TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE B: AIR POLLUTION
CHAPTER I: POLLUTION CONTROL BOARD
SUBCHAPTER a: PERMITS AND GENERAL PROVISIONS
PART 201 PERMITS AND GENERAL PROVISIONS
SECTION 201.142 CONSTRUCTION PERMIT REQUIRED


 

Section 201.142  Construction Permit Required

 

No person shall cause or allow the construction of any new emission source or any new air pollution control equipment, or cause or allow the modification of any existing emission source or air pollution control equipment, without first obtaining a construction permit from the Agency, except as provided in Sections 201.146 or Section 201.170(b) of this Part.

 

(Source:  Amended at 27 Ill. Reg. 5820, effective March 21, 2003)