|
| | 10400HB2987ham002 | - 2 - | LRB104 09137 RPS 25493 a |
|
|
| 1 | | of the person's working hours working within a warehouse, |
| 2 | | regardless of that person's status as an employee or |
| 3 | | independent contractor or the existence or non-existence of |
| 4 | | any employment relationship between the operator or owner of |
| 5 | | the warehouse. "Warehouse worker" does not include a person |
| 6 | | who, due to the person's employment or any other reason, |
| 7 | | enters a warehouse irregularly, infrequently, or only for a |
| 8 | | short period of time. |
| 9 | | Section 10. Tornado safety plan required. All operators of |
| 10 | | a warehouse within this State shall prepare a tornado safety |
| 11 | | plan for each warehouse they operate within 120 days after the |
| 12 | | effective date of this Act for each existing warehouse or, for |
| 13 | | warehouses opened on or after 120 days after the effective |
| 14 | | date of this Act, no later than 7 days after the warehouse |
| 15 | | becomes operational. Each plan shall be specific to the |
| 16 | | warehouse it was prepared for and must be reviewed and updated |
| 17 | | at least once per year or upon any significant change to the |
| 18 | | operations of the warehouse that affects the applicability or |
| 19 | | accuracy of the information in the plan. The operator of the |
| 20 | | warehouse should coordinate with the warehouse's local |
| 21 | | emergency services and disaster agency and fire department or |
| 22 | | fire protection district to create plans that, when |
| 23 | | implemented, will be consistent with the local jurisdiction's |
| 24 | | response activities. Copies of the plan and all updates made |
| 25 | | to the plan must be filed with the fire department or fire |
|
| | 10400HB2987ham002 | - 3 - | LRB104 09137 RPS 25493 a |
|
|
| 1 | | protection district in the jurisdiction in which the warehouse |
| 2 | | is located and the local emergency services and disaster |
| 3 | | agency in the jurisdiction in which the warehouse is located. |
| 4 | | The plan must, at a minimum, contain the following |
| 5 | | information: |
| 6 | | (1) A floor plan of the warehouse with emergency |
| 7 | | exits, assembly points, shelter areas, and orienting |
| 8 | | landmarks clearly displayed. |
| 9 | | (2) A written description of the actions that |
| 10 | | employees and supervisors are required to perform in the |
| 11 | | event of a tornado warning or other severe weather event. |
| 12 | | (3) A list of all emergency equipment stored in the |
| 13 | | warehouse and the equipment's location and instructions on |
| 14 | | the use of the equipment. |
| 15 | | (4) A written description of the actions that |
| 16 | | employees and supervisors are required to perform in the |
| 17 | | aftermath of a tornado or other severe weather event, |
| 18 | | including basic first aid procedures and guidelines for |
| 19 | | communications with other warehouse workers and first |
| 20 | | responders. |
| 21 | | Section 15. Inclement weather risk reduction. Warehouse |
| 22 | | facilities constructed after the effective date of this Act |
| 23 | | must provide the means, through modification, installation, or |
| 24 | | demonstration via rational analysis, to meet a life-safety |
| 25 | | performance level for tornado loading that is equivalent to, |
|
| | 10400HB2987ham002 | - 4 - | LRB104 09137 RPS 25493 a |
|
|
| 1 | | or exceeds, the life-safety performance level for the most |
| 2 | | onerous of other building code-prescribed extreme |
| 3 | | environmental loading events, such as hurricane, wind, |
| 4 | | earthquake, fire, and flood. The evaluation may incorporate |
| 5 | | statistical analyses of published data sets for extreme load |
| 6 | | intensity versus probability of exceedance, such as ASCE/SEI |
| 7 | | 7-22 Appendix G; occupancy load; facility location; and |
| 8 | | building construction type and may follow non-prescriptive |
| 9 | | performance-based methods to achieve the desired level. In |
| 10 | | lieu of this risk-targeted approach, the evaluating design |
| 11 | | professional may elect to follow prescriptive methods as |
| 12 | | outlined in the Federal Emergency Management Agency standard |
| 13 | | P-431, Tornado Protection: Selecting Refuge Areas in Buildings |
| 14 | | and the Best Available Refuge Area Checklist to ensure that |
| 15 | | shelter areas designated in tornado safety plans are qualified |
| 16 | | as the best available refuge areas. |
| 17 | | Section 99. Effective date. This Act takes effect upon |
| 18 | | becoming law.". |