Sec. 39. Issuance of permits; procedures.
|
(a) When the Board has by regulation required a permit for
|
the construction, installation, or operation of any type of |
facility,
equipment, vehicle, vessel, or aircraft, the |
applicant shall apply to
the Agency for such permit and it |
shall be the duty of the Agency to
issue such a permit upon |
proof by the applicant that the facility,
equipment, vehicle, |
vessel, or aircraft will not cause a violation of
this Act or |
of regulations hereunder. The Agency shall adopt such
|
procedures as are necessary to carry out its duties under this |
Section.
In making its determinations on permit applications |
under this Section the Agency may consider prior adjudications |
of
noncompliance with this Act by the applicant that involved a |
release of a
contaminant into the environment. In granting |
permits, the Agency
may impose reasonable conditions |
specifically related to the applicant's past
compliance |
history with this Act as necessary to correct, detect, or
|
|
prevent noncompliance. The Agency may impose such other |
conditions
as may be necessary to accomplish the purposes of |
this Act, and as are not
inconsistent with the regulations |
promulgated by the Board hereunder. Except as
otherwise |
provided in this Act, a bond or other security shall not be |
required
as a condition for the issuance of a permit. If the |
Agency denies any permit
under this Section, the Agency shall |
transmit to the applicant within the time
limitations of this |
Section specific, detailed statements as to the reasons the
|
permit application was denied. Such statements shall include, |
but not be
limited to the following:
|
(i) the Sections of this Act which may be violated if |
the permit
were granted;
|
(ii) the provision of the regulations, promulgated |
under this Act,
which may be violated if the permit were |
granted;
|
(iii) the specific type of information, if any, which |
the Agency
deems the applicant did not provide the Agency; |
and
|
(iv) a statement of specific reasons why the Act and |
the regulations
might not be met if the permit were |
granted.
|
If there is no final action by the Agency within 90 days |
after the
filing of the application for permit, the applicant |
may deem the permit
issued; except that this time period shall |
be extended to 180 days when
(1) notice and opportunity for |
|
public hearing are required by State or
federal law or |
regulation, (2) the application which was filed is for
any |
permit to develop a landfill subject to issuance pursuant to |
this
subsection, or (3) the application that was filed is for a |
MSWLF unit
required to issue public notice under subsection (p) |
of Section 39. The
90-day and 180-day time periods for the |
Agency to take final action do not
apply to NPDES permit |
applications under subsection (b) of this Section,
to RCRA |
permit applications under subsection (d) of this Section, or
to |
UIC permit applications under subsection (e) of this Section.
|
The Agency shall publish notice of all final permit |
determinations for
development permits for MSWLF units and for |
significant permit modifications
for lateral expansions for |
existing MSWLF units one time in a newspaper of
general |
circulation in the county in which the unit is or is proposed |
to be
located.
|
After January 1, 1994 and until July 1, 1998, operating |
permits issued under
this Section by the
Agency for sources of |
air pollution permitted to emit less than 25 tons
per year of |
any combination of regulated air pollutants, as defined in
|
Section 39.5 of this Act, shall be required to be renewed only |
upon written
request by the Agency consistent with applicable |
provisions of this Act and
regulations promulgated hereunder. |
Such operating permits shall expire
180 days after the date of |
such a request. The Board shall revise its
regulations for the |
existing State air pollution operating permit program
|
|
consistent with this provision by January 1, 1994.
|
After June 30, 1998, operating permits issued under this |
Section by the
Agency for sources of air pollution that are not |
subject to Section 39.5 of
this Act and are not required to |
have a federally enforceable State operating
permit shall be |
required to be renewed only upon written request by the Agency
|
consistent with applicable provisions of this Act and its |
rules. Such
operating permits shall expire 180 days after the |
date of such a request.
Before July 1, 1998, the Board shall |
revise its rules for the existing State
air pollution operating |
permit program consistent with this paragraph and shall
adopt |
rules that require a source to demonstrate that it qualifies |
for a permit
under this paragraph.
|
(b) The Agency may issue NPDES permits exclusively under |
this
subsection for the discharge of contaminants from point |
sources into
navigable waters, all as defined in the Federal |
Water Pollution Control
Act, as now or hereafter amended, |
within the jurisdiction of the
State, or into any well.
|
All NPDES permits shall contain those terms and conditions, |
including
but not limited to schedules of compliance, which may |
be required to
accomplish the purposes and provisions of this |
Act.
|
The Agency may issue general NPDES permits for discharges |
from categories
of point sources which are subject to the same |
permit limitations and
conditions. Such general permits may be |
issued without individual
applications and shall conform to |
|
regulations promulgated under Section 402
of the Federal Water |
Pollution Control Act, as now or hereafter amended.
|
The Agency may include, among such conditions, effluent |
limitations
and other requirements established under this Act, |
Board regulations,
the Federal Water Pollution Control Act, as |
now or hereafter amended, and
regulations pursuant thereto, and |
schedules for achieving compliance
therewith at the earliest |
reasonable date.
|
The Agency shall adopt filing requirements and procedures |
which are
necessary and appropriate for the issuance of NPDES |
permits, and which
are consistent with the Act or regulations |
adopted by the Board, and
with the Federal Water Pollution |
Control Act, as now or hereafter
amended, and regulations |
pursuant thereto.
|
The Agency, subject to any conditions which may be |
prescribed by
Board regulations, may issue NPDES permits to |
allow discharges beyond
deadlines established by this Act or by |
regulations of the Board without
the requirement of a variance, |
subject to the Federal Water Pollution
Control Act, as now or |
hereafter amended, and regulations pursuant thereto.
|
(c) Except for those facilities owned or operated by |
sanitary districts
organized under the Metropolitan Water |
Reclamation District Act, no
permit for the development or |
construction of a new pollution control
facility may be granted |
by the Agency unless the applicant submits proof to the
Agency |
that the location of the facility has been approved by the |
|
County Board
of the county if in an unincorporated area, or the |
governing body of the
municipality when in an incorporated |
area, in which the facility is to be
located in accordance with |
Section 39.2 of this Act. For purposes of this subsection (c), |
and for purposes of Section 39.2 of this Act, the appropriate |
county board or governing body of the municipality shall be the |
county board of the county or the governing body of the |
municipality in which the facility is to be located as of the |
date when the application for siting approval is filed.
|
In the event that siting approval granted pursuant to |
Section 39.2 has
been transferred to a subsequent owner or |
operator, that subsequent owner or
operator may apply to the |
Agency for, and the Agency may grant, a development
or |
construction permit for the facility for which local siting |
approval was
granted. Upon application to the Agency for a |
development or
construction permit by that subsequent owner or |
operator,
the permit applicant shall cause written notice of |
the permit application
to be served upon the appropriate county |
board or governing body of the
municipality that granted siting |
approval for that facility and upon any party
to the siting |
proceeding pursuant to which siting approval was granted. In
|
that event, the Agency shall conduct an evaluation of the |
subsequent owner or
operator's prior experience in waste |
management operations in the manner
conducted under subsection |
(i) of Section 39 of this Act.
|
Beginning August 20, 1993, if the pollution control |
|
facility consists of a
hazardous or solid waste disposal |
facility for which the proposed site is
located in an |
unincorporated area of a county with a population of less than
|
100,000 and includes all or a portion of a parcel of land that |
was, on April 1,
1993, adjacent to a municipality having a |
population of less than 5,000, then
the local siting review |
required under this subsection (c) in conjunction with
any |
permit applied for after that date shall be performed by the |
governing body
of that adjacent municipality rather than the |
county board of the county in
which the proposed site is |
located; and for the purposes of that local siting
review, any |
references in this Act to the county board shall be deemed to |
mean
the governing body of that adjacent municipality; |
provided, however, that the
provisions of this paragraph shall |
not apply to any proposed site which was, on
April 1, 1993, |
owned in whole or in part by another municipality.
|
In the case of a pollution control facility for which a
|
development permit was issued before November 12, 1981, if an |
operating
permit has not been issued by the Agency prior to |
August 31, 1989 for
any portion of the facility, then the |
Agency may not issue or renew any
development permit nor issue |
an original operating permit for any portion of
such facility |
unless the applicant has submitted proof to the Agency that the
|
location of the facility has been approved by the appropriate |
county board or
municipal governing body pursuant to Section |
39.2 of this Act.
|
|
After January 1, 1994, if a solid waste
disposal facility, |
any portion for which an operating permit has been issued by
|
the Agency, has not accepted waste disposal for 5 or more |
consecutive calendars
years, before that facility may accept |
any new or additional waste for
disposal, the owner and |
operator must obtain a new operating permit under this
Act for |
that facility unless the owner and operator have applied to the |
Agency
for a permit authorizing the temporary suspension of |
waste acceptance. The
Agency may not issue a new operation |
permit under this Act for the facility
unless the applicant has |
submitted proof to the Agency that the location of the
facility |
has been approved or re-approved by the appropriate county |
board or
municipal governing body under Section 39.2 of this |
Act after the facility
ceased accepting waste.
|
Except for those facilities owned or operated by sanitary |
districts
organized under the Metropolitan Water Reclamation |
District Act, and
except for new pollution control facilities |
governed by Section 39.2,
and except for fossil fuel mining |
facilities, the granting of a permit under
this Act shall not |
relieve the applicant from meeting and securing all
necessary |
zoning approvals from the unit of government having zoning
|
jurisdiction over the proposed facility.
|
Before beginning construction on any new sewage treatment |
plant or sludge
drying site to be owned or operated by a |
sanitary district organized under
the Metropolitan Water |
Reclamation District Act for which a new
permit (rather than |
|
the renewal or amendment of an existing permit) is
required, |
such sanitary district shall hold a public hearing within the
|
municipality within which the proposed facility is to be |
located, or within the
nearest community if the proposed |
facility is to be located within an
unincorporated area, at |
which information concerning the proposed facility
shall be |
made available to the public, and members of the public shall |
be given
the opportunity to express their views concerning the |
proposed facility.
|
The Agency may issue a permit for a municipal waste |
transfer station
without requiring approval pursuant to |
Section 39.2 provided that the following
demonstration is made:
|
(1) the municipal waste transfer station was in |
existence on or before
January 1, 1979 and was in |
continuous operation from January 1, 1979 to January
1, |
1993;
|
(2) the operator submitted a permit application to the |
Agency to develop
and operate the municipal waste transfer |
station during April of 1994;
|
(3) the operator can demonstrate that the county board |
of the county, if
the municipal waste transfer station is |
in an unincorporated area, or the
governing body of the |
municipality, if the station is in an incorporated area,
|
does not object to resumption of the operation of the |
station; and
|
(4) the site has local zoning approval.
|
|
(d) The Agency may issue RCRA permits exclusively under |
this
subsection to persons owning or operating a facility for |
the treatment,
storage, or disposal of hazardous waste as |
defined under this Act.
|
All RCRA permits shall contain those terms and conditions, |
including but
not limited to schedules of compliance, which may |
be required to accomplish
the purposes and provisions of this |
Act. The Agency may include among such
conditions standards and |
other requirements established under this Act,
Board |
regulations, the Resource Conservation and Recovery Act of 1976 |
(P.L.
94-580), as amended, and regulations pursuant thereto, |
and may include
schedules for achieving compliance therewith as |
soon as possible. The
Agency shall require that a performance |
bond or other security be provided
as a condition for the |
issuance of a RCRA permit.
|
In the case of a permit to operate a hazardous waste or PCB |
incinerator
as defined in subsection (k) of Section 44, the |
Agency shall require, as a
condition of the permit, that the |
operator of the facility perform such
analyses of the waste to |
be incinerated as may be necessary and appropriate
to ensure |
the safe operation of the incinerator.
|
The Agency shall adopt filing requirements and procedures |
which
are necessary and appropriate for the issuance of RCRA |
permits, and which
are consistent with the Act or regulations |
adopted by the Board, and with
the Resource Conservation and |
Recovery Act of 1976 (P.L. 94-580), as
amended, and regulations |
|
pursuant thereto.
|
The applicant shall make available to the public for |
inspection all
documents submitted by the applicant to the |
Agency in furtherance
of an application, with the exception of |
trade secrets, at the office of
the county board or governing |
body of the municipality. Such documents
may be copied upon |
payment of the actual cost of reproduction during regular
|
business hours of the local office. The Agency shall issue a |
written statement
concurrent with its grant or denial of the |
permit explaining the basis for its
decision.
|
(e) The Agency may issue UIC permits exclusively under this
|
subsection to persons owning or operating a facility for the |
underground
injection of contaminants as defined under this |
Act.
|
All UIC permits shall contain those terms and conditions, |
including but
not limited to schedules of compliance, which may |
be required to accomplish
the purposes and provisions of this |
Act. The Agency may include among such
conditions standards and |
other requirements established under this Act,
Board |
regulations, the Safe Drinking Water Act (P.L. 93-523), as |
amended,
and regulations pursuant thereto, and may include |
schedules for achieving
compliance therewith. The Agency shall |
require that a performance bond or
other security be provided |
as a condition for the issuance of a UIC permit.
|
The Agency shall adopt filing requirements and procedures |
which
are necessary and appropriate for the issuance of UIC |
|
permits, and which
are consistent with the Act or regulations |
adopted by the Board, and with
the Safe Drinking Water Act |
(P.L. 93-523), as amended, and regulations
pursuant thereto.
|
The applicant shall make available to the public for |
inspection, all
documents submitted by the applicant to the |
Agency in furtherance of an
application, with the exception of |
trade secrets, at the office of the county
board or governing |
body of the municipality. Such documents may be copied upon
|
payment of the actual cost of reproduction during regular |
business hours of the
local office. The Agency shall issue a |
written statement concurrent with its
grant or denial of the |
permit explaining the basis for its decision.
|
(f) In making any determination pursuant to Section 9.1 of |
this Act:
|
(1) The Agency shall have authority to make the |
determination of any
question required to be determined by |
the Clean Air Act, as now or
hereafter amended, this Act, |
or the regulations of the Board, including the
|
determination of the Lowest Achievable Emission Rate, |
Maximum Achievable
Control Technology, or Best Available |
Control Technology, consistent with the
Board's |
regulations, if any.
|
(2) The Agency shall, after conferring with the |
applicant, give written
notice to the applicant of its |
proposed decision on the application including
the terms |
and conditions of the permit to be issued and the facts, |
|
conduct
or other basis upon which the Agency will rely to |
support its proposed action.
|
(3) Following such notice, the Agency shall give the |
applicant an
opportunity for a hearing in accordance with |
the provisions of Sections
10-25 through 10-60 of the |
Illinois Administrative Procedure Act.
|
(g) The Agency shall include as conditions upon all permits |
issued for
hazardous waste disposal sites such restrictions |
upon the future use
of such sites as are reasonably necessary |
to protect public health and
the environment, including |
permanent prohibition of the use of such
sites for purposes |
which may create an unreasonable risk of injury to human
health |
or to the environment. After administrative and judicial |
challenges
to such restrictions have been exhausted, the Agency |
shall file such
restrictions of record in the Office of the |
Recorder of the county in which
the hazardous waste disposal |
site is located.
|
(h) A hazardous waste stream may not be deposited in a |
permitted hazardous
waste site unless specific authorization |
is obtained from the Agency by the
generator and disposal site |
owner and operator for the deposit of that specific
hazardous |
waste stream. The Agency may grant specific authorization for
|
disposal of hazardous waste streams only after the generator |
has reasonably
demonstrated that, considering
technological |
feasibility and economic reasonableness, the hazardous waste
|
cannot be reasonably recycled for reuse, nor incinerated or |
|
chemically,
physically or biologically treated so as to |
neutralize the hazardous waste
and render it nonhazardous. In |
granting authorization under this Section,
the Agency may |
impose such conditions as may be necessary to accomplish
the |
purposes of the Act and are consistent with this Act and |
regulations
promulgated by the Board hereunder. If the Agency |
refuses to grant
authorization under this Section, the |
applicant may appeal as if the Agency
refused to grant a |
permit, pursuant to the provisions of subsection (a) of
Section |
40 of this Act. For purposes of this subsection (h), the term
|
"generator" has the meaning given in Section 3.205 of this Act,
|
unless: (1) the hazardous waste is treated, incinerated, or |
partially recycled
for reuse prior to disposal, in which case |
the last person who treats,
incinerates, or partially recycles |
the hazardous waste prior to disposal is the
generator; or (2) |
the hazardous waste is from a response action, in which case
|
the person performing the response action is the generator. |
This subsection
(h) does not apply to any hazardous waste that |
is restricted from land disposal
under 35 Ill. Adm. Code 728.
|
(i) Before issuing any RCRA permit, any permit for a waste |
storage site,
sanitary landfill, waste disposal site, waste |
transfer station, waste treatment
facility, waste incinerator, |
or any waste-transportation operation, or any permit or interim |
authorization for a clean construction or demolition debris |
fill operation, the Agency
shall conduct an evaluation of the |
prospective owner's or operator's prior
experience in waste |
|
management operations and clean construction or demolition |
debris fill operations. The Agency may deny such a permit, or |
deny or revoke interim authorization,
if the prospective owner |
or operator or any employee or officer of the
prospective owner |
or operator has a history of:
|
(1) repeated violations of federal, State, or local |
laws, regulations,
standards, or ordinances in the |
operation of waste management facilities or
sites or clean |
construction or demolition debris fill operation |
facilities or sites; or
|
(2) conviction in this or another State of any crime |
which is a felony
under the laws of this State, or |
conviction of a felony in a federal court; or conviction in |
this or another state or federal court of any of the |
following crimes: forgery, official misconduct, bribery, |
perjury, or knowingly submitting false information under |
any environmental law, regulation, or permit term or |
condition; or
|
(3) proof of gross carelessness or incompetence in |
handling, storing,
processing, transporting or disposing |
of waste or clean construction or demolition debris, or |
proof of gross carelessness or incompetence in using clean |
construction or demolition debris as fill.
|
(i-5) Before issuing any permit or approving any interim |
authorization for a clean construction or demolition debris |
fill operation in which any ownership interest is transferred |
|
between January 1, 2005, and the effective date of the |
prohibition set forth in Section 22.52 of this Act, the Agency |
shall conduct an evaluation of the operation if any previous |
activities at the site or facility may have caused or allowed |
contamination of the site. It shall be the responsibility of |
the owner or operator seeking the permit or interim |
authorization to provide to the Agency all of the information |
necessary for the Agency to conduct its evaluation. The Agency |
may deny a permit or interim authorization if previous |
activities at the site may have caused or allowed contamination |
at the site, unless such contamination is authorized under any |
permit issued by the Agency.
|
(j) The issuance under this Act of a permit to engage in |
the surface mining
of any resources other than fossil fuels |
shall not relieve
the permittee from its duty to comply with |
any applicable local law regulating
the commencement, location |
or operation of surface mining facilities.
|
(k) A development permit issued under subsection (a) of |
Section 39 for any
facility or site which is required to have a |
permit under subsection (d) of
Section 21 shall expire at the |
end of 2 calendar years from the date upon which
it was issued, |
unless within that period the applicant has taken action to
|
develop the facility or the site. In the event that review of |
the
conditions of the development permit is sought pursuant to |
Section 40 or
41, or permittee is prevented from commencing |
development of the facility
or site by any other litigation |
|
beyond the permittee's control, such
two-year period shall be |
deemed to begin on the date upon which such review
process or |
litigation is concluded.
|
(l) No permit shall be issued by the Agency under this Act |
for
construction or operation of any facility or site located |
within the
boundaries of any setback zone established pursuant |
to this Act, where such
construction or operation is |
prohibited.
|
(m) The Agency may issue permits to persons owning or |
operating
a facility for composting landscape waste. In |
granting such permits, the Agency
may impose such conditions as |
may be necessary to accomplish the purposes of
this Act, and as |
are not inconsistent with applicable regulations promulgated
|
by the Board. Except as otherwise provided in this Act, a bond |
or other
security shall not be required as a condition for the |
issuance of a permit. If
the Agency denies any permit pursuant |
to this subsection, the Agency shall
transmit to the applicant |
within the time limitations of this subsection
specific, |
detailed statements as to the reasons the permit application |
was
denied. Such statements shall include but not be limited to |
the following:
|
(1) the Sections of this Act that may be violated if |
the permit
were granted;
|
(2) the specific regulations promulgated pursuant to |
this
Act that may be violated if the permit were granted;
|
(3) the specific information, if any, the Agency deems |
|
the
applicant did not provide in its application to the |
Agency; and
|
(4) a statement of specific reasons why the Act and the |
regulations
might be violated if the permit were granted.
|
If no final action is taken by the Agency within 90 days |
after the filing
of the application for permit, the applicant |
may deem the permit issued.
Any applicant for a permit may |
waive the 90 day limitation by filing a
written statement with |
the Agency.
|
The Agency shall issue permits for such facilities upon |
receipt of an
application that includes a legal description of |
the site, a topographic
map of the site drawn to the scale of |
200 feet to the inch or larger, a
description of the operation, |
including the area served, an estimate of
the volume of |
materials to be processed, and documentation that:
|
(1) the facility includes a setback of at
least 200 |
feet from the nearest potable water supply well;
|
(2) the facility is located outside the boundary
of the |
10-year floodplain or the site will be floodproofed;
|
(3) the facility is located so as to minimize
|
incompatibility with the character of the surrounding |
area, including at
least a 200 foot setback from any |
residence, and in the case of a
facility that is developed |
or the permitted composting area of which is
expanded after |
November 17, 1991, the composting area is located at least |
1/8
mile from the nearest residence (other than a residence |
|
located on the same
property as the facility);
|
(4) the design of the facility will prevent any compost |
material from
being placed within 5 feet of the water |
table, will adequately control runoff
from the site, and |
will collect and manage any leachate that is generated on
|
the site;
|
(5) the operation of the facility will include |
appropriate dust
and odor control measures, limitations on |
operating hours, appropriate
noise control measures for |
shredding, chipping and similar equipment,
management |
procedures for composting, containment and disposal of
|
non-compostable wastes, procedures to be used for
|
terminating operations at the site, and recordkeeping |
sufficient to
document the amount of materials received, |
composted and otherwise
disposed of; and
|
(6) the operation will be conducted in accordance with |
any applicable
rules adopted by the Board.
|
The Agency shall issue renewable permits of not longer than |
10 years
in duration for the composting of landscape wastes, as |
defined in Section
3.155 of this Act, based on the above |
requirements.
|
The operator of any facility permitted under this |
subsection (m) must
submit a written annual statement to the |
Agency on or before April 1 of
each year that includes an |
estimate of the amount of material, in tons,
received for |
composting.
|
|
(n) The Agency shall issue permits jointly with the |
Department of
Transportation for the dredging or deposit of |
material in Lake Michigan in
accordance with Section 18 of the |
Rivers, Lakes, and Streams Act.
|
(o) (Blank.)
|
(p) (1) Any person submitting an application for a permit |
for a new MSWLF
unit or for a lateral expansion under |
subsection (t) of Section 21 of this Act
for an existing MSWLF |
unit that has not received and is not subject to local
siting |
approval under Section 39.2 of this Act shall publish notice of |
the
application in a newspaper of general circulation in the |
county in which the
MSWLF unit is or is proposed to be located. |
The notice must be published at
least 15 days before submission |
of the permit application to the Agency. The
notice shall state |
the name and address of the applicant, the location of the
|
MSWLF unit or proposed MSWLF unit, the nature and size of the |
MSWLF unit or
proposed MSWLF unit, the nature of the activity |
proposed, the probable life of
the proposed activity, the date |
the permit application will be submitted, and a
statement that |
persons may file written comments with the Agency concerning |
the
permit application within 30 days after the filing of the |
permit application
unless the time period to submit comments is |
extended by the Agency.
|
When a permit applicant submits information to the Agency |
to supplement a
permit application being reviewed by the |
Agency, the applicant shall not be
required to reissue the |
|
notice under this subsection.
|
(2) The Agency shall accept written comments concerning the |
permit
application that are postmarked no later than 30 days |
after the
filing of the permit application, unless the time |
period to accept comments is
extended by the Agency.
|
(3) Each applicant for a permit described in part (1) of |
this subsection
shall file a
copy of the permit application |
with the county board or governing body of the
municipality in |
which the MSWLF unit is or is proposed to be located at the
|
same time the application is submitted to the Agency. The |
permit application
filed with the county board or governing |
body of the municipality shall include
all documents submitted |
to or to be submitted to the Agency, except trade
secrets as |
determined under Section 7.1 of this Act. The permit |
application
and other documents on file with the county board |
or governing body of the
municipality shall be made available |
for public inspection during regular
business hours at the |
office of the county board or the governing body of the
|
municipality and may be copied upon payment of the actual cost |
of
reproduction.
|
(Source: P.A. 93-575, eff. 1-1-04; 94-272, eff. 7-19-05; |
94-725, eff. 6-1-06 .)
|
(415 ILCS 5/39.2) (from Ch. 111 1/2, par. 1039.2)
|
Sec. 39.2. Local siting review.
|
(a) The county board of the county or the governing body of |
|
the
municipality, as determined by paragraph (c) of Section 39 |
of this Act, shall
approve or disapprove the request for local |
siting approval for each pollution
control facility which is |
subject to such review. An applicant for local
siting approval |
shall submit sufficient details describing the proposed
|
facility to demonstrate compliance, and local siting approval |
shall be granted
only if the proposed facility meets the |
following criteria:
|
(i) the facility is necessary to accommodate the waste |
needs of the area
it is intended to serve;
|
(ii) the facility is so designed, located and proposed |
to be operated
that the public health, safety and welfare |
will be protected;
|
(iii) the facility is located so as to minimize |
incompatibility with the
character of the surrounding area |
and to minimize the effect on the value of
the surrounding |
property;
|
(iv) (A) for a facility other than a sanitary landfill |
or waste disposal
site, the facility is located outside the |
boundary of the 100 year flood plain
or the site is |
flood-proofed; (B) for a facility that is a sanitary |
landfill
or waste disposal site, the facility is located |
outside the boundary of the
100-year floodplain, or if the |
facility is a facility described in subsection
(b)(3) of |
Section 22.19a, the site is flood-proofed;
|
(v) the plan of operations for the facility is designed |
|
to minimize
the danger to the surrounding area from fire, |
spills, or other operational
accidents;
|
(vi) the traffic patterns to or from the facility are |
so designed as to
minimize the impact on existing traffic |
flows;
|
(vii) if the facility will be treating, storing or |
disposing of
hazardous waste, an emergency response plan |
exists for the facility which
includes notification, |
containment and evacuation procedures to be used in
case of |
an accidental release;
|
(viii) if the facility is to be located in a county |
where the county
board has adopted a solid waste management |
plan consistent with the planning
requirements of the Local |
Solid Waste Disposal Act or the Solid Waste Planning
and |
Recycling Act, the facility is
consistent with that plan; |
for purposes of this criterion (viii), the "solid waste |
management plan" means the plan that is in effect as of the |
date the application for siting approval is filed; and
|
(ix) if the facility will be located within a regulated |
recharge area,
any applicable requirements specified by |
the Board for such areas have been
met.
|
The county board or the governing body of the municipality |
may also
consider as evidence the previous operating experience |
and past record of
convictions or admissions of violations of |
the applicant (and any subsidiary
or parent corporation) in the |
field of solid waste management when
considering criteria (ii) |
|
and (v) under this Section. |
If the facility is subject to the location restrictions in |
Section 22.14 of this Act, compliance with that Section shall |
be determined as of the date the application for siting |
approval is filed.
|
(b) No later than 14 days before the date on which the |
county board or
governing body of the municipality receives a |
request for
site approval, the applicant shall cause written |
notice
of such request to be served either in person or by |
registered mail, return
receipt requested, on the owners of all |
property within the subject area not
solely owned by the |
applicant, and on the owners of all property within 250
feet in |
each direction of the lot line of the subject property, said |
owners
being such persons or entities which appear from the |
authentic tax records of
the County in which such facility is |
to be located; provided, that the number
of all feet occupied |
by all public roads, streets, alleys and other public ways
|
shall be excluded in computing the 250 feet requirement; |
provided further, that
in no event shall this requirement |
exceed 400 feet, including public streets,
alleys and other |
public ways.
|
Such written notice shall also be served upon members of |
the General Assembly
from the legislative district in which the |
proposed facility is located
and shall be published in a |
newspaper of general circulation published in
the county in |
which the site is located.
|
|
Such notice shall state the name and address of the |
applicant, the location
of the proposed site, the nature and |
size of the development, the nature of the
activity proposed, |
the probable life of the proposed activity, the date when
the |
request for site approval will be submitted, and a description |
of the right
of persons to comment on such request as hereafter |
provided.
|
(c) An applicant shall file a copy of its request with the |
county board
of the county or the governing body of the |
municipality in which the proposed
site is located. The request |
shall include (i) the substance of the
applicant's proposal and |
(ii) all documents, if any, submitted as of that date
to the |
Agency pertaining to the proposed facility, except trade |
secrets as
determined under Section 7.1 of this Act. All such |
documents or other
materials on file with the county board or |
governing body of the municipality
shall be made available for |
public inspection at the office of the county board
or the |
governing body of the municipality and may be copied upon |
payment of the
actual cost of reproduction.
|
Any person may file written comment with the county board |
or governing
body of the municipality concerning the |
appropriateness of the proposed
site for its intended purpose. |
The county board or governing body of the
municipality shall |
consider any comment received or postmarked not later
than 30 |
days after the date of the last public hearing.
|
(d) At least one public hearing is to be held by the county |
|
board or
governing body of the municipality no sooner than 90 |
days but no later than
120 days after the date on which it |
received the
request for site approval. No later than 14 days |
prior to such hearing,
notice shall be published in a newspaper |
of general circulation published in
the county of the proposed |
site, and delivered by certified mail to all members
of the |
General Assembly from the district in which the proposed site |
is
located, to the governing authority of every municipality |
contiguous to the
proposed site or contiguous to the |
municipality in which the proposed site is
to be located, to |
the county board of the county where the proposed site is to
be |
located, if the proposed site is located within the boundaries |
of a
municipality, and to the Agency. Members or |
representatives of the governing
authority of a municipality |
contiguous to the proposed site or contiguous to
the |
municipality in which the proposed site is to be located and, |
if the
proposed site is located in a municipality, members or |
representatives of the
county board of a county in which the |
proposed site is to be located may appear
at and participate in |
public hearings held pursuant to this Section. The
public |
hearing shall develop a record sufficient to form the basis of |
appeal
of the decision in accordance with Section 40.1 of this |
Act. The fact that a
member of the county board or governing |
body of the municipality has publicly
expressed an opinion on |
an issue related to a site review proceeding shall not
preclude |
the member from taking part in the proceeding and voting on the |
|
issue.
|
(e) Decisions of the county board or governing body of the |
municipality
are to be in writing, specifying the reasons for |
the decision, such reasons
to be in conformance with subsection |
(a) of this Section. In granting approval
for a site the county |
board or governing body of the municipality may impose
such |
conditions as may be reasonable and necessary to accomplish the |
purposes
of this Section and as are not inconsistent with |
regulations promulgated
by the Board. Such decision shall be |
available for public inspection at
the office of the county |
board or governing body of the municipality and
may be copied |
upon payment of the actual cost of reproduction. If there is
no |
final action by the county board or governing body of the |
municipality
within 180 days after the date on which it |
received the
request for site approval, the applicant may deem |
the request approved.
|
At any time prior to completion by the applicant of the |
presentation of
the applicant's factual evidence and an |
opportunity for cross-questioning
by the county board or |
governing body of the municipality and any participants,
the |
applicant may file not more than one amended application upon |
payment
of additional fees pursuant to subsection (k); in which |
case the time
limitation for final action set forth in this |
subsection (e) shall
be extended for an additional period of 90 |
days.
|
If, prior to making a final local siting decision, a county |
|
board or
governing body of a municipality has negotiated and |
entered into a host
agreement with the local siting applicant, |
the terms and conditions of
the host agreement, whether written |
or oral, shall be disclosed and made
a part of the hearing |
record for that local siting proceeding.
In the case of an oral |
agreement, the disclosure shall be made in the form
of a |
written summary jointly prepared and submitted by the county |
board or
governing body of the municipality and the siting |
applicant and shall describe
the terms and conditions of the |
oral agreement.
|
(e-5) Siting approval obtained pursuant to this Section is |
transferable
and may be transferred to a subsequent owner or |
operator. In the event that
siting approval has been |
transferred to a subsequent owner or operator, that
subsequent |
owner or operator assumes and takes subject to any and all
|
conditions imposed upon the prior owner or operator by the |
county board of
the county or governing body of the |
municipality pursuant to subsection (e).
However, any such |
conditions imposed pursuant to this Section may be modified
by |
agreement between the subsequent owner or operator and the |
appropriate
county board or governing body. Further, in the |
event that siting approval
obtained pursuant to this Section |
has been transferred to a subsequent owner or
operator, that |
subsequent owner or operator assumes all rights and obligations
|
and takes the facility subject to any and all terms and |
conditions of any
existing host agreement between the prior |
|
owner or operator and the appropriate
county board or governing |
body.
|
(f) A local siting approval granted under this Section |
shall expire at
the end of 2 calendar years from the date upon |
which it was granted, unless
the local siting approval granted |
under this Section is for a sanitary landfill
operation, in |
which case the approval shall expire at the end of 3 calendar
|
years from the date upon which it was granted, and unless |
within that period
the applicant has made application to the |
Agency for a
permit to develop the site. In the event that the |
local siting decision has
been appealed, such expiration period |
shall be deemed to begin on the date
upon which the appeal |
process is concluded.
|
Except as otherwise provided in this subsection, upon the |
expiration
of a development permit under subsection (k) of |
Section 39, any associated
local siting approval granted for |
the facility under this Section shall also
expire.
|
If a first development permit for a municipal waste |
incineration
facility expires under subsection (k) of Section |
39 after September 30,
1989 due to circumstances beyond the |
control of the applicant, any
associated local siting approval |
granted for the facility under this
Section may be used to |
fulfill the local siting approval requirement upon
application |
for a second development permit for the same site, provided
|
that the proposal in the new application is materially the |
same, with respect
to the criteria in subsection (a) of this |
|
Section, as the proposal that
received the original siting |
approval, and application for the second
development permit is |
made before January 1, 1990.
|
(g) The siting approval procedures, criteria and appeal |
procedures
provided for in this Act for new pollution control |
facilities
shall be the exclusive siting procedures and rules |
and appeal procedures
for facilities subject to such |
procedures. Local zoning or other local land
use requirements |
shall not be applicable to such siting decisions.
|
(h) Nothing in this Section shall apply to any existing or |
new
pollution control facility located within the corporate |
limits of
a municipality with a population of over 1,000,000.
|
(i) (Blank.)
|
The Board shall adopt regulations establishing the |
geologic and
hydrologic siting criteria necessary to protect |
usable groundwater
resources which are to be followed by the |
Agency in its review of permit
applications for new pollution |
control facilities. Such
regulations, insofar as they apply to |
new pollution control
facilities authorized to store, treat or |
dispose of any hazardous waste,
shall be at least as stringent |
as the requirements of the Resource
Conservation and Recovery |
Act and any State or federal regulations adopted
pursuant |
thereto.
|
(j) Any new pollution control facility which has never |
obtained local
siting approval under the provisions of this |
Section shall be required to
obtain such approval after a final |
|
decision on an appeal of a permit denial.
|
(k) A county board or governing body of a municipality may |
charge
applicants for siting review under this Section a |
reasonable fee to cover
the reasonable and necessary costs |
incurred by such county or municipality
in the siting review |
process.
|
(l) The governing Authority as determined by subsection (c) |
of Section
39 of this Act may request the Department of |
Transportation to perform
traffic impact studies of proposed or |
potential locations for required
pollution control facilities.
|
(m) An applicant may not file a request for local siting |
approval which is
substantially the same as a request which was |
disapproved pursuant to a
finding against the applicant under |
any of criteria (i) through (ix) of
subsection (a) of this |
Section within the preceding 2 years.
|
(n) In any review proceeding of a decision of the county |
board or
governing body of a municipality made pursuant to the |
local
siting review process, the petitioner in the review |
proceeding shall pay to
the county or municipality the cost of |
preparing and certifying the record
of proceedings. Should the |
petitioner in the review proceeding fail to make
payment, the |
provisions of Section 3-109 of the Code of Civil
Procedure |
shall apply.
|
In the event the petitioner is a citizens' group that |
participated in the
siting proceeding and is so located as to |
be affected by the proposed
facility, such petitioner shall be |
|
exempt from paying the costs of
preparing and certifying the |
record.
|
(o) Notwithstanding any other provision of this Section, a |
transfer
station used exclusively for landscape waste, where |
landscape waste is held
no longer than 24 hours from the time |
it was received, is not subject to the
requirements of local |
siting approval under this Section, but is subject only
to |
local zoning approval.
|
(Source: P.A. 94-591, eff. 8-15-05.)
|
(415 ILCS 115/Act rep.)
|
Section 10. The Illinois Pollution Prevention Act is |
repealed. |
Section 97. Applicability. The changes made by Section 5 of |
this amendatory Act of the 95th General Assembly apply only to |
siting applications filed on or after the effective date of |
this amendatory Act.
|
Section 99. Effective date. This Act takes effect upon |
becoming law.
|