Public Act 095-0805 |
HB4646 Enrolled |
LRB095 16528 HLH 42558 b |
|
|
AN ACT concerning local government.
|
Be it enacted by the People of the State of Illinois,
|
represented in the General Assembly:
|
Section 5. The Counties Code is amended by adding Section |
42000 as follows: |
(55 ILCS 5/42000 new) |
Sec. 42000. Wind farms. A county may own and operate a wind |
generation turbine farm, either individually or jointly with |
another unit of local government, school district, or community |
college district that is authorized to own and operate a wind |
generation turbine farm, that directly or indirectly reduces |
the energy or other operating costs of the county. The county |
may ask for the assistance of any State agency, including |
without limitation the Department of Commerce and Economic |
Opportunity, the Illinois Power Agency, or the Environmental |
Protection Agency, in obtaining financing options for a wind |
generation turbine farm. |
Section 10. The Illinois Municipal Code is amended by |
adding Section 11-15.3-1 as follows: |
(65 ILCS 5/11-15.3-1 new) |
Sec. 11-15.3-1. Wind farms. A municipality may own and |
|
operate a wind generation turbine farm, either individually or |
jointly with another unit of local government, school district, |
or community college district that is authorized to own and |
operate a wind generation turbine farm, that directly or |
indirectly reduces the energy or other operating costs of the |
municipality. The municipality may ask for the assistance of |
any State agency, including without limitation the Department |
of Commerce and Economic Opportunity, the Illinois Power |
Agency, or the Environmental Protection Agency, in obtaining |
financing options for a wind generation turbine farm. |
Section 15. The School Code is amended by changing and |
renumbering Sections 10-20.40 and 34-18.34 as follows: |
(105 ILCS 5/10-20.42) |
Sec. 10-20.42
10-20.40 . Wind farm. A school district may |
own and operate a wind generation turbine farm, either |
individually or jointly with a unit of local government, school |
district, or community college district that is authorized to |
own and operate a wind generation turbine farm , that directly |
or indirectly reduces the energy or other operating costs of |
the school district. The school district may ask for the |
assistance of any State agency, including without limitation |
the State Board of Education , the Illinois Power Agency, or the |
Environmental Protection Agency, in obtaining financing |
options for a wind generation turbine farm.
|
|
(Source: P.A. 95-390, eff. 8-23-07; revised 12-7-07.) |
(105 ILCS 5/34-18.36) |
Sec. 34-18.36
34-18.34 . Wind farm. The school district may |
own and operate a wind generation turbine farm, either |
individually or jointly with a unit of local government, school |
district, or community college district that is authorized to |
own and operate a wind generation turbine farm , that directly |
or indirectly reduces the energy or other operating costs of |
the school district. The school district may ask for the |
assistance of any State agency, including without limitation |
the State Board of Education , the Illinois Power Agency, or the |
Environmental Protection Agency, in obtaining financing |
options for a wind generation turbine farm.
|
(Source: P.A. 95-390, eff. 8-23-07; revised 12-7-07.) |
Section 20. The Public Community College Act is amended by |
changing Section 3-42.3 as follows: |
(110 ILCS 805/3-42.3)
|
Sec. 3-42.3. Wind farm. To own and operate a wind |
generation turbine farm, either individually or jointly with a |
unit of local government, school district, or community college |
district that is authorized to own and operate a wind |
generation turbine farm , that directly or indirectly reduces |
the energy or other operating costs of the community college |
|
district. The board may ask for the assistance of any State |
agency, including without limitation the State Board , the |
Illinois Power Agency, or the Environmental Protection Agency, |
in obtaining financing options for a wind generation turbine |
farm.
|
(Source: P.A. 95-390, eff. 8-23-07.)
|
Section 99. Effective date. This Act takes effect upon |
becoming law.
|