6    (30 ILCS 500/30-30)
7    Sec. 30-30. Design-bid-build construction.
8    (a) Except as provided in subsection (a-5), for building
9construction contracts in excess of $250,000, separate
10specifications may be prepared for all equipment, labor, and
11materials in connection with the following 5 subdivisions of
12the work to be performed:
13        (1) plumbing;
14        (2) heating, piping, refrigeration, and automatic
15    temperature control systems, including the testing and
16    balancing of those systems;
17        (3) ventilating and distribution systems for
18    conditioned air, including the testing and balancing of
19    those systems;
20        (4) electric wiring; and
21        (5) general contract work.
22    Except as provided in subsection (a-5), the specifications
23may be so drawn as to permit separate and independent bidding

 

 

HB5501 Engrossed- 2 -LRB104 18314 HLH 31754 b

1upon each of the 5 subdivisions of work. All contracts awarded
2for any part thereof may award the 5 subdivisions of work
3separately to responsible and reliable persons, firms, or
4corporations engaged in these classes of work. The contracts,
5at the discretion of the construction agency, may be assigned
6to the successful bidder on the general contract work or to the
7successful bidder on the subdivision of work designated by the
8construction agency before the bidding as the prime
9subdivision of work, provided that all payments will be made
10directly to the contractors for the 5 subdivisions of work
11upon compliance with the conditions of the contract.
12    For single prime projects: (i) the bid of the successful
13low bidder shall identify the name of the subcontractor, if
14any, and the bid proposal costs for each of the 5 subdivisions
15of work set forth in this Section; (ii) the contract entered
16into with the successful bidder shall provide that no
17identified subcontractor may be terminated without the written
18consent of the Capital Development Board; (iii) the contract
19shall comply with the disadvantaged business practices of the
20Business Enterprise for Minorities, Women, and Persons with
21Disabilities Act and the equal employment practices of Section
222-105 of the Illinois Human Rights Act; and (iv) the Capital
23Development Board shall submit an annual report to the General
24Assembly and Governor on the bidding, award, and performance
25of all single prime projects.
26    Until December 31, 2023, for building construction

 

 

HB5501 Engrossed- 3 -LRB104 18314 HLH 31754 b

1projects with a total construction cost valued at $5,000,000
2or less, the Capital Development Board shall not use the
3single prime procurement delivery method for more than 50% of
4the total number of projects bid for each fiscal year. Until
5December 31, 2023, any project with a total construction cost
6valued greater than $5,000,000 may be bid using single prime
7at the discretion of the Executive Director of the Capital
8Development Board.
9    For contracts entered into on or after January 1, 2024,
10the Capital Development Board shall determine whether the
11single prime procurement delivery method is to be pursued.
12Before electing to use single prime on a project, the Capital
13Development Board must make a written determination that must
14include a description as to the particular advantages of the
15single prime procurement method for that project and an
16evaluation of the items in paragraphs (1) through (4). The
17chief procurement officer must review the Capital Development
18Board's determination and consider the adequacy of information
19in paragraphs (1) through (4) to determine whether the Capital
20Development Board may proceed with single prime. Approval by
21the chief procurement officer shall not be unreasonably
22withheld. The following factors must be considered by the
23chief procurement officer in any determination:
24        (1) The benefit that using the single prime
25    procurement method will have on the Capital Development
26    Board's ability to increase participation of

 

 

HB5501 Engrossed- 4 -LRB104 18314 HLH 31754 b

1    minority-owned firms, woman-owned firms, firms owned by
2    persons with a disability, and veteran-owned firms.
3        (2) The likelihood that single prime will be in the
4    best interest of the State by providing a material savings
5    of time or cost over the multiple prime delivery system.
6    The best interest of the State justification must show the
7    specific benefits of using the single prime method,
8    including documentation of the estimates or scheduling
9    impacts of any of the following: project complexity and
10    trade coordination required, length of project,
11    availability of skilled workforce, geographic area,
12    project timelines, project budget, ability to secure
13    minority, women, persons with disabilities and veteran
14    participation, or other information.
15        (3) The type and size of the project and its
16    suitability to the single prime procurement method.
17        (4) Whether the project will comply with the
18    underrepresented business and equal employment practices
19    of the State, as established in the Business Enterprise
20    for Minorities, Women, and Persons with Disabilities Act,
21    Section 45-57 of this Code, and Section 2-105 of the
22    Illinois Human Rights Act.
23    If the chief procurement officer finds that the Capital
24Development Board's written determination is insufficient, the
25Capital Development Board shall have the opportunity to cure
26its determination. Within 15 days of receiving approval from

 

 

HB5501 Engrossed- 5 -LRB104 18314 HLH 31754 b

1the chief procurement officer, the Capital Development Board
2shall provide an advisory copy of the written determination to
3the Procurement Policy Board and the Commission on Equity and
4Inclusion. The Capital Development Board must maintain the
5full record of determination for 5 years.
6    (a-5) Beginning on the effective date of this amendatory
7Act of the 104th General Assembly and through December 31,
82032 December 31, 2026, for single prime projects in which a
9public institution of higher education is a construction
10agency awarding building construction contracts in excess of
11$250,000, separate specifications may be prepared for all
12equipment, labor, and materials in connection with the 5
13subdivisions of work enumerated in subsection (a). Any public
14institution of higher education contract awarded for any part
15thereof may award 2 or more of the 5 subdivisions of work
16together or separately to responsible and reliable persons,
17firms, or corporations engaged in these classes of work if:
18(i) the public institution of higher education has submitted
19to the Procurement Policy Board and the Commission on Equity
20and Inclusion a written notice that includes the reasons for
21using the single prime method and an explanation of why the use
22of that method is in the best interest of the State and
23arranges to have the notice posted on the institution's online
24procurement webpage and its online procurement bulletin at
25least 3 business days following submission to the Procurement
26Policy Board and the Commission on Equity and Inclusion; (ii)

 

 

HB5501 Engrossed- 6 -LRB104 18314 HLH 31754 b

1the successful low bidder has prequalified with the public
2institution of higher education; (iii) the bid of the
3successful low bidder identifies the name of the
4subcontractor, if any, and the bid proposal costs for each of
5the 5 subdivisions of work set forth in subsection (a); (iv)
6the contract entered into with the successful bidder provides
7that no identified subcontractor may be terminated without the
8written consent of the public institution of higher education;
9and (v) the successful low bidder has prequalified with the
10University of Illinois or with the Capital Development Board.
11    For building construction projects with a total
12construction cost valued at $20,000,000 or less, public
13institutions of higher education shall not use the single
14prime delivery method for more than 50% of the total number of
15projects bid for each fiscal year. Projects with a total
16construction cost valued at $20,000,000 or more may be bid
17using the single prime delivery method at the discretion of
18the public institution of higher education. With respect to
19any construction project described in this subsection (a-5),
20the public institution of higher education shall: (i) specify
21in writing as a public record that the project shall comply
22with the Business Enterprise for Minorities, Women, and
23Persons with Disabilities Act and the equal employment
24practices of Section 2-105 of the Illinois Human Rights Act;
25and (ii) report annually to the Governor, General Assembly,
26Procurement Policy Board, and Auditor General on the bidding,

 

 

HB5501 Engrossed- 7 -LRB104 18314 HLH 31754 b

1award, and performance of all single prime projects. On and
2after the effective date of this amendatory Act of the 102nd
3General Assembly, the public institution of higher education
4may award in each fiscal year single prime contracts with an
5aggregate total value of no more than $100,000,000. The Board
6of Trustees of the University of Illinois may award in each
7fiscal year single prime contracts with an aggregate total
8value of not more than $300,000,000.
9    (b) For public institutions of higher education, the
10provisions of this subsection are operative on and after
11December 31, 2032 January 1, 2026. For building construction
12contracts in excess of $250,000, separate specifications shall
13be prepared for all equipment, labor, and materials in
14connection with the following 5 subdivisions of the work to be
15performed:
16        (1) plumbing;
17        (2) heating, piping, refrigeration, and automatic
18    temperature control systems, including the testing and
19    balancing of those systems;
20        (3) ventilating and distribution systems for
21    conditioned air, including the testing and balancing of
22    those systems;
23        (4) electric wiring; and
24        (5) general contract work.
25    The specifications must be so drawn as to permit separate
26and independent bidding upon each of the 5 subdivisions of

 

 

HB5501 Engrossed- 8 -LRB104 18314 HLH 31754 b

1work. All contracts awarded for any part thereof shall award
2the 5 subdivisions of work separately to responsible and
3reliable persons, firms, or corporations engaged in these
4classes of work. The contracts, at the discretion of the
5construction agency, may be assigned to the successful bidder
6on the general contract work or to the successful bidder on the
7subdivision of work designated by the construction agency
8before the bidding as the prime subdivision of work, provided
9that all payments will be made directly to the contractors for
10the 5 subdivisions of work upon compliance with the conditions
11of the contract.
12    It is the intent of the General Assembly that the
13provisions of subsection (a-5), rather than the provisions of
14this subsection (b), apply continuously from November 21, 2025
15(the effective date of Public Act 104-434) through December
1631, 2032. Any actions taken in reliance on the extension of
17subsection (a-5) in Public Act 104-434 are hereby validated.
18(Source: P.A. 103-570, eff. 1-1-24; 104-434, eff. 11-21-25.)
 
19    Section 99. Effective date. This Act takes effect upon
20becoming law.