2019 and 2020 HB3290 Introduced , by Rep. William Davis SYNOPSIS AS INTRODUCED: |
| |
Amends the Illinois Procurement Code. Provides that for building construction contracts in excess of $500,000 (currently, $250,000), separate specifications may be prepared for all equipment, labor, and materials in connection with specified subdivisions of the work to be performed. Makes conforming changes. Effective immediately.
|
| |
| | A BILL FOR |
|
|
| | HB3290 | | LRB101 10163 RJF 55266 b |
|
|
| 1 | | AN ACT concerning finance.
|
| 2 | | Be it enacted by the People of the State of Illinois,
|
| 3 | | represented in the General Assembly:
|
| 4 | | Section 5. The Illinois Procurement Code is amended by |
| 5 | | changing Section 30-30 as follows:
|
| 6 | | (30 ILCS 500/30-30)
|
| 7 | | Sec. 30-30. Design-bid-build construction. |
| 8 | | (a) The provisions of this subsection are operative through |
| 9 | | December 31, 2019. |
| 10 | | For
building construction contracts in excess of $500,000
|
| 11 | | $250,000, separate specifications may be prepared for all
|
| 12 | | equipment, labor, and materials in
connection with the |
| 13 | | following 5 subdivisions of the work to be
performed:
|
| 14 | | (1) plumbing;
|
| 15 | | (2) heating, piping, refrigeration, and automatic
|
| 16 | | temperature control systems,
including the testing and |
| 17 | | balancing of those systems;
|
| 18 | | (3) ventilating and distribution systems for
|
| 19 | | conditioned air, including the testing
and balancing of |
| 20 | | those systems;
|
| 21 | | (4) electric wiring; and
|
| 22 | | (5) general contract work.
|
| 23 | | The specifications may be so drawn as to permit separate |
|
| | HB3290 | - 2 - | LRB101 10163 RJF 55266 b |
|
|
| 1 | | and
independent bidding upon
each of the 5 subdivisions of |
| 2 | | work. All contracts awarded
for any part thereof may
award the |
| 3 | | 5 subdivisions of work separately to responsible and
reliable |
| 4 | | persons, firms, or
corporations engaged in these classes of |
| 5 | | work. The contracts, at
the discretion of the
construction |
| 6 | | agency, may be assigned to the successful bidder on
the general |
| 7 | | contract work or
to the successful bidder on the subdivision of |
| 8 | | work designated by
the construction agency before
the bidding |
| 9 | | as the prime subdivision of work, provided that all
payments |
| 10 | | will be made directly
to the contractors for the 5 subdivisions |
| 11 | | of work upon compliance
with the conditions of the
contract.
|
| 12 | | Beginning on the effective date of this amendatory Act of |
| 13 | | the 99th General Assembly and through December 31, 2019, for |
| 14 | | single prime projects: (i) the bid of the successful low bidder |
| 15 | | shall identify the name of the subcontractor, if any, and the |
| 16 | | bid proposal costs for each of the 5 subdivisions of work set |
| 17 | | forth in this Section; (ii) the contract entered into with the |
| 18 | | successful bidder shall provide that no identified |
| 19 | | subcontractor may be terminated without the written consent of |
| 20 | | the Capital Development Board; (iii) the contract shall comply |
| 21 | | with the disadvantaged business practices of the Business |
| 22 | | Enterprise for Minorities, Women, and Persons with |
| 23 | | Disabilities Act and the equal employment practices of Section |
| 24 | | 2-105 of the Illinois Human Rights Act; (iv) the Capital |
| 25 | | Development Board shall submit a quarterly report to the |
| 26 | | Procurement Policy Board with information on the general scope, |
|
| | HB3290 | - 3 - | LRB101 10163 RJF 55266 b |
|
|
| 1 | | project budget, and established Business Enterprise Program |
| 2 | | goals for any single prime procurement bid in the previous 3 |
| 3 | | months with a total construction cost valued at $10,000,000 or |
| 4 | | less; and (v) the Capital Development Board shall submit an |
| 5 | | annual report to the General Assembly and Governor on the |
| 6 | | bidding, award, and performance of all single prime projects. |
| 7 | | For building construction projects with a total |
| 8 | | construction cost valued at $5,000,000 or less, the Capital |
| 9 | | Development Board shall not use the single prime procurement |
| 10 | | delivery method for more than 50% of the total number of |
| 11 | | projects bid for each fiscal year. Any project with a total |
| 12 | | construction cost valued greater than $5,000,000 may be bid |
| 13 | | using single prime at the discretion of the Executive Director |
| 14 | | of the Capital Development Board. |
| 15 | | Beginning on the effective date of this amendatory Act of |
| 16 | | the 99th General Assembly and through December 31, 2017, the |
| 17 | | Capital Development Board shall, on a weekly basis: review the |
| 18 | | projects that have been designed, and approved to bid; and, for |
| 19 | | every fifth determination to use the single prime procurement |
| 20 | | delivery method for a project under $10,000,000, submit to the |
| 21 | | Procurement Policy Board a written notice of its intent to use |
| 22 | | the single prime method on the project. The notice shall |
| 23 | | include the reasons for using the single prime method and an |
| 24 | | explanation of why the use of that method is in the best |
| 25 | | interest of the State. The Capital Development Board shall post |
| 26 | | the notice on its online procurement webpage and on the online |
|
| | HB3290 | - 4 - | LRB101 10163 RJF 55266 b |
|
|
| 1 | | Procurement Bulletin at least 3 business days following |
| 2 | | submission. The Procurement Policy Board shall review and |
| 3 | | provide its decision on the use of the single prime method for |
| 4 | | every fifth use of the single prime procurement delivery method |
| 5 | | for a project under $10,000,000 within 7 business days of |
| 6 | | receipt of the notice from the Capital Development Board. |
| 7 | | Approval by the Procurement Policy Board shall not be |
| 8 | | unreasonably withheld and shall be provided unless the |
| 9 | | Procurement Policy Board finds that the use of the single prime |
| 10 | | method is not in the best interest of the State. Any decision |
| 11 | | by the Procurement Policy Board to disapprove the use of the |
| 12 | | single prime method shall be made in writing to the Capital |
| 13 | | Development Board, posted on the online Procurement Bulletin, |
| 14 | | and shall state the reasons why the single prime method was |
| 15 | | disapproved and why it is not in the best interest of the |
| 16 | | State. |
| 17 | | (b) The provisions of this subsection are operative on and |
| 18 | | after January 1, 2020.
For building construction contracts in |
| 19 | | excess of $500,000 $250,000, separate specifications shall be |
| 20 | | prepared for all equipment, labor, and materials in connection |
| 21 | | with the following 5 subdivisions of the work to be performed: |
| 22 | | (1) plumbing; |
| 23 | | (2) heating, piping, refrigeration, and automatic |
| 24 | | temperature control systems, including the testing and |
| 25 | | balancing of those systems; |
| 26 | | (3) ventilating and distribution systems for |
|
| | HB3290 | - 5 - | LRB101 10163 RJF 55266 b |
|
|
| 1 | | conditioned air, including the testing and balancing of |
| 2 | | those systems; |
| 3 | | (4) electric wiring; and |
| 4 | | (5) general contract work. |
| 5 | | The specifications must be so drawn as to permit separate |
| 6 | | and independent bidding upon each of the 5 subdivisions of |
| 7 | | work. All contracts awarded for any part thereof shall award |
| 8 | | the 5 subdivisions of work separately to responsible and |
| 9 | | reliable persons, firms, or corporations engaged in these |
| 10 | | classes of work. The contracts, at the discretion of the |
| 11 | | construction agency, may be assigned to the successful bidder |
| 12 | | on the general contract work or to the successful bidder on the |
| 13 | | subdivision of work designated by the construction agency |
| 14 | | before the bidding as the prime subdivision of work, provided |
| 15 | | that all payments will be made directly to the contractors for |
| 16 | | the 5 subdivisions of work upon compliance with the conditions |
| 17 | | of the contract. |
| 18 | | (Source: P.A. 99-257, eff. 8-4-15; 100-391, eff. 8-25-17.)
|