Sen. Antonio Muņoz
Filed: 3/15/2021
| | 10200SB1535sam001 | | LRB102 15919 RJF 23447 a |
|
|
1 | | AMENDMENT TO SENATE BILL 1535
|
2 | | AMENDMENT NO. ______. Amend Senate Bill 1535 by replacing |
3 | | everything after the enacting clause with the following:
|
4 | | "Section 5. The Illinois Procurement Code is amended by |
5 | | changing Sections 1-15.93, 30-30, 33-5, and 33-50 as follows: |
6 | | (30 ILCS 500/1-15.93) |
7 | | (Section scheduled to be repealed on January 1, 2022) |
8 | | Sec. 1-15.93. Single prime. "Single prime" means the |
9 | | design-bid-build procurement delivery method for a building |
10 | | construction project in which the Capital Development Board or |
11 | | a public institution of higher education is the construction |
12 | | agency procuring 2 or more subdivisions of work enumerated in |
13 | | paragraphs (1) through (5) of subsection (a) of Section 30-30 |
14 | | of this Code under a single contract. This Section is repealed |
15 | | on January 1, 2025 2022 .
|
16 | | (Source: P.A. 101-369, eff. 12-15-19; 101-645, eff. 6-26-20.)
|
|
| | 10200SB1535sam001 | - 2 - | LRB102 15919 RJF 23447 a |
|
|
1 | | (30 ILCS 500/30-30)
|
2 | | Sec. 30-30. Design-bid-build construction. |
3 | | (a) The provisions of this subsection are operative |
4 | | through December 31, 2024 2021 . |
5 | | Except as provided in subsections (a-5), for For
building |
6 | | construction contracts in excess of
$250,000, separate |
7 | | specifications may be prepared for all
equipment, labor, and |
8 | | materials in
connection with the following 5 subdivisions of |
9 | | the work to be
performed:
|
10 | | (1) plumbing;
|
11 | | (2) heating, piping, refrigeration, and automatic
|
12 | | temperature control systems,
including the testing and |
13 | | balancing of those systems;
|
14 | | (3) ventilating and distribution systems for
|
15 | | conditioned air, including the testing
and balancing of |
16 | | those systems;
|
17 | | (4) electric wiring; and
|
18 | | (5) general contract work.
|
19 | | Except as provided in subsections (a-5), the The |
20 | | specifications may be so drawn as to permit separate and
|
21 | | independent bidding upon
each of the 5 subdivisions of work , |
22 | | and all . All contracts awarded
for any part thereof may
award |
23 | | the 5 subdivisions of work separately to responsible and
|
24 | | reliable persons, firms, or
corporations engaged in these |
25 | | classes of work. The contracts, at
the discretion of the
|
|
| | 10200SB1535sam001 | - 3 - | LRB102 15919 RJF 23447 a |
|
|
1 | | construction agency, may be assigned to the successful bidder |
2 | | on
the general contract work or
to the successful bidder on the |
3 | | subdivision of work designated by
the construction agency |
4 | | before
the bidding as the prime subdivision of work, provided |
5 | | that all
payments will be made directly
to the contractors for |
6 | | the 5 subdivisions of work upon compliance
with the conditions |
7 | | of the
contract.
|
8 | | (a-5) Beginning on the effective date of this amendatory |
9 | | Act of the 102nd General Assembly and through December 31, |
10 | | 2024, for single prime projects in which a public institution |
11 | | of higher education is a construction agency procuring for |
12 | | building construction contracts in excess of $250,000, |
13 | | separate specifications may be prepared for all equipment, |
14 | | labor, and materials in connection with the 5 subdivisions of |
15 | | work enumerated in subsection (a). Any public institution of |
16 | | higher education contract awarded for any part thereof may |
17 | | award 2 or more of the 5 subdivisions of work together or |
18 | | separately to responsible and reliable persons, firms, or |
19 | | corporations engaged in these classes of work if: (i) the |
20 | | public institution of higher education has submitted to the |
21 | | Procurement Policy Board a written notice that shall include |
22 | | the reasons for using the single prime method and an |
23 | | explanation of why the use of that method is in the best |
24 | | interest of the State. The notice provided under this item (i) |
25 | | shall be posted on the public institution of higher |
26 | | education's online procurement webpage and on the online |
|
| | 10200SB1535sam001 | - 4 - | LRB102 15919 RJF 23447 a |
|
|
1 | | Procurement Bulletin at least 3 business days following |
2 | | submission to the Procurement Policy Board; (ii) the |
3 | | successful low bidder has prequalified with the public |
4 | | institution of higher education; (iii) the bid of the |
5 | | successful low bidder identifies the name of the |
6 | | subcontractor, if any, and the bid proposal costs for each of |
7 | | the 5 subdivisions of work set forth in subsection (a); (iv) |
8 | | the contract entered into with the successful bidder provides |
9 | | that no identified subcontractor may be terminated without the |
10 | | written consent of the public institution of higher education; |
11 | | and (v) the successful low bidder has prequalified with the |
12 | | University of Illinois or with Capital Development Board. |
13 | | For building construction projects with a total |
14 | | construction cost valued at $20,000,000 or less, public |
15 | | institutions of higher education shall not use the single |
16 | | prime delivery method for more than 50% of the total number of |
17 | | projects bid for each fiscal year. Projects with a total |
18 | | construction cost valued greater than $20,000,000 may be bid |
19 | | using the single prime delivery method at the discretion of |
20 | | the public institution of higher education. |
21 | | With respect to any construction project described in this |
22 | | subsection (a-5), the public institution of higher education |
23 | | shall: (i) specify in writing as a public record that the |
24 | | project shall comply with the Business Enterprise for |
25 | | Minorities, Women, and Persons with Disabilities Act and the |
26 | | equal employment practices of Section 2-105 of the Illinois |
|
| | 10200SB1535sam001 | - 5 - | LRB102 15919 RJF 23447 a |
|
|
1 | | Human Rights Act; and (ii) report annually to the Governor, |
2 | | General Assembly, Procurement Policy Board, and Auditor |
3 | | General on the bidding, award, and performance of all single |
4 | | prime projects. On or after the effective date of this |
5 | | amendatory Act of the 102nd General Assembly, the public |
6 | | institution of higher education may award in each fiscal year |
7 | | single prime contracts with an aggregate total value of no |
8 | | more than $100,000,000. The Board of Trustees of the |
9 | | University of Illinois may award in each fiscal year single |
10 | | prime contracts with an aggregate total value of no more than |
11 | | $300,000,000. |
12 | | Beginning on the effective date of this amendatory Act of |
13 | | the 101st General Assembly and through December 31, 2024 2020 , |
14 | | for single prime projects: (i) the bid of the successful low |
15 | | bidder shall identify the name of the subcontractor, if any, |
16 | | and the bid proposal costs for each of the 5 subdivisions of |
17 | | work set forth in this Section; (ii) the contract entered into |
18 | | with the successful bidder shall provide that no identified |
19 | | subcontractor may be terminated without the written consent of |
20 | | the Capital Development Board; (iii) the contract shall comply |
21 | | with the disadvantaged business practices of the Business |
22 | | Enterprise for Minorities, Women, and Persons with |
23 | | Disabilities Act and the equal employment practices of Section |
24 | | 2-105 of the Illinois Human Rights Act; and (iv) the Capital |
25 | | Development Board shall submit an annual report to the General |
26 | | Assembly and Governor on the bidding, award, and performance |
|
| | 10200SB1535sam001 | - 6 - | LRB102 15919 RJF 23447 a |
|
|
1 | | of all single prime projects. |
2 | | For building construction projects with a total |
3 | | construction cost valued at $5,000,000 or less, the Capital |
4 | | Development Board shall not use the single prime procurement |
5 | | delivery method for more than 50% of the total number of |
6 | | projects bid for each fiscal year. Any project with a total |
7 | | construction cost valued greater than $5,000,000 may be bid |
8 | | using single prime at the discretion of the Executive Director |
9 | | of the Capital Development Board. |
10 | | (b) The provisions of this subsection are operative on and |
11 | | after January 1, 2025 2022 .
For building construction |
12 | | contracts in excess of $250,000, separate specifications shall |
13 | | be prepared for all equipment, labor, and materials in |
14 | | connection with the following 5 subdivisions of the work to be |
15 | | performed: |
16 | | (1) plumbing; |
17 | | (2) heating, piping, refrigeration, and automatic |
18 | | temperature control systems, including the testing and |
19 | | balancing of those systems; |
20 | | (3) ventilating and distribution systems for |
21 | | conditioned air, including the testing and balancing of |
22 | | those systems; |
23 | | (4) electric wiring; and |
24 | | (5) general contract work. |
25 | | The specifications must be so drawn as to permit separate |
26 | | and independent bidding upon each of the 5 subdivisions of |
|
| | 10200SB1535sam001 | - 7 - | LRB102 15919 RJF 23447 a |
|
|
1 | | work. All contracts awarded for any part thereof shall award |
2 | | the 5 subdivisions of work separately to responsible and |
3 | | reliable persons, firms, or corporations engaged in these |
4 | | classes of work. The contracts, at the discretion of the |
5 | | construction agency, may be assigned to the successful bidder |
6 | | on the general contract work or to the successful bidder on the |
7 | | subdivision of work designated by the construction agency |
8 | | before the bidding as the prime subdivision of work, provided |
9 | | that all payments will be made directly to the contractors for |
10 | | the 5 subdivisions of work upon compliance with the conditions |
11 | | of the contract. |
12 | | (Source: P.A. 100-391, eff. 8-25-17; 101-369, eff. 12-15-19; |
13 | | 101-645, eff. 6-26-20.)
|
14 | | (30 ILCS 500/33-5)
|
15 | | Sec. 33-5. Definitions. In this Article:
|
16 | | "Construction management services" includes:
|
17 | | (1) services provided in the planning and |
18 | | pre-construction phases of a
construction project |
19 | | including, but not limited to, consulting with,
advising, |
20 | | assisting, and making recommendations to the Capital |
21 | | Development Board and
architect, engineer, or licensed |
22 | | land surveyor on all aspects
of planning for project |
23 | | construction; reviewing all plans and
specifications as |
24 | | they are being developed and making recommendations
with |
25 | | respect to construction feasibility, availability of |
|
| | 10200SB1535sam001 | - 8 - | LRB102 15919 RJF 23447 a |
|
|
1 | | material and
labor, time requirements for procurement and |
2 | | construction, and
projected costs; making, reviewing, and |
3 | | refining budget estimates based
on the Board's program and |
4 | | other available information; making
recommendations to the |
5 | | Board and the architect or engineer
regarding the division |
6 | | of work in the plans and specifications to
facilitate the |
7 | | bidding and awarding of contracts; soliciting the
interest |
8 | | of capable contractors and taking bids on the project;
|
9 | | analyzing the bids received; and preparing and maintaining |
10 | | a progress
schedule during the design phase of the project |
11 | | and preparation of a
proposed construction schedule; and
|
12 | | (2) services provided in the construction phase of the |
13 | | project
including, but not limited to, maintaining |
14 | | competent supervisory staff
to coordinate and provide |
15 | | general direction of the work and progress
of the |
16 | | contractors on the project; directing the work as it is |
17 | | being
performed for general conformance with working |
18 | | drawings and
specifications; establishing procedures for |
19 | | coordinating among the
Board, architect or engineer, |
20 | | contractors, and construction
manager with respect to all |
21 | | aspects of the project and
implementing those procedures; |
22 | | maintaining job site records
and making appropriate |
23 | | progress reports; implementing labor policy
in conformance |
24 | | with the requirements of the public owner; reviewing
the |
25 | | safety and equal opportunity programs of each contractor |
26 | | for
conformance with the public owner's policy and making
|
|
| | 10200SB1535sam001 | - 9 - | LRB102 15919 RJF 23447 a |
|
|
1 | | recommendations; reviewing and processing
all applications |
2 | | for payment by involved contractors and material
suppliers |
3 | | in accordance with the terms of the contract; making
|
4 | | recommendations and processing requests for changes in the |
5 | | work and
maintaining records of change orders; scheduling |
6 | | and conducting job
meetings to ensure orderly progress of |
7 | | the work; developing and
monitoring a project progress |
8 | | schedule, coordinating and expediting
the work of all |
9 | | contractors and providing periodic status reports to
the |
10 | | owner and the architect or engineer; and establishing and
|
11 | | maintaining a cost control system and conducting meetings |
12 | | to review
costs.
|
13 | | "Construction manager" means any individual, sole
|
14 | | proprietorship, firm, partnership, corporation, or other legal |
15 | | entity
providing construction management services for the |
16 | | Board and
prequalified by the State in accordance with 30 ILCS
|
17 | | 500/33-10.
|
18 | | "Board" means the Capital Development Board and public |
19 | | institutions of higher education .
|
20 | | (Source: P.A. 94-532, eff. 8-10-05.) |
21 | | (30 ILCS 500/33-50)
|
22 | | Sec. 33-50. Duties of construction manager; additional
|
23 | | requirements for persons performing construction work.
|
24 | | (a) Upon the award of a construction management services
|
25 | | contract, a construction manager must contract with the Board |
|
| | 10200SB1535sam001 | - 10 - | LRB102 15919 RJF 23447 a |
|
|
1 | | to
furnish his or her skill and judgment in cooperation with, |
2 | | and reliance
upon, the services of the project architect or |
3 | | engineer. The
construction manager must furnish business |
4 | | administration, management
of the construction process, and |
5 | | other specified services to the Board and must perform his or |
6 | | her obligations in an expeditious and
economical manner |
7 | | consistent with the interest of the Board. If
it is in the |
8 | | State's best interest, the construction manager may
provide or |
9 | | perform basic services for which reimbursement is provided
in |
10 | | the general conditions to the construction management services
|
11 | | contract.
|
12 | | (b) The actual construction work on the project must be |
13 | | awarded to
contractors under this Code. The Capital |
14 | | Development Board may further separate additional divisions of |
15 | | work under this Article. This subsection is
subject to the |
16 | | applicable provisions of the following Acts:
|
17 | | (1) the Prevailing Wage Act;
|
18 | | (2) the Public Construction Bond Act;
|
19 | | (3) the Public Works Employment Discrimination Act;
|
20 | | (4) the Public Works Preference Act (repealed on June |
21 | | 16, 2010 by Public Act 96-929);
|
22 | | (5) the Employment of Illinois Workers on Public
Works |
23 | | Act;
|
24 | | (6) the Public Contract Fraud Act;
|
25 | | (7) (blank); and
|
26 | | (8) the Illinois Architecture Practice Act of 1989, |
|
| | 10200SB1535sam001 | - 11 - | LRB102 15919 RJF 23447 a |
|
|
1 | | the Professional
Engineering
Practice Act of 1989, the |
2 | | Illinois Professional Land Surveyor Act of 1989, and
the |
3 | | Structural
Engineering Practice Act of 1989.
|
4 | | (Source: P.A. 101-149, eff. 7-26-19.) |
5 | | Section 10. The Design-Build
Procurement Act is amended by |
6 | | changing Sections 5, 10, and 90 as follows: |
7 | | (30 ILCS 537/5) |
8 | | (Section scheduled to be repealed on July 1, 2022)
|
9 | | Sec. 5. Legislative policy. It is the intent of the |
10 | | General Assembly
that
the State construction agency Capital |
11 | | Development Board be allowed to use the design-build delivery |
12 | | method
for public
projects if it is shown to be in the State's |
13 | | best interest for that particular
project. It shall be the |
14 | | policy of the State construction agency Capital Development |
15 | | Board in the
procurement of
design-build services to publicly |
16 | | announce all requirements for design-build
services and to |
17 | | procure these services on the basis of demonstrated competence
|
18 | | and qualifications and with due regard for the principles of |
19 | | competitive
selection.
|
20 | | The State construction agency Capital Development Board |
21 | | shall, prior to issuing requests for proposals,
promulgate
and |
22 | | publish procedures for the solicitation and award of contracts |
23 | | pursuant to
this Act.
|
24 | | The State construction agency Capital Development Board |
|
| | 10200SB1535sam001 | - 12 - | LRB102 15919 RJF 23447 a |
|
|
1 | | shall, for each public project or projects
permitted under
|
2 | | this Act, make a written determination, including a |
3 | | description as to the
particular advantages of the |
4 | | design-build procurement method, that it is in the
best |
5 | | interests of this State to enter into a design-build contract |
6 | | for the
project or projects. In making that determination, the |
7 | | following factors shall
be considered:
|
8 | | (1) The probability that the design-build procurement |
9 | | method will be in
the best interests of the State by |
10 | | providing a material savings of time or
cost over the |
11 | | design-bid-build or other delivery system.
|
12 | | (2) The type and size of the project and its |
13 | | suitability to the
design-build procurement method.
|
14 | | (3) The ability of the State construction agency to |
15 | | define and provide
comprehensive
scope and performance |
16 | | criteria for the project.
|
17 | | No State construction agency may use a design-build |
18 | | procurement method unless the agency determines in writing |
19 | | that the project will comply with the disadvantaged business |
20 | | and equal employment practices of the State as established in |
21 | | the Business Enterprise for Minorities, Women, and Persons |
22 | | with Disabilities Act and Section 2-105 of the Illinois Human |
23 | | Rights Act.
|
24 | | The State construction agency Capital Development Board |
25 | | shall within 15 days after the initial
determination provide |
26 | | an advisory copy to the Procurement Policy Board and
maintain |
|
| | 10200SB1535sam001 | - 13 - | LRB102 15919 RJF 23447 a |
|
|
1 | | the full record of determination for 5 years.
|
2 | | (Source: P.A. 100-391, eff. 8-25-17 .) |
3 | | (30 ILCS 537/10) |
4 | | (Section scheduled to be repealed on July 1, 2022)
|
5 | | Sec. 10. Definitions. As used in this Act:
|
6 | | "State construction agency" means the Capital Development |
7 | | Board and public institutions of higher education .
|
8 | | "Delivery system" means the design and construction |
9 | | approach used to develop
and construct a project.
|
10 | | "Design-bid-build" means the traditional delivery system |
11 | | used on public
projects in this State that incorporates the |
12 | | Architectural, Engineering, and
Land Surveying Qualification |
13 | | Based Selection Act (30 ILCS 535/) and the
principles of |
14 | | competitive selection in the Illinois Procurement Code (30 |
15 | | ILCS
500/).
|
16 | | "Design-build" means a delivery system that provides |
17 | | responsibility within a
single contract for the furnishing of |
18 | | architecture, engineering, land surveying
and related services |
19 | | as required, and the labor, materials, equipment, and
other |
20 | | construction services for the project.
|
21 | | "Design-build contract" means a contract for a public |
22 | | project under this Act
between the State construction agency |
23 | | and a design-build entity to furnish
architecture,
|
24 | | engineering, land surveying, and related services as required, |
25 | | and to furnish
the labor, materials, equipment, and other |
|
| | 10200SB1535sam001 | - 14 - | LRB102 15919 RJF 23447 a |
|
|
1 | | construction services for the
project. The design-build |
2 | | contract may be conditioned upon subsequent
refinements in |
3 | | scope and price and may allow the State construction agency to
|
4 | | make
modifications in the project scope without invalidating |
5 | | the design-build
contract.
|
6 | | "Design-build entity" means any individual, sole |
7 | | proprietorship, firm,
partnership, joint venture, corporation, |
8 | | professional corporation, or other
entity that proposes to |
9 | | design and construct any public project under this Act.
A |
10 | | design-build entity and associated design-build professionals |
11 | | shall conduct themselves in accordance with the laws of this |
12 | | State and the related provisions of the Illinois |
13 | | Administrative Code, as referenced by the licensed design |
14 | | professionals Acts of this State.
|
15 | | "Design professional" means any individual, sole |
16 | | proprietorship, firm,
partnership, joint venture, corporation, |
17 | | professional corporation, or other
entity that offers services |
18 | | under the Illinois Architecture Practice Act of
1989 (225 ILCS |
19 | | 305/), the Professional Engineering Practice Act of 1989 (225
|
20 | | ILCS 325/),
the Structural Engineering Licensing Act of 1989 |
21 | | (225 ILCS 340/), or the
Illinois Professional
Land Surveyor |
22 | | Act of 1989 (225 ILCS 330/).
|
23 | | "Evaluation criteria" means the requirements for the |
24 | | separate phases of the
selection process as defined in this |
25 | | Act and may include the specialized
experience, technical |
26 | | qualifications and competence, capacity to perform, past
|
|
| | 10200SB1535sam001 | - 15 - | LRB102 15919 RJF 23447 a |
|
|
1 | | performance, experience with similar projects, assignment of |
2 | | personnel to the
project, and other appropriate factors. Price |
3 | | may not be used as a factor in
the evaluation of Phase I |
4 | | proposals.
|
5 | | "Proposal" means the offer to enter into a design-build |
6 | | contract as submitted
by a design-build entity in accordance |
7 | | with this Act.
|
8 | | "Request for proposal" means the document used by the |
9 | | State construction agency
to solicit
proposals for a |
10 | | design-build contract.
|
11 | | "Scope and performance criteria" means the requirements |
12 | | for the public
project, including but not limited to, the |
13 | | intended usage, capacity, size,
scope, quality and performance |
14 | | standards, life-cycle costs, and other
programmatic criteria |
15 | | that are expressed in performance-oriented and
quantifiable |
16 | | specifications and drawings that can be reasonably inferred |
17 | | and
are suited to allow a design-build entity to develop a |
18 | | proposal.
|
19 | | (Source: P.A. 94-716, eff. 12-13-05 .) |
20 | | (30 ILCS 537/90) |
21 | | (Section scheduled to be repealed on July 1, 2022)
|
22 | | Sec. 90. Repealer. This Act is repealed on January 1, 2025 |
23 | | July 1, 2022 .
|
24 | | (Source: P.A. 100-1189, eff. 4-5-19.)
|