| 1 | | (30 ILCS 500/30-30)
|
| 2 | | Sec. 30-30. Design-bid-build construction. |
| 3 | | (a) The provisions of this subsection are operative |
| 4 | | through December 31, 2023 2021. |
| 5 | | For
building construction contracts in excess of
$250,000, |
| 6 | | separate specifications may be prepared for all
equipment, |
| 7 | | labor, and materials in
connection with the following 5 |
| 8 | | subdivisions of the work to be
performed:
|
| 9 | | (1) plumbing;
|
| 10 | | (2) heating, piping, refrigeration, and automatic
|
| 11 | | temperature control systems,
including the testing and |
| 12 | | balancing of those systems;
|
| 13 | | (3) ventilating and distribution systems for
|
| 14 | | conditioned air, including the testing
and balancing of |
| 15 | | those systems;
|
| 16 | | (4) electric wiring; and
|
| 17 | | (5) general contract work.
|
| 18 | | The specifications may be so drawn as to permit separate |
| 19 | | and
independent bidding upon
each of the 5 subdivisions of |
| 20 | | work. All contracts awarded
for any part thereof may
award the |
| 21 | | 5 subdivisions of work separately to responsible and
reliable |
| 22 | | persons, firms, or
corporations engaged in these classes of |
| 23 | | work. The contracts, at
the discretion of the
construction |
| 24 | | agency, may be assigned to the successful bidder on
the |
| 25 | | general contract work or
to the successful bidder on the |
| 26 | | subdivision of work designated by
the construction agency |
|
| | 10200HB2567ham001 | - 3 - | LRB102 13430 RJF 23011 a |
|
|
| 1 | | before
the bidding as the prime subdivision of work, provided |
| 2 | | that all
payments will be made directly
to the contractors for |
| 3 | | the 5 subdivisions of work upon compliance
with the conditions |
| 4 | | of the
contract.
|
| 5 | | Beginning on the effective date of this amendatory Act of |
| 6 | | the 101st General Assembly and through December 31, 2023 2020, |
| 7 | | for single prime projects: (i) the bid of the successful low |
| 8 | | bidder shall identify the name of the subcontractor, if any, |
| 9 | | and the bid proposal costs for each of the 5 subdivisions of |
| 10 | | work set forth in this Section; (ii) the contract entered into |
| 11 | | with the successful bidder shall provide that no identified |
| 12 | | subcontractor may be terminated without the written consent of |
| 13 | | the Capital Development Board; (iii) the contract shall comply |
| 14 | | with the disadvantaged business practices of the Business |
| 15 | | Enterprise for Minorities, Women, and Persons with |
| 16 | | Disabilities Act and the equal employment practices of Section |
| 17 | | 2-105 of the Illinois Human Rights Act; and (iv) the Capital |
| 18 | | Development Board shall submit an annual report to the General |
| 19 | | Assembly and Governor on the bidding, award, and performance |
| 20 | | of all single prime projects. |
| 21 | | For building construction projects with a total |
| 22 | | construction cost valued at $5,000,000 or less, the Capital |
| 23 | | Development Board shall not use the single prime procurement |
| 24 | | delivery method for more than 50% of the total number of |
| 25 | | projects bid for each fiscal year. Any project with a total |
| 26 | | construction cost valued greater than $5,000,000 may be bid |
|
| | 10200HB2567ham001 | - 4 - | LRB102 13430 RJF 23011 a |
|
|
| 1 | | using single prime at the discretion of the Executive Director |
| 2 | | of the Capital Development Board. |
| 3 | | (b) The provisions of this subsection are operative on and |
| 4 | | after January 1, 2024 2022.
For building construction |
| 5 | | contracts in excess of $250,000, separate specifications shall |
| 6 | | be prepared for all equipment, labor, and materials in |
| 7 | | connection with the following 5 subdivisions of the work to be |
| 8 | | performed: |
| 9 | | (1) plumbing; |
| 10 | | (2) heating, piping, refrigeration, and automatic |
| 11 | | temperature control systems, including the testing and |
| 12 | | balancing of those systems; |
| 13 | | (3) ventilating and distribution systems for |
| 14 | | conditioned air, including the testing and balancing of |
| 15 | | those systems; |
| 16 | | (4) electric wiring; and |
| 17 | | (5) general contract work. |
| 18 | | The specifications must be so drawn as to permit separate |
| 19 | | and independent bidding upon each of the 5 subdivisions of |
| 20 | | work. All contracts awarded for any part thereof shall award |
| 21 | | the 5 subdivisions of work separately to responsible and |
| 22 | | reliable persons, firms, or corporations engaged in these |
| 23 | | classes of work. The contracts, at the discretion of the |
| 24 | | construction agency, may be assigned to the successful bidder |
| 25 | | on the general contract work or to the successful bidder on the |
| 26 | | subdivision of work designated by the construction agency |