| | 102ND GENERAL ASSEMBLY
State of Illinois
2021 and 2022 SB2380 Introduced 2/26/2021, by Sen. Laura Fine SYNOPSIS AS INTRODUCED: |
| 415 ILCS 5/39 | from Ch. 111 1/2, par. 1039 |
|
Amends the Environmental Protection Act. Makes a technical change in a Section concerning the issuance and procedures of permits.
|
| |
| | A BILL FOR |
|
|
| | SB2380 | | LRB102 14555 CPF 19908 b |
|
|
1 | | AN ACT concerning safety.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Environmental Protection Act is amended by |
5 | | changing Section 39 as follows:
|
6 | | (415 ILCS 5/39) (from Ch. 111 1/2, par. 1039)
|
7 | | Sec. 39. Issuance of permits; procedures.
|
8 | | (a) When the the Board has by regulation required a permit |
9 | | for
the construction, installation, or operation of any type |
10 | | of facility,
equipment, vehicle, vessel, or aircraft, the |
11 | | applicant shall apply to
the Agency for such permit and it |
12 | | shall be the duty of the Agency to
issue such a permit upon |
13 | | proof by the applicant that the facility,
equipment, vehicle, |
14 | | vessel, or aircraft will not cause a violation of
this Act or |
15 | | of regulations hereunder. The Agency shall adopt such
|
16 | | procedures as are necessary to carry out its duties under this |
17 | | Section.
In making its determinations on permit applications |
18 | | under this Section the Agency may consider prior adjudications |
19 | | of
noncompliance with this Act by the applicant that involved |
20 | | a release of a
contaminant into the environment. In granting |
21 | | permits, the Agency
may impose reasonable conditions |
22 | | specifically related to the applicant's past
compliance |
23 | | history with this Act as necessary to correct, detect, or
|
|
| | SB2380 | - 2 - | LRB102 14555 CPF 19908 b |
|
|
1 | | prevent noncompliance. The Agency may impose such other |
2 | | conditions
as may be necessary to accomplish the purposes of |
3 | | this Act, and as are not
inconsistent with the regulations |
4 | | promulgated by the Board hereunder. Except as
otherwise |
5 | | provided in this Act, a bond or other security shall not be |
6 | | required
as a condition for the issuance of a permit. If the |
7 | | Agency denies any permit
under this Section, the Agency shall |
8 | | transmit to the applicant within the time
limitations of this |
9 | | Section specific, detailed statements as to the reasons the
|
10 | | permit application was denied. Such statements shall include, |
11 | | but not be
limited to the following:
|
12 | | (i) the Sections of this Act which may be violated if |
13 | | the permit
were granted;
|
14 | | (ii) the provision of the regulations, promulgated |
15 | | under this Act,
which may be violated if the permit were |
16 | | granted;
|
17 | | (iii) the specific type of information, if any, which |
18 | | the Agency
deems the applicant did not provide the Agency; |
19 | | and
|
20 | | (iv) a statement of specific reasons why the Act and |
21 | | the regulations
might not be met if the permit were |
22 | | granted.
|
23 | | If there is no final action by the Agency within 90 days |
24 | | after the
filing of the application for permit, the applicant |
25 | | may deem the permit
issued; except that this time period shall |
26 | | be extended to 180 days when
(1) notice and opportunity for |
|
| | SB2380 | - 3 - | LRB102 14555 CPF 19908 b |
|
|
1 | | public hearing are required by State or
federal law or |
2 | | regulation, (2) the application which was filed is for
any |
3 | | permit to develop a landfill subject to issuance pursuant to |
4 | | this
subsection, or (3) the application that was filed is for a |
5 | | MSWLF unit
required to issue public notice under subsection |
6 | | (p) of Section 39. The
90-day and 180-day time periods for the |
7 | | Agency to take final action do not
apply to NPDES permit |
8 | | applications under subsection (b) of this Section,
to RCRA |
9 | | permit applications under subsection (d) of this Section,
to |
10 | | UIC permit applications under subsection (e) of this Section, |
11 | | or to CCR surface impoundment applications under subsection |
12 | | (y) of this Section.
|
13 | | The Agency shall publish notice of all final permit |
14 | | determinations for
development permits for MSWLF units and for |
15 | | significant permit modifications
for lateral expansions for |
16 | | existing MSWLF units one time in a newspaper of
general |
17 | | circulation in the county in which the unit is or is proposed |
18 | | to be
located.
|
19 | | After January 1, 1994 and until July 1, 1998, operating |
20 | | permits issued under
this Section by the
Agency for sources of |
21 | | air pollution permitted to emit less than 25 tons
per year of |
22 | | any combination of regulated air pollutants, as defined in
|
23 | | Section 39.5 of this Act, shall be required to be renewed only |
24 | | upon written
request by the Agency consistent with applicable |
25 | | provisions of this Act and
regulations promulgated hereunder. |
26 | | Such operating permits shall expire
180 days after the date of |
|
| | SB2380 | - 4 - | LRB102 14555 CPF 19908 b |
|
|
1 | | such a request. The Board shall revise its
regulations for the |
2 | | existing State air pollution operating permit program
|
3 | | consistent with this provision by January 1, 1994.
|
4 | | After June 30, 1998, operating permits issued under this |
5 | | Section by the
Agency for sources of air pollution that are not |
6 | | subject to Section 39.5 of
this Act and are not required to |
7 | | have a federally enforceable State operating
permit shall be |
8 | | required to be renewed only upon written request by the Agency
|
9 | | consistent with applicable provisions of this Act and its |
10 | | rules. Such
operating permits shall expire 180 days after the |
11 | | date of such a request.
Before July 1, 1998, the Board shall |
12 | | revise its rules for the existing State
air pollution |
13 | | operating permit program consistent with this paragraph and |
14 | | shall
adopt rules that require a source to demonstrate that it |
15 | | qualifies for a permit
under this paragraph.
|
16 | | (b) The Agency may issue NPDES permits exclusively under |
17 | | this
subsection for the discharge of contaminants from point |
18 | | sources into
navigable waters, all as defined in the Federal |
19 | | Water Pollution Control
Act, as now or hereafter amended, |
20 | | within the jurisdiction of the
State, or into any well.
|
21 | | All NPDES permits shall contain those terms and |
22 | | conditions, including ,
but not limited to , schedules of |
23 | | compliance, which may be required to
accomplish the purposes |
24 | | and provisions of this Act.
|
25 | | The Agency may issue general NPDES permits for discharges |
26 | | from categories
of point sources which are subject to the same |
|
| | SB2380 | - 5 - | LRB102 14555 CPF 19908 b |
|
|
1 | | permit limitations and
conditions. Such general permits may be |
2 | | issued without individual
applications and shall conform to |
3 | | regulations promulgated under Section 402
of the Federal Water |
4 | | Pollution Control Act, as now or hereafter amended.
|
5 | | The Agency may include, among such conditions, effluent |
6 | | limitations
and other requirements established under this Act, |
7 | | Board regulations,
the Federal Water Pollution Control Act, as |
8 | | now or hereafter amended, and
regulations pursuant thereto, |
9 | | and schedules for achieving compliance
therewith at the |
10 | | earliest reasonable date.
|
11 | | The Agency shall adopt filing requirements and procedures |
12 | | which are
necessary and appropriate for the issuance of NPDES |
13 | | permits, and which
are consistent with the Act or regulations |
14 | | adopted by the Board, and
with the Federal Water Pollution |
15 | | Control Act, as now or hereafter
amended, and regulations |
16 | | pursuant thereto.
|
17 | | The Agency, subject to any conditions which may be |
18 | | prescribed by
Board regulations, may issue NPDES permits to |
19 | | allow discharges beyond
deadlines established by this Act or |
20 | | by regulations of the Board without
the requirement of a |
21 | | variance, subject to the Federal Water Pollution
Control Act, |
22 | | as now or hereafter amended, and regulations pursuant thereto.
|
23 | | (c) Except for those facilities owned or operated by |
24 | | sanitary districts
organized under the Metropolitan Water |
25 | | Reclamation District Act, no
permit for the development or |
26 | | construction of a new pollution control
facility may be |
|
| | SB2380 | - 6 - | LRB102 14555 CPF 19908 b |
|
|
1 | | granted by the Agency unless the applicant submits proof to |
2 | | the
Agency that the location of the facility has been approved |
3 | | by the county board County Board
of the county if in an |
4 | | unincorporated area, or the governing body of the
municipality |
5 | | when in an incorporated area, in which the facility is to be
|
6 | | located in accordance with Section 39.2 of this Act. For |
7 | | purposes of this subsection (c), and for purposes of Section |
8 | | 39.2 of this Act, the appropriate county board or governing |
9 | | body of the municipality shall be the county board of the |
10 | | county or the governing body of the municipality in which the |
11 | | facility is to be located as of the date when the application |
12 | | for siting approval is filed.
|
13 | | In the event that siting approval granted pursuant to |
14 | | Section 39.2 has
been transferred to a subsequent owner or |
15 | | operator, that subsequent owner or
operator may apply to the |
16 | | Agency for, and the Agency may grant, a development
or |
17 | | construction permit for the facility for which local siting |
18 | | approval was
granted. Upon application to the Agency for a |
19 | | development or
construction permit by that subsequent owner or |
20 | | operator,
the permit applicant shall cause written notice of |
21 | | the permit application
to be served upon the appropriate |
22 | | county board or governing body of the
municipality that |
23 | | granted siting approval for that facility and upon any party
|
24 | | to the siting proceeding pursuant to which siting approval was |
25 | | granted. In
that event, the Agency shall conduct an evaluation |
26 | | of the subsequent owner or
operator's prior experience in |
|
| | SB2380 | - 7 - | LRB102 14555 CPF 19908 b |
|
|
1 | | waste management operations in the manner
conducted under |
2 | | subsection (i) of Section 39 of this Act.
|
3 | | Beginning August 20, 1993, if the pollution control |
4 | | facility consists of a
hazardous or solid waste disposal |
5 | | facility for which the proposed site is
located in an |
6 | | unincorporated area of a county with a population of less than
|
7 | | 100,000 and includes all or a portion of a parcel of land that |
8 | | was, on April 1,
1993, adjacent to a municipality having a |
9 | | population of less than 5,000, then
the local siting review |
10 | | required under this subsection (c) in conjunction with
any |
11 | | permit applied for after that date shall be performed by the |
12 | | governing body
of that adjacent municipality rather than the |
13 | | county board of the county in
which the proposed site is |
14 | | located; and for the purposes of that local siting
review, any |
15 | | references in this Act to the county board shall be deemed to |
16 | | mean
the governing body of that adjacent municipality; |
17 | | provided, however, that the
provisions of this paragraph shall |
18 | | not apply to any proposed site which was, on
April 1, 1993, |
19 | | owned in whole or in part by another municipality.
|
20 | | In the case of a pollution control facility for which a
|
21 | | development permit was issued before November 12, 1981, if an |
22 | | operating
permit has not been issued by the Agency prior to |
23 | | August 31, 1989 for
any portion of the facility, then the |
24 | | Agency may not issue or renew any
development permit nor issue |
25 | | an original operating permit for any portion of
such facility |
26 | | unless the applicant has submitted proof to the Agency that |
|
| | SB2380 | - 8 - | LRB102 14555 CPF 19908 b |
|
|
1 | | the
location of the facility has been approved by the |
2 | | appropriate county board or
municipal governing body pursuant |
3 | | to Section 39.2 of this Act.
|
4 | | After January 1, 1994, if a solid waste
disposal facility, |
5 | | any portion for which an operating permit has been issued by
|
6 | | the Agency, has not accepted waste disposal for 5 or more |
7 | | consecutive calendar calendars
years, before that facility may |
8 | | accept any new or additional waste for
disposal, the owner and |
9 | | operator must obtain a new operating permit under this
Act for |
10 | | that facility unless the owner and operator have applied to |
11 | | the Agency
for a permit authorizing the temporary suspension |
12 | | of waste acceptance. The
Agency may not issue a new operation |
13 | | permit under this Act for the facility
unless the applicant |
14 | | has submitted proof to the Agency that the location of the
|
15 | | facility has been approved or re-approved by the appropriate |
16 | | county board or
municipal governing body under Section 39.2 of |
17 | | this Act after the facility
ceased accepting waste.
|
18 | | Except for those facilities owned or operated by sanitary |
19 | | districts
organized under the Metropolitan Water Reclamation |
20 | | District Act, and
except for new pollution control facilities |
21 | | governed by Section 39.2,
and except for fossil fuel mining |
22 | | facilities, the granting of a permit under
this Act shall not |
23 | | relieve the applicant from meeting and securing all
necessary |
24 | | zoning approvals from the unit of government having zoning
|
25 | | jurisdiction over the proposed facility.
|
26 | | Before beginning construction on any new sewage treatment |
|
| | SB2380 | - 9 - | LRB102 14555 CPF 19908 b |
|
|
1 | | plant or sludge
drying site to be owned or operated by a |
2 | | sanitary district organized under
the Metropolitan Water |
3 | | Reclamation District Act for which a new
permit (rather than |
4 | | the renewal or amendment of an existing permit) is
required, |
5 | | such sanitary district shall hold a public hearing within the
|
6 | | municipality within which the proposed facility is to be |
7 | | located, or within the
nearest community if the proposed |
8 | | facility is to be located within an
unincorporated area, at |
9 | | which information concerning the proposed facility
shall be |
10 | | made available to the public, and members of the public shall |
11 | | be given
the opportunity to express their views concerning the |
12 | | proposed facility.
|
13 | | The Agency may issue a permit for a municipal waste |
14 | | transfer station
without requiring approval pursuant to |
15 | | Section 39.2 provided that the following
demonstration is |
16 | | made:
|
17 | | (1) the municipal waste transfer station was in |
18 | | existence on or before
January 1, 1979 and was in |
19 | | continuous operation from January 1, 1979 to January
1, |
20 | | 1993;
|
21 | | (2) the operator submitted a permit application to the |
22 | | Agency to develop
and operate the municipal waste transfer |
23 | | station during April of 1994;
|
24 | | (3) the operator can demonstrate that the county board |
25 | | of the county, if
the municipal waste transfer station is |
26 | | in an unincorporated area, or the
governing body of the |
|
| | SB2380 | - 10 - | LRB102 14555 CPF 19908 b |
|
|
1 | | municipality, if the station is in an incorporated area,
|
2 | | does not object to resumption of the operation of the |
3 | | station; and
|
4 | | (4) the site has local zoning approval.
|
5 | | (d) The Agency may issue RCRA permits exclusively under |
6 | | this
subsection to persons owning or operating a facility for |
7 | | the treatment,
storage, or disposal of hazardous waste as |
8 | | defined under this Act. Subsection (y) of this Section, rather |
9 | | than this subsection (d), shall apply to permits issued for |
10 | | CCR surface impoundments.
|
11 | | All RCRA permits shall contain those terms and conditions, |
12 | | including , but
not limited to , schedules of compliance, which |
13 | | may be required to accomplish
the purposes and provisions of |
14 | | this Act. The Agency may include among such
conditions |
15 | | standards and other requirements established under this Act,
|
16 | | Board regulations, the Resource Conservation and Recovery Act |
17 | | of 1976 (P.L.
94-580), as amended, and regulations pursuant |
18 | | thereto, and may include
schedules for achieving compliance |
19 | | therewith as soon as possible. The
Agency shall require that a |
20 | | performance bond or other security be provided
as a condition |
21 | | for the issuance of a RCRA permit.
|
22 | | In the case of a permit to operate a hazardous waste or PCB |
23 | | incinerator
as defined in subsection (k) of Section 44, the |
24 | | Agency shall require, as a
condition of the permit, that the |
25 | | operator of the facility perform such
analyses of the waste to |
26 | | be incinerated as may be necessary and appropriate
to ensure |
|
| | SB2380 | - 11 - | LRB102 14555 CPF 19908 b |
|
|
1 | | the safe operation of the incinerator.
|
2 | | The Agency shall adopt filing requirements and procedures |
3 | | which
are necessary and appropriate for the issuance of RCRA |
4 | | permits, and which
are consistent with the Act or regulations |
5 | | adopted by the Board, and with
the Resource Conservation and |
6 | | Recovery Act of 1976 (P.L. 94-580), as
amended, and |
7 | | regulations pursuant thereto.
|
8 | | The applicant shall make available to the public for |
9 | | inspection all
documents submitted by the applicant to the |
10 | | Agency in furtherance
of an application, with the exception of |
11 | | trade secrets, at the office of
the county board or governing |
12 | | body of the municipality. Such documents
may be copied upon |
13 | | payment of the actual cost of reproduction during regular
|
14 | | business hours of the local office. The Agency shall issue a |
15 | | written statement
concurrent with its grant or denial of the |
16 | | permit explaining the basis for its
decision.
|
17 | | (e) The Agency may issue UIC permits exclusively under |
18 | | this
subsection to persons owning or operating a facility for |
19 | | the underground
injection of contaminants as defined under |
20 | | this Act.
|
21 | | All UIC permits shall contain those terms and conditions, |
22 | | including , but
not limited to , schedules of compliance, which |
23 | | may be required to accomplish
the purposes and provisions of |
24 | | this Act. The Agency may include among such
conditions |
25 | | standards and other requirements established under this Act,
|
26 | | Board regulations, the Safe Drinking Water Act (P.L. 93-523), |
|
| | SB2380 | - 12 - | LRB102 14555 CPF 19908 b |
|
|
1 | | as amended,
and regulations pursuant thereto, and may include |
2 | | schedules for achieving
compliance therewith. The Agency shall |
3 | | require that a performance bond or
other security be provided |
4 | | as a condition for the issuance of a UIC permit.
|
5 | | The Agency shall adopt filing requirements and procedures |
6 | | which
are necessary and appropriate for the issuance of UIC |
7 | | permits, and which
are consistent with the Act or regulations |
8 | | adopted by the Board, and with
the Safe Drinking Water Act |
9 | | (P.L. 93-523), as amended, and regulations
pursuant thereto.
|
10 | | The applicant shall make available to the public for |
11 | | inspection, all
documents submitted by the applicant to the |
12 | | Agency in furtherance of an
application, with the exception of |
13 | | trade secrets, at the office of the county
board or governing |
14 | | body of the municipality. Such documents may be copied upon
|
15 | | payment of the actual cost of reproduction during regular |
16 | | business hours of the
local office. The Agency shall issue a |
17 | | written statement concurrent with its
grant or denial of the |
18 | | permit explaining the basis for its decision.
|
19 | | (f) In making any determination pursuant to Section 9.1 of |
20 | | this Act:
|
21 | | (1) The Agency shall have authority to make the |
22 | | determination of any
question required to be determined by |
23 | | the Clean Air Act, as now or
hereafter amended, this Act, |
24 | | or the regulations of the Board, including the
|
25 | | determination of the Lowest Achievable Emission Rate, |
26 | | Maximum Achievable
Control Technology, or Best Available |
|
| | SB2380 | - 13 - | LRB102 14555 CPF 19908 b |
|
|
1 | | Control Technology, consistent with the
Board's |
2 | | regulations, if any.
|
3 | | (2) The Agency shall adopt requirements as necessary |
4 | | to implement public participation procedures, including, |
5 | | but not limited to, public notice, comment, and an |
6 | | opportunity for hearing, which must accompany the |
7 | | processing of applications for PSD permits. The Agency |
8 | | shall briefly describe and respond to all significant |
9 | | comments on the draft permit raised during the public |
10 | | comment period or during any hearing. The Agency may group |
11 | | related comments together and provide one unified response |
12 | | for each issue raised. |
13 | | (3) Any complete permit application submitted to the |
14 | | Agency under this subsection for a PSD permit shall be |
15 | | granted or denied by the Agency not later than one year |
16 | | after the filing of such completed application. |
17 | | (4) The Agency shall, after conferring with the |
18 | | applicant, give written
notice to the applicant of its |
19 | | proposed decision on the application , including
the terms |
20 | | and conditions of the permit to be issued and the facts, |
21 | | conduct ,
or other basis upon which the Agency will rely to |
22 | | support its proposed action.
|
23 | | (g) The Agency shall include as conditions upon all |
24 | | permits issued for
hazardous waste disposal sites such |
25 | | restrictions upon the future use
of such sites as are |
26 | | reasonably necessary to protect public health and
the |
|
| | SB2380 | - 14 - | LRB102 14555 CPF 19908 b |
|
|
1 | | environment, including permanent prohibition of the use of |
2 | | such
sites for purposes which may create an unreasonable risk |
3 | | of injury to human
health or to the environment. After |
4 | | administrative and judicial challenges
to such restrictions |
5 | | have been exhausted, the Agency shall file such
restrictions |
6 | | of record in the Office of the Recorder of the county in which
|
7 | | the hazardous waste disposal site is located.
|
8 | | (h) A hazardous waste stream may not be deposited in a |
9 | | permitted hazardous
waste site unless specific authorization |
10 | | is obtained from the Agency by the
generator and disposal site |
11 | | owner and operator for the deposit of that specific
hazardous |
12 | | waste stream. The Agency may grant specific authorization for
|
13 | | disposal of hazardous waste streams only after the generator |
14 | | has reasonably
demonstrated that, considering
technological |
15 | | feasibility and economic reasonableness, the hazardous waste
|
16 | | cannot be reasonably recycled for reuse, nor incinerated or |
17 | | chemically,
physically or biologically treated so as to |
18 | | neutralize the hazardous waste
and render it nonhazardous. In |
19 | | granting authorization under this Section,
the Agency may |
20 | | impose such conditions as may be necessary to accomplish
the |
21 | | purposes of the Act and are consistent with this Act and |
22 | | regulations
promulgated by the Board hereunder. If the Agency |
23 | | refuses to grant
authorization under this Section, the |
24 | | applicant may appeal as if the Agency
refused to grant a |
25 | | permit, pursuant to the provisions of subsection (a) of
|
26 | | Section 40 of this Act. For purposes of this subsection (h), |
|
| | SB2380 | - 15 - | LRB102 14555 CPF 19908 b |
|
|
1 | | the term
"generator" has the meaning given in Section 3.205 of |
2 | | this Act,
unless: (1) the hazardous waste is treated, |
3 | | incinerated, or partially recycled
for reuse prior to |
4 | | disposal, in which case the last person who treats,
|
5 | | incinerates, or partially recycles the hazardous waste prior |
6 | | to disposal is the
generator; or (2) the hazardous waste is |
7 | | from a response action, in which case
the person performing |
8 | | the response action is the generator. This subsection
(h) does |
9 | | not apply to any hazardous waste that is restricted from land |
10 | | disposal
under 35 Ill. Adm. Code 728.
|
11 | | (i) Before issuing any RCRA permit, any permit for a waste |
12 | | storage site,
sanitary landfill, waste disposal site, waste |
13 | | transfer station, waste treatment
facility, waste incinerator, |
14 | | or any waste-transportation operation, any permit or interim |
15 | | authorization for a clean construction or demolition debris |
16 | | fill operation, or any permit required under subsection (d-5) |
17 | | of Section 55, the Agency
shall conduct an evaluation of the |
18 | | prospective owner's or operator's prior
experience in waste |
19 | | management operations, clean construction or demolition debris |
20 | | fill operations, and tire storage site management. The Agency |
21 | | may deny such a permit, or deny or revoke interim |
22 | | authorization,
if the prospective owner or operator or any |
23 | | employee or officer of the
prospective owner or operator has a |
24 | | history of:
|
25 | | (1) repeated violations of federal, State, or local |
26 | | laws, regulations,
standards, or ordinances in the |
|
| | SB2380 | - 16 - | LRB102 14555 CPF 19908 b |
|
|
1 | | operation of waste management facilities or
sites, clean |
2 | | construction or demolition debris fill operation |
3 | | facilities or sites, or tire storage sites; or
|
4 | | (2) conviction in this or another State of any crime |
5 | | which is a felony
under the laws of this State, or |
6 | | conviction of a felony in a federal court; or conviction |
7 | | in this or another state or federal court of any of the |
8 | | following crimes: forgery, official misconduct, bribery, |
9 | | perjury, or knowingly submitting false information under |
10 | | any environmental law, regulation, or permit term or |
11 | | condition; or
|
12 | | (3) proof of gross carelessness or incompetence in |
13 | | handling, storing,
processing, transporting or disposing |
14 | | of waste, clean construction or demolition debris, or used |
15 | | or waste tires, or proof of gross carelessness or |
16 | | incompetence in using clean construction or demolition |
17 | | debris as fill.
|
18 | | (i-5) Before issuing any permit or approving any interim |
19 | | authorization for a clean construction or demolition debris |
20 | | fill operation in which any ownership interest is transferred |
21 | | between January 1, 2005, and the effective date of the |
22 | | prohibition set forth in Section 22.52 of this Act, the Agency |
23 | | shall conduct an evaluation of the operation if any previous |
24 | | activities at the site or facility may have caused or allowed |
25 | | contamination of the site. It shall be the responsibility of |
26 | | the owner or operator seeking the permit or interim |
|
| | SB2380 | - 17 - | LRB102 14555 CPF 19908 b |
|
|
1 | | authorization to provide to the Agency all of the information |
2 | | necessary for the Agency to conduct its evaluation. The Agency |
3 | | may deny a permit or interim authorization if previous |
4 | | activities at the site may have caused or allowed |
5 | | contamination at the site, unless such contamination is |
6 | | authorized under any permit issued by the Agency.
|
7 | | (j) The issuance under this Act of a permit to engage in |
8 | | the surface mining
of any resources other than fossil fuels |
9 | | shall not relieve
the permittee from its duty to comply with |
10 | | any applicable local law regulating
the commencement, location |
11 | | or operation of surface mining facilities.
|
12 | | (k) A development permit issued under subsection (a) of |
13 | | Section 39 for any
facility or site which is required to have a |
14 | | permit under subsection (d) of
Section 21 shall expire at the |
15 | | end of 2 calendar years from the date upon which
it was issued, |
16 | | unless within that period the applicant has taken action to
|
17 | | develop the facility or the site. In the event that review of |
18 | | the
conditions of the development permit is sought pursuant to |
19 | | Section 40 or
41, or permittee is prevented from commencing |
20 | | development of the facility
or site by any other litigation |
21 | | beyond the permittee's control, such
two-year period shall be |
22 | | deemed to begin on the date upon which such review
process or |
23 | | litigation is concluded.
|
24 | | (l) No permit shall be issued by the Agency under this Act |
25 | | for
construction or operation of any facility or site located |
26 | | within the
boundaries of any setback zone established pursuant |
|
| | SB2380 | - 18 - | LRB102 14555 CPF 19908 b |
|
|
1 | | to this Act, where such
construction or operation is |
2 | | prohibited.
|
3 | | (m) The Agency may issue permits to persons owning or |
4 | | operating
a facility for composting landscape waste. In |
5 | | granting such permits, the Agency
may impose such conditions |
6 | | as may be necessary to accomplish the purposes of
this Act, and |
7 | | as are not inconsistent with applicable regulations |
8 | | promulgated
by the Board. Except as otherwise provided in this |
9 | | Act, a bond or other
security shall not be required as a |
10 | | condition for the issuance of a permit. If
the Agency denies |
11 | | any permit pursuant to this subsection, the Agency shall
|
12 | | transmit to the applicant within the time limitations of this |
13 | | subsection
specific, detailed statements as to the reasons the |
14 | | permit application was
denied. Such statements shall include |
15 | | but not be limited to the following:
|
16 | | (1) the Sections of this Act that may be violated if |
17 | | the permit
were granted;
|
18 | | (2) the specific regulations promulgated pursuant to |
19 | | this
Act that may be violated if the permit were granted;
|
20 | | (3) the specific information, if any, the Agency deems |
21 | | the
applicant did not provide in its application to the |
22 | | Agency; and
|
23 | | (4) a statement of specific reasons why the Act and |
24 | | the regulations
might be violated if the permit were |
25 | | granted.
|
26 | | If no final action is taken by the Agency within 90 days |
|
| | SB2380 | - 19 - | LRB102 14555 CPF 19908 b |
|
|
1 | | after the filing
of the application for permit, the applicant |
2 | | may deem the permit issued.
Any applicant for a permit may |
3 | | waive the 90-day limitation by filing a
written statement with |
4 | | the Agency.
|
5 | | The Agency shall issue permits for such facilities upon |
6 | | receipt of an
application that includes a legal description of |
7 | | the site, a topographic
map of the site drawn to the scale of |
8 | | 200 feet to the inch or larger, a
description of the operation, |
9 | | including the area served, an estimate of
the volume of |
10 | | materials to be processed, and documentation that:
|
11 | | (1) the facility includes a setback of at
least 200 |
12 | | feet from the nearest potable water supply well;
|
13 | | (2) the facility is located outside the boundary
of |
14 | | the 10-year floodplain or the site will be floodproofed;
|
15 | | (3) the facility is located so as to minimize
|
16 | | incompatibility with the character of the surrounding |
17 | | area, including at
least a 200 foot setback from any |
18 | | residence, and in the case of a
facility that is developed |
19 | | or the permitted composting area of which is
expanded |
20 | | after November 17, 1991, the composting area is located at |
21 | | least 1/8
mile from the nearest residence (other than a |
22 | | residence located on the same
property as the facility);
|
23 | | (4) the design of the facility will prevent any |
24 | | compost material from
being placed within 5 feet of the |
25 | | water table, will adequately control runoff
from the site, |
26 | | and will collect and manage any leachate that is generated |
|
| | SB2380 | - 20 - | LRB102 14555 CPF 19908 b |
|
|
1 | | on
the site;
|
2 | | (5) the operation of the facility will include |
3 | | appropriate dust
and odor control measures, limitations on |
4 | | operating hours, appropriate
noise control measures for |
5 | | shredding, chipping and similar equipment,
management |
6 | | procedures for composting, containment and disposal of
|
7 | | non-compostable wastes, procedures to be used for
|
8 | | terminating operations at the site, and recordkeeping |
9 | | sufficient to
document the amount of materials received, |
10 | | composted and otherwise
disposed of; and
|
11 | | (6) the operation will be conducted in accordance with |
12 | | any applicable
rules adopted by the Board.
|
13 | | The Agency shall issue renewable permits of not longer |
14 | | than 10 years
in duration for the composting of landscape |
15 | | wastes, as defined in Section
3.155 of this Act, based on the |
16 | | above requirements.
|
17 | | The operator of any facility permitted under this |
18 | | subsection (m) must
submit a written annual statement to the |
19 | | Agency on or before April 1 of
each year that includes an |
20 | | estimate of the amount of material, in tons,
received for |
21 | | composting.
|
22 | | (n) The Agency shall issue permits jointly with the |
23 | | Department of
Transportation for the dredging or deposit of |
24 | | material in Lake Michigan in
accordance with Section 18 of the |
25 | | Rivers, Lakes, and Streams Act.
|
26 | | (o) (Blank.)
|
|
| | SB2380 | - 21 - | LRB102 14555 CPF 19908 b |
|
|
1 | | (p) (1) Any person submitting an application for a permit |
2 | | for a new MSWLF
unit or for a lateral expansion under |
3 | | subsection (t) of Section 21 of this Act
for an existing MSWLF |
4 | | unit that has not received and is not subject to local
siting |
5 | | approval under Section 39.2 of this Act shall publish notice |
6 | | of the
application in a newspaper of general circulation in |
7 | | the county in which the
MSWLF unit is or is proposed to be |
8 | | located. The notice must be published at
least 15 days before |
9 | | submission of the permit application to the Agency. The
notice |
10 | | shall state the name and address of the applicant, the |
11 | | location of the
MSWLF unit or proposed MSWLF unit, the nature |
12 | | and size of the MSWLF unit or
proposed MSWLF unit, the nature |
13 | | of the activity proposed, the probable life of
the proposed |
14 | | activity, the date the permit application will be submitted, |
15 | | and a
statement that persons may file written comments with |
16 | | the Agency concerning the
permit application within 30 days |
17 | | after the filing of the permit application
unless the time |
18 | | period to submit comments is extended by the Agency.
|
19 | | When a permit applicant submits information to the Agency |
20 | | to supplement a
permit application being reviewed by the |
21 | | Agency, the applicant shall not be
required to reissue the |
22 | | notice under this subsection.
|
23 | | (2) The Agency shall accept written comments concerning |
24 | | the permit
application that are postmarked no later than 30 |
25 | | days after the
filing of the permit application, unless the |
26 | | time period to accept comments is
extended by the Agency.
|
|
| | SB2380 | - 22 - | LRB102 14555 CPF 19908 b |
|
|
1 | | (3) Each applicant for a permit described in part (1) of |
2 | | this subsection
shall file a
copy of the permit application |
3 | | with the county board or governing body of the
municipality in |
4 | | which the MSWLF unit is or is proposed to be located at the
|
5 | | same time the application is submitted to the Agency. The |
6 | | permit application
filed with the county board or governing |
7 | | body of the municipality shall include
all documents submitted |
8 | | to or to be submitted to the Agency, except trade
secrets as |
9 | | determined under Section 7.1 of this Act. The permit |
10 | | application
and other documents on file with the county board |
11 | | or governing body of the
municipality shall be made available |
12 | | for public inspection during regular
business hours at the |
13 | | office of the county board or the governing body of the
|
14 | | municipality and may be copied upon payment of the actual cost |
15 | | of
reproduction.
|
16 | | (q) Within 6 months after July 12, 2011 (the effective |
17 | | date of Public Act 97-95), the Agency, in consultation with |
18 | | the regulated community, shall develop a web portal to be |
19 | | posted on its website for the purpose of enhancing review and |
20 | | promoting timely issuance of permits required by this Act. At |
21 | | a minimum, the Agency shall make the following information |
22 | | available on the web portal: |
23 | | (1) Checklists and guidance relating to the completion |
24 | | of permit applications, developed pursuant to subsection |
25 | | (s) of this Section, which may include, but are not |
26 | | limited to, existing instructions for completing the |
|
| | SB2380 | - 23 - | LRB102 14555 CPF 19908 b |
|
|
1 | | applications and examples of complete applications. As the |
2 | | Agency develops new checklists and develops guidance, it |
3 | | shall supplement the web portal with those materials. |
4 | | (2) Within 2 years after July 12, 2011 (the effective |
5 | | date of Public Act 97-95), permit application forms or |
6 | | portions of permit applications that can be completed and |
7 | | saved electronically, and submitted to the Agency |
8 | | electronically with digital signatures. |
9 | | (3) Within 2 years after July 12, 2011 (the effective |
10 | | date of Public Act 97-95), an online tracking system where |
11 | | an applicant may review the status of its pending |
12 | | application, including the name and contact information of |
13 | | the permit analyst assigned to the application. Until the |
14 | | online tracking system has been developed, the Agency |
15 | | shall post on its website semi-annual permitting |
16 | | efficiency tracking reports that include statistics on the |
17 | | timeframes for Agency action on the following types of |
18 | | permits received after July 12, 2011 (the effective date |
19 | | of Public Act 97-95): air construction permits, new NPDES |
20 | | permits and associated water construction permits, and |
21 | | modifications of major NPDES permits and associated water |
22 | | construction permits. The reports must be posted by |
23 | | February 1 and August 1 each year and shall include: |
24 | | (A) the number of applications received for each |
25 | | type of permit, the number of applications on which |
26 | | the Agency has taken action, and the number of |
|
| | SB2380 | - 24 - | LRB102 14555 CPF 19908 b |
|
|
1 | | applications still pending; and |
2 | | (B) for those applications where the Agency has |
3 | | not taken action in accordance with the timeframes set |
4 | | forth in this Act, the date the application was |
5 | | received and the reasons for any delays, which may |
6 | | include, but shall not be limited to, (i) the |
7 | | application being inadequate or incomplete, (ii) |
8 | | scientific or technical disagreements with the |
9 | | applicant, USEPA, or other local, state, or federal |
10 | | agencies involved in the permitting approval process, |
11 | | (iii) public opposition to the permit, or (iv) Agency |
12 | | staffing shortages. To the extent practicable, the |
13 | | tracking report shall provide approximate dates when |
14 | | cause for delay was identified by the Agency, when the |
15 | | Agency informed the applicant of the problem leading |
16 | | to the delay, and when the applicant remedied the |
17 | | reason for the delay. |
18 | | (r) Upon the request of the applicant, the Agency shall |
19 | | notify the applicant of the permit analyst assigned to the |
20 | | application upon its receipt. |
21 | | (s) The Agency is authorized to prepare and distribute |
22 | | guidance documents relating to its administration of this |
23 | | Section and procedural rules implementing this Section. |
24 | | Guidance documents prepared under this subsection shall not be |
25 | | considered rules and shall not be subject to the Illinois |
26 | | Administrative Procedure Act. Such guidance shall not be |
|
| | SB2380 | - 25 - | LRB102 14555 CPF 19908 b |
|
|
1 | | binding on any party. |
2 | | (t) Except as otherwise prohibited by federal law or |
3 | | regulation, any person submitting an application for a permit |
4 | | may include with the application suggested permit language for |
5 | | Agency consideration. The Agency is not obligated to use the |
6 | | suggested language or any portion thereof in its permitting |
7 | | decision. If requested by the permit applicant, the Agency |
8 | | shall meet with the applicant to discuss the suggested |
9 | | language. |
10 | | (u) If requested by the permit applicant, the Agency shall |
11 | | provide the permit applicant with a copy of the draft permit |
12 | | prior to any public review period. |
13 | | (v) If requested by the permit applicant, the Agency shall |
14 | | provide the permit applicant with a copy of the final permit |
15 | | prior to its issuance. |
16 | | (w) An air pollution permit shall not be required due to |
17 | | emissions of greenhouse gases, as specified by Section 9.15 of |
18 | | this Act. |
19 | | (x) If, before the expiration of a State operating permit |
20 | | that is issued pursuant to subsection (a) of this Section and |
21 | | contains federally enforceable conditions limiting the |
22 | | potential to emit of the source to a level below the major |
23 | | source threshold for that source so as to exclude the source |
24 | | from the Clean Air Act Permit Program, the Agency receives a |
25 | | complete application for the renewal of that permit, then all |
26 | | of the terms and conditions of the permit shall remain in |
|
| | SB2380 | - 26 - | LRB102 14555 CPF 19908 b |
|
|
1 | | effect until final administrative action has been taken on the |
2 | | application for the renewal of the permit. |
3 | | (y) The Agency may issue permits exclusively under this |
4 | | subsection to persons owning or operating a CCR surface |
5 | | impoundment subject to Section 22.59. |
6 | | All CCR surface impoundment permits shall contain those |
7 | | terms and conditions, including, but not limited to, schedules |
8 | | of compliance, which may be required to accomplish the |
9 | | purposes and provisions of this Act, Board regulations, the |
10 | | Illinois Groundwater Protection Act and regulations pursuant |
11 | | thereto, and the Resource Conservation and Recovery Act and |
12 | | regulations pursuant thereto, and may include schedules for |
13 | | achieving compliance therewith as soon as possible. |
14 | | The Board shall adopt filing requirements and procedures |
15 | | that are necessary and appropriate for the issuance of CCR |
16 | | surface impoundment permits and that are consistent with this |
17 | | Act or regulations adopted by the Board, and with the RCRA, as |
18 | | amended, and regulations pursuant thereto. |
19 | | The applicant shall make available to the public for |
20 | | inspection all documents submitted by the applicant to the |
21 | | Agency in furtherance of an application, with the exception of |
22 | | trade secrets, on its public internet website as well as at the |
23 | | office of the county board or governing body of the |
24 | | municipality where CCR from the CCR surface impoundment will |
25 | | be permanently disposed. Such documents may be copied upon |
26 | | payment of the actual cost of reproduction during regular |