The application must contain maps showing the details of the facility.  The maps must have a scale no smaller than one inch equals 200 feet, have appropriate contour intervals as needed to delineate all physical features of the facility, and show the following:

 

a)         The entire facility, including, but not limited, to all permanent structures and roads within the facility;

 

b)         The boundaries, both above and below ground level, of the facility and all units included in the facility;

 

c)         All roads entering and exiting the facility; and

 

d)         Devices for controlling access to the facility.