| 1 | AN ACT concerning revenue.
| |||||||||||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||||||||||||
| 4 | Section 5. The Property Tax Code is amended by adding | |||||||||||||||||||||||||||||
| 5 | Division 21 to Article 10 as follows: | |||||||||||||||||||||||||||||
| 6 | (35 ILCS 200/Art. 10 Div. 21 heading new) | |||||||||||||||||||||||||||||
| 7 | Division 21. Eligible energy storage system | |||||||||||||||||||||||||||||
| 8 | (35 ILCS 200/10-800 new) | |||||||||||||||||||||||||||||
| 9 | Sec. 10-800. Policy; definitions. | |||||||||||||||||||||||||||||
| 10 | (a) It is the policy of this State that the use of energy | |||||||||||||||||||||||||||||
| 11 | storage systems should be encouraged because they increase the | |||||||||||||||||||||||||||||
| 12 | reliability of the State's electrical grid, expedite and | |||||||||||||||||||||||||||||
| 13 | assist in the implementation of renewable energy sources, and | |||||||||||||||||||||||||||||
| 14 | thereby promote the health and well-being of the people of | |||||||||||||||||||||||||||||
| 15 | this State and should be valued in relation to these benefits. | |||||||||||||||||||||||||||||
| 16 | (b) For the purposes of this Division 21: | |||||||||||||||||||||||||||||
| 17 | "2021 real property cost basis" excludes personal property | |||||||||||||||||||||||||||||
| 18 | but represents both the land and real property improvements of | |||||||||||||||||||||||||||||
| 19 | an eligible energy storage system and means $500,000 per | |||||||||||||||||||||||||||||
| 20 | megawatt of nameplate capacity. | |||||||||||||||||||||||||||||
| 21 | "Allowance for physical depreciation" means (i) the actual | |||||||||||||||||||||||||||||
| 22 | age in years of the eligible energy storage system on the | |||||||||||||||||||||||||||||
| |||||||
| |||||||
| 1 | assessment date divided by 25 years multiplied by (ii) the | ||||||
| 2 | trended real property cost basis. The physical depreciation, | ||||||
| 3 | however, may not reduce the value of the eligible energy | ||||||
| 4 | storage system to less than 30% of the trended real property | ||||||
| 5 | cost basis. | ||||||
| 6 | "Eligible energy storage system" means commercially | ||||||
| 7 | available technology that is capable of absorbing energy and | ||||||
| 8 | storing a capacity of up to 2 megawatts for use at a later | ||||||
| 9 | time, including, but not limited to, electrochemical, thermal, | ||||||
| 10 | and electromechanical technologies, and may be interconnected | ||||||
| 11 | behind the customer's meter or interconnected behind its own | ||||||
| 12 | meter. Energy storage systems owned, operated, or constructed | ||||||
| 13 | by the owners or affiliates of electric generating facilities | ||||||
| 14 | that are eligible to supply renewable energy credits or | ||||||
| 15 | pursuant to subsection (c-5) of Section 1-75 of the Illinois | ||||||
| 16 | Power Agency Act and energy storage systems located adjacent | ||||||
| 17 | to electric generating facilities that are eligible to supply | ||||||
| 18 | renewable energy credits pursuant to subsection (c-5) of | ||||||
| 19 | Section 1-75 of the Illinois Power Agency Act are not | ||||||
| 20 | considered "eligible energy storage systems" for purposes of | ||||||
| 21 | this Division 21. | ||||||
| 22 | "Trended real property cost basis" means the 2021 real | ||||||
| 23 | property cost basis multiplied by the trending factor. | ||||||
| 24 | "Trending factor" means a number equal to the Consumer | ||||||
| 25 | Price Index (U.S. city average all items) published by the | ||||||
| 26 | Bureau of Labor Statistics for the December immediately | ||||||
| |||||||
| |||||||
| 1 | preceding the assessment date, divided by the Consumer Price | ||||||
| 2 | Index (U.S. city average all items) published by the Bureau of | ||||||
| 3 | Labor Statistics for December 2021. | ||||||
| 4 | (35 ILCS 200/10-805 new) | ||||||
| 5 | Sec. 10-805. Valuation of eligible energy storage system. | ||||||
| 6 | Beginning in assessment year 2021, the fair cash value of | ||||||
| 7 | eligible energy storage systems shall be determined by | ||||||
| 8 | subtracting the allowance for physical depreciation from the | ||||||
| 9 | trended real property cost basis. Functional obsolescence and | ||||||
| 10 | external obsolescence may further reduce the fair cash value | ||||||
| 11 | of the eligible energy storage system to the extent those | ||||||
| 12 | factors are proved by the taxpayer by clear and convincing | ||||||
| 13 | evidence. | ||||||
| 14 | (35 ILCS 200/10-810 new) | ||||||
| 15 | Sec. 10-810. Applicability. | ||||||
| 16 | (a) The provisions of this Division apply for assessment | ||||||
| 17 | years 2021 through 2040. | ||||||
| 18 | (b) The provisions of this Division do not apply to | ||||||
| 19 | eligible energy storage systems that are owned by any person | ||||||
| 20 | or entity that is otherwise exempt from taxation under this | ||||||
| 21 | Code. | ||||||
| 22 | (35 ILCS 200/10-815 new) | ||||||
| 23 | Sec. 10-815. Not subject to equalization. An eligible | ||||||
| |||||||
| |||||||
| 1 | energy storage system is not subject to equalization. Eligible | ||||||
| 2 | energy storage system assessable property is not subject to | ||||||
| 3 | equalization factors applied by the Department or any board of | ||||||
| 4 | review, assessor, or chief county assessment officer. | ||||||
| 5 | (35 ILCS 200/10-820 new) | ||||||
| 6 | Sec. 10-820. Platting requirements; parcel identification | ||||||
| 7 | numbers. The owner of an eligible energy storage system shall, | ||||||
| 8 | at his or her own expense, use an Illinois registered land | ||||||
| 9 | surveyor to prepare a plat showing the metes and bounds | ||||||
| 10 | description, including access routes, of the area immediately | ||||||
| 11 | surrounding the eligible energy storage system or systems over | ||||||
| 12 | which that owner has exclusive control; provided that such | ||||||
| 13 | platting does not constitute a subdivision of land subject to | ||||||
| 14 | the provisions of the Plat Act. Within 60 days after | ||||||
| 15 | completion of construction of the eligible energy storage | ||||||
| 16 | system, the owner of the eligible energy storage system shall | ||||||
| 17 | record the plat and deliver a copy of it to the chief county | ||||||
| 18 | assessment officer and to the owner of the land surrounding | ||||||
| 19 | the newly platted area. Upon receiving a copy of the plat, the | ||||||
| 20 | chief county assessment officer shall issue a separate parcel | ||||||
| 21 | identification number or numbers for the property containing | ||||||
| 22 | the eligible energy storage system or systems.
| ||||||
| 23 | Section 99. Effective date. This Act takes effect upon | ||||||
| 24 | becoming law.
| ||||||