|
| | SB1089 Engrossed | | LRB102 04912 CPF 14931 b |
|
|
1 | | AN ACT concerning regulation.
|
2 | | Be it enacted by the People of the State of Illinois, |
3 | | represented in the General Assembly:
|
4 | | Section 5. The Environmental Protection Act is amended by |
5 | | changing Sections 3.160, 3.330, 21, 22.15, 22.38, 31.1, and 42 |
6 | | as follows: |
7 | | (415 ILCS 5/3.160) (was 415 ILCS 5/3.78 and 3.78a) |
8 | | Sec. 3.160. Construction or demolition debris. |
9 | | (a) "General construction or demolition debris" means |
10 | | non-hazardous,
uncontaminated materials resulting from the |
11 | | construction, remodeling, repair,
and demolition of utilities, |
12 | | structures, and roads, limited to the following:
bricks, |
13 | | concrete, and other masonry materials; soil; rock; wood, |
14 | | including
non-hazardous painted, treated, and coated wood and |
15 | | wood products; wall
coverings; plaster; drywall; plumbing |
16 | | fixtures; non-asbestos insulation;
roofing shingles and other |
17 | | roof coverings; reclaimed or other asphalt pavement; glass;
|
18 | | plastics that are not sealed in a manner that conceals waste; |
19 | | electrical
wiring and components containing no hazardous |
20 | | substances; and corrugated cardboard, piping or metals
|
21 | | incidental to any of those materials. |
22 | | General construction or demolition debris does not include |
23 | | uncontaminated
soil generated during construction, remodeling, |
|
| | SB1089 Engrossed | - 2 - | LRB102 04912 CPF 14931 b |
|
|
1 | | repair, and demolition of
utilities, structures, and roads |
2 | | provided the uncontaminated soil is not
commingled with any |
3 | | general construction or demolition debris or other waste. |
4 | | To the extent allowed by federal law, uncontaminated |
5 | | concrete with protruding rebar shall be considered clean |
6 | | construction or demolition debris and shall not be considered |
7 | | "waste" if it is separated or processed and returned to the |
8 | | economic mainstream in the form of raw materials or products |
9 | | within 4 years of its generation, if it is not speculatively |
10 | | accumulated and, if used as a fill material, it is used in |
11 | | accordance with item (i) in subsection (b) of this Section.
|
12 | | (a-1) "General construction or demolition debris recovery |
13 | | facility" means a site or facility used to store or treat |
14 | | exclusively general construction or demolition debris, |
15 | | including, but not limited to, sorting, separating, or |
16 | | transferring, for recycling, reclamation, or reuse. For |
17 | | purposes of this definition, treatment includes altering the |
18 | | physical nature of the general construction or demolition |
19 | | debris, such as by size reduction, crushing, grinding, or |
20 | | homogenization, but does not include treatment designed to |
21 | | change the chemical nature of the general construction or |
22 | | demolition debris. |
23 | | (b) "Clean construction or demolition debris" means
|
24 | | uncontaminated broken concrete without protruding metal bars, |
25 | | bricks, rock,
stone, reclaimed or other asphalt pavement, or |
26 | | soil generated from construction or
demolition activities. |
|
| | SB1089 Engrossed | - 3 - | LRB102 04912 CPF 14931 b |
|
|
1 | | Clean construction or demolition debris does not include |
2 | | uncontaminated soil
generated during construction, remodeling, |
3 | | repair, and demolition of utilities,
structures, and roads |
4 | | provided the uncontaminated soil is not commingled with
any |
5 | | clean construction or demolition debris or other waste. |
6 | | To the extent allowed by federal law, clean construction |
7 | | or demolition debris
shall not be considered "waste" if it is |
8 | | (i) used as fill material outside of a setback zone if the fill |
9 | | is placed no higher than the
highest point of elevation |
10 | | existing prior to the filling immediately adjacent
to the fill |
11 | | area, and if covered by sufficient uncontaminated soil to
|
12 | | support vegetation within 30 days of the completion of filling |
13 | | or if covered
by a road or structure, and, if used as fill |
14 | | material in a current or former quarry, mine, or other |
15 | | excavation, is used in accordance with the requirements of |
16 | | Section 22.51 of this Act and the rules adopted thereunder or |
17 | | (ii) separated or processed and returned to the
economic |
18 | | mainstream in the form of raw materials or products, if it is |
19 | | not
speculatively accumulated and, if used as a fill material, |
20 | | it is used in
accordance with item (i), or (iii) solely
broken |
21 | | concrete without protruding metal bars used for erosion |
22 | | control, or
(iv) generated from the construction or demolition |
23 | | of a building, road, or
other structure and used to construct, |
24 | | on the site where the construction or
demolition has taken |
25 | | place, a manmade
functional structure not to exceed 20 feet |
26 | | above the highest point of
elevation of the property |
|
| | SB1089 Engrossed | - 4 - | LRB102 04912 CPF 14931 b |
|
|
1 | | immediately adjacent to the new manmade functional
structure |
2 | | as that elevation existed prior to the creation of that new
|
3 | | structure,
provided that the structure shall be covered with |
4 | | sufficient soil
materials to sustain vegetation or by a road |
5 | | or structure, and further
provided that no such structure |
6 | | shall be constructed within
a home rule municipality with a |
7 | | population over 500,000 without the consent
of the |
8 | | municipality.
|
9 | | For purposes of this subsection (b), reclaimed or other |
10 | | asphalt pavement shall not be considered speculatively |
11 | | accumulated if: (i) it is not commingled with any other clean |
12 | | construction or demolition debris or any waste; (ii) it is |
13 | | returned to the economic mainstream in the form of raw |
14 | | materials or products within 4 years after its generation; |
15 | | (iii) at least 25% of the total amount present at a site during |
16 | | a calendar year is transported off of the site during the next |
17 | | calendar year; and (iv) if used as a fill material, it is used |
18 | | in accordance with item (i) of the second paragraph of this |
19 | | subsection (b).
|
20 | | (c) For purposes of this Section, the term "uncontaminated |
21 | | soil" means soil that does not contain contaminants in |
22 | | concentrations that pose a threat to human health and safety |
23 | | and the environment. |
24 | | (1) No later than one year after the effective date of |
25 | | this amendatory Act of the 96th General Assembly, the |
26 | | Agency shall propose, and, no later than one year after |
|
| | SB1089 Engrossed | - 5 - | LRB102 04912 CPF 14931 b |
|
|
1 | | receipt of the Agency's proposal, the Board shall adopt, |
2 | | rules specifying the maximum concentrations of |
3 | | contaminants that may be present in uncontaminated soil |
4 | | for purposes of this Section. For carcinogens, the maximum |
5 | | concentrations shall not allow exposure to exceed an |
6 | | excess upper-bound lifetime risk of 1 in 1,000,000; |
7 | | provided that if the most stringent remediation objective |
8 | | or applicable background concentration for a contaminant |
9 | | set forth in 35 Ill. Adm. Code 742 is greater than the |
10 | | concentration that would allow exposure at an excess |
11 | | upper-bound lifetime risk of 1 in 1,000,000, the Board may |
12 | | consider allowing that contaminant in concentrations up to |
13 | | its most stringent remediation objective or applicable |
14 | | background concentration set forth in 35 Ill. Adm. Code |
15 | | 742 in soil used as fill material in a current or former |
16 | | quarry, mine, or other excavation in accordance with |
17 | | Section 22.51 or 22.51a of this Act and rules adopted |
18 | | under those Sections. Any background concentration set |
19 | | forth in 35 Ill. Adm. Code 742 that is adopted as a maximum |
20 | | concentration must be based upon the location of the |
21 | | quarry, mine, or other excavation where the soil is used |
22 | | as fill material. |
23 | | (2) To the extent allowed under federal law and |
24 | | regulations, uncontaminated soil shall not be considered a |
25 | | waste. |
26 | | (Source: P.A. 96-235, eff. 8-11-09; 96-1416, eff. 7-30-10; |
|
| | SB1089 Engrossed | - 6 - | LRB102 04912 CPF 14931 b |
|
|
1 | | 97-137, eff. 7-14-11.)
|
2 | | (415 ILCS 5/3.330) (was 415 ILCS 5/3.32)
|
3 | | Sec. 3.330. Pollution control facility.
|
4 | | (a) "Pollution control facility" is any waste storage |
5 | | site, sanitary
landfill, waste disposal site, waste transfer |
6 | | station, waste treatment
facility, or waste incinerator. This |
7 | | includes sewers, sewage treatment
plants, and any other |
8 | | facilities owned or operated by sanitary districts
organized |
9 | | under the Metropolitan Water Reclamation District Act.
|
10 | | The following are not pollution control facilities:
|
11 | | (1) (blank);
|
12 | | (2) waste storage sites regulated under 40 CFR, Part |
13 | | 761.42;
|
14 | | (3) sites or facilities used by any person conducting |
15 | | a waste storage,
waste treatment, waste disposal, waste |
16 | | transfer or waste incineration
operation, or a combination |
17 | | thereof, for wastes generated by such person's
own |
18 | | activities, when such wastes are stored, treated, disposed |
19 | | of,
transferred or incinerated within the site or facility |
20 | | owned, controlled or
operated by such person, or when such |
21 | | wastes are transported within or
between sites or |
22 | | facilities owned, controlled or operated by such person;
|
23 | | (4) sites or facilities at which the State is |
24 | | performing removal or
remedial action pursuant to Section |
25 | | 22.2 or 55.3;
|
|
| | SB1089 Engrossed | - 7 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (5) abandoned quarries used solely for the disposal of |
2 | | concrete, earth
materials, gravel, or aggregate debris |
3 | | resulting from road construction
activities conducted by a |
4 | | unit of government or construction activities due
to the |
5 | | construction and installation of underground pipes, lines, |
6 | | conduit
or wires off of the premises of a public utility |
7 | | company which are
conducted by a public utility;
|
8 | | (6) sites or facilities used by any person to |
9 | | specifically conduct a
landscape composting operation;
|
10 | | (7) regional facilities as defined in the Central |
11 | | Midwest Interstate
Low-Level Radioactive Waste Compact;
|
12 | | (8) the portion of a site or facility where coal |
13 | | combustion wastes are
stored or disposed of in accordance |
14 | | with subdivision (r)(2) or (r)(3) of
Section 21;
|
15 | | (9) the portion of a site or facility used for the |
16 | | collection,
storage or processing of waste tires as |
17 | | defined in Title XIV;
|
18 | | (10) the portion of a site or facility used for |
19 | | treatment of
petroleum contaminated materials by |
20 | | application onto or incorporation into
the soil surface |
21 | | and any portion of that site or facility used for storage
|
22 | | of petroleum contaminated materials before treatment. Only |
23 | | those categories
of petroleum listed in Section
57.9(a)(3) |
24 | | are exempt under this subdivision (10);
|
25 | | (11) the portion of a site or facility where used oil |
26 | | is collected or
stored prior to shipment to a recycling or |
|
| | SB1089 Engrossed | - 8 - | LRB102 04912 CPF 14931 b |
|
|
1 | | energy recovery facility, provided
that the used oil is |
2 | | generated by households or commercial establishments, and
|
3 | | the site or facility is a recycling center or a business |
4 | | where oil or gasoline
is sold at retail; |
5 | | (11.5) processing sites or facilities that receive |
6 | | only on-specification used oil, as defined in 35 Ill. |
7 | | Admin. Code 739, originating from used oil collectors for |
8 | | processing that is managed under 35 Ill. Admin. Code 739 |
9 | | to produce products for sale to off-site petroleum |
10 | | facilities, if these processing sites or facilities are: |
11 | | (i) located within a home rule unit of local government |
12 | | with a population of at least 30,000 according to the 2000 |
13 | | federal census, that home rule unit of local government |
14 | | has been designated as an Urban Round II Empowerment Zone |
15 | | by the United States Department of Housing and Urban |
16 | | Development, and that home rule unit of local government |
17 | | has enacted an ordinance approving the location of the |
18 | | site or facility and provided funding for the site or |
19 | | facility; and (ii) in compliance with all applicable |
20 | | zoning requirements;
|
21 | | (12) the portion of a site or facility utilizing coal |
22 | | combustion waste
for stabilization and treatment of only |
23 | | waste generated on that site or
facility when used in |
24 | | connection with response actions pursuant to the federal
|
25 | | Comprehensive Environmental Response, Compensation, and |
26 | | Liability Act of 1980,
the federal Resource Conservation |
|
| | SB1089 Engrossed | - 9 - | LRB102 04912 CPF 14931 b |
|
|
1 | | and Recovery Act of 1976, or the Illinois
Environmental |
2 | | Protection Act or as authorized by the Agency;
|
3 | | (13) the portion of a site or facility regulated under |
4 | | that accepts exclusively general
construction or |
5 | | demolition debris and is operated and located in |
6 | | accordance with Section 22.38 of this Act; |
7 | | (14) the portion of a site or facility, located within |
8 | | a unit of local government that has enacted local zoning |
9 | | requirements, used to accept, separate, and process |
10 | | uncontaminated broken concrete, with or without protruding |
11 | | metal bars, provided that the uncontaminated broken |
12 | | concrete and metal bars are not speculatively accumulated, |
13 | | are at the site or facility no longer than one year after |
14 | | their acceptance, and are returned to the economic |
15 | | mainstream in the form of raw materials or products;
|
16 | | (15) the portion of a site or facility located in a |
17 | | county with a population over 3,000,000 that has obtained |
18 | | local siting approval under Section 39.2 of this Act for a |
19 | | municipal waste incinerator on or before July 1, 2005 and |
20 | | that is used for a non-hazardous waste transfer station;
|
21 | | (16) a site or facility that temporarily holds in |
22 | | transit for 10 days or less, non-putrescible solid waste |
23 | | in original containers, no larger in capacity than 500 |
24 | | gallons, provided that such waste is further transferred |
25 | | to a recycling, disposal, treatment, or storage facility |
26 | | on a non-contiguous site and provided such site or |
|
| | SB1089 Engrossed | - 10 - | LRB102 04912 CPF 14931 b |
|
|
1 | | facility complies with the applicable 10-day transfer |
2 | | requirements of the federal Resource Conservation and |
3 | | Recovery Act of 1976 and United States Department of |
4 | | Transportation hazardous material requirements. For |
5 | | purposes of this Section only, "non-putrescible solid |
6 | | waste" means waste other than municipal garbage that does |
7 | | not rot or become putrid, including, but not limited to, |
8 | | paints, solvent, filters, and absorbents;
|
9 | | (17)
the portion of a site or facility located in a |
10 | | county with a population greater than 3,000,000 that has |
11 | | obtained local siting approval, under Section 39.2 of this |
12 | | Act, for a municipal waste incinerator on or before July |
13 | | 1, 2005 and that is used for wood combustion facilities |
14 | | for energy recovery that accept and burn only wood |
15 | | material, as included in a fuel specification approved by |
16 | | the Agency;
|
17 | | (18)
a transfer station used exclusively for landscape |
18 | | waste, including a transfer station where landscape waste |
19 | | is ground to reduce its volume, where the landscape waste |
20 | | is held no longer than 24 hours from the time it was |
21 | | received; |
22 | | (19) the portion of a site or facility that (i) is used |
23 | | for the composting of food scrap, livestock waste, crop |
24 | | residue, uncontaminated wood waste, or paper waste, |
25 | | including, but not limited to, corrugated paper or |
26 | | cardboard, and (ii) meets all of the following |
|
| | SB1089 Engrossed | - 11 - | LRB102 04912 CPF 14931 b |
|
|
1 | | requirements: |
2 | | (A) There must not be more than a total of 30,000 |
3 | | cubic yards of livestock waste in raw form or in the |
4 | | process of being composted at the site or facility at |
5 | | any one time. |
6 | | (B) All food scrap, livestock waste, crop residue, |
7 | | uncontaminated wood waste, and paper waste must, by |
8 | | the end of each operating day, be processed and placed |
9 | | into an enclosed vessel in which air flow and |
10 | | temperature are controlled, or all of the following |
11 | | additional requirements must be met: |
12 | | (i) The portion of the site or facility used |
13 | | for the composting operation must include a |
14 | | setback of at least 200 feet from the nearest |
15 | | potable water supply well. |
16 | | (ii) The portion of the site or facility used |
17 | | for the composting operation must be located |
18 | | outside the boundary of the 10-year floodplain or |
19 | | floodproofed. |
20 | | (iii) Except in municipalities with more than |
21 | | 1,000,000 inhabitants, the portion of the site or |
22 | | facility used for the composting operation must be |
23 | | located at least one-eighth of a mile from the |
24 | | nearest residence, other than a residence located |
25 | | on the same property as the site or facility. |
26 | | (iv) The portion of the site or facility used |
|
| | SB1089 Engrossed | - 12 - | LRB102 04912 CPF 14931 b |
|
|
1 | | for the composting operation must be located at |
2 | | least one-eighth of a mile from the property line |
3 | | of all of the following areas: |
4 | | (I) Facilities that primarily serve to |
5 | | house or treat people that are |
6 | | immunocompromised or immunosuppressed, such as |
7 | | cancer or AIDS patients; people with asthma, |
8 | | cystic fibrosis, or bioaerosol allergies; or |
9 | | children under the age of one year. |
10 | | (II) Primary and secondary schools and |
11 | | adjacent areas that the schools use for |
12 | | recreation. |
13 | | (III) Any facility for child care licensed |
14 | | under Section 3 of the Child Care Act of 1969; |
15 | | preschools; and adjacent areas that the |
16 | | facilities or preschools use for recreation. |
17 | | (v) By the end of each operating day, all food |
18 | | scrap, livestock waste, crop residue, |
19 | | uncontaminated wood waste, and paper waste must be |
20 | | (i) processed into windrows or other piles and |
21 | | (ii) covered in a manner that prevents scavenging |
22 | | by birds and animals and that prevents other |
23 | | nuisances. |
24 | | (C) Food scrap, livestock waste, crop residue, |
25 | | uncontaminated wood waste, paper waste, and compost |
26 | | must not be placed within 5 feet of the water table. |
|
| | SB1089 Engrossed | - 13 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (D) The site or facility must meet all of the |
2 | | requirements of the Wild and Scenic Rivers Act (16 |
3 | | U.S.C. 1271 et seq.). |
4 | | (E) The site or facility must not (i) restrict the |
5 | | flow of a 100-year flood, (ii) result in washout of |
6 | | food scrap, livestock waste, crop residue, |
7 | | uncontaminated wood waste, or paper waste from a |
8 | | 100-year flood, or (iii) reduce the temporary water |
9 | | storage capacity of the 100-year floodplain, unless |
10 | | measures are undertaken to provide alternative storage |
11 | | capacity, such as by providing lagoons, holding tanks, |
12 | | or drainage around structures at the facility. |
13 | | (F) The site or facility must not be located in any |
14 | | area where it may pose a threat of harm or destruction |
15 | | to the features for which: |
16 | | (i) an irreplaceable historic or |
17 | | archaeological site has been listed under the |
18 | | National Historic Preservation Act (16 U.S.C. 470 |
19 | | et seq.) or the Illinois Historic Preservation |
20 | | Act; |
21 | | (ii) a natural landmark has been designated by |
22 | | the National Park Service or the Illinois State |
23 | | Historic Preservation Office; or |
24 | | (iii) a natural area has been designated as a |
25 | | Dedicated Illinois Nature Preserve under the |
26 | | Illinois Natural Areas Preservation Act. |
|
| | SB1089 Engrossed | - 14 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (G) The site or facility must not be located in an |
2 | | area where it may jeopardize the continued existence |
3 | | of any designated endangered species, result in the |
4 | | destruction or adverse modification of the critical |
5 | | habitat for such species, or cause or contribute to |
6 | | the taking of any endangered or threatened species of |
7 | | plant, fish, or wildlife listed under the Endangered |
8 | | Species Act (16 U.S.C. 1531 et seq.) or the Illinois |
9 | | Endangered Species Protection Act; |
10 | | (20) the portion of a site or facility that is located |
11 | | entirely within a home rule unit having a population of no |
12 | | less than 120,000 and no more than 135,000, according to |
13 | | the 2000 federal census, and that meets all of the |
14 | | following requirements: |
15 | | (i) the portion of the site or facility is used |
16 | | exclusively to perform testing of a thermochemical |
17 | | conversion technology using only woody biomass, |
18 | | collected as landscape waste within the boundaries of |
19 | | the home rule unit, as the hydrocarbon feedstock for |
20 | | the production of synthetic gas in accordance with |
21 | | Section 39.9 of this Act; |
22 | | (ii) the portion of the site or facility is in |
23 | | compliance with all applicable zoning requirements; |
24 | | and |
25 | | (iii) a complete application for a demonstration |
26 | | permit at the portion of the site or facility has been |
|
| | SB1089 Engrossed | - 15 - | LRB102 04912 CPF 14931 b |
|
|
1 | | submitted to the Agency in accordance with Section |
2 | | 39.9 of this Act within one year after July 27, 2010 |
3 | | (the effective date of Public Act 96-1314); |
4 | | (21) the portion of a site or facility used to perform |
5 | | limited testing of a gasification conversion technology in |
6 | | accordance with Section 39.8 of this Act and for which a |
7 | | complete permit application has been submitted to the |
8 | | Agency prior to one year from April 9, 2010 (the effective |
9 | | date of Public Act 96-887);
|
10 | | (22) the portion of a site or facility that is used to |
11 | | incinerate only pharmaceuticals from residential sources |
12 | | that are collected and transported by law enforcement |
13 | | agencies under Section 17.9A of this Act; |
14 | | (23) the portion of a site or facility: |
15 | | (A) that is used exclusively for the transfer of |
16 | | commingled landscape waste and food scrap held at the |
17 | | site or facility for no longer than 24 hours after |
18 | | their receipt; |
19 | | (B) that is located entirely within a home rule |
20 | | unit having a population of (i) not less than 100,000 |
21 | | and not more than 115,000 according to the 2010 |
22 | | federal census, (ii) not less than 5,000 and not more |
23 | | than 10,000 according to the 2010 federal census, or |
24 | | (iii) not less than 25,000 and not more than 30,000 |
25 | | according to the 2010 federal census or that is |
26 | | located in the unincorporated area of a county having |
|
| | SB1089 Engrossed | - 16 - | LRB102 04912 CPF 14931 b |
|
|
1 | | a population of not less than 700,000 and not more than |
2 | | 705,000 according to the 2010 federal census; |
3 | | (C) that is permitted, by the Agency, prior to |
4 | | January 1, 2002, for the transfer of landscape waste |
5 | | if located in a home rule unit or that is permitted |
6 | | prior to January 1, 2008 if located in an |
7 | | unincorporated area of a county; and |
8 | | (D) for which a permit application is submitted to |
9 | | the Agency to modify an existing permit for the |
10 | | transfer of landscape waste to also include, on a |
11 | | demonstration basis not to exceed 24 months each time |
12 | | a permit is issued, the transfer of commingled |
13 | | landscape waste and food scrap or for which a permit |
14 | | application is submitted to the Agency within 6 months |
15 | | of the effective date of this amendatory Act of the |
16 | | 100th General Assembly; and |
17 | | (24) the portion of a municipal solid waste landfill |
18 | | unit: |
19 | | (A) that is located in a county having a |
20 | | population of not less than 55,000 and not more than |
21 | | 60,000 according to the 2010 federal census; |
22 | | (B) that is owned by that county; |
23 | | (C) that is permitted, by the Agency, prior to |
24 | | July 10, 2015 (the effective date of Public Act |
25 | | 99-12); and |
26 | | (D) for which a permit application is submitted to |
|
| | SB1089 Engrossed | - 17 - | LRB102 04912 CPF 14931 b |
|
|
1 | | the Agency within 6 months after July 10, 2015 (the |
2 | | effective date of Public Act 99-12) for the disposal |
3 | | of non-hazardous special waste. |
4 | | (b) A new pollution control facility is:
|
5 | | (1) a pollution control facility initially permitted |
6 | | for development or
construction after July 1, 1981; or
|
7 | | (2) the area of expansion beyond the boundary of a |
8 | | currently permitted
pollution control facility; or
|
9 | | (3) a permitted pollution control facility requesting |
10 | | approval to
store, dispose of, transfer or incinerate, for |
11 | | the first time, any special
or hazardous waste.
|
12 | | (Source: P.A. 99-12, eff. 7-10-15; 99-440, eff. 8-21-15; |
13 | | 99-642, eff. 7-28-16; 100-94, eff. 8-11-17.)
|
14 | | (415 ILCS 5/21) (from Ch. 111 1/2, par. 1021)
|
15 | | Sec. 21. Prohibited acts. No person shall:
|
16 | | (a) Cause or allow the open dumping of any waste.
|
17 | | (b) Abandon, dump, or deposit any waste upon the public |
18 | | highways or
other public property, except in a sanitary |
19 | | landfill approved by the
Agency pursuant to regulations |
20 | | adopted by the Board.
|
21 | | (c) Abandon any vehicle in violation of the "Abandoned |
22 | | Vehicles
Amendment to the Illinois Vehicle Code", as enacted |
23 | | by the 76th General
Assembly.
|
24 | | (d) Conduct any waste-storage, waste-treatment, or |
25 | | waste-disposal
operation:
|
|
| | SB1089 Engrossed | - 18 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (1) without a permit granted by the Agency or in |
2 | | violation of any
conditions imposed by such permit, |
3 | | including periodic reports and full
access to adequate |
4 | | records and the inspection of facilities, as may be
|
5 | | necessary to assure compliance with this Act and with |
6 | | regulations and
standards adopted thereunder; provided, |
7 | | however, that, except for municipal
solid waste landfill |
8 | | units that receive waste on or after October 9, 1993, and |
9 | | CCR surface impoundments,
no permit shall be
required for |
10 | | (i) any person conducting a waste-storage, |
11 | | waste-treatment, or
waste-disposal operation for wastes |
12 | | generated by such person's own
activities which are |
13 | | stored, treated, or disposed within the site where
such |
14 | | wastes are generated, or (ii) until one year after the |
15 | | effective date of rules adopted by the Board under |
16 | | subsection (n) of Section 22.38,
a facility located in a |
17 | | county with a
population over 700,000 as of January 1, |
18 | | 2000, operated and located in accordance with
Section |
19 | | 22.38 of this Act, and used exclusively for the transfer, |
20 | | storage, or
treatment of general construction or |
21 | | demolition debris, provided that the facility was |
22 | | receiving construction or demolition debris on August 24, |
23 | | 2009 ( the effective date of Public Act 96-611) this |
24 | | amendatory Act of the 96th General Assembly ;
|
25 | | (2) in violation of any regulations or standards |
26 | | adopted by the
Board under this Act; or
|
|
| | SB1089 Engrossed | - 19 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (3) which receives waste after August 31, 1988, does |
2 | | not have a permit
issued by the Agency, and is (i) a |
3 | | landfill used exclusively for the
disposal of waste |
4 | | generated at the site, (ii) a surface impoundment
|
5 | | receiving special waste not listed in an NPDES permit, |
6 | | (iii) a waste pile
in which the total volume of waste is |
7 | | greater than 100 cubic yards or the
waste is stored for |
8 | | over one year, or (iv) a land treatment facility
receiving |
9 | | special waste generated at the site; without giving notice |
10 | | of the
operation to the Agency by January 1, 1989, or 30 |
11 | | days after the date on
which the operation commences, |
12 | | whichever is later, and every 3 years
thereafter. The form |
13 | | for such notification shall be specified by the
Agency, |
14 | | and shall be limited to information regarding: the name |
15 | | and address
of the location of the operation; the type of |
16 | | operation; the types and
amounts of waste stored, treated |
17 | | or disposed of on an annual basis; the
remaining capacity |
18 | | of the operation; and the remaining expected life of
the |
19 | | operation.
|
20 | | Item (3) of this subsection (d) shall not apply to any |
21 | | person
engaged in agricultural activity who is disposing of a |
22 | | substance that
constitutes solid waste, if the substance was |
23 | | acquired for use by that
person on his own property, and the |
24 | | substance is disposed of on his own
property in accordance |
25 | | with regulations or standards adopted by the Board.
|
26 | | This subsection (d) shall not apply to hazardous waste.
|
|
| | SB1089 Engrossed | - 20 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (e) Dispose, treat, store or abandon any waste, or |
2 | | transport any waste
into this State for disposal, treatment, |
3 | | storage or abandonment, except at
a site or facility which |
4 | | meets the requirements of this Act and of
regulations and |
5 | | standards thereunder.
|
6 | | (f) Conduct any hazardous waste-storage, hazardous |
7 | | waste-treatment or
hazardous waste-disposal operation:
|
8 | | (1) without a RCRA permit for the site issued by the |
9 | | Agency under
subsection (d) of Section 39 of this Act, or |
10 | | in violation of any condition
imposed by such permit, |
11 | | including periodic reports and full access to
adequate |
12 | | records and the inspection of facilities, as may be |
13 | | necessary to
assure compliance with this Act and with |
14 | | regulations and standards adopted
thereunder; or
|
15 | | (2) in violation of any regulations or standards |
16 | | adopted by the Board
under this Act; or
|
17 | | (3) in violation of any RCRA permit filing requirement |
18 | | established under
standards adopted by the Board under |
19 | | this Act; or
|
20 | | (4) in violation of any order adopted by the Board |
21 | | under this Act.
|
22 | | Notwithstanding the above, no RCRA permit shall be |
23 | | required under this
subsection or subsection (d) of Section 39 |
24 | | of this Act for any
person engaged in agricultural activity |
25 | | who is disposing of a substance
which has been identified as a |
26 | | hazardous waste, and which has been
designated by Board |
|
| | SB1089 Engrossed | - 21 - | LRB102 04912 CPF 14931 b |
|
|
1 | | regulations as being subject to this exception, if the
|
2 | | substance was acquired for use by that person on his own |
3 | | property and the
substance is disposed of on his own property |
4 | | in accordance with regulations
or standards adopted by the |
5 | | Board.
|
6 | | (g) Conduct any hazardous waste-transportation operation:
|
7 | | (1) without registering with and obtaining a special |
8 | | waste hauling permit from the Agency in
accordance with |
9 | | the regulations adopted by the Board under this Act; or
|
10 | | (2) in violation of any regulations or standards |
11 | | adopted by
the
Board under this Act.
|
12 | | (h) Conduct any hazardous waste-recycling or hazardous |
13 | | waste-reclamation
or hazardous waste-reuse operation in |
14 | | violation of any regulations, standards
or permit requirements |
15 | | adopted by the Board under this Act.
|
16 | | (i) Conduct any process or engage in any act which |
17 | | produces hazardous
waste in violation of any regulations or |
18 | | standards adopted by the Board
under subsections (a) and (c) |
19 | | of Section 22.4 of this Act.
|
20 | | (j) Conduct any special waste-transportation waste |
21 | | transportation operation in violation
of any regulations, |
22 | | standards or permit requirements adopted by the Board
under |
23 | | this Act. However, sludge from a water or sewage treatment |
24 | | plant
owned and operated by a unit of local government which |
25 | | (1) is subject to a
sludge management plan approved by the |
26 | | Agency or a permit granted by the
Agency, and (2) has been |
|
| | SB1089 Engrossed | - 22 - | LRB102 04912 CPF 14931 b |
|
|
1 | | tested and determined not to be a hazardous waste
as required |
2 | | by applicable State and federal laws and regulations, may be
|
3 | | transported in this State without a special waste hauling |
4 | | permit, and the
preparation and carrying of a manifest shall |
5 | | not be required for such
sludge under the rules of the |
6 | | Pollution Control Board. The unit of local
government which |
7 | | operates the treatment plant producing such sludge shall
file |
8 | | an annual report with the Agency identifying the volume of |
9 | | such
sludge transported during the reporting period, the |
10 | | hauler of the sludge,
and the disposal sites to which it was |
11 | | transported. This subsection (j)
shall not apply to hazardous |
12 | | waste.
|
13 | | (k) Fail or refuse to pay any fee imposed under this Act.
|
14 | | (l) Locate a hazardous waste disposal site above an active |
15 | | or
inactive shaft or tunneled mine or within 2 miles of an |
16 | | active fault in
the earth's crust. In counties of population |
17 | | less than 225,000 no
hazardous waste disposal site shall be |
18 | | located (1) within 1 1/2 miles of
the corporate limits as |
19 | | defined on June 30, 1978, of any municipality
without the |
20 | | approval of the governing body of the municipality in an
|
21 | | official action; or (2) within 1000 feet of an existing |
22 | | private well or
the existing source of a public water supply |
23 | | measured from the boundary
of the actual active permitted site |
24 | | and excluding existing private wells
on the property of the |
25 | | permit applicant. The provisions of this
subsection do not |
26 | | apply to publicly owned publicly-owned sewage works or the |
|
| | SB1089 Engrossed | - 23 - | LRB102 04912 CPF 14931 b |
|
|
1 | | disposal
or utilization of sludge from publicly owned |
2 | | publicly-owned sewage works.
|
3 | | (m) Transfer interest in any land which has been used as a
|
4 | | hazardous waste disposal site without written notification to |
5 | | the Agency
of the transfer and to the transferee of the |
6 | | conditions imposed by the Agency
upon its use under subsection |
7 | | (g) of Section 39.
|
8 | | (n) Use any land which has been used as a hazardous waste
|
9 | | disposal site except in compliance with conditions imposed by |
10 | | the Agency
under subsection (g) of Section 39.
|
11 | | (o) Conduct a sanitary landfill operation which is |
12 | | required to have a
permit under subsection (d) of this |
13 | | Section, in a manner which results in
any of the following |
14 | | conditions:
|
15 | | (1) refuse in standing or flowing waters;
|
16 | | (2) leachate flows entering waters of the State;
|
17 | | (3) leachate flows exiting the landfill confines (as |
18 | | determined by the
boundaries established for the landfill |
19 | | by a permit issued by the Agency);
|
20 | | (4) open burning of refuse in violation of Section 9 |
21 | | of this Act;
|
22 | | (5) uncovered refuse remaining from any previous |
23 | | operating day or at the
conclusion of any operating day, |
24 | | unless authorized by permit;
|
25 | | (6) failure to provide final cover within time limits |
26 | | established by
Board regulations;
|
|
| | SB1089 Engrossed | - 24 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (7) acceptance of wastes without necessary permits;
|
2 | | (8) scavenging as defined by Board regulations;
|
3 | | (9) deposition of refuse in any unpermitted portion of |
4 | | the landfill;
|
5 | | (10) acceptance of a special waste without a required |
6 | | manifest;
|
7 | | (11) failure to submit reports required by permits or |
8 | | Board regulations;
|
9 | | (12) failure to collect and contain litter from the |
10 | | site by the end of
each operating day;
|
11 | | (13) failure to submit any cost estimate for the site |
12 | | or any performance
bond or other security for the site as |
13 | | required by this Act or Board rules.
|
14 | | The prohibitions specified in this subsection (o) shall be |
15 | | enforceable by
the Agency either by administrative citation |
16 | | under Section 31.1 of this Act
or as otherwise provided by this |
17 | | Act. The specific prohibitions in this
subsection do not limit |
18 | | the power of the Board to establish regulations
or standards |
19 | | applicable to sanitary landfills.
|
20 | | (p) In violation of subdivision (a) of this Section, cause |
21 | | or allow the
open dumping of any waste in a manner which |
22 | | results in any of the following
occurrences at the dump site:
|
23 | | (1) litter;
|
24 | | (2) scavenging;
|
25 | | (3) open burning;
|
26 | | (4) deposition of waste in standing or flowing waters;
|
|
| | SB1089 Engrossed | - 25 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (5) proliferation of disease vectors;
|
2 | | (6) standing or flowing liquid discharge from the dump |
3 | | site;
|
4 | | (7) deposition of:
|
5 | | (i) general construction or demolition debris as |
6 | | defined in Section
3.160(a) of this Act; or
|
7 | | (ii) clean construction or demolition debris as |
8 | | defined in Section
3.160(b) of this Act.
|
9 | | The prohibitions specified in this subsection (p) shall be
|
10 | | enforceable by the Agency either by administrative citation |
11 | | under Section
31.1 of this Act or as otherwise provided by this |
12 | | Act. The specific
prohibitions in this subsection do not limit |
13 | | the power of the Board to
establish regulations or standards |
14 | | applicable to open dumping.
|
15 | | (q) Conduct a landscape waste composting operation without |
16 | | an Agency
permit, provided, however, that no permit shall be |
17 | | required for any person:
|
18 | | (1) conducting a landscape waste composting operation |
19 | | for landscape
wastes generated by such person's own |
20 | | activities which are stored, treated,
or disposed of |
21 | | within the site where such wastes are generated; or
|
22 | | (1.5) conducting a landscape waste composting |
23 | | operation that (i) has no more than 25 cubic yards of |
24 | | landscape waste, composting additives, composting |
25 | | material, or end-product compost on-site at any one time |
26 | | and (ii) is not engaging in commercial activity; or |
|
| | SB1089 Engrossed | - 26 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (2) applying landscape waste or composted landscape |
2 | | waste at agronomic
rates; or
|
3 | | (2.5) operating a landscape waste composting facility |
4 | | at a site having 10 or more occupied non-farm residences |
5 | | within 1/2 mile of its boundaries, if the facility meets |
6 | | all of the following criteria: |
7 | | (A) the composting facility is operated by the |
8 | | farmer on property on which the composting material is |
9 | | utilized, and the composting facility
constitutes no |
10 | | more than 2% of the site's total acreage; |
11 | | (A-5) any composting additives that the composting |
12 | | facility accepts and uses at the facility are |
13 | | necessary to provide proper conditions for composting |
14 | | and do not exceed 10% of the total composting material |
15 | | at the facility at any one time; |
16 | | (B) the property on which the composting facility |
17 | | is located, and any associated property on which the |
18 | | compost is used, is principally and diligently devoted |
19 | | to the production of agricultural crops and is not |
20 | | owned, leased, or otherwise controlled by any waste |
21 | | hauler or generator of nonagricultural compost |
22 | | materials, and the operator of the composting facility |
23 | | is not an employee, partner, shareholder, or in any |
24 | | way connected with or controlled by any such waste |
25 | | hauler or generator; |
26 | | (C) all compost generated by the composting |
|
| | SB1089 Engrossed | - 27 - | LRB102 04912 CPF 14931 b |
|
|
1 | | facility is applied at agronomic rates and used as |
2 | | mulch, fertilizer, or soil conditioner on land |
3 | | actually farmed by the person operating the composting |
4 | | facility, and the finished compost is not stored at |
5 | | the composting site for a period longer than 18 months |
6 | | prior to its application as mulch, fertilizer, or soil |
7 | | conditioner; |
8 | | (D) no fee is charged for the acceptance of |
9 | | materials to be composted at the facility; and |
10 | | (E) the owner or operator, by January 1, 2014 (or |
11 | | the January 1
following commencement of operation, |
12 | | whichever is later) and January 1 of
each year |
13 | | thereafter, registers the site with the Agency, (ii) |
14 | | reports to the Agency on the volume of composting |
15 | | material received and used at the site; (iii) |
16 | | certifies to the Agency that the site complies with |
17 | | the
requirements set forth in subparagraphs (A), |
18 | | (A-5), (B), (C), and (D) of this paragraph
(2.5); and |
19 | | (iv) certifies to the Agency that all composting |
20 | | material was placed more than 200 feet from the |
21 | | nearest potable water supply well, was placed outside |
22 | | the boundary of the 10-year floodplain or on a part of |
23 | | the site that is floodproofed, was placed at least 1/4 |
24 | | mile from the nearest residence (other than a |
25 | | residence located on the same property as the |
26 | | facility) or a lesser distance from the nearest |
|
| | SB1089 Engrossed | - 28 - | LRB102 04912 CPF 14931 b |
|
|
1 | | residence (other than a residence located on the same |
2 | | property as the facility) if the municipality in which |
3 | | the facility is located has by ordinance approved a |
4 | | lesser distance than 1/4 mile, and was placed more |
5 | | than 5 feet above the water table; any ordinance |
6 | | approving a residential setback of less than 1/4 mile |
7 | | that is used to meet the requirements of this |
8 | | subparagraph (E) of paragraph (2.5) of this subsection |
9 | | must specifically reference this paragraph; or |
10 | | (3) operating a landscape waste composting facility on |
11 | | a farm, if the
facility meets all of the following |
12 | | criteria:
|
13 | | (A) the composting facility is operated by the |
14 | | farmer on property on
which the composting material is |
15 | | utilized, and the composting facility
constitutes no |
16 | | more than 2% of the property's total acreage, except |
17 | | that
the Board may allow a higher percentage for |
18 | | individual sites where the owner
or operator has |
19 | | demonstrated to the Board that the site's soil
|
20 | | characteristics or crop needs require a higher rate;
|
21 | | (A-1) the composting facility accepts from other |
22 | | agricultural operations for composting with landscape |
23 | | waste no materials other than uncontaminated and |
24 | | source-separated (i) crop residue and other |
25 | | agricultural plant residue generated from the |
26 | | production and harvesting of crops and other customary |
|
| | SB1089 Engrossed | - 29 - | LRB102 04912 CPF 14931 b |
|
|
1 | | farm practices, including, but not limited to, stalks, |
2 | | leaves, seed pods, husks, bagasse, and roots and (ii) |
3 | | plant-derived animal bedding, such as straw or |
4 | | sawdust, that is free of manure and was not made from |
5 | | painted or treated wood; |
6 | | (A-2) any composting additives that the composting |
7 | | facility accepts and uses at the facility are |
8 | | necessary to provide proper conditions for composting |
9 | | and do not exceed 10% of the total composting material |
10 | | at the facility at any one time; |
11 | | (B) the property on which the composting facility |
12 | | is located, and any
associated property on which the |
13 | | compost is used, is principally and
diligently devoted |
14 | | to the production of agricultural crops and
is not |
15 | | owned, leased or otherwise controlled by any waste |
16 | | hauler
or generator of nonagricultural compost |
17 | | materials, and the operator of the
composting facility |
18 | | is not an employee, partner, shareholder, or in any |
19 | | way
connected with or controlled by any such waste |
20 | | hauler or generator;
|
21 | | (C) all compost generated by the composting |
22 | | facility is applied at
agronomic rates and used as |
23 | | mulch, fertilizer or soil conditioner on land
actually |
24 | | farmed by the person operating the composting |
25 | | facility, and the
finished compost is not stored at |
26 | | the composting site for a period longer
than 18 months |
|
| | SB1089 Engrossed | - 30 - | LRB102 04912 CPF 14931 b |
|
|
1 | | prior to its application as mulch, fertilizer, or soil |
2 | | conditioner;
|
3 | | (D) the owner or operator, by January 1 of
each |
4 | | year, (i) registers the site with the Agency, (ii) |
5 | | reports
to the Agency on the volume of composting |
6 | | material received and used at the
site, (iii) |
7 | | certifies to the Agency that the site complies with |
8 | | the
requirements set forth in subparagraphs (A), |
9 | | (A-1), (A-2), (B), and (C) of this paragraph
(q)(3), |
10 | | and (iv) certifies to the Agency that all composting |
11 | | material: |
12 | | (I) was
placed more than 200 feet from the |
13 | | nearest potable water supply well; |
14 | | (II) was
placed outside the boundary of the |
15 | | 10-year floodplain or on a part of the
site that is |
16 | | floodproofed; |
17 | | (III) was placed either (aa) at least 1/4 mile |
18 | | from the nearest
residence (other than a residence |
19 | | located on the same property as the
facility) and |
20 | | there are not more than 10 occupied non-farm |
21 | | residences
within 1/2 mile of the boundaries of |
22 | | the site on the date of application or (bb) a |
23 | | lesser distance from the nearest residence (other |
24 | | than a residence located on the same property as |
25 | | the facility) provided that the municipality or |
26 | | county in which the facility is located has by |
|
| | SB1089 Engrossed | - 31 - | LRB102 04912 CPF 14931 b |
|
|
1 | | ordinance approved a lesser distance than 1/4 mile |
2 | | and there are not more than 10 occupied non-farm |
3 | | residences
within 1/2 mile of the boundaries of |
4 | | the site on the date of application;
and |
5 | | (IV) was placed more than 5 feet above the |
6 | | water table. |
7 | | Any ordinance approving a residential setback of |
8 | | less than 1/4 mile that is used to meet the |
9 | | requirements of this subparagraph (D) must |
10 | | specifically reference this subparagraph.
|
11 | | For the purposes of this subsection (q), "agronomic rates" |
12 | | means the
application of not more than 20 tons per acre per |
13 | | year, except that the
Board may allow a higher rate for |
14 | | individual sites where the owner or
operator has demonstrated |
15 | | to the Board that the site's soil
characteristics or crop |
16 | | needs require a higher rate.
|
17 | | (r) Cause or allow the storage or disposal of coal |
18 | | combustion
waste unless:
|
19 | | (1) such waste is stored or disposed of at a site or
|
20 | | facility for which
a permit has been obtained or is not |
21 | | otherwise required under subsection
(d) of this Section; |
22 | | or
|
23 | | (2) such waste is stored or disposed of as a part of
|
24 | | the design and
reclamation of a site or facility which is |
25 | | an abandoned mine site in
accordance with the Abandoned |
26 | | Mined Lands and Water Reclamation Act; or
|
|
| | SB1089 Engrossed | - 32 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (3) such waste is stored or disposed of at a site or
|
2 | | facility which is
operating under NPDES and Subtitle D |
3 | | permits issued by the Agency pursuant
to regulations |
4 | | adopted by the Board for mine-related water pollution and
|
5 | | permits issued pursuant to the federal Federal Surface |
6 | | Mining Control and
Reclamation Act of 1977 (P.L. 95-87) or |
7 | | the rules and regulations
thereunder or any law or rule or |
8 | | regulation adopted by the State of
Illinois pursuant |
9 | | thereto, and the owner or operator of the facility agrees
|
10 | | to accept the waste; and either :
|
11 | | (i) such waste is stored or disposed of in |
12 | | accordance
with requirements
applicable to refuse |
13 | | disposal under regulations adopted by the Board for
|
14 | | mine-related water pollution and pursuant to NPDES and |
15 | | Subtitle D permits
issued by the Agency under such |
16 | | regulations; or
|
17 | | (ii) the owner or operator of the facility |
18 | | demonstrates all of the
following to the Agency, and |
19 | | the facility is operated in accordance with
the |
20 | | demonstration as approved by the Agency: (1) the |
21 | | disposal area will be
covered in a manner that will |
22 | | support continuous vegetation, (2) the
facility will |
23 | | be adequately protected from wind and water erosion, |
24 | | (3) the
pH will be maintained so as to prevent |
25 | | excessive leaching of metal ions,
and (4) adequate |
26 | | containment or other measures will be provided to |
|
| | SB1089 Engrossed | - 33 - | LRB102 04912 CPF 14931 b |
|
|
1 | | protect
surface water and groundwater from |
2 | | contamination at levels prohibited by
this Act, the |
3 | | Illinois Groundwater Protection Act, or regulations |
4 | | adopted
pursuant thereto.
|
5 | | Notwithstanding any other provision of this Title, the |
6 | | disposal of coal
combustion waste pursuant to item (2) or (3) |
7 | | of this
subdivision (r) shall
be exempt from the other |
8 | | provisions of this Title V, and notwithstanding
the provisions |
9 | | of Title X of this Act, the Agency is authorized to grant
|
10 | | experimental permits which include provision for the disposal |
11 | | of
wastes from the combustion of coal and other materials |
12 | | pursuant to items
(2) and (3) of this subdivision (r).
|
13 | | (s) After April 1, 1989, offer for transportation, |
14 | | transport, deliver,
receive or accept special waste for which |
15 | | a manifest is required, unless
the manifest indicates that the |
16 | | fee required under Section 22.8 of this
Act has been paid.
|
17 | | (t) Cause or allow a lateral expansion of a municipal |
18 | | solid waste landfill
unit on or after October 9, 1993, without |
19 | | a permit modification, granted by the
Agency, that authorizes |
20 | | the lateral expansion.
|
21 | | (u) Conduct any vegetable by-product treatment, storage, |
22 | | disposal or
transportation operation in violation of any |
23 | | regulation, standards or permit
requirements adopted by the |
24 | | Board under this Act. However, no permit shall be
required |
25 | | under this Title V for the land application of vegetable |
26 | | by-products
conducted pursuant to Agency permit issued under |
|
| | SB1089 Engrossed | - 34 - | LRB102 04912 CPF 14931 b |
|
|
1 | | Title III of this Act to
the generator of the vegetable |
2 | | by-products. In addition, vegetable by-products
may be |
3 | | transported in this State without a special waste hauling |
4 | | permit, and
without the preparation and carrying of a |
5 | | manifest.
|
6 | | (v) (Blank).
|
7 | | (w) Conduct any generation, transportation, or recycling |
8 | | of construction or
demolition debris, clean or general, or |
9 | | uncontaminated soil generated during
construction, remodeling, |
10 | | repair, and demolition of utilities, structures, and
roads |
11 | | that is not commingled with any waste, without the maintenance |
12 | | of
documentation identifying the hauler, generator, place of |
13 | | origin of the debris
or soil, the weight or volume of the |
14 | | debris or soil, and the location, owner,
and operator of the |
15 | | facility where the debris or soil was transferred,
disposed, |
16 | | recycled, or treated. This documentation must be maintained by |
17 | | the
generator, transporter, or recycler for 3 years.
This |
18 | | subsection (w) shall not apply to (1) a permitted pollution |
19 | | control
facility that transfers or accepts construction or |
20 | | demolition debris,
clean or general, or uncontaminated soil |
21 | | for final disposal, recycling, or
treatment, (2) a public |
22 | | utility (as that term is defined in the Public
Utilities Act) |
23 | | or a municipal utility, (3) the Illinois Department of
|
24 | | Transportation, or (4) a municipality or a county highway |
25 | | department, with
the exception of any municipality or county |
26 | | highway department located within a
county having a population |
|
| | SB1089 Engrossed | - 35 - | LRB102 04912 CPF 14931 b |
|
|
1 | | of over 3,000,000 inhabitants or located in a county
that
is |
2 | | contiguous to a county having a population of over 3,000,000 |
3 | | inhabitants;
but it shall apply to an entity that contracts |
4 | | with a public utility, a
municipal utility, the Illinois |
5 | | Department of Transportation, or a
municipality or a county |
6 | | highway department.
The terms
"generation" and "recycling" , as
|
7 | | used in this subsection , do not
apply to clean construction or |
8 | | demolition debris
when (i) used as fill material below grade |
9 | | outside of a setback zone
if covered by sufficient |
10 | | uncontaminated soil to support vegetation within 30
days of |
11 | | the completion of filling or if covered by a road or structure, |
12 | | (ii)
solely broken concrete without
protruding metal bars is |
13 | | used for erosion control, or (iii) milled
asphalt or crushed |
14 | | concrete is used as aggregate in construction of the
shoulder |
15 | | of a roadway. The terms "generation" and "recycling", as used |
16 | | in this
subsection, do not apply to uncontaminated soil
that |
17 | | is not commingled with any waste when (i) used as fill material |
18 | | below
grade or contoured to grade, or (ii) used at the site of |
19 | | generation.
|
20 | | (Source: P.A. 100-103, eff. 8-11-17; 101-171, eff. 7-30-19; |
21 | | revised 9-12-19.)
|
22 | | (415 ILCS 5/22.15) (from Ch. 111 1/2, par. 1022.15)
|
23 | | Sec. 22.15. Solid Waste Management Fund; fees.
|
24 | | (a) There is hereby created within the State Treasury a
|
25 | | special fund to be known as the Solid Waste Management Fund, to |
|
| | SB1089 Engrossed | - 36 - | LRB102 04912 CPF 14931 b |
|
|
1 | | be
constituted from the fees collected by the State pursuant |
2 | | to this Section,
from repayments of loans made from the Fund |
3 | | for solid waste projects, from registration fees collected |
4 | | pursuant to the Consumer Electronics Recycling Act, and from |
5 | | amounts transferred into the Fund pursuant to Public Act |
6 | | 100-433.
Moneys received by the Department of Commerce and |
7 | | Economic Opportunity
in repayment of loans made pursuant to |
8 | | the Illinois Solid Waste Management
Act shall be deposited |
9 | | into the General Revenue Fund.
|
10 | | (b) The Agency shall assess and collect a
fee in the amount |
11 | | set forth herein from the owner or operator of each sanitary
|
12 | | landfill permitted or required to be permitted by the Agency |
13 | | to dispose of
solid waste if the sanitary landfill is located |
14 | | off the site where such waste
was produced and if such sanitary |
15 | | landfill is owned, controlled, and operated
by a person other |
16 | | than the generator of such waste. The Agency shall deposit
all |
17 | | fees collected into the Solid Waste Management Fund. If a site |
18 | | is
contiguous to one or more landfills owned or operated by the |
19 | | same person, the
volumes permanently disposed of by each |
20 | | landfill shall be combined for purposes
of determining the fee |
21 | | under this subsection. Beginning on July 1, 2018, and on the |
22 | | first day of each month thereafter during fiscal years 2019 |
23 | | through 2021, the State Comptroller shall direct and State |
24 | | Treasurer shall transfer an amount equal to 1/12 of $5,000,000 |
25 | | per fiscal year from the Solid Waste Management Fund to the |
26 | | General Revenue Fund.
|
|
| | SB1089 Engrossed | - 37 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (1) If more than 150,000 cubic yards of non-hazardous |
2 | | solid waste is
permanently disposed of at a site in a |
3 | | calendar year, the owner or operator
shall either pay a |
4 | | fee of 95 cents per cubic yard or,
alternatively, the |
5 | | owner or operator may weigh the quantity of the solid |
6 | | waste
permanently disposed of with a device for which |
7 | | certification has been obtained
under the Weights and |
8 | | Measures Act and pay a fee of $2.00 per
ton of solid waste |
9 | | permanently disposed of. In no case shall the fee |
10 | | collected
or paid by the owner or operator under this |
11 | | paragraph exceed $1.55 per cubic yard or $3.27 per ton.
|
12 | | (2) If more than 100,000 cubic yards but not more than |
13 | | 150,000 cubic
yards of non-hazardous waste is permanently |
14 | | disposed of at a site in a calendar
year, the owner or |
15 | | operator shall pay a fee of $52,630.
|
16 | | (3) If more than 50,000 cubic yards but not more than |
17 | | 100,000 cubic
yards of non-hazardous solid waste is |
18 | | permanently disposed of at a site
in a calendar year, the |
19 | | owner or operator shall pay a fee of $23,790.
|
20 | | (4) If more than 10,000 cubic yards but not more than |
21 | | 50,000 cubic
yards of non-hazardous solid waste is |
22 | | permanently disposed of at a site
in a calendar year, the |
23 | | owner or operator shall pay a fee of $7,260.
|
24 | | (5) If not more than 10,000 cubic yards of |
25 | | non-hazardous solid waste is
permanently disposed of at a |
26 | | site in a calendar year, the owner or operator
shall pay a |
|
| | SB1089 Engrossed | - 38 - | LRB102 04912 CPF 14931 b |
|
|
1 | | fee of $1050.
|
2 | | (c) (Blank).
|
3 | | (d) The Agency shall establish rules relating to the |
4 | | collection of the
fees authorized by this Section. Such rules |
5 | | shall include, but not be
limited to:
|
6 | | (1) necessary records identifying the quantities of |
7 | | solid waste received
or disposed;
|
8 | | (2) the form and submission of reports to accompany |
9 | | the payment of fees
to the Agency;
|
10 | | (3) the time and manner of payment of fees to the |
11 | | Agency, which payments
shall not be more often than |
12 | | quarterly; and
|
13 | | (4) procedures setting forth criteria establishing |
14 | | when an owner or
operator may measure by weight or volume |
15 | | during any given quarter or other
fee payment period.
|
16 | | (e) Pursuant to appropriation, all monies in the Solid |
17 | | Waste Management
Fund shall be used by the Agency and the |
18 | | Department of Commerce and Economic Opportunity for the |
19 | | purposes set forth in this Section and in the Illinois
Solid |
20 | | Waste Management Act, including for the costs of fee |
21 | | collection and
administration, and for the administration of |
22 | | (1) the Consumer Electronics Recycling Act and (2) until |
23 | | January 1, 2020, the Electronic Products Recycling and Reuse |
24 | | Act.
|
25 | | (f) The Agency is authorized to enter into such agreements |
26 | | and to
promulgate such rules as are necessary to carry out its |
|
| | SB1089 Engrossed | - 39 - | LRB102 04912 CPF 14931 b |
|
|
1 | | duties under this
Section and the Illinois Solid Waste |
2 | | Management Act.
|
3 | | (g) On the first day of January, April, July, and October |
4 | | of each year,
beginning on July 1, 1996, the State Comptroller |
5 | | and Treasurer shall
transfer $500,000 from the Solid Waste |
6 | | Management Fund to the Hazardous Waste
Fund. Moneys |
7 | | transferred under this subsection (g) shall be used only for |
8 | | the
purposes set forth in item (1) of subsection (d) of Section |
9 | | 22.2.
|
10 | | (h) The Agency is authorized to provide financial |
11 | | assistance to units of
local government for the performance of |
12 | | inspecting, investigating and
enforcement activities pursuant |
13 | | to Section 4(r) at nonhazardous solid
waste disposal sites.
|
14 | | (i) The Agency is authorized to conduct household waste |
15 | | collection and
disposal programs.
|
16 | | (j) A unit of local government, as defined in the Local |
17 | | Solid Waste Disposal
Act, in which a solid waste disposal |
18 | | facility is located may establish a fee,
tax, or surcharge |
19 | | with regard to the permanent disposal of solid waste.
All |
20 | | fees, taxes, and surcharges collected under this subsection |
21 | | shall be
utilized for solid waste management purposes, |
22 | | including long-term monitoring
and maintenance of landfills, |
23 | | planning, implementation, inspection, enforcement
and other |
24 | | activities consistent with the Solid Waste Management Act and |
25 | | the
Local Solid Waste Disposal Act, or for any other |
26 | | environment-related purpose,
including but not limited to an |
|
| | SB1089 Engrossed | - 40 - | LRB102 04912 CPF 14931 b |
|
|
1 | | environment-related public works project, but
not for the |
2 | | construction of a new pollution control facility other than a
|
3 | | household hazardous waste facility. However, the total fee, |
4 | | tax or surcharge
imposed by all units of local government |
5 | | under this subsection (j) upon the
solid waste disposal |
6 | | facility shall not exceed:
|
7 | | (1) 60¢ per cubic yard if more than 150,000 cubic |
8 | | yards of non-hazardous
solid waste is permanently disposed |
9 | | of at the site in a calendar year, unless
the owner or |
10 | | operator weighs the quantity of the solid waste received |
11 | | with a
device for which certification has been obtained |
12 | | under the Weights and Measures
Act, in which case the fee |
13 | | shall not exceed $1.27 per ton of solid waste
permanently |
14 | | disposed of.
|
15 | | (2) $33,350 if more than 100,000
cubic yards, but not |
16 | | more than 150,000 cubic yards, of non-hazardous waste
is |
17 | | permanently disposed of at the site in a calendar year.
|
18 | | (3) $15,500 if more than 50,000 cubic
yards, but not |
19 | | more than 100,000 cubic yards, of non-hazardous solid |
20 | | waste is
permanently disposed of at the site in a calendar |
21 | | year.
|
22 | | (4) $4,650 if more than 10,000 cubic
yards, but not |
23 | | more than 50,000 cubic yards, of non-hazardous solid waste
|
24 | | is permanently disposed of at the site in a calendar year.
|
25 | | (5) $650 if not more than 10,000 cubic
yards of |
26 | | non-hazardous solid waste is permanently disposed of at |
|
| | SB1089 Engrossed | - 41 - | LRB102 04912 CPF 14931 b |
|
|
1 | | the site in
a calendar year.
|
2 | | The corporate authorities of the unit of local government
|
3 | | may use proceeds from the fee, tax, or surcharge to reimburse a |
4 | | highway
commissioner whose road district lies wholly or |
5 | | partially within the
corporate limits of the unit of local |
6 | | government for expenses incurred in
the removal of |
7 | | nonhazardous, nonfluid municipal waste that has been dumped
on |
8 | | public property in violation of a State law or local |
9 | | ordinance.
|
10 | | For the disposal of solid waste from general construction |
11 | | or demolition debris recovery facilities subject to Section |
12 | | 22.38 of this Act, the total fee, tax, or surcharge imposed by |
13 | | all units of local government under this subsection (j) upon |
14 | | the solid waste disposal facility shall not exceed 50% of the |
15 | | applicable amount set forth above. A unit of local government, |
16 | | as defined in the Local Solid Waste Disposal Act, in which a |
17 | | general construction or demolition debris recovery facility is |
18 | | located may also establish a fee, tax, or surcharge with |
19 | | regard to the permanent disposal of solid waste from the |
20 | | general construction or demolition debris recovery facility at |
21 | | a solid waste disposal facility, provided that such fee, tax, |
22 | | or surcharge shall not exceed 50% of the applicable amount set |
23 | | forth above and the unit of local government and fee shall be |
24 | | subject to all other requirements of this subsection (j). |
25 | | A county or Municipal Joint Action Agency that imposes a |
26 | | fee, tax, or
surcharge under this subsection may use the |
|
| | SB1089 Engrossed | - 42 - | LRB102 04912 CPF 14931 b |
|
|
1 | | proceeds thereof to reimburse a
municipality that lies wholly |
2 | | or partially within its boundaries for expenses
incurred in |
3 | | the removal of nonhazardous, nonfluid municipal waste that has |
4 | | been
dumped on public property in violation of a State law or |
5 | | local ordinance.
|
6 | | If the fees are to be used to conduct a local sanitary |
7 | | landfill
inspection or enforcement program, the unit of local |
8 | | government must enter
into a written delegation agreement with |
9 | | the Agency pursuant to subsection
(r) of Section 4. The unit of |
10 | | local government and the Agency shall enter
into such a |
11 | | written delegation agreement within 60 days after the
|
12 | | establishment of such fees. At least annually,
the Agency |
13 | | shall conduct an audit of the expenditures made by units of |
14 | | local
government from the funds granted by the Agency to the |
15 | | units of local
government for purposes of local sanitary |
16 | | landfill inspection and enforcement
programs, to ensure that |
17 | | the funds have been expended for the prescribed
purposes under |
18 | | the grant.
|
19 | | The fees, taxes or surcharges collected under this |
20 | | subsection (j) shall
be placed by the unit of local government |
21 | | in a separate fund, and the
interest received on the moneys in |
22 | | the fund shall be credited to the fund. The
monies in the fund |
23 | | may be accumulated over a period of years to be
expended in |
24 | | accordance with this subsection.
|
25 | | A unit of local government, as defined in the Local Solid |
26 | | Waste Disposal
Act, shall prepare and post on its website |
|
| | SB1089 Engrossed | - 43 - | LRB102 04912 CPF 14931 b |
|
|
1 | | distribute to the Agency , in April of each year, a
report that |
2 | | details spending plans for monies collected in accordance with
|
3 | | this subsection. The report will at a minimum include the |
4 | | following:
|
5 | | (1) The total monies collected pursuant to this |
6 | | subsection.
|
7 | | (2) The most current balance of monies collected |
8 | | pursuant to this
subsection.
|
9 | | (3) An itemized accounting of all monies expended for |
10 | | the previous year
pursuant to this subsection.
|
11 | | (4) An estimation of monies to be collected for the |
12 | | following 3
years pursuant to this subsection.
|
13 | | (5) A narrative detailing the general direction and |
14 | | scope of future
expenditures for one, 2 and 3 years.
|
15 | | The exemptions granted under Sections 22.16 and 22.16a, |
16 | | and under
subsection (k) of this Section, shall be applicable |
17 | | to any fee,
tax or surcharge imposed under this subsection |
18 | | (j); except that the fee,
tax or surcharge authorized to be |
19 | | imposed under this subsection (j) may be
made applicable by a |
20 | | unit of local government to the permanent disposal of
solid |
21 | | waste after December 31, 1986, under any contract lawfully |
22 | | executed
before June 1, 1986 under which more than 150,000 |
23 | | cubic yards (or 50,000 tons)
of solid waste is to be |
24 | | permanently disposed of, even though the waste is
exempt from |
25 | | the fee imposed by the State under subsection (b) of this |
26 | | Section
pursuant to an exemption granted under Section 22.16.
|
|
| | SB1089 Engrossed | - 44 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (k) In accordance with the findings and purposes of the |
2 | | Illinois Solid
Waste Management Act, beginning January 1, 1989 |
3 | | the fee under subsection
(b) and the fee, tax or surcharge |
4 | | under subsection (j) shall not apply to:
|
5 | | (1) waste which is hazardous waste;
|
6 | | (2) waste which is pollution control waste;
|
7 | | (3) waste from recycling, reclamation or reuse |
8 | | processes which have been
approved by the Agency as being |
9 | | designed to remove any contaminant from
wastes so as to |
10 | | render such wastes reusable, provided that the process
|
11 | | renders at least 50% of the waste reusable , except for |
12 | | general construction or demolition debris recovery |
13 | | facilities regulated pursuant to Section 22.38 ;
|
14 | | (4) non-hazardous solid waste that is received at a |
15 | | sanitary landfill
and composted or recycled through a |
16 | | process permitted by the Agency; or
|
17 | | (5) any landfill which is permitted by the Agency to |
18 | | receive only
demolition or construction debris or |
19 | | landscape waste.
|
20 | | (Source: P.A. 100-103, eff. 8-11-17; 100-433, eff. 8-25-17; |
21 | | 100-587, eff. 6-4-18; 100-621, eff. 7-20-18; 100-863, eff. |
22 | | 8-14-18; 101-10, eff. 6-5-19; 101-636, eff. 6-10-20.)
|
23 | | (415 ILCS 5/22.38)
|
24 | | Sec. 22.38. General construction or demolition debris |
25 | | recovery facilities Facilities accepting exclusively general |
|
| | SB1089 Engrossed | - 45 - | LRB102 04912 CPF 14931 b |
|
|
1 | | construction or
demolition debris
for transfer, storage, or |
2 | | treatment .
|
3 | | (a) General construction or demolition debris recovery |
4 | | facilities Facilities accepting exclusively general |
5 | | construction or demolition
debris for
transfer, storage, or |
6 | | treatment shall be subject to local zoning, ordinance,
and
|
7 | | land use requirements.
General construction or demolition |
8 | | debris recovery Those facilities shall be located in |
9 | | accordance with local zoning requirements
or, in the absence |
10 | | of local zoning requirements, shall be located so that no
part |
11 | | of the facility boundary is closer than 1,320 feet from the |
12 | | nearest
property zoned for primarily residential use.
|
13 | | (b) An owner or operator of a general construction or |
14 | | demolition debris recovery facility accepting exclusively |
15 | | general
construction or demolition debris for transfer, |
16 | | storage, or treatment shall:
|
17 | | (0.5) Except as otherwise provided by Board rule, at a |
18 | | minimum, recycle 40% of the total general construction or |
19 | | demolition debris received on a rolling 12-month average |
20 | | basis. The percentages in this paragraph (0.5) of |
21 | | subsection (b) shall be calculated by weight.
|
22 | | (1) Within 48 hours after receipt of the general |
23 | | construction or demolition
debris at the facility, sort |
24 | | the general construction or demolition debris to
separate |
25 | | the (i)
recyclable general construction or demolition |
26 | | debris and (ii) wood being , recovered wood that is |
|
| | SB1089 Engrossed | - 46 - | LRB102 04912 CPF 14931 b |
|
|
1 | | processed for use as fuel from all other general |
2 | | construction or demolition debris , and general |
3 | | construction or demolition debris that is processed for |
4 | | use at a landfill from the non-recyclable
general |
5 | | construction or demolition debris that is to be disposed |
6 | | of or discarded .
|
7 | | (2) Transport off site for disposal, in accordance |
8 | | with all applicable federal, State, and local |
9 | | requirements , within 72 hours after its receipt at the |
10 | | facility, all non-usable or non-recyclable general
|
11 | | construction or demolition debris that is not (i) |
12 | | recyclable general construction or demolition debris or |
13 | | (ii) wood being , recovered wood that is processed for use |
14 | | as fuel , or general construction or demolition debris that |
15 | | is processed for use at a landfill .
|
16 | | (3) Use best management practices to identify and |
17 | | remove all drywall and other wallboard containing gypsum |
18 | | from the (i) recyclable general construction or demolition |
19 | | debris and (ii) wood being recovered for use as fuel, |
20 | | prior to any mechanical sorting, separating, grinding, or |
21 | | other processing. Limit the percentage of incoming |
22 | | non-recyclable general construction
or demolition debris |
23 | | to 25% or
less of the total incoming general construction |
24 | | or demolition debris, so that 75% or more of the general |
25 | | construction or demolition debris accepted, as calculated |
26 | | monthly on a rolling 12-month average, consists of |
|
| | SB1089 Engrossed | - 47 - | LRB102 04912 CPF 14931 b |
|
|
1 | | recyclable general construction or demolition debris, |
2 | | recovered wood that is processed for use as fuel, or |
3 | | general construction or demolition debris that is |
4 | | processed for use at a landfill except that general |
5 | | construction or demolition debris processed for use at a |
6 | | landfill shall not exceed 35% of the general construction |
7 | | or demolition debris accepted on a rolling 12-month |
8 | | average basis. The percentages in this paragraph (3) of |
9 | | subsection (b) shall be calculated by weight, using scales |
10 | | located at the facility that are certified under the |
11 | | Weights and Measures Act.
|
12 | | (4) Within 45 calendar days after receipt, transport |
13 | | off-site all putrescible recyclable general construction |
14 | | or demolition debris and all wood recovered for use as |
15 | | fuel. Within 6 months after its receipt at the facility, |
16 | | transport: |
17 | | (A) all non-putrescible recyclable general |
18 | | construction or
demolition debris
for recycling or |
19 | | disposal; and |
20 | | (B) all non-putrescible general construction or |
21 | | demolition debris that is processed for use at a |
22 | | landfill to a MSWLF unit for use or disposal.
|
23 | | (5) Within 6 months after receipt, transport off-site |
24 | | all non-putrescible recyclable general construction or |
25 | | demolition debris. 45 days after its receipt at the |
26 | | facility, transport: |
|
| | SB1089 Engrossed | - 48 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (A) all putrescible or combustible recyclable |
2 | | general
construction or demolition debris
(excluding |
3 | | recovered wood that is processed for use as fuel) for |
4 | | recycling or disposal; |
5 | | (B) all recovered wood that is processed for use |
6 | | as fuel to an intermediate processing facility for |
7 | | sizing, to a combustion facility for use as fuel, or to |
8 | | a disposal facility; and |
9 | | (C) all putrescible general construction or |
10 | | demolition debris that is processed for use at a |
11 | | landfill to a MSWLF unit for use or disposal.
|
12 | | (6) Employ tagging and recordkeeping procedures to , at |
13 | | a minimum, (i) demonstrate
compliance
with this Section , |
14 | | and (ii) identify the type, amount, source , and |
15 | | transporter of material
accepted by the facility , and |
16 | | (iii) identify the type, amount, destination, and |
17 | | transporter of material transported from the facility. |
18 | | Records shall be maintained in a form and format |
19 | | prescribed by the Agency, and beginning October 1, 2021, |
20 | | no later than every October 1, January 1, April 1, and July |
21 | | 1 thereafter the records shall be summarized in quarterly |
22 | | reports submitted to the Agency in a form and format |
23 | | prescribed by the Agency .
|
24 | | (7) Control odor, noise, combustion of materials, |
25 | | disease vectors, dust,
and litter.
|
26 | | (8) Control, manage, and dispose of any storm water |
|
| | SB1089 Engrossed | - 49 - | LRB102 04912 CPF 14931 b |
|
|
1 | | runoff and leachate
generated at the facility in |
2 | | accordance with applicable federal, State, and
local |
3 | | requirements.
|
4 | | (9) Control access to the facility.
|
5 | | (10) Comply with all applicable federal, State, or |
6 | | local requirements for
the handling, storage, |
7 | | transportation, or disposal of asbestos-containing
|
8 | | material or other material accepted at the
facility that |
9 | | is not general construction or demolition debris.
|
10 | | (11) For an owner or operator that first received |
11 | | general construction or demolition debris prior to August |
12 | | 24, 2009, submit to the Agency, no later than 6 months |
13 | | after the effective date of rules adopted by the Board |
14 | | under subsection (n), a permit application for a general |
15 | | construction or demolition debris recovery facility. Prior |
16 | | to August 24, 2009 (the effective date of Public Act |
17 | | 96-611), submit to the Agency at least 30 days prior to the |
18 | | initial acceptance
of general construction or demolition |
19 | | debris at the facility, on forms provided
by the Agency, |
20 | | the following information:
|
21 | | (A) the name, address, and telephone number of |
22 | | both the facility owner
and operator;
|
23 | | (B) the street address and location of the |
24 | | facility;
|
25 | | (C) a description of facility operations;
|
26 | | (D) a description of the tagging and recordkeeping |
|
| | SB1089 Engrossed | - 50 - | LRB102 04912 CPF 14931 b |
|
|
1 | | procedures the
facility will employ to (i) demonstrate |
2 | | compliance with this Section and (ii)
identify the |
3 | | source and transporter of any material accepted by the |
4 | | facility;
|
5 | | (E) the name and location of the disposal sites to |
6 | | be used for the
disposal of any general construction |
7 | | or demolition debris received at the facility that |
8 | | must be disposed of;
|
9 | | (F) the name and location of an individual, |
10 | | facility, or business to
which recyclable materials |
11 | | will be transported;
|
12 | | (G) the name and location of intermediate |
13 | | processing facilities or combustion facilities to |
14 | | which recovered wood that is processed for use as fuel |
15 | | will be transported; and
|
16 | | (H) other information as specified on the form |
17 | | provided by the Agency.
|
18 | | (12) On or after August 24, 2009 (the effective date |
19 | | of Public Act 96-611), obtain a permit for the operation |
20 | | of a general construction or demolition debris recovery |
21 | | facility issued by the Agency prior to the initial |
22 | | acceptance of general construction or demolition debris at |
23 | | the facility.
|
24 | | When any of the information contained or processes |
25 | | described in the initial
notification form submitted to |
26 | | the Agency under paragraph (11) of subsection (b) of this |
|
| | SB1089 Engrossed | - 51 - | LRB102 04912 CPF 14931 b |
|
|
1 | | Section changes, the owner and operator shall
submit an |
2 | | updated form within 14 days of the change.
|
3 | | (c) For purposes of this Section, the term "recyclable |
4 | | general
construction or demolition debris" means general |
5 | | construction or demolition
debris that is being reclaimed from |
6 | | the general construction or demolition debris waste stream and |
7 | | (i) is has been rendered reusable and is reused or (ii) that |
8 | | would otherwise
be disposed of or discarded but is collected, |
9 | | separated, or processed and
returned to the economic |
10 | | mainstream in the form of raw materials or products.
|
11 | | "Recyclable general construction or demolition debris" does |
12 | | not include (i) general
construction or demolition debris that |
13 | | is (i) recovered processed for use as fuel or that is |
14 | | otherwise , incinerated or ,
burned, (ii) used in violation of |
15 | | subsection (k), buried, or otherwise used as fill material or |
16 | | (iii) disposed at a landfill (ii) general construction or |
17 | | demolition debris that is processed for use at a landfill .
|
18 | | (d) (Blank). For purposes of this Section, "treatment" |
19 | | means processing
designed to alter the physical nature of the |
20 | | general construction or
demolition debris, including but not |
21 | | limited to size reduction, crushing,
grinding, or
|
22 | | homogenization, but does not include processing designed to |
23 | | change the chemical
nature of the general construction or |
24 | | demolition debris.
|
25 | | (e) For purposes of this Section, wood recovered for use |
26 | | as fuel is "recovered wood that is processed for use as fuel" |
|
| | SB1089 Engrossed | - 52 - | LRB102 04912 CPF 14931 b |
|
|
1 | | means wood that is recovered has been salvaged from the |
2 | | general construction or demolition debris waste stream and |
3 | | processed for use as fuel, as authorized by the applicable |
4 | | state or federal environmental regulatory authority, and |
5 | | supplied only to intermediate processing facilities for |
6 | | sizing, or to combustion facilities for use as fuel, that have |
7 | | obtained all necessary waste management and air permits for |
8 | | handling and combustion of the fuel. |
9 | | (f) (Blank). For purposes of this Section, "non-recyclable |
10 | | general construction or demolition debris" does not include |
11 | | "recovered wood that is processed for use as fuel" or general |
12 | | construction or demolition debris that is processed for use at |
13 | | a landfill. |
14 | | (g) (Blank). Recyclable general construction or demolition |
15 | | debris, recovered wood that is processed for use as fuel, and |
16 | | general construction or demolition debris that is processed |
17 | | for use at a landfill shall not be considered as meeting the |
18 | | 75% diversion requirement for purposes of subdivision (b)(3) |
19 | | of this Section if sent for disposal at the end of the |
20 | | applicable retention period. |
21 | | (h) (Blank). For the purposes of this Section, "general |
22 | | construction or demolition debris that is processed for use at |
23 | | a landfill" means general construction or demolition debris |
24 | | that is processed for use at a MSWLF unit as alternative daily |
25 | | cover, road building material, or drainage structure building |
26 | | material in accordance with the MSWLF unit's waste disposal |
|
| | SB1089 Engrossed | - 53 - | LRB102 04912 CPF 14931 b |
|
|
1 | | permit issued by the Agency under this Act. |
2 | | (i) (Blank). For purposes of the 75% diversion requirement |
3 | | under subdivision (b)(3) of this Section, owners and operators |
4 | | of facilities accepting exclusively general construction or |
5 | | demolition debris for transfer, storage, or treatment may |
6 | | multiply by 2 the amount of accepted asphalt roofing shingles |
7 | | that are transferred to a facility for recycling in accordance |
8 | | with a beneficial use determination issued under Section 22.54 |
9 | | of this Act. The owner or operator of the facility accepting |
10 | | exclusively general construction or demolition debris for |
11 | | transfer, storage, or treatment must maintain receipts from |
12 | | the shingle recycling facility that document the amounts of |
13 | | asphalt roofing shingles transferred for recycling in |
14 | | accordance with the beneficial use determination. All receipts |
15 | | must be maintained for a minimum of 3 years and must be made |
16 | | available to the Agency for inspection and copying during |
17 | | normal business hours. |
18 | | (j) No person shall cause or allow the acceptance of any |
19 | | waste at a general construction or demolition debris recovery |
20 | | facility, other than general construction or demolition |
21 | | debris. |
22 | | (k) No person shall cause or allow the deposit or other |
23 | | placement of general construction or demolition debris that is |
24 | | received at a general construction or demolition debris |
25 | | recovery facility into or on any land or water, including, but |
26 | | not limited to, use as fill or road construction material at a |
|
| | SB1089 Engrossed | - 54 - | LRB102 04912 CPF 14931 b |
|
|
1 | | site subject to Section 22.51, unless the general construction |
2 | | or demolition debris (i) meets the definition of clean |
3 | | construction or demolition debris in subsection (b) of Section |
4 | | 3.160 of this Act and (ii) has been returned to the economic |
5 | | mainstream in the form of a raw material or product. |
6 | | (l) Beginning one year after the effective date of rules |
7 | | adopted by the Board under subsection (n), no person shall own |
8 | | or operate a general construction or demolition debris |
9 | | recovery facility without a permit issued by the Agency. |
10 | | (m) In addition to any other requirements of this Act, no |
11 | | person shall, at a general construction or demolition debris |
12 | | recovery facility, cause or allow the storage or treatment of |
13 | | general construction or demolition debris in violation of this |
14 | | Act, any regulations or standards adopted under this Act, or |
15 | | any condition of a permit issued under this Act. |
16 | | (n) No later than one year after the effective date of this |
17 | | amendatory Act of the 102nd General Assembly, the Agency shall |
18 | | propose to the Board, and no later than one year after receipt |
19 | | of the Agency's proposal, the Board shall, adopt rules for |
20 | | permitting the operation of general construction or demolition |
21 | | debris recovery facilities. Such rules shall include, but not |
22 | | be limited to: requirements for material receipt, handling, |
23 | | storage, and transfer; improvements to best management |
24 | | practices for identifying, testing for, and removing drywall |
25 | | containing gypsum; minimal recycling, reclamation, reuse |
26 | | requirements, and recordkeeping; reporting; financial |
|
| | SB1089 Engrossed | - 55 - | LRB102 04912 CPF 14931 b |
|
|
1 | | assurance; and limiting or prohibiting sulfur in wallboard |
2 | | used or disposed of at landfills; and transition of facilities |
3 | | to permitting under the rules. |
4 | | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; |
5 | | 96-1000, eff. 7-2-10; 97-230, eff. 7-28-11; 97-314, eff. |
6 | | 1-1-12; 97-813, eff. 7-13-12.)
|
7 | | (415 ILCS 5/31.1) (from Ch. 111 1/2, par. 1031.1)
|
8 | | Sec. 31.1. Administrative citation.
|
9 | | (a) The prohibitions specified in subsections (o) and (p) |
10 | | of
Section 21 and subsection (k) of Section 55 of this Act |
11 | | shall be enforceable either by administrative
citation under |
12 | | this Section or as otherwise provided by this Act. Violations |
13 | | of Sections 22.38, Section 22.51 , and 22.51a of this Act shall |
14 | | be enforceable either by administrative citation under this |
15 | | Section or as otherwise provided by this Act.
|
16 | | (b) Whenever Agency personnel or personnel of a unit of |
17 | | local government to
which the Agency has delegated its |
18 | | functions pursuant to subsection (r) of
Section 4 of this Act, |
19 | | on the basis of direct observation, determine that any
person |
20 | | has violated any provision of subsection (o) or (p) of Section
|
21 | | 21, Section 22.38, Section 22.51, Section 22.51a, or |
22 | | subsection (k) of Section 55 of this Act, the Agency or such |
23 | | unit of local government may issue and serve
an administrative |
24 | | citation upon such person within not more than 60 days after
|
25 | | the date of the observed violation. Each such citation issued |
|
| | SB1089 Engrossed | - 56 - | LRB102 04912 CPF 14931 b |
|
|
1 | | shall be served
upon the person named therein or such person's |
2 | | authorized agent for service of
process, and shall include the |
3 | | following information:
|
4 | | (1) a statement specifying the provisions of |
5 | | subsection (o) or (p)
of Section 21, Section 22.38, |
6 | | Section 22.51, Section 22.51a, or subsection (k) of |
7 | | Section 55 of which the person was observed to be in |
8 | | violation;
|
9 | | (2) a copy of the inspection report in which the |
10 | | Agency or local
government recorded the violation, which |
11 | | report shall include the date and
time of inspection, and |
12 | | weather conditions prevailing during the inspection;
|
13 | | (3) the penalty imposed by subdivision (b)(4) or |
14 | | (b)(4-5) of Section
42 for such violation;
|
15 | | (4) instructions for contesting the administrative |
16 | | citation findings
pursuant to this Section, including |
17 | | notification that the person has 35
days within which to |
18 | | file a petition for review before the Board to contest
the |
19 | | administrative citation; and
|
20 | | (5) an affidavit by the personnel observing the |
21 | | violation, attesting to
their material actions and |
22 | | observations.
|
23 | | (c) The Agency or unit of local government shall file a |
24 | | copy of each
administrative citation served under subsection |
25 | | (b) of this Section with
the Board no later than 10 days after |
26 | | the date of service.
|
|
| | SB1089 Engrossed | - 57 - | LRB102 04912 CPF 14931 b |
|
|
1 | | (d) (1) If the person named in the administrative citation |
2 | | fails to
petition the Board for review within 35 days from the |
3 | | date of service, the
Board shall adopt a final order, which |
4 | | shall include the administrative
citation and findings of |
5 | | violation as alleged in the citation, and shall impose
the |
6 | | penalty specified in subdivision (b)(4) or (b)(4-5) of Section |
7 | | 42.
|
8 | | (2) If a petition for review is filed before the Board to |
9 | | contest an
administrative citation issued under subsection (b) |
10 | | of this Section, the
Agency or unit of local government shall |
11 | | appear as a complainant at a
hearing before the Board to be |
12 | | conducted pursuant to Section 32 of this Act
at a time not less |
13 | | than 21 days after notice of such hearing has
been sent by the |
14 | | Board to the Agency or unit of local government and the
person |
15 | | named in the citation. In such hearings, the burden of proof |
16 | | shall be
on the Agency or unit of local government. If, based |
17 | | on the record, the Board
finds that the alleged violation |
18 | | occurred, it shall adopt a final order which
shall include the |
19 | | administrative citation and findings of violation as alleged
|
20 | | in the citation, and shall impose the penalty specified in |
21 | | subdivision (b)(4)
or (b)(4-5) of Section 42. However, if the |
22 | | Board finds that the person
appealing the citation has shown |
23 | | that the violation resulted from
uncontrollable circumstances, |
24 | | the Board shall adopt a final order which makes
no finding of |
25 | | violation and which imposes no penalty.
|
26 | | (e) Sections 10-25 through 10-60 of the Illinois |
|
| | SB1089 Engrossed | - 58 - | LRB102 04912 CPF 14931 b |
|
|
1 | | Administrative Procedure
Act shall not apply to any |
2 | | administrative citation issued under subsection (b)
of this |
3 | | Section.
|
4 | | (f) The other provisions of this Section shall not apply |
5 | | to a sanitary
landfill operated by a unit of local government |
6 | | solely for the purpose of
disposing of water and sewage |
7 | | treatment plant sludges, including necessary
stabilizing |
8 | | materials.
|
9 | | (g) All final orders issued and entered by the Board |
10 | | pursuant to this
Section shall be enforceable by injunction, |
11 | | mandamus or other appropriate
remedy, in accordance with |
12 | | Section 42 of this Act.
|
13 | | (Source: P.A. 96-737, eff. 8-25-09; 96-1416, eff. 7-30-10.)
|
14 | | (415 ILCS 5/42) (from Ch. 111 1/2, par. 1042) |
15 | | Sec. 42. Civil penalties. |
16 | | (a) Except as provided in this Section, any person that |
17 | | violates any
provision of this Act or any regulation adopted |
18 | | by the Board, or any permit
or term or condition thereof, or |
19 | | that violates any order of the Board pursuant
to this Act, |
20 | | shall be liable for a civil penalty of not to exceed
$50,000 |
21 | | for the violation and an additional civil penalty of not to |
22 | | exceed
$10,000 for each day during which the violation |
23 | | continues; such penalties may,
upon order of the Board or a |
24 | | court of competent jurisdiction, be made payable
to the |
25 | | Environmental Protection Trust Fund, to be used in accordance |
|
| | SB1089 Engrossed | - 59 - | LRB102 04912 CPF 14931 b |
|
|
1 | | with the
provisions of the Environmental Protection Trust Fund |
2 | | Act. |
3 | | (b) Notwithstanding the provisions of subsection (a) of |
4 | | this Section: |
5 | | (1) Any person that violates Section 12(f) of this Act |
6 | | or any
NPDES permit or term or condition thereof, or any |
7 | | filing requirement,
regulation or order relating to the |
8 | | NPDES permit program, shall be liable
to a civil penalty |
9 | | of not to exceed $10,000 per day of violation. |
10 | | (2) Any person that violates Section 12(g) of this Act |
11 | | or any UIC permit
or term or condition thereof, or any |
12 | | filing requirement, regulation or order
relating to the |
13 | | State UIC program for all wells, except Class II wells as
|
14 | | defined by the Board under this Act, shall be liable to a |
15 | | civil penalty
not to exceed $2,500 per day of violation; |
16 | | provided, however, that any person
who commits such |
17 | | violations relating to the State UIC program for Class
II |
18 | | wells, as defined by the Board under this Act, shall be |
19 | | liable to a civil
penalty of not to exceed $10,000 for the |
20 | | violation and an additional civil
penalty of not to exceed |
21 | | $1,000 for each day during which the violation
continues. |
22 | | (3) Any person that violates Sections 21(f), 21(g), |
23 | | 21(h) or 21(i) of
this Act, or any RCRA permit or term or |
24 | | condition thereof, or any filing
requirement, regulation |
25 | | or order relating to the State RCRA program, shall
be |
26 | | liable to a civil penalty of not to exceed $25,000 per day |
|
| | SB1089 Engrossed | - 60 - | LRB102 04912 CPF 14931 b |
|
|
1 | | of violation. |
2 | | (4)
In an administrative citation action under Section |
3 | | 31.1 of this Act,
any person found to have violated any |
4 | | provision of subsection (o) of
Section 21 of this Act |
5 | | shall pay a civil penalty of $500 for each
violation of |
6 | | each such provision, plus any hearing costs incurred by |
7 | | the Board
and the Agency. Such penalties shall be made |
8 | | payable to the Environmental
Protection Trust Fund, to be |
9 | | used in accordance with the provisions of the
|
10 | | Environmental Protection Trust Fund Act; except that if a |
11 | | unit of local
government issued the administrative |
12 | | citation, 50% of the civil penalty shall
be payable to the |
13 | | unit of local government. |
14 | | (4-5) In an administrative citation action under |
15 | | Section 31.1 of this
Act, any person found to have |
16 | | violated any
provision of subsection (p) of
Section 21, |
17 | | Section 22.38, Section 22.51, Section 22.51a, or |
18 | | subsection (k) of Section 55 of this Act shall pay a civil |
19 | | penalty of $1,500 for each violation
of
each such |
20 | | provision, plus any hearing costs incurred by the Board |
21 | | and the
Agency, except that the civil penalty amount shall |
22 | | be $3,000 for
each violation of any provision of |
23 | | subsection (p) of Section 21, Section 22.38, Section |
24 | | 22.51, Section 22.51a, or subsection (k) of Section 55 |
25 | | that is the
person's second or subsequent adjudication |
26 | | violation of that
provision. The penalties shall be |
|
| | SB1089 Engrossed | - 61 - | LRB102 04912 CPF 14931 b |
|
|
1 | | deposited into the
Environmental Protection Trust Fund, to |
2 | | be used in accordance with the
provisions of the |
3 | | Environmental Protection Trust Fund Act; except that if a
|
4 | | unit of local government issued the administrative |
5 | | citation, 50% of the civil
penalty shall be payable to the |
6 | | unit of local government. |
7 | | (5) Any person who violates subsection 6 of Section |
8 | | 39.5 of this Act
or any CAAPP permit, or term or condition |
9 | | thereof, or any fee or filing
requirement, or any duty to |
10 | | allow or carry out inspection, entry or
monitoring |
11 | | activities, or any regulation or order relating to the |
12 | | CAAPP
shall be liable for a civil penalty not to exceed |
13 | | $10,000 per day of violation. |
14 | | (6) Any owner or operator of a community water system |
15 | | that violates subsection (b) of Section 18.1 or subsection |
16 | | (a) of Section 25d-3 of this Act shall, for each day of |
17 | | violation, be liable for a civil penalty not to exceed $5 |
18 | | for each of the premises connected to the affected |
19 | | community water system. |
20 | | (7) Any person who violates Section 52.5 of this Act |
21 | | shall be liable for a civil penalty of up to $1,000 for the |
22 | | first violation of that Section and a civil penalty of up |
23 | | to $2,500 for a second or subsequent violation of that |
24 | | Section. |
25 | | (b.5) In lieu of the penalties set forth in subsections |
26 | | (a) and (b) of
this Section, any person who fails to file, in a |
|
| | SB1089 Engrossed | - 62 - | LRB102 04912 CPF 14931 b |
|
|
1 | | timely manner, toxic
chemical release forms with the Agency |
2 | | pursuant to Section 25b-2
of this Act
shall be liable for a |
3 | | civil penalty of $100 per day for
each day the forms are
late, |
4 | | not to exceed a maximum total penalty of $6,000. This daily |
5 | | penalty
shall begin accruing on the thirty-first day after the
|
6 | | date that the person receives the warning notice issued by the |
7 | | Agency pursuant
to Section 25b-6 of this Act; and the penalty |
8 | | shall be paid to the Agency. The
daily accrual of penalties |
9 | | shall cease as of January 1 of the following year.
All |
10 | | penalties collected by the Agency pursuant to this subsection |
11 | | shall be
deposited into the Environmental Protection Permit |
12 | | and Inspection Fund. |
13 | | (c) Any person that violates this Act, any rule or |
14 | | regulation adopted under
this Act, any permit or term or |
15 | | condition of a permit, or any Board order and
causes the death |
16 | | of fish
or aquatic life shall, in addition to the other |
17 | | penalties provided by
this Act, be liable to pay to the State |
18 | | an additional sum for the
reasonable value of the fish or |
19 | | aquatic life destroyed. Any money so
recovered shall be placed |
20 | | in the Wildlife and Fish Fund in the State
Treasury. |
21 | | (d) The penalties provided for in this Section may be |
22 | | recovered in a
civil action. |
23 | | (e) The State's Attorney of the county in which the |
24 | | violation
occurred, or the Attorney General, may, at the |
25 | | request of the Agency or
on his own motion, institute a civil |
26 | | action for an injunction, prohibitory or mandatory, to
|
|
| | SB1089 Engrossed | - 63 - | LRB102 04912 CPF 14931 b |
|
|
1 | | restrain violations of this Act, any rule or regulation |
2 | | adopted under this Act,
any permit or term or condition of a |
3 | | permit, or any Board order, or to require such other actions as |
4 | | may be necessary to address violations of this Act, any rule or |
5 | | regulation adopted under this Act, any permit or term or |
6 | | condition of a permit, or any Board order. |
7 | | (f) The State's Attorney of the county in which the |
8 | | violation
occurred, or the Attorney General, shall bring such |
9 | | actions in the name
of the people of the State of Illinois.
|
10 | | Without limiting any other authority which may exist for the |
11 | | awarding
of attorney's fees and costs, the Board or a court of |
12 | | competent
jurisdiction may award costs and reasonable |
13 | | attorney's fees, including the
reasonable costs of expert |
14 | | witnesses and consultants, to the State's
Attorney or the |
15 | | Attorney General in a case where he has prevailed against a
|
16 | | person who has committed a willful, knowing, or repeated |
17 | | violation of this Act,
any rule or regulation adopted under |
18 | | this Act, any permit or term or condition
of a permit, or any |
19 | | Board order. |
20 | | Any funds collected under this subsection (f) in which the |
21 | | Attorney
General has prevailed shall be deposited in the
|
22 | | Hazardous Waste Fund created in Section 22.2 of this Act. Any |
23 | | funds
collected under this subsection (f) in which a State's |
24 | | Attorney has
prevailed shall be retained by the county in |
25 | | which he serves. |
26 | | (g) All final orders imposing civil penalties pursuant to |
|
| | SB1089 Engrossed | - 64 - | LRB102 04912 CPF 14931 b |
|
|
1 | | this Section
shall prescribe the time for payment of such |
2 | | penalties. If any such
penalty is not paid within the time |
3 | | prescribed, interest on such penalty
at the rate set forth in |
4 | | subsection (a) of Section 1003 of the Illinois Income
Tax Act, |
5 | | shall be paid for the period from the date payment is due until |
6 | | the
date payment is received. However, if the time for payment |
7 | | is stayed during
the pendency of an appeal, interest shall not |
8 | | accrue during such stay. |
9 | | (h) In determining the appropriate civil penalty to be |
10 | | imposed under
subdivisions (a), (b)(1), (b)(2), (b)(3), |
11 | | (b)(5), (b)(6), or (b)(7) of this
Section, the Board is |
12 | | authorized to consider any matters of record in
mitigation or |
13 | | aggravation of penalty, including, but not limited to, the
|
14 | | following factors: |
15 | | (1) the duration and gravity of the violation; |
16 | | (2) the presence or absence of due diligence on the |
17 | | part of the
respondent in attempting to comply with |
18 | | requirements of this
Act and regulations thereunder or to |
19 | | secure relief therefrom as provided by
this Act; |
20 | | (3) any economic benefits accrued by the respondent
|
21 | | because of delay in compliance with requirements, in which |
22 | | case the economic
benefits shall be determined by the |
23 | | lowest cost alternative for achieving
compliance; |
24 | | (4) the amount of monetary penalty which will serve to |
25 | | deter further
violations by the respondent and to |
26 | | otherwise aid in enhancing
voluntary
compliance with this |
|
| | SB1089 Engrossed | - 65 - | LRB102 04912 CPF 14931 b |
|
|
1 | | Act by the respondent and other persons
similarly
subject |
2 | | to the Act; |
3 | | (5) the number, proximity in time, and gravity of |
4 | | previously
adjudicated violations of this Act by the |
5 | | respondent; |
6 | | (6) whether the respondent voluntarily self-disclosed, |
7 | | in accordance
with subsection (i) of this Section, the |
8 | | non-compliance to the Agency; |
9 | | (7) whether the respondent has agreed to undertake a |
10 | | "supplemental
environmental project", which means an |
11 | | environmentally beneficial project that
a respondent |
12 | | agrees to undertake in settlement of an enforcement action |
13 | | brought
under this Act, but which the respondent is not |
14 | | otherwise legally required to
perform; and |
15 | | (8) whether the respondent has successfully completed |
16 | | a Compliance Commitment Agreement under subsection (a) of |
17 | | Section 31 of this Act to remedy the violations that are |
18 | | the subject of the complaint. |
19 | | In determining the appropriate civil penalty to be imposed |
20 | | under subsection
(a) or paragraph (1), (2), (3), (5), (6), or |
21 | | (7) of subsection (b) of this Section, the
Board shall ensure, |
22 | | in all cases, that the penalty is at least as great as the
|
23 | | economic benefits, if any, accrued by the respondent as a |
24 | | result of the
violation, unless the Board finds that |
25 | | imposition of such penalty would result
in an arbitrary or |
26 | | unreasonable financial hardship. However, such civil
penalty
|
|
| | SB1089 Engrossed | - 66 - | LRB102 04912 CPF 14931 b |
|
|
1 | | may be off-set in whole or in part pursuant to a supplemental
|
2 | | environmental project agreed to by the complainant and the |
3 | | respondent. |
4 | | (i) A person who voluntarily self-discloses non-compliance |
5 | | to the Agency,
of which the Agency had been unaware, is |
6 | | entitled to a 100% reduction in the
portion of the penalty that |
7 | | is not based on the economic benefit of
non-compliance if the |
8 | | person can
establish the following: |
9 | | (1) that either the regulated entity is a small entity |
10 | | or the non-compliance was discovered through an |
11 | | environmental
audit or a compliance management system |
12 | | documented by the regulated entity as
reflecting the |
13 | | regulated entity's due diligence in preventing, detecting, |
14 | | and
correcting violations; |
15 | | (2) that the non-compliance was disclosed in writing |
16 | | within 30 days of
the date on which the person discovered |
17 | | it; |
18 | | (3) that the non-compliance was discovered and |
19 | | disclosed prior to: |
20 | | (i) the commencement of an Agency inspection, |
21 | | investigation, or request
for information; |
22 | | (ii) notice of a citizen suit; |
23 | | (iii) the filing of a complaint by a citizen, the |
24 | | Illinois Attorney
General, or the State's Attorney of |
25 | | the county in which the violation occurred; |
26 | | (iv) the reporting of the non-compliance by an |
|
| | SB1089 Engrossed | - 67 - | LRB102 04912 CPF 14931 b |
|
|
1 | | employee of the person
without that person's |
2 | | knowledge; or |
3 | | (v) imminent discovery of the non-compliance by |
4 | | the Agency; |
5 | | (4) that the non-compliance is being corrected and any |
6 | | environmental
harm is being remediated in a timely |
7 | | fashion; |
8 | | (5) that the person agrees to prevent a recurrence of |
9 | | the non-compliance; |
10 | | (6) that no related non-compliance events have |
11 | | occurred in the
past 3 years at the same facility or in the |
12 | | past 5 years as part of a
pattern at multiple facilities |
13 | | owned or operated by the person; |
14 | | (7) that the non-compliance did not result in serious |
15 | | actual
harm or present an imminent and substantial |
16 | | endangerment to human
health or the environment or violate |
17 | | the specific terms of any judicial or
administrative order |
18 | | or consent agreement; |
19 | | (8) that the person cooperates as reasonably requested |
20 | | by the Agency
after the disclosure; and |
21 | | (9) that the non-compliance was identified voluntarily |
22 | | and not through a
monitoring, sampling, or auditing |
23 | | procedure that is required by statute, rule,
permit, |
24 | | judicial or administrative order, or consent agreement. |
25 | | If a person can establish all of the elements under this |
26 | | subsection except
the element set forth in paragraph (1) of |
|
| | SB1089 Engrossed | - 68 - | LRB102 04912 CPF 14931 b |
|
|
1 | | this subsection, the person is
entitled to a 75% reduction in |
2 | | the portion of the penalty that is not based
upon the economic |
3 | | benefit of non-compliance. |
4 | | For the purposes of this subsection (i), "small entity" |
5 | | has the same meaning as in Section 221 of the federal Small |
6 | | Business Regulatory Enforcement Fairness Act of 1996 (5 U.S.C. |
7 | | 601). |
8 | | (j) In addition to any other remedy or penalty that may
|
9 | | apply, whether civil or criminal, any person who violates |
10 | | Section 22.52 of this Act shall be liable for an additional |
11 | | civil penalty of up to 3 times the gross amount of any |
12 | | pecuniary gain resulting from the violation.
|
13 | | (k) In addition to any other remedy or penalty that may |
14 | | apply, whether civil or criminal, any person who violates |
15 | | subdivision (a)(7.6) of Section 31 of this Act shall be liable |
16 | | for an additional civil penalty of $2,000. |
17 | | (Source: P.A. 99-934, eff. 1-27-17; 100-436, eff. 8-25-17; |
18 | | 100-863, eff. 8-14-18.) |
19 | | (415 ILCS 5/22.38a rep.) |
20 | | Section 10. The Environmental Protection Act is amended by |
21 | | repealing Section 22.38a.
|
22 | | Section 99. Effective date. This Act takes effect upon |
23 | | becoming law. |