| 1 | | AMENDMENT TO HOUSE BILL 4288
|
| 2 | | AMENDMENT NO. ______. Amend House Bill 4288 by replacing |
| 3 | | everything after the enacting clause with the following: |
| 4 | | "Section 5. The State Prompt Payment Act is amended by |
| 5 | | changing Sections 3-2, 3-6, and 7 as follows: |
| 6 | | (30 ILCS 540/3-2) |
| 7 | | Sec. 3-2. Beginning July 1, 1993, in any instance where a |
| 8 | | State official or agency is late in payment of a vendor's bill |
| 9 | | or invoice for goods or services furnished to the State, as |
| 10 | | defined in Section 1, properly approved in accordance with |
| 11 | | rules promulgated under Section 3-3, the State official or |
| 12 | | agency shall pay interest to the vendor in accordance with the |
| 13 | | following: |
| 14 | | (1) (Blank). Any bill, except a bill submitted under |
| 15 | | Article V of the Illinois Public Aid Code and except as |
| 16 | | provided under paragraph (1.05) of this Section, approved |
|
| | 10400HB4288ham001 | - 2 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | for payment under this Section must be paid or the payment |
| 2 | | issued to the payee within 60 days of receipt of a proper |
| 3 | | bill or invoice. If payment is not issued to the payee |
| 4 | | within this 60-day period, an interest penalty of 1.0% of |
| 5 | | any amount approved and unpaid shall be added for each |
| 6 | | month or fraction thereof after the end of this 60-day |
| 7 | | period, until final payment is made. Any bill, except a |
| 8 | | bill for pharmacy or nursing facility services or goods, |
| 9 | | and except as provided under paragraph (1.05) of this |
| 10 | | Section, submitted under Article V of the Illinois Public |
| 11 | | Aid Code approved for payment under this Section must be |
| 12 | | paid or the payment issued to the payee within 60 days |
| 13 | | after receipt of a proper bill or invoice, and, if payment |
| 14 | | is not issued to the payee within this 60-day period, an |
| 15 | | interest penalty of 2.0% of any amount approved and unpaid |
| 16 | | shall be added for each month or fraction thereof after |
| 17 | | the end of this 60-day period, until final payment is |
| 18 | | made. Any bill for pharmacy or nursing facility services |
| 19 | | or goods submitted under Article V of the Illinois Public |
| 20 | | Aid Code, except as provided under paragraph (1.05) of |
| 21 | | this Section, and approved for payment under this Section |
| 22 | | must be paid or the payment issued to the payee within 60 |
| 23 | | days of receipt of a proper bill or invoice. If payment is |
| 24 | | not issued to the payee within this 60-day period, an |
| 25 | | interest penalty of 1.0% of any amount approved and unpaid |
| 26 | | shall be added for each month or fraction thereof after |
|
| | 10400HB4288ham001 | - 3 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | the end of this 60-day period, until final payment is |
| 2 | | made. |
| 3 | | (1.05) For State fiscal year 2012 and future fiscal |
| 4 | | years, any bill approved for payment under this Section |
| 5 | | must be paid or the payment issued to the payee within 90 |
| 6 | | days of receipt of a proper bill or invoice. If payment is |
| 7 | | not issued to the payee within this 90-day period, an |
| 8 | | interest penalty of 1.0% of any amount approved and unpaid |
| 9 | | shall be added for each month, or 0.033% (one-thirtieth of |
| 10 | | one percent) of any amount approved and unpaid for each |
| 11 | | day, after the end of this 90-day period, until final |
| 12 | | payment is made. |
| 13 | | (1.1) A State agency shall review in a timely manner |
| 14 | | each bill or invoice within 30 days after its receipt. If |
| 15 | | the State agency determines that the bill or invoice |
| 16 | | contains a defect making it unable to process the payment |
| 17 | | request, the agency shall notify the vendor requesting |
| 18 | | payment as soon as possible after discovering the defect |
| 19 | | pursuant to rules promulgated under Section 3-3; provided, |
| 20 | | however, that the notice for construction related bills or |
| 21 | | invoices must be given not later than 30 days after the |
| 22 | | bill or invoice was first submitted. The notice shall |
| 23 | | identify the defect and any additional information |
| 24 | | necessary to correct the defect. If one or more items on a |
| 25 | | construction related bill or invoice are disapproved, but |
| 26 | | not the entire bill or invoice, then the portion that is |
|
| | 10400HB4288ham001 | - 4 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | not disapproved shall be paid in accordance with the |
| 2 | | requirements of this Act. |
| 3 | | (2) Where a State official or agency is late in |
| 4 | | payment of a vendor's bill or invoice properly approved in |
| 5 | | accordance with this Act, and different late payment terms |
| 6 | | are not reduced to writing as a contractual agreement, the |
| 7 | | State official or agency shall automatically pay interest |
| 8 | | penalties required by this Section amounting to $50 or |
| 9 | | more to the appropriate vendor. Each agency shall be |
| 10 | | responsible for determining whether an interest penalty is |
| 11 | | owed and for paying the interest to the vendor. Except as |
| 12 | | provided in paragraph (4), an individual interest payment |
| 13 | | amounting to $5 or less shall not be paid by the State. |
| 14 | | Interest due to a vendor that amounts to greater than $5 |
| 15 | | and less than $50 shall not be paid but shall be accrued |
| 16 | | until all interest due the vendor for all similar warrants |
| 17 | | exceeds $50, at which time the accrued interest shall be |
| 18 | | payable and interest will begin accruing again, except |
| 19 | | that interest accrued as of the end of the fiscal year that |
| 20 | | does not exceed $50 shall be payable at that time. In the |
| 21 | | event an individual has paid a vendor for services in |
| 22 | | advance, the provisions of this Section shall apply until |
| 23 | | payment is made to that individual. |
| 24 | | (3) The provisions of Public Act 96-1501 reducing the |
| 25 | | interest rate on pharmacy claims under Article V of the |
| 26 | | Illinois Public Aid Code to 1.0% per month shall apply to |
|
| | 10400HB4288ham001 | - 5 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | any pharmacy bills for services and goods under Article V |
| 2 | | of the Illinois Public Aid Code received on or after the |
| 3 | | date 60 days before January 25, 2011 (the effective date |
| 4 | | of Public Act 96-1501) except as provided under paragraph |
| 5 | | (1.05) of this Section. |
| 6 | | (4) Interest amounting to less than $5 shall not be |
| 7 | | paid by the State, except for claims (i) to the Department |
| 8 | | of Healthcare and Family Services or the Department of |
| 9 | | Human Services, (ii) pursuant to Article V of the Illinois |
| 10 | | Public Aid Code, the Covering ALL KIDS Health Insurance |
| 11 | | Act, or the Children's Health Insurance Program Act, and |
| 12 | | (iii) made (A) by pharmacies for prescriptive services or |
| 13 | | (B) by any federally qualified health center for |
| 14 | | prescriptive services or any other services. |
| 15 | | Notwithstanding any provision to the contrary, interest |
| 16 | | may not be paid under this Act when: (1) a Chief Procurement |
| 17 | | Officer has voided the underlying contract for goods or |
| 18 | | services under Article 50 of the Illinois Procurement Code; or |
| 19 | | (2) the Auditor General is conducting a performance or program |
| 20 | | audit and the Comptroller has held or is holding for review a |
| 21 | | related contract or vouchers for payment of goods or services |
| 22 | | in the exercise of duties under Section 9 of the State |
| 23 | | Comptroller Act. In such event, interest shall not accrue |
| 24 | | during the pendency of the Auditor General's review. |
| 25 | | (Source: P.A. 100-1064, eff. 8-24-18.) |
|
| | 10400HB4288ham001 | - 6 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | (30 ILCS 540/3-6) |
| 2 | | Sec. 3-6. Federal funds; lack of authority. If an agency |
| 3 | | incurs an interest liability under this Act that cannot be |
| 4 | | charged to the same expenditure authority account to which the |
| 5 | | related goods or services were charged due to federal |
| 6 | | prohibitions, the agency is authorized to pay the interest |
| 7 | | from its available appropriations from the General Revenue |
| 8 | | Fund or from any other fund in the State Treasury that is not |
| 9 | | otherwise prohibited from being used to pay interest, except |
| 10 | | that the Department of Transportation is authorized to pay the |
| 11 | | interest from its available appropriations from the Road Fund, |
| 12 | | as long as the original goods or services were for purposes |
| 13 | | consistent with Section 11 of Article IX of the Illinois |
| 14 | | Constitution. |
| 15 | | (Source: P.A. 103-588, eff. 6-5-24.) |
| 16 | | (30 ILCS 540/7) (from Ch. 127, par. 132.407) |
| 17 | | Sec. 7. Payments to subcontractors and material suppliers. |
| 18 | | (a) When a State official or agency responsible for |
| 19 | | administering a contract receives a proper bill or invoice |
| 20 | | from a contractor, that State official or agency shall |
| 21 | | transmit any approved amount to the Comptroller within 30 days |
| 22 | | of receipt. |
| 23 | | (a-1) When a State official or agency responsible for |
| 24 | | administering a contract submits a voucher to the Comptroller |
| 25 | | for payment to a contractor, that State official or agency |
|
| | 10400HB4288ham001 | - 7 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | shall promptly make available electronically the voucher |
| 2 | | number, the date of the voucher, and the amount of the voucher. |
| 3 | | The State official or agency responsible for administering the |
| 4 | | contract shall provide subcontractors and material suppliers, |
| 5 | | known to the State official or agency, with instructions on |
| 6 | | how to access the electronic information on the Comptroller's |
| 7 | | website. |
| 8 | | (a-5) When a contractor receives any payment, the |
| 9 | | contractor shall pay each subcontractor and material supplier |
| 10 | | electronically within 10 business days or 15 calendar days, |
| 11 | | whichever occurs earlier, or, if paid by a printed check, the |
| 12 | | printed check must be postmarked within 10 business days or 15 |
| 13 | | calendar days, whichever occurs earlier, after receiving |
| 14 | | payment in proportion to the work completed by each |
| 15 | | subcontractor and material supplier its application or pay |
| 16 | | estimate, plus interest received under this Act. When a |
| 17 | | contractor receives any payment, the contractor shall pay each |
| 18 | | lower-tiered subcontractor and material supplier and each |
| 19 | | subcontractor and material supplier shall make payment to its |
| 20 | | own respective subcontractors and material suppliers. If the |
| 21 | | contractor receives less than the full payment due under the |
| 22 | | public construction contract, the contractor shall be |
| 23 | | obligated to disburse on a pro rata basis those funds |
| 24 | | received, plus interest received under this Act, with the |
| 25 | | contractor, subcontractors and material suppliers each |
| 26 | | receiving a prorated portion based on the amount of payment |
|
| | 10400HB4288ham001 | - 8 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | each has earned. When, however, the State official or agency |
| 2 | | does not release the full payment due under the contract |
| 3 | | because there are specific areas of work or materials the |
| 4 | | State agency or official has determined are not suitable for |
| 5 | | payment, then those specific subcontractors or material |
| 6 | | suppliers involved shall not be paid for that portion of work |
| 7 | | rejected or deemed not suitable for payment and all other |
| 8 | | subcontractors and suppliers shall be paid based upon the |
| 9 | | amount of payment each has earned, plus interest received |
| 10 | | under this Act. |
| 11 | | (a-10) For construction contracts with the Department of |
| 12 | | Transportation, the contractor, subcontractor, or material |
| 13 | | supplier, regardless of tier, shall not offset, decrease, or |
| 14 | | diminish payment or payments that are due to its |
| 15 | | subcontractors or material suppliers without reasonable cause. |
| 16 | | A contractor, who refuses to make prompt payment within 10 |
| 17 | | business days or 15 calendar days, whichever occurs earlier, |
| 18 | | after receiving payment, in whole or in part, shall provide to |
| 19 | | the subcontractor or material supplier and the public owner or |
| 20 | | its agent, a written notice of that refusal. The written |
| 21 | | notice shall be made by a contractor no later than 5 calendar |
| 22 | | days after payment is received by the contractor. The written |
| 23 | | notice shall identify the Department of Transportation's |
| 24 | | contract, any subcontract or material purchase agreement, a |
| 25 | | detailed reason for refusal, the value of the payment to be |
| 26 | | withheld, and the specific remedial actions required of the |
|
| | 10400HB4288ham001 | - 9 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | subcontractor or material supplier so that payment may be |
| 2 | | made. Written notice of refusal may be given in a form and |
| 3 | | method which is acceptable to the parties and public owner. |
| 4 | | (b) If the contractor, without reasonable cause, fails to |
| 5 | | make full payment of amounts due under subsection (a) to its |
| 6 | | subcontractors and material suppliers within 10 business days |
| 7 | | or 15 calendar days, whichever occurs earlier, after receipt |
| 8 | | of payment from the State official or agency, the contractor |
| 9 | | shall pay to its subcontractors and material suppliers, in |
| 10 | | addition to the payment due them, interest in the amount of 2% |
| 11 | | per month, calculated from the expiration of the |
| 12 | | 10-business-day period or the 15-calendar-day period until |
| 13 | | fully paid. This subsection shall further apply to any |
| 14 | | payments made by subcontractors and material suppliers to |
| 15 | | their subcontractors and material suppliers and to all |
| 16 | | payments made to lower tier subcontractors and material |
| 17 | | suppliers throughout the contracting chain. |
| 18 | | (1) If a contractor, without reasonable cause, fails |
| 19 | | to make payment in full as provided in subsection (a-5) |
| 20 | | within 10 business days or 15 calendar days, whichever |
| 21 | | occurs earlier, after receipt of payment under the public |
| 22 | | construction contract, any subcontractor or material |
| 23 | | supplier to whom payments are owed may file a written |
| 24 | | notice and request for administrative hearing with the |
| 25 | | State official or agency setting forth the amount owed by |
| 26 | | the contractor and the contractor's failure to timely pay |
|
| | 10400HB4288ham001 | - 10 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | the amount owed. The written notice and request for |
| 2 | | administrative hearing shall identify the public |
| 3 | | construction contract, the contractor, and the amount |
| 4 | | owed, and shall contain a sworn statement or attestation |
| 5 | | to verify the accuracy of the notice. The notice and |
| 6 | | request for administrative hearing shall be filed with the |
| 7 | | State official for the public construction contract, with |
| 8 | | a copy of the notice concurrently provided to the |
| 9 | | contractor. Notice to the State official may be made by |
| 10 | | certified or registered mail, messenger service, or |
| 11 | | personal service, and must include proof of delivery to |
| 12 | | the State official. |
| 13 | | (2) The State official or agency, within 15 calendar |
| 14 | | days after receipt of a subcontractor's or material |
| 15 | | supplier's written notice and request for administrative |
| 16 | | hearing, shall hold a hearing convened by an |
| 17 | | administrative law judge to determine whether the |
| 18 | | contractor withheld payment, without reasonable cause, |
| 19 | | from the subcontractors or material suppliers and what |
| 20 | | amount, if any, is due to the subcontractors or material |
| 21 | | suppliers, and the reasonable cause or causes asserted by |
| 22 | | the contractor. The State official or agency shall provide |
| 23 | | appropriate notice to the parties of the date, time, and |
| 24 | | location of the hearing. Each contractor, subcontractor, |
| 25 | | or material supplier has the right to be represented by |
| 26 | | counsel at a hearing and to cross-examine witnesses and |
|
| | 10400HB4288ham001 | - 11 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | challenge documents. Upon the request of the subcontractor |
| 2 | | or material supplier and a showing of good cause, |
| 3 | | reasonable continuances may be granted by the |
| 4 | | administrative law judge. |
| 5 | | (3) Upon a finding by the administrative law judge |
| 6 | | that the contractor failed to make payment in full, |
| 7 | | without reasonable cause, as provided in subsection |
| 8 | | (a-10), then the administrative law judge shall, in |
| 9 | | writing, order the contractor to pay the amount owed to |
| 10 | | the subcontractors or material suppliers plus interest |
| 11 | | within 15 calendar days after the order. |
| 12 | | (4) If a contractor fails to make full payment as |
| 13 | | ordered under paragraph (3) of this subsection (b) within |
| 14 | | 15 days after the administrative law judge's order, then |
| 15 | | the contractor shall be barred from entering into a State |
| 16 | | public construction contract for a period of one year |
| 17 | | beginning on the date of the administrative law judge's |
| 18 | | order. |
| 19 | | (5) If, on 2 or more occasions within a |
| 20 | | 3-calendar-year period, there is a finding by an |
| 21 | | administrative law judge that the contractor failed to |
| 22 | | make payment in full, without reasonable cause, and a |
| 23 | | written order was issued to a contractor under paragraph |
| 24 | | (3) of this subsection (b), then the contractor shall be |
| 25 | | barred from entering into a State public construction |
| 26 | | contract for a period of 6 months beginning on the date of |
|
| | 10400HB4288ham001 | - 12 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | the administrative law judge's second written order, even |
| 2 | | if the payments required under the orders were made in |
| 3 | | full. |
| 4 | | (6) If a contractor fails to make full payment as |
| 5 | | ordered under paragraph (4) of this subsection (b), the |
| 6 | | subcontractor or material supplier may, within 30 days of |
| 7 | | the date of that order, petition the State agency for an |
| 8 | | order for reasonable attorney's fees and costs incurred in |
| 9 | | the prosecution of the action under this subsection (b). |
| 10 | | Upon that petition and taking of additional evidence, as |
| 11 | | may be required, the administrative law judge may issue a |
| 12 | | supplemental order directing the contractor to pay those |
| 13 | | reasonable attorney's fees and costs. |
| 14 | | (7) The written order of the administrative law judge |
| 15 | | shall be final and appealable under the Administrative |
| 16 | | Review Law. |
| 17 | | (b-5) On or before July 2021, the Department of |
| 18 | | Transportation shall publish on its website a searchable |
| 19 | | database that allows for queries for each active construction |
| 20 | | contract by the name of a subcontractor or the pay item such |
| 21 | | that each pay item is associated with either the prime |
| 22 | | contractor or a subcontractor. |
| 23 | | (c) This Section shall not be construed to in any manner |
| 24 | | diminish, negate, or interfere with the |
| 25 | | contractor-subcontractor or contractor-material supplier |
| 26 | | relationship or commercially useful function. |
|
| | 10400HB4288ham001 | - 13 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | (d) This Section shall not preclude, bar, or stay the |
| 2 | | rights, remedies, and defenses available to the parties by way |
| 3 | | of the operation of their contract, purchase agreement, the |
| 4 | | Mechanics Lien Act, or the Public Construction Bond Act. |
| 5 | | (e) State officials and agencies may adopt rules as may be |
| 6 | | deemed necessary in order to establish the formal procedures |
| 7 | | required under this Section. |
| 8 | | (f) As used in this Section: |
| 9 | | "Payment" means the discharge of an obligation in money or |
| 10 | | other valuable consideration or thing delivered in full or |
| 11 | | partial satisfaction of an obligation to pay. "Payment" shall |
| 12 | | include interest paid pursuant to this Act. |
| 13 | | "Reasonable cause" may include, but is not limited to, |
| 14 | | unsatisfactory workmanship or materials; failure to provide |
| 15 | | documentation required by the contract, subcontract, or |
| 16 | | material purchase agreement; claims made against the |
| 17 | | Department of Transportation or the subcontractor pursuant to |
| 18 | | subsection (c) of Section 23 of the Mechanics Lien Act or the |
| 19 | | Public Construction Bond Act; judgments, levies, garnishments, |
| 20 | | or other court-ordered assessments or offsets in favor of the |
| 21 | | Department of Transportation or other State agency entered |
| 22 | | against a subcontractor or material supplier. "Reasonable |
| 23 | | cause" does not include payments issued to the contractor that |
| 24 | | create a negative or reduced valuation pay application or pay |
| 25 | | estimate due to a reduction of contract quantities or work not |
| 26 | | performed or provided by the subcontractor or material |
|
| | 10400HB4288ham001 | - 14 - | LRB104 17163 HLH 35361 a |
|
|
| 1 | | supplier; the interception or withholding of funds for reasons |
| 2 | | not related to the subcontractor's or material supplier's work |
| 3 | | on the contract; anticipated claims or assessments of third |
| 4 | | parties not a party related to the contract or subcontract; |
| 5 | | asserted claims or assessments of third parties that are not |
| 6 | | authorized by court order, administrative tribunal, or |
| 7 | | statute. "Reasonable cause" further does not include the |
| 8 | | withholding, offset, or reduction of payment, in whole or in |
| 9 | | part, due to the assessment of liquidated damages or penalties |
| 10 | | assessed by the Department of Transportation against the |
| 11 | | contractor, unless the subcontractor's performance or supplied |
| 12 | | materials were the sole and proximate cause of the liquidated |
| 13 | | damage or penalty. |
| 14 | | (Source: P.A. 100-43, eff. 8-9-17; 100-376, eff. 1-1-18; |
| 15 | | 100-863, eff. 8-14-18; 101-524, eff. 1-1-20.) |
| 16 | | Section 99. Effective date. This Act takes effect July 1, |
| 17 | | 2027.". |