TITLE 83: PUBLIC UTILITIES
CHAPTER I: ILLINOIS COMMERCE COMMISSION
SUBCHAPTER c: ELECTRIC UTILITIES
PART 467 ELECTRIC INTERCONNECTION OF LARGE DISTRIBUTED ENERGY RESOURCES FACILITIES
SECTION 467.APPENDIX A CERTIFICATE OF COMPLETION



Section 467.APPENDIX A   Certificate of Completion

 

Certificate of Completion

(To be completed and returned to the EDC when installation is complete

and final electric inspector approval has been obtained[1])

 

 

Interconnection Customer Information

 

Name:

 

 

Mailing Address:

 

 

City:

 

State:

 

Zip Code:

 

 

Telephone (Primary):

 

(Alternate):

 

 

Facsimile Number:

 

E-Mail Address:

 

 

 

 

Installer

 

Check if owner-installed

 

 

 

Name:

 

 

Mailing Address:

 

 

City:

 

State:

 

Zip Code:

 

 

Telephone (Primary):

 

(Alternate):

 

 

Facsimile Number:

 

E-Mail Address:

 

 

 

 

Final Electric Inspection and Interconnection Customer Signature

 

The distributed generation facility is complete and has been approved by the local electric inspector having jurisdiction.  A signed copy of the electric inspector's form indicating final approval is attached.  The interconnection customer acknowledges that it shall not operate the distributed generation facility until receipt of the final acceptance and approval by the EDC as provided below.

 

Signed:

 

Date:

 

 

 

(Signature of interconnection customer)

Printed Name:

 

 

 

 

Check if copy of signed electric inspection form is attached

Check if copy of as-built documents is attached

……………………………………………………………………………………………………
Acceptance and Final Approval for Interconnection (for EDC use only)

 

The interconnection agreement is approved and the distributed generation facility is approved for interconnected operation upon the signing and return of this Certificate of Completion by EDC:

 

 

Electric Distribution Company waives Witness Test?  (Initial)

Yes

No

 

If not waived, date of successful Witness Test:

 

Passed:  (Initial)

 

 

EDC Signature:

 

Date:

 

 

Printed Name:

 

Title:

 

 

 



[1] Prior to interconnected operation, the interconnection customer is required to complete this form and return it to the EDC.  Use contact information provided on the EDC's web page for generator interconnection to obtain mailing address/fax number/e-mail address.