| 1 | AN ACT concerning safety. | |||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||||
| 4 | Section 5. The Environmental Protection Act is amended by | |||||||||||||||||||||
| 5 | changing Section 22.59 and by adding Section 22.59a as | |||||||||||||||||||||
| 6 | follows: | |||||||||||||||||||||
| 7 | (415 ILCS 5/22.59) | |||||||||||||||||||||
| 8 | Sec. 22.59. CCR surface impoundments. | |||||||||||||||||||||
| 9 | (a) The General Assembly finds that: | |||||||||||||||||||||
| 10 | (1) the State of Illinois has a long-standing policy | |||||||||||||||||||||
| 11 | to restore, protect, and enhance the environment, | |||||||||||||||||||||
| 12 | including the purity of the air, land, and waters, | |||||||||||||||||||||
| 13 | including groundwaters, of this State; | |||||||||||||||||||||
| 14 | (2) a clean environment is essential to the growth and | |||||||||||||||||||||
| 15 | well-being of this State; | |||||||||||||||||||||
| 16 | (3) CCR generated by the electric generating industry | |||||||||||||||||||||
| 17 | has caused groundwater contamination and other forms of | |||||||||||||||||||||
| 18 | pollution at active and inactive plants throughout this | |||||||||||||||||||||
| 19 | State; | |||||||||||||||||||||
| 20 | (4) environmental laws should be supplemented to | |||||||||||||||||||||
| 21 | ensure consistent, responsible regulation of all existing | |||||||||||||||||||||
| 22 | CCR surface impoundments; and | |||||||||||||||||||||
| 23 | (5) meaningful participation of State residents, | |||||||||||||||||||||
| |||||||
| |||||||
| 1 | especially vulnerable populations who may be affected by | ||||||
| 2 | regulatory actions, is critical to ensure that | ||||||
| 3 | environmental justice considerations are incorporated in | ||||||
| 4 | the development of, decision-making related to, and | ||||||
| 5 | implementation of environmental laws and rulemaking that | ||||||
| 6 | protects and improves the well-being of communities in | ||||||
| 7 | this State that bear disproportionate burdens imposed by | ||||||
| 8 | environmental pollution; and . | ||||||
| 9 | (6) the State recognizes the critical need to | ||||||
| 10 | zealously guard and vigilantly protect the water quality | ||||||
| 11 | and public uses of public bodies of water throughout the | ||||||
| 12 | State, including Lake Michigan. | ||||||
| 13 | Therefore, the purpose of this Section is to promote a | ||||||
| 14 | healthful environment, including clean water, air, and land, | ||||||
| 15 | meaningful public involvement, and the responsible disposal | ||||||
| 16 | and storage of coal combustion residuals, so as to protect | ||||||
| 17 | public health and to prevent pollution of the environment of | ||||||
| 18 | this State. | ||||||
| 19 | The provisions of this Section shall be liberally | ||||||
| 20 | construed to carry out the purposes of this Section. | ||||||
| 21 | (b) No person shall: | ||||||
| 22 | (1) cause or allow the discharge of any contaminants | ||||||
| 23 | from a CCR surface impoundment into the environment so as | ||||||
| 24 | to cause, directly or indirectly, a violation of this | ||||||
| 25 | Section or any regulations or standards adopted by the | ||||||
| 26 | Board under this Section, either alone or in combination | ||||||
| |||||||
| |||||||
| 1 | with contaminants from other sources; | ||||||
| 2 | (2) construct, install, modify, operate, or close any | ||||||
| 3 | CCR surface impoundment without a permit granted by the | ||||||
| 4 | Agency, or so as to violate any conditions imposed by such | ||||||
| 5 | permit, any provision of this Section or any regulations | ||||||
| 6 | or standards adopted by the Board under this Section; | ||||||
| 7 | (3) cause or allow, directly or indirectly, the | ||||||
| 8 | discharge, deposit, injection, dumping, spilling, leaking, | ||||||
| 9 | or placing of any CCR upon the land in a place and manner | ||||||
| 10 | so as to cause or tend to cause a violation of this Section | ||||||
| 11 | or any regulations or standards adopted by the Board under | ||||||
| 12 | this Section; or | ||||||
| 13 | (4) construct, install, modify, or close a CCR surface | ||||||
| 14 | impoundment in accordance with a permit issued under this | ||||||
| 15 | Act without certifying to the Agency that all contractors, | ||||||
| 16 | subcontractors, and installers utilized to construct, | ||||||
| 17 | install, modify, or close a CCR surface impoundment are | ||||||
| 18 | participants in: | ||||||
| 19 | (A) a training program that is approved by and | ||||||
| 20 | registered with the United States Department of | ||||||
| 21 | Labor's Employment and Training Administration and | ||||||
| 22 | that includes instruction in erosion control and | ||||||
| 23 | environmental remediation; and | ||||||
| 24 | (B) a training program that is approved by and | ||||||
| 25 | registered with the United States Department of | ||||||
| 26 | Labor's Employment and Training Administration and | ||||||
| |||||||
| |||||||
| 1 | that includes instruction in the operation of heavy | ||||||
| 2 | equipment and excavation. | ||||||
| 3 | Nothing in this paragraph (4) shall be construed to | ||||||
| 4 | require providers of construction-related professional | ||||||
| 5 | services to participate in a training program approved by | ||||||
| 6 | and registered with the United States Department of | ||||||
| 7 | Labor's Employment and Training Administration. | ||||||
| 8 | In this paragraph (4), "construction-related | ||||||
| 9 | professional services" includes, but is not limited to, | ||||||
| 10 | those services within the scope of: (i) the practice of | ||||||
| 11 | architecture as regulated under the Illinois Architecture | ||||||
| 12 | Practice Act of 1989; (ii) professional engineering as | ||||||
| 13 | defined in Section 4 of the Professional Engineering | ||||||
| 14 | Practice Act of 1989; (iii) the practice of a structural | ||||||
| 15 | engineer as defined in Section 4 of the Structural | ||||||
| 16 | Engineering Practice Act of 1989; or (iv) land surveying | ||||||
| 17 | under the Illinois Professional Land Surveyor Act of 1989. | ||||||
| 18 | (c) (Blank). | ||||||
| 19 | (d) Before commencing closure of a CCR surface | ||||||
| 20 | impoundment, in accordance with Board rules, the owner of a | ||||||
| 21 | CCR surface impoundment must submit to the Agency for approval | ||||||
| 22 | a closure alternatives analysis that analyzes all closure | ||||||
| 23 | methods being considered and that otherwise satisfies all | ||||||
| 24 | closure requirements adopted by the Board under this Act. | ||||||
| 25 | Complete removal of CCR, as specified by the Board's rules, | ||||||
| 26 | from the CCR surface impoundment must be considered and | ||||||
| |||||||
| |||||||
| 1 | analyzed. Section 3.405 does not apply to the Board's rules | ||||||
| 2 | specifying complete removal of CCR. The selected closure | ||||||
| 3 | method must ensure compliance with regulations adopted by the | ||||||
| 4 | Board pursuant to this Section. | ||||||
| 5 | (e) Owners or operators of CCR surface impoundments who | ||||||
| 6 | have submitted a closure plan to the Agency before May 1, 2019, | ||||||
| 7 | and who have completed closure prior to 24 months after July | ||||||
| 8 | 30, 2019 (the effective date of Public Act 101-171) shall not | ||||||
| 9 | be required to obtain a construction permit for the surface | ||||||
| 10 | impoundment closure under this Section. | ||||||
| 11 | (f) Except for the State, its agencies and institutions, a | ||||||
| 12 | unit of local government, or a not-for-profit electric | ||||||
| 13 | cooperative as defined in Section 3.4 of the Electric Supplier | ||||||
| 14 | Act, any person who owns or operates a CCR surface impoundment | ||||||
| 15 | in this State shall post with the Agency a performance bond or | ||||||
| 16 | other security for the purpose of: (i) ensuring closure of the | ||||||
| 17 | CCR surface impoundment and post-closure care in accordance | ||||||
| 18 | with this Act and its rules; and (ii) ensuring remediation of | ||||||
| 19 | releases from the CCR surface impoundment. The only acceptable | ||||||
| 20 | forms of financial assurance are: a trust fund, a surety bond | ||||||
| 21 | guaranteeing payment, a surety bond guaranteeing performance, | ||||||
| 22 | or an irrevocable letter of credit. | ||||||
| 23 | (1) The cost estimate for the post-closure care of a | ||||||
| 24 | CCR surface impoundment shall be calculated using a | ||||||
| 25 | 30-year post-closure care period or such longer period as | ||||||
| 26 | may be approved by the Agency under Board or federal | ||||||
| |||||||
| |||||||
| 1 | rules. | ||||||
| 2 | (2) The Agency is authorized to enter into such | ||||||
| 3 | contracts and agreements as it may deem necessary to carry | ||||||
| 4 | out the purposes of this Section. Neither the State, nor | ||||||
| 5 | the Director, nor any State employee shall be liable for | ||||||
| 6 | any damages or injuries arising out of or resulting from | ||||||
| 7 | any action taken under this Section. | ||||||
| 8 | (3) The Agency shall have the authority to approve or | ||||||
| 9 | disapprove any performance bond or other security posted | ||||||
| 10 | under this subsection. Any person whose performance bond | ||||||
| 11 | or other security is disapproved by the Agency may contest | ||||||
| 12 | the disapproval as a permit denial appeal pursuant to | ||||||
| 13 | Section 40. | ||||||
| 14 | (g) The Board shall adopt rules establishing construction | ||||||
| 15 | permit requirements, operating permit requirements, design | ||||||
| 16 | standards, reporting, financial assurance, and closure and | ||||||
| 17 | post-closure care requirements for CCR surface impoundments. | ||||||
| 18 | Not later than 8 months after July 30, 2019 (the effective date | ||||||
| 19 | of Public Act 101-171) the Agency shall propose, and not later | ||||||
| 20 | than one year after receipt of the Agency's proposal the Board | ||||||
| 21 | shall adopt, rules under this Section. The Board shall not be | ||||||
| 22 | deemed in noncompliance with the rulemaking deadline due to | ||||||
| 23 | delays in adopting rules as a result of the Joint Committee on | ||||||
| 24 | Administrative Rules oversight process. The rules must, at a | ||||||
| 25 | minimum: | ||||||
| 26 | (1) be at least as protective and comprehensive as the | ||||||
| |||||||
| |||||||
| 1 | federal regulations or amendments thereto promulgated by | ||||||
| 2 | the Administrator of the United States Environmental | ||||||
| 3 | Protection Agency in Subpart D of 40 CFR 257 governing CCR | ||||||
| 4 | surface impoundments; | ||||||
| 5 | (2) specify the minimum contents of CCR surface | ||||||
| 6 | impoundment construction and operating permit | ||||||
| 7 | applications, including the closure alternatives analysis | ||||||
| 8 | required under subsection (d); | ||||||
| 9 | (3) specify which types of permits include | ||||||
| 10 | requirements for closure, post-closure, remediation and | ||||||
| 11 | all other requirements applicable to CCR surface | ||||||
| 12 | impoundments; | ||||||
| 13 | (4) specify when permit applications for existing CCR | ||||||
| 14 | surface impoundments must be submitted, taking into | ||||||
| 15 | consideration whether the CCR surface impoundment must | ||||||
| 16 | close under the RCRA; | ||||||
| 17 | (5) specify standards for review and approval by the | ||||||
| 18 | Agency of CCR surface impoundment permit applications; | ||||||
| 19 | (6) specify meaningful public participation procedures | ||||||
| 20 | for the issuance of CCR surface impoundment construction | ||||||
| 21 | and operating permits, including, but not limited to, | ||||||
| 22 | public notice of the submission of permit applications, an | ||||||
| 23 | opportunity for the submission of public comments, an | ||||||
| 24 | opportunity for a public hearing prior to permit issuance, | ||||||
| 25 | and a summary and response of the comments prepared by the | ||||||
| 26 | Agency; | ||||||
| |||||||
| |||||||
| 1 | (7) prescribe the type and amount of the performance | ||||||
| 2 | bonds or other securities required under subsection (f), | ||||||
| 3 | and the conditions under which the State is entitled to | ||||||
| 4 | collect moneys from such performance bonds or other | ||||||
| 5 | securities; | ||||||
| 6 | (8) specify a procedure to identify areas of | ||||||
| 7 | environmental justice concern in relation to CCR surface | ||||||
| 8 | impoundments; | ||||||
| 9 | (9) specify a method to prioritize CCR surface | ||||||
| 10 | impoundments required to close under RCRA if not otherwise | ||||||
| 11 | specified by the United States Environmental Protection | ||||||
| 12 | Agency, so that the CCR surface impoundments with the | ||||||
| 13 | highest risk to public health and the environment, and | ||||||
| 14 | areas of environmental justice concern are given first | ||||||
| 15 | priority; | ||||||
| 16 | (10) define when complete removal of CCR is achieved | ||||||
| 17 | and specify the standards for responsible removal of CCR | ||||||
| 18 | from CCR surface impoundments, including, but not limited | ||||||
| 19 | to, dust controls and the protection of adjacent surface | ||||||
| 20 | water and groundwater; and | ||||||
| 21 | (11) describe the process and standards for | ||||||
| 22 | identifying a specific alternative source of groundwater | ||||||
| 23 | pollution when the owner or operator of the CCR surface | ||||||
| 24 | impoundment believes that groundwater contamination on the | ||||||
| 25 | site is not from the CCR surface impoundment. | ||||||
| 26 | (h) Any owner of a CCR surface impoundment that generates | ||||||
| |||||||
| |||||||
| 1 | CCR and sells or otherwise provides coal combustion byproducts | ||||||
| 2 | pursuant to Section 3.135 shall, every 12 months, post on its | ||||||
| 3 | publicly available website a report specifying the volume or | ||||||
| 4 | weight of CCR, in cubic yards or tons, that it sold or provided | ||||||
| 5 | during the past 12 months. | ||||||
| 6 | (i) The owner of a CCR surface impoundment shall post all | ||||||
| 7 | closure plans, permit applications, and supporting | ||||||
| 8 | documentation, as well as any Agency approval of the plans or | ||||||
| 9 | applications, on its publicly available website. | ||||||
| 10 | (j) The owner or operator of a CCR surface impoundment | ||||||
| 11 | shall pay the following fees: | ||||||
| 12 | (1) An initial fee to the Agency within 6 months after | ||||||
| 13 | July 30, 2019 (the effective date of Public Act 101-171) | ||||||
| 14 | of: | ||||||
| 15 | $50,000 for each closed CCR surface impoundment; | ||||||
| 16 | and | ||||||
| 17 | $75,000 for each CCR surface impoundment that have | ||||||
| 18 | not completed closure. | ||||||
| 19 | (2) Annual fees to the Agency, beginning on July 1, | ||||||
| 20 | 2020, of: | ||||||
| 21 | $25,000 for each CCR surface impoundment that has | ||||||
| 22 | not completed closure; and | ||||||
| 23 | $15,000 for each CCR surface impoundment that has | ||||||
| 24 | completed closure, but has not completed post-closure | ||||||
| 25 | care. | ||||||
| 26 | (k) All fees collected by the Agency under subsection (j) | ||||||
| |||||||
| |||||||
| 1 | shall be deposited into the Environmental Protection Permit | ||||||
| 2 | and Inspection Fund. | ||||||
| 3 | (l) The Coal Combustion Residual Surface Impoundment | ||||||
| 4 | Financial Assurance Fund is created as a special fund in the | ||||||
| 5 | State treasury. Any moneys forfeited to the State of Illinois | ||||||
| 6 | from any performance bond or other security required under | ||||||
| 7 | this Section shall be placed in the Coal Combustion Residual | ||||||
| 8 | Surface Impoundment Financial Assurance Fund and shall, upon | ||||||
| 9 | approval by the Governor and the Director, be used by the | ||||||
| 10 | Agency for the purposes for which such performance bond or | ||||||
| 11 | other security was issued. The Coal Combustion Residual | ||||||
| 12 | Surface Impoundment Financial Assurance Fund is not subject to | ||||||
| 13 | the provisions of subsection (c) of Section 5 of the State | ||||||
| 14 | Finance Act. | ||||||
| 15 | (m) The provisions of this Section shall apply, without | ||||||
| 16 | limitation, to all existing CCR surface impoundments and any | ||||||
| 17 | CCR surface impoundments constructed after July 30, 2019 (the | ||||||
| 18 | effective date of Public Act 101-171), except to the extent | ||||||
| 19 | prohibited by the Illinois or United States Constitutions. | ||||||
| 20 | (n) This subsection only applies to an owner or operator | ||||||
| 21 | of a facility that (i) has at least one CCR surface impoundment | ||||||
| 22 | and (ii) is an electric generating plant located within 4,000 | ||||||
| 23 | feet of Lake Michigan. | ||||||
| 24 | CCR in all CCR surface impoundments subject to this | ||||||
| 25 | subsection, including CCR surface impoundments for which an | ||||||
| 26 | adjusted standard has been sought pursuant to Section 28.1, | ||||||
| |||||||
| |||||||
| 1 | shall be closed by removal and off-site disposal, pursuant to | ||||||
| 2 | this Section, applicable Illinois Pollution Control Board | ||||||
| 3 | regulations, and the following provisions: | ||||||
| 4 | (1) CCR surface impoundments under this subsection are | ||||||
| 5 | not subject to the closure alternative analysis | ||||||
| 6 | requirement under subsection (d). | ||||||
| 7 | (2) Notwithstanding any other requirements of this | ||||||
| 8 | Section or Board rules or regulations, applications for | ||||||
| 9 | closure construction subject to this subsection shall be | ||||||
| 10 | submitted to the Agency within one year after the | ||||||
| 11 | effective date of this amendatory Act of the 104th General | ||||||
| 12 | Assembly. Application requirements and permit issuance | ||||||
| 13 | procedures shall follow those adopted by the Illinois | ||||||
| 14 | Pollution Control Board under this Section. | ||||||
| 15 | (3) If the owner or operator of any CCR surface | ||||||
| 16 | impoundment subject to this subsection has submitted a | ||||||
| 17 | construction permit application to the Agency to close a | ||||||
| 18 | subject CCR surface impoundment by any method other than | ||||||
| 19 | removal under Part 845 of Title 35 of the Illinois | ||||||
| 20 | Administrative Code, the owner or operator shall submit an | ||||||
| 21 | amended construction permit application that complies with | ||||||
| 22 | the requirements of this Section within one year after the | ||||||
| 23 | effective date of this amendatory Act of the 104th General | ||||||
| 24 | Assembly. | ||||||
| 25 | (4) Any permit issued by the Agency allowing a CCR | ||||||
| 26 | surface impoundment subject to this subsection to close in | ||||||
| |||||||
| |||||||
| 1 | place shall be declared void. The Agency shall not issue | ||||||
| 2 | any operating permit or construction permit allowing | ||||||
| 3 | closure in place to the owner or operator of any CCR | ||||||
| 4 | surface impoundment subject to this subsection. | ||||||
| 5 | (Source: P.A. 102-16, eff. 6-17-21; 102-137, eff. 7-23-21; | ||||||
| 6 | 102-309, eff. 8-6-21; 102-558, eff. 8-20-21; 102-662, eff. | ||||||
| 7 | 9-15-21; 102-813, eff. 5-13-22; 103-154, eff. 6-30-23.) | ||||||
| 8 | (415 ILCS 5/22.59a new) | ||||||
| 9 | Sec. 22.59a. Great Lakes CCR protection. | ||||||
| 10 | (a) The General Assembly finds that: | ||||||
| 11 | (1) The State has a long-standing policy to restore, | ||||||
| 12 | protect, and enhance the environment and has a particular | ||||||
| 13 | interest in preserving the quality of Lake Michigan, which | ||||||
| 14 | serves as a drinking water source for millions of State | ||||||
| 15 | residents and provides irreplaceable recreational, | ||||||
| 16 | ecological, and economic value to Illinois. | ||||||
| 17 | (2) CCR generated by the electric generating industry | ||||||
| 18 | has contaminated, and continues to contaminate, Lake | ||||||
| 19 | Michigan, and CCR placed in unlined deposits, including | ||||||
| 20 | deposits outside of CCR surface impoundments as well as in | ||||||
| 21 | CCR surface impoundments, continues to threaten the | ||||||
| 22 | quality of Lake Michigan's water. | ||||||
| 23 | (3) The purpose of this Section is to protect Lake | ||||||
| 24 | Michigan against further contamination from CCR. | ||||||
| 25 | (b) This Section only applies to an owner or operator of a | ||||||
| |||||||
| |||||||
| 1 | facility that (i) generates or has generated CCR that is not | ||||||
| 2 | disposed of, treated, stored, or abandoned in a CCR surface | ||||||
| 3 | impoundment and (ii) is an electric generating plant located | ||||||
| 4 | within 4,000 feet of Lake Michigan. | ||||||
| 5 | (c) An owner or operator of a facility that is subject to | ||||||
| 6 | this Section shall remove from the owner's or operator's site, | ||||||
| 7 | for off-site disposal, all CCR generated by the facility that | ||||||
| 8 | is not disposed of, treated, stored, or abandoned in a CCR | ||||||
| 9 | surface impoundment, and remediate all soil and groundwater | ||||||
| 10 | impacted by that CCR, in accordance with the following: | ||||||
| 11 | (1) Within one year after the effective date of this | ||||||
| 12 | amendatory Act of the 104th General Assembly, the owner or | ||||||
| 13 | operator shall conduct a site investigation and submit to | ||||||
| 14 | the Agency a site investigation report that identifies the | ||||||
| 15 | full extent of CCR at the site. The investigation and | ||||||
| 16 | report shall also identify the full extent of soil and | ||||||
| 17 | groundwater that, as a result of the CCR, exceeds the most | ||||||
| 18 | stringent remediation objectives adopted under Title XVII | ||||||
| 19 | of this Act. | ||||||
| 20 | (A) Within 5 days after submitting the report to | ||||||
| 21 | the Agency, the owner or operator shall post public | ||||||
| 22 | notice of the report's submission (i) on the owner or | ||||||
| 23 | operator's website, along with a copy of the report | ||||||
| 24 | for public viewing, and (ii) in a newspaper of general | ||||||
| 25 | distribution in the municipality where the applicable | ||||||
| 26 | electric generating plant is located. The notice shall | ||||||
| |||||||
| |||||||
| 1 | be provided in English and Spanish and shall inform | ||||||
| 2 | the public of their right to submit comments on the | ||||||
| 3 | report to the Agency within 30 days after the date the | ||||||
| 4 | notice is published in the newspaper. The owner or | ||||||
| 5 | operator shall also maintain a copy of the report in a | ||||||
| 6 | public repository in the municipality where the | ||||||
| 7 | applicable electric generating plant is located for | ||||||
| 8 | public viewing, which shall be identified in the | ||||||
| 9 | public notice. | ||||||
| 10 | (B) Within 90 days after receipt of the site | ||||||
| 11 | investigation report, the Agency shall determine | ||||||
| 12 | whether the investigation and report comply with this | ||||||
| 13 | paragraph (1). In making its determination, the Agency | ||||||
| 14 | shall consider all public comments submitted within 30 | ||||||
| 15 | days after the date of the newspaper notice required | ||||||
| 16 | under subparagraph (A). | ||||||
| 17 | (C) If the Agency determines the investigation and | ||||||
| 18 | report comply with this paragraph (1), it shall notify | ||||||
| 19 | the owner or operator in writing of its determination. | ||||||
| 20 | The owner or operator shall then submit a CCR removal | ||||||
| 21 | and remediation plan in accordance with paragraph (2). | ||||||
| 22 | (D) If the Agency determines the investigation or | ||||||
| 23 | report does not comply with this paragraph (1), it | ||||||
| 24 | shall notify the owner or operator in writing of its | ||||||
| 25 | determination and the reasons for the determination. | ||||||
| 26 | The owner or operator shall then have 6 months to (i) | ||||||
| |||||||
| |||||||
| 1 | perform additional investigation or correct any | ||||||
| 2 | deficiencies and (ii) submit an amended site | ||||||
| 3 | investigation report to the Agency, which shall be | ||||||
| 4 | subject to the submission and review procedures set | ||||||
| 5 | forth in this paragraph (1). | ||||||
| 6 | (2) Within 6 months after the Agency's approval of the | ||||||
| 7 | site investigation report, the owner or operator shall | ||||||
| 8 | submit to the Agency a CCR removal and remediation plan | ||||||
| 9 | that will achieve the removal of all CCR at the site and | ||||||
| 10 | the remediation of all soil and groundwater that, as a | ||||||
| 11 | result of the CCR, exceeds the most stringent remediation | ||||||
| 12 | objectives adopted under Title XVII of this Act. The plan | ||||||
| 13 | shall include a schedule for completion of its major | ||||||
| 14 | milestones, along with the following: | ||||||
| 15 | (A) An analysis of the modes for transporting the | ||||||
| 16 | removed CCR off-site, including by rail, barge, | ||||||
| 17 | low-polluting trucks, or a combination of these | ||||||
| 18 | transportation modes. | ||||||
| 19 | (B) Removal of CCR consistent with 35 Ill. Adm. | ||||||
| 20 | Code 845.740 and 845.760. | ||||||
| 21 | (C) Within 5 days after submitting the plan to the | ||||||
| 22 | Agency, the owner or operator shall post public notice | ||||||
| 23 | of the plan's submission (i) on the owner or | ||||||
| 24 | operator's website, along with a copy of the plan for | ||||||
| 25 | public viewing, and (ii) in a newspaper of general | ||||||
| 26 | distribution in the municipality where the applicable | ||||||
| |||||||
| |||||||
| 1 | electric generating plant is located. The notice shall | ||||||
| 2 | be provided in English and Spanish and shall inform | ||||||
| 3 | the public of their right to submit comments on the | ||||||
| 4 | plan to the Agency within 30 days after the date the | ||||||
| 5 | notice is published in the newspaper. The owner or | ||||||
| 6 | operator shall also maintain a copy of the report in a | ||||||
| 7 | public repository in the municipality where the | ||||||
| 8 | applicable electric generating plant is located for | ||||||
| 9 | public viewing, which shall be identified in the | ||||||
| 10 | public notice. | ||||||
| 11 | (D) Within 90 days after receipt of the plan, the | ||||||
| 12 | Agency shall determine whether the plan complies with | ||||||
| 13 | this paragraph (2). In making its determination, the | ||||||
| 14 | Agency shall consider all public comments submitted | ||||||
| 15 | within 30 days after the date of the newspaper notice | ||||||
| 16 | required under subparagraph (C). | ||||||
| 17 | (E) If the Agency determines the plan, with or | ||||||
| 18 | without Agency modifications, complies with this | ||||||
| 19 | paragraph (2), it shall notify the owner or operator | ||||||
| 20 | in writing of its determination. The owner or operator | ||||||
| 21 | shall then proceed with implementation of the plan, | ||||||
| 22 | including any modifications by the Agency, and | ||||||
| 23 | submission of a removal and remediation report in | ||||||
| 24 | accordance with paragraph (3). | ||||||
| 25 | (F) If the Agency determines the investigation or | ||||||
| 26 | report does not comply with this paragraph (2), it | ||||||
| |||||||
| |||||||
| 1 | shall notify the owner or operator in writing of its | ||||||
| 2 | determination and the reasons for the determination. | ||||||
| 3 | The owner or operator shall then have 60 days to submit | ||||||
| 4 | an amended plan to the Agency, which shall be subject | ||||||
| 5 | to the submission and review procedures set forth in | ||||||
| 6 | subparagraphs (C) and (D). | ||||||
| 7 | (3) In accordance with a schedule approved by the | ||||||
| 8 | Agency, the owner or operator shall implement the | ||||||
| 9 | remediation plan and provide the Agency with updates on | ||||||
| 10 | the plan's implementation. Upon completion of the plan, | ||||||
| 11 | the owner or operator shall submit a completion report to | ||||||
| 12 | the Agency. | ||||||
| 13 | (A) Within 5 days after submitting an update or | ||||||
| 14 | the completion report to the Agency on plan | ||||||
| 15 | implementation, the owner or operator shall post | ||||||
| 16 | public notice of the report's submission (i) on the | ||||||
| 17 | owner or operator's website, along with a copy of the | ||||||
| 18 | report for public viewing, and (ii) in a newspaper of | ||||||
| 19 | general distribution in the municipality where the | ||||||
| 20 | applicable electric generating plant is located. The | ||||||
| 21 | notice shall be provided in English and Spanish and | ||||||
| 22 | shall inform the public of their right to submit | ||||||
| 23 | comments on the report to the Agency within 30 days | ||||||
| 24 | after the date the notice is published in the | ||||||
| 25 | newspaper. The owner or operator shall also maintain a | ||||||
| 26 | copy of the report in a public repository in the | ||||||
| |||||||
| |||||||
| 1 | municipality where the applicable electric generating | ||||||
| 2 | plant is located for public viewing, which shall be | ||||||
| 3 | identified in the public notice. | ||||||
| 4 | (B) Within 90 days after receipt of the completion | ||||||
| 5 | report, the Agency shall determine whether the removal | ||||||
| 6 | and remediation has resulted in (i) the removal of all | ||||||
| 7 | CCR at the site and (ii) the remediation of all soil | ||||||
| 8 | and groundwater that, as a result of the CCR, exceeds | ||||||
| 9 | the most stringent remediation objectives adopted | ||||||
| 10 | under Title XVII of this Act. In making its | ||||||
| 11 | determination, the Agency shall consider all public | ||||||
| 12 | comments submitted within 30 days after the date of | ||||||
| 13 | the newspaper notice required under subparagraph (A). | ||||||
| 14 | (C) If the Agency determines that the required | ||||||
| 15 | removal and remediation is complete, it shall notify | ||||||
| 16 | the owner or operator in writing of its determination. | ||||||
| 17 | (D) If the Agency determines that the required | ||||||
| 18 | removal and remediation is not complete, it shall | ||||||
| 19 | notify the owner or operator in writing of its | ||||||
| 20 | determination and the reasons for the determination. | ||||||
| 21 | The owner or operator shall then continue removal or | ||||||
| 22 | remediation, and submit reports to the Agency, in | ||||||
| 23 | accordance with a schedule established by the Agency. | ||||||
| 24 | Reports shall be subject to the submission and review | ||||||
| 25 | procedures set forth in subparagraphs (A) and (B). If | ||||||
| 26 | necessary, the owner or operator may amend the plan | ||||||
| |||||||
| |||||||
| 1 | and submit it for review and approval in accordance | ||||||
| 2 | with paragraph (2). | ||||||
| 3 | (d) Except for the State, its agencies and institutions, a | ||||||
| 4 | unit of local government, or a not-for-profit electric | ||||||
| 5 | cooperative as defined in Section 3.4 of the Electric Supplier | ||||||
| 6 | Act, an owner or operator shall post with the Agency a | ||||||
| 7 | performance bond or other security for the purpose of ensuring | ||||||
| 8 | removal and remediation in accordance with this Section. The | ||||||
| 9 | only acceptable forms of financial assurance are the forms of | ||||||
| 10 | financial assurance that are acceptable for CCR surface | ||||||
| 11 | impoundments under Section 22.59. | ||||||
| 12 | (e) The Agency may enter into such contracts and | ||||||
| 13 | agreements as it deems necessary to carry out the purposes of | ||||||
| 14 | this Section. Neither the State, nor the Director of the | ||||||
| 15 | Agency, nor any State employee shall be liable for any damages | ||||||
| 16 | or injuries arising out of or resulting from any action taken | ||||||
| 17 | under this Section. | ||||||
| 18 | (f) The Agency may approve or disapprove any performance | ||||||
| 19 | bond or other security posted under this Section. Any person | ||||||
| 20 | whose performance bond or other security is disapproved by the | ||||||
| 21 | Agency may contest the disapproval as a permit denial appeal | ||||||
| 22 | pursuant to Section 40. | ||||||
| 23 | Section 97. Severability. The provisions of this Act are | ||||||
| 24 | severable under Section 1.31 of the Statute on Statutes. | ||||||
| 25 | Section 99. Effective date. This Act takes effect upon | ||||||
| |||||||
| |||||||
| 1 | becoming law. | ||||||