103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024
SB1323

 

Introduced 2/6/2023, by Sen. Celina Villanueva

 

SYNOPSIS AS INTRODUCED:
 
415 ILCS 5/3.187 new
415 ILCS 5/3.281 new
415 ILCS 5/9.12
415 ILCS 5/22.63 new
415 ILCS 5/34.5 new
415 ILCS 5/39  from Ch. 111 1/2, par. 1039
415 ILCS 5/39.2  from Ch. 111 1/2, par. 1039.2
415 ILCS 5/39.5  from Ch. 111 1/2, par. 1039.5
415 ILCS 5/39.15 new
415 ILCS 5/40  from Ch. 111 1/2, par. 1040
415 ILCS 5/40.4 new

    Amends the Environmental Protection Act. Requires the Environmental Protection Agency to establish a process by which communities not designated as environmental justice communities may petition for such a designation. Provides that an applicant for a permit for the construction of a new source that will become a major source subject to the Clean Air Act Permit Program and will be located in an environmental justice community or a new source that has required or will require a federally enforceable State operating permit and will be located in an environmental justice community must conduct a public meeting prior to submission of the permit application and must submit with the permit application an environmental justice assessment identifying the potential environmental and health impacts to the area associated with the proposed project. Provides requirements for the environmental justice assessment. Provides that a supplemental fee of $200,000 for each construction permit application shall be assessed if the construction permit application is subject to the requirements regarding the construction of a new source located in an environmental justice community. Contains provisions regarding public participation requirements for permitting transactions in an environmental justice community. Provides that, if the Agency grants a permit to construct, modify, or operate a facility that emits air pollutants and is classified as a minor source, a third party may petition the Pollution Control Board for a hearing to contest the issuance of the permit. Allows the Agency to deny the issuance of certain permits to persons with a history of violating specified environmental laws. Contains provisions regarding environmental justice grievances. Defines "environmental justice community". Contains other provisions.


LRB103 27060 CPF 53428 b

 

 

A BILL FOR

 

SB1323LRB103 27060 CPF 53428 b

1    AN ACT concerning health.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Environmental Protection Act is amended by
5changing Sections 9.12, 39, 39.2, 39.5, and 40 and by adding
6Sections 3.187, 3.281, 22.63, 34.5, 39.15, and 40.4 as
7follows:
 
8    (415 ILCS 5/3.187 new)
9    Sec. 3.187. Environmental justice community.
10"Environmental justice community" has the same meaning, based
11on existing methodologies and findings, as used in the
12Illinois Solar for All Program, as updated from time to time by
13the Illinois Power Agency and the Program Administrator of
14that Program.
 
15    (415 ILCS 5/3.281 new)
16    Sec. 3.281. Linguistic isolation. "Linguistic isolation"
17means a situation in which members of a household who are 14
18years of age and older speak a non-English language and speak
19English less than very well. A community surrounding a
20facility is in linguistic isolation if 20% of the households
21in the community's surrounding one-mile radius meet the United
22States Census Bureau's definition for linguistic isolation

 

 

SB1323- 2 -LRB103 27060 CPF 53428 b

1based on the Bureau's latest one-year or 5-year American
2Community Survey.
 
3    (415 ILCS 5/9.12)
4    Sec. 9.12. Construction permit fees for air pollution
5sources.
6    (a) An applicant for a new or revised air pollution
7construction permit shall pay a fee, as established in this
8Section, to the Agency at the time that he or she submits the
9application for a construction permit. Except as set forth
10below, the fee for each activity or category listed in this
11Section is separate and is cumulative with any other
12applicable fee listed in this Section.
13    (b) The fee amounts in this subsection (b) apply to
14construction permit applications relating to (i) a source
15subject to Section 39.5 of this Act (the Clean Air Act Permit
16Program); (ii) a source that, upon issuance of the requested
17construction permit, will become a major source subject to
18Section 39.5; or (iii) a source that has or will require a
19federally enforceable State operating permit limiting its
20potential to emit.
21        (1) Base fees for each construction permit application
22    shall be assessed as follows:
23            (A) If the construction permit application relates
24        to one or more new emission units or to a combination
25        of new and modified emission units, a fee of $4,000 for

 

 

SB1323- 3 -LRB103 27060 CPF 53428 b

1        the first new emission unit and a fee of $1,000 for
2        each additional new or modified emission unit;
3        provided that the total base fee under this
4        subdivision (A) shall not exceed $10,000.
5            (B) If the construction permit application relates
6        to one or more modified emission units but not to any
7        new emission unit, a fee of $2,000 for the first
8        modified emission unit and a fee of $1,000 for each
9        additional modified emission unit; provided that the
10        total base fee under this subdivision (B) shall not
11        exceed $5,000.
12        (2) Supplemental fees for each construction permit
13    application shall be assessed as follows:
14            (A) If, based on the construction permit
15        application, the source will be, but is not currently,
16        subject to Section 39.5 of this Act, a CAAPP entry fee
17        of $5,000.
18            (B) If the construction permit application
19        involves (i) a new source or emission unit subject to
20        Section 39.2 of this Act, (ii) a commercial
21        incinerator or other municipal waste, hazardous waste,
22        or waste tire incinerator, (iii) a commercial power
23        generator, or (iv) one or more other emission units
24        designated as a complex source by Agency rulemaking, a
25        fee of $25,000.
26            (C) If the construction permit application

 

 

SB1323- 4 -LRB103 27060 CPF 53428 b

1        involves an emissions netting exercise or reliance on
2        a contemporaneous emissions decrease for a pollutant
3        to avoid application of the PSD permit program or
4        nonattainment new source review, a fee of $3,000 for
5        each such pollutant.
6            (D) If the construction permit application is for
7        a new major source subject to the PSD permit program, a
8        fee of $12,000.
9            (E) If the construction permit application is for
10        a new major source subject to nonattainment new source
11        review, a fee of $20,000.
12            (F) If the construction permit application is for
13        a major modification subject to the PSD permit
14        program, a fee of $6,000.
15            (G) If the construction permit application is for
16        a major modification subject to nonattainment new
17        source review, a fee of $12,000.
18            (H) (Blank).
19            (I) If the construction permit application review
20        involves a determination of the Maximum Achievable
21        Control Technology standard for a pollutant and the
22        project is not otherwise subject to BACT or LAER for a
23        related pollutant under the PSD permit program or
24        nonattainment new source review, a fee of $5,000 per
25        unit for which a determination is requested or
26        otherwise required.

 

 

SB1323- 5 -LRB103 27060 CPF 53428 b

1            (J) (Blank).
2            (K) If the construction permit application is
3        subject to the requirements under subsection (z) or
4        subsection (aa) of Section 39, a fee of $200,000.
5        (3) If a public hearing is held regarding the
6    construction permit application, an administrative fee of
7    $10,000. This fee shall be submitted at the time the
8    applicant requests a public hearing or, if a public
9    hearing is not requested by the applicant, then within 30
10    days after the applicant is informed by the Agency that a
11    public hearing will be held.
12    (c) The fee amounts in this subsection (c) apply to
13construction permit applications relating to a source that,
14upon issuance of the construction permit, will not (i) be or
15become subject to Section 39.5 of this Act (the Clean Air Act
16Permit Program) or (ii) have or require a federally
17enforceable state operating permit limiting its potential to
18emit.
19        (1) Base fees for each construction permit application
20    shall be assessed as follows:
21            (A) For a construction permit application
22        involving a single new emission unit, a fee of $500.
23            (B) For a construction permit application
24        involving more than one new emission unit, a fee of
25        $1,000.
26            (C) For a construction permit application

 

 

SB1323- 6 -LRB103 27060 CPF 53428 b

1        involving no more than 2 modified emission units, a
2        fee of $500.
3            (D) For a construction permit application
4        involving more than 2 modified emission units, a fee
5        of $1,000.
6        (2) Supplemental fees for each construction permit
7    application shall be assessed as follows:
8            (A) If the source is a new source, i.e., does not
9        currently have an operating permit, an entry fee of
10        $500;
11            (B) If the construction permit application
12        involves (i) a new source or emission unit subject to
13        Section 39.2 of this Act, (ii) a commercial
14        incinerator or a municipal waste, hazardous waste, or
15        waste tire incinerator, (iii) a commercial power
16        generator, or (iv) an emission unit designated as a
17        complex source by Agency rulemaking, a fee of $15,000.
18        (3) If a public hearing is held regarding the
19    construction permit application, an administrative fee of
20    $10,000. This fee shall be submitted at the time the
21    applicant requests a public hearing or, if a public
22    hearing is not requested by the applicant, then within 30
23    days after the applicant is informed by the Agency that a
24    public hearing will be held.
25    (d) If no other fee is applicable under this Section, a
26construction permit application addressing one or more of the

 

 

SB1323- 7 -LRB103 27060 CPF 53428 b

1following shall be subject to a filing fee of $500:
2        (1) A construction permit application to add or
3    replace a control device on a permitted emission unit.
4        (2) A construction permit application to conduct a
5    pilot project or trial burn for a permitted emission unit.
6        (3) A construction permit application for a land
7    remediation project.
8        (4) (Blank).
9        (5) A construction permit application to revise an
10    emissions testing methodology or the timing of required
11    emissions testing.
12        (6) A construction permit application that provides
13    for a change in the name, address, or phone number of any
14    person identified in the permit, or for a change in the
15    stated ownership or control, or for a similar minor
16    administrative permit change at the source.
17    (e) No fee shall be assessed for a request to correct an
18issued permit that involves only an Agency error, if the
19request is received within the deadline for a permit appeal to
20the Pollution Control Board.
21    (f) The applicant for a new or revised air pollution
22construction permit shall submit to the Agency, with the
23construction permit application, both a certification of the
24fee that he or she estimates to be due under this Section and
25the fee itself.
26    (g) Notwithstanding the requirements of subsection (a) of

 

 

SB1323- 8 -LRB103 27060 CPF 53428 b

1Section 39 of this Act, the application for an air pollution
2construction permit shall not be deemed to be filed with the
3Agency until the Agency receives the initial air pollution
4construction permit application fee and the certified estimate
5of the fee required by this Section. Unless the Agency has
6received the initial air pollution construction permit
7application fee and the certified estimate of the fee required
8by this Section, the Agency is not required to review or
9process the application.
10    (h) If the Agency determines at any time that a
11construction permit application is subject to an additional
12fee under this Section that the applicant has not submitted,
13the Agency shall notify the applicant in writing of the amount
14due under this Section. The applicant shall have 60 days to
15remit the assessed fee to the Agency.
16    If the proper fee established under this Section is not
17submitted within 60 days after the request for further
18remittance:
19        (1) If the construction permit has not yet been
20    issued, the Agency is not required to further review or
21    process, and the provisions of subsection (a) of Section
22    39 of this Act do not apply to, the application for a
23    construction permit until such time as the proper fee is
24    remitted.
25        (2) If the construction permit has been issued, the
26    Agency may, upon written notice, immediately revoke the

 

 

SB1323- 9 -LRB103 27060 CPF 53428 b

1    construction permit.
2    The denial or revocation of a construction permit does not
3excuse the applicant from the duty of paying the fees required
4under this Section.
5    (i) The Agency may deny the issuance of a pending air
6pollution construction permit or the subsequent operating
7permit if the applicant has not paid the required fees by the
8date required for issuance of the permit. The denial or
9revocation of a permit for failure to pay a construction
10permit fee is subject to review by the Board pursuant to the
11provisions of subsection (a) of Section 40 of this Act.
12    (j) If the owner or operator undertakes construction
13without obtaining an air pollution construction permit, the
14fee under this Section is still required. Payment of the
15required fee does not preclude the Agency or the Attorney
16General or other authorized persons from pursuing enforcement
17against the applicant for failure to have an air pollution
18construction permit prior to commencing construction.
19    (k) If an air pollution construction permittee makes a fee
20payment under this Section from an account with insufficient
21funds to cover the amount of the fee payment, the Agency shall
22notify the permittee of the failure to pay the fee. If the
23permittee fails to pay the fee within 60 days after such
24notification, the Agency may, by written notice, immediately
25revoke the air pollution construction permit. Failure of the
26Agency to notify the permittee of the permittee's failure to

 

 

SB1323- 10 -LRB103 27060 CPF 53428 b

1make payment does not excuse or alter the duty of the permittee
2to comply with the provisions of this Section.
3    (l) The Agency may establish procedures for the collection
4of air pollution construction permit fees.
5    (m) Fees collected pursuant to this Section shall be
6deposited into the Environmental Protection Permit and
7Inspection Fund.
8(Source: P.A. 99-463, eff. 1-1-16.)
 
9    (415 ILCS 5/22.63 new)
10    Sec. 22.63. Environmental justice community designation.
11The Agency shall establish a process by which communities not
12designated as environmental justice communities may petition
13for such a designation.
 
14    (415 ILCS 5/34.5 new)
15    Sec. 34.5. Environmentally beneficial project bank.
16    (a) The Agency shall establish and maintain on its website
17a bank of potential environmentally beneficial projects. The
18website must permit members of the public to submit
19suggestions for environmentally beneficial projects. The
20Agency shall assess the submissions for feasibility and
21clarity before inclusion in the bank.
22    (b) A respondent or defendant may propose to undertake an
23environmentally beneficial project that is not contained in
24the environmentally beneficial project bank established under

 

 

SB1323- 11 -LRB103 27060 CPF 53428 b

1subsection (a).
2    (c) If funds for an environmentally beneficial project are
3derived from penalties resulting from an administrative,
4civil, or criminal enforcement action arising from an alleged
5violation by a facility, site, or activity in an environmental
6justice community, the Agency must require that the funds be
7used for an environmentally beneficial project in the
8environmental justice community where the alleged violation
9occurred.
 
10    (415 ILCS 5/39)  (from Ch. 111 1/2, par. 1039)
11    Sec. 39. Issuance of permits; procedures.
12    (a) When the Board has by regulation required a permit for
13the construction, installation, or operation of any type of
14facility, equipment, vehicle, vessel, or aircraft, the
15applicant shall apply to the Agency for such permit and it
16shall be the duty of the Agency to issue such a permit upon
17proof by the applicant that the facility, equipment, vehicle,
18vessel, or aircraft will not cause a violation of this Act or
19of regulations hereunder. The Agency shall adopt such
20procedures as are necessary to carry out its duties under this
21Section. In making its determinations on permit applications
22under this Section the Agency shall may consider prior
23adjudications of noncompliance with this Act by the applicant
24that involved a release of a contaminant into the environment.
25In granting permits, the Agency shall may impose reasonable

 

 

SB1323- 12 -LRB103 27060 CPF 53428 b

1conditions specifically related to the applicant's past
2compliance history with this Act as necessary to correct,
3detect, or prevent noncompliance. The Agency shall may impose
4such other conditions as may be necessary to accomplish the
5purposes of this Act, and as are not inconsistent with the
6regulations promulgated by the Board hereunder. Except as
7otherwise provided in this Act, a bond or other security shall
8not be required as a condition for the issuance of a permit. If
9the Agency denies any permit under this Section, the Agency
10shall transmit to the applicant within the time limitations of
11this Section specific, detailed statements as to the reasons
12the permit application was denied. Such statements shall
13include, but not be limited to, the following:
14        (i) the Sections of this Act which may be violated if
15    the permit were granted;
16        (ii) the provision of the regulations, promulgated
17    under this Act, which may be violated if the permit were
18    granted;
19        (iii) the specific type of information, if any, which
20    the Agency deems the applicant did not provide the Agency;
21    and
22        (iv) a statement of specific reasons why the Act and
23    the regulations might not be met if the permit were
24    granted.
25    If there is no final action by the Agency within 90 days
26after the filing of the application for permit, the applicant

 

 

SB1323- 13 -LRB103 27060 CPF 53428 b

1may deem the permit issued; except that this time period shall
2be extended to 180 days when (1) notice and opportunity for
3public hearing are required by State or federal law or
4regulation, (2) the application which was filed is for any
5permit to develop a landfill subject to issuance pursuant to
6this subsection, or (3) the application that was filed is for a
7MSWLF unit required to issue public notice under subsection
8(p) of Section 39. The 90-day and 180-day time periods for the
9Agency to take final action do not apply to NPDES permit
10applications under subsection (b) of this Section, to RCRA
11permit applications under subsection (d) of this Section, to
12UIC permit applications under subsection (e) of this Section,
13or to CCR surface impoundment applications under subsection
14(y) of this Section.
15    The Agency shall publish notice of all final permit
16determinations for development permits for MSWLF units and for
17significant permit modifications for lateral expansions for
18existing MSWLF units one time in a newspaper of general
19circulation in the county in which the unit is or is proposed
20to be located.
21    After January 1, 1994 and until July 1, 1998, operating
22permits issued under this Section by the Agency for sources of
23air pollution permitted to emit less than 25 tons per year of
24any combination of regulated air pollutants, as defined in
25Section 39.5 of this Act, shall be required to be renewed only
26upon written request by the Agency consistent with applicable

 

 

SB1323- 14 -LRB103 27060 CPF 53428 b

1provisions of this Act and regulations promulgated hereunder.
2Such operating permits shall expire 180 days after the date of
3such a request. The Board shall revise its regulations for the
4existing State air pollution operating permit program
5consistent with this provision by January 1, 1994.
6    After June 30, 1998, operating permits issued under this
7Section by the Agency for sources of air pollution that are not
8subject to Section 39.5 of this Act and are not required to
9have a federally enforceable State operating permit shall be
10required to be renewed only upon written request by the Agency
11consistent with applicable provisions of this Act and its
12rules. Such operating permits shall expire 180 days after the
13date of such a request. Before July 1, 1998, the Board shall
14revise its rules for the existing State air pollution
15operating permit program consistent with this paragraph and
16shall adopt rules that require a source to demonstrate that it
17qualifies for a permit under this paragraph.
18    (b) The Agency may issue NPDES permits exclusively under
19this subsection for the discharge of contaminants from point
20sources into navigable waters, all as defined in the Federal
21Water Pollution Control Act, as now or hereafter amended,
22within the jurisdiction of the State, or into any well.
23    All NPDES permits shall contain those terms and
24conditions, including, but not limited to, schedules of
25compliance, which may be required to accomplish the purposes
26and provisions of this Act.

 

 

SB1323- 15 -LRB103 27060 CPF 53428 b

1    The Agency may issue general NPDES permits for discharges
2from categories of point sources which are subject to the same
3permit limitations and conditions. Such general permits may be
4issued without individual applications and shall conform to
5regulations promulgated under Section 402 of the Federal Water
6Pollution Control Act, as now or hereafter amended.
7    The Agency may include, among such conditions, effluent
8limitations and other requirements established under this Act,
9Board regulations, the Federal Water Pollution Control Act, as
10now or hereafter amended, and regulations pursuant thereto,
11and schedules for achieving compliance therewith at the
12earliest reasonable date.
13    The Agency shall adopt filing requirements and procedures
14which are necessary and appropriate for the issuance of NPDES
15permits, and which are consistent with the Act or regulations
16adopted by the Board, and with the Federal Water Pollution
17Control Act, as now or hereafter amended, and regulations
18pursuant thereto.
19    The Agency, subject to any conditions which may be
20prescribed by Board regulations, may issue NPDES permits to
21allow discharges beyond deadlines established by this Act or
22by regulations of the Board without the requirement of a
23variance, subject to the Federal Water Pollution Control Act,
24as now or hereafter amended, and regulations pursuant thereto.
25    (c) Except for those facilities owned or operated by
26sanitary districts organized under the Metropolitan Water

 

 

SB1323- 16 -LRB103 27060 CPF 53428 b

1Reclamation District Act, no permit for the development or
2construction of a new pollution control facility may be
3granted by the Agency unless the applicant submits proof to
4the Agency that the location of the facility has been approved
5by the county board of the county if in an unincorporated area,
6or the governing body of the municipality when in an
7incorporated area, in which the facility is to be located in
8accordance with Section 39.2 of this Act. For purposes of this
9subsection (c), and for purposes of Section 39.2 of this Act,
10the appropriate county board or governing body of the
11municipality shall be the county board of the county or the
12governing body of the municipality in which the facility is to
13be located as of the date when the application for siting
14approval is filed.
15    In the event that siting approval granted pursuant to
16Section 39.2 has been transferred to a subsequent owner or
17operator, that subsequent owner or operator may apply to the
18Agency for, and the Agency may grant, a development or
19construction permit for the facility for which local siting
20approval was granted. Upon application to the Agency for a
21development or construction permit by that subsequent owner or
22operator, the permit applicant shall cause written notice of
23the permit application to be served upon the appropriate
24county board or governing body of the municipality that
25granted siting approval for that facility and upon any party
26to the siting proceeding pursuant to which siting approval was

 

 

SB1323- 17 -LRB103 27060 CPF 53428 b

1granted. In that event, the Agency shall conduct an evaluation
2of the subsequent owner or operator's prior experience in
3waste management operations in the manner conducted under
4subsection (i) of Section 39 of this Act.
5    Beginning August 20, 1993, if the pollution control
6facility consists of a hazardous or solid waste disposal
7facility for which the proposed site is located in an
8unincorporated area of a county with a population of less than
9100,000 and includes all or a portion of a parcel of land that
10was, on April 1, 1993, adjacent to a municipality having a
11population of less than 5,000, then the local siting review
12required under this subsection (c) in conjunction with any
13permit applied for after that date shall be performed by the
14governing body of that adjacent municipality rather than the
15county board of the county in which the proposed site is
16located; and for the purposes of that local siting review, any
17references in this Act to the county board shall be deemed to
18mean the governing body of that adjacent municipality;
19provided, however, that the provisions of this paragraph shall
20not apply to any proposed site which was, on April 1, 1993,
21owned in whole or in part by another municipality.
22    In the case of a pollution control facility for which a
23development permit was issued before November 12, 1981, if an
24operating permit has not been issued by the Agency prior to
25August 31, 1989 for any portion of the facility, then the
26Agency may not issue or renew any development permit nor issue

 

 

SB1323- 18 -LRB103 27060 CPF 53428 b

1an original operating permit for any portion of such facility
2unless the applicant has submitted proof to the Agency that
3the location of the facility has been approved by the
4appropriate county board or municipal governing body pursuant
5to Section 39.2 of this Act.
6    After January 1, 1994, if a solid waste disposal facility,
7any portion for which an operating permit has been issued by
8the Agency, has not accepted waste disposal for 5 or more
9consecutive calendar years, before that facility may accept
10any new or additional waste for disposal, the owner and
11operator must obtain a new operating permit under this Act for
12that facility unless the owner and operator have applied to
13the Agency for a permit authorizing the temporary suspension
14of waste acceptance. The Agency may not issue a new operation
15permit under this Act for the facility unless the applicant
16has submitted proof to the Agency that the location of the
17facility has been approved or re-approved by the appropriate
18county board or municipal governing body under Section 39.2 of
19this Act after the facility ceased accepting waste.
20    Except for those facilities owned or operated by sanitary
21districts organized under the Metropolitan Water Reclamation
22District Act, and except for new pollution control facilities
23governed by Section 39.2, and except for fossil fuel mining
24facilities, the granting of a permit under this Act shall not
25relieve the applicant from meeting and securing all necessary
26zoning approvals from the unit of government having zoning

 

 

SB1323- 19 -LRB103 27060 CPF 53428 b

1jurisdiction over the proposed facility.
2    Before beginning construction on any new sewage treatment
3plant or sludge drying site to be owned or operated by a
4sanitary district organized under the Metropolitan Water
5Reclamation District Act for which a new permit (rather than
6the renewal or amendment of an existing permit) is required,
7such sanitary district shall hold a public hearing within the
8municipality within which the proposed facility is to be
9located, or within the nearest community if the proposed
10facility is to be located within an unincorporated area, at
11which information concerning the proposed facility shall be
12made available to the public, and members of the public shall
13be given the opportunity to express their views concerning the
14proposed facility.
15    The Agency may issue a permit for a municipal waste
16transfer station without requiring approval pursuant to
17Section 39.2 provided that the following demonstration is
18made:
19        (1) the municipal waste transfer station was in
20    existence on or before January 1, 1979 and was in
21    continuous operation from January 1, 1979 to January 1,
22    1993;
23        (2) the operator submitted a permit application to the
24    Agency to develop and operate the municipal waste transfer
25    station during April of 1994;
26        (3) the operator can demonstrate that the county board

 

 

SB1323- 20 -LRB103 27060 CPF 53428 b

1    of the county, if the municipal waste transfer station is
2    in an unincorporated area, or the governing body of the
3    municipality, if the station is in an incorporated area,
4    does not object to resumption of the operation of the
5    station; and
6        (4) the site has local zoning approval.
7    No permit for the development or construction of any of
8the following will be granted by the Agency unless the
9applicant submits proof to the Agency that the location of the
10source has been approved by the county board of the county, if
11in an unincorporated area, or the governing body of a
12municipality, when in an incorporated area, in which the
13source is to be located in accordance with Section 39.2: (i) a
14new or modified source that, upon issuance of the requested
15construction permit, will become a major source subject to
16Section 39.5 and will be located in an environmental justice
17community; or (ii) a new source that has required or will
18require a federally enforceable State operating permit and
19will be located in an environmental justice community. For
20purposes of this subsection (c), and for purposes of Section
2139.2, the appropriate county board or governing body of the
22municipality shall be the county board of the county or the
23governing body of the municipality in which the source is to be
24located as of the date when the application for siting
25approval is filed. This provision does not apply to permits
26for modifications or expansions at existing FESOP or CAAPP

 

 

SB1323- 21 -LRB103 27060 CPF 53428 b

1sources unless the modification will result in an increase in
2the hourly rate of emissions or the total annual emissions of
3any air pollutant.
4    (d) The Agency may issue RCRA permits exclusively under
5this subsection to persons owning or operating a facility for
6the treatment, storage, or disposal of hazardous waste as
7defined under this Act. Subsection (y) of this Section, rather
8than this subsection (d), shall apply to permits issued for
9CCR surface impoundments.
10    All RCRA permits shall contain those terms and conditions,
11including, but not limited to, schedules of compliance, which
12may be required to accomplish the purposes and provisions of
13this Act. The Agency may include among such conditions
14standards and other requirements established under this Act,
15Board regulations, the Resource Conservation and Recovery Act
16of 1976 (P.L. 94-580), as amended, and regulations pursuant
17thereto, and may include schedules for achieving compliance
18therewith as soon as possible. The Agency shall require that a
19performance bond or other security be provided as a condition
20for the issuance of a RCRA permit.
21    In the case of a permit to operate a hazardous waste or PCB
22incinerator as defined in subsection (k) of Section 44, the
23Agency shall require, as a condition of the permit, that the
24operator of the facility perform such analyses of the waste to
25be incinerated as may be necessary and appropriate to ensure
26the safe operation of the incinerator.

 

 

SB1323- 22 -LRB103 27060 CPF 53428 b

1    The Agency shall adopt filing requirements and procedures
2which are necessary and appropriate for the issuance of RCRA
3permits, and which are consistent with the Act or regulations
4adopted by the Board, and with the Resource Conservation and
5Recovery Act of 1976 (P.L. 94-580), as amended, and
6regulations pursuant thereto.
7    The applicant shall make available to the public for
8inspection all documents submitted by the applicant to the
9Agency in furtherance of an application, with the exception of
10trade secrets, at the office of the county board or governing
11body of the municipality. Such documents may be copied upon
12payment of the actual cost of reproduction during regular
13business hours of the local office. The Agency shall issue a
14written statement concurrent with its grant or denial of the
15permit explaining the basis for its decision.
16    (e) The Agency may issue UIC permits exclusively under
17this subsection to persons owning or operating a facility for
18the underground injection of contaminants as defined under
19this Act.
20    All UIC permits shall contain those terms and conditions,
21including, but not limited to, schedules of compliance, which
22may be required to accomplish the purposes and provisions of
23this Act. The Agency may include among such conditions
24standards and other requirements established under this Act,
25Board regulations, the Safe Drinking Water Act (P.L. 93-523),
26as amended, and regulations pursuant thereto, and may include

 

 

SB1323- 23 -LRB103 27060 CPF 53428 b

1schedules for achieving compliance therewith. The Agency shall
2require that a performance bond or other security be provided
3as a condition for the issuance of a UIC permit.
4    The Agency shall adopt filing requirements and procedures
5which are necessary and appropriate for the issuance of UIC
6permits, and which are consistent with the Act or regulations
7adopted by the Board, and with the Safe Drinking Water Act
8(P.L. 93-523), as amended, and regulations pursuant thereto.
9    The applicant shall make available to the public for
10inspection all documents submitted by the applicant to the
11Agency in furtherance of an application, with the exception of
12trade secrets, at the office of the county board or governing
13body of the municipality. Such documents may be copied upon
14payment of the actual cost of reproduction during regular
15business hours of the local office. The Agency shall issue a
16written statement concurrent with its grant or denial of the
17permit explaining the basis for its decision.
18    (f) In making any determination pursuant to Section 9.1 of
19this Act:
20        (1) The Agency shall have authority to make the
21    determination of any question required to be determined by
22    the Clean Air Act, as now or hereafter amended, this Act,
23    or the regulations of the Board, including the
24    determination of the Lowest Achievable Emission Rate,
25    Maximum Achievable Control Technology, or Best Available
26    Control Technology, consistent with the Board's

 

 

SB1323- 24 -LRB103 27060 CPF 53428 b

1    regulations, if any.
2        (2) The Agency shall adopt requirements as necessary
3    to implement public participation procedures, including,
4    but not limited to, public notice, comment, and an
5    opportunity for hearing, which must accompany the
6    processing of applications for PSD permits. The Agency
7    shall briefly describe and respond to all significant
8    comments on the draft permit raised during the public
9    comment period or during any hearing. The Agency may group
10    related comments together and provide one unified response
11    for each issue raised.
12        (3) Any complete permit application submitted to the
13    Agency under this subsection for a PSD permit shall be
14    granted or denied by the Agency not later than one year
15    after the filing of such completed application.
16        (4) The Agency shall, after conferring with the
17    applicant, give written notice to the applicant of its
18    proposed decision on the application, including the terms
19    and conditions of the permit to be issued and the facts,
20    conduct, or other basis upon which the Agency will rely to
21    support its proposed action.
22    (g) The Agency shall include as conditions upon all
23permits issued for hazardous waste disposal sites such
24restrictions upon the future use of such sites as are
25reasonably necessary to protect public health and the
26environment, including permanent prohibition of the use of

 

 

SB1323- 25 -LRB103 27060 CPF 53428 b

1such sites for purposes which may create an unreasonable risk
2of injury to human health or to the environment. After
3administrative and judicial challenges to such restrictions
4have been exhausted, the Agency shall file such restrictions
5of record in the Office of the Recorder of the county in which
6the hazardous waste disposal site is located.
7    (h) A hazardous waste stream may not be deposited in a
8permitted hazardous waste site unless specific authorization
9is obtained from the Agency by the generator and disposal site
10owner and operator for the deposit of that specific hazardous
11waste stream. The Agency may grant specific authorization for
12disposal of hazardous waste streams only after the generator
13has reasonably demonstrated that, considering technological
14feasibility and economic reasonableness, the hazardous waste
15cannot be reasonably recycled for reuse, nor incinerated or
16chemically, physically, or biologically treated so as to
17neutralize the hazardous waste and render it nonhazardous. In
18granting authorization under this Section, the Agency may
19impose such conditions as may be necessary to accomplish the
20purposes of the Act and are consistent with this Act and
21regulations promulgated by the Board hereunder. If the Agency
22refuses to grant authorization under this Section, the
23applicant may appeal as if the Agency refused to grant a
24permit, pursuant to the provisions of subsection (a) of
25Section 40 of this Act. For purposes of this subsection (h),
26the term "generator" has the meaning given in Section 3.205 of

 

 

SB1323- 26 -LRB103 27060 CPF 53428 b

1this Act, unless: (1) the hazardous waste is treated,
2incinerated, or partially recycled for reuse prior to
3disposal, in which case the last person who treats,
4incinerates, or partially recycles the hazardous waste prior
5to disposal is the generator; or (2) the hazardous waste is
6from a response action, in which case the person performing
7the response action is the generator. This subsection (h) does
8not apply to any hazardous waste that is restricted from land
9disposal under 35 Ill. Adm. Code 728.
10    (i) Before issuing any RCRA permit, any permit for a waste
11storage site, sanitary landfill, waste disposal site, waste
12transfer station, waste treatment facility, waste incinerator,
13or any waste-transportation operation, any permit or interim
14authorization for a clean construction or demolition debris
15fill operation, or any permit required under subsection (d-5)
16of Section 55, the Agency shall conduct an evaluation of the
17prospective owner's or operator's prior experience in waste
18management operations, clean construction or demolition debris
19fill operations, and tire storage site management. The Agency
20may deny such a permit, or deny or revoke interim
21authorization, if the prospective owner or operator or any
22employee or officer of the prospective owner or operator has a
23history of:
24        (1) repeated violations of federal, State, or local
25    laws, regulations, standards, or ordinances in the
26    operation of waste management facilities or sites, clean

 

 

SB1323- 27 -LRB103 27060 CPF 53428 b

1    construction or demolition debris fill operation
2    facilities or sites, or tire storage sites; or
3        (2) conviction in this or another State of any crime
4    which is a felony under the laws of this State, or
5    conviction of a felony in a federal court; or conviction
6    in this or another state or federal court of any of the
7    following crimes: forgery, official misconduct, bribery,
8    perjury, or knowingly submitting false information under
9    any environmental law, regulation, or permit term or
10    condition; or
11        (3) proof of gross carelessness or incompetence in
12    handling, storing, processing, transporting, or disposing
13    of waste, clean construction or demolition debris, or used
14    or waste tires, or proof of gross carelessness or
15    incompetence in using clean construction or demolition
16    debris as fill.
17    (i-5) Before issuing any permit or approving any interim
18authorization for a clean construction or demolition debris
19fill operation in which any ownership interest is transferred
20between January 1, 2005, and the effective date of the
21prohibition set forth in Section 22.52 of this Act, the Agency
22shall conduct an evaluation of the operation if any previous
23activities at the site or facility may have caused or allowed
24contamination of the site. It shall be the responsibility of
25the owner or operator seeking the permit or interim
26authorization to provide to the Agency all of the information

 

 

SB1323- 28 -LRB103 27060 CPF 53428 b

1necessary for the Agency to conduct its evaluation. The Agency
2may deny a permit or interim authorization if previous
3activities at the site may have caused or allowed
4contamination at the site, unless such contamination is
5authorized under any permit issued by the Agency.
6    (j) The issuance under this Act of a permit to engage in
7the surface mining of any resources other than fossil fuels
8shall not relieve the permittee from its duty to comply with
9any applicable local law regulating the commencement,
10location, or operation of surface mining facilities.
11    (k) A development permit issued under subsection (a) of
12Section 39 for any facility or site which is required to have a
13permit under subsection (d) of Section 21 shall expire at the
14end of 2 calendar years from the date upon which it was issued,
15unless within that period the applicant has taken action to
16develop the facility or the site. In the event that review of
17the conditions of the development permit is sought pursuant to
18Section 40 or 41, or permittee is prevented from commencing
19development of the facility or site by any other litigation
20beyond the permittee's control, such two-year period shall be
21deemed to begin on the date upon which such review process or
22litigation is concluded.
23    (l) No permit shall be issued by the Agency under this Act
24for construction or operation of any facility or site located
25within the boundaries of any setback zone established pursuant
26to this Act, where such construction or operation is

 

 

SB1323- 29 -LRB103 27060 CPF 53428 b

1prohibited.
2    (m) The Agency may issue permits to persons owning or
3operating a facility for composting landscape waste. In
4granting such permits, the Agency may impose such conditions
5as may be necessary to accomplish the purposes of this Act, and
6as are not inconsistent with applicable regulations
7promulgated by the Board. Except as otherwise provided in this
8Act, a bond or other security shall not be required as a
9condition for the issuance of a permit. If the Agency denies
10any permit pursuant to this subsection, the Agency shall
11transmit to the applicant within the time limitations of this
12subsection specific, detailed statements as to the reasons the
13permit application was denied. Such statements shall include
14but not be limited to the following:
15        (1) the Sections of this Act that may be violated if
16    the permit were granted;
17        (2) the specific regulations promulgated pursuant to
18    this Act that may be violated if the permit were granted;
19        (3) the specific information, if any, the Agency deems
20    the applicant did not provide in its application to the
21    Agency; and
22        (4) a statement of specific reasons why the Act and
23    the regulations might be violated if the permit were
24    granted.
25    If no final action is taken by the Agency within 90 days
26after the filing of the application for permit, the applicant

 

 

SB1323- 30 -LRB103 27060 CPF 53428 b

1may deem the permit issued. Any applicant for a permit may
2waive the 90-day limitation by filing a written statement with
3the Agency.
4    The Agency shall issue permits for such facilities upon
5receipt of an application that includes a legal description of
6the site, a topographic map of the site drawn to the scale of
7200 feet to the inch or larger, a description of the operation,
8including the area served, an estimate of the volume of
9materials to be processed, and documentation that:
10        (1) the facility includes a setback of at least 200
11    feet from the nearest potable water supply well;
12        (2) the facility is located outside the boundary of
13    the 10-year floodplain or the site will be floodproofed;
14        (3) the facility is located so as to minimize
15    incompatibility with the character of the surrounding
16    area, including at least a 200 foot setback from any
17    residence, and in the case of a facility that is developed
18    or the permitted composting area of which is expanded
19    after November 17, 1991, the composting area is located at
20    least 1/8 mile from the nearest residence (other than a
21    residence located on the same property as the facility);
22        (4) the design of the facility will prevent any
23    compost material from being placed within 5 feet of the
24    water table, will adequately control runoff from the site,
25    and will collect and manage any leachate that is generated
26    on the site;

 

 

SB1323- 31 -LRB103 27060 CPF 53428 b

1        (5) the operation of the facility will include
2    appropriate dust and odor control measures, limitations on
3    operating hours, appropriate noise control measures for
4    shredding, chipping and similar equipment, management
5    procedures for composting, containment and disposal of
6    non-compostable wastes, procedures to be used for
7    terminating operations at the site, and recordkeeping
8    sufficient to document the amount of materials received,
9    composted, and otherwise disposed of; and
10        (6) the operation will be conducted in accordance with
11    any applicable rules adopted by the Board.
12    The Agency shall issue renewable permits of not longer
13than 10 years in duration for the composting of landscape
14wastes, as defined in Section 3.155 of this Act, based on the
15above requirements.
16    The operator of any facility permitted under this
17subsection (m) must submit a written annual statement to the
18Agency on or before April 1 of each year that includes an
19estimate of the amount of material, in tons, received for
20composting.
21    (n) The Agency shall issue permits jointly with the
22Department of Transportation for the dredging or deposit of
23material in Lake Michigan in accordance with Section 18 of the
24Rivers, Lakes, and Streams Act.
25    (o) (Blank).
26    (p) (1) Any person submitting an application for a permit

 

 

SB1323- 32 -LRB103 27060 CPF 53428 b

1for a new MSWLF unit or for a lateral expansion under
2subsection (t) of Section 21 of this Act for an existing MSWLF
3unit that has not received and is not subject to local siting
4approval under Section 39.2 of this Act shall publish notice
5of the application in a newspaper of general circulation in
6the county in which the MSWLF unit is or is proposed to be
7located. The notice must be published at least 15 days before
8submission of the permit application to the Agency. The notice
9shall state the name and address of the applicant, the
10location of the MSWLF unit or proposed MSWLF unit, the nature
11and size of the MSWLF unit or proposed MSWLF unit, the nature
12of the activity proposed, the probable life of the proposed
13activity, the date the permit application will be submitted,
14and a statement that persons may file written comments with
15the Agency concerning the permit application within 30 days
16after the filing of the permit application unless the time
17period to submit comments is extended by the Agency.
18    When a permit applicant submits information to the Agency
19to supplement a permit application being reviewed by the
20Agency, the applicant shall not be required to reissue the
21notice under this subsection.
22    (2) The Agency shall accept written comments concerning
23the permit application that are postmarked no later than 30
24days after the filing of the permit application, unless the
25time period to accept comments is extended by the Agency.
26    (3) Each applicant for a permit described in part (1) of

 

 

SB1323- 33 -LRB103 27060 CPF 53428 b

1this subsection shall file a copy of the permit application
2with the county board or governing body of the municipality in
3which the MSWLF unit is or is proposed to be located at the
4same time the application is submitted to the Agency. The
5permit application filed with the county board or governing
6body of the municipality shall include all documents submitted
7to or to be submitted to the Agency, except trade secrets as
8determined under Section 7.1 of this Act. The permit
9application and other documents on file with the county board
10or governing body of the municipality shall be made available
11for public inspection during regular business hours at the
12office of the county board or the governing body of the
13municipality and may be copied upon payment of the actual cost
14of reproduction.
15    (q) Within 6 months after July 12, 2011 (the effective
16date of Public Act 97-95), the Agency, in consultation with
17the regulated community, shall develop a web portal to be
18posted on its website for the purpose of enhancing review and
19promoting timely issuance of permits required by this Act. At
20a minimum, the Agency shall make the following information
21available on the web portal:
22        (1) Checklists and guidance relating to the completion
23    of permit applications, developed pursuant to subsection
24    (s) of this Section, which may include, but are not
25    limited to, existing instructions for completing the
26    applications and examples of complete applications. As the

 

 

SB1323- 34 -LRB103 27060 CPF 53428 b

1    Agency develops new checklists and develops guidance, it
2    shall supplement the web portal with those materials.
3        (2) Within 2 years after July 12, 2011 (the effective
4    date of Public Act 97-95), permit application forms or
5    portions of permit applications that can be completed and
6    saved electronically, and submitted to the Agency
7    electronically with digital signatures.
8        (3) Within 2 years after July 12, 2011 (the effective
9    date of Public Act 97-95), an online tracking system where
10    an applicant may review the status of its pending
11    application, including the name and contact information of
12    the permit analyst assigned to the application. Until the
13    online tracking system has been developed, the Agency
14    shall post on its website semi-annual permitting
15    efficiency tracking reports that include statistics on the
16    timeframes for Agency action on the following types of
17    permits received after July 12, 2011 (the effective date
18    of Public Act 97-95): air construction permits, new NPDES
19    permits and associated water construction permits, and
20    modifications of major NPDES permits and associated water
21    construction permits. The reports must be posted by
22    February 1 and August 1 each year and shall include:
23            (A) the number of applications received for each
24        type of permit, the number of applications on which
25        the Agency has taken action, and the number of
26        applications still pending; and

 

 

SB1323- 35 -LRB103 27060 CPF 53428 b

1            (B) for those applications where the Agency has
2        not taken action in accordance with the timeframes set
3        forth in this Act, the date the application was
4        received and the reasons for any delays, which may
5        include, but shall not be limited to, (i) the
6        application being inadequate or incomplete, (ii)
7        scientific or technical disagreements with the
8        applicant, USEPA, or other local, state, or federal
9        agencies involved in the permitting approval process,
10        (iii) public opposition to the permit, or (iv) Agency
11        staffing shortages. To the extent practicable, the
12        tracking report shall provide approximate dates when
13        cause for delay was identified by the Agency, when the
14        Agency informed the applicant of the problem leading
15        to the delay, and when the applicant remedied the
16        reason for the delay.
17    (r) Upon the request of the applicant, the Agency shall
18notify the applicant of the permit analyst assigned to the
19application upon its receipt.
20    (s) The Agency is authorized to prepare and distribute
21guidance documents relating to its administration of this
22Section and procedural rules implementing this Section.
23Guidance documents prepared under this subsection shall not be
24considered rules and shall not be subject to the Illinois
25Administrative Procedure Act. Such guidance shall not be
26binding on any party.

 

 

SB1323- 36 -LRB103 27060 CPF 53428 b

1    (t) Except as otherwise prohibited by federal law or
2regulation, any person submitting an application for a permit
3may include with the application suggested permit language for
4Agency consideration. The Agency is not obligated to use the
5suggested language or any portion thereof in its permitting
6decision. If requested by the permit applicant, the Agency
7shall meet with the applicant to discuss the suggested
8language.
9    (u) If requested by the permit applicant, the Agency shall
10provide the permit applicant with a copy of the draft permit
11prior to any public review period.
12    (v) If requested by the permit applicant, the Agency shall
13provide the permit applicant with a copy of the final permit
14prior to its issuance.
15    (w) An air pollution permit shall not be required due to
16emissions of greenhouse gases, as specified by Section 9.15 of
17this Act.
18    (x) If, before the expiration of a State operating permit
19that is issued pursuant to subsection (a) of this Section and
20contains federally enforceable conditions limiting the
21potential to emit of the source to a level below the major
22source threshold for that source so as to exclude the source
23from the Clean Air Act Permit Program, the Agency receives a
24complete application for the renewal of that permit, then all
25of the terms and conditions of the permit shall remain in
26effect until final administrative action has been taken on the

 

 

SB1323- 37 -LRB103 27060 CPF 53428 b

1application for the renewal of the permit.
2    (y) The Agency may issue permits exclusively under this
3subsection to persons owning or operating a CCR surface
4impoundment subject to Section 22.59.
5    (z) If a mass animal mortality event is declared by the
6Department of Agriculture in accordance with the Animal
7Mortality Act:
8        (1) the owner or operator responsible for the disposal
9    of dead animals is exempted from the following:
10            (i) obtaining a permit for the construction,
11        installation, or operation of any type of facility or
12        equipment issued in accordance with subsection (a) of
13        this Section;
14            (ii) obtaining a permit for open burning in
15        accordance with the rules adopted by the Board; and
16            (iii) registering the disposal of dead animals as
17        an eligible small source with the Agency in accordance
18        with Section 9.14 of this Act;
19        (2) as applicable, the owner or operator responsible
20    for the disposal of dead animals is required to obtain the
21    following permits:
22            (i) an NPDES permit in accordance with subsection
23        (b) of this Section;
24            (ii) a PSD permit or an NA NSR permit in accordance
25        with Section 9.1 of this Act;
26            (iii) a lifetime State operating permit or a

 

 

SB1323- 38 -LRB103 27060 CPF 53428 b

1        federally enforceable State operating permit, in
2        accordance with subsection (a) of this Section; or
3            (iv) a CAAPP permit, in accordance with Section
4        39.5 of this Act.
5    All CCR surface impoundment permits shall contain those
6terms and conditions, including, but not limited to, schedules
7of compliance, which may be required to accomplish the
8purposes and provisions of this Act, Board regulations, the
9Illinois Groundwater Protection Act and regulations pursuant
10thereto, and the Resource Conservation and Recovery Act and
11regulations pursuant thereto, and may include schedules for
12achieving compliance therewith as soon as possible.
13    The Board shall adopt filing requirements and procedures
14that are necessary and appropriate for the issuance of CCR
15surface impoundment permits and that are consistent with this
16Act or regulations adopted by the Board, and with the RCRA, as
17amended, and regulations pursuant thereto.
18    The applicant shall make available to the public for
19inspection all documents submitted by the applicant to the
20Agency in furtherance of an application, with the exception of
21trade secrets, on its public internet website as well as at the
22office of the county board or governing body of the
23municipality where CCR from the CCR surface impoundment will
24be permanently disposed. Such documents may be copied upon
25payment of the actual cost of reproduction during regular
26business hours of the local office.

 

 

SB1323- 39 -LRB103 27060 CPF 53428 b

1    The Agency shall issue a written statement concurrent with
2its grant or denial of the permit explaining the basis for its
3decision.
4    (aa) An applicant for a permit for the construction of a
5new source that will become a major source subject to the Clean
6Air Act Permit Program under Section 39.5 and will be located
7in an environmental justice community or a new source that has
8required or will require a federally enforceable State
9operating permit and will be located in an environmental
10justice community must conduct a public meeting prior to
11submission of the permit application and must submit with the
12permit application an environmental justice assessment
13identifying the potential environmental and health impacts to
14the area associated with the proposed project. This subsection
15(aa) also applies to permit applications for modifications or
16expansions to existing sources that will result in an increase
17in the hourly rate of emissions or the total annual emissions
18of any air pollutant.
19    Before submitting the permit application to the Agency and
20after obtaining local siting approval under Section 39.2, the
21applicant must conduct a public meeting within the
22environmental justice community where the proposed source is
23to be located and collect public comments. Notice of the
24public meeting must be provided 30 days in advance of the
25meeting and in accordance with the following requirements:
26        (1) The notice shall be:

 

 

SB1323- 40 -LRB103 27060 CPF 53428 b

1            (A) provided to local elected officials in the
2        area where the proposed source is to be located,
3        including the mayor or village president, municipal
4        clerk, county board chairman, county clerk, and
5        State's Attorney;
6            (B) provided to members of the General Assembly
7        from the legislative district in which the proposed
8        source is to be located;
9            (C) provided to directors of child care centers
10        licensed by the Department of Children and Family
11        Services, school principals, and public park
12        superintendents who oversee facilities located within
13        one mile of the proposed source;
14            (D) published in a newspaper of general
15        circulation; and
16            (E) posted on a website of the applicant with a
17        link provided to the Agency for posting on the
18        Agency's website.
19        (2) The notice of the public meeting shall include the
20    following:
21            (A) The name and address of the applicant and the
22        proposed source.
23            (B) The activity or activities at the proposed
24        source to be permitted.
25            (C) The anticipated potential to emit and
26        allowable emissions for regulated pollutants of the

 

 

SB1323- 41 -LRB103 27060 CPF 53428 b

1        proposed source.
2            (D) The date, time, and location of the public
3        meeting.
4            (E) The deadline for submission of written
5        comments.
6            (F) The mailing address or email address where
7        written comments can be submitted.
8            (G) The website where the summary of the
9        environmental justice assessment required under
10        subsection (bb) can be accessed.
11        (3) For a community determined to be in linguistic
12    isolation, the applicant shall provide the public notice
13    in a multilingual format appropriate to the needs of the
14    linguistically isolated community and shall provide oral
15    and written translation services at the public meeting.
16    The applicant shall present a summary of the environmental
17justice assessment required under subsection (bb) at the
18public meeting.
19    The applicant must accept written public comments from the
20date the public notice is provided through at least 30 days
21following the public meeting.
22    The applicant must provide with its permit application a
23copy of the notice and a certification, subject to penalty of
24law, signed by a responsible official for the permit applicant
25attesting to the fact that a public meeting was held, the
26information that was provided by the applicant and the permit

 

 

SB1323- 42 -LRB103 27060 CPF 53428 b

1applicant collected written and transcribed oral public
2comments collected by the applicant in accordance with the
3requirements of this subsection (aa).
4    The failure of the applicant to comply with the procedural
5requirements of this subsection (aa) will result in a finding
6of incompleteness or denial of the subsequent permit
7application by the Agency.
8    The Agency may propose and the Board may adopt rules
9regarding the implementation of this subsection (aa).
10    (bb) The permit application under subsection (aa) shall
11include an environmental justice assessment. The environmental
12justice assessment shall consist of the following:
13        (1) Air dispersion modeling examining the air
14    quality-related impacts from the proposed project in
15    combination with existing mobile and stationary sources of
16    emissions.
17        The air dispersion modeling must address emissions
18    associated with a new or modified CAAPP source as well as
19    emissions from any existing source that will comprise part
20    of a single stationary source with the new or modified
21    CAAPP source under the requirements of Section 39.5.
22        If the air dispersion modeling reveals estimated
23    off-site impacts from the proposed project of a
24    significant nature, the applicant shall also identify
25    efforts that will be undertaken by the applicant during
26    the construction or operation of the new source to

 

 

SB1323- 43 -LRB103 27060 CPF 53428 b

1    mitigate such impacts.
2        (2) A modeling protocol submitted to the Agency for
3    review and consideration prior to performance of the air
4    dispersion modeling. The modeling protocol shall include
5    analyses sufficient to evaluate short-term impacts to air
6    quality and impacts to air quality from nonstandard
7    operating conditions, such as worst case emission
8    estimates under a variety of weather and atmospheric
9    conditions and emissions associated with startup,
10    shutdown, maintenance, and outages. Any Agency
11    recommendations for revisions to the modeling protocol
12    shall be provided in writing to the applicant within 120
13    days after receipt of the modeling protocol. The modeling
14    shall be performed using accepted USEPA methodologies.
15        (3) An environmental impact review evaluating the
16    direct, indirect, and cumulative environmental impacts to
17    the environmental justice community that are associated
18    with the proposed project. The environmental impact review
19    shall include, but shall not be limited to, the following:
20            (A) A qualitative and quantitative assessment of
21        emissions-related impacts to the area from the
22        project, including identifying the maximum allowable
23        emissions of criteria pollutants and hazardous air
24        pollutant emissions to be anticipated from the
25        proposed new source.
26            (B) An assessment of the health-based indicators

 

 

SB1323- 44 -LRB103 27060 CPF 53428 b

1        for inhalation exposure, including, but not limited
2        to, impacts to the respiratory, hematological,
3        neurological, cardiovascular, renal, and hepatic
4        systems and cancer rates.
5    The environmental justice assessment must be completed by
6an independent third party.
7    If the environmental justice assessment shows that the
8proposed project will cause harm to the environment or public
9health, the Agency shall impose conditions in the permit that
10will mitigate such harm or deny the permit if such harm is
11unavoidable and causes or contributes to disproportionate
12harm.
13    The Agency shall propose and the Board shall adopt rules
14regarding the implementation of this subsection, including, at
15a minimum, the type and nature of air dispersion modeling, the
16contents of the modeling protocol and environmental impact
17review, and a description of harm and disproportionate harm
18that may be evidenced by the environmental justice assessment.
19    (cc) Before issuing any covered non-CAAPP permit, the
20Agency shall conduct an evaluation of the prospective owner's
21or operator's prior experience in owning and operating sources
22of air pollution. The Agency may deny the permit if the
23prospective owner or operator or any employee or officer of
24the prospective owner or operator or any board member has a
25history of:
26        (1) repeated violations of federal, State, or local

 

 

SB1323- 45 -LRB103 27060 CPF 53428 b

1    laws, rules, regulations, standards, or ordinances
2    involving the ownership or operation of sources of air
3    pollution;
4        (2) conviction:
5            (A) in this or another state of any crime that is a
6        felony under the laws of this State;
7            (B) of a felony in a federal court; or
8            (C) in this or another state or federal court of
9        any of the following crimes:
10                (i) forgery;
11                (ii) official misconduct;
12                (iii) bribery;
13                (iv) perjury; or
14                (v) knowingly submitting false information
15            under any environmental law, rule, regulation, or
16            permit term or condition; or
17        (3) proof of gross carelessness or incompetence in the
18    ownership or operation of a source of air pollution.
19(Source: P.A. 101-171, eff. 7-30-19; 102-216, eff. 1-1-22;
20102-558, eff. 8-20-21; 102-813, eff. 5-13-22.)
 
21    (415 ILCS 5/39.2)  (from Ch. 111 1/2, par. 1039.2)
22    Sec. 39.2. Local siting review.
23    (a) The county board of the county or the governing body of
24the municipality, as determined by paragraph (c) of Section 39
25of this Act, shall, subject to review, approve or disapprove

 

 

SB1323- 46 -LRB103 27060 CPF 53428 b

1the request for local siting approval for the following: (i)
2each pollution control facility; (ii) an air pollution source
3that, upon issuance of the requested construction permit, will
4become a major source subject to Section 39.5 and will be
5located in an environmental justice community; or (iii) an air
6pollution source that has required or will require a federally
7enforceable State operating permit and will be located in an
8environmental justice community which is subject to such
9review. An applicant for local siting approval shall submit
10sufficient details describing the proposed facility and
11evidence to demonstrate compliance, and local siting approval
12shall be granted only if the proposed facility meets the
13following criteria:
14        (i) the pollution control facility is necessary to
15    accommodate the waste needs of the area it is intended to
16    serve;
17        (ii) the pollution control facility or air pollution
18    source is so designed, located, and proposed to be
19    operated that the public health, safety, and welfare will
20    be protected;
21        (iii) the pollution control facility or air pollution
22    source is located so as to minimize incompatibility with
23    the character of the surrounding area and to minimize the
24    effect on the value of the surrounding property;
25        (iv) (A) for a pollution control facility other than a
26    sanitary landfill or waste disposal site, the pollution

 

 

SB1323- 47 -LRB103 27060 CPF 53428 b

1    control facility is located outside the boundary of the
2    100-year 100 year flood plain or the site is
3    flood-proofed; (B) for a pollution control facility that
4    is a sanitary landfill or waste disposal site, the
5    pollution control facility is located outside the boundary
6    of the 100-year floodplain, or if the pollution control
7    facility is a facility described in subsection (b)(3) of
8    Section 22.19a, the site is flood-proofed;
9        (v) the plan of operations for the pollution control
10    facility or air pollution source is designed to minimize
11    the danger to the surrounding area from fire, spills, or
12    other operational accidents;
13        (vi) the traffic patterns to or from the pollution
14    control facility or air pollution source are so designed
15    as to minimize the impact on existing traffic flows;
16        (vii) if the pollution control facility will be
17    treating, storing, or disposing of hazardous waste, an
18    emergency response plan exists for the facility which
19    includes notification, containment, and evacuation
20    procedures to be used in case of an accidental release;
21        (viii) if the pollution control facility is to be
22    located in a county where the county board has adopted a
23    solid waste management plan consistent with the planning
24    requirements of the Local Solid Waste Disposal Act or the
25    Solid Waste Planning and Recycling Act, the pollution
26    control facility is consistent with that plan; for

 

 

SB1323- 48 -LRB103 27060 CPF 53428 b

1    purposes of this criterion (viii), the "solid waste
2    management plan" means the plan that is in effect as of the
3    date the application for siting approval is filed; and
4        (ix) if the pollution control facility will be located
5    within a regulated recharge area, any applicable
6    requirements specified by the Board for such areas have
7    been met.
8    The county board or the governing body of the municipality
9may also consider as evidence the previous operating
10experience and past record of convictions or admissions of
11violations of the pollution control facility applicant (and
12any subsidiary or parent corporation) in the field of solid
13waste management when considering criteria (ii) and (v) under
14this Section.
15    If the pollution control facility is subject to the
16location restrictions in Section 22.14 of this Act, compliance
17with that Section shall be determined as of the date the
18application for siting approval is filed.
19    (b) No later than 14 days before the date on which the
20county board or governing body of the municipality receives a
21request for site approval, the applicant shall cause written
22notice of such request to be served either in person or by
23registered mail, return receipt requested, on the owners of
24all property within the subject area not solely owned by the
25applicant, and on the owners of all property within 250 feet in
26each direction of the lot line of the subject property, said

 

 

SB1323- 49 -LRB103 27060 CPF 53428 b

1owners being such persons or entities which appear from the
2authentic tax records of the county County in which such
3pollution control facility or air pollution source is to be
4located; provided, that the number of all feet occupied by all
5public roads, streets, alleys, and other public ways shall be
6excluded in computing the 250 feet requirement; provided
7further, that in no event shall this requirement exceed 400
8feet, including public streets, alleys, and other public ways.
9    Such written notice shall also be served upon members of
10the General Assembly from the legislative district in which
11the proposed pollution control facility or air pollution
12source is located and shall be published in a newspaper of
13general circulation published in the county in which the site
14is located.
15    Such notice shall state the name and address of the
16applicant, the location of the proposed site, the nature and
17size of the development, the nature of the activity proposed,
18the probable life of the proposed activity, the date when the
19request for site approval will be submitted, and a description
20of the right of persons to comment on such request as hereafter
21provided.
22    (c) An applicant shall file a copy of its request with the
23county board of the county or the governing body of the
24municipality in which the proposed site is located. The
25request shall include (i) the substance of the applicant's
26proposal and (ii) all documents, if any, submitted as of that

 

 

SB1323- 50 -LRB103 27060 CPF 53428 b

1date to the Agency pertaining to the proposed pollution
2control facility or air pollution source, except trade secrets
3as determined under Section 7.1 of this Act. All such
4documents or other materials on file with the county board or
5governing body of the municipality shall be made available for
6public inspection at the office of the county board or the
7governing body of the municipality and may be copied upon
8payment of the actual cost of reproduction.
9    Any person may file written comment with the county board
10or governing body of the municipality concerning the
11appropriateness of the proposed site for its intended purpose.
12The county board or governing body of the municipality shall
13consider any comment received or postmarked not later than 30
14days after the date of the last public hearing.
15    (d) At least one public hearing, at which an applicant
16shall present at least one witness to testify subject to
17cross-examination, is to be held by the county board or
18governing body of the municipality no sooner than 90 days but
19no later than 120 days after the date on which it received the
20request for site approval. No later than 14 days prior to such
21hearing, notice shall be published in a newspaper of general
22circulation published in the county of the proposed site, and
23delivered by certified mail to all members of the General
24Assembly from the district in which the proposed site is
25located, to the governing authority of every municipality
26contiguous to the proposed site or contiguous to the

 

 

SB1323- 51 -LRB103 27060 CPF 53428 b

1municipality in which the proposed site is to be located, to
2the county board of the county where the proposed site is to be
3located, if the proposed site is located within the boundaries
4of a municipality, and to the Agency. Members or
5representatives of the governing authority of a municipality
6contiguous to the proposed site or contiguous to the
7municipality in which the proposed site is to be located and,
8if the proposed site is located in a municipality, members or
9representatives of the county board of a county in which the
10proposed site is to be located may appear at and participate in
11public hearings held pursuant to this Section. The public
12hearing shall develop a record sufficient to form the basis of
13appeal of the decision in accordance with Section 40.1 of this
14Act. The fact that a member of the county board or governing
15body of the municipality has publicly expressed an opinion on
16an issue related to a site review proceeding shall not
17preclude the member from taking part in the proceeding and
18voting on the issue.
19    (e) Decisions of the county board or governing body of the
20municipality are to be in writing, confirming a public hearing
21was held with testimony from at least one witness presented by
22the applicant, specifying the reasons for the decision, such
23reasons to be in conformance with subsection (a) of this
24Section. In granting approval for a site the county board or
25governing body of the municipality may impose such conditions
26as may be reasonable and necessary to accomplish the purposes

 

 

SB1323- 52 -LRB103 27060 CPF 53428 b

1of this Section and as are not inconsistent with regulations
2promulgated by the Board. Such decision shall be available for
3public inspection at the office of the county board or
4governing body of the municipality and may be copied upon
5payment of the actual cost of reproduction. If there is no
6final action by the county board or governing body of the
7municipality within 180 days after the date on which it
8received the request for site approval, the applicant may deem
9the request approved.
10    At the public hearing, at any time prior to completion by
11the applicant of the presentation of the applicant's factual
12evidence, testimony, and an opportunity for cross-examination
13by the county board or governing body of the municipality and
14any participants, the applicant may file not more than one
15amended application upon payment of additional fees pursuant
16to subsection (k); in which case the time limitation for final
17action set forth in this subsection (e) shall be extended for
18an additional period of 90 days.
19    If, prior to making a final local siting decision, a
20county board or governing body of a municipality has
21negotiated and entered into a host agreement with the local
22siting applicant, the terms and conditions of the host
23agreement, whether written or oral, shall be disclosed and
24made a part of the hearing record for that local siting
25proceeding. In the case of an oral agreement, the disclosure
26shall be made in the form of a written summary jointly prepared

 

 

SB1323- 53 -LRB103 27060 CPF 53428 b

1and submitted by the county board or governing body of the
2municipality and the siting applicant and shall describe the
3terms and conditions of the oral agreement.
4    (e-5) Siting approval obtained pursuant to this Section is
5transferable and may be transferred to a subsequent owner or
6operator. In the event that siting approval has been
7transferred to a subsequent owner or operator, that subsequent
8owner or operator assumes and takes subject to any and all
9conditions imposed upon the prior owner or operator by the
10county board of the county or governing body of the
11municipality pursuant to subsection (e). However, any such
12conditions imposed pursuant to this Section may be modified by
13agreement between the subsequent owner or operator and the
14appropriate county board or governing body. Further, in the
15event that siting approval obtained pursuant to this Section
16has been transferred to a subsequent owner or operator, that
17subsequent owner or operator assumes all rights and
18obligations and takes the facility subject to any and all
19terms and conditions of any existing host agreement between
20the prior owner or operator and the appropriate county board
21or governing body.
22    (f) A local siting approval granted under this Section
23shall expire at the end of 2 calendar years from the date upon
24which it was granted, unless the local siting approval granted
25under this Section is for a sanitary landfill operation, in
26which case the approval shall expire at the end of 3 calendar

 

 

SB1323- 54 -LRB103 27060 CPF 53428 b

1years from the date upon which it was granted, and unless
2within that period the applicant has made application to the
3Agency for a permit to develop the site. In the event that the
4local siting decision has been appealed, such expiration
5period shall be deemed to begin on the date upon which the
6appeal process is concluded.
7    Except as otherwise provided in this subsection, upon the
8expiration of a development permit under subsection (k) of
9Section 39, any associated local siting approval granted for
10the facility under this Section shall also expire.
11    If a first development permit for a municipal waste
12incineration facility expires under subsection (k) of Section
1339 after September 30, 1989 due to circumstances beyond the
14control of the applicant, any associated local siting approval
15granted for the facility under this Section may be used to
16fulfill the local siting approval requirement upon application
17for a second development permit for the same site, provided
18that the proposal in the new application is materially the
19same, with respect to the criteria in subsection (a) of this
20Section, as the proposal that received the original siting
21approval, and application for the second development permit is
22made before January 1, 1990.
23    (g) The siting approval procedures, criteria and appeal
24procedures provided for in this Act for new pollution control
25facilities shall be the exclusive siting procedures and rules
26and appeal procedures for facilities subject to such

 

 

SB1323- 55 -LRB103 27060 CPF 53428 b

1procedures. Local zoning or other local land use requirements
2shall not be applicable to such siting decisions.
3    (h) Nothing in this Section shall apply to any existing or
4new pollution control facility located within the corporate
5limits of a municipality with a population of over 1,000,000.
6    (i) (Blank.)
7    The Board shall adopt regulations establishing the
8geologic and hydrologic siting criteria necessary to protect
9usable groundwater resources which are to be followed by the
10Agency in its review of permit applications for new pollution
11control facilities. Such regulations, insofar as they apply to
12new pollution control facilities authorized to store, treat or
13dispose of any hazardous waste, shall be at least as stringent
14as the requirements of the Resource Conservation and Recovery
15Act and any State or federal regulations adopted pursuant
16thereto.
17    (j) Any new pollution control facility which has never
18obtained local siting approval under the provisions of this
19Section shall be required to obtain such approval after a
20final decision on an appeal of a permit denial.
21    (k) A county board or governing body of a municipality may
22charge applicants for siting review under this Section a
23reasonable fee to cover the reasonable and necessary costs
24incurred by such county or municipality in the siting review
25process.
26    (l) The governing Authority as determined by subsection

 

 

SB1323- 56 -LRB103 27060 CPF 53428 b

1(c) of Section 39 of this Act may request the Department of
2Transportation to perform traffic impact studies of proposed
3or potential locations for required pollution control
4facilities.
5    (m) An applicant may not file a request for local siting
6approval which is substantially the same as a request which
7was disapproved pursuant to a finding against the applicant
8under any of criteria (i) through (ix) of subsection (a) of
9this Section within the preceding 2 years.
10    (n) In any review proceeding of a decision of the county
11board or governing body of a municipality made pursuant to the
12local siting review process, the petitioner in the review
13proceeding shall pay to the county or municipality the cost of
14preparing and certifying the record of proceedings. Should the
15petitioner in the review proceeding fail to make payment, the
16provisions of Section 3-109 of the Code of Civil Procedure
17shall apply.
18    In the event the petitioner is a citizens' group that
19participated in the siting proceeding and is so located as to
20be affected by the proposed facility, such petitioner shall be
21exempt from paying the costs of preparing and certifying the
22record.
23    (o) Notwithstanding any other provision of this Section, a
24transfer station used exclusively for landscape waste, where
25landscape waste is held no longer than 24 hours from the time
26it was received, is not subject to the requirements of local

 

 

SB1323- 57 -LRB103 27060 CPF 53428 b

1siting approval under this Section, but is subject only to
2local zoning approval.
3    (p) The siting approval procedures, criteria, and appeal
4procedures provided for in this Act for new air pollution
5sources shall be in addition to the applicable local land use
6and zoning standards, procedures, rules, and appeal
7procedures. Local zoning or other local land use requirements
8shall continue to be applicable to such siting decisions for
9new air pollution sources in addition to the siting approval
10procedures, criteria, and appeal procedures provided in this
11Act.
12(Source: P.A. 100-382, eff. 8-25-17.)
 
13    (415 ILCS 5/39.5)  (from Ch. 111 1/2, par. 1039.5)
14    Sec. 39.5. Clean Air Act Permit Program.
15    1. Definitions. For purposes of this Section:
16    "Administrative permit amendment" means a permit revision
17subject to subsection 13 of this Section.
18    "Affected source for acid deposition" means a source that
19includes one or more affected units under Title IV of the Clean
20Air Act.
21    "Affected States" for purposes of formal distribution of a
22draft CAAPP permit to other States for comments prior to
23issuance, means all States:
24        (1) Whose air quality may be affected by the source
25    covered by the draft permit and that are contiguous to

 

 

SB1323- 58 -LRB103 27060 CPF 53428 b

1    Illinois; or
2        (2) That are within 50 miles of the source.
3    "Affected unit for acid deposition" shall have the meaning
4given to the term "affected unit" in the regulations
5promulgated under Title IV of the Clean Air Act.
6    "Applicable Clean Air Act requirement" means all of the
7following as they apply to emissions units in a source
8(including regulations that have been promulgated or approved
9by USEPA pursuant to the Clean Air Act which directly impose
10requirements upon a source and other such federal requirements
11which have been adopted by the Board. These may include
12requirements and regulations which have future effective
13compliance dates. Requirements and regulations will be exempt
14if USEPA determines that such requirements need not be
15contained in a Title V permit):
16        (1) Any standard or other requirement provided for in
17    the applicable state implementation plan approved or
18    promulgated by USEPA under Title I of the Clean Air Act
19    that implements the relevant requirements of the Clean Air
20    Act, including any revisions to the state Implementation
21    Plan promulgated in 40 CFR Part 52, Subparts A and O and
22    other subparts applicable to Illinois. For purposes of
23    this paragraph (1) of this definition, "any standard or
24    other requirement" means only such standards or
25    requirements directly enforceable against an individual
26    source under the Clean Air Act.

 

 

SB1323- 59 -LRB103 27060 CPF 53428 b

1        (2)(i) Any term or condition of any preconstruction
2        permits issued pursuant to regulations approved or
3        promulgated by USEPA under Title I of the Clean Air
4        Act, including Part C or D of the Clean Air Act.
5            (ii) Any term or condition as required pursuant to
6        Section 39.5 of any federally enforceable State
7        operating permit issued pursuant to regulations
8        approved or promulgated by USEPA under Title I of the
9        Clean Air Act, including Part C or D of the Clean Air
10        Act.
11        (3) Any standard or other requirement under Section
12    111 of the Clean Air Act, including Section 111(d).
13        (4) Any standard or other requirement under Section
14    112 of the Clean Air Act, including any requirement
15    concerning accident prevention under Section 112(r)(7) of
16    the Clean Air Act.
17        (5) Any standard or other requirement of the acid rain
18    program under Title IV of the Clean Air Act or the
19    regulations promulgated thereunder.
20        (6) Any requirements established pursuant to Section
21    504(b) or Section 114(a)(3) of the Clean Air Act.
22        (7) Any standard or other requirement governing solid
23    waste incineration, under Section 129 of the Clean Air
24    Act.
25        (8) Any standard or other requirement for consumer and
26    commercial products, under Section 183(e) of the Clean Air

 

 

SB1323- 60 -LRB103 27060 CPF 53428 b

1    Act.
2        (9) Any standard or other requirement for tank
3    vessels, under Section 183(f) of the Clean Air Act.
4        (10) Any standard or other requirement of the program
5    to control air pollution from Outer Continental Shelf
6    sources, under Section 328 of the Clean Air Act.
7        (11) Any standard or other requirement of the
8    regulations promulgated to protect stratospheric ozone
9    under Title VI of the Clean Air Act, unless USEPA has
10    determined that such requirements need not be contained in
11    a Title V permit.
12        (12) Any national ambient air quality standard or
13    increment or visibility requirement under Part C of Title
14    I of the Clean Air Act, but only as it would apply to
15    temporary sources permitted pursuant to Section 504(e) of
16    the Clean Air Act.
17    "Applicable requirement" means all applicable Clean Air
18Act requirements and any other standard, limitation, or other
19requirement contained in this Act or regulations promulgated
20under this Act as applicable to sources of air contaminants
21(including requirements that have future effective compliance
22dates).
23    "CAAPP" means the Clean Air Act Permit Program, developed
24pursuant to Title V of the Clean Air Act.
25    "CAAPP application" means an application for a CAAPP
26permit.

 

 

SB1323- 61 -LRB103 27060 CPF 53428 b

1    "CAAPP Permit" or "permit" (unless the context suggests
2otherwise) means any permit issued, renewed, amended, modified
3or revised pursuant to Title V of the Clean Air Act.
4    "CAAPP source" means any source for which the owner or
5operator is required to obtain a CAAPP permit pursuant to
6subsection 2 of this Section.
7    "Clean Air Act" means the Clean Air Act, as now and
8hereafter amended, 42 U.S.C. 7401, et seq.
9    "Designated representative" has the meaning given to it in
10Section 402(26) of the Clean Air Act and the regulations
11promulgated thereunder, which state that the term "designated
12representative" means a responsible person or official
13authorized by the owner or operator of a unit to represent the
14owner or operator in all matters pertaining to the holding,
15transfer, or disposition of allowances allocated to a unit,
16and the submission of and compliance with permits, permit
17applications, and compliance plans for the unit.
18    "Draft CAAPP permit" means the version of a CAAPP permit
19for which public notice and an opportunity for public comment
20and hearing is offered by the Agency.
21    "Effective date of the CAAPP" means the date that USEPA
22approves Illinois' CAAPP.
23    "Emission unit" means any part or activity of a stationary
24source that emits or has the potential to emit any air
25pollutant. This term is not meant to alter or affect the
26definition of the term "unit" for purposes of Title IV of the

 

 

SB1323- 62 -LRB103 27060 CPF 53428 b

1Clean Air Act.
2    "Federally enforceable" means enforceable by USEPA.
3    "Final permit action" means the Agency's granting with
4conditions, refusal to grant, renewal of, or revision of a
5CAAPP permit, the Agency's determination of incompleteness of
6a submitted CAAPP application, or the Agency's failure to act
7on an application for a permit, permit renewal, or permit
8revision within the time specified in subsection 13,
9subsection 14, or paragraph (j) of subsection 5 of this
10Section.
11    "General permit" means a permit issued to cover numerous
12similar sources in accordance with subsection 11 of this
13Section.
14    "Major source" means a source for which emissions of one
15or more air pollutants meet the criteria for major status
16pursuant to paragraph (c) of subsection 2 of this Section.
17    "Maximum achievable control technology" or "MACT" means
18the maximum degree of reductions in emissions deemed
19achievable under Section 112 of the Clean Air Act.
20    "Owner or operator" means any person who owns, leases,
21operates, controls, or supervises a stationary source.
22    "Permit modification" means a revision to a CAAPP permit
23that cannot be accomplished under the provisions for
24administrative permit amendments under subsection 13 of this
25Section.
26    "Permit revision" means a permit modification or

 

 

SB1323- 63 -LRB103 27060 CPF 53428 b

1administrative permit amendment.
2    "Phase II" means the period of the national acid rain
3program, established under Title IV of the Clean Air Act,
4beginning January 1, 2000, and continuing thereafter.
5    "Phase II acid rain permit" means the portion of a CAAPP
6permit issued, renewed, modified, or revised by the Agency
7during Phase II for an affected source for acid deposition.
8    "Potential to emit" means the maximum capacity of a
9stationary source to emit any air pollutant under its physical
10and operational design. Any physical or operational limitation
11on the capacity of a source to emit an air pollutant, including
12air pollution control equipment and restrictions on hours of
13operation or on the type or amount of material combusted,
14stored, or processed, shall be treated as part of its design if
15the limitation is enforceable by USEPA. This definition does
16not alter or affect the use of this term for any other purposes
17under the Clean Air Act, or the term "capacity factor" as used
18in Title IV of the Clean Air Act or the regulations promulgated
19thereunder.
20    "Preconstruction Permit" or "Construction Permit" means a
21permit which is to be obtained prior to commencing or
22beginning actual construction or modification of a source or
23emissions unit.
24    "Proposed CAAPP permit" means the version of a CAAPP
25permit that the Agency proposes to issue and forwards to USEPA
26for review in compliance with applicable requirements of the

 

 

SB1323- 64 -LRB103 27060 CPF 53428 b

1Act and regulations promulgated thereunder.
2    "Regulated air pollutant" means the following:
3        (1) Nitrogen oxides (NOx) or any volatile organic
4    compound.
5        (2) Any pollutant for which a national ambient air
6    quality standard has been promulgated.
7        (3) Any pollutant that is subject to any standard
8    promulgated under Section 111 of the Clean Air Act.
9        (4) Any Class I or II substance subject to a standard
10    promulgated under or established by Title VI of the Clean
11    Air Act.
12        (5) Any pollutant subject to a standard promulgated
13    under Section 112 or other requirements established under
14    Section 112 of the Clean Air Act, including Sections
15    112(g), (j) and (r).
16            (i) Any pollutant subject to requirements under
17        Section 112(j) of the Clean Air Act. Any pollutant
18        listed under Section 112(b) for which the subject
19        source would be major shall be considered to be
20        regulated 18 months after the date on which USEPA was
21        required to promulgate an applicable standard pursuant
22        to Section 112(e) of the Clean Air Act, if USEPA fails
23        to promulgate such standard.
24            (ii) Any pollutant for which the requirements of
25        Section 112(g)(2) of the Clean Air Act have been met,
26        but only with respect to the individual source subject

 

 

SB1323- 65 -LRB103 27060 CPF 53428 b

1        to Section 112(g)(2) requirement.
2        (6) Greenhouse gases.
3    "Renewal" means the process by which a permit is reissued
4at the end of its term.
5    "Responsible official" means one of the following:
6        (1) For a corporation: a president, secretary,
7    treasurer, or vice-president of the corporation in charge
8    of a principal business function, or any other person who
9    performs similar policy or decision-making functions for
10    the corporation, or a duly authorized representative of
11    such person if the representative is responsible for the
12    overall operation of one or more manufacturing,
13    production, or operating facilities applying for or
14    subject to a permit and either (i) the facilities employ
15    more than 250 persons or have gross annual sales or
16    expenditures exceeding $25 million (in second quarter 1980
17    dollars), or (ii) the delegation of authority to such
18    representative is approved in advance by the Agency.
19        (2) For a partnership or sole proprietorship: a
20    general partner or the proprietor, respectively, or in the
21    case of a partnership in which all of the partners are
22    corporations, a duly authorized representative of the
23    partnership if the representative is responsible for the
24    overall operation of one or more manufacturing,
25    production, or operating facilities applying for or
26    subject to a permit and either (i) the facilities employ

 

 

SB1323- 66 -LRB103 27060 CPF 53428 b

1    more than 250 persons or have gross annual sales or
2    expenditures exceeding $25 million (in second quarter 1980
3    dollars), or (ii) the delegation of authority to such
4    representative is approved in advance by the Agency.
5        (3) For a municipality, State, Federal, or other
6    public agency: either a principal executive officer or
7    ranking elected official. For the purposes of this part, a
8    principal executive officer of a Federal agency includes
9    the chief executive officer having responsibility for the
10    overall operations of a principal geographic unit of the
11    agency (e.g., a Regional Administrator of USEPA).
12        (4) For affected sources for acid deposition:
13            (i) The designated representative shall be the
14        "responsible official" in so far as actions,
15        standards, requirements, or prohibitions under Title
16        IV of the Clean Air Act or the regulations promulgated
17        thereunder are concerned.
18            (ii) The designated representative may also be the
19        "responsible official" for any other purposes with
20        respect to air pollution control.
21    "Section 502(b)(10) changes" means changes that contravene
22express permit terms. "Section 502(b)(10) changes" do not
23include changes that would violate applicable requirements or
24contravene federally enforceable permit terms or conditions
25that are monitoring (including test methods), recordkeeping,
26reporting, or compliance certification requirements.

 

 

SB1323- 67 -LRB103 27060 CPF 53428 b

1    "Solid waste incineration unit" means a distinct operating
2unit of any facility which combusts any solid waste material
3from commercial or industrial establishments or the general
4public (including single and multiple residences, hotels, and
5motels). The term does not include incinerators or other units
6required to have a permit under Section 3005 of the Solid Waste
7Disposal Act. The term also does not include (A) materials
8recovery facilities (including primary or secondary smelters)
9which combust waste for the primary purpose of recovering
10metals, (B) qualifying small power production facilities, as
11defined in Section 3(17)(C) of the Federal Power Act (16
12U.S.C. 769(17)(C)), or qualifying cogeneration facilities, as
13defined in Section 3(18)(B) of the Federal Power Act (16
14U.S.C. 796(18)(B)), which burn homogeneous waste (such as
15units which burn tires or used oil, but not including
16refuse-derived fuel) for the production of electric energy or
17in the case of qualifying cogeneration facilities which burn
18homogeneous waste for the production of electric energy and
19steam or forms of useful energy (such as heat) which are used
20for industrial, commercial, heating or cooling purposes, or
21(C) air curtain incinerators provided that such incinerators
22only burn wood wastes, yard waste and clean lumber and that
23such air curtain incinerators comply with opacity limitations
24to be established by the USEPA by rule.
25    "Source" means any stationary source (or any group of
26stationary sources) that is located on one or more contiguous

 

 

SB1323- 68 -LRB103 27060 CPF 53428 b

1or adjacent properties that are under common control of the
2same person (or persons under common control) and that belongs
3to a single major industrial grouping. For the purposes of
4defining "source," a stationary source or group of stationary
5sources shall be considered part of a single major industrial
6grouping if all of the pollutant emitting activities at such
7source or group of sources located on contiguous or adjacent
8properties and under common control belong to the same Major
9Group (i.e., all have the same two-digit code) as described in
10the Standard Industrial Classification Manual, 1987, or such
11pollutant emitting activities at a stationary source (or group
12of stationary sources) located on contiguous or adjacent
13properties and under common control constitute a support
14facility. The determination as to whether any group of
15stationary sources is located on contiguous or adjacent
16properties, and/or is under common control, and/or whether the
17pollutant emitting activities at such group of stationary
18sources constitute a support facility shall be made on a case
19by case basis.
20    "Stationary source" means any building, structure,
21facility, or installation that emits or may emit any regulated
22air pollutant or any pollutant listed under Section 112(b) of
23the Clean Air Act, except those emissions resulting directly
24from an internal combustion engine for transportation purposes
25or from a nonroad engine or nonroad vehicle as defined in
26Section 216 of the Clean Air Act.

 

 

SB1323- 69 -LRB103 27060 CPF 53428 b

1    "Subject to regulation" has the meaning given to it in 40
2CFR 70.2, as now or hereafter amended.
3    "Support facility" means any stationary source (or group
4of stationary sources) that conveys, stores, or otherwise
5assists to a significant extent in the production of a
6principal product at another stationary source (or group of
7stationary sources). A support facility shall be considered to
8be part of the same source as the stationary source (or group
9of stationary sources) that it supports regardless of the
102-digit Standard Industrial Classification code for the
11support facility.
12    "USEPA" means the Administrator of the United States
13Environmental Protection Agency (USEPA) or a person designated
14by the Administrator.
 
15    1.1. Exclusion From the CAAPP.
16        a. An owner or operator of a source which determines
17    that the source could be excluded from the CAAPP may seek
18    such exclusion prior to the date that the CAAPP
19    application for the source is due but in no case later than
20    9 months after the effective date of the CAAPP through the
21    imposition of federally enforceable conditions limiting
22    the "potential to emit" of the source to a level below the
23    major source threshold for that source as described in
24    paragraph (c) of subsection 2 of this Section, within a
25    State operating permit issued pursuant to subsection (a)

 

 

SB1323- 70 -LRB103 27060 CPF 53428 b

1    of Section 39 of this Act. After such date, an exclusion
2    from the CAAPP may be sought under paragraph (c) of
3    subsection 3 of this Section.
4        b. An owner or operator of a source seeking exclusion
5    from the CAAPP pursuant to paragraph (a) of this
6    subsection must submit a permit application consistent
7    with the existing State permit program which specifically
8    requests such exclusion through the imposition of such
9    federally enforceable conditions.
10        c. Upon such request, if the Agency determines that
11    the owner or operator of a source has met the requirements
12    for exclusion pursuant to paragraph (a) of this subsection
13    and other applicable requirements for permit issuance
14    under subsection (a) of Section 39 of this Act, the Agency
15    shall issue a State operating permit for such source under
16    subsection (a) of Section 39 of this Act, as amended, and
17    regulations promulgated thereunder with federally
18    enforceable conditions limiting the "potential to emit" of
19    the source to a level below the major source threshold for
20    that source as described in paragraph (c) of subsection 2
21    of this Section.
22        d. The Agency shall provide an owner or operator of a
23    source which may be excluded from the CAAPP pursuant to
24    this subsection with reasonable notice that the owner or
25    operator may seek such exclusion.
26        e. The Agency shall provide such sources with the

 

 

SB1323- 71 -LRB103 27060 CPF 53428 b

1    necessary permit application forms.
 
2    2. Applicability.
3        a. Sources subject to this Section shall include:
4            i. Any major source as defined in paragraph (c) of
5        this subsection.
6            ii. Any source subject to a standard or other
7        requirements promulgated under Section 111 (New Source
8        Performance Standards) or Section 112 (Hazardous Air
9        Pollutants) of the Clean Air Act, except that a source
10        is not required to obtain a permit solely because it is
11        subject to regulations or requirements under Section
12        112(r) of the Clean Air Act.
13            iii. Any affected source for acid deposition, as
14        defined in subsection 1 of this Section.
15            iv. Any other source subject to this Section under
16        the Clean Air Act or regulations promulgated
17        thereunder, or applicable Board regulations.
18        b. Sources exempted from this Section shall include:
19            i. All sources listed in paragraph (a) of this
20        subsection that are not major sources, affected
21        sources for acid deposition or solid waste
22        incineration units required to obtain a permit
23        pursuant to Section 129(e) of the Clean Air Act, until
24        the source is required to obtain a CAAPP permit
25        pursuant to the Clean Air Act or regulations

 

 

SB1323- 72 -LRB103 27060 CPF 53428 b

1        promulgated thereunder.
2            ii. Nonmajor sources subject to a standard or
3        other requirements subsequently promulgated by USEPA
4        under Section 111 or 112 of the Clean Air Act that are
5        determined by USEPA to be exempt at the time a new
6        standard is promulgated.
7            iii. All sources and source categories that would
8        be required to obtain a permit solely because they are
9        subject to Part 60, Subpart AAA - Standards of
10        Performance for New Residential Wood Heaters (40 CFR
11        Part 60).
12            iv. All sources and source categories that would
13        be required to obtain a permit solely because they are
14        subject to Part 61, Subpart M - National Emission
15        Standard for Hazardous Air Pollutants for Asbestos,
16        Section 61.145 (40 CFR Part 61).
17            v. Any other source categories exempted by USEPA
18        regulations pursuant to Section 502(a) of the Clean
19        Air Act.
20            vi. Major sources of greenhouse gas emissions
21        required to obtain a CAAPP permit under this Section
22        if any of the following occurs:
23                (A) enactment of federal legislation depriving
24            the Administrator of the USEPA of authority to
25            regulate greenhouse gases under the Clean Air Act;
26                (B) the issuance of any opinion, ruling,

 

 

SB1323- 73 -LRB103 27060 CPF 53428 b

1            judgment, order, or decree by a federal court
2            depriving the Administrator of the USEPA of
3            authority to regulate greenhouse gases under the
4            Clean Air Act; or
5                (C) action by the President of the United
6            States or the President's authorized agent,
7            including the Administrator of the USEPA, to
8            repeal or withdraw the Greenhouse Gas Tailoring
9            Rule (75 Fed. Reg. 31514, June 3, 2010).
10            If any event listed in this subparagraph (vi)
11        occurs, CAAPP permits issued after such event shall
12        not impose permit terms or conditions addressing
13        greenhouse gases during the effectiveness of any event
14        listed in subparagraph (vi). If any event listed in
15        this subparagraph (vi) occurs, any owner or operator
16        with a CAAPP permit that includes terms or conditions
17        addressing greenhouse gases may elect to submit an
18        application to the Agency to address a revision or
19        repeal of such terms or conditions. If any owner or
20        operator submits such an application, the Agency shall
21        expeditiously process the permit application in
22        accordance with applicable laws and regulations.
23        Nothing in this subparagraph (vi) shall relieve an
24        owner or operator of a source from the requirement to
25        obtain a CAAPP permit for its emissions of regulated
26        air pollutants other than greenhouse gases, as

 

 

SB1323- 74 -LRB103 27060 CPF 53428 b

1        required by this Section.
2        c. For purposes of this Section the term "major
3    source" means any source that is:
4            i. A major source under Section 112 of the Clean
5        Air Act, which is defined as:
6                A. For pollutants other than radionuclides,
7            any stationary source or group of stationary
8            sources located within a contiguous area and under
9            common control that emits or has the potential to
10            emit, in the aggregate, 10 tons per year (tpy) or
11            more of any hazardous air pollutant which has been
12            listed pursuant to Section 112(b) of the Clean Air
13            Act, 25 tpy or more of any combination of such
14            hazardous air pollutants, or such lesser quantity
15            as USEPA may establish by rule. Notwithstanding
16            the preceding sentence, emissions from any oil or
17            gas exploration or production well (with its
18            associated equipment) and emissions from any
19            pipeline compressor or pump station shall not be
20            aggregated with emissions from other similar
21            units, whether or not such units are in a
22            contiguous area or under common control, to
23            determine whether such stations are major sources.
24                B. For radionuclides, "major source" shall
25            have the meaning specified by the USEPA by rule.
26            ii. A major stationary source of air pollutants,

 

 

SB1323- 75 -LRB103 27060 CPF 53428 b

1        as defined in Section 302 of the Clean Air Act, that
2        directly emits or has the potential to emit, 100 tpy or
3        more of any air pollutant subject to regulation
4        (including any major source of fugitive emissions of
5        any such pollutant, as determined by rule by USEPA).
6        For purposes of this subsection, "fugitive emissions"
7        means those emissions which could not reasonably pass
8        through a stack, chimney, vent, or other
9        functionally-equivalent opening. The fugitive
10        emissions of a stationary source shall not be
11        considered in determining whether it is a major
12        stationary source for the purposes of Section 302(j)
13        of the Clean Air Act, unless the source belongs to one
14        of the following categories of stationary source:
15                A. Coal cleaning plants (with thermal dryers).
16                B. Kraft pulp mills.
17                C. Portland cement plants.
18                D. Primary zinc smelters.
19                E. Iron and steel mills.
20                F. Primary aluminum ore reduction plants.
21                G. Primary copper smelters.
22                H. Municipal incinerators capable of charging
23            more than 250 tons of refuse per day.
24                I. Hydrofluoric, sulfuric, or nitric acid
25            plants.
26                J. Petroleum refineries.

 

 

SB1323- 76 -LRB103 27060 CPF 53428 b

1                K. Lime plants.
2                L. Phosphate rock processing plants.
3                M. Coke oven batteries.
4                N. Sulfur recovery plants.
5                O. Carbon black plants (furnace process).
6                P. Primary lead smelters.
7                Q. Fuel conversion plants.
8                R. Sintering plants.
9                S. Secondary metal production plants.
10                T. Chemical process plants.
11                U. Fossil-fuel boilers (or combination
12            thereof) totaling more than 250 million British
13            thermal units per hour heat input.
14                V. Petroleum storage and transfer units with a
15            total storage capacity exceeding 300,000 barrels.
16                W. Taconite ore processing plants.
17                X. Glass fiber processing plants.
18                Y. Charcoal production plants.
19                Z. Fossil fuel-fired steam electric plants of
20            more than 250 million British thermal units per
21            hour heat input.
22                AA. All other stationary source categories,
23            which as of August 7, 1980 are being regulated by a
24            standard promulgated under Section 111 or 112 of
25            the Clean Air Act.
26                BB. Any other stationary source category

 

 

SB1323- 77 -LRB103 27060 CPF 53428 b

1            designated by USEPA by rule.
2            iii. A major stationary source as defined in part
3        D of Title I of the Clean Air Act including:
4                A. For ozone nonattainment areas, sources with
5            the potential to emit 100 tons or more per year of
6            volatile organic compounds or oxides of nitrogen
7            in areas classified as "marginal" or "moderate",
8            50 tons or more per year in areas classified as
9            "serious", 25 tons or more per year in areas
10            classified as "severe", and 10 tons or more per
11            year in areas classified as "extreme"; except that
12            the references in this clause to 100, 50, 25, and
13            10 tons per year of nitrogen oxides shall not
14            apply with respect to any source for which USEPA
15            has made a finding, under Section 182(f)(1) or (2)
16            of the Clean Air Act, that requirements otherwise
17            applicable to such source under Section 182(f) of
18            the Clean Air Act do not apply. Such sources shall
19            remain subject to the major source criteria of
20            subparagraph (ii) of paragraph (c) of this
21            subsection.
22                B. For ozone transport regions established
23            pursuant to Section 184 of the Clean Air Act,
24            sources with the potential to emit 50 tons or more
25            per year of volatile organic compounds (VOCs).
26                C. For carbon monoxide nonattainment areas (1)

 

 

SB1323- 78 -LRB103 27060 CPF 53428 b

1            that are classified as "serious", and (2) in which
2            stationary sources contribute significantly to
3            carbon monoxide levels as determined under rules
4            issued by USEPA, sources with the potential to
5            emit 50 tons or more per year of carbon monoxide.
6                D. For particulate matter (PM-10)
7            nonattainment areas classified as "serious",
8            sources with the potential to emit 70 tons or more
9            per year of PM-10.
 
10    3. Agency Authority To Issue CAAPP Permits and Federally
11Enforceable State Operating Permits.
12        a. The Agency shall issue CAAPP permits under this
13    Section consistent with the Clean Air Act and regulations
14    promulgated thereunder and this Act and regulations
15    promulgated thereunder.
16        b. The Agency shall issue CAAPP permits for fixed
17    terms of 5 years, except CAAPP permits issued for solid
18    waste incineration units combusting municipal waste which
19    shall be issued for fixed terms of 12 years and except
20    CAAPP permits for affected sources for acid deposition
21    which shall be issued for initial terms to expire on
22    December 31, 1999, and for fixed terms of 5 years
23    thereafter.
24        c. The Agency shall have the authority to issue a
25    State operating permit for a source under subsection (a)

 

 

SB1323- 79 -LRB103 27060 CPF 53428 b

1    of Section 39 of this Act, as amended, and regulations
2    promulgated thereunder, which includes federally
3    enforceable conditions limiting the "potential to emit" of
4    the source to a level below the major source threshold for
5    that source as described in paragraph (c) of subsection 2
6    of this Section, thereby excluding the source from the
7    CAAPP, when requested by the applicant pursuant to
8    paragraph (u) of subsection 5 of this Section. The public
9    notice requirements of this Section applicable to CAAPP
10    permits shall also apply to the initial issuance of
11    permits under this paragraph.
12        d. For purposes of this Act, a permit issued by USEPA
13    under Section 505 of the Clean Air Act, as now and
14    hereafter amended, shall be deemed to be a permit issued
15    by the Agency pursuant to Section 39.5 of this Act.
 
16    4. Transition.
17        a. An owner or operator of a CAAPP source shall not be
18    required to renew an existing State operating permit for
19    any emission unit at such CAAPP source once a CAAPP
20    application timely submitted prior to expiration of the
21    State operating permit has been deemed complete. For
22    purposes other than permit renewal, the obligation upon
23    the owner or operator of a CAAPP source to obtain a State
24    operating permit is not removed upon submittal of the
25    complete CAAPP permit application. An owner or operator of

 

 

SB1323- 80 -LRB103 27060 CPF 53428 b

1    a CAAPP source seeking to make a modification to a source
2    prior to the issuance of its CAAPP permit shall be
3    required to obtain a construction permit, operating
4    permit, or both as required for such modification in
5    accordance with the State permit program under subsection
6    (a) of Section 39 of this Act, as amended, and regulations
7    promulgated thereunder. The application for such
8    construction permit, operating permit, or both shall be
9    considered an amendment to the CAAPP application submitted
10    for such source.
11        b. An owner or operator of a CAAPP source shall
12    continue to operate in accordance with the terms and
13    conditions of its applicable State operating permit
14    notwithstanding the expiration of the State operating
15    permit until the source's CAAPP permit has been issued.
16        c. An owner or operator of a CAAPP source shall submit
17    its initial CAAPP application to the Agency no later than
18    12 months after the effective date of the CAAPP. The
19    Agency may request submittal of initial CAAPP applications
20    during this 12-month period according to a schedule set
21    forth within Agency procedures, however, in no event shall
22    the Agency require such submittal earlier than 3 months
23    after such effective date of the CAAPP. An owner or
24    operator may voluntarily submit its initial CAAPP
25    application prior to the date required within this
26    paragraph or applicable procedures, if any, subsequent to

 

 

SB1323- 81 -LRB103 27060 CPF 53428 b

1    the date the Agency submits the CAAPP to USEPA for
2    approval.
3        d. The Agency shall act on initial CAAPP applications
4    in accordance with paragraph (j) of subsection 5 of this
5    Section.
6        e. For purposes of this Section, the term "initial
7    CAAPP application" shall mean the first CAAPP application
8    submitted for a source existing as of the effective date
9    of the CAAPP.
10        f. The Agency shall provide owners or operators of
11    CAAPP sources with at least 3 months advance notice of the
12    date on which their applications are required to be
13    submitted. In determining which sources shall be subject
14    to early submittal, the Agency shall include among its
15    considerations the complexity of the permit application,
16    and the burden that such early submittal will have on the
17    source.
18        g. The CAAPP permit shall upon becoming effective
19    supersede the State operating permit.
20        h. The Agency shall have the authority to adopt
21    procedural rules, in accordance with the Illinois
22    Administrative Procedure Act, as the Agency deems
23    necessary, to implement this subsection.
 
24    5. Applications and Completeness.
25        a. An owner or operator of a CAAPP source shall submit

 

 

SB1323- 82 -LRB103 27060 CPF 53428 b

1    its complete CAAPP application consistent with the Act and
2    applicable regulations.
3        b. An owner or operator of a CAAPP source shall submit
4    a single complete CAAPP application covering all emission
5    units at that source.
6        c. To be deemed complete, a CAAPP application must
7    provide all information, as requested in Agency
8    application forms, sufficient to evaluate the subject
9    source and its application and to determine all applicable
10    requirements, pursuant to the Clean Air Act, and
11    regulations thereunder, this Act and regulations
12    thereunder. Such Agency application forms shall be
13    finalized and made available prior to the date on which
14    any CAAPP application is required.
15        d. An owner or operator of a CAAPP source shall
16    submit, as part of its complete CAAPP application, a
17    compliance plan, including a schedule of compliance,
18    describing how each emission unit will comply with all
19    applicable requirements. Any such schedule of compliance
20    shall be supplemental to, and shall not sanction
21    noncompliance with, the applicable requirements on which
22    it is based.
23        e. Each submitted CAAPP application shall be certified
24    for truth, accuracy, and completeness by a responsible
25    official in accordance with applicable regulations.
26        f. The Agency shall provide notice to a CAAPP

 

 

SB1323- 83 -LRB103 27060 CPF 53428 b

1    applicant as to whether a submitted CAAPP application is
2    complete. Unless the Agency notifies the applicant of
3    incompleteness, within 60 days after receipt of the CAAPP
4    application, the application shall be deemed complete. The
5    Agency may request additional information as needed to
6    make the completeness determination. The Agency may to the
7    extent practicable provide the applicant with a reasonable
8    opportunity to correct deficiencies prior to a final
9    determination of completeness.
10        g. If after the determination of completeness the
11    Agency finds that additional information is necessary to
12    evaluate or take final action on the CAAPP application,
13    the Agency may request in writing such information from
14    the source with a reasonable deadline for response.
15        h. If the owner or operator of a CAAPP source submits a
16    timely and complete CAAPP application, the source's
17    failure to have a CAAPP permit shall not be a violation of
18    this Section until the Agency takes final action on the
19    submitted CAAPP application, provided, however, where the
20    applicant fails to submit the requested information under
21    paragraph (g) of this subsection 5 within the time frame
22    specified by the Agency, this protection shall cease to
23    apply.
24        i. Any applicant who fails to submit any relevant
25    facts necessary to evaluate the subject source and its
26    CAAPP application or who has submitted incorrect

 

 

SB1323- 84 -LRB103 27060 CPF 53428 b

1    information in a CAAPP application shall, upon becoming
2    aware of such failure or incorrect submittal, submit
3    supplementary facts or correct information to the Agency.
4    In addition, an applicant shall provide to the Agency
5    additional information as necessary to address any
6    requirements which become applicable to the source
7    subsequent to the date the applicant submitted its
8    complete CAAPP application but prior to release of the
9    draft CAAPP permit.
10        j. The Agency shall issue or deny the CAAPP permit
11    within 18 months after the date of receipt of the complete
12    CAAPP application, with the following exceptions: (i)
13    permits for affected sources for acid deposition shall be
14    issued or denied within 6 months after receipt of a
15    complete application in accordance with subsection 17 of
16    this Section; (ii) the Agency shall act on initial CAAPP
17    applications within 24 months after the date of receipt of
18    the complete CAAPP application; (iii) the Agency shall act
19    on complete applications containing early reduction
20    demonstrations under Section 112(i)(5) of the Clean Air
21    Act within 9 months of receipt of the complete CAAPP
22    application.
23        Where the Agency does not take final action on the
24    permit within the required time period, the permit shall
25    not be deemed issued; rather, the failure to act shall be
26    treated as a final permit action for purposes of judicial

 

 

SB1323- 85 -LRB103 27060 CPF 53428 b

1    review pursuant to Sections 40.2 and 41 of this Act.
2        k. The submittal of a complete CAAPP application shall
3    not affect the requirement that any source have a
4    preconstruction permit under Title I of the Clean Air Act.
5        l. Unless a timely and complete renewal application
6    has been submitted consistent with this subsection, a
7    CAAPP source operating upon the expiration of its CAAPP
8    permit shall be deemed to be operating without a CAAPP
9    permit. Such operation is prohibited under this Act.
10        m. Permits being renewed shall be subject to the same
11    procedural requirements, including those for public
12    participation and federal review and objection, that apply
13    to original permit issuance.
14        n. For purposes of permit renewal, a timely
15    application is one that is submitted no less than 9 months
16    prior to the date of permit expiration.
17        o. The terms and conditions of a CAAPP permit shall
18    remain in effect until the issuance of a CAAPP renewal
19    permit provided a timely and complete CAAPP application
20    has been submitted.
21        p. The owner or operator of a CAAPP source seeking a
22    permit shield pursuant to paragraph (j) of subsection 7 of
23    this Section shall request such permit shield in the CAAPP
24    application regarding that source.
25        q. The Agency shall make available to the public all
26    documents submitted by the applicant to the Agency,

 

 

SB1323- 86 -LRB103 27060 CPF 53428 b

1    including each CAAPP application, compliance plan
2    (including the schedule of compliance), and emissions or
3    compliance monitoring report, with the exception of
4    information entitled to confidential treatment pursuant to
5    Section 7 of this Act.
6        r. The Agency shall use the standardized forms
7    required under Title IV of the Clean Air Act and
8    regulations promulgated thereunder for affected sources
9    for acid deposition.
10        s. An owner or operator of a CAAPP source may include
11    within its CAAPP application a request for permission to
12    operate during a startup, malfunction, or breakdown
13    consistent with applicable Board regulations.
14        t. An owner or operator of a CAAPP source, in order to
15    utilize the operational flexibility provided under
16    paragraph (l) of subsection 7 of this Section, must
17    request such use and provide the necessary information
18    within its CAAPP application.
19        u. An owner or operator of a CAAPP source which seeks
20    exclusion from the CAAPP through the imposition of
21    federally enforceable conditions, pursuant to paragraph
22    (c) of subsection 3 of this Section, must request such
23    exclusion within a CAAPP application submitted consistent
24    with this subsection on or after the date that the CAAPP
25    application for the source is due. Prior to such date, but
26    in no case later than 9 months after the effective date of

 

 

SB1323- 87 -LRB103 27060 CPF 53428 b

1    the CAAPP, such owner or operator may request the
2    imposition of federally enforceable conditions pursuant to
3    paragraph (b) of subsection 1.1 of this Section.
4        v. CAAPP applications shall contain accurate
5    information on allowable emissions to implement the fee
6    provisions of subsection 18 of this Section.
7        w. An owner or operator of a CAAPP source shall submit
8    within its CAAPP application emissions information
9    regarding all regulated air pollutants emitted at that
10    source consistent with applicable Agency procedures.
11    Emissions information regarding insignificant activities
12    or emission levels, as determined by the Agency pursuant
13    to Board regulations, may be submitted as a list within
14    the CAAPP application. The Agency shall propose
15    regulations to the Board defining insignificant activities
16    or emission levels, consistent with federal regulations,
17    if any, no later than 18 months after the effective date of
18    this amendatory Act of 1992, consistent with Section
19    112(n)(1) of the Clean Air Act. The Board shall adopt
20    final regulations defining insignificant activities or
21    emission levels no later than 9 months after the date of
22    the Agency's proposal.
23        x. The owner or operator of a new CAAPP source shall
24    submit its complete CAAPP application consistent with this
25    subsection within 12 months after commencing operation of
26    such source. The owner or operator of an existing source

 

 

SB1323- 88 -LRB103 27060 CPF 53428 b

1    that has been excluded from the provisions of this Section
2    under subsection 1.1 or paragraph (c) of subsection 3 of
3    this Section and that becomes subject to the CAAPP solely
4    due to a change in operation at the source shall submit its
5    complete CAAPP application consistent with this subsection
6    at least 180 days before commencing operation in
7    accordance with the change in operation.
8        y. The Agency shall have the authority to adopt
9    procedural rules, in accordance with the Illinois
10    Administrative Procedure Act, as the Agency deems
11    necessary to implement this subsection.
 
12    6. Prohibitions.
13        a. It shall be unlawful for any person to violate any
14    terms or conditions of a permit issued under this Section,
15    to operate any CAAPP source except in compliance with a
16    permit issued by the Agency under this Section or to
17    violate any other applicable requirements. All terms and
18    conditions of a permit issued under this Section are
19    enforceable by USEPA and citizens under the Clean Air Act,
20    except those, if any, that are specifically designated as
21    not being federally enforceable in the permit pursuant to
22    paragraph (m) of subsection 7 of this Section.
23        b. After the applicable CAAPP permit or renewal
24    application submittal date, as specified in subsection 5
25    of this Section, no person shall operate a CAAPP source

 

 

SB1323- 89 -LRB103 27060 CPF 53428 b

1    without a CAAPP permit unless the complete CAAPP permit or
2    renewal application for such source has been timely
3    submitted to the Agency.
4        c. No owner or operator of a CAAPP source shall cause
5    or threaten or allow the continued operation of an
6    emission source during malfunction or breakdown of the
7    emission source or related air pollution control equipment
8    if such operation would cause a violation of the standards
9    or limitations applicable to the source, unless the CAAPP
10    permit granted to the source provides for such operation
11    consistent with this Act and applicable Board regulations.
 
12    7. Permit Content.
13        a. All CAAPP permits shall contain emission
14    limitations and standards and other enforceable terms and
15    conditions, including but not limited to operational
16    requirements, and schedules for achieving compliance at
17    the earliest reasonable date, which are or will be
18    required to accomplish the purposes and provisions of this
19    Act and to assure compliance with all applicable
20    requirements.
21        b. The Agency shall include among such conditions
22    applicable monitoring, reporting, record keeping and
23    compliance certification requirements, as authorized by
24    paragraphs (d), (e), and (f) of this subsection, that the
25    Agency deems necessary to assure compliance with the Clean

 

 

SB1323- 90 -LRB103 27060 CPF 53428 b

1    Air Act, the regulations promulgated thereunder, this Act,
2    and applicable Board regulations. When monitoring,
3    reporting, record keeping, and compliance certification
4    requirements are specified within the Clean Air Act,
5    regulations promulgated thereunder, this Act, or
6    applicable regulations, such requirements shall be
7    included within the CAAPP permit. The Board shall have
8    authority to promulgate additional regulations where
9    necessary to accomplish the purposes of the Clean Air Act,
10    this Act, and regulations promulgated thereunder.
11        c. The Agency shall assure, within such conditions,
12    the use of terms, test methods, units, averaging periods,
13    and other statistical conventions consistent with the
14    applicable emission limitations, standards, and other
15    requirements contained in the permit.
16        d. To meet the requirements of this subsection with
17    respect to monitoring, the permit shall:
18            i. Incorporate and identify all applicable
19        emissions monitoring and analysis procedures or test
20        methods required under the Clean Air Act, regulations
21        promulgated thereunder, this Act, and applicable Board
22        regulations, including any procedures and methods
23        promulgated by USEPA pursuant to Section 504(b) or
24        Section 114 (a)(3) of the Clean Air Act.
25            ii. Where the applicable requirement does not
26        require periodic testing or instrumental or

 

 

SB1323- 91 -LRB103 27060 CPF 53428 b

1        noninstrumental monitoring (which may consist of
2        recordkeeping designed to serve as monitoring),
3        require periodic monitoring sufficient to yield
4        reliable data from the relevant time period that is
5        representative of the source's compliance with the
6        permit, as reported pursuant to paragraph (f) of this
7        subsection. The Agency may determine that
8        recordkeeping requirements are sufficient to meet the
9        requirements of this subparagraph.
10            iii. As necessary, specify requirements concerning
11        the use, maintenance, and when appropriate,
12        installation of monitoring equipment or methods.
13        e. To meet the requirements of this subsection with
14    respect to record keeping, the permit shall incorporate
15    and identify all applicable recordkeeping requirements and
16    require, where applicable, the following:
17            i. Records of required monitoring information that
18        include the following:
19                A. The date, place and time of sampling or
20            measurements.
21                B. The date(s) analyses were performed.
22                C. The company or entity that performed the
23            analyses.
24                D. The analytical techniques or methods used.
25                E. The results of such analyses.
26                F. The operating conditions as existing at the

 

 

SB1323- 92 -LRB103 27060 CPF 53428 b

1            time of sampling or measurement.
2            ii. Retention of records of all monitoring data
3        and support information for a period of at least 5
4        years from the date of the monitoring sample,
5        measurement, report, or application. Support
6        information includes all calibration and maintenance
7        records, original strip-chart recordings for
8        continuous monitoring instrumentation, and copies of
9        all reports required by the permit.
10        f. To meet the requirements of this subsection with
11    respect to reporting, the permit shall incorporate and
12    identify all applicable reporting requirements and require
13    the following:
14            i. Submittal of reports of any required monitoring
15        every 6 months. More frequent submittals may be
16        requested by the Agency if such submittals are
17        necessary to assure compliance with this Act or
18        regulations promulgated by the Board thereunder. All
19        instances of deviations from permit requirements must
20        be clearly identified in such reports. All required
21        reports must be certified by a responsible official
22        consistent with subsection 5 of this Section.
23            ii. Prompt reporting of deviations from permit
24        requirements, including those attributable to upset
25        conditions as defined in the permit, the probable
26        cause of such deviations, and any corrective actions

 

 

SB1323- 93 -LRB103 27060 CPF 53428 b

1        or preventive measures taken.
2        g. Each CAAPP permit issued under subsection 10 of
3    this Section shall include a condition prohibiting
4    emissions exceeding any allowances that the source
5    lawfully holds under Title IV of the Clean Air Act or the
6    regulations promulgated thereunder, consistent with
7    subsection 17 of this Section and applicable regulations,
8    if any.
9        h. All CAAPP permits shall state that, where another
10    applicable requirement of the Clean Air Act is more
11    stringent than any applicable requirement of regulations
12    promulgated under Title IV of the Clean Air Act, both
13    provisions shall be incorporated into the permit and shall
14    be State and federally enforceable.
15        i. Each CAAPP permit issued under subsection 10 of
16    this Section shall include a severability clause to ensure
17    the continued validity of the various permit requirements
18    in the event of a challenge to any portions of the permit.
19        j. The following shall apply with respect to owners or
20    operators requesting a permit shield:
21            i. The Agency shall include in a CAAPP permit,
22        when requested by an applicant pursuant to paragraph
23        (p) of subsection 5 of this Section, a provision
24        stating that compliance with the conditions of the
25        permit shall be deemed compliance with applicable
26        requirements which are applicable as of the date of

 

 

SB1323- 94 -LRB103 27060 CPF 53428 b

1        release of the proposed permit, provided that:
2                A. The applicable requirement is specifically
3            identified within the permit; or
4                B. The Agency in acting on the CAAPP
5            application or revision determines in writing that
6            other requirements specifically identified are not
7            applicable to the source, and the permit includes
8            that determination or a concise summary thereof.
9            ii. The permit shall identify the requirements for
10        which the source is shielded. The shield shall not
11        extend to applicable requirements which are
12        promulgated after the date of release of the proposed
13        permit unless the permit has been modified to reflect
14        such new requirements.
15            iii. A CAAPP permit which does not expressly
16        indicate the existence of a permit shield shall not
17        provide such a shield.
18            iv. Nothing in this paragraph or in a CAAPP permit
19        shall alter or affect the following:
20                A. The provisions of Section 303 (emergency
21            powers) of the Clean Air Act, including USEPA's
22            authority under that section.
23                B. The liability of an owner or operator of a
24            source for any violation of applicable
25            requirements prior to or at the time of permit
26            issuance.

 

 

SB1323- 95 -LRB103 27060 CPF 53428 b

1                C. The applicable requirements of the acid
2            rain program consistent with Section 408(a) of the
3            Clean Air Act.
4                D. The ability of USEPA to obtain information
5            from a source pursuant to Section 114
6            (inspections, monitoring, and entry) of the Clean
7            Air Act.
8        k. Each CAAPP permit shall include an emergency
9    provision providing an affirmative defense of emergency to
10    an action brought for noncompliance with technology-based
11    emission limitations under a CAAPP permit if the following
12    conditions are met through properly signed,
13    contemporaneous operating logs, or other relevant
14    evidence:
15            i. An emergency occurred and the permittee can
16        identify the cause(s) of the emergency.
17            ii. The permitted facility was at the time being
18        properly operated.
19            iii. The permittee submitted notice of the
20        emergency to the Agency within 2 working days after
21        the time when emission limitations were exceeded due
22        to the emergency. This notice must contain a detailed
23        description of the emergency, any steps taken to
24        mitigate emissions, and corrective actions taken.
25            iv. During the period of the emergency the
26        permittee took all reasonable steps to minimize levels

 

 

SB1323- 96 -LRB103 27060 CPF 53428 b

1        of emissions that exceeded the emission limitations,
2        standards, or requirements in the permit.
3        For purposes of this subsection, "emergency" means any
4    situation arising from sudden and reasonably unforeseeable
5    events beyond the control of the source, such as an act of
6    God, that requires immediate corrective action to restore
7    normal operation, and that causes the source to exceed a
8    technology-based emission limitation under the permit, due
9    to unavoidable increases in emissions attributable to the
10    emergency. An emergency shall not include noncompliance to
11    the extent caused by improperly designed equipment, lack
12    of preventative maintenance, careless or improper
13    operation, or operation error.
14        In any enforcement proceeding, the permittee seeking
15    to establish the occurrence of an emergency has the burden
16    of proof. This provision is in addition to any emergency
17    or upset provision contained in any applicable
18    requirement. This provision does not relieve a permittee
19    of any reporting obligations under existing federal or
20    state laws or regulations.
21        l. The Agency shall include in each permit issued
22    under subsection 10 of this Section:
23            i. Terms and conditions for reasonably anticipated
24        operating scenarios identified by the source in its
25        application. The permit terms and conditions for each
26        such operating scenario shall meet all applicable

 

 

SB1323- 97 -LRB103 27060 CPF 53428 b

1        requirements and the requirements of this Section.
2                A. Under this subparagraph, the source must
3            record in a log at the permitted facility a record
4            of the scenario under which it is operating
5            contemporaneously with making a change from one
6            operating scenario to another.
7                B. The permit shield described in paragraph
8            (j) of subsection 7 of this Section shall extend
9            to all terms and conditions under each such
10            operating scenario.
11            ii. Where requested by an applicant, all terms and
12        conditions allowing for trading of emissions increases
13        and decreases between different emission units at the
14        CAAPP source, to the extent that the applicable
15        requirements provide for trading of such emissions
16        increases and decreases without a case-by-case
17        approval of each emissions trade. Such terms and
18        conditions:
19                A. Shall include all terms required under this
20            subsection to determine compliance;
21                B. Must meet all applicable requirements;
22                C. Shall extend the permit shield described in
23            paragraph (j) of subsection 7 of this Section to
24            all terms and conditions that allow such increases
25            and decreases in emissions.
26        m. The Agency shall specifically designate as not

 

 

SB1323- 98 -LRB103 27060 CPF 53428 b

1    being federally enforceable under the Clean Air Act any
2    terms and conditions included in the permit that are not
3    specifically required under the Clean Air Act or federal
4    regulations promulgated thereunder. Terms or conditions so
5    designated shall be subject to all applicable State
6    requirements, except the requirements of subsection 7
7    (other than this paragraph, paragraph q of subsection 7,
8    subsections 8 through 11, and subsections 13 through 16 of
9    this Section. The Agency shall, however, include such
10    terms and conditions in the CAAPP permit issued to the
11    source.
12        n. Each CAAPP permit issued under subsection 10 of
13    this Section shall specify and reference the origin of and
14    authority for each term or condition, and identify any
15    difference in form as compared to the applicable
16    requirement upon which the term or condition is based.
17        o. Each CAAPP permit issued under subsection 10 of
18    this Section shall include provisions stating the
19    following:
20            i. Duty to comply. The permittee must comply with
21        all terms and conditions of the CAAPP permit. Any
22        permit noncompliance constitutes a violation of the
23        Clean Air Act and the Act, and is grounds for any or
24        all of the following: enforcement action; permit
25        termination, revocation and reissuance, or
26        modification; or denial of a permit renewal

 

 

SB1323- 99 -LRB103 27060 CPF 53428 b

1        application.
2            ii. Need to halt or reduce activity not a defense.
3        It shall not be a defense for a permittee in an
4        enforcement action that it would have been necessary
5        to halt or reduce the permitted activity in order to
6        maintain compliance with the conditions of this
7        permit.
8            iii. Permit actions. The permit may be modified,
9        revoked, reopened, and reissued, or terminated for
10        cause in accordance with the applicable subsections of
11        Section 39.5 of this Act. The filing of a request by
12        the permittee for a permit modification, revocation
13        and reissuance, or termination, or of a notification
14        of planned changes or anticipated noncompliance does
15        not stay any permit condition.
16            iv. Property rights. The permit does not convey
17        any property rights of any sort, or any exclusive
18        privilege.
19            v. Duty to provide information. The permittee
20        shall furnish to the Agency within a reasonable time
21        specified by the Agency any information that the
22        Agency may request in writing to determine whether
23        cause exists for modifying, revoking and reissuing, or
24        terminating the permit or to determine compliance with
25        the permit. Upon request, the permittee shall also
26        furnish to the Agency copies of records required to be

 

 

SB1323- 100 -LRB103 27060 CPF 53428 b

1        kept by the permit or, for information claimed to be
2        confidential, the permittee may furnish such records
3        directly to USEPA along with a claim of
4        confidentiality.
5            vi. Duty to pay fees. The permittee must pay fees
6        to the Agency consistent with the fee schedule
7        approved pursuant to subsection 18 of this Section,
8        and submit any information relevant thereto.
9            vii. Emissions trading. No permit revision shall
10        be required for increases in emissions allowed under
11        any approved economic incentives, marketable permits,
12        emissions trading, and other similar programs or
13        processes for changes that are provided for in the
14        permit and that are authorized by the applicable
15        requirement.
16        p. Each CAAPP permit issued under subsection 10 of
17    this Section shall contain the following elements with
18    respect to compliance:
19            i. Compliance certification, testing, monitoring,
20        reporting, and record keeping requirements sufficient
21        to assure compliance with the terms and conditions of
22        the permit. Any document (including reports) required
23        by a CAAPP permit shall contain a certification by a
24        responsible official that meets the requirements of
25        subsection 5 of this Section and applicable
26        regulations.

 

 

SB1323- 101 -LRB103 27060 CPF 53428 b

1            ii. Inspection and entry requirements that
2        necessitate that, upon presentation of credentials and
3        other documents as may be required by law and in
4        accordance with constitutional limitations, the
5        permittee shall allow the Agency, or an authorized
6        representative to perform the following:
7                A. Enter upon the permittee's premises where a
8            CAAPP source is located or emissions-related
9            activity is conducted, or where records must be
10            kept under the conditions of the permit.
11                B. Have access to and copy, at reasonable
12            times, any records that must be kept under the
13            conditions of the permit.
14                C. Inspect at reasonable times any facilities,
15            equipment (including monitoring and air pollution
16            control equipment), practices, or operations
17            regulated or required under the permit.
18                D. Sample or monitor any substances or
19            parameters at any location:
20                    1. As authorized by the Clean Air Act, at
21                reasonable times, for the purposes of assuring
22                compliance with the CAAPP permit or applicable
23                requirements; or
24                    2. As otherwise authorized by this Act.
25            iii. A schedule of compliance consistent with
26        subsection 5 of this Section and applicable

 

 

SB1323- 102 -LRB103 27060 CPF 53428 b

1        regulations.
2            iv. Progress reports consistent with an applicable
3        schedule of compliance pursuant to paragraph (d) of
4        subsection 5 of this Section and applicable
5        regulations to be submitted semiannually, or more
6        frequently if the Agency determines that such more
7        frequent submittals are necessary for compliance with
8        the Act or regulations promulgated by the Board
9        thereunder. Such progress reports shall contain the
10        following:
11                A. Required dates for achieving the
12            activities, milestones, or compliance required by
13            the schedule of compliance and dates when such
14            activities, milestones or compliance were
15            achieved.
16                B. An explanation of why any dates in the
17            schedule of compliance were not or will not be
18            met, and any preventive or corrective measures
19            adopted.
20            v. Requirements for compliance certification with
21        terms and conditions contained in the permit,
22        including emission limitations, standards, or work
23        practices. Permits shall include each of the
24        following:
25                A. The frequency (annually or more frequently
26            as specified in any applicable requirement or by

 

 

SB1323- 103 -LRB103 27060 CPF 53428 b

1            the Agency pursuant to written procedures) of
2            submissions of compliance certifications.
3                B. A means for assessing or monitoring the
4            compliance of the source with its emissions
5            limitations, standards, and work practices.
6                C. A requirement that the compliance
7            certification include the following:
8                    1. The identification of each term or
9                condition contained in the permit that is the
10                basis of the certification.
11                    2. The compliance status.
12                    3. Whether compliance was continuous or
13                intermittent.
14                    4. The method(s) used for determining the
15                compliance status of the source, both
16                currently and over the reporting period
17                consistent with subsection 7 of this Section.
18                D. A requirement that all compliance
19            certifications be submitted to the Agency.
20                E. Additional requirements as may be specified
21            pursuant to Sections 114(a)(3) and 504(b) of the
22            Clean Air Act.
23                F. Other provisions as the Agency may require.
24        q. If the owner or operator of CAAPP source can
25    demonstrate in its CAAPP application, including an
26    application for a significant modification, that an

 

 

SB1323- 104 -LRB103 27060 CPF 53428 b

1    alternative emission limit would be equivalent to that
2    contained in the applicable Board regulations, the Agency
3    shall include the alternative emission limit in the CAAPP
4    permit, which shall supersede the emission limit set forth
5    in the applicable Board regulations, and shall include
6    conditions that insure that the resulting emission limit
7    is quantifiable, accountable, enforceable, and based on
8    replicable procedures.
 
9    8. Public Notice; Affected State Review.
10        a. The Agency shall provide notice to the public,
11    including an opportunity for public comment and a hearing,
12    on each draft CAAPP permit for issuance, renewal or
13    significant modification, subject to Section 7.1 and
14    subsection (a) of Section 7 of this Act.
15        b. The Agency shall prepare a draft CAAPP permit and a
16    statement that sets forth the legal and factual basis for
17    the draft CAAPP permit conditions, including references to
18    the applicable statutory or regulatory provisions. The
19    Agency shall provide this statement to any person who
20    requests it.
21        c. The Agency shall give notice of each draft CAAPP
22    permit to the applicant and to any affected State on or
23    before the time that the Agency has provided notice to the
24    public, except as otherwise provided in this Act.
25        d. The Agency, as part of its submittal of a proposed

 

 

SB1323- 105 -LRB103 27060 CPF 53428 b

1    permit to USEPA (or as soon as possible after the
2    submittal for minor permit modification procedures allowed
3    under subsection 14 of this Section), shall notify USEPA
4    and any affected State in writing of any refusal of the
5    Agency to accept all of the recommendations for the
6    proposed permit that an affected State submitted during
7    the public or affected State review period. The notice
8    shall include the Agency's reasons for not accepting the
9    recommendations. The Agency is not required to accept
10    recommendations that are not based on applicable
11    requirements or the requirements of this Section.
12        e. The Agency shall make available to the public any
13    CAAPP permit application, compliance plan (including the
14    schedule of compliance), CAAPP permit, and emissions or
15    compliance monitoring report. If an owner or operator of a
16    CAAPP source is required to submit information entitled to
17    protection from disclosure under Section 7.1 and
18    subsection (a) of Section 7 of this Act, the owner or
19    operator shall submit such information separately. The
20    requirements of Section 7.1 and subsection (a) of Section
21    7 of this Act shall apply to such information, which shall
22    not be included in a CAAPP permit unless required by law.
23    The contents of a CAAPP permit shall not be entitled to
24    protection under Section 7.1 and subsection (a) of Section
25    7 of this Act.
26        f. The Agency shall have the authority to adopt

 

 

SB1323- 106 -LRB103 27060 CPF 53428 b

1    procedural rules, in accordance with the Illinois
2    Administrative Procedure Act, as the Agency deems
3    necessary, to implement this subsection.
4        g. If requested by the permit applicant, the Agency
5    shall provide the permit applicant with a copy of the
6    draft CAAPP permit prior to any public review period. If
7    requested by the permit applicant, the Agency shall
8    provide the permit applicant with a copy of the final
9    CAAPP permit prior to issuance of the CAAPP permit.
 
10    9. USEPA Notice and Objection.
11        a. The Agency shall provide to USEPA for its review a
12    copy of each CAAPP application (including any application
13    for permit modification), statement of basis as provided
14    in paragraph (b) of subsection 8 of this Section, proposed
15    CAAPP permit, CAAPP permit, and, if the Agency does not
16    incorporate any affected State's recommendations on a
17    proposed CAAPP permit, a written statement of this
18    decision and its reasons for not accepting the
19    recommendations, except as otherwise provided in this Act
20    or by agreement with USEPA. To the extent practicable, the
21    preceding information shall be provided in computer
22    readable format compatible with USEPA's national database
23    management system.
24        b. The Agency shall not issue the proposed CAAPP
25    permit if USEPA objects in writing within 45 days after

 

 

SB1323- 107 -LRB103 27060 CPF 53428 b

1    receipt of the proposed CAAPP permit and all necessary
2    supporting information.
3        c. If USEPA objects in writing to the issuance of the
4    proposed CAAPP permit within the 45-day period, the Agency
5    shall respond in writing and may revise and resubmit the
6    proposed CAAPP permit in response to the stated objection,
7    to the extent supported by the record, within 90 days
8    after the date of the objection. Prior to submitting a
9    revised permit to USEPA, the Agency shall provide the
10    applicant and any person who participated in the public
11    comment process, pursuant to subsection 8 of this Section,
12    with a 10-day period to comment on any revision which the
13    Agency is proposing to make to the permit in response to
14    USEPA's objection in accordance with Agency procedures.
15        d. Any USEPA objection under this subsection,
16    according to the Clean Air Act, will include a statement
17    of reasons for the objection and a description of the
18    terms and conditions that must be in the permit, in order
19    to adequately respond to the objections. Grounds for a
20    USEPA objection include the failure of the Agency to: (1)
21    submit the items and notices required under this
22    subsection; (2) submit any other information necessary to
23    adequately review the proposed CAAPP permit; or (3)
24    process the permit under subsection 8 of this Section
25    except for minor permit modifications.
26        e. If USEPA does not object in writing to issuance of a

 

 

SB1323- 108 -LRB103 27060 CPF 53428 b

1    permit under this subsection, any person may petition
2    USEPA within 60 days after expiration of the 45-day review
3    period to make such objection.
4        f. If the permit has not yet been issued and USEPA
5    objects to the permit as a result of a petition, the Agency
6    shall not issue the permit until USEPA's objection has
7    been resolved. The Agency shall provide a 10-day comment
8    period in accordance with paragraph c of this subsection.
9    A petition does not, however, stay the effectiveness of a
10    permit or its requirements if the permit was issued after
11    expiration of the 45-day review period and prior to a
12    USEPA objection.
13        g. If the Agency has issued a permit after expiration
14    of the 45-day review period and prior to receipt of a USEPA
15    objection under this subsection in response to a petition
16    submitted pursuant to paragraph e of this subsection, the
17    Agency may, upon receipt of an objection from USEPA,
18    revise and resubmit the permit to USEPA pursuant to this
19    subsection after providing a 10-day comment period in
20    accordance with paragraph c of this subsection. If the
21    Agency fails to submit a revised permit in response to the
22    objection, USEPA shall modify, terminate or revoke the
23    permit. In any case, the source will not be in violation of
24    the requirement to have submitted a timely and complete
25    application.
26        h. The Agency shall have the authority to adopt

 

 

SB1323- 109 -LRB103 27060 CPF 53428 b

1    procedural rules, in accordance with the Illinois
2    Administrative Procedure Act, as the Agency deems
3    necessary, to implement this subsection.
 
4    10. Final Agency Action.
5        a. The Agency shall issue a CAAPP permit, permit
6    modification, or permit renewal if all of the following
7    conditions are met:
8            i. The applicant has submitted a complete and
9        certified application for a permit, permit
10        modification, or permit renewal consistent with
11        subsections 5 and 14 of this Section, as applicable,
12        and applicable regulations.
13            ii. The applicant has submitted with its complete
14        application an approvable compliance plan, including a
15        schedule for achieving compliance, consistent with
16        subsection 5 of this Section and applicable
17        regulations.
18            iii. The applicant has timely paid the fees
19        required pursuant to subsection 18 of this Section and
20        applicable regulations.
21            iv. The Agency has received a complete CAAPP
22        application and, if necessary, has requested and
23        received additional information from the applicant
24        consistent with subsection 5 of this Section and
25        applicable regulations.

 

 

SB1323- 110 -LRB103 27060 CPF 53428 b

1            v. The Agency has complied with all applicable
2        provisions regarding public notice and affected State
3        review consistent with subsection 8 of this Section
4        and applicable regulations.
5            vi. The Agency has provided a copy of each CAAPP
6        application, or summary thereof, pursuant to agreement
7        with USEPA and proposed CAAPP permit required under
8        subsection 9 of this Section to USEPA, and USEPA has
9        not objected to the issuance of the permit in
10        accordance with the Clean Air Act and 40 CFR Part 70.
11            vii. The Agency has concluded, following a review
12        of the prospective owner's or operator's compliance
13        history as required by paragraph b of subsection 10 of
14        this Section, that previous noncompliance does not
15        justify permit denial.
16        b. The Agency shall have the authority to deny a CAAPP
17    permit, permit modification, or permit renewal if the
18    applicant has not complied with the requirements of
19    subparagraphs (i) through (iv) of paragraph (a) of this
20    subsection or if USEPA objects to its issuance. Further,
21    for a covered permit transaction, the Agency shall conduct
22    an evaluation of the prospective owner's or operator's
23    prior experience in owning and operating sources of air
24    pollution. The Agency has the authority to deny a covered
25    permit transaction if the prospective owner or operator or
26    any employee or officer of the prospective owner or

 

 

SB1323- 111 -LRB103 27060 CPF 53428 b

1    operator or board member or manager has a history of:
2            i. repeated violations of federal, State, or local
3        laws, rules, regulations, standards, or ordinances
4        involving the ownership or operation of sources of air
5        pollution;
6            ii. conviction:
7                (A) in this or another state of any crime that
8            is a felony under the laws of this State;
9                (B) of a felony in a federal court; or
10                (C) in this or another state or federal court
11            of any of the following crimes:
12                    (i) forgery;
13                    (ii) official misconduct;
14                    (iii) bribery;
15                    (iv) perjury; or
16                    (v) knowingly submitting false information
17                under any environmental law, rule, regulation,
18                or permit term or condition; or
19            iii. proof of gross carelessness or incompetence
20        in the ownership or operation of a source of air
21        pollution.
22        c. i. Prior to denial of a CAAPP permit, permit
23        modification, or permit renewal under this Section,
24        the Agency shall notify the applicant of the possible
25        denial and the reasons for the denial.
26            ii. Within such notice, the Agency shall specify

 

 

SB1323- 112 -LRB103 27060 CPF 53428 b

1        an appropriate date by which the applicant shall
2        adequately respond to the Agency's notice. Such date
3        shall not exceed 15 days from the date the
4        notification is received by the applicant. The Agency
5        may grant a reasonable extension for good cause shown.
6            iii. Failure by the applicant to adequately
7        respond by the date specified in the notification or
8        by any granted extension date shall be grounds for
9        denial of the permit.
10            For purposes of obtaining judicial review under
11        Sections 40.2 and 41 of this Act, the Agency shall
12        provide to USEPA and each applicant, and, upon
13        request, to affected States, any person who
14        participated in the public comment process, and any
15        other person who could obtain judicial review under
16        Sections 40.2 and 41 of this Act, a copy of each CAAPP
17        permit or notification of denial pertaining to that
18        party.
19        d. The Agency shall have the authority to adopt
20    procedural rules, in accordance with the Illinois
21    Administrative Procedure Act, as the Agency deems
22    necessary, to implement this subsection.
 
23    11. General Permits.
24        a. The Agency may issue a general permit covering
25    numerous similar sources, except for affected sources for

 

 

SB1323- 113 -LRB103 27060 CPF 53428 b

1    acid deposition unless otherwise provided in regulations
2    promulgated under Title IV of the Clean Air Act.
3        b. The Agency shall identify, in any general permit,
4    criteria by which sources may qualify for the general
5    permit.
6        c. CAAPP sources that would qualify for a general
7    permit must apply for coverage under the terms of the
8    general permit or must apply for a CAAPP permit consistent
9    with subsection 5 of this Section and applicable
10    regulations.
11        d. The Agency shall comply with the public comment and
12    hearing provisions of this Section as well as the USEPA
13    and affected State review procedures prior to issuance of
14    a general permit.
15        e. When granting a subsequent request by a qualifying
16    CAAPP source for coverage under the terms of a general
17    permit, the Agency shall not be required to repeat the
18    public notice and comment procedures. The granting of such
19    request shall not be considered a final permit action for
20    purposes of judicial review.
21        f. The Agency may not issue a general permit to cover
22    any discrete emission unit at a CAAPP source if another
23    CAAPP permit covers emission units at the source.
24        g. The Agency shall have the authority to adopt
25    procedural rules, in accordance with the Illinois
26    Administrative Procedure Act, as the Agency deems

 

 

SB1323- 114 -LRB103 27060 CPF 53428 b

1    necessary, to implement this subsection.
 
2    12. Operational Flexibility.
3        a. An owner or operator of a CAAPP source may make
4    changes at the CAAPP source without requiring a prior
5    permit revision, consistent with subparagraphs (i) through
6    (iii) of paragraph (a) of this subsection, so long as the
7    changes are not modifications under any provision of Title
8    I of the Clean Air Act and they do not exceed the emissions
9    allowable under the permit (whether expressed therein as a
10    rate of emissions or in terms of total emissions),
11    provided that the owner or operator of the CAAPP source
12    provides USEPA and the Agency with written notification as
13    required below in advance of the proposed changes, which
14    shall be a minimum of 7 days, unless otherwise provided by
15    the Agency in applicable regulations regarding
16    emergencies. The owner or operator of a CAAPP source and
17    the Agency shall each attach such notice to their copy of
18    the relevant permit.
19            i. An owner or operator of a CAAPP source may make
20        Section 502 (b) (10) changes without a permit
21        revision, if the changes are not modifications under
22        any provision of Title I of the Clean Air Act and the
23        changes do not exceed the emissions allowable under
24        the permit (whether expressed therein as a rate of
25        emissions or in terms of total emissions).

 

 

SB1323- 115 -LRB103 27060 CPF 53428 b

1                A. For each such change, the written
2            notification required above shall include a brief
3            description of the change within the source, the
4            date on which the change will occur, any change in
5            emissions, and any permit term or condition that
6            is no longer applicable as a result of the change.
7                B. The permit shield described in paragraph
8            (j) of subsection 7 of this Section shall not
9            apply to any change made pursuant to this
10            subparagraph.
11            ii. An owner or operator of a CAAPP source may
12        trade increases and decreases in emissions in the
13        CAAPP source, where the applicable implementation plan
14        provides for such emission trades without requiring a
15        permit revision. This provision is available in those
16        cases where the permit does not already provide for
17        such emissions trading.
18                A. Under this subparagraph (ii) of paragraph
19            (a) of this subsection, the written notification
20            required above shall include such information as
21            may be required by the provision in the applicable
22            implementation plan authorizing the emissions
23            trade, including at a minimum, when the proposed
24            changes will occur, a description of each such
25            change, any change in emissions, the permit
26            requirements with which the source will comply

 

 

SB1323- 116 -LRB103 27060 CPF 53428 b

1            using the emissions trading provisions of the
2            applicable implementation plan, and the pollutants
3            emitted subject to the emissions trade. The notice
4            shall also refer to the provisions in the
5            applicable implementation plan with which the
6            source will comply and provide for the emissions
7            trade.
8                B. The permit shield described in paragraph
9            (j) of subsection 7 of this Section shall not
10            apply to any change made pursuant to subparagraph
11            (ii) of paragraph (a) of this subsection.
12            Compliance with the permit requirements that the
13            source will meet using the emissions trade shall
14            be determined according to the requirements of the
15            applicable implementation plan authorizing the
16            emissions trade.
17            iii. If requested within a CAAPP application, the
18        Agency shall issue a CAAPP permit which contains terms
19        and conditions, including all terms required under
20        subsection 7 of this Section to determine compliance,
21        allowing for the trading of emissions increases and
22        decreases at the CAAPP source solely for the purpose
23        of complying with a federally-enforceable emissions
24        cap that is established in the permit independent of
25        otherwise applicable requirements. The owner or
26        operator of a CAAPP source shall include in its CAAPP

 

 

SB1323- 117 -LRB103 27060 CPF 53428 b

1        application proposed replicable procedures and permit
2        terms that ensure the emissions trades are
3        quantifiable and enforceable. The permit shall also
4        require compliance with all applicable requirements.
5                A. Under this subparagraph (iii) of paragraph
6            (a), the written notification required above shall
7            state when the change will occur and shall
8            describe the changes in emissions that will result
9            and how these increases and decreases in emissions
10            will comply with the terms and conditions of the
11            permit.
12                B. The permit shield described in paragraph
13            (j) of subsection 7 of this Section shall extend
14            to terms and conditions that allow such increases
15            and decreases in emissions.
16        b. An owner or operator of a CAAPP source may make
17    changes that are not addressed or prohibited by the
18    permit, other than those which are subject to any
19    requirements under Title IV of the Clean Air Act or are
20    modifications under any provisions of Title I of the Clean
21    Air Act, without a permit revision, in accordance with the
22    following requirements:
23            (i) Each such change shall meet all applicable
24        requirements and shall not violate any existing permit
25        term or condition;
26            (ii) Sources must provide contemporaneous written

 

 

SB1323- 118 -LRB103 27060 CPF 53428 b

1        notice to the Agency and USEPA of each such change,
2        except for changes that qualify as insignificant under
3        provisions adopted by the Agency or the Board. Such
4        written notice shall describe each such change,
5        including the date, any change in emissions,
6        pollutants emitted, and any applicable requirement
7        that would apply as a result of the change;
8            (iii) The change shall not qualify for the shield
9        described in paragraph (j) of subsection 7 of this
10        Section; and
11            (iv) The permittee shall keep a record describing
12        changes made at the source that result in emissions of
13        a regulated air pollutant subject to an applicable
14        Clean Air Act requirement, but not otherwise regulated
15        under the permit, and the emissions resulting from
16        those changes.
17        c. The Agency shall have the authority to adopt
18    procedural rules, in accordance with the Illinois
19    Administrative Procedure Act, as the Agency deems
20    necessary to implement this subsection.
 
21    13. Administrative Permit Amendments.
22        a. The Agency shall take final action on a request for
23    an administrative permit amendment within 60 days after
24    receipt of the request. Neither notice nor an opportunity
25    for public and affected State comment shall be required

 

 

SB1323- 119 -LRB103 27060 CPF 53428 b

1    for the Agency to incorporate such revisions, provided it
2    designates the permit revisions as having been made
3    pursuant to this subsection.
4        b. The Agency shall submit a copy of the revised
5    permit to USEPA.
6        c. For purposes of this Section the term
7    "administrative permit amendment" shall be defined as a
8    permit revision that can accomplish one or more of the
9    changes described below:
10            i. Corrects typographical errors;
11            ii. Identifies a change in the name, address, or
12        phone number of any person identified in the permit,
13        or provides a similar minor administrative change at
14        the source;
15            iii. Requires more frequent monitoring or
16        reporting by the permittee;
17            iv. Allows for a change in ownership or
18        operational control of a source where the Agency
19        determines that no other change in the permit is
20        necessary, provided that a written agreement
21        containing a specific date for transfer of permit
22        responsibility, coverage, and liability between the
23        current and new permittees has been submitted to the
24        Agency;
25            v. Incorporates into the CAAPP permit the
26        requirements from preconstruction review permits

 

 

SB1323- 120 -LRB103 27060 CPF 53428 b

1        authorized under a USEPA-approved program, provided
2        the program meets procedural and compliance
3        requirements substantially equivalent to those
4        contained in this Section;
5            vi. (Blank); or
6            vii. Any other type of change which USEPA has
7        determined as part of the approved CAAPP permit
8        program to be similar to those included in this
9        subsection.
10        d. The Agency shall, upon taking final action granting
11    a request for an administrative permit amendment, allow
12    coverage by the permit shield in paragraph (j) of
13    subsection 7 of this Section for administrative permit
14    amendments made pursuant to subparagraph (v) of paragraph
15    (c) of this subsection which meet the relevant
16    requirements for significant permit modifications.
17        e. Permit revisions and modifications, including
18    administrative amendments and automatic amendments
19    (pursuant to Sections 408(b) and 403(d) of the Clean Air
20    Act or regulations promulgated thereunder), for purposes
21    of the acid rain portion of the permit shall be governed by
22    the regulations promulgated under Title IV of the Clean
23    Air Act. Owners or operators of affected sources for acid
24    deposition shall have the flexibility to amend their
25    compliance plans as provided in the regulations
26    promulgated under Title IV of the Clean Air Act.

 

 

SB1323- 121 -LRB103 27060 CPF 53428 b

1        f. The CAAPP source may implement the changes
2    addressed in the request for an administrative permit
3    amendment immediately upon submittal of the request.
4        g. The Agency shall have the authority to adopt
5    procedural rules, in accordance with the Illinois
6    Administrative Procedure Act, as the Agency deems
7    necessary, to implement this subsection.
 
8    14. Permit Modifications.
9        a. Minor permit modification procedures.
10            i. The Agency shall review a permit modification
11        using the "minor permit" modification procedures only
12        for those permit modifications that:
13                A. Do not violate any applicable requirement;
14                B. Do not involve significant changes to
15            existing monitoring, reporting, or recordkeeping
16            requirements in the permit;
17                C. Do not require a case-by-case determination
18            of an emission limitation or other standard, or a
19            source-specific determination of ambient impacts,
20            or a visibility or increment analysis;
21                D. Do not seek to establish or change a permit
22            term or condition for which there is no
23            corresponding underlying requirement and which
24            avoids an applicable requirement to which the
25            source would otherwise be subject. Such terms and

 

 

SB1323- 122 -LRB103 27060 CPF 53428 b

1            conditions include:
2                    1. A federally enforceable emissions cap
3                assumed to avoid classification as a
4                modification under any provision of Title I of
5                the Clean Air Act; and
6                    2. An alternative emissions limit approved
7                pursuant to regulations promulgated under
8                Section 112(i)(5) of the Clean Air Act;
9                E. Are not modifications under any provision
10            of Title I of the Clean Air Act; and
11                F. Are not required to be processed as a
12            significant modification.
13            ii. Notwithstanding subparagraph (i) of paragraph
14        (a) and subparagraph (ii) of paragraph (b) of this
15        subsection, minor permit modification procedures may
16        be used for permit modifications involving the use of
17        economic incentives, marketable permits, emissions
18        trading, and other similar approaches, to the extent
19        that such minor permit modification procedures are
20        explicitly provided for in an applicable
21        implementation plan or in applicable requirements
22        promulgated by USEPA.
23            iii. An applicant requesting the use of minor
24        permit modification procedures shall meet the
25        requirements of subsection 5 of this Section and shall
26        include the following in its application:

 

 

SB1323- 123 -LRB103 27060 CPF 53428 b

1                A. A description of the change, the emissions
2            resulting from the change, and any new applicable
3            requirements that will apply if the change occurs;
4                B. The source's suggested draft permit;
5                C. Certification by a responsible official,
6            consistent with paragraph (e) of subsection 5 of
7            this Section and applicable regulations, that the
8            proposed modification meets the criteria for use
9            of minor permit modification procedures and a
10            request that such procedures be used; and
11                D. Completed forms for the Agency to use to
12            notify USEPA and affected States as required under
13            subsections 8 and 9 of this Section.
14            iv. Within 5 working days after receipt of a
15        complete permit modification application, the Agency
16        shall notify USEPA and affected States of the
17        requested permit modification in accordance with
18        subsections 8 and 9 of this Section. The Agency
19        promptly shall send any notice required under
20        paragraph (d) of subsection 8 of this Section to
21        USEPA.
22            v. The Agency may not issue a final permit
23        modification until after the 45-day review period for
24        USEPA or until USEPA has notified the Agency that
25        USEPA will not object to the issuance of the permit
26        modification, whichever comes first, although the

 

 

SB1323- 124 -LRB103 27060 CPF 53428 b

1        Agency can approve the permit modification prior to
2        that time. Within 90 days after the Agency's receipt
3        of an application under the minor permit modification
4        procedures or 15 days after the end of USEPA's 45-day
5        review period under subsection 9 of this Section,
6        whichever is later, the Agency shall:
7                A. Issue the permit modification as proposed;
8                B. Deny the permit modification application;
9                C. Determine that the requested modification
10            does not meet the minor permit modification
11            criteria and should be reviewed under the
12            significant modification procedures; or
13                D. Revise the draft permit modification and
14            transmit to USEPA the new proposed permit
15            modification as required by subsection 9 of this
16            Section.
17            vi. Any CAAPP source may make the change proposed
18        in its minor permit modification application
19        immediately after it files such application. After the
20        CAAPP source makes the change allowed by the preceding
21        sentence, and until the Agency takes any of the
22        actions specified in items (A) through (C) of
23        subparagraph (v) of paragraph (a) of this subsection,
24        the source must comply with both the applicable
25        requirements governing the change and the proposed
26        permit terms and conditions. During this time period,

 

 

SB1323- 125 -LRB103 27060 CPF 53428 b

1        the source need not comply with the existing permit
2        terms and conditions it seeks to modify. If the source
3        fails to comply with its proposed permit terms and
4        conditions during this time period, the existing
5        permit terms and conditions which it seeks to modify
6        may be enforced against it.
7            vii. The permit shield under paragraph (j) of
8        subsection 7 of this Section may not extend to minor
9        permit modifications.
10            viii. If a construction permit is required,
11        pursuant to subsection (a) of Section 39 of this Act
12        and regulations thereunder, for a change for which the
13        minor permit modification procedures are applicable,
14        the source may request that the processing of the
15        construction permit application be consolidated with
16        the processing of the application for the minor permit
17        modification. In such cases, the provisions of this
18        Section, including those within subsections 5, 8, and
19        9, shall apply and the Agency shall act on such
20        applications pursuant to subparagraph (v) of paragraph
21        (a) of subsection 14 of this Section. The source may
22        make the proposed change immediately after filing its
23        application for the minor permit modification. Nothing
24        in this subparagraph shall otherwise affect the
25        requirements and procedures applicable to construction
26        permits.

 

 

SB1323- 126 -LRB103 27060 CPF 53428 b

1        b. Group Processing of Minor Permit Modifications.
2            i. Where requested by an applicant within its
3        application, the Agency shall process groups of a
4        source's applications for certain modifications
5        eligible for minor permit modification processing in
6        accordance with the provisions of this paragraph (b).
7            ii. Permit modifications may be processed in
8        accordance with the procedures for group processing,
9        for those modifications:
10                A. Which meet the criteria for minor permit
11            modification procedures under subparagraph (i) of
12            paragraph (a) of subsection 14 of this Section;
13            and
14                B. That collectively are below 10 percent of
15            the emissions allowed by the permit for the
16            emissions unit for which change is requested, 20
17            percent of the applicable definition of major
18            source set forth in subsection 2 of this Section,
19            or 5 tons per year, whichever is least.
20            iii. An applicant requesting the use of group
21        processing procedures shall meet the requirements of
22        subsection 5 of this Section and shall include the
23        following in its application:
24                A. A description of the change, the emissions
25            resulting from the change, and any new applicable
26            requirements that will apply if the change occurs.

 

 

SB1323- 127 -LRB103 27060 CPF 53428 b

1                B. The source's suggested draft permit.
2                C. Certification by a responsible official
3            consistent with paragraph (e) of subsection 5 of
4            this Section, that the proposed modification meets
5            the criteria for use of group processing
6            procedures and a request that such procedures be
7            used.
8                D. A list of the source's other pending
9            applications awaiting group processing, and a
10            determination of whether the requested
11            modification, aggregated with these other
12            applications, equals or exceeds the threshold set
13            under item (B) of subparagraph (ii) of paragraph
14            (b) of this subsection.
15                E. Certification, consistent with paragraph
16            (e) of subsection 5 of this Section, that the
17            source has notified USEPA of the proposed
18            modification. Such notification need only contain
19            a brief description of the requested modification.
20                F. Completed forms for the Agency to use to
21            notify USEPA and affected states as required under
22            subsections 8 and 9 of this Section.
23            iv. On a quarterly basis or within 5 business days
24        after receipt of an application demonstrating that the
25        aggregate of a source's pending applications equals or
26        exceeds the threshold level set forth within item (B)

 

 

SB1323- 128 -LRB103 27060 CPF 53428 b

1        of subparagraph (ii) of paragraph (b) of this
2        subsection, whichever is earlier, the Agency shall
3        promptly notify USEPA and affected States of the
4        requested permit modifications in accordance with
5        subsections 8 and 9 of this Section. The Agency shall
6        send any notice required under paragraph (d) of
7        subsection 8 of this Section to USEPA.
8            v. The provisions of subparagraph (v) of paragraph
9        (a) of this subsection shall apply to modifications
10        eligible for group processing, except that the Agency
11        shall take one of the actions specified in items (A)
12        through (D) of subparagraph (v) of paragraph (a) of
13        this subsection within 180 days after receipt of the
14        application or 15 days after the end of USEPA's 45-day
15        review period under subsection 9 of this Section,
16        whichever is later.
17            vi. The provisions of subparagraph (vi) of
18        paragraph (a) of this subsection shall apply to
19        modifications for group processing.
20            vii. The provisions of paragraph (j) of subsection
21        7 of this Section shall not apply to modifications
22        eligible for group processing.
23        c. Significant Permit Modifications.
24            i. Significant modification procedures shall be
25        used for applications requesting significant permit
26        modifications and for those applications that do not

 

 

SB1323- 129 -LRB103 27060 CPF 53428 b

1        qualify as either minor permit modifications or as
2        administrative permit amendments.
3            ii. Every significant change in existing
4        monitoring permit terms or conditions and every
5        relaxation of reporting or recordkeeping requirements
6        shall be considered significant. A modification shall
7        also be considered significant if in the judgment of
8        the Agency action on an application for modification
9        would require decisions to be made on technically
10        complex issues. Nothing herein shall be construed to
11        preclude the permittee from making changes consistent
12        with this Section that would render existing permit
13        compliance terms and conditions irrelevant.
14            iii. Significant permit modifications must meet
15        all the requirements of this Section, including those
16        for applications (including completeness review),
17        public participation, review by affected States, and
18        review by USEPA applicable to initial permit issuance
19        and permit renewal. The Agency shall take final action
20        on significant permit modifications within 9 months
21        after receipt of a complete application.
22        d. The Agency shall have the authority to adopt
23    procedural rules, in accordance with the Illinois
24    Administrative Procedure Act, as the Agency deems
25    necessary, to implement this subsection.
 

 

 

SB1323- 130 -LRB103 27060 CPF 53428 b

1    15. Reopenings for Cause by the Agency.
2        a. Each issued CAAPP permit shall include provisions
3    specifying the conditions under which the permit will be
4    reopened prior to the expiration of the permit. Such
5    revisions shall be made as expeditiously as practicable. A
6    CAAPP permit shall be reopened and revised under any of
7    the following circumstances, in accordance with procedures
8    adopted by the Agency:
9            i. Additional requirements under the Clean Air Act
10        become applicable to a major CAAPP source for which 3
11        or more years remain on the original term of the
12        permit. Such a reopening shall be completed not later
13        than 18 months after the promulgation of the
14        applicable requirement. No such revision is required
15        if the effective date of the requirement is later than
16        the date on which the permit is due to expire.
17            ii. Additional requirements (including excess
18        emissions requirements) become applicable to an
19        affected source for acid deposition under the acid
20        rain program. Excess emissions offset plans shall be
21        deemed to be incorporated into the permit upon
22        approval by USEPA.
23            iii. The Agency or USEPA determines that the
24        permit contains a material mistake or that inaccurate
25        statements were made in establishing the emissions
26        standards, limitations, or other terms or conditions

 

 

SB1323- 131 -LRB103 27060 CPF 53428 b

1        of the permit.
2            iv. The Agency or USEPA determines that the permit
3        must be revised or revoked to assure compliance with
4        the applicable requirements.
5        b. In the event that the Agency determines that there
6    are grounds for revoking a CAAPP permit, for cause,
7    consistent with paragraph a of this subsection, it shall
8    file a petition before the Board setting forth the basis
9    for such revocation. In any such proceeding, the Agency
10    shall have the burden of establishing that the permit
11    should be revoked under the standards set forth in this
12    Act and the Clean Air Act. Any such proceeding shall be
13    conducted pursuant to the Board's procedures for
14    adjudicatory hearings and the Board shall render its
15    decision within 120 days of the filing of the petition.
16    The Agency shall take final action to revoke and reissue a
17    CAAPP permit consistent with the Board's order.
18        c. Proceedings regarding a reopened CAAPP permit shall
19    follow the same procedures as apply to initial permit
20    issuance and shall affect only those parts of the permit
21    for which cause to reopen exists.
22        d. Reopenings under paragraph (a) of this subsection
23    shall not be initiated before a notice of such intent is
24    provided to the CAAPP source by the Agency at least 30 days
25    in advance of the date that the permit is to be reopened,
26    except that the Agency may provide a shorter time period

 

 

SB1323- 132 -LRB103 27060 CPF 53428 b

1    in the case of an emergency.
2        e. The Agency shall have the authority to adopt
3    procedural rules, in accordance with the Illinois
4    Administrative Procedure Act, as the Agency deems
5    necessary, to implement this subsection.
 
6    16. Reopenings for Cause by USEPA.
7        a. When USEPA finds that cause exists to terminate,
8    modify, or revoke and reissue a CAAPP permit pursuant to
9    subsection 15 of this Section, and thereafter notifies the
10    Agency and the permittee of such finding in writing, the
11    Agency shall forward to USEPA and the permittee a proposed
12    determination of termination, modification, or revocation
13    and reissuance as appropriate, in accordance with
14    paragraph (b) of this subsection. The Agency's proposed
15    determination shall be in accordance with the record, the
16    Clean Air Act, regulations promulgated thereunder, this
17    Act and regulations promulgated thereunder. Such proposed
18    determination shall not affect the permit or constitute a
19    final permit action for purposes of this Act or the
20    Administrative Review Law. The Agency shall forward to
21    USEPA such proposed determination within 90 days after
22    receipt of the notification from USEPA. If additional time
23    is necessary to submit the proposed determination, the
24    Agency shall request a 90-day extension from USEPA and
25    shall submit the proposed determination within 180 days

 

 

SB1323- 133 -LRB103 27060 CPF 53428 b

1    after receipt of notification from USEPA.
2            b. i. Prior to the Agency's submittal to USEPA of a
3        proposed determination to terminate or revoke and
4        reissue the permit, the Agency shall file a petition
5        before the Board setting forth USEPA's objection, the
6        permit record, the Agency's proposed determination,
7        and the justification for its proposed determination.
8        The Board shall conduct a hearing pursuant to the
9        rules prescribed by Section 32 of this Act, and the
10        burden of proof shall be on the Agency.
11            ii. After due consideration of the written and
12        oral statements, the testimony and arguments that
13        shall be submitted at hearing, the Board shall issue
14        and enter an interim order for the proposed
15        determination, which shall set forth all changes, if
16        any, required in the Agency's proposed determination.
17        The interim order shall comply with the requirements
18        for final orders as set forth in Section 33 of this
19        Act. Issuance of an interim order by the Board under
20        this paragraph, however, shall not affect the permit
21        status and does not constitute a final action for
22        purposes of this Act or the Administrative Review Law.
23            iii. The Board shall cause a copy of its interim
24        order to be served upon all parties to the proceeding
25        as well as upon USEPA. The Agency shall submit the
26        proposed determination to USEPA in accordance with the

 

 

SB1323- 134 -LRB103 27060 CPF 53428 b

1        Board's Interim Order within 180 days after receipt of
2        the notification from USEPA.
3        c. USEPA shall review the proposed determination to
4    terminate, modify, or revoke and reissue the permit within
5    90 days after receipt.
6            i. When USEPA reviews the proposed determination
7        to terminate or revoke and reissue and does not
8        object, the Board shall, within 7 days after receipt
9        of USEPA's final approval, enter the interim order as
10        a final order. The final order may be appealed as
11        provided by Title XI of this Act. The Agency shall take
12        final action in accordance with the Board's final
13        order.
14            ii. When USEPA reviews such proposed determination
15        to terminate or revoke and reissue and objects, the
16        Agency shall submit USEPA's objection and the Agency's
17        comments and recommendation on the objection to the
18        Board and permittee. The Board shall review its
19        interim order in response to USEPA's objection and the
20        Agency's comments and recommendation and issue a final
21        order in accordance with Sections 32 and 33 of this
22        Act. The Agency shall, within 90 days after receipt of
23        such objection, respond to USEPA's objection in
24        accordance with the Board's final order.
25            iii. When USEPA reviews such proposed
26        determination to modify and objects, the Agency shall,

 

 

SB1323- 135 -LRB103 27060 CPF 53428 b

1        within 90 days after receipt of the objection, resolve
2        the objection and modify the permit in accordance with
3        USEPA's objection, based upon the record, the Clean
4        Air Act, regulations promulgated thereunder, this Act,
5        and regulations promulgated thereunder.
6        d. If the Agency fails to submit the proposed
7    determination pursuant to paragraph a of this subsection
8    or fails to resolve any USEPA objection pursuant to
9    paragraph c of this subsection, USEPA will terminate,
10    modify, or revoke and reissue the permit.
11        e. The Agency shall have the authority to adopt
12    procedural rules, in accordance with the Illinois
13    Administrative Procedure Act, as the Agency deems
14    necessary, to implement this subsection.
 
15    17. Title IV; Acid Rain Provisions.
16        a. The Agency shall act on initial CAAPP applications
17    for affected sources for acid deposition in accordance
18    with this Section and Title V of the Clean Air Act and
19    regulations promulgated thereunder, except as modified by
20    Title IV of the Clean Air Act and regulations promulgated
21    thereunder. The Agency shall issue initial CAAPP permits
22    to the affected sources for acid deposition which shall
23    become effective no earlier than January 1, 1995, and
24    which shall terminate on December 31, 1999, in accordance
25    with this Section. Subsequent CAAPP permits issued to

 

 

SB1323- 136 -LRB103 27060 CPF 53428 b

1    affected sources for acid deposition shall be issued for a
2    fixed term of 5 years. Title IV of the Clean Air Act and
3    regulations promulgated thereunder, including but not
4    limited to 40 C.F.R. Part 72, as now or hereafter amended,
5    are applicable to and enforceable under this Act.
6        b. A designated representative of an affected source
7    for acid deposition shall submit a timely and complete
8    Phase II acid rain permit application and compliance plan
9    to the Agency, not later than January 1, 1996, that meets
10    the requirements of Titles IV and V of the Clean Air Act
11    and regulations. The Agency shall act on the Phase II acid
12    rain permit application and compliance plan in accordance
13    with this Section and Title V of the Clean Air Act and
14    regulations promulgated thereunder, except as modified by
15    Title IV of the Clean Air Act and regulations promulgated
16    thereunder. The Agency shall issue the Phase II acid rain
17    permit to an affected source for acid deposition no later
18    than December 31, 1997, which shall become effective on
19    January 1, 2000, in accordance with this Section, except
20    as modified by Title IV and regulations promulgated
21    thereunder; provided that the designated representative of
22    the source submitted a timely and complete Phase II permit
23    application and compliance plan to the Agency that meets
24    the requirements of Title IV and V of the Clean Air Act and
25    regulations.
26        c. Each Phase II acid rain permit issued in accordance

 

 

SB1323- 137 -LRB103 27060 CPF 53428 b

1    with this subsection shall have a fixed term of 5 years.
2    Except as provided in paragraph b above, the Agency shall
3    issue or deny a Phase II acid rain permit within 18 months
4    of receiving a complete Phase II permit application and
5    compliance plan.
6        d. A designated representative of a new unit, as
7    defined in Section 402 of the Clean Air Act, shall submit a
8    timely and complete Phase II acid rain permit application
9    and compliance plan that meets the requirements of Titles
10    IV and V of the Clean Air Act and its regulations. The
11    Agency shall act on the new unit's Phase II acid rain
12    permit application and compliance plan in accordance with
13    this Section and Title V of the Clean Air Act and its
14    regulations, except as modified by Title IV of the Clean
15    Air Act and its regulations. The Agency shall reopen the
16    new unit's CAAPP permit for cause to incorporate the
17    approved Phase II acid rain permit in accordance with this
18    Section. The Phase II acid rain permit for the new unit
19    shall become effective no later than the date required
20    under Title IV of the Clean Air Act and its regulations.
21        e. A designated representative of an affected source
22    for acid deposition shall submit a timely and complete
23    Title IV NOx permit application to the Agency, not later
24    than January 1, 1998, that meets the requirements of
25    Titles IV and V of the Clean Air Act and its regulations.
26    The Agency shall reopen the Phase II acid rain permit for

 

 

SB1323- 138 -LRB103 27060 CPF 53428 b

1    cause and incorporate the approved NOx provisions into the
2    Phase II acid rain permit not later than January 1, 1999,
3    in accordance with this Section, except as modified by
4    Title IV of the Clean Air Act and regulations promulgated
5    thereunder. Such reopening shall not affect the term of
6    the Phase II acid rain permit.
7        f. The designated representative of the affected
8    source for acid deposition shall renew the initial CAAPP
9    permit and Phase II acid rain permit in accordance with
10    this Section and Title V of the Clean Air Act and
11    regulations promulgated thereunder, except as modified by
12    Title IV of the Clean Air Act and regulations promulgated
13    thereunder.
14        g. In the case of an affected source for acid
15    deposition for which a complete Phase II acid rain permit
16    application and compliance plan are timely received under
17    this subsection, the complete permit application and
18    compliance plan, including amendments thereto, shall be
19    binding on the owner, operator and designated
20    representative, all affected units for acid deposition at
21    the affected source, and any other unit, as defined in
22    Section 402 of the Clean Air Act, governed by the Phase II
23    acid rain permit application and shall be enforceable as
24    an acid rain permit for purposes of Titles IV and V of the
25    Clean Air Act, from the date of submission of the acid rain
26    permit application until a Phase II acid rain permit is

 

 

SB1323- 139 -LRB103 27060 CPF 53428 b

1    issued or denied by the Agency.
2        h. The Agency shall not include or implement any
3    measure which would interfere with or modify the
4    requirements of Title IV of the Clean Air Act or
5    regulations promulgated thereunder.
6        i. Nothing in this Section shall be construed as
7    affecting allowances or USEPA's decision regarding an
8    excess emissions offset plan, as set forth in Title IV of
9    the Clean Air Act or regulations promulgated thereunder.
10            i. No permit revision shall be required for
11        increases in emissions that are authorized by
12        allowances acquired pursuant to the acid rain program,
13        provided that such increases do not require a permit
14        revision under any other applicable requirement.
15            ii. No limit shall be placed on the number of
16        allowances held by the source. The source may not,
17        however, use allowances as a defense to noncompliance
18        with any other applicable requirement.
19            iii. Any such allowance shall be accounted for
20        according to the procedures established in regulations
21        promulgated under Title IV of the Clean Air Act.
22        j. To the extent that the federal regulations
23    promulgated under Title IV, including but not limited to
24    40 C.F.R. Part 72, as now or hereafter amended, are
25    inconsistent with the federal regulations promulgated
26    under Title V, the federal regulations promulgated under

 

 

SB1323- 140 -LRB103 27060 CPF 53428 b

1    Title IV shall take precedence.
2        k. The USEPA may intervene as a matter of right in any
3    permit appeal involving a Phase II acid rain permit
4    provision or denial of a Phase II acid rain permit.
5        l. It is unlawful for any owner or operator to violate
6    any terms or conditions of a Phase II acid rain permit
7    issued under this subsection, to operate any affected
8    source for acid deposition except in compliance with a
9    Phase II acid rain permit issued by the Agency under this
10    subsection, or to violate any other applicable
11    requirements.
12        m. The designated representative of an affected source
13    for acid deposition shall submit to the Agency the data
14    and information submitted quarterly to USEPA, pursuant to
15    40 CFR 75.64, concurrently with the submission to USEPA.
16    The submission shall be in the same electronic format as
17    specified by USEPA.
18        n. The Agency shall act on any petition for exemption
19    of a new unit or retired unit, as those terms are defined
20    in Section 402 of the Clean Air Act, from the requirements
21    of the acid rain program in accordance with Title IV of the
22    Clean Air Act and its regulations.
23        o. The Agency shall have the authority to adopt
24    procedural rules, in accordance with the Illinois
25    Administrative Procedure Act, as the Agency deems
26    necessary to implement this subsection.
 

 

 

SB1323- 141 -LRB103 27060 CPF 53428 b

1    18. Fee Provisions.
2        a. A source subject to this Section or excluded under
3    subsection 1.1 or paragraph (c) of subsection 3 of this
4    Section, shall pay a fee as provided in this paragraph (a)
5    of subsection 18. However, a source that has been excluded
6    from the provisions of this Section under subsection 1.1
7    or under paragraph (c) of subsection 3 of this Section
8    because the source emits less than 25 tons per year of any
9    combination of regulated air pollutants, except greenhouse
10    gases, shall pay fees in accordance with paragraph (1) of
11    subsection (b) of Section 9.6.
12            i. The fee for a source allowed to emit less than
13        100 tons per year of any combination of regulated air
14        pollutants, except greenhouse gases, shall be $1,800
15        per year, and that fee shall increase, beginning
16        January 1, 2012, to $2,150 per year.
17            ii. The fee for a source allowed to emit 100 tons
18        or more per year of any combination of regulated air
19        pollutants, except greenhouse gases and those
20        regulated air pollutants excluded in paragraph (f) of
21        this subsection 18, shall be as follows:
22                A. The Agency shall assess a fee of $18 per
23            ton, per year for the allowable emissions of
24            regulated air pollutants subject to this
25            subparagraph (ii) of paragraph (a) of subsection

 

 

SB1323- 142 -LRB103 27060 CPF 53428 b

1            18, and that fee shall increase, beginning January
2            1, 2012, to $21.50 per ton, per year. These fees
3            shall be used by the Agency and the Board to fund
4            the activities required by Title V of the Clean
5            Air Act including such activities as may be
6            carried out by other State or local agencies
7            pursuant to paragraph (d) of this subsection. The
8            amount of such fee shall be based on the
9            information supplied by the applicant in its
10            complete CAAPP permit application or in the CAAPP
11            permit if the permit has been granted and shall be
12            determined by the amount of emissions that the
13            source is allowed to emit annually, provided
14            however, that the maximum fee for a CAAPP permit
15            under this subparagraph (ii) of paragraph (a) of
16            subsection 18 is $250,000, and increases,
17            beginning January 1, 2012, to $294,000. Beginning
18            January 1, 2012, the maximum fee under this
19            subparagraph (ii) of paragraph (a) of subsection
20            18 for a source that has been excluded under
21            subsection 1.1 of this Section or under paragraph
22            (c) of subsection 3 of this Section is $4,112. The
23            Agency shall provide as part of the permit
24            application form required under subsection 5 of
25            this Section a separate fee calculation form which
26            will allow the applicant to identify the allowable

 

 

SB1323- 143 -LRB103 27060 CPF 53428 b

1            emissions and calculate the fee. In no event shall
2            the Agency raise the amount of allowable emissions
3            requested by the applicant unless such increases
4            are required to demonstrate compliance with terms
5            of a CAAPP permit.
6                Notwithstanding the above, any applicant may
7            seek a change in its permit which would result in
8            increases in allowable emissions due to an
9            increase in the hours of operation or production
10            rates of an emission unit or units and such a
11            change shall be consistent with the construction
12            permit requirements of the existing State permit
13            program, under subsection (a) of Section 39 of
14            this Act and applicable provisions of this
15            Section. Where a construction permit is required,
16            the Agency shall expeditiously grant such
17            construction permit and shall, if necessary,
18            modify the CAAPP permit based on the same
19            application.
20                B. The applicant or permittee may pay the fee
21            annually or semiannually for those fees greater
22            than $5,000. However, any applicant paying a fee
23            equal to or greater than $100,000 shall pay the
24            full amount on July 1, for the subsequent fiscal
25            year, or pay 50% of the fee on July 1 and the
26            remaining 50% by the next January 1. The Agency

 

 

SB1323- 144 -LRB103 27060 CPF 53428 b

1            may change any annual billing date upon reasonable
2            notice, but shall prorate the new bill so that the
3            permittee or applicant does not pay more than its
4            required fees for the fee period for which payment
5            is made.
6        b. (Blank).
7        c. (Blank).
8        d. There is hereby created in the State Treasury a
9    special fund to be known as the Clean Air Act Permit Fund
10    (formerly known as the CAA Permit Fund). All Funds
11    collected by the Agency pursuant to this subsection shall
12    be deposited into the Fund. The General Assembly shall
13    appropriate monies from this Fund to the Agency and to the
14    Board to carry out their obligations under this Section.
15    The General Assembly may also authorize monies to be
16    granted by the Agency from this Fund to other State and
17    local agencies which perform duties related to the CAAPP.
18    Interest generated on the monies deposited in this Fund
19    shall be returned to the Fund.
20        e. The Agency shall have the authority to adopt
21    procedural rules, in accordance with the Illinois
22    Administrative Procedure Act, as the Agency deems
23    necessary to implement this subsection.
24        f. For purposes of this subsection, the term
25    "regulated air pollutant" shall have the meaning given to
26    it under subsection 1 of this Section but shall exclude

 

 

SB1323- 145 -LRB103 27060 CPF 53428 b

1    the following:
2            i. carbon monoxide;
3            ii. any Class I or II substance which is a
4        regulated air pollutant solely because it is listed
5        pursuant to Section 602 of the Clean Air Act; and
6            iii. any pollutant that is a regulated air
7        pollutant solely because it is subject to a standard
8        or regulation under Section 112(r) of the Clean Air
9        Act based on the emissions allowed in the permit
10        effective in that calendar year, at the time the
11        applicable bill is generated.
 
12    19. Air Toxics Provisions.
13        a. In the event that the USEPA fails to promulgate in a
14    timely manner a standard pursuant to Section 112(d) of the
15    Clean Air Act, the Agency shall have the authority to
16    issue permits, pursuant to Section 112(j) of the Clean Air
17    Act and regulations promulgated thereunder, which contain
18    emission limitations which are equivalent to the emission
19    limitations that would apply to a source if an emission
20    standard had been promulgated in a timely manner by USEPA
21    pursuant to Section 112(d). Provided, however, that the
22    owner or operator of a source shall have the opportunity
23    to submit to the Agency a proposed emission limitation
24    which it determines to be equivalent to the emission
25    limitations that would apply to such source if an emission

 

 

SB1323- 146 -LRB103 27060 CPF 53428 b

1    standard had been promulgated in a timely manner by USEPA.
2    If the Agency refuses to include the emission limitation
3    proposed by the owner or operator in a CAAPP permit, the
4    owner or operator may petition the Board to establish
5    whether the emission limitation proposal submitted by the
6    owner or operator provides for emission limitations which
7    are equivalent to the emission limitations that would
8    apply to the source if the emission standard had been
9    promulgated by USEPA in a timely manner. The Board shall
10    determine whether the emission limitation proposed by the
11    owner or operator or an alternative emission limitation
12    proposed by the Agency provides for the level of control
13    required under Section 112 of the Clean Air Act, or shall
14    otherwise establish an appropriate emission limitation,
15    pursuant to Section 112 of the Clean Air Act.
16        b. Any Board proceeding brought under paragraph (a) or
17    (e) of this subsection shall be conducted according to the
18    Board's procedures for adjudicatory hearings and the Board
19    shall render its decision within 120 days of the filing of
20    the petition. Any such decision shall be subject to review
21    pursuant to Section 41 of this Act. Where USEPA
22    promulgates an applicable emission standard prior to the
23    issuance of the CAAPP permit, the Agency shall include in
24    the permit the promulgated standard, provided that the
25    source shall have the compliance period provided under
26    Section 112(i) of the Clean Air Act. Where USEPA

 

 

SB1323- 147 -LRB103 27060 CPF 53428 b

1    promulgates an applicable standard subsequent to the
2    issuance of the CAAPP permit, the Agency shall revise such
3    permit upon the next renewal to reflect the promulgated
4    standard, providing a reasonable time for the applicable
5    source to comply with the standard, but no longer than 8
6    years after the date on which the source is first required
7    to comply with the emissions limitation established under
8    this subsection.
9        c. The Agency shall have the authority to implement
10    and enforce complete or partial emission standards
11    promulgated by USEPA pursuant to Section 112(d), and
12    standards promulgated by USEPA pursuant to Sections
13    112(f), 112(h), 112(m), and 112(n), and may accept
14    delegation of authority from USEPA to implement and
15    enforce Section 112(l) and requirements for the prevention
16    and detection of accidental releases pursuant to Section
17    112(r) of the Clean Air Act.
18        d. The Agency shall have the authority to issue
19    permits pursuant to Section 112(i)(5) of the Clean Air
20    Act.
21        e. The Agency has the authority to implement Section
22    112(g) of the Clean Air Act consistent with the Clean Air
23    Act and federal regulations promulgated thereunder. If the
24    Agency refuses to include the emission limitations
25    proposed in an application submitted by an owner or
26    operator for a case-by-case maximum achievable control

 

 

SB1323- 148 -LRB103 27060 CPF 53428 b

1    technology (MACT) determination, the owner or operator may
2    petition the Board to determine whether the emission
3    limitation proposed by the owner or operator or an
4    alternative emission limitation proposed by the Agency
5    provides for a level of control required by Section 112 of
6    the Clean Air Act, or to otherwise establish an
7    appropriate emission limitation under Section 112 of the
8    Clean Air Act.
 
9    20. Small Business.
10        a. For purposes of this subsection:
11        "Program" is the Small Business Stationary Source
12    Technical and Environmental Compliance Assistance Program
13    created within this State pursuant to Section 507 of the
14    Clean Air Act and guidance promulgated thereunder, to
15    provide technical assistance and compliance information to
16    small business stationary sources;
17        "Small Business Assistance Program" is a component of
18    the Program responsible for providing sufficient
19    communications with small businesses through the
20    collection and dissemination of information to small
21    business stationary sources; and
22        "Small Business Stationary Source" means a stationary
23    source that:
24            1. is owned or operated by a person that employs
25        100 or fewer individuals;

 

 

SB1323- 149 -LRB103 27060 CPF 53428 b

1            2. is a small business concern as defined in the
2        "Small Business Act";
3            3. is not a major source as that term is defined in
4        subsection 2 of this Section;
5            4. does not emit 50 tons or more per year of any
6        regulated air pollutant, except greenhouse gases; and
7            5. emits less than 75 tons per year of all
8        regulated pollutants, except greenhouse gases.
9        b. The Agency shall adopt and submit to USEPA, after
10    reasonable notice and opportunity for public comment, as a
11    revision to the Illinois state implementation plan, plans
12    for establishing the Program.
13        c. The Agency shall have the authority to enter into
14    such contracts and agreements as the Agency deems
15    necessary to carry out the purposes of this subsection.
16        d. The Agency may establish such procedures as it may
17    deem necessary for the purposes of implementing and
18    executing its responsibilities under this subsection.
19        e. There shall be appointed a Small Business Ombudsman
20    (hereinafter in this subsection referred to as
21    "Ombudsman") to monitor the Small Business Assistance
22    Program. The Ombudsman shall be a nonpartisan designated
23    official, with the ability to independently assess whether
24    the goals of the Program are being met.
25        f. The State Ombudsman Office shall be located in an
26    existing Ombudsman office within the State or in any State

 

 

SB1323- 150 -LRB103 27060 CPF 53428 b

1    Department.
2        g. There is hereby created a State Compliance Advisory
3    Panel (hereinafter in this subsection referred to as
4    "Panel") for determining the overall effectiveness of the
5    Small Business Assistance Program within this State.
6        h. The selection of Panel members shall be by the
7    following method:
8            1. The Governor shall select two members who are
9        not owners or representatives of owners of small
10        business stationary sources to represent the general
11        public;
12            2. The Director of the Agency shall select one
13        member to represent the Agency; and
14            3. The State Legislature shall select four members
15        who are owners or representatives of owners of small
16        business stationary sources. Both the majority and
17        minority leadership in both Houses of the Legislature
18        shall appoint one member of the panel.
19        i. Panel members should serve without compensation but
20    will receive full reimbursement for expenses including
21    travel and per diem as authorized within this State.
22        j. The Panel shall select its own Chair by a majority
23    vote. The Chair may meet and consult with the Ombudsman
24    and the head of the Small Business Assistance Program in
25    planning the activities for the Panel.
 

 

 

SB1323- 151 -LRB103 27060 CPF 53428 b

1    21. Temporary Sources.
2        a. The Agency may issue a single permit authorizing
3    emissions from similar operations by the same source owner
4    or operator at multiple temporary locations, except for
5    sources which are affected sources for acid deposition
6    under Title IV of the Clean Air Act.
7        b. The applicant must demonstrate that the operation
8    is temporary and will involve at least one change of
9    location during the term of the permit.
10        c. Any such permit shall meet all applicable
11    requirements of this Section and applicable regulations,
12    and include conditions assuring compliance with all
13    applicable requirements at all authorized locations and
14    requirements that the owner or operator notify the Agency
15    at least 10 days in advance of each change in location.
 
16    22. Solid Waste Incineration Units.
17        a. A CAAPP permit for a solid waste incineration unit
18    combusting municipal waste subject to standards
19    promulgated under Section 129(e) of the Clean Air Act
20    shall be issued for a period of 12 years and shall be
21    reviewed every 5 years, unless the Agency requires more
22    frequent review through Agency procedures.
23        b. During the review in paragraph (a) of this
24    subsection, the Agency shall fully review the previously
25    submitted CAAPP permit application and corresponding

 

 

SB1323- 152 -LRB103 27060 CPF 53428 b

1    reports subsequently submitted to determine whether the
2    source is in compliance with all applicable requirements.
3        c. If the Agency determines that the source is not in
4    compliance with all applicable requirements it shall
5    revise the CAAPP permit as appropriate.
6        d. The Agency shall have the authority to adopt
7    procedural rules, in accordance with the Illinois
8    Administrative Procedure Act, as the Agency deems
9    necessary, to implement this subsection.
10(Source: P.A. 99-380, eff. 8-17-15; 99-933, eff. 1-27-17;
11100-103, eff. 8-11-17.)
 
12    (415 ILCS 5/39.15 new)
13    Sec. 39.15. Environmental justice considerations in
14permitting.
15    (a) The following public participation requirements for
16permitting transactions in an environmental justice community
17must be complied with:
18        (1) If an application for a permit, permit renewal, or
19    permit modification is subject to public notice and
20    comment requirements under this Act, rules adopted by the
21    Board, or rules adopted by the Agency and if the
22    application is for a facility or source in an
23    environmental justice community, then the Agency must
24    comply with existing applicable requirements.
25        (2) In addition to the public notice requirements

 

 

SB1323- 153 -LRB103 27060 CPF 53428 b

1    referenced in paragraph (1), the Agency shall provide the
2    public with notice of an application for a permit, permit
3    renewal, or permit modification if the facility or
4    proposed facility is located or is to be located in an
5    environmental justice community for the following types of
6    permitting transactions: (i) permits for pollution control
7    facilities subject to local siting review under Section
8    39.2; and (ii) individual minor or major NPDES permits
9    issued under subsection (b) of Section 39. The public
10    notice required under this Section shall:
11            (A) be provided: (i) by prominent placement at a
12        dedicated page on the Agency's website; (ii) to local
13        elected officials in the area where the facility or
14        proposed facility is located or is to be located,
15        including the mayor or president, clerk, county board
16        chairman, county clerk, and State's Attorney; and
17        (iii) to members of the General Assembly from the
18        legislative district in which the facility or proposed
19        facility is located or is to be located; and
20            (B) include: (i) the name and address of the
21        permit applicant and the facility or proposed facility
22        and (ii) the activity or activities at the facility or
23        proposed facility being permitted.
24    (b) The Agency must comply with the following requirements
25regarding linguistically isolated communities:
26        (1) For a community determined to be in linguistic

 

 

SB1323- 154 -LRB103 27060 CPF 53428 b

1    isolation, the Agency shall provide all public notices
2    required by this Section in a multilingual format
3    appropriate to the needs of the linguistically isolated
4    community.
5        (2) For a community determined to be in linguistic
6    isolation, the Agency shall provide oral and written
7    translation services at public hearings.
8    (c) For permit applications for facilities in an
9environmental justice community, the Director of the Agency
10may grant extensions of any permitting deadlines established
11in this Act by up to 180 days to allow for additional review of
12the permit application by the Agency or additional public
13participation. Any exercise of this authority shall be
14provided in writing to the permit applicant with the specific
15reason and new permitting deadline.
 
16    (415 ILCS 5/40)  (from Ch. 111 1/2, par. 1040)
17    Sec. 40. Appeal of permit denial.
18    (a)(1) If the Agency refuses to grant or grants with
19conditions a permit under Section 39 of this Act, the
20applicant may, within 35 days after the date on which the
21Agency served its decision on the applicant, petition for a
22hearing before the Board to contest the decision of the
23Agency. However, the 35-day period for petitioning for a
24hearing may be extended for an additional period of time not to
25exceed 90 days by written notice provided to the Board from the

 

 

SB1323- 155 -LRB103 27060 CPF 53428 b

1applicant and the Agency within the initial appeal period. The
2Board shall give 21 days' notice to any person in the county
3where is located the facility in issue who has requested
4notice of enforcement proceedings and to each member of the
5General Assembly in whose legislative district that
6installation or property is located; and shall publish that
721-day notice in a newspaper of general circulation in that
8county. The Agency shall appear as respondent in such hearing.
9At such hearing the rules prescribed in Section 32 and
10subsection (a) of Section 33 of this Act shall apply, and the
11burden of proof shall be on the petitioner. If, however, the
12Agency issues an NPDES permit that imposes limits which are
13based upon a criterion or denies a permit based upon
14application of a criterion, then the Agency shall have the
15burden of going forward with the basis for the derivation of
16those limits or criterion which were derived under the Board's
17rules.
18    (2) Except as provided in paragraph (a)(3), if there is no
19final action by the Board within 120 days after the date on
20which it received the petition, the petitioner may deem the
21permit issued under this Act, provided, however, that that
22period of 120 days shall not run for any period of time, not to
23exceed 30 days, during which the Board is without sufficient
24membership to constitute the quorum required by subsection (a)
25of Section 5 of this Act, and provided further that such 120
26day period shall not be stayed for lack of quorum beyond 30

 

 

SB1323- 156 -LRB103 27060 CPF 53428 b

1days regardless of whether the lack of quorum exists at the
2beginning of such 120-day period or occurs during the running
3of such 120-day period.
4    (3) Paragraph (a)(2) shall not apply to any permit which
5is subject to subsection (b), (d) or (e) of Section 39. If
6there is no final action by the Board within 120 days after the
7date on which it received the petition, the petitioner shall
8be entitled to an Appellate Court order pursuant to subsection
9(d) of Section 41 of this Act.
10    (b) If the Agency grants a RCRA permit for a hazardous
11waste disposal site, a third party, other than the permit
12applicant or Agency, may, within 35 days after the date on
13which the Agency issued its decision, petition the Board for a
14hearing to contest the issuance of the permit. Unless the
15Board determines that such petition is duplicative or
16frivolous, or that the petitioner is so located as to not be
17affected by the permitted facility, the Board shall hear the
18petition in accordance with the terms of subsection (a) of
19this Section and its procedural rules governing denial
20appeals, such hearing to be based exclusively on the record
21before the Agency. The burden of proof shall be on the
22petitioner. The Agency and the permit applicant shall be named
23co-respondents.
24    The provisions of this subsection do not apply to the
25granting of permits issued for the disposal or utilization of
26sludge from publicly owned sewage works.

 

 

SB1323- 157 -LRB103 27060 CPF 53428 b

1    (c) Any party to an Agency proceeding conducted pursuant
2to Section 39.3 of this Act may petition as of right to the
3Board for review of the Agency's decision within 35 days from
4the date of issuance of the Agency's decision, provided that
5such appeal is not duplicative or frivolous. However, the
635-day period for petitioning for a hearing may be extended by
7the applicant for a period of time not to exceed 90 days by
8written notice provided to the Board from the applicant and
9the Agency within the initial appeal period. If another person
10with standing to appeal wishes to obtain an extension, there
11must be a written notice provided to the Board by that person,
12the Agency, and the applicant, within the initial appeal
13period. The decision of the Board shall be based exclusively
14on the record compiled in the Agency proceeding. In other
15respects the Board's review shall be conducted in accordance
16with subsection (a) of this Section and the Board's procedural
17rules governing permit denial appeals.
18    (d) In reviewing the denial or any condition of a NA NSR
19permit issued by the Agency pursuant to rules and regulations
20adopted under subsection (c) of Section 9.1 of this Act, the
21decision of the Board shall be based exclusively on the record
22before the Agency including the record of the hearing, if any,
23unless the parties agree to supplement the record. The Board
24shall, if it finds the Agency is in error, make a final
25determination as to the substantive limitations of the permit
26including a final determination of Lowest Achievable Emission

 

 

SB1323- 158 -LRB103 27060 CPF 53428 b

1Rate.
2    (e)(1) If the Agency grants or denies a permit under
3subsection (b) of Section 39 of this Act, a third party, other
4than the permit applicant or Agency, may petition the Board
5within 35 days from the date of issuance of the Agency's
6decision, for a hearing to contest the decision of the Agency.
7    (2) A petitioner shall include the following within a
8petition submitted under subdivision (1) of this subsection:
9        (A) a demonstration that the petitioner raised the
10    issues contained within the petition during the public
11    notice period or during the public hearing on the NPDES
12    permit application, if a public hearing was held; and
13        (B) a demonstration that the petitioner is so situated
14    as to be affected by the permitted facility.
15    (3) If the Board determines that the petition is not
16duplicative or frivolous and contains a satisfactory
17demonstration under subdivision (2) of this subsection, the
18Board shall hear the petition (i) in accordance with the terms
19of subsection (a) of this Section and its procedural rules
20governing permit denial appeals and (ii) exclusively on the
21basis of the record before the Agency. The burden of proof
22shall be on the petitioner. The Agency and permit applicant
23shall be named co-respondents.
24    (f) Any person who files a petition to contest the
25issuance of a permit by the Agency shall pay a filing fee.
26    (g) If the Agency grants or denies a permit under

 

 

SB1323- 159 -LRB103 27060 CPF 53428 b

1subsection (y) of Section 39, a third party, other than the
2permit applicant or Agency, may appeal the Agency's decision
3as provided under federal law for CCR surface impoundment
4permits.
5    (h) If the Agency grants a permit to construct, modify, or
6operate a facility that emits air pollutants and is classified
7as a minor source, a third party, other than the permit
8applicant or Agency, may, within 35 days after the date on
9which the Agency issued its decision, petition the Board for a
10hearing to contest the issuance of the permit. Unless the
11Board determines that the petition is duplicative or frivolous
12or that the petitioner is so located as to not be affected by
13the permitted facility, the Board shall hear the petition in
14accordance with the terms of subsection (a) of this Section
15and its procedural rules governing denial appeals. The hearing
16shall be based exclusively on the record before the Agency.
17The burden of proof shall be on the petitioner. The Agency and
18the permit applicant shall be named corespondents.
19(Source: P.A. 101-171, eff. 7-30-19; 102-558, eff. 8-20-21.)
 
20    (415 ILCS 5/40.4 new)
21    Sec. 40.4. Environmental justice grievance.
22    (a) An environmental justice grievance process applies,
23subject to the provisions of this Section, to complaints
24alleging violations of Section 601 of the federal Civil Rights
25Act of 1964.

 

 

SB1323- 160 -LRB103 27060 CPF 53428 b

1    (b) An environmental justice grievance must allege
2discrimination on the basis of an individual's actual or
3perceived race, color, religion, national origin, citizenship,
4ancestry, age, sex, marital status, order of protection
5status, conviction record, arrest record, disability, military
6status, sexual orientation, gender identity, gender
7expression, pregnancy, or unfavorable discharge from military
8service.
9    (c) To initiate an environmental justice grievance process
10a person must file a complaint with the Agency within 60 days
11after an alleged violation. The Agency, in its discretion, may
12waive the 60-day deadline for good cause. The complaint must:
13        (1) be in writing;
14        (2) describe with specificity the discrimination
15    alleged; and
16        (3) identify the parties impacted by the alleged
17    discrimination.
18    (d) The complaint under subsection (c) must be addressed
19as follows:
20        Illinois Environmental Protection Agency
21        Environmental Justice Officer
22        1021 North Grand Avenue East
23        P.O. Box 19276
24        Springfield, IL 62794
25    (e) Within 10 days after receiving the complaint filed
26under subsection (c), the Agency shall provide written notice

 

 

SB1323- 161 -LRB103 27060 CPF 53428 b

1of receipt and acceptance of the complainant. If the Agency
2determines that it has jurisdiction to review the complaint,
3the complaint will be considered meritorious, unless:
4        (1) the complaint clearly appears on its face to be
5    frivolous or trivial;
6        (2) the complaint is not timely and good cause does
7    not exist to waive timeliness;
8        (3) the Agency, within the time allotted to
9    investigate the complaint, voluntarily concedes
10    noncompliance and agrees to take appropriate remedial
11    action or agrees to an informal resolution of the
12    complaint; or
13        (4) the complainant, within the time allotted for the
14    complaint to be investigated, withdraws the complaint.
15    (f) Within 120 days after the date it provides written
16notice of receipt and acceptance of the complaint under
17subsection (e), the Agency shall make a determination of
18jurisdiction and the merits of the complaint, conduct an
19investigation, and provide a proposed resolution, if
20appropriate, to the extent practicable and allowable under
21existing laws, rules, and regulations.