Rep. Stephanie A. Kifowit
Filed: 5/21/2019
| | 10100SB2120ham002 | | LRB101 10535 RJF 60740 a |
|
|
| 1 | | AMENDMENT TO SENATE BILL 2120
|
| 2 | | AMENDMENT NO. ______. Amend Senate Bill 2120 as follows:
|
| 3 | | on page 9, immediately below line 25, by inserting the |
| 4 | | following: |
| 5 | | "Section 15. The Illinois Procurement Code is amended by |
| 6 | | changing Sections 1-15.93 and 30-30 as follows: |
| 7 | | (30 ILCS 500/1-15.93) |
| 8 | | (Section scheduled to be repealed on January 1, 2020) |
| 9 | | Sec. 1-15.93. Single prime. "Single prime" means the |
| 10 | | design-bid-build procurement delivery method for a building |
| 11 | | construction project in which the Capital Development Board is |
| 12 | | the construction agency procuring 2 or more subdivisions of |
| 13 | | work enumerated in paragraphs (1) through (5) of subsection (a) |
| 14 | | of Section 30-30 of this Code under a single contract. This |
| 15 | | Section is repealed on January 1, 2021 2020.
|
|
| | 10100SB2120ham002 | - 2 - | LRB101 10535 RJF 60740 a |
|
|
| 1 | | (Source: P.A. 99-257, eff. 8-4-15.)
|
| 2 | | (30 ILCS 500/30-30)
|
| 3 | | Sec. 30-30. Design-bid-build construction. |
| 4 | | (a) The provisions of this subsection are operative through |
| 5 | | December 31, 2020 2019. |
| 6 | | For
building construction contracts in excess of
$250,000, |
| 7 | | separate specifications may be prepared for all
equipment, |
| 8 | | labor, and materials in
connection with the following 5 |
| 9 | | subdivisions of the work to be
performed:
|
| 10 | | (1) plumbing;
|
| 11 | | (2) heating, piping, refrigeration, and automatic
|
| 12 | | temperature control systems,
including the testing and |
| 13 | | balancing of those systems;
|
| 14 | | (3) ventilating and distribution systems for
|
| 15 | | conditioned air, including the testing
and balancing of |
| 16 | | those systems;
|
| 17 | | (4) electric wiring; and
|
| 18 | | (5) general contract work.
|
| 19 | | The specifications may be so drawn as to permit separate |
| 20 | | and
independent bidding upon
each of the 5 subdivisions of |
| 21 | | work. All contracts awarded
for any part thereof may
award the |
| 22 | | 5 subdivisions of work separately to responsible and
reliable |
| 23 | | persons, firms, or
corporations engaged in these classes of |
| 24 | | work. The contracts, at
the discretion of the
construction |
| 25 | | agency, may be assigned to the successful bidder on
the general |
|
| | 10100SB2120ham002 | - 3 - | LRB101 10535 RJF 60740 a |
|
|
| 1 | | contract work or
to the successful bidder on the subdivision of |
| 2 | | work designated by
the construction agency before
the bidding |
| 3 | | as the prime subdivision of work, provided that all
payments |
| 4 | | will be made directly
to the contractors for the 5 subdivisions |
| 5 | | of work upon compliance
with the conditions of the
contract.
|
| 6 | | Beginning on the effective date of this amendatory Act of |
| 7 | | the 101st 99th General Assembly and through December 31, 2020 |
| 8 | | 2019, for single prime projects: (i) the bid of the successful |
| 9 | | low bidder shall identify the name of the subcontractor, if |
| 10 | | any, and the bid proposal costs for each of the 5 subdivisions |
| 11 | | of work set forth in this Section; (ii) the contract entered |
| 12 | | into with the successful bidder shall provide that no |
| 13 | | identified subcontractor may be terminated without the written |
| 14 | | consent of the Capital Development Board; (iii) the contract |
| 15 | | shall comply with the disadvantaged business practices of the |
| 16 | | Business Enterprise for Minorities, Women, and Persons with |
| 17 | | Disabilities Act and the equal employment practices of Section |
| 18 | | 2-105 of the Illinois Human Rights Act; (iv) the Capital |
| 19 | | Development Board shall submit a quarterly report to the |
| 20 | | Procurement Policy Board with information on the general scope, |
| 21 | | project budget, and established Business Enterprise Program |
| 22 | | goals for any single prime procurement bid in the previous 3 |
| 23 | | months with a total construction cost valued at $10,000,000 or |
| 24 | | less; and (iv) (v) the Capital Development Board shall submit |
| 25 | | an annual report to the General Assembly and Governor on the |
| 26 | | bidding, award, and performance of all single prime projects. |
|
| | 10100SB2120ham002 | - 4 - | LRB101 10535 RJF 60740 a |
|
|
| 1 | | For building construction projects with a total |
| 2 | | construction cost valued at $5,000,000 or less, the Capital |
| 3 | | Development Board shall not use the single prime procurement |
| 4 | | delivery method for more than 50% of the total number of |
| 5 | | projects bid for each fiscal year. Any project with a total |
| 6 | | construction cost valued greater than $5,000,000 may be bid |
| 7 | | using single prime at the discretion of the Executive Director |
| 8 | | of the Capital Development Board. |
| 9 | | Beginning on the effective date of this amendatory Act of |
| 10 | | the 99th General Assembly and through December 31, 2017, the |
| 11 | | Capital Development Board shall, on a weekly basis: review the |
| 12 | | projects that have been designed, and approved to bid; and, for |
| 13 | | every fifth determination to use the single prime procurement |
| 14 | | delivery method for a project under $10,000,000, submit to the |
| 15 | | Procurement Policy Board a written notice of its intent to use |
| 16 | | the single prime method on the project. The notice shall |
| 17 | | include the reasons for using the single prime method and an |
| 18 | | explanation of why the use of that method is in the best |
| 19 | | interest of the State. The Capital Development Board shall post |
| 20 | | the notice on its online procurement webpage and on the online |
| 21 | | Procurement Bulletin at least 3 business days following |
| 22 | | submission. The Procurement Policy Board shall review and |
| 23 | | provide its decision on the use of the single prime method for |
| 24 | | every fifth use of the single prime procurement delivery method |
| 25 | | for a project under $10,000,000 within 7 business days of |
| 26 | | receipt of the notice from the Capital Development Board. |
|
| | 10100SB2120ham002 | - 5 - | LRB101 10535 RJF 60740 a |
|
|
| 1 | | Approval by the Procurement Policy Board shall not be |
| 2 | | unreasonably withheld and shall be provided unless the |
| 3 | | Procurement Policy Board finds that the use of the single prime |
| 4 | | method is not in the best interest of the State. Any decision |
| 5 | | by the Procurement Policy Board to disapprove the use of the |
| 6 | | single prime method shall be made in writing to the Capital |
| 7 | | Development Board, posted on the online Procurement Bulletin, |
| 8 | | and shall state the reasons why the single prime method was |
| 9 | | disapproved and why it is not in the best interest of the |
| 10 | | State. |
| 11 | | (b) The provisions of this subsection are operative on and |
| 12 | | after January 1, 2021 2020.
For building construction contracts |
| 13 | | in excess of $250,000, separate specifications shall be |
| 14 | | prepared for all equipment, labor, and materials in connection |
| 15 | | with the following 5 subdivisions of the work to be performed: |
| 16 | | (1) plumbing; |
| 17 | | (2) heating, piping, refrigeration, and automatic |
| 18 | | temperature control systems, including the testing and |
| 19 | | balancing of those systems; |
| 20 | | (3) ventilating and distribution systems for |
| 21 | | conditioned air, including the testing and balancing of |
| 22 | | those systems; |
| 23 | | (4) electric wiring; and |
| 24 | | (5) general contract work. |
| 25 | | The specifications must be so drawn as to permit separate |
| 26 | | and independent bidding upon each of the 5 subdivisions of |
|
| | 10100SB2120ham002 | - 6 - | LRB101 10535 RJF 60740 a |
|
|
| 1 | | work. All contracts awarded for any part thereof shall award |
| 2 | | the 5 subdivisions of work separately to responsible and |
| 3 | | reliable persons, firms, or corporations engaged in these |
| 4 | | classes of work. The contracts, at the discretion of the |
| 5 | | construction agency, may be assigned to the successful bidder |
| 6 | | on the general contract work or to the successful bidder on the |
| 7 | | subdivision of work designated by the construction agency |
| 8 | | before the bidding as the prime subdivision of work, provided |
| 9 | | that all payments will be made directly to the contractors for |
| 10 | | the 5 subdivisions of work upon compliance with the conditions |
| 11 | | of the contract. |
| 12 | | (Source: P.A. 99-257, eff. 8-4-15; 100-391, eff. 8-25-17.)"; |
| 13 | | and
|
| 14 | | on page 10, lines 1 and 2, by replacing "January 1, 2020" with |
| 15 | | "December 15, 2019".
|