|
| | 102ND GENERAL ASSEMBLY
State of Illinois
2021 and 2022 SB2522 Introduced 2/26/2021, by Sen. Chapin Rose SYNOPSIS AS INTRODUCED: |
| |
Amends the Eminent Domain Act. Provides that quick-take proceedings may be used for a period of no more than 2 years after the effective date by Moultrie County for the acquisition of certain described property for the purpose of replacing a structuring and constructing an associated roadway on Township Road 185A. Effective immediately.
|
| |
| | A BILL FOR |
|
|
| | SB2522 | | LRB102 10476 LNS 15805 b |
|
|
1 | | AN ACT concerning civil law.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Eminent Domain Act is amended by adding |
5 | | Section 25-5-80 as follows: |
6 | | (735 ILCS 30/25-5-80 new) |
7 | | Sec. 25-5-80. Quick-take; Moultrie County; Township Road |
8 | | 185A. |
9 | | (a) Quick-take proceedings under Article 20 may be used |
10 | | for a period of no more than 2 years after the effective date |
11 | | of this amendatory Act of the 102nd General Assembly by |
12 | | Moultrie County for the acquisition of the following described |
13 | | property for the purpose of replacing a structure and |
14 | | constructing an associated roadway on Township Road 185A: |
15 | | A part of the Northeast Quarter of Section 11, |
16 | | Township 12 North, Range 6 East of the Third Principal |
17 | | Meridian located in Moultrie County, Illinois, more |
18 | | particularly described as follows: |
19 | | Commencing at the Southeast corner of the said |
20 | | Northeast Quarter; thence North 88°48'50" West along the |
21 | | South line of said Northeast Quarter, 966.15 feet to the |
22 | | point of beginning; thence North 00°09'24" West, 13.14 |
23 | | feet to the centerline of proposed improvement; thence |
|
| | SB2522 | - 2 - | LRB102 10476 LNS 15805 b |
|
|
1 | | continuing North 00°09'24" West, 30.00 feet to a point |
2 | | being 30 feet distant measured and perpendicular to the |
3 | | North of said centerline; thence North 84°54'18" West, |
4 | | 109.25 feet to a point being 40 feet distant measured and |
5 | | perpendicular to and North of said centerline; thence |
6 | | parallel with said centerline 169.29 feet along a circular |
7 | | curve to the right having a chord bearing of North |
8 | | 68°09'28" West with a chord length of 165.14 feet and a |
9 | | radius of 220.12 feet; thence parallel with said |
10 | | centerline North 46°09'33" West, 296.16 feet: thence |
11 | | parallel with said centerline 73.65 feet along a circular |
12 | | curve to the left having a chord bearing of North |
13 | | 53°10'55" West with a chord length of 73.47 feet and a |
14 | | radius of 300.44 feet to the South line of the North 70 |
15 | | acres of the West Half of the said Northeast Quarter; |
16 | | thence North 88°59'47" West along the South line of said |
17 | | North 70 acres, 620.26 feet; thence South 01°25'31" East, |
18 | | 29.21 feet to the existing South right-of-way line of the |
19 | | East-West public road; thence South 82°37'17" East, 75.89 |
20 | | feet to the point being 30 feet distant measured and |
21 | | perpendicular to the South of the said centerline; thence |
22 | | parallel with said centerline North 88°34'29" East, 100 |
23 | | feet; thence South 63°13'29" East, 42.32 feet to a point |
24 | | being 50 feet distant measured and perpendicular to and |
25 | | South of the said centerline; thence parallel with said |
26 | | centerline 109.31 feet along a circular curve to the right |
|
| | SB2522 | - 3 - | LRB102 10476 LNS 15805 b |
|
|
1 | | having a chord bearing of South 89°44'30" East, with a |
2 | | chord length of 109.29 feet and a radius of 1859.51 feet; |
3 | | thence North 89°05'34" East,100.58 feet to a point being |
4 | | 45 feet distant measured and perpendicular to and South of |
5 | | said centerline; thence parallel with said centerline |
6 | | South 88°03'29" East, 54.61 feet; thence parallel with |
7 | | said centerline 157.54 feet along a circular curve to the |
8 | | right having a chord bearing of South 67°06'30" East with |
9 | | a chord length of 165.14 feet and a radius of 220.12 feet,; |
10 | | thence parallel with said centerline South 46°09'33" East, |
11 | | 79.94 feet; thence North 43°50'27" East, 5.00 feet to a |
12 | | point being 40 feet distant measured and perpendicular to |
13 | | and South of said centerline; thence parallel with said |
14 | | centerline South 46°09'33" East, 161.15 feet to the West |
15 | | line of Southeast Quarter of said Northeast Quarter; |
16 | | thence South 01°05'23" East along the West line of said |
17 | | Southeast Quarter of the Northeast Quarter, 87.37 feet to |
18 | | the Southwest corner of said Southeast Quarter of the |
19 | | Northeast Quarter; thence Easterly along the South line |
20 | | said Northeast Quarter, 355.8 feet to the point of |
21 | | beginning. |
22 | | ALSO, |
23 | | A part of the Northeast Quarter of Section 11, |
24 | | Township 12 North, Range 6 East of the Third Principal |
25 | | Meridian located in Moultrie County, Illinois, more |
|
| | SB2522 | - 4 - | LRB102 10476 LNS 15805 b |
|
|
1 | | particularly described as follows: |
2 | | Commencing at the Southeast corner of the said |
3 | | Northeast Quarter; thence North 88°48'50" West along the |
4 | | South line of said Northeast Quarter, 1319.84 feet; thence |
5 | | North 01°11'10" East, 190.97 feet to a point being 40 feet |
6 | | distant measured and perpendicular to and North of the |
7 | | centerline of proposed improvement and the point of |
8 | | beginning; thence North 43°50'27" East, 50.00 feet to a |
9 | | point being 90 feet distant measured and perpendicular to |
10 | | and North of said centerline: thence parallel with said |
11 | | centerline North 46°09'33" West, 120.00 feet; thence South |
12 | | 43°50'27" West, 50.00 feet to the proposed right-of-way |
13 | | line of proposed improvement, said point being 40 feet |
14 | | distant measured and perpendicular to and North of said |
15 | | centerline; thence South 46°09'33" East along said |
16 | | proposed right-of-way line, 120.00 feet to the point of |
17 | | beginning. |
18 | | ALSO, |
19 | | A part of the Northeast Quarter of Section 11, |
20 | | Township 12 North, Range 6 East of the Third Principal |
21 | | Meridian located in Moultrie County, Illinois, more |
22 | | particularly described as follows: |
23 | | Commencing at the Southeast corner of the said |
24 | | Northeast Quarter; thence North 88°48'50" West along the |
25 | | South line of said Northeast Quarter, 1351.98 feet; thence |
|
| | SB2522 | - 5 - | LRB102 10476 LNS 15805 b |
|
|
1 | | North 01°11'10" East, 111.80 feet to the proposed |
2 | | right-of-way line of the proposed improvement, said point |
3 | | being 40 feet distant measured and perpendicular to and |
4 | | South of the centerline of proposed improvement and the |
5 | | point of beginning; thence parallel with said centerline |
6 | | North 46°09'33" West along said proposed right-of-way |
7 | | line, 125.00 feet; thence South 43°50'27" West along said |
8 | | proposed right-of-way line, 5.00 feet to a point being 45 |
9 | | feet distant measured and perpendicular to and South of |
10 | | said centerline; thence parallel with said centerline |
11 | | North 46°09'33" West along said proposed right-of-way, |
12 | | 25.00 feet; thence South 43°50'27" West. 35.00 feet to a |
13 | | point being 80 feet distant measured and perpendicular to |
14 | | and South of said centerline; thence parallel with said |
15 | | centerline South 46°09'33" East, 150.00 feet; North |
16 | | 43°50'27" East, 40.00 feet to the point of beginning. |
17 | | ALSO, |
18 | | A part of the Northeast Quarter of Section 11, |
19 | | Township 12 North, Range 6 East of the Third Principal |
20 | | Meridian located in Moultrie County, Illinois, more |
21 | | particularly described as follows: |
22 | | Commencing at the Southeast corner of the said |
23 | | Northeast Quarter; thence North 88°48'50" West along the |
24 | | South line of said Northeast Quarter, 1527.33 feet; thence |
25 | | North 01°11'30" East, 264.11 feet to the proposed |
|
| | SB2522 | - 6 - | LRB102 10476 LNS 15805 b |
|
|
1 | | right-of-way line of the proposed improvement, said point |
2 | | being 45 feet distant measured and perpendicular to and |
3 | | South of the centerline of proposed improvement and the |
4 | | point of beginning; thence parallel with said centerline |
5 | | 73.33 feet along a circular curve to the left having a |
6 | | chord bearing of North 63°12'22" West with a chord length |
7 | | of 72.94 feet and a radius of 215.44 feet; thence South |
8 | | 17°06'20" West, 35.00 feet to a point being 80 feet |
9 | | distant measured and perpendicular to and South of said |
10 | | centerline; thence parallel with said centerline 61.41 |
11 | | feet along a circular curve to the right having a chord |
12 | | bearing of South 63°08'38" East with a chord length of |
13 | | 61.12 feet and a radius of 180.44 feet; thence North |
14 | | 36°36'25" East, 35.00 feet to the point of beginning. |
15 | | (b) This Section is repealed 3 years after the effective
|
16 | | date of this amendatory Act of the 102nd General Assembly.
|
17 | | Section 99. Effective date. This Act takes effect upon |
18 | | becoming law.
|