TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE C: WATER POLLUTION
CHAPTER I: POLLUTION CONTROL BOARD
PART 309 PERMITS
SECTION 309.205 JOINT CONSTRUCTION AND OPERATING PERMITS


 

Section 309.205  Joint Construction and Operating Permits

 

If the Agency determines that a proposed treatment works, pretreatment works, sewer, or wastewater source is sufficiently standard to obviate the need for separate construction and operating permits, the Agency may issue a joint construction and operating permit.

 

(Source:  Amended at 47 Ill. Reg. 5017, effective March 23, 2023)