Sen. Bill Cunningham
Filed: 3/7/2024
| | 10300SB3636sam001 | | LRB103 39306 CES 70126 a |
|
|
| 1 | | AMENDMENT TO SENATE BILL 3636
|
| 2 | | AMENDMENT NO. ______. Amend Senate Bill 3636 on page 1, |
| 3 | | line 6, by deleting "and 1-94"; and |
| 4 | | on page 7, immediately below line 23, by inserting the |
| 5 | | following: |
| 6 | | ""Availability" means the percentage of time the energy |
| 7 | | storage system is capable of charging or discharging."; and |
| 8 | | on page 12, by replacing lines 7 through 10 with "contract |
| 9 | | under Section 1-93."; and |
| 10 | | on page 15, by replacing lines 3 and 4 with "one megawatt of |
| 11 | | energy storage capacity each month that the contracted |
| 12 | | energy"; and |
| 13 | | on page 17, by replacing line 16 with "capacity for the |
| 14 | | expected duration of"; and |
|
| | 10300SB3636sam001 | - 2 - | LRB103 39306 CES 70126 a |
|
|
| 1 | | on page 19, immediately below line 11, by inserting the |
| 2 | | following: |
| 3 | | ""Independent engineer" means a neutral, third-party |
| 4 | | engineer engaged in designing energy storage projects."; and |
| 5 | | on page 20, immediately below line 1, by inserting the |
| 6 | | following: |
| 7 | | ""Measured capacity" means the output of an energy storage |
| 8 | | system measured in megawatts at the point of change of control |
| 9 | | between the energy storage system and the utility. |
| 10 | | "Measured duration" means the output of an energy storage |
| 11 | | system measured in megawatt hours divided by the measured |
| 12 | | capacity at the point of change of control between the energy |
| 13 | | storage system and the utility. |
| 14 | | "Measured round-trip efficiency" means the ratio of the |
| 15 | | energy discharged from the energy storage system to the energy |
| 16 | | delivered to it during the charging process, expressed as a |
| 17 | | percentage."; and |
| 18 | | on page 20, by deleting lines 2 through 10; and |
| 19 | | on page 22, by deleting lines 15 through 25; and |
| 20 | | on page 36, immediately below line 14, by inserting the |
| 21 | | following" |
|
| | 10300SB3636sam001 | - 3 - | LRB103 39306 CES 70126 a |
|
|
| 1 | | "(30) To buy and sell, in the PJM and MISO markets, all |
| 2 | | products that contracted energy storage systems are |
| 3 | | capable of producing. All revenues obtained by the Agency |
| 4 | | shall be used to offset the energy storage payments."; and |
| 5 | | on page 37, line 6, after "2024", by inserting "with an energy |
| 6 | | storage duration of at least 4 hours"; and |
| 7 | | on page 37, line 8, after "2026", by inserting "with an energy |
| 8 | | storage duration of at least 4 hours"; and |
| 9 | | by deleting line 14 on page 39 through line 10 on page 40; and |
| 10 | | on page 80, immediately below line 25, by inserting the |
| 11 | | following: |
| 12 | | "(v) Once every contract year, an independent |
| 13 | | engineer shall verify the measured capacity, the |
| 14 | | measured round-trip efficiency, and the measured |
| 15 | | duration of the contracted energy storage system. If |
| 16 | | the measured capacity is less than the energy storage |
| 17 | | capacity, the energy storage system has 3 months to |
| 18 | | cure the problem or the Agency shall reduce the energy |
| 19 | | storage capacity to the measured capacity. If the |
| 20 | | measured duration is less than the energy storage |
| 21 | | duration, the energy storage system has 3 months to |
| 22 | | cure the problem or the Agency shall reduce the energy |
|
| | 10300SB3636sam001 | - 4 - | LRB103 39306 CES 70126 a |
|
|
| 1 | | storage capacity to the measured duration. If the |
| 2 | | availability of the energy storage system in any 2 |
| 3 | | consecutive years drops below 80%, the contract may be |
| 4 | | terminated by the Agency. If the availability of the |
| 5 | | energy storage system drops below 85% in a month, the |
| 6 | | energy storage credit will be reduced by the |
| 7 | | availability of the energy storage system multiplied |
| 8 | | by the energy storage credit value.". |