|
Rep. Ann M. Williams
Filed: 3/13/2025
| | 10400HB3609ham001 | | LRB104 12086 AAS 23627 a |
|
|
| 1 | | AMENDMENT TO HOUSE BILL 3609
|
| 2 | | AMENDMENT NO. ______. Amend House Bill 3609 on page 6, |
| 3 | | line 20, by replacing "supplies thermal energy." with |
| 4 | | "supplies non-combusting thermal energy. "Thermal energy |
| 5 | | network" includes real estate, fixtures, and personal property |
| 6 | | that is operated, owned, or used by multiple parties."; and |
| 7 | | on page 8, lines 24 and 25, by replacing "be focused on |
| 8 | | existing electric heat customers." with "include an industrial |
| 9 | | heat application that may additionally include residential and |
| 10 | | commercial applications. Priority shall be given to pilot |
| 11 | | proposals that replace leak-prone natural gas distribution |
| 12 | | infrastructure with distribution infrastructure that supplies |
| 13 | | non-combusting thermal energy or that replaces thermal energy |
| 14 | | for buildings currently heated with electric resistance |
| 15 | | heat."; and |
| 16 | | on page 9, immediately above line 16, by inserting the |
|
| | 10400HB3609ham001 | - 2 - | LRB104 12086 AAS 23627 a |
|
|
| 1 | | following: |
| 2 | | "(c-5) Each public utility shall hold at least one |
| 3 | | pre-filing public meeting to receive public comment concerning |
| 4 | | the proposed thermal energy network in the municipality where |
| 5 | | the thermal energy network is to be located. Notice of the |
| 6 | | public meeting shall be published in a newspaper of general |
| 7 | | circulation for 3 consecutive weeks, beginning no earlier than |
| 8 | | one month before the first public meeting. Notice of the |
| 9 | | public meeting, including a description of the thermal energy |
| 10 | | network, must be provided in writing to the clerk of the county |
| 11 | | where the project is to be located and to the Chief Clerk of |
| 12 | | the Commission. A representative of the Commission shall be |
| 13 | | invited to each pre-filing public meeting."; and |
| 14 | | on page 10, immediately below line 7, by inserting the |
| 15 | | following: |
| 16 | | "(d-5) The Commission shall require projects submitted to |
| 17 | | the utility-scale renewable thermal energy network program for |
| 18 | | approval to include a proposed rate structure for thermal |
| 19 | | energy services supplied to network end users and consumer |
| 20 | | protection plans for end users. The Commission may approve the |
| 21 | | proposed rate structure if the projected heating and cooling |
| 22 | | costs for end users is not greater than the heating and cooling |
| 23 | | costs the end users would have incurred if the end users had |
| 24 | | not participated in the program."; and |
|
| | 10400HB3609ham001 | - 3 - | LRB104 12086 AAS 23627 a |
|
|
| 1 | | on page 11, lines 10 through 12, by replacing "after the |
| 2 | | completion of the construction of all thermal energy network |
| 3 | | projects under this Section" with "after the effective date of |
| 4 | | this amendatory Act of the 104th General Assembly"; and |
| 5 | | on page 12, line 6, after "16-108.18.", by inserting "A gas |
| 6 | | public utility, electric public utility, or combination public |
| 7 | | utility developing a thermal energy network project that |
| 8 | | includes an industrial heat application may recover rates |
| 9 | | proportionally from each class of customer.". |