TITLE 32: ENERGY
CHAPTER II: ILLINOIS EMERGENCY MANAGEMENT AGENCY
SUBCHAPTER c: NUCLEAR FACILITY SAFETY
PART 505 SAFE OPERATION OF NUCLEAR FACILITY BOILERS AND PRESSURE VESSELS
SECTION 505.2400 INSPECTION REQUIREMENTS


 

Section 505.2400  Inspection Requirements

 

a)         If, upon an external inspection, there is evidence of a leak or crack, enough of the covering of the non-ISI boiler or pressure vessel shall be removed so that the Authorized Inspector may determine the condition of the non-ISI boiler or pressure vessel. If removing the covering could create a situation which could affect the operability or safety of the vessel, the limitations of Section 505.20(c) of this Part shall apply.

 

b)         Owners shall permanently maintain inspection reports and supporting documents throughout the lifetime of the equipment.

 

c)         In addition to the requirements of this Section, owners shall meet the requirements of Section 505.140.

 

(Source:  Amended at 45 Ill. Reg. 686, effective December 23, 2020)