|
| | SB3561 Enrolled | | LRB100 17985 AWJ 33170 b |
|
|
1 | | AN ACT concerning local government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Public Building Commission Act is amended by |
5 | | changing Sections 2.5, 3, 20, 20.3, 20.4, 20.5, 20.10, 20.15, |
6 | | 20.20, 20.25, and 23.5 as follows: |
7 | | (50 ILCS 20/2.5)
|
8 | | (Section scheduled to be repealed on June 1, 2018) |
9 | | Sec. 2.5. Legislative policy; conditions for use of |
10 | | design-build. It is the intent of the General Assembly that a |
11 | | commission be allowed to use the design-build delivery method |
12 | | for public projects if
it is shown to be in the commission's |
13 | | best interest for that particular project. |
14 | | It shall be the policy of the commission in the procurement |
15 | | of design-build services to publicly announce all requirements |
16 | | for design-build services and to procure these services on the |
17 | | basis of demonstrated competence and qualifications and with |
18 | | due regard for the principles of competitive selection. |
19 | | The commission shall, prior to issuing requests for |
20 | | proposals, promulgate and publish procedures for the |
21 | | solicitation and award of contracts pursuant to this Act. |
22 | | The commission shall, for each public project or projects |
23 | | permitted under this Act, make a written determination, |
|
| | SB3561 Enrolled | - 2 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | including a description as to the particular
advantages of the |
2 | | design-build procurement method, that it is in the best |
3 | | interests of the commission to enter into a design-build |
4 | | contract for the project or projects. |
5 | | In making that determination, the following factors shall |
6 | | be considered: |
7 | | (1) The probability that the design-build procurement |
8 | | method will be in the best interests of the commission by |
9 | | providing a material savings of time or cost over the |
10 | | design-bid-build or other delivery system. |
11 | | (2) The type and size of the project and its |
12 | | suitability to the design-build procurement method. |
13 | | (3) The ability of the design-build entity to define |
14 | | and provide comprehensive scope and performance criteria |
15 | | for the project. |
16 | | The commission shall require the design-build entity to |
17 | | comply with the utilization goals established by the corporate |
18 | | authorities of the commission for minority and women business |
19 | | enterprises and to comply with Section 2-105 of the Illinois |
20 | | Human Rights Act. |
21 | | This Section is repealed on June 1, 2023 2018 ; provided |
22 | | that any design-build contracts entered into before such date |
23 | | or any procurement of a project under this Act commenced before |
24 | | such date, and the contracts resulting from those procurements, |
25 | | shall remain effective.
|
26 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
|
| | SB3561 Enrolled | - 3 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | eff. 1-7-14.)
|
2 | | (50 ILCS 20/3) (from Ch. 85, par. 1033)
|
3 | | Sec. 3. The following terms, wherever used, or referred to |
4 | | in this Act,
mean unless the context clearly requires a |
5 | | different meaning:
|
6 | | (a) "Commission" means a Public Building Commission |
7 | | created pursuant to
this Act.
|
8 | | (b) "Commissioner" or "Commissioners" means a |
9 | | Commissioner or
Commissioners of a Public Building |
10 | | Commission.
|
11 | | (c) "County seat" means a city, village or town which |
12 | | is the county seat
of a county.
|
13 | | (d) "Municipality" means any city, village or |
14 | | incorporated town of the
State of Illinois.
|
15 | | (e) "Municipal corporation" includes a county, city, |
16 | | village, town,
(including a county seat), park district,
|
17 | | school district in a county of 3,000,000 or more |
18 | | population, board of
education of a school district in a |
19 | | county of 3,000,000 or more population,
sanitary district,
|
20 | | airport authority contiguous with the County
Seat as of |
21 | | July 1, 1969 and any other municipal body or governmental |
22 | | agency
of the State, and until July 1, 2011, a school |
23 | | district that (i) was organized prior to 1860, (ii) is |
24 | | located in part in a city originally incorporated prior to |
25 | | 1840, and (iii) entered into a lease with a Commission |
|
| | SB3561 Enrolled | - 4 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | prior to 1993, and its board of education, but does not |
2 | | include a school district in a county of less
than |
3 | | 3,000,000 population, a board of education of a school |
4 | | district in a
county of less than 3,000,000 population, or |
5 | | a community college district in
a county of less than |
6 | | 3,000,000 population, except that until July 1, 2011, a |
7 | | school district that (i) was organized prior to 1860, (ii) |
8 | | is located in part in a city originally incorporated prior |
9 | | to 1840, and (iii) entered into a lease with a Commission |
10 | | prior to 1993, and its board of education, are included.
|
11 | | (f) "Governing body" includes a city council, county |
12 | | board, or any other
body or board, by whatever name it may |
13 | | be known, charged with the governing
of a municipal |
14 | | corporation.
|
15 | | (g) "Presiding officer" includes the mayor or |
16 | | president of a city,
village or town, the presiding officer |
17 | | of a county board, or the presiding
officer of any other |
18 | | board or commission, as the case may be.
|
19 | | (h) "Oath" means oath or affirmation.
|
20 | | (i) "Building" means an improvement to real estate to |
21 | | be made available
for use by a municipal corporation for |
22 | | the furnishing of governmental
services to its citizens, |
23 | | together with any land or interest in land
necessary or |
24 | | useful in connection with the improvement.
|
25 | | (j) "Delivery system" means the design and |
26 | | construction approach used to develop
and construct a |
|
| | SB3561 Enrolled | - 5 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | project.
|
2 | | (k) "Design-bid-build" means the traditional delivery |
3 | | system used on public
projects that incorporates the Local |
4 | | Government Professional Services Selection Act (50 ILCS |
5 | | 510/) and the
principles of competitive selection.
|
6 | | (l) "Design-build" means a delivery system that |
7 | | provides responsibility within a
single contract for the |
8 | | furnishing of architecture, engineering, land surveying
|
9 | | and related services as required, and the labor, materials, |
10 | | equipment, and
other construction services for the |
11 | | project.
|
12 | | (m) "Design-build contract" means a contract for a |
13 | | public project under this Act
between the Commission and a |
14 | | design-build entity to furnish
architecture,
engineering, |
15 | | land surveying, and related services as required, and to |
16 | | furnish
the labor, materials, equipment, and other |
17 | | construction services for the
project. The design-build |
18 | | contract may be conditioned upon subsequent
refinements in |
19 | | scope and price and may allow the Commission to
make
|
20 | | modifications in the project scope without invalidating |
21 | | the design-build
contract.
|
22 | | (n) "Design-build entity" means any individual, sole |
23 | | proprietorship, firm,
partnership, joint venture, |
24 | | corporation, professional corporation, or other
entity |
25 | | that proposes to design and construct any public project |
26 | | under this Act.
A design-build entity and associated |
|
| | SB3561 Enrolled | - 6 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | design-build professionals shall conduct themselves in |
2 | | accordance with the laws of this State and the related |
3 | | provisions of the Illinois Administrative Code, as |
4 | | referenced by the licensed design professionals Acts of |
5 | | this State.
|
6 | | (o) "Design professional" means any individual, sole |
7 | | proprietorship, firm,
partnership, joint venture, |
8 | | corporation, professional corporation, or other
entity |
9 | | that offers services under the Illinois Architecture |
10 | | Practice Act of
1989 (225 ILCS 305/), the Professional |
11 | | Engineering Practice Act of 1989 (225
ILCS 325/),
the |
12 | | Structural Engineering Licensing Act of 1989 (225 ILCS |
13 | | 340/), or the
Illinois Professional
Land Surveyor Act of |
14 | | 1989 (225 ILCS 330/).
|
15 | | (p) "Evaluation criteria" means the requirements for |
16 | | the separate phases of the
selection process for |
17 | | design-build proposals as defined in this Act and may |
18 | | include the specialized
experience, technical |
19 | | qualifications and competence, capacity to perform, past
|
20 | | performance, experience with similar projects, assignment |
21 | | of personnel to the
project, and other appropriate factors. |
22 | | Price may not be used as a factor in
the evaluation of |
23 | | Phase I proposals.
|
24 | | (q) "Proposal" means the offer to enter into a |
25 | | design-build contract as submitted
by a design-build |
26 | | entity in accordance with this Act.
|
|
| | SB3561 Enrolled | - 7 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | (r) "Request for proposal" means the document used by |
2 | | the Commission
to solicit
proposals for a design-build |
3 | | contract.
|
4 | | (s) "Scope and performance criteria" means the |
5 | | requirements for the public
project, including but not |
6 | | limited to, the intended usage, capacity, size,
scope, |
7 | | quality and performance standards, life-cycle costs, and |
8 | | other
programmatic criteria that are expressed in |
9 | | performance-oriented and
quantifiable specifications and |
10 | | drawings that can be reasonably inferred and
are suited to |
11 | | allow a design-build entity to develop a proposal.
|
12 | | (t) "Guaranteed maximum price" means a form of contract |
13 | | in which compensation may vary according to the scope of |
14 | | work involved but in any case may not exceed an agreed |
15 | | total amount.
|
16 | | Definitions in this Section with respect to design-build |
17 | | shall have no effect beginning on June 1, 2023 2018 ; provided |
18 | | that any design-build contracts entered into before such date |
19 | | or any procurement of a project under this Act commenced before |
20 | | such date, and the contracts resulting from those procurements, |
21 | | shall remain effective.
The actions of any person or entity |
22 | | taken on or after June 1, 2013 and before the effective date of |
23 | | this amendatory Act of the 98th General Assembly in reliance on |
24 | | the provisions of this Section with respect to design-build |
25 | | continuing to be effective are hereby validated. |
26 | | (Source: P.A. 98-299, eff. 8-9-13; 98-619, eff. 1-7-14.)
|
|
| | SB3561 Enrolled | - 8 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | (50 ILCS 20/20) (from Ch. 85, par. 1050)
|
2 | | Sec. 20. Contracts let to lowest responsible bidder; |
3 | | competitive bidding; advertisement for bids; design-build |
4 | | contracts. |
5 | | (a) All contracts to be let for the construction, |
6 | | alteration,
improvement, repair, enlargement, demolition or |
7 | | removal of any buildings or
other facilities, or for materials |
8 | | or supplies to be furnished, where the
amount thereof is in |
9 | | excess of $20,000, shall be awarded as a design-build contract |
10 | | in accordance with Sections 20.3 through 20.20 or shall be let |
11 | | to the lowest
responsible bidder, or bidders, on open |
12 | | competitive bidding. |
13 | | (b) A contract awarded on the basis of competitive bidding |
14 | | shall be awarded after public
advertisement published at least |
15 | | once in each week for three consecutive
weeks prior to the |
16 | | opening of bids, in a daily newspaper of general
circulation in |
17 | | the county where the commission is located, except in the case |
18 | | of an emergency situation, as determined by the chief executive |
19 | | officer. If a contract is awarded in an emergency situation, |
20 | | (i) the contract accepted must be based on the lowest |
21 | | responsible proposal after the commission has made a diligent |
22 | | effort to solicit multiple proposals by telephone, facsimile, |
23 | | or other efficient means and (ii) the chief executive officer |
24 | | must submit a report at the next regular meeting of the Board, |
25 | | to be ratified by the Board and entered into the official |
|
| | SB3561 Enrolled | - 9 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | record, that states the chief executive officer's reason for |
2 | | declaring an emergency situation, the names of all parties |
3 | | solicited for proposals, and their proposals and that includes |
4 | | a copy of the contract awarded. Nothing
contained in this |
5 | | Section shall be construed to prohibit the Board of
|
6 | | Commissioners from placing additional advertisements in |
7 | | recognized trade
journals. Advertisements for bids shall |
8 | | describe the character of the
proposed contract in sufficient |
9 | | detail to enable the bidders thereon to
know what their |
10 | | obligation will be, either in the advertisement itself, or
by |
11 | | reference to detailed plans and specifications on file in the |
12 | | office of
the Public Building Commission at the time of the |
13 | | publication of the first
announcement. Such advertisement |
14 | | shall also state the date, time, and place
assigned for the |
15 | | opening of bids. No bids shall be received at any time
|
16 | | subsequent to the time indicated in said advertisement. |
17 | | (c) In addition to the requirements of Section 20.3, the |
18 | | Commission shall advertise a design-build solicitation at |
19 | | least once in a daily newspaper of general circulation in the |
20 | | county where the Commission is located. The date that Phase I |
21 | | submissions by design-build entities are due must be at least |
22 | | 14 calendar days after the date the newspaper advertisement for |
23 | | design-build proposals is first published. The advertisement |
24 | | shall identify the design-build project, the due date, the |
25 | | place and time for Phase I submissions, and the place where |
26 | | proposers can obtain a complete copy of the request for |
|
| | SB3561 Enrolled | - 10 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | design-build proposals, including the criteria for evaluation |
2 | | and the scope and performance criteria. The Commission is not |
3 | | precluded from using other media or from placing advertisements |
4 | | in addition to the one required under this subsection. |
5 | | (d) The Board of
Commissioners may reject any and all bids |
6 | | and proposals received and may readvertise for
bids or issue a |
7 | | new request for design-build proposals. |
8 | | (e) All bids shall be open to public inspection in the |
9 | | office of the
Public Building Commission after an award or |
10 | | final selection has been made. The successful bidder for such |
11 | | work shall enter into
contracts furnished and prescribed by the |
12 | | Board of Commissioners and in
addition to any other bonds |
13 | | required under this Act the successful bidder
shall execute and |
14 | | give bond, payable to and to be approved by the
Commission, |
15 | | with a corporate surety authorized to do business under the
|
16 | | laws of the State of Illinois, in an amount to be determined by |
17 | | the Board
of Commissioners, conditioned upon the payment of all |
18 | | labor furnished and
materials supplied in the prosecution of |
19 | | the contracted work. If the bidder
whose bid has been accepted |
20 | | shall neglect or refuse to accept the contract
within five (5) |
21 | | days after written notice that the same has been awarded to
|
22 | | him, or if he accepts but does not execute the contract and |
23 | | give the proper
security, the Commission may accept the next |
24 | | lowest bidder, or readvertise
and relet in manner above |
25 | | provided. |
26 | | (f) In case any work shall be abandoned by
any contractor |
|
| | SB3561 Enrolled | - 11 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | or design-build entity, the Commission may, if the best |
2 | | interests of the Commission
be thereby served, adopt on behalf |
3 | | of the Commission all subcontracts made
by such contractor or |
4 | | design-build entity for such work and all such sub-contractors |
5 | | shall be
bound by such adoption if made; and the Commission |
6 | | shall, in the manner
provided in this Act, readvertise and |
7 | | relet, or request proposals and award design-build contracts |
8 | | for, the work specified in the original
contract exclusive of |
9 | | so much thereof as shall be accepted. Every contract
when made |
10 | | and entered into, as provided in this Section or Section 20.20, |
11 | | shall be executed, held by the Commission, and filed
in
its |
12 | | records, and one copy of which shall be given to the contractor |
13 | | or design-build entity.
|
14 | | (g) The provisions of this Section with respect to |
15 | | design-build shall have no effect beginning on June 1, 2023 |
16 | | 2018 ; provided that any design-build contracts entered into |
17 | | before such date or any procurement of a project under this Act |
18 | | commenced before such date, and the contracts resulting from |
19 | | those procurements, shall remain effective. The actions of any |
20 | | person or entity taken on or after June 1, 2013 and before the |
21 | | effective date of this amendatory Act of the 98th General |
22 | | Assembly in reliance on the provisions of this Section with |
23 | | respect to design-build continuing to be effective are hereby |
24 | | validated. |
25 | | (Source: P.A. 98-299, eff. 8-9-13; 98-619, eff. 1-7-14.)
|
|
| | SB3561 Enrolled | - 12 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | (50 ILCS 20/20.3)
|
2 | | (Section scheduled to be repealed on June 1, 2018) |
3 | | Sec. 20.3. Solicitation of design-build proposals.
|
4 | | (a) When the Commission elects to use the design-build |
5 | | delivery
method, it must
issue a notice of intent to receive |
6 | | proposals for the project at
least 14 days before issuing the |
7 | | request for the proposal. The Commission
must publish the |
8 | | advance notice in a daily newspaper of general circulation in |
9 | | the county where the Commission is located. The
Commission is |
10 | | encouraged to use publication of the notice in related |
11 | | construction
industry service publications. A brief |
12 | | description of the proposed procurement
must be included in the |
13 | | notice. The Commission must provide a
copy of the
request for |
14 | | proposal to any party requesting a copy.
|
15 | | (b) The request for proposal shall be prepared for each |
16 | | project and must
contain, without limitation, the following |
17 | | information:
|
18 | | (1) The name of the Commission.
|
19 | | (2) A preliminary schedule for the completion of the |
20 | | contract.
|
21 | | (3) The proposed budget for the project, the source of |
22 | | funds, and the
currently available funds at the time the |
23 | | request for proposal is submitted.
|
24 | | (4) Prequalification criteria for design-build |
25 | | entities wishing to submit
proposals.
The Commission shall |
26 | | include, at a minimum, its normal
prequalification, |
|
| | SB3561 Enrolled | - 13 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | licensing, registration, and other requirements, but |
2 | | nothing
contained herein precludes the use of additional |
3 | | prequalification criteria
by the Commission.
|
4 | | (5) Material requirements of the contract, including |
5 | | but not limited to,
the proposed terms and conditions, |
6 | | required performance and payment bonds,
insurance, and the |
7 | | entity's plan to comply with the utilization goals |
8 | | established by the corporate authorities of the Commission |
9 | | for minority and women business enterprises and to comply |
10 | | with Section 2-105 of the Illinois Human Rights Act.
|
11 | | (6) The performance criteria.
|
12 | | (7) The evaluation criteria for each phase of the |
13 | | solicitation.
|
14 | | (8) The number of entities that will be considered for |
15 | | the technical and
cost
evaluation phase.
|
16 | | (c) The Commission may include any other relevant |
17 | | information
that it
chooses to supply. The design-build entity |
18 | | shall be entitled to rely upon the
accuracy of this |
19 | | documentation in the development of its proposal.
|
20 | | (d) The date that proposals are due must be at least 21 |
21 | | calendar days after
the date of the issuance of the request for |
22 | | proposal. In the event the cost of
the project
is estimated to |
23 | | exceed $12,000,000, then the proposal due date must be at least
|
24 | | 28 calendar days after the date of the issuance of the request |
25 | | for proposal.
The Commission shall include in the request for |
26 | | proposal a
minimum of 30 days
to develop the Phase II |
|
| | SB3561 Enrolled | - 14 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | submissions after the selection of entities
from the Phase I |
2 | | evaluation is completed.
|
3 | | (e) This Section is repealed on June 1, 2023 2018 ; provided |
4 | | that any design-build contracts entered into before such date |
5 | | or any procurement of a project under this Act commenced before |
6 | | such date, and the contracts resulting from those procurements, |
7 | | shall remain effective.
|
8 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
9 | | eff. 1-7-14.) |
10 | | (50 ILCS 20/20.4)
|
11 | | (Section scheduled to be repealed on June 1, 2018) |
12 | | Sec. 20.4. Development of design-build scope and |
13 | | performance criteria.
|
14 | | (a) The Commission shall develop, with the assistance of a
|
15 | | licensed design professional, a request
for proposal, which |
16 | | shall include scope and performance criteria.
The scope and |
17 | | performance criteria must be in sufficient detail and contain
|
18 | | adequate information to reasonably apprise the qualified |
19 | | design-build entities
of the Commission's overall programmatic |
20 | | needs and goals,
including criteria and preliminary design |
21 | | plans,
general budget parameters, schedule, and delivery |
22 | | requirements.
|
23 | | (b) Each request for proposal shall also include a |
24 | | description of the level
of design to be provided in the |
25 | | proposals. This description must include the
scope and type of |
|
| | SB3561 Enrolled | - 15 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | renderings, drawings, and specifications that, at a minimum,
|
2 | | will be required by the Commission to be produced by the
|
3 | | design-build entities.
|
4 | | (c) The scope and performance criteria shall be prepared by |
5 | | a design
professional who is an employee of the Commission, or |
6 | | the Commission may
contract with an independent design |
7 | | professional selected under the
Local Government Professional |
8 | | Services Selection Act (50 ILCS 510/) to provide these |
9 | | services.
|
10 | | (d) The design professional that prepares the scope and |
11 | | performance criteria
is prohibited from participating in any |
12 | | design-build entity proposal for the
project.
|
13 | | (e) This Section is repealed on June 1, 2023 2018 ; provided |
14 | | that any design-build contracts entered into before such date |
15 | | or any procurement of a project under this Act commenced before |
16 | | such date, and the contracts resulting from those procurements, |
17 | | shall remain effective.
|
18 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
19 | | eff. 1-7-14.) |
20 | | (50 ILCS 20/20.5) |
21 | | (Section scheduled to be repealed on June 1, 2018) |
22 | | Sec. 20.5. Procedures for design-build selection. |
23 | | (a) The Commission must use a two-phase procedure for the
|
24 | | selection of the
successful design-build entity. Phase I of the |
25 | | procedure will evaluate and
shortlist the design-build |
|
| | SB3561 Enrolled | - 16 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | entities based on qualifications, and Phase II
will
evaluate |
2 | | the technical and cost proposals. |
3 | | (b) The Commission shall include in the request for |
4 | | proposal
the
evaluating factors to be used in Phase I. These |
5 | | factors are in addition to any
prequalification requirements of |
6 | | design-build entities that the Commission has set
forth. Each |
7 | | request for proposal shall establish the relative importance
|
8 | | assigned to each evaluation factor and subfactor, including any |
9 | | weighting of
criteria to be employed by the Commission. The |
10 | | Commission must maintain a
record of the evaluation scoring to |
11 | | be disclosed in event of a protest
regarding the solicitation.
|
12 | | The Commission shall include the following criteria in |
13 | | every
Phase I
evaluation of design-build entities: (1) |
14 | | experience of personnel; (2)
successful
experience with |
15 | | similar project types; (3) financial capability; (4) |
16 | | timeliness
of past performance; (5) experience with similarly |
17 | | sized projects; (6)
successful reference checks of the firm; |
18 | | (7) commitment to assign personnel
for the duration of the |
19 | | project and qualifications of the entity's consultants; and (8) |
20 | | ability or past performance in meeting or exhausting good faith |
21 | | efforts to meet the utilization goals for minority and women |
22 | | business enterprises established by the corporate authorities |
23 | | of the Commission and in complying with Section 2-105 of the |
24 | | Illinois Human Rights Act. The Commission may include any |
25 | | additional relevant criteria in Phase I that it deems necessary |
26 | | for a proper qualification review.
|
|
| | SB3561 Enrolled | - 17 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | The Commission may not consider any design-build entity for
|
2 | | evaluation or
award if the entity has any pecuniary interest in |
3 | | the project or has other
relationships or circumstances, |
4 | | including but not limited to, long-term
leasehold, mutual |
5 | | performance, or development contracts with the Commission,
|
6 | | that may give the design-build entity a financial or tangible |
7 | | advantage over
other design-build entities in the preparation, |
8 | | evaluation, or performance of
the
design-build contract or that |
9 | | create the appearance of impropriety. No design-build proposal |
10 | | shall be considered that does not include an entity's plan to |
11 | | comply with the requirements established in the minority and |
12 | | women business enterprises and economically disadvantaged |
13 | | firms established by the corporate authorities of the |
14 | | Commission and with Section 2-105 of the Illinois Human Rights |
15 | | Act.
|
16 | | Upon completion of the qualifications evaluation, the |
17 | | Commission shall
create a shortlist of the most highly |
18 | | qualified design-build entities. The
Commission, in its |
19 | | discretion, is not required to shortlist the
maximum number of
|
20 | | entities as identified for Phase II evaluation, provided |
21 | | however, no less than
2
design-build entities nor more than 6 |
22 | | are selected to submit Phase II
proposals.
|
23 | | The Commission shall notify the entities selected for the
|
24 | | shortlist in
writing. This notification shall commence the |
25 | | period for the preparation of the
Phase II technical and cost |
26 | | evaluations. The Commission must
allow sufficient
time for the |
|
| | SB3561 Enrolled | - 18 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | shortlist entities to prepare their Phase II submittals
|
2 | | considering
the scope and detail requested by the Commission.
|
3 | | (c) The Commission shall include in the request for |
4 | | proposal
the
evaluating factors to be used in the technical and |
5 | | cost submission components
of Phase II. Each request for |
6 | | proposal shall establish, for both the technical
and cost |
7 | | submission components of Phase II, the relative importance |
8 | | assigned to
each evaluation factor and subfactor, including any |
9 | | weighting of criteria to be
employed by the Commission. The |
10 | | Commission must
maintain a record of the
evaluation scoring to |
11 | | be disclosed in event of a protest regarding the
solicitation.
|
12 | | The Commission shall include the following criteria in |
13 | | every
Phase II
technical evaluation of design-build entities: |
14 | | (1) compliance with objectives
of
the
project; (2) compliance |
15 | | of proposed services to the request for proposal
requirements; |
16 | | (3) quality of products or materials proposed; (4) quality of
|
17 | | design parameters; (5) design concepts; (6) innovation in |
18 | | meeting the scope and
performance criteria; and (7) |
19 | | constructability of the
proposed project. The Commission may |
20 | | include any additional
relevant
technical evaluation factors |
21 | | it deems necessary for proper selection.
|
22 | | The Commission shall include the following criteria in |
23 | | every
Phase II cost
evaluation: the guaranteed maximum project |
24 | | cost and the time of
completion. The Commission may include any |
25 | | additional relevant
technical
evaluation factors it deems |
26 | | necessary for proper selection. The guaranteed maximum project |
|
| | SB3561 Enrolled | - 19 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | cost criteria weighing factor shall not exceed 30%.
|
2 | | The Commission shall directly employ or retain a licensed
|
3 | | design
professional to evaluate the technical and cost |
4 | | submissions to determine if the
technical submissions are in |
5 | | accordance with generally
accepted industry standards.
|
6 | | Upon completion of the technical submissions and cost |
7 | | submissions evaluation,
the Commission may award the |
8 | | design-build contract to the
highest
overall ranked entity.
|
9 | | (d) This Section is repealed on June 1, 2023 2018 ; provided |
10 | | that any design-build contracts entered into before such date |
11 | | or any procurement of a project under this Act commenced before |
12 | | such date, and the contracts resulting from those procurements, |
13 | | shall remain effective.
|
14 | | (Source: P.A. 100-201, eff. 8-18-17.) |
15 | | (50 ILCS 20/20.10)
|
16 | | (Section scheduled to be repealed on June 1, 2018) |
17 | | Sec. 20.10. Small design-build projects. In any case where |
18 | | the total overall cost of the
project is estimated to be less |
19 | | than $12,000,000, the Commission
may combine
the two-phase |
20 | | procedure for design-build selection described in Section 20.5 |
21 | | into one combined
step, provided that all the requirements of |
22 | | evaluation are performed in
accordance with Section 20.5. |
23 | | This Section is repealed on June 1, 2023 2018 ; provided |
24 | | that any design-build contracts entered into before such date |
25 | | or any procurement of a project under this Act commenced before |
|
| | SB3561 Enrolled | - 20 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | such date, and the contracts resulting from those procurements, |
2 | | shall remain effective.
|
3 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
4 | | eff. 1-7-14.) |
5 | | (50 ILCS 20/20.15)
|
6 | | (Section scheduled to be repealed on June 1, 2018) |
7 | | Sec. 20.15. Submission of design-build proposals. |
8 | | Design-build proposals must be properly identified
and sealed. |
9 | | Proposals may not be reviewed until after the deadline for
|
10 | | submission has passed as set forth in the request for |
11 | | proposals. All
design-build entities submitting proposals |
12 | | shall be disclosed after the
deadline
for submission, and all |
13 | | design-build entities who are selected for Phase II
evaluation |
14 | | shall also be disclosed at the time of that determination. |
15 | | Phase II design-build proposals shall include a bid bond in |
16 | | the form and security as designated in
the request for |
17 | | proposals. Proposals shall also contain a separate sealed
|
18 | | envelope with the cost information within the overall proposal |
19 | | submission.
Proposals shall include a list of all design |
20 | | professionals and other entities
to which any work identified |
21 | | in Section 30-30 of the Illinois Procurement Code as a |
22 | | subdivision of construction work may be subcontracted during |
23 | | the performance of the contract.
|
24 | | Proposals must meet all material requirements of the |
25 | | request for proposal or
they may be rejected as non-responsive. |
|
| | SB3561 Enrolled | - 21 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | The Commission shall
have the right
to reject any and all |
2 | | proposals.
|
3 | | The drawings and specifications of any unsuccessful |
4 | | design-build proposal shall remain the property of
the |
5 | | design-build entity.
|
6 | | The Commission shall review the proposals for compliance |
7 | | with
the
performance criteria and evaluation factors.
|
8 | | Proposals may be withdrawn prior to the due date and time |
9 | | for submissions for any cause. After
evaluation begins by the |
10 | | Commission, clear and convincing
evidence of error
is required |
11 | | for withdrawal.
|
12 | | This Section is repealed on June 1, 2023 2018 ; provided |
13 | | that any design-build contracts entered into before such date |
14 | | or any procurement of a project under this Act commenced before |
15 | | such date, and the contracts resulting from those procurements, |
16 | | shall remain effective.
|
17 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
18 | | eff. 1-7-14.) |
19 | | (50 ILCS 20/20.20)
|
20 | | (Section scheduled to be repealed on June 1, 2018) |
21 | | Sec. 20.20. Design-build award. The Commission may award a |
22 | | design-build contract to
the highest
overall ranked entity. |
23 | | Notice of award shall be made in writing. Unsuccessful
entities |
24 | | shall also be notified in writing. The Commission may
not |
25 | | request a
best and final offer after the receipt of proposals. |
|
| | SB3561 Enrolled | - 22 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | The Commission may
negotiate with the selected design-build |
2 | | entity after award but prior to
contract
execution for the |
3 | | purpose of securing better terms than originally proposed,
|
4 | | provided that the salient features of the request for proposal |
5 | | are not
diminished. |
6 | | This Section is repealed on June 1, 2023 2018 ; provided |
7 | | that any design-build contracts entered into before such date |
8 | | or any procurement of a project under this Act commenced before |
9 | | such date, and the contracts resulting from those procurements, |
10 | | shall remain effective.
|
11 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
12 | | eff. 1-7-14.) |
13 | | (50 ILCS 20/20.25)
|
14 | | (Section scheduled to be repealed on June 1, 2018) |
15 | | Sec. 20.25. Minority and female owned enterprises; total |
16 | | construction budget. |
17 | | (a) Each year, within 60 days following the end of a |
18 | | commission's fiscal year, the commission shall provide a report |
19 | | to the General Assembly addressing the utilization of minority |
20 | | and female owned business enterprises on design-build |
21 | | projects. |
22 | | (b) The payments for design-build projects by any |
23 | | commission in one fiscal year shall not exceed 50% of the |
24 | | moneys spent on construction projects during the same fiscal |
25 | | year. |
|
| | SB3561 Enrolled | - 23 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | (c) This Section is repealed on June 1, 2023 2018 ; provided |
2 | | that any design-build contracts entered into before such date |
3 | | or any procurement of a project under this Act commenced before |
4 | | such date, and the contracts resulting from those procurements, |
5 | | shall remain effective.
|
6 | | (Source: P.A. 98-299, eff. 8-9-13; reenacted by P.A. 98-619, |
7 | | eff. 1-7-14.) |
8 | | (50 ILCS 20/23.5) |
9 | | Sec. 23.5. Continuation of Sections 2.5, 20.3, 20.4, 20.5, |
10 | | 20.10, 20.15, 20.20, and 20.25 of this Act; validation. |
11 | | (a) The General Assembly finds and declares that: |
12 | | (1) When Public Act 95-595 (effective June 1, 2008) |
13 | | amended the Public Building Commission Act, it provided |
14 | | repeal dates for Sections 2.5, 20.3, 20.4, 20.5, 20.10, |
15 | | 20.15, 20.20, and 20.25 of this Act of 5 years after the |
16 | | effective date of Public Act 95-595 (June 1, 2013). |
17 | | (2) Senate Bill 2233 of the 98th General Assembly |
18 | | contained provisions that would have changed the repeal |
19 | | dates of Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, |
20 | | 20.20, and 20.25 of this Act from 5 years after the |
21 | | effective date of Public Act 95-595 to June 1, 2018. Senate |
22 | | Bill 2233 passed both houses on May 31, 2013. Senate Bill |
23 | | 2233 provided that it took effect upon becoming law. Senate |
24 | | Bill 2233 was sent to the Governor on June 10, 2013. Senate |
25 | | Bill 2233 was approved by the Governor on August 9, 2013. |
|
| | SB3561 Enrolled | - 24 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | Senate Bill 2233 became Public Act 98-299. |
2 | | (3) The Statute on Statutes sets forth general rules on
|
3 | | the repeal of statutes and the construction of multiple
|
4 | | amendments, but Section 1 of that Act also states that
|
5 | | these rules will not be observed when the result would be
|
6 | | "inconsistent with the manifest intent of the General
|
7 | | Assembly or repugnant to the context of the statute". |
8 | | (4) The actions of the General Assembly
clearly |
9 | | manifest the intention of the General Assembly to extend
|
10 | | the repeal of Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, |
11 | | 20.20, and 20.25 of this Act and have those Sections
|
12 | | continue in effect until June 1, 2018 . |
13 | | (5) Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, |
14 | | 20.20, and 20.25 of this Act were
originally enacted to |
15 | | protect, promote, and preserve the
general welfare. Any |
16 | | construction of this Act that results
in the repeal of |
17 | | those Sections on June 1, 2013 would be
inconsistent with |
18 | | the manifest intent of the General
Assembly and repugnant |
19 | | to the context of this Act. |
20 | | (b) It is hereby declared to have been the intent of the
|
21 | | General Assembly, in enacting Public Act 98-299, that Sections |
22 | | 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, and 20.25 of this |
23 | | Act be changed to make June 1, 2018 the repeal date of Sections |
24 | | 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, and 20.25 of this |
25 | | Act, and that Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, |
26 | | 20.20, and 20.25 of this Act therefore not be subject to repeal |
|
| | SB3561 Enrolled | - 25 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | on June 1, 2013. |
2 | | (c) Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, |
3 | | and 20.25 of this Act shall be
deemed to have been in |
4 | | continuous effect since June 1, 2008
(the effective date of |
5 | | Public Act 95-595), and shall
continue to be in effect |
6 | | henceforward until June 1, 2018, unless they are otherwise
|
7 | | lawfully repealed . All previously enacted amendments to this |
8 | | Act
taking effect on or after June 1, 2013 are hereby
|
9 | | validated. |
10 | | (d) All actions taken in reliance on or pursuant to |
11 | | Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, and 20.25 |
12 | | of this Act by the Public Building Commission or any other |
13 | | person or entity are hereby validated. |
14 | | (e) In order to ensure the continuing effectiveness of |
15 | | Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, and 20.25 |
16 | | of this Act, those Sections are set forth in
full and reenacted |
17 | | by this amendatory Act of the 98th General
Assembly. This |
18 | | reenactment is intended as a continuation of
those Sections. It |
19 | | is not intended to supersede any amendment to the
Act that is |
20 | | enacted by the 98th General Assembly. |
21 | | (f) In this amendatory Act of the 98th General Assembly, |
22 | | the base text of the reenacted Sections is set forth as amended |
23 | | by Public Act 98-299. Striking and underscoring is used only to |
24 | | show changes being made to the base text. In this instance, no |
25 | | underscoring or striking is shown in the base text because no |
26 | | additional changes are being made. |
|
| | SB3561 Enrolled | - 26 - | LRB100 17985 AWJ 33170 b |
|
|
1 | | (g) Sections 2.5, 20.3, 20.4, 20.5, 20.10, 20.15, 20.20, |
2 | | and 20.25 of this Act apply
to all claims, civil actions, and |
3 | | proceedings pending on or
filed on or before the effective date |
4 | | of this amendatory Act of the 98th General Assembly.
|
5 | | (Source: P.A. 98-619, eff. 1-7-14.)
|