|
| | 101ST GENERAL ASSEMBLY
State of Illinois
2019 and 2020 SB1789 Introduced 2/15/2019, by Sen. Antonio Muņoz SYNOPSIS AS INTRODUCED: |
| |
Amends the Public Utilities Act. Makes a grammatical correction in provisions relating to the procurement of power and energy, zero emission credits, and renewable energy resources by electric utilities. Effective immediately.
|
| |
| | A BILL FOR |
|
|
| | SB1789 | | LRB101 07686 JRG 52734 b |
|
|
| 1 | | AN ACT concerning regulation.
|
| 2 | | Be it enacted by the People of the State of Illinois,
|
| 3 | | represented in the General Assembly:
|
| 4 | | Section 5. The Public Utilities Act is amended by changing |
| 5 | | Section 16-111.5 as follows: |
| 6 | | (220 ILCS 5/16-111.5) |
| 7 | | Sec. 16-111.5. Provisions relating to procurement. |
| 8 | | (a) An electric utility that on December 31, 2005 served at |
| 9 | | least 100,000 customers in Illinois shall procure power and |
| 10 | | energy for its eligible retail customers in accordance with the |
| 11 | | applicable provisions set forth in Section 1-75 of the Illinois |
| 12 | | Power Agency Act and this Section. Beginning with the delivery |
| 13 | | year commencing on June 1, 2017, such electric utility shall |
| 14 | | also procure zero emission credits from zero emission |
| 15 | | facilities in accordance with the applicable provisions set |
| 16 | | forth in Section 1-75 of the Illinois Power Agency Act, and, |
| 17 | | for years beginning on or after June 1, 2017, the utility shall |
| 18 | | procure renewable energy resources in accordance with the |
| 19 | | applicable provisions set forth in Section 1-75 of the Illinois |
| 20 | | Power Agency Act and this Section. |
| 21 | | A small multi-jurisdictional electric utility that on |
| 22 | | December 31, 2005 served less than 100,000 customers in |
| 23 | | Illinois may elect to procure power and energy for all or a |
|
| | SB1789 | - 2 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | portion of its eligible Illinois retail customers in accordance |
| 2 | | with the applicable provisions set forth in this Section and |
| 3 | | Section 1-75 of the Illinois Power Agency Act. This Section |
| 4 | | shall not apply to a small multi-jurisdictional utility until |
| 5 | | such time as a small multi-jurisdictional utility requests the |
| 6 | | Illinois Power Agency to prepare a procurement plan for its |
| 7 | | eligible retail customers. "Eligible retail customers" for the |
| 8 | | purposes of this Section means those retail customers that |
| 9 | | purchase power and energy from the electric utility under |
| 10 | | fixed-price bundled service tariffs, other than those retail |
| 11 | | customers whose service is declared or deemed competitive under |
| 12 | | Section 16-113 and those other customer groups specified in |
| 13 | | this Section, including self-generating customers, customers |
| 14 | | electing hourly pricing, or those customers who are otherwise |
| 15 | | ineligible for fixed-price bundled tariff service. For those |
| 16 | | customers that are excluded from the procurement plan's |
| 17 | | electric supply service requirements, and the utility shall |
| 18 | | procure any supply requirements, including capacity, ancillary |
| 19 | | services, and hourly priced energy, in the applicable markets |
| 20 | | as needed to serve those customers, provided that the utility |
| 21 | | may include in its procurement plan load requirements for the |
| 22 | | load that is associated with those retail customers whose |
| 23 | | service has been declared or deemed competitive pursuant to |
| 24 | | Section 16-113 of this Act to the extent that those customers |
| 25 | | are purchasing power and energy during one of the transition |
| 26 | | periods identified in subsection (b) of Section 16-113 of this |
|
| | SB1789 | - 3 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | Act. |
| 2 | | (b) A procurement plan shall be prepared for each electric |
| 3 | | utility consistent with the applicable requirements of the |
| 4 | | Illinois Power Agency Act and this Section. For purposes of |
| 5 | | this Section, Illinois electric utilities that are affiliated |
| 6 | | by virtue of a common parent company are considered to be a |
| 7 | | single electric utility. Small multi-jurisdictional utilities |
| 8 | | may request a procurement plan for a portion of or all of its |
| 9 | | Illinois load. Each procurement plan shall analyze the |
| 10 | | projected balance of supply and demand for those retail |
| 11 | | customers to be included in the plan's electric supply service |
| 12 | | requirements over a 5-year period, with the first planning year |
| 13 | | beginning on June 1 of the year following the year in which the |
| 14 | | plan is filed. The plan shall specifically identify the |
| 15 | | wholesale products to be procured following plan approval, and |
| 16 | | shall follow all the requirements set forth in the Public |
| 17 | | Utilities Act and all applicable State and federal laws, |
| 18 | | statutes, rules, or regulations, as well as Commission orders. |
| 19 | | Nothing in this Section precludes consideration of contracts |
| 20 | | longer than 5 years and related forecast data. Unless specified |
| 21 | | otherwise in this Section, in the procurement plan or in the |
| 22 | | implementing tariff, any procurement occurring in accordance |
| 23 | | with this plan shall be competitively bid through a request for |
| 24 | | proposals process. Approval and implementation of the |
| 25 | | procurement plan shall be subject to review and approval by the |
| 26 | | Commission according to the provisions set forth in this |
|
| | SB1789 | - 4 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | Section. A procurement plan shall include each of the following |
| 2 | | components: |
| 3 | | (1) Hourly load analysis. This analysis shall include: |
| 4 | | (i) multi-year historical analysis of hourly |
| 5 | | loads; |
| 6 | | (ii) switching trends and competitive retail |
| 7 | | market analysis; |
| 8 | | (iii) known or projected changes to future loads; |
| 9 | | and |
| 10 | | (iv) growth forecasts by customer class. |
| 11 | | (2) Analysis of the impact of any demand side and |
| 12 | | renewable energy initiatives. This analysis shall include: |
| 13 | | (i) the impact of demand response programs and |
| 14 | | energy efficiency programs, both current and |
| 15 | | projected; for small multi-jurisdictional utilities, |
| 16 | | the impact of demand response and energy efficiency |
| 17 | | programs approved pursuant to Section 8-408 of this |
| 18 | | Act, both current and projected; and |
| 19 | | (ii) supply side needs that are projected to be |
| 20 | | offset by purchases of renewable energy resources, if |
| 21 | | any. |
| 22 | | (3) A plan for meeting the expected load requirements |
| 23 | | that will not be met through preexisting contracts. This |
| 24 | | plan shall include: |
| 25 | | (i) definitions of the different Illinois retail |
| 26 | | customer classes for which supply is being purchased; |
|
| | SB1789 | - 5 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | (ii) the proposed mix of demand-response products |
| 2 | | for which contracts will be executed during the next |
| 3 | | year. For small multi-jurisdictional electric |
| 4 | | utilities that on December 31, 2005 served fewer than |
| 5 | | 100,000 customers in Illinois, these shall be defined |
| 6 | | as demand-response products offered in an energy |
| 7 | | efficiency plan approved pursuant to Section 8-408 of |
| 8 | | this Act. The cost-effective demand-response measures |
| 9 | | shall be procured whenever the cost is lower than |
| 10 | | procuring comparable capacity products, provided that |
| 11 | | such products shall: |
| 12 | | (A) be procured by a demand-response provider |
| 13 | | from those retail customers included in the plan's |
| 14 | | electric supply service requirements; |
| 15 | | (B) at least satisfy the demand-response |
| 16 | | requirements of the regional transmission |
| 17 | | organization market in which the utility's service |
| 18 | | territory is located, including, but not limited |
| 19 | | to, any applicable capacity or dispatch |
| 20 | | requirements; |
| 21 | | (C) provide for customers' participation in |
| 22 | | the stream of benefits produced by the |
| 23 | | demand-response products; |
| 24 | | (D) provide for reimbursement by the |
| 25 | | demand-response provider of the utility for any |
| 26 | | costs incurred as a result of the failure of the |
|
| | SB1789 | - 6 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | supplier of such products to perform its |
| 2 | | obligations thereunder; and |
| 3 | | (E) meet the same credit requirements as apply |
| 4 | | to suppliers of capacity, in the applicable |
| 5 | | regional transmission organization market; |
| 6 | | (iii) monthly forecasted system supply |
| 7 | | requirements, including expected minimum, maximum, and |
| 8 | | average values for the planning period; |
| 9 | | (iv) the proposed mix and selection of standard |
| 10 | | wholesale products for which contracts will be |
| 11 | | executed during the next year, separately or in |
| 12 | | combination, to meet that portion of its load |
| 13 | | requirements not met through pre-existing contracts, |
| 14 | | including but not limited to monthly 5 x 16 peak period |
| 15 | | block energy, monthly off-peak wrap energy, monthly 7 x |
| 16 | | 24 energy, annual 5 x 16 energy, annual off-peak wrap |
| 17 | | energy, annual 7 x 24 energy, monthly capacity, annual |
| 18 | | capacity, peak load capacity obligations, capacity |
| 19 | | purchase plan, and ancillary services; |
| 20 | | (v) proposed term structures for each wholesale |
| 21 | | product type included in the proposed procurement plan |
| 22 | | portfolio of products; and |
| 23 | | (vi) an assessment of the price risk, load |
| 24 | | uncertainty, and other factors that are associated |
| 25 | | with the proposed procurement plan; this assessment, |
| 26 | | to the extent possible, shall include an analysis of |
|
| | SB1789 | - 7 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | the following factors: contract terms, time frames for |
| 2 | | securing products or services, fuel costs, weather |
| 3 | | patterns, transmission costs, market conditions, and |
| 4 | | the governmental regulatory environment; the proposed |
| 5 | | procurement plan shall also identify alternatives for |
| 6 | | those portfolio measures that are identified as having |
| 7 | | significant price risk. |
| 8 | | (4) Proposed procedures for balancing loads. The |
| 9 | | procurement plan shall include, for load requirements |
| 10 | | included in the procurement plan, the process for (i) |
| 11 | | hourly balancing of supply and demand and (ii) the criteria |
| 12 | | for portfolio re-balancing in the event of significant |
| 13 | | shifts in load. |
| 14 | | (5) Long-Term Renewable Resources Procurement Plan. |
| 15 | | The Agency shall prepare a long-term renewable resources |
| 16 | | procurement plan for the procurement of renewable energy |
| 17 | | credits under Sections 1-56 and 1-75 of the Illinois Power |
| 18 | | Agency Act for delivery beginning in the 2017 delivery |
| 19 | | year. |
| 20 | | (i) The initial long-term renewable resources |
| 21 | | procurement plan and all subsequent revisions shall be |
| 22 | | subject to review and approval by the Commission. For |
| 23 | | the purposes of this Section, "delivery year" has the |
| 24 | | same meaning as in Section 1-10 of the Illinois Power |
| 25 | | Agency Act. For purposes of this Section, "Agency" |
| 26 | | shall mean the Illinois Power Agency. |
|
| | SB1789 | - 8 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | (ii) The long-term renewable resources planning |
| 2 | | process shall be conducted as follows: |
| 3 | | (A) Electric utilities shall provide a range |
| 4 | | of load forecasts to the Illinois Power Agency |
| 5 | | within 45 days of the Agency's request for |
| 6 | | forecasts, which request shall specify the length |
| 7 | | and conditions for the forecasts including, but |
| 8 | | not limited to, the quantity of distributed |
| 9 | | generation expected to be interconnected for each |
| 10 | | year. |
| 11 | | (B) The Agency shall publish for comment the |
| 12 | | initial long-term renewable resources procurement |
| 13 | | plan no later than 120 days after the effective |
| 14 | | date of this amendatory Act of the 99th General |
| 15 | | Assembly and shall review, and may revise, the plan |
| 16 | | at least every 2 years thereafter. To the extent |
| 17 | | practicable, the Agency shall review and propose |
| 18 | | any revisions to the long-term renewable energy |
| 19 | | resources procurement plan in conjunction with the |
| 20 | | Agency's other planning and approval processes |
| 21 | | conducted under this Section. The initial |
| 22 | | long-term renewable resources procurement plan |
| 23 | | shall: |
| 24 | | (aa) Identify the procurement programs and |
| 25 | | competitive procurement events consistent with |
| 26 | | the applicable requirements of the Illinois |
|
| | SB1789 | - 9 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | Power Agency Act and shall be designed to |
| 2 | | achieve the goals set forth in subsection (c) |
| 3 | | of Section 1-75 of that Act. |
| 4 | | (bb) Include a schedule for procurements |
| 5 | | for renewable energy credits from |
| 6 | | utility-scale wind projects, utility-scale |
| 7 | | solar projects, and brownfield site |
| 8 | | photovoltaic projects consistent with |
| 9 | | subparagraph (G) of paragraph (1) of |
| 10 | | subsection (c) of Section 1-75 of the Illinois |
| 11 | | Power Agency Act. |
| 12 | | (cc) Identify the process whereby the |
| 13 | | Agency will submit to the Commission for review |
| 14 | | and approval the proposed contracts to |
| 15 | | implement the programs required by such plan. |
| 16 | | Copies of the initial long-term renewable |
| 17 | | resources procurement plan and all subsequent |
| 18 | | revisions shall be posted and made publicly |
| 19 | | available on the Agency's and Commission's |
| 20 | | websites, and copies shall also be provided to each |
| 21 | | affected electric utility. An affected utility and |
| 22 | | other interested parties shall have 45 days |
| 23 | | following the date of posting to provide comment to |
| 24 | | the Agency on the initial long-term renewable |
| 25 | | resources procurement plan and all subsequent |
| 26 | | revisions. All comments submitted to the Agency |
|
| | SB1789 | - 10 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | shall be specific, supported by data or other |
| 2 | | detailed analyses, and, if objecting to all or a |
| 3 | | portion of the procurement plan, accompanied by |
| 4 | | specific alternative wording or proposals. All |
| 5 | | comments shall be posted on the Agency's and |
| 6 | | Commission's websites. During this 45-day comment |
| 7 | | period, the Agency shall hold at least one public |
| 8 | | hearing within each utility's service area that is |
| 9 | | subject to the requirements of this paragraph (5) |
| 10 | | for the purpose of receiving public comment. |
| 11 | | Within 21 days following the end of the 45-day |
| 12 | | review period, the Agency may revise the long-term |
| 13 | | renewable resources procurement plan based on the |
| 14 | | comments received and shall file the plan with the |
| 15 | | Commission for review and approval. |
| 16 | | (C) Within 14 days after the filing of the |
| 17 | | initial long-term renewable resources procurement |
| 18 | | plan or any subsequent revisions, any person |
| 19 | | objecting to the plan may file an objection with |
| 20 | | the Commission. Within 21 days after the filing of |
| 21 | | the plan, the Commission shall determine whether a |
| 22 | | hearing is necessary. The Commission shall enter |
| 23 | | its order confirming or modifying the initial |
| 24 | | long-term renewable resources procurement plan or |
| 25 | | any subsequent revisions within 120 days after the |
| 26 | | filing of the plan by the Illinois Power Agency. |
|
| | SB1789 | - 11 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | (D) The Commission shall approve the initial |
| 2 | | long-term renewable resources procurement plan and |
| 3 | | any subsequent revisions, including expressly the |
| 4 | | forecast used in the plan and taking into account |
| 5 | | that funding will be limited to the amount of |
| 6 | | revenues actually collected by the utilities, if |
| 7 | | the Commission determines that the plan will |
| 8 | | reasonably and prudently accomplish the |
| 9 | | requirements of Section 1-56 and subsection (c) of |
| 10 | | Section 1-75 of the Illinois Power Agency Act. The |
| 11 | | Commission shall also approve the process for the |
| 12 | | submission, review, and approval of the proposed |
| 13 | | contracts to procure renewable energy credits or |
| 14 | | implement the programs authorized by the |
| 15 | | Commission pursuant to a long-term renewable |
| 16 | | resources procurement plan approved under this |
| 17 | | Section. |
| 18 | | (iii) The Agency or third parties contracted by the |
| 19 | | Agency shall implement all programs authorized by the |
| 20 | | Commission in an approved long-term renewable |
| 21 | | resources procurement plan without further review and |
| 22 | | approval by the Commission. Third parties shall not |
| 23 | | begin implementing any programs or receive any payment |
| 24 | | under this Section until the Commission has approved |
| 25 | | the contract or contracts under the process authorized |
| 26 | | by the Commission in item (D) of subparagraph (ii) of |
|
| | SB1789 | - 12 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | paragraph (5) of this subsection (b) and the third |
| 2 | | party and the Agency or utility, as applicable, have |
| 3 | | executed the contract. For those renewable energy |
| 4 | | credits subject to procurement through a competitive |
| 5 | | bid process under the plan or under the initial forward |
| 6 | | procurements for wind and solar resources described in |
| 7 | | subparagraph (G) of paragraph (1) of subsection (c) of |
| 8 | | Section 1-75 of the Illinois Power Agency Act, the |
| 9 | | Agency shall follow the procurement process specified |
| 10 | | in the provisions relating to electricity procurement |
| 11 | | in subsections (e) through (i) of this Section. |
| 12 | | (iv) An electric utility shall recover its costs |
| 13 | | associated with the procurement of renewable energy |
| 14 | | credits under this Section through an automatic |
| 15 | | adjustment clause tariff under subsection (k) of |
| 16 | | Section 16-108 of this Act. A utility shall not be |
| 17 | | required to advance any payment or pay any amounts |
| 18 | | under this Section that exceed the actual amount of |
| 19 | | revenues collected by the utility under paragraph (6) |
| 20 | | of subsection (c) of Section 1-75 of the Illinois Power |
| 21 | | Agency Act and subsection (k) of Section 16-108 of this |
| 22 | | Act, and contracts executed under this Section shall |
| 23 | | expressly incorporate this limitation. |
| 24 | | (v) For the public interest, safety, and welfare, |
| 25 | | the Agency and the Commission may adopt rules to carry |
| 26 | | out the provisions of this Section on an emergency |
|
| | SB1789 | - 13 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | basis immediately following the effective date of this |
| 2 | | amendatory Act of the 99th General Assembly. |
| 3 | | (vi) On or before July 1 of each year, the |
| 4 | | Commission shall hold an informal hearing for the |
| 5 | | purpose of receiving comments on the prior year's |
| 6 | | procurement process and any recommendations for |
| 7 | | change. |
| 8 | | (c) The procurement process set forth in Section 1-75 of |
| 9 | | the Illinois Power Agency Act and subsection (e) of this |
| 10 | | Section shall be administered by a procurement administrator |
| 11 | | and monitored by a procurement monitor. |
| 12 | | (1) The procurement administrator shall: |
| 13 | | (i) design the final procurement process in |
| 14 | | accordance with Section 1-75 of the Illinois Power |
| 15 | | Agency Act and subsection (e) of this Section following |
| 16 | | Commission approval of the procurement plan; |
| 17 | | (ii) develop benchmarks in accordance with |
| 18 | | subsection (e)(3) to be used to evaluate bids; these |
| 19 | | benchmarks shall be submitted to the Commission for |
| 20 | | review and approval on a confidential basis prior to |
| 21 | | the procurement event; |
| 22 | | (iii) serve as the interface between the electric |
| 23 | | utility and suppliers; |
| 24 | | (iv) manage the bidder pre-qualification and |
| 25 | | registration process; |
| 26 | | (v) obtain the electric utilities' agreement to |
|
| | SB1789 | - 14 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | the final form of all supply contracts and credit |
| 2 | | collateral agreements; |
| 3 | | (vi) administer the request for proposals process; |
| 4 | | (vii) have the discretion to negotiate to |
| 5 | | determine whether bidders are willing to lower the |
| 6 | | price of bids that meet the benchmarks approved by the |
| 7 | | Commission; any post-bid negotiations with bidders |
| 8 | | shall be limited to price only and shall be completed |
| 9 | | within 24 hours after opening the sealed bids and shall |
| 10 | | be conducted in a fair and unbiased manner; in |
| 11 | | conducting the negotiations, there shall be no |
| 12 | | disclosure of any information derived from proposals |
| 13 | | submitted by competing bidders; if information is |
| 14 | | disclosed to any bidder, it shall be provided to all |
| 15 | | competing bidders; |
| 16 | | (viii) maintain confidentiality of supplier and |
| 17 | | bidding information in a manner consistent with all |
| 18 | | applicable laws, rules, regulations, and tariffs; |
| 19 | | (ix) submit a confidential report to the |
| 20 | | Commission recommending acceptance or rejection of |
| 21 | | bids; |
| 22 | | (x) notify the utility of contract counterparties |
| 23 | | and contract specifics; and |
| 24 | | (xi) administer related contingency procurement |
| 25 | | events. |
| 26 | | (2) The procurement monitor, who shall be retained by |
|
| | SB1789 | - 15 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | the Commission, shall: |
| 2 | | (i) monitor interactions among the procurement |
| 3 | | administrator, suppliers, and utility; |
| 4 | | (ii) monitor and report to the Commission on the |
| 5 | | progress of the procurement process; |
| 6 | | (iii) provide an independent confidential report |
| 7 | | to the Commission regarding the results of the |
| 8 | | procurement event; |
| 9 | | (iv) assess compliance with the procurement plans |
| 10 | | approved by the Commission for each utility that on |
| 11 | | December 31, 2005 provided electric service to at least |
| 12 | | 100,000 customers in Illinois and for each small |
| 13 | | multi-jurisdictional utility that on December 31, 2005 |
| 14 | | served less than 100,000 customers in Illinois; |
| 15 | | (v) preserve the confidentiality of supplier and |
| 16 | | bidding information in a manner consistent with all |
| 17 | | applicable laws, rules, regulations, and tariffs; |
| 18 | | (vi) provide expert advice to the Commission and |
| 19 | | consult with the procurement administrator regarding |
| 20 | | issues related to procurement process design, rules, |
| 21 | | protocols, and policy-related matters; and |
| 22 | | (vii) consult with the procurement administrator |
| 23 | | regarding the development and use of benchmark |
| 24 | | criteria, standard form contracts, credit policies, |
| 25 | | and bid documents. |
| 26 | | (d) Except as provided in subsection (j), the planning |
|
| | SB1789 | - 16 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | process shall be conducted as follows: |
| 2 | | (1) Beginning in 2008, each Illinois utility procuring |
| 3 | | power pursuant to this Section shall annually provide a |
| 4 | | range of load forecasts to the Illinois Power Agency by |
| 5 | | July 15 of each year, or such other date as may be required |
| 6 | | by the Commission or Agency. The load forecasts shall cover |
| 7 | | the 5-year procurement planning period for the next |
| 8 | | procurement plan and shall include hourly data |
| 9 | | representing a high-load, low-load, and expected-load |
| 10 | | scenario for the load of those retail customers included in |
| 11 | | the plan's electric supply service requirements. The |
| 12 | | utility shall provide supporting data and assumptions for |
| 13 | | each of the scenarios.
|
| 14 | | (2) Beginning in 2008, the Illinois Power Agency shall |
| 15 | | prepare a procurement plan by August 15th of each year, or |
| 16 | | such other date as may be required by the Commission. The |
| 17 | | procurement plan shall identify the portfolio of |
| 18 | | demand-response and power and energy products to be |
| 19 | | procured. Cost-effective demand-response measures shall be |
| 20 | | procured as set forth in item (iii) of subsection (b) of |
| 21 | | this Section. Copies of the procurement plan shall be |
| 22 | | posted and made publicly available on the Agency's and |
| 23 | | Commission's websites, and copies shall also be provided to |
| 24 | | each affected electric utility. An affected utility shall |
| 25 | | have 30 days following the date of posting to provide |
| 26 | | comment to the Agency on the procurement plan. Other |
|
| | SB1789 | - 17 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | interested entities also may comment on the procurement |
| 2 | | plan. All comments submitted to the Agency shall be |
| 3 | | specific, supported by data or other detailed analyses, |
| 4 | | and, if objecting to all or a portion of the procurement |
| 5 | | plan, accompanied by specific alternative wording or |
| 6 | | proposals. All comments shall be posted on the Agency's and |
| 7 | | Commission's websites. During this 30-day comment period, |
| 8 | | the Agency shall hold at least one public hearing within |
| 9 | | each utility's service area for the purpose of receiving |
| 10 | | public comment on the procurement plan. Within 14 days |
| 11 | | following the end of the 30-day review period, the Agency |
| 12 | | shall revise the procurement plan as necessary based on the |
| 13 | | comments received and file the procurement plan with the |
| 14 | | Commission and post the procurement plan on the websites. |
| 15 | | (3) Within 5 days after the filing of the procurement |
| 16 | | plan, any person objecting to the procurement plan shall |
| 17 | | file an objection with the Commission. Within 10 days after |
| 18 | | the filing, the Commission shall determine whether a |
| 19 | | hearing is necessary. The Commission shall enter its order |
| 20 | | confirming or modifying the procurement plan within 90 days |
| 21 | | after the filing of the procurement plan by the Illinois |
| 22 | | Power Agency. |
| 23 | | (4) The Commission shall approve the procurement plan, |
| 24 | | including expressly the forecast used in the procurement |
| 25 | | plan, if the Commission determines that it will ensure |
| 26 | | adequate, reliable, affordable, efficient, and |
|
| | SB1789 | - 18 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | environmentally sustainable electric service at the lowest |
| 2 | | total cost over time, taking into account any benefits of |
| 3 | | price stability. |
| 4 | | (e) The procurement process shall include each of the |
| 5 | | following components: |
| 6 | | (1) Solicitation, pre-qualification, and registration |
| 7 | | of bidders. The procurement administrator shall |
| 8 | | disseminate information to potential bidders to promote a |
| 9 | | procurement event, notify potential bidders that the |
| 10 | | procurement administrator may enter into a post-bid price |
| 11 | | negotiation with bidders that meet the applicable |
| 12 | | benchmarks, provide supply requirements, and otherwise |
| 13 | | explain the competitive procurement process. In addition |
| 14 | | to such other publication as the procurement administrator |
| 15 | | determines is appropriate, this information shall be |
| 16 | | posted on the Illinois Power Agency's and the Commission's |
| 17 | | websites. The procurement administrator shall also |
| 18 | | administer the prequalification process, including |
| 19 | | evaluation of credit worthiness, compliance with |
| 20 | | procurement rules, and agreement to the standard form |
| 21 | | contract developed pursuant to paragraph (2) of this |
| 22 | | subsection (e). The procurement administrator shall then |
| 23 | | identify and register bidders to participate in the |
| 24 | | procurement event. |
| 25 | | (2) Standard contract forms and credit terms and |
| 26 | | instruments. The procurement administrator, in |
|
| | SB1789 | - 19 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | consultation with the utilities, the Commission, and other |
| 2 | | interested parties and subject to Commission oversight, |
| 3 | | shall develop and provide standard contract forms for the |
| 4 | | supplier contracts that meet generally accepted industry |
| 5 | | practices. Standard credit terms and instruments that meet |
| 6 | | generally accepted industry practices shall be similarly |
| 7 | | developed. The procurement administrator shall make |
| 8 | | available to the Commission all written comments it |
| 9 | | receives on the contract forms, credit terms, or |
| 10 | | instruments. If the procurement administrator cannot reach |
| 11 | | agreement with the applicable electric utility as to the |
| 12 | | contract terms and conditions, the procurement |
| 13 | | administrator must notify the Commission of any disputed |
| 14 | | terms and the Commission shall resolve the dispute. The |
| 15 | | terms of the contracts shall not be subject to negotiation |
| 16 | | by winning bidders, and the bidders must agree to the terms |
| 17 | | of the contract in advance so that winning bids are |
| 18 | | selected solely on the basis of price. |
| 19 | | (3) Establishment of a market-based price benchmark. |
| 20 | | As part of the development of the procurement process, the |
| 21 | | procurement administrator, in consultation with the |
| 22 | | Commission staff, Agency staff, and the procurement |
| 23 | | monitor, shall establish benchmarks for evaluating the |
| 24 | | final prices in the contracts for each of the products that |
| 25 | | will be procured through the procurement process. The |
| 26 | | benchmarks shall be based on price data for similar |
|
| | SB1789 | - 20 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | products for the same delivery period and same delivery |
| 2 | | hub, or other delivery hubs after adjusting for that |
| 3 | | difference. The price benchmarks may also be adjusted to |
| 4 | | take into account differences between the information |
| 5 | | reflected in the underlying data sources and the specific |
| 6 | | products and procurement process being used to procure |
| 7 | | power for the Illinois utilities. The benchmarks shall be |
| 8 | | confidential but shall be provided to, and will be subject |
| 9 | | to Commission review and approval, prior to a procurement |
| 10 | | event. |
| 11 | | (4) Request for proposals competitive procurement |
| 12 | | process. The procurement administrator shall design and |
| 13 | | issue a request for proposals to supply electricity in |
| 14 | | accordance with each utility's procurement plan, as |
| 15 | | approved by the Commission. The request for proposals shall |
| 16 | | set forth a procedure for sealed, binding commitment |
| 17 | | bidding with pay-as-bid settlement, and provision for |
| 18 | | selection of bids on the basis of price. |
| 19 | | (5) A plan for implementing contingencies in the event |
| 20 | | of supplier default or failure of the procurement process |
| 21 | | to fully meet the expected load requirement due to |
| 22 | | insufficient supplier participation, Commission rejection |
| 23 | | of results, or any other cause. |
| 24 | | (i) Event of supplier default: In the event of |
| 25 | | supplier default, the utility shall review the |
| 26 | | contract of the defaulting supplier to determine if the |
|
| | SB1789 | - 21 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | amount of supply is 200 megawatts or greater, and if |
| 2 | | there are more than 60 days remaining of the contract |
| 3 | | term. If both of these conditions are met, and the |
| 4 | | default results in termination of the contract, the |
| 5 | | utility shall immediately notify the Illinois Power |
| 6 | | Agency that a request for proposals must be issued to |
| 7 | | procure replacement power, and the procurement |
| 8 | | administrator shall run an additional procurement |
| 9 | | event. If the contracted supply of the defaulting |
| 10 | | supplier is less than 200 megawatts or there are less |
| 11 | | than 60 days remaining of the contract term, the |
| 12 | | utility shall procure power and energy from the |
| 13 | | applicable regional transmission organization market, |
| 14 | | including ancillary services, capacity, and day-ahead |
| 15 | | or real time energy, or both, for the duration of the |
| 16 | | contract term to replace the contracted supply; |
| 17 | | provided, however, that if a needed product is not |
| 18 | | available through the regional transmission |
| 19 | | organization market it shall be purchased from the |
| 20 | | wholesale market. |
| 21 | | (ii) Failure of the procurement process to fully |
| 22 | | meet the expected load requirement: If the procurement |
| 23 | | process fails to fully meet the expected load |
| 24 | | requirement due to insufficient supplier participation |
| 25 | | or due to a Commission rejection of the procurement |
| 26 | | results, the procurement administrator, the |
|
| | SB1789 | - 22 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | procurement monitor, and the Commission staff shall |
| 2 | | meet within 10 days to analyze potential causes of low |
| 3 | | supplier interest or causes for the Commission |
| 4 | | decision. If changes are identified that would likely |
| 5 | | result in increased supplier participation, or that |
| 6 | | would address concerns causing the Commission to |
| 7 | | reject the results of the prior procurement event, the |
| 8 | | procurement administrator may implement those changes |
| 9 | | and rerun the request for proposals process according |
| 10 | | to a schedule determined by those parties and |
| 11 | | consistent with Section 1-75 of the Illinois Power |
| 12 | | Agency Act and this subsection. In any event, a new |
| 13 | | request for proposals process shall be implemented by |
| 14 | | the procurement administrator within 90 days after the |
| 15 | | determination that the procurement process has failed |
| 16 | | to fully meet the expected load requirement. |
| 17 | | (iii) In all cases where there is insufficient |
| 18 | | supply provided under contracts awarded through the |
| 19 | | procurement process to fully meet the electric |
| 20 | | utility's load requirement, the utility shall meet the |
| 21 | | load requirement by procuring power and energy from the |
| 22 | | applicable regional transmission organization market, |
| 23 | | including ancillary services, capacity, and day-ahead |
| 24 | | or real time energy, or both; provided, however, that |
| 25 | | if a needed product is not available through the |
| 26 | | regional transmission organization market it shall be |
|
| | SB1789 | - 23 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | purchased from the wholesale market. |
| 2 | | (6) The procurement process described in this |
| 3 | | subsection is exempt from the requirements of the Illinois |
| 4 | | Procurement Code, pursuant to Section 20-10 of that Code. |
| 5 | | (f) Within 2 business days after opening the sealed bids, |
| 6 | | the procurement administrator shall submit a confidential |
| 7 | | report to the Commission. The report shall contain the results |
| 8 | | of the bidding for each of the products along with the |
| 9 | | procurement administrator's recommendation for the acceptance |
| 10 | | and rejection of bids based on the price benchmark criteria and |
| 11 | | other factors observed in the process. The procurement monitor |
| 12 | | also shall submit a confidential report to the Commission |
| 13 | | within 2 business days after opening the sealed bids. The |
| 14 | | report shall contain the procurement monitor's assessment of |
| 15 | | bidder behavior in the process as well as an assessment of the |
| 16 | | procurement administrator's compliance with the procurement |
| 17 | | process and rules. The Commission shall review the confidential |
| 18 | | reports submitted by the procurement administrator and |
| 19 | | procurement monitor, and shall accept or reject the |
| 20 | | recommendations of the procurement administrator within 2 |
| 21 | | business days after receipt of the reports. |
| 22 | | (g) Within 3 business days after the Commission decision |
| 23 | | approving the results of a procurement event, the utility shall |
| 24 | | enter into binding contractual arrangements with the winning |
| 25 | | suppliers using the standard form contracts; except that the |
| 26 | | utility shall not be required either directly or indirectly to |
|
| | SB1789 | - 24 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | execute the contracts if a tariff that is consistent with |
| 2 | | subsection (l) of this Section has not been approved and placed |
| 3 | | into effect for that utility. |
| 4 | | (h) The names of the successful bidders and the load |
| 5 | | weighted average of the winning bid prices for each contract |
| 6 | | type and for each contract term shall be made available to the |
| 7 | | public at the time of Commission approval of a procurement |
| 8 | | event. The Commission, the procurement monitor, the |
| 9 | | procurement administrator, the Illinois Power Agency, and all |
| 10 | | participants in the procurement process shall maintain the |
| 11 | | confidentiality of all other supplier and bidding information |
| 12 | | in a manner consistent with all applicable laws, rules, |
| 13 | | regulations, and tariffs. Confidential information, including |
| 14 | | the confidential reports submitted by the procurement |
| 15 | | administrator and procurement monitor pursuant to subsection |
| 16 | | (f) of this Section, shall not be made publicly available and |
| 17 | | shall not be discoverable by any party in any proceeding, |
| 18 | | absent a compelling demonstration of need, nor shall those |
| 19 | | reports be admissible in any proceeding other than one for law |
| 20 | | enforcement purposes. |
| 21 | | (i) Within 2 business days after a Commission decision |
| 22 | | approving the results of a procurement event or such other date |
| 23 | | as may be required by the Commission from time to time, the |
| 24 | | utility shall file for informational purposes with the |
| 25 | | Commission its actual or estimated retail supply charges, as |
| 26 | | applicable, by customer supply group reflecting the costs |
|
| | SB1789 | - 25 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | associated with the procurement and computed in accordance with |
| 2 | | the tariffs filed pursuant to subsection (l) of this Section |
| 3 | | and approved by the Commission. |
| 4 | | (j) Within 60 days following August 28, 2007 (the effective |
| 5 | | date of Public Act 95-481), each electric utility that on |
| 6 | | December 31, 2005 provided electric service to at least 100,000 |
| 7 | | customers in Illinois shall prepare and file with the |
| 8 | | Commission an initial procurement plan, which shall conform in |
| 9 | | all material respects to the requirements of the procurement |
| 10 | | plan set forth in subsection (b); provided, however, that the |
| 11 | | Illinois Power Agency Act shall not apply to the initial |
| 12 | | procurement plan prepared pursuant to this subsection. The |
| 13 | | initial procurement plan shall identify the portfolio of power |
| 14 | | and energy products to be procured and delivered for the period |
| 15 | | June 2008 through May 2009, and shall identify the proposed |
| 16 | | procurement administrator, who shall have the same experience |
| 17 | | and expertise as is required of a procurement administrator |
| 18 | | hired pursuant to Section 1-75 of the Illinois Power Agency |
| 19 | | Act. Copies of the procurement plan shall be posted and made |
| 20 | | publicly available on the Commission's website. The initial |
| 21 | | procurement plan may include contracts for renewable resources |
| 22 | | that extend beyond May 2009. |
| 23 | | (i) Within 14 days following filing of the initial |
| 24 | | procurement plan, any person may file a detailed objection |
| 25 | | with the Commission contesting the procurement plan |
| 26 | | submitted by the electric utility. All objections to the |
|
| | SB1789 | - 26 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | electric utility's plan shall be specific, supported by |
| 2 | | data or other detailed analyses. The electric utility may |
| 3 | | file a response to any objections to its procurement plan |
| 4 | | within 7 days after the date objections are due to be |
| 5 | | filed. Within 7 days after the date the utility's response |
| 6 | | is due, the Commission shall determine whether a hearing is |
| 7 | | necessary. If it determines that a hearing is necessary, it |
| 8 | | shall require the hearing to be completed and issue an |
| 9 | | order on the procurement plan within 60 days after the |
| 10 | | filing of the procurement plan by the electric utility. |
| 11 | | (ii) The order shall approve or modify the procurement |
| 12 | | plan, approve an independent procurement administrator, |
| 13 | | and approve or modify the electric utility's tariffs that |
| 14 | | are proposed with the initial procurement plan. The |
| 15 | | Commission shall approve the procurement plan if the |
| 16 | | Commission determines that it will ensure adequate, |
| 17 | | reliable, affordable, efficient, and environmentally |
| 18 | | sustainable electric service at the lowest total cost over |
| 19 | | time, taking into account any benefits of price stability. |
| 20 | | (k) (Blank). |
| 21 | | (k-5) (Blank). |
| 22 | | (l) An electric utility shall recover its costs incurred |
| 23 | | under this Section, including, but not limited to, the costs of |
| 24 | | procuring power and energy demand-response resources under |
| 25 | | this Section. The utility shall file with the initial |
| 26 | | procurement plan its proposed tariffs through which its costs |
|
| | SB1789 | - 27 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | of procuring power that are incurred pursuant to a |
| 2 | | Commission-approved procurement plan and those other costs |
| 3 | | identified in this subsection (l), will be recovered. The |
| 4 | | tariffs shall include a formula rate or charge designed to pass |
| 5 | | through both the costs incurred by the utility in procuring a |
| 6 | | supply of electric power and energy for the applicable customer |
| 7 | | classes with no mark-up or return on the price paid by the |
| 8 | | utility for that supply, plus any just and reasonable costs |
| 9 | | that the utility incurs in arranging and providing for the |
| 10 | | supply of electric power and energy. The formula rate or charge |
| 11 | | shall also contain provisions that ensure that its application |
| 12 | | does not result in over or under recovery due to changes in |
| 13 | | customer usage and demand patterns, and that provide for the |
| 14 | | correction, on at least an annual basis, of any accounting |
| 15 | | errors that may occur. A utility shall recover through the |
| 16 | | tariff all reasonable costs incurred to implement or comply |
| 17 | | with any procurement plan that is developed and put into effect |
| 18 | | pursuant to Section 1-75 of the Illinois Power Agency Act and |
| 19 | | this Section, including any fees assessed by the Illinois Power |
| 20 | | Agency, costs associated with load balancing, and contingency |
| 21 | | plan costs. The electric utility shall also recover its full |
| 22 | | costs of procuring electric supply for which it contracted |
| 23 | | before the effective date of this Section in conjunction with |
| 24 | | the provision of full requirements service under fixed-price |
| 25 | | bundled service tariffs subsequent to December 31, 2006. All |
| 26 | | such costs shall be deemed to have been prudently incurred. The |
|
| | SB1789 | - 28 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | pass-through tariffs that are filed and approved pursuant to |
| 2 | | this Section shall not be subject to review under, or in any |
| 3 | | way limited by, Section 16-111(i) of this Act. All of the costs |
| 4 | | incurred by the electric utility associated with the purchase |
| 5 | | of zero emission credits in accordance with subsection (d-5) of |
| 6 | | Section 1-75 of the Illinois Power Agency Act and, beginning |
| 7 | | June 1, 2017, all of the costs incurred by the electric utility |
| 8 | | associated with the purchase of renewable energy resources in |
| 9 | | accordance with Sections 1-56 and 1-75 of the Illinois Power |
| 10 | | Agency Act, shall be recovered through the electric utility's |
| 11 | | tariffed charges applicable to all of its retail customers, as |
| 12 | | specified in subsection (k) of Section 16-108 of this Act, and |
| 13 | | shall not be recovered through the electric utility's tariffed |
| 14 | | charges for electric power and energy supply to its eligible |
| 15 | | retail customers. |
| 16 | | (m) The Commission has the authority to adopt rules to |
| 17 | | carry out the provisions of this Section. For the public |
| 18 | | interest, safety, and welfare, the Commission also has |
| 19 | | authority to adopt rules to carry out the provisions of this |
| 20 | | Section on an emergency basis immediately following August 28, |
| 21 | | 2007 (the effective date of Public Act 95-481). |
| 22 | | (n) Notwithstanding any other provision of this Act, any |
| 23 | | affiliated electric utilities that submit a single procurement |
| 24 | | plan covering their combined needs may procure for those |
| 25 | | combined needs in conjunction with that plan, and may enter |
| 26 | | jointly into power supply contracts, purchases, and other |
|
| | SB1789 | - 29 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | procurement arrangements, and allocate capacity and energy and |
| 2 | | cost responsibility therefor among themselves in proportion to |
| 3 | | their requirements. |
| 4 | | (o) On or before June 1 of each year, the Commission shall |
| 5 | | hold an informal hearing for the purpose of receiving comments |
| 6 | | on the prior year's procurement process and any recommendations |
| 7 | | for change.
|
| 8 | | (p) An electric utility subject to this Section may propose |
| 9 | | to invest, lease, own, or operate an electric generation |
| 10 | | facility as part of its procurement plan, provided the utility |
| 11 | | demonstrates that such facility is the least-cost option to |
| 12 | | provide electric service to those retail customers included in |
| 13 | | the plan's electric supply service requirements. If the |
| 14 | | facility is shown to be the least-cost option and is included |
| 15 | | in a procurement plan prepared in accordance with Section 1-75 |
| 16 | | of the Illinois Power Agency Act and this Section, then the |
| 17 | | electric utility shall make a filing pursuant to Section 8-406 |
| 18 | | of this Act, and may request of the Commission any statutory |
| 19 | | relief required thereunder. If the Commission grants all of the |
| 20 | | necessary approvals for the proposed facility, such supply |
| 21 | | shall thereafter be considered as a pre-existing contract under |
| 22 | | subsection (b) of this Section. The Commission shall in any |
| 23 | | order approving a proposal under this subsection specify how |
| 24 | | the utility will recover the prudently incurred costs of |
| 25 | | investing in, leasing, owning, or operating such generation |
| 26 | | facility through just and reasonable rates charged to those |
|
| | SB1789 | - 30 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | retail customers included in the plan's electric supply service |
| 2 | | requirements. Cost recovery for facilities included in the |
| 3 | | utility's procurement plan pursuant to this subsection shall |
| 4 | | not be subject to review under or in any way limited by the |
| 5 | | provisions of Section 16-111(i) of this Act. Nothing in this |
| 6 | | Section is intended to prohibit a utility from filing for a |
| 7 | | fuel adjustment clause as is otherwise permitted under Section |
| 8 | | 9-220 of this Act.
|
| 9 | | (q) If the Illinois Power Agency filed with the Commission, |
| 10 | | under Section 16-111.5 of this Act, its proposed procurement |
| 11 | | plan for the period commencing June 1, 2017, and the Commission |
| 12 | | has not yet entered its final order approving the plan on or |
| 13 | | before the effective date of this amendatory Act of the 99th |
| 14 | | General Assembly, then the Illinois Power Agency shall file a |
| 15 | | notice of withdrawal with the Commission, after the effective |
| 16 | | date of this amendatory Act of the 99th General Assembly, to |
| 17 | | withdraw the proposed procurement of renewable energy |
| 18 | | resources to be approved under the plan, other than the |
| 19 | | procurement of renewable energy credits from distributed |
| 20 | | renewable energy generation devices using funds previously |
| 21 | | collected from electric utilities' retail customers that take |
| 22 | | service pursuant to electric utilities' hourly pricing tariff |
| 23 | | or tariffs and, for an electric utility that serves less than |
| 24 | | 100,000 retail customers in the State, other than the |
| 25 | | procurement of renewable energy credits from distributed |
| 26 | | renewable energy generation devices. Upon receipt of the |
|
| | SB1789 | - 31 - | LRB101 07686 JRG 52734 b |
|
|
| 1 | | notice, the Commission shall enter an order that approves the |
| 2 | | withdrawal of the proposed procurement of renewable energy |
| 3 | | resources from the plan. The initially proposed procurement of |
| 4 | | renewable energy resources shall not be approved or be the |
| 5 | | subject of any further hearing, investigation, proceeding, or |
| 6 | | order of any kind. |
| 7 | | This amendatory Act of the 99th General Assembly preempts |
| 8 | | and supersedes any order entered by the Commission that |
| 9 | | approved the Illinois Power Agency's procurement plan for the |
| 10 | | period commencing June 1, 2017, to the extent it is |
| 11 | | inconsistent with the provisions of this amendatory Act of the |
| 12 | | 99th General Assembly. To the extent any previously entered |
| 13 | | order approved the procurement of renewable energy resources, |
| 14 | | the portion of that order approving the procurement shall be |
| 15 | | void, other than the procurement of renewable energy credits |
| 16 | | from distributed renewable energy generation devices using |
| 17 | | funds previously collected from electric utilities' retail |
| 18 | | customers that take service under electric utilities' hourly |
| 19 | | pricing tariff or tariffs and, for an electric utility that |
| 20 | | serves less than 100,000 retail customers in the State, other |
| 21 | | than the procurement of renewable energy credits for |
| 22 | | distributed renewable energy generation devices. |
| 23 | | (Source: P.A. 99-906, eff. 6-1-17.)
|
| 24 | | Section 99. Effective date. This Act takes effect upon |
| 25 | | becoming law.
|