TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL CHAPTER I: POLLUTION CONTROL BOARD SUBCHAPTER j: COAL COMBUSTION WASTE SURFACE IMPOUNDMENTS PART 845 STANDARDS FOR THE DISPOSAL OF COAL COMBUSTION RESIDUALS IN SURFACE IMPOUNDMENTS SECTION 845.620 HYDROGEOLOGIC SITE CHARACTERIZATION
Section 845.620 Hydrogeologic Site Characterization
a) The owner or operator of the CCR surface impoundment must design and implement a hydrogeologic site characterization.
b) The hydrogeologic site characterization must include, but is not limited to, the following:
1) Geologic well logs/boring logs;
2) Climatic aspects of the site, including seasonal and temporal fluctuations in groundwater flow;
3) Identification of nearby surface water bodies and drinking water intakes;
4) Identification of nearby pumping wells and associated uses of the groundwater;
5) Identification of nearby dedicated nature preserves;
6) Geologic setting;
7) Structural characteristics;
8) Geologic cross-sections;
9) Soil characteristics;
10) Identification of confining layers;
11) Identification of potential migration pathways;
12) Groundwater quality data;
13) Vertical and horizontal extent of the geologic layers to a minimum depth of 100 feet below land surface, including lithology and stratigraphy;
14) A map displaying any known underground mines beneath a CCR surface impoundment;
15) Chemical and physical properties of the geologic layers to a minimum depth of 100 feet below land surface;
16) Hydraulic characteristics of the geologic layers identified as migration pathways and geologic layers that limit migration, including:
A) Water table depth;
B) Hydraulic conductivities;
C) Effective and total porosities;
D) Direction and velocity of groundwater flow; and
E) Map of the potentiometric surface;
17) Groundwater classification under 35 Ill. Adm. Code 620; and
18) Any other information requested by the Agency that is relevant to the hydrogeologic site characterization. |