37,703
15 For planning, equipment, site improvements,
16 construction and renovation of the heating
17 system to restore coal burning capability .... 30,429
18 GOVERNORS STATE UNIVERSITY - PARK FOREST
19 (From Article 90, Section 13 of Public Act 90-585)
20 For planning and beginning the
21 main building renovations,
22 a child development center, and
23 faculty offices .............................. 1,500,000
24 (From Article 91, Section 20 of Public Act 90-585)
25 For upgrading and replacing cooling
26 and refrigeration systems and
27 equipment .................................... 1,985,811
28 For renovation of the main building ............ 422,825
29 For remodeling Main Building ................... 346,063
30 For renovation of the main building ............ 49,954
31 For remodeling the main building ............... 171,802
32 (From Article 90, Section 13 of Public Act 90-585)
33 ILLINOIS STATE UNIVERSITY - NORMAL
34 For remodeling Julian and Moulton Halls ........ 7,050,000
-106- BOB-CDBnew-re2000
1 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
2 For replacing fire alarm systems, lighting
3 and ceilings ................................. 2,561,800
4 (From Article 91, Section 20 of Public Act 90-585)
5 For renovating the auditorium in
6 Building E ................................... 7,131,614
7 For upgrading the boilers and related
8 control systems .............................. 12,626
9 For fire safety modifications at the
10 facility ..................................... 981,903
11 For renovation of Buildings E, F, and
12 the auditorium, and demolition and
13 replacement of Buildings G, J and M,
14 in addition to amounts previously
15 appropriated ................................. 829,569
16 For remodeling the library ..................... 171,978
17 NORTHERN ILLINOIS UNIVERSITY - DEKALB
18 For renovating Altgeld Hall and
19 purchasing equipment ......................... 19,150,400
20 (From Article 90, Section 13 of Public Act 90-585)
21 For upgrading storm waterway controls in
22 addition to funds previously appropriated .... 6,716,000
23 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
24 For upgrading and remodeling Anthony Hall ...... 3,131,100
25 (From Article 91, Section 20 of Public Act 90-585)
26 For site improvements and purchasing
27 equipment for the Engineering and
28 Technology Building .......................... 423,681
29 For planning addition, remodeling and
30 upgrading the HVAC system in Altgeld Hall .... 574,000
31 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
32 For construction of the Engineering Facility
33 building and related site improvements ....... 16,893,162
34 (From Article 90, Section 13 of Public Act 90-585)
-107- BOB-CDBnew-re2000
1 For planning and beginning construction
2 or renovation for a classroom/administration
3 facility in addition to funds previously
4 appropriated ................................. 1,179,600
5 UNIVERSITY OF ILLINOIS - CHICAGO
6 For remodeling the Clinical
7 Sciences Building ............................ 15,000,000
8 (From Article 91, Section 20 of Public Act 90-585)
9 For the renovation of the court area and
10 Lecture Center, in addition to funds
11 previously appropriated ...................... 3,760,506
12 UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
13 For constructing an Agricultural
14 Library ...................................... 9,500,000
15 For completion of campus flood control ......... 6,000,000
16 (From Article 90, Section 13 of Public Act 90-585)
17 For remodeling the Mechanical Engineering
18 Laboratory Building .......................... 7,365,000
19 UNIVERSITY OF ILLINOIS - SPRINGFIELD
20 For constructing and improving campus
21 roadways, in addition to funds previously
22 appropriated ................................. 2,252,855
23 WESTERN ILLINOIS UNIVERSITY - MACOMB
24 (From Article 91, Section 20 of Public Act 90-585)
25 For remodeling Horrabin Hall and
26 beginning to convert Simpkins Hall
27 gymnasium and adjacent areas into
28 a performing arts facility ................... 2,153,696
29 For construction of a steam and electrical
30 utility tunnel ............................... 211,374
31 (From Article 90, Section 13, Public Act 90-585)
32 For constructing a utility tunnel and
33 installing piping, lines and cables .......... 6,313,400
34 For remodeling Horrabin and Simpkins
-108- BOB-CDBnew-re2000
1 Halls, in addition to funds
2 previously appropriated....................... 1,655,400
3 Total, Section 21 $153,158,829
4 Section 21.1. The sum of $237,635, or so much thereof as
5 may be necessary and remains unexpended at the close of
6 business on June 30, 1999, from a reappropriation heretofore
7 made for such purposes in Article 91, Section 20.1 of Public
8 Act 90-585, is reappropriated from the Capital Development
9 Fund to the Capital Development Board for the Board of Higher
10 Education for miscellaneous capital improvements including
11 construction, reconstruction, remodeling, improvement, repair
12 and installation of capital facilities, cost of planning,
13 supplies, equipment, materials, services and all other
14 expenses required for completing the the work at the colleges
15 and universities. This appropriation shall be in addition to
16 any other appropriated amounts which can be expended for
17 these purposes.
18 Section 21.2. The following named amounts, or so much
19 thereof as may be necessary and remain unexpended at the
20 close of business on June 30, 1999, from reappropriations
21 heretofore made for such purposes in Article 91, Section 20.2
22 of Public Act 90-585, are reappropriated from the Capital
23 Development Fund to the Capital Development Board for the
24 Board of Higher Education for miscellaneous capital
25 improvements including construction, reconstruction,
26 remodeling, improvement, repair and installation of capital
27 facilities, cost of planning, supplies, equipment, materials,
28 services and all other expenses required to complete the work
29 at the colleges and universities hereinafter enumerated. This
30 appropriation shall be in addition to any other appropriated
31 amounts which can be expended for these purposes:
32 Eastern Illinois University .................. $ 24,385
-109- BOB-CDBnew-re2000
1 Northeastern Illinois University ............. 149,786
2 Western Illinois University .................. 455,704
3 Total, Section 21.2 $629,875
4 Section 21.3. The sum of $14,663,596, or so much thereof
5 as may be necessary and remains unexpended at the close of
6 business on June 30, 1999, from a reappropriation heretofore
7 made for such purposes in Article 91, Section 20.3 of Public
8 Act 90-585, is reappropriated from the Capital Development
9 Fund to the Capital Development Board for the Board of Higher
10 Education for miscellaneous capital improvements, including
11 construction, reconstruction, remodeling, improvement, repair
12 and installation of capital facilities, cost of planning,
13 supplies, equipment, materials, services and all other
14 expenses required to complete the work at the various
15 universities set forth below. This appropriation shall be in
16 addition to any other appropriated amounts which can be
17 expended for these purposes.
18 For Chicago State University ......... 301,400
19 For Eastern Illinois University ...... 564,100
20 For Governors State University ....... 122,972
21 For Illinois State University ...... 1,150,279
22 For Northeastern Illinois University . 423,700
23 For Northern Illinois University ... 1,287,700
24 For Western Illinois University ...... 858,250
25 For Southern Illinois University -
26 Carbondale ........................ 1,808,728
27 For Southern Illinois University -
28 Edwardsville ........................ 751,500
29 For University of Illinois -
30 Chicago ........................... 3,280,400
31 For University of Illinois -
32 Springfield ......................... 134,267
33 For University of Illinois -
-110- BOB-CDBnew-re2000
1 Urbana-Champaign .................. 3,980,300
2 Section 21.4. The sum of $11,244,000, or so much thereof
3 as may be necessary and remains unexpended at the close of
4 business on June 30, 1999, from an appropriation heretofore
5 made for such purposes in Article 90, Section 14 of Public
6 Act 90-585, is reappropriated from the Capital Development
7 Fund to the Capital Development Board for the Board of Higher
8 Education for miscellaneous capital improvements including
9 construction, capital facilities, cost of planning, various
10 universities set forth below. This appropriation shall be in
11 addition to any other appropriated amounts which can be
12 expended for these purposes.
13 For Chicago State University ........... 226,000
14 For Eastern Illinois University ........ 423,100
15 For Governors State University ......... 136,200
16 For Illinois State University .......... 863,000
17 For Northeastern Illinois University ... 317,800
18 For Northern Illinois University ....... 965,800
19 For Western Illinois University ........ 646,800
20 For Southern Illinois University -
21 Carbondale ......................... 1,493,600
22 For Southern Illinois University -
23 Edwardsville ......................... 563,600
24 For University of Illinois - Chicago . 2,460,300
25 For University of Illinois -
26 Springfield .......................... 162,600
27 For University of Illinois -
28 Urbana-Champaign ................... 2,985,200
29 Section 22. The following named amounts, or so much
30 thereof as may be necessary and remain unexpended at the
31 close of business on June 30, 1999, from reappropriations
32 heretofore made for such purposes in Article 91, Section 21
-111- BOB-CDBnew-re2000
1 of Public Act 90-585, are reappropriated from the Capital
2 Development Fund to the Capital Development Board for the
3 Board of Higher Education for the projects hereinafter
4 enumerated:
5 ILLINOIS STATE UNIVERSITY - NORMAL
6 For construction of science laboratory
7 facilities ................................... $ 173,569
8 NORTHERN ILLINOIS UNIVERSITY
9 For upgrading the storm waterway controls
10 and campus drives ............................ 1,023,738
11 For construction of tunnels and installation
12 of utility piping ............................ 30,177
13 For renovation of heating plants and the
14 HVAC system .................................. 54,699
15 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD
16 For construction of the Rockford Center
17 facilities ................................... 35,982
18 Total, Section 22 $1,318,165
19 Section 22.1. The sum of $2,174,555, or so much thereof
20 as may be necessary and remains unexpended at the close of
21 business on June 30, 1999, from a reappropriation heretofore
22 made for such purposes in Article 91, Section 21.1 of Public
23 Act 90-585, is reappropriated from the Capital Development
24 Fund to the Capital Development Board for the Board of Higher
25 Education for miscellaneous capital improvements, including
26 construction, reconstruction, remodeling, improvement, repair
27 and installation of capital facilities, cost of planning,
28 supplies, equipment, materials, services and all other
29 expenses required for completing the the work at the colleges
30 and universities. This appropriation shall be in addition to
31 any other appropriated amounts which can be expended for
32 these purposes.
-112- BOB-CDBnew-re2000
1 Section 22.2. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1999, from reappropriations
4 heretofore made for such purposes in Article 91, Section 21.2
5 of Public Act 90-585, are reappropriated from the Capital
6 Development Fund to the Capital Development Board for the
7 Board of Higher Education for miscellaneous capital
8 improvements, including construction, reconstruction,
9 remodeling, improvements, repair and installation of capital
10 facilities, cost of planning, supplies, equipment, materials,
11 services, and all other expenses required to complete the
12 work at the colleges and universities hereinafter enumerated.
13 This appropriation shall be in addition to any other
14 appropriated amounts which can be expended for these
15 purposes:
16 Northern Illinois University ................... 1,185,487
17 Total, Section 22.2 $1,185,487
18 Section 22.3. The sum of $21,156, or so much thereof as
19 may be necessary and remains unexpended at the close of
20 business on June 30, 1999, from a reappropriation heretofore
21 made for such purposes in Article 91, Section 21.3 of Public
22 Act 90-585, is reappropriated from the Capital Development
23 Fund to the Capital Development Board for the Board of Higher
24 Education for Northern Illinois University, for the planning,
25 architectural engineering, purchase, site improvements and
26 construction or remodeling of a site in Rockford for use as a
27 campus.
28 Section 22.4. The following named amounts, or so much
29 thereof as may be necessary, and remain unexpended at the
30 close of business on June 30, 1999, from appropriations
31 heretofore made for such purposes in Article 91, Section 21.4
32 of Public Act 90-585, are reappropriated from the Capital
-113- BOB-CDBnew-re2000
1 Development Fund to the Capital Development Board for the
2 Board of Higher Education for miscellaneous capital
3 improvements including construction, reconstruction,
4 remodeling, improvement, repair and installation of capital
5 facilities, cost of planning, supplies, equipment, materials,
6 services and all other expenses required to complete the work
7 at the various universities set forth below. This
8 appropriation shall be in addition to any other appropriated
9 amounts which can be expended for these purposes.
10 For Chicago State University ................. $ 508,212
11 For Eastern Illinois University .............. 528,004
12 For Governors State University ............... 185,351
13 For Illinois State University ................ 1,536,981
14 For Northeastern Illinois University ......... 735,000
15 For Northern Illinois University ............. 2,162,141
16 For Southern Illinois University ............. 1,564,754
17 For University of Illinois ................... 8,329,783
18 For Western Illinois University .............. 1,465,825
19 Total, Section 22.4 $17,016,051
20 Section 23. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 1999, from reappropriations
23 heretofore made for such purposes in Article 91, Section 22
24 of Public Act 90-585, are reappropriated from the Capital
25 Development Fund to the Capital Development Board for the
26 Board of Trustees of Southern Illinois University for the
27 projects hereinafter enumerated:
28 CARBONDALE CAMPUS
29 For construction of an engineering building
30 annex ........................................ $ 77,968
31 For remodeling the Communications Building ..... 9,756
32 EDWARDSVILLE CAMPUS
33 For replacement of the high temperature water
-114- BOB-CDBnew-re2000
1 distribution system .......................... 188,842
2 For infrastructure, site development, and
3 other necessary costs associated with
4 the development of University Park ........... 7,501
5 For costs associated with the consolidation
6 of the music facilities ...................... 24,336
7 For planning and construction of an Art and
8 Design Facility .............................. 25,089
9 Total, Section 23 $333,492
10 Section 23.1. The sum of $817,493, or so much thereof as
11 may be necessary and remains unexpended at the close of
12 business on June 30, 1999, from a reappropriation heretofore
13 made for such purposes in Article 91, Section 22.1 of Public
14 Act 90-585, is reappropriated from the Capital Development
15 Fund to the Capital Development Board for Southern Illinois
16 University for miscellaneous capital improvements including
17 construction, reconstruction, remodeling, improvements,
18 repair and installation of capital facilities, cost of
19 planning, supplies, equipment, materials, services, and all
20 other expenses required to complete the work. This
21 appropriation shall be in addition to any other appropriated
22 amounts which can be expended for these purposes.
23 Section 24. The following named amounts, or so much
24 thereof as may be necessary and remain unexpended at the
25 close of business on June 30, 1999, from reappropriations
26 heretofore made for such purposes in Article 91, Section 23
27 of Public Act 90-585, are reappropriated from the Capital
28 Development Fund to the Capital Development Board for the
29 Board of Trustees of the University of Illinois for the
30 projects hereinafter enumerated:
31 UNIVERSITY CENTER - CHICAGO
32 For remodeling Alumni Hall, Phase II,
-115- BOB-CDBnew-re2000
1 including utilities .......................... 83,708
2 HEALTH SCIENCE CENTER
3 For remodeling the Neuropsychiatric
4 Institute .................................... 746,749
5 URBANA-CHAMPAIGN CAMPUS
6 For initiating a campus flood
7 control project .............................. 1,296,572
8 Total, Section 24 $2,127,029
9 Section 24.1. The sum of $3,715,959, or so much thereof
10 as may be necessary and remains unexpended at the close of
11 business on June 30, 1999, from a reappropriation heretofore
12 made for such purposes in Article 91, Section 23.1 of Public
13 Act 90-585, is reappropriated from the Capital Development
14 Fund to the Capital Development Board for the Board of
15 Trustees of the University of Illinois for miscellaneous
16 capital improvements including construction, reconstruction,
17 remodeling, improvement, repair and installation of capital
18 facilities, cost of planning, supplies, equipment, materials,
19 services and all other expenses required for completing the
20 work at the colleges and universities. This appropriation
21 shall be in addition to any other appropriated amounts which
22 can be expended for these purposes.
23 Section 24.2. The following named amount, or so much
24 thereof as may be necessary and remains unexpended at the
25 close of business on June 30, 1999, from a reappropriation
26 heretofore made for such purposes in Article 91, Section 23.2
27 of Public Act 90-585, is reappropriated from the General
28 Revenue Fund to the Capital Development Board for the Board
29 of Trustees of the University of Illinois for the project
30 hereinafter enumerated:
31 HEALTH SCIENCE CENTER - CHICAGO
32 For energy conservation improvements at
-116- BOB-CDBnew-re2000
1 Taylor Street Hospital, the College of
2 Pharmacy Building, and the Clinical
3 Science Building ............................. $ 24,780
4 Total, Section 24.2 $24,780
5 Section 24.3. The sum of $4,500,000, or so much thereof
6 as may be necessary and remains unexpended at the close of
7 business on June 30, 1999, from a reappropriation heretofore
8 made for such purposes in Article 91, Section 23.3 of Public
9 Act 90-585, is reappropriated from the Capital Development
10 Fund to the Capital Development Board for the Board of
11 Trustees of the University of Illinois (formerly for the
12 Department of Human Services) for renovation of the School of
13 Public Health and Psychiatric Institute (formerly the ISPI
14 building).
15 Section 25. The following named amounts, or so much
16 thereof as may be necessary, and remain unexpended at the
17 close of business on June 30, 1999, from an appropriation and
18 reappropriations heretofore made for such purposes in Article
19 90, Section 13 and Article 91, Section 24 of Public Act
20 90-585, are reappropriated from the Capital Development Fund
21 to the following Universities (formerly to the Capital
22 Development Board for the Universities) for the projects
23 hereinafter enumerated:
24 (From Article 91, Section 24 of Public Act 90-585)
25 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
26 For purchasing equipment
27 for the Fine Arts Complex .................... 4,000,000
28 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
29 For purchasing Bio-Science building
30 equipment .................................... 8,086
31 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
32 (From Article 90, Section 13 of Public Act 90-585)
-117- BOB-CDBnew-re2000
1 For purchasing equipment for the Engineering
2 Building ..................................... 6,000,000
3 UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN
4 (From Article 91, Section 24 of Public Act 90-585)
5 For purchasing equipment for Temple
6 Hoyne Buell Hall ............................. 99,494
7 Total, Section 25 $10,107,580
8 Section 26. In addition to any amounts heretofore
9 appropriated for such purposes, the sum of $1,802, or so much
10 thereof as may be necessary and remains unexpended at the
11 close of business on June 30, 1999, from a reappropriation
12 heretofore made for such purposes in Article 91, Section 25
13 of Public Act 90-585, is reappropriated from the Capital
14 Development Fund to the Secretary of State for planning,
15 remodeling, relocation, permanent equipment, and any other
16 related expenses, including architectural and engineering
17 fees associated with construction and remodeling of office
18 space and other support areas under the jurisdiction of the
19 House of Representatives, and to various legislative services
20 agencies in both the Capitol and Stratton Office Buildings.
21 Section 27. The sum of $300,000, or so much thereof as
22 may be necessary and remains unexpended at the close of
23 business on June 30, 1999, from an appropriation heretofore
24 made for such purposes in Article 90, Section 19 of Public
25 Act 90-585, is reappropriated from the General Revenue Fund
26 to the Capital Development Board for a grant to the Nipper
27 School in Maryville for all costs associated with
28 infrastructure improvements, including, but not limited to,
29 roof and mechanical system replacement.
30 Section 28. The sum of $50,000, or so much thereof as
31 may be necessary and remains unexpended at the close of
-118- BOB-CDBnew-re2000
1 business on June 30, 1999, from an appropriation heretofore
2 made for such purposes in Article 90, Section 24 of Public
3 Act 90-585, as amended by Section 8 of House Bill 871 of the
4 90th General Assembly, is reappropriated from the General
5 Revenue Fund to the Capital Development Board for a grant to
6 the Tilden Fire Protection District for land acquisition,
7 planning, design, construction, reconstruction, renovation,
8 rehabilitation, and all other costs associated with the fire
9 district building project.
10 Section 29. The sum of $189,987, or so much thereof as
11 may be necessary and remains unexpended at the close of
12 business on June 30, 1999, from an appropriation heretofore
13 made for such purposes in Article 90, Section 30 of Public
14 Act 90-585, is reappropriated from the Capital Development
15 Fund to the Capital Development Board for a grant to the City
16 of Mattoon for land acquisition, planning, design,
17 construction, reconstruction, renovation, rehabilitation,
18 equipping, and all other costs associated with a
19 police/public safety building.
20 Section 30. The sum of $350,000, or so much thereof as
21 may be necessary and remains unexpended at the close of
22 business on June 30, 1999, from an appropriation heretofore
23 made for such purposes in Article 90, Section 34 of Public
24 Act 90-585, is reappropriated from the General Revenue Fund
25 to the Capital Development Board for a grant to the
26 Argenta-Oreana Fire Protection District for land acquisition,
27 planning, design, construction, reconstruction, renovation,
28 rehabilitation, operation, and all other costs associated
29 with a new firehouse.
30 Section 31. The sum of $250,000, or so much thereof as
31 may be necessary and remains unexpended at the close of
-119- BOB-CDBnew-re2000
1 business on June 30, 1999, from an appropriation heretofore
2 made for such purposes in Article 90, Section 37 of Public
3 Act 90-585, is reappropriated from the Capital Development
4 Fund to the Capital Development Board for a grant to the
5 College of Lake County for all costs associated with the
6 renovation of the Southlake Education Center.
7 Section 32. The sum of $30,000, or so much thereof as
8 may be necessary and remains unexpended at the close of
9 business on June 30, 1999, from an appropriation heretofore
10 made for such purposes in Article 90, Section 39 of Public
11 Act 90-585, is reappropriated from the General Revenue Fund
12 to the Capital Development Board for a grant to the Village
13 of St. Peter for all costs associated with the construction
14 and rehabilitation of community park restrooms to assure
15 compliance with the Americans With Disabilities Act.
16 Section 33. The sum of $1,000,000, or so much thereof as
17 may be necessary and remains unexpended at the close of
18 business on June 30, 1999, from an appropriation heretofore
19 made for such purposes in Article 90, Section 40 of Public
20 Act 90-585, is reappropriated from the Capital Development
21 Fund to the Capital Development Board for a grant to Parkland
22 College for capital improvements.
23 Section 34. The sum of $1,250,000, or so much thereof as
24 may be necessary and remains unexpended at the close of
25 business on June 30, 1999, from an appropriation heretofore
26 made for such purposes in Article 90, Section 42 of Public
27 Act 90-585, is reappropriated from the Capital Development
28 Fund to the Capital Development Board for a fish processing
29 center at Pinckneyville Correctional Center.
30 Section 35. The sum of $175,500, or so much thereof as
-120- BOB-CDBnew-re2000
1 may be necessary and remains unexpended at the close of
2 business on June 30, 1999, from an appropriation heretofore
3 made for such purposes in Article 90, Section 43 of Public
4 Act 90-585, is reappropriated from the General Revenue Fund
5 to the Capital Development Board for a grant to Prairie State
6 College for planning for Outreach/Adult Training Center.
7 Section 36. The sum of $1,000,000, or so much thereof as
8 may be necessary and remains unexpended at the close of
9 business on June 30, 1999, from an appropriation heretofore
10 made for such purposes in Article 90, Section 44 of Public
11 Act 90-585, is reappropriated from the Capital Development
12 Fund to the Capital Development Board for planning for
13 expansion at McHenry County College at Crystal Lake.
14 Section 37. The sum of $500,000, or so much thereof as
15 may be necessary and remains unexpended at the close of
16 business on June 30, 1999, from an appropriation heretofore
17 made for such purposes in Article 90, Section 45 of Public
18 Act 90-585, is reappropriated from the General Revenue Fund
19 to the Capital Development Board for a grant to Spoon River
20 College for Macomb Campus renovation and classroom
21 enhancements.
22 Section 38. The sum of $250,000, or so much thereof as
23 may be necessary and remains unexpended at the close of
24 business on June 30, 1999, from an appropriation heretofore
25 made for such purposes in Article 90, Section 46 of Public
26 Act 90-585, is reappropriated from the Capital Development
27 Fund to the Capital Development Board for a grant to Rock
28 Valley College for planning for a new instructional building.
29 Section 39. The sum of $50,000, or so much thereof as
30 may be necessary and remains unexpended at the close of
-121- BOB-CDBnew-re2000
1 business on June 30, 1999, from an appropriation heretofore
2 made for such purposes in Article 90, Section 49 of Public
3 Act 90-585, as amended by Section 8 of House Bill 871 of the
4 90th General Assembly, is reappropriated from the Capital
5 Development Fund to the Capital Development Board for all
6 costs associated with construction of the Silvis Community
7 Center in the City of Silvas.
8 Section 40. No contract shall be entered into or
9 obligation incurred for any expenditures from appropriations
10 made in this Article until after the purposes and amounts
11 have been approved in writing by the Governor.
12 Section 99. Effective date. This Act takes effect on
13 July 1, 1999.