104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026
SB2690

 

Introduced 10/14/2025, by Sen. Sue Rezin - Chris Balkema

 

SYNOPSIS AS INTRODUCED:
 
55 ILCS 5/5-12020

    Amends the Counties Code. Specifies that Grundy County or a municipality with planning jurisdiction may prohibit the siting or establish standards for the development and operation of a commercial wind energy facility, a commercial solar energy facility, or both, on any portion of the Brisbin Road commercial or industrial site under its planning jurisdiction. Defines "municipality with planning jurisdiction" and "Brisbin Road commercial or industrial site". Effective immediately.


LRB104 15180 WRO 28324 b

 

 

A BILL FOR

 

SB2690LRB104 15180 WRO 28324 b

1    AN ACT concerning local government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Counties Code is amended by changing
5Section 5-12020 as follows:
 
6    (55 ILCS 5/5-12020)
7    Sec. 5-12020. Commercial wind energy facilities and
8commercial solar energy facilities.
9    (a) As used in this Section:
10    "Brisbin Road commercial or industrial site" means
11property in Grundy County that is located within 2.5 miles of
12the Brisbin Road Exit on Interstate 80 and that has been
13designated for commercial or industrial use in a planning
14document adopted before January 1, 2025 by Grundy County or a
15municipality with planning jurisdiction.
16    "Commercial solar energy facility" means a "commercial
17solar energy system" as defined in Section 10-720 of the
18Property Tax Code. "Commercial solar energy facility" does not
19mean a utility-scale solar energy facility being constructed
20at a site that was eligible to participate in a procurement
21event conducted by the Illinois Power Agency pursuant to
22subsection (c-5) of Section 1-75 of the Illinois Power Agency
23Act.

 

 

SB2690- 2 -LRB104 15180 WRO 28324 b

1    "Commercial wind energy facility" means a wind energy
2conversion facility of equal or greater than 500 kilowatts in
3total nameplate generating capacity. "Commercial wind energy
4facility" includes a wind energy conversion facility seeking
5an extension of a permit to construct granted by a county or
6municipality before January 27, 2023 (the effective date of
7Public Act 102-1123).
8    "Facility owner" means (i) a person with a direct
9ownership interest in a commercial wind energy facility or a
10commercial solar energy facility, or both, regardless of
11whether the person is involved in acquiring the necessary
12rights, permits, and approvals or otherwise planning for the
13construction and operation of the facility, and (ii) at the
14time the facility is being developed, a person who is acting as
15a developer of the facility by acquiring the necessary rights,
16permits, and approvals or by planning for the construction and
17operation of the facility, regardless of whether the person
18will own or operate the facility.
19    "Municipality with planning jurisdiction" means a
20municipality that has planning jurisdiction over all or a
21portion of the Brisbin Road commercial or industrial site
22under an applicable boundary agreement or otherwise.
23    "Nonparticipating property" means real property that is
24not a participating property.
25    "Nonparticipating residence" means a residence that is
26located on nonparticipating property and that is existing and

 

 

SB2690- 3 -LRB104 15180 WRO 28324 b

1occupied on the date that an application for a permit to
2develop the commercial wind energy facility or the commercial
3solar energy facility is filed with the county.
4    "Occupied community building" means any one or more of the
5following buildings that is existing and occupied on the date
6that the application for a permit to develop the commercial
7wind energy facility or the commercial solar energy facility
8is filed with the county: a school, place of worship, day care
9facility, public library, or community center.
10    "Participating property" means real property that is the
11subject of a written agreement between a facility owner and
12the owner of the real property that provides the facility
13owner an easement, option, lease, or license to use the real
14property for the purpose of constructing a commercial wind
15energy facility, a commercial solar energy facility, or
16supporting facilities. "Participating property" also includes
17real property that is owned by a facility owner for the purpose
18of constructing a commercial wind energy facility, a
19commercial solar energy facility, or supporting facilities.
20    "Participating residence" means a residence that is
21located on participating property and that is existing and
22occupied on the date that an application for a permit to
23develop the commercial wind energy facility or the commercial
24solar energy facility is filed with the county.
25    "Protected lands" means real property that is:
26        (1) subject to a permanent conservation right

 

 

SB2690- 4 -LRB104 15180 WRO 28324 b

1    consistent with the Real Property Conservation Rights Act;
2    or
3        (2) registered or designated as a nature preserve,
4    buffer, or land and water reserve under the Illinois
5    Natural Areas Preservation Act.
6    "Supporting facilities" means the transmission lines,
7substations, access roads, meteorological towers, storage
8containers, and equipment associated with the generation and
9storage of electricity by the commercial wind energy facility
10or commercial solar energy facility.
11    "Wind tower" includes the wind turbine tower, nacelle, and
12blades.
13    (b) Notwithstanding any other provision of law or whether
14the county has formed a zoning commission and adopted formal
15zoning under Section 5-12007, a county may establish standards
16for commercial wind energy facilities, commercial solar energy
17facilities, or both. The standards may include all of the
18requirements specified in this Section but may not include
19requirements for commercial wind energy facilities or
20commercial solar energy facilities that are more restrictive
21than specified in this Section. A county may also regulate the
22siting of commercial wind energy facilities with standards
23that are not more restrictive than the requirements specified
24in this Section in unincorporated areas of the county that are
25outside the zoning jurisdiction of a municipality and that are
26outside the 1.5-mile radius surrounding the zoning

 

 

SB2690- 5 -LRB104 15180 WRO 28324 b

1jurisdiction of a municipality.
2    (c) If a county has elected to establish standards under
3subsection (b), before the county grants siting approval or a
4special use permit for a commercial wind energy facility or a
5commercial solar energy facility, or modification of an
6approved siting or special use permit, the county board of the
7county in which the facility is to be sited or the zoning board
8of appeals for the county shall hold at least one public
9hearing. The public hearing shall be conducted in accordance
10with the Open Meetings Act and shall be held not more than 60
11days after the filing of the application for the facility. The
12county shall allow interested parties to a special use permit
13an opportunity to present evidence and to cross-examine
14witnesses at the hearing, but the county may impose reasonable
15restrictions on the public hearing, including reasonable time
16limitations on the presentation of evidence and the
17cross-examination of witnesses. The county shall also allow
18public comment at the public hearing in accordance with the
19Open Meetings Act. The county shall make its siting and
20permitting decisions not more than 30 days after the
21conclusion of the public hearing. Notice of the hearing shall
22be published in a newspaper of general circulation in the
23county. A facility owner must enter into an agricultural
24impact mitigation agreement with the Department of Agriculture
25prior to the date of the required public hearing. A commercial
26wind energy facility owner seeking an extension of a permit

 

 

SB2690- 6 -LRB104 15180 WRO 28324 b

1granted by a county prior to July 24, 2015 (the effective date
2of Public Act 99-132) must enter into an agricultural impact
3mitigation agreement with the Department of Agriculture prior
4to a decision by the county to grant the permit extension.
5Counties may allow test wind towers or test solar energy
6systems to be sited without formal approval by the county
7board.
8    (d) A county with an existing zoning ordinance in conflict
9with this Section shall amend that zoning ordinance to be in
10compliance with this Section within 120 days after January 27,
112023 (the effective date of Public Act 102-1123).
12    (e) A county may require:
13        (1) a wind tower of a commercial wind energy facility
14    to be sited as follows, with setback distances measured
15    from the center of the base of the wind tower:
 
16Setback Description           Setback Distance
 
17Occupied Community            2.1 times the maximum blade tip
18Buildings                     height of the wind tower to the
19                              nearest point on the outside
20                              wall of the structure
 
21Participating Residences      1.1 times the maximum blade tip
22                              height of the wind tower to the
23                              nearest point on the outside

 

 

SB2690- 7 -LRB104 15180 WRO 28324 b

1                              wall of the structure
 
2Nonparticipating Residences   2.1 times the maximum blade tip
3                              height of the wind tower to the
4                              nearest point on the outside
5                              wall of the structure
 
6Boundary Lines of             None
7Participating Property 
 
8Boundary Lines of             1.1 times the maximum blade tip
9Nonparticipating Property     height of the wind tower to the
10                              nearest point on the property
11                              line of the nonparticipating
12                              property
 
13Public Road Rights-of-Way     1.1 times the maximum blade tip
14                              height of the wind tower
15                              to the center point of the
16                              public road right-of-way
 
17Overhead Communication and    1.1 times the maximum blade tip
18Electric Transmission         height of the wind tower to the
19and Distribution Facilities   nearest edge of the property
20(Not Including Overhead       line, easement, or 
21Utility Service Lines to      right-of-way 

 

 

SB2690- 8 -LRB104 15180 WRO 28324 b

1Individual Houses or          containing the overhead line
2Outbuildings)
 
3Overhead Utility Service      None
4Lines to Individual
5Houses or Outbuildings
 
6Fish and Wildlife Areas       2.1 times the maximum blade
7and Illinois Nature           tip height of the wind tower
8Preserve Commission           to the nearest point on the
9Protected Lands               property line of the fish and
10                              wildlife area or protected
11                              land
12    This Section does not exempt or excuse compliance with
13    electric facility clearances approved or required by the
14    National Electrical Code, the The National Electrical
15    Safety Code, the Illinois Commerce Commission, and the
16    Federal Energy Regulatory Commission, and their designees
17    or successors; .
18        (2) a wind tower of a commercial wind energy facility
19    to be sited so that industry standard computer modeling
20    indicates that any occupied community building or
21    nonparticipating residence will not experience more than
22    30 hours per year of shadow flicker under planned
23    operating conditions;
24        (3) a commercial solar energy facility to be sited as

 

 

SB2690- 9 -LRB104 15180 WRO 28324 b

1    follows, with setback distances measured from the nearest
2    edge of any component of the facility:
 
3Setback Description           Setback Distance
 
4Occupied Community            150 feet from the nearest
5Buildings and Dwellings on    point on the outside wall 
6Nonparticipating Properties   of the structure
 
7Boundary Lines of             None
8Participating Property    
 
9Public Road Rights-of-Way     50 feet from the nearest
10                              edge
 
11Boundary Lines of             50 feet to the nearest
12Nonparticipating Property     point on the property
13                              line of the nonparticipating
14                              property
 
15        (4) a commercial solar energy facility to be sited so
16    that the facility's perimeter is enclosed by fencing
17    having a height of at least 6 feet and no more than 25
18    feet; and
19        (5) a commercial solar energy facility to be sited so
20    that no component of a solar panel has a height of more

 

 

SB2690- 10 -LRB104 15180 WRO 28324 b

1    than 20 feet above ground when the solar energy facility's
2    arrays are at full tilt.
3    The requirements set forth in this subsection (e) may be
4waived subject to the written consent of the owner of each
5affected nonparticipating property.
6    (f) A county may not set a sound limitation for wind towers
7in commercial wind energy facilities or any components in
8commercial solar energy facilities that is more restrictive
9than the sound limitations established by the Illinois
10Pollution Control Board under 35 Ill. Adm. Code Parts 900,
11901, and 910.
12    (g) A county may not place any restriction on the
13installation or use of a commercial wind energy facility or a
14commercial solar energy facility unless it adopts an ordinance
15that complies with this Section. A county may not establish
16siting standards for supporting facilities that preclude
17development of commercial wind energy facilities or commercial
18solar energy facilities.
19    A request for siting approval or a special use permit for a
20commercial wind energy facility or a commercial solar energy
21facility, or modification of an approved siting or special use
22permit, shall be approved if the request is in compliance with
23the standards and conditions imposed in this Act, the zoning
24ordinance adopted consistent with this Code, and the
25conditions imposed under State and federal statutes and
26regulations.

 

 

SB2690- 11 -LRB104 15180 WRO 28324 b

1    (h) A county may not adopt zoning regulations that
2disallow, permanently or temporarily, commercial wind energy
3facilities or commercial solar energy facilities from being
4developed or operated in any district zoned to allow
5agricultural or industrial uses.
6    (i) A county may not require permit application fees for a
7commercial wind energy facility or commercial solar energy
8facility that are unreasonable. All application fees imposed
9by the county shall be consistent with fees for projects in the
10county with similar capital value and cost.
11    (j) Except as otherwise provided in this Section, a county
12shall not require standards for construction, decommissioning,
13or deconstruction of a commercial wind energy facility or
14commercial solar energy facility or related financial
15assurances that are more restrictive than those included in
16the Department of Agriculture's standard wind farm
17agricultural impact mitigation agreement, template 81818, or
18standard solar agricultural impact mitigation agreement,
19version 8.19.19, as applicable and in effect on December 31,
202022. The amount of any decommissioning payment shall be in
21accordance with the financial assurance required by those
22agricultural impact mitigation agreements.
23    (j-5) A commercial wind energy facility or a commercial
24solar energy facility shall file a farmland drainage plan with
25the county and impacted drainage districts outlining how
26surface and subsurface drainage of farmland will be restored

 

 

SB2690- 12 -LRB104 15180 WRO 28324 b

1during and following construction or deconstruction of the
2facility. The plan is to be created independently by the
3facility developer and shall include the location of any
4potentially impacted drainage district facilities to the
5extent this information is publicly available from the county
6or the drainage district, plans to repair any subsurface
7drainage affected during construction or deconstruction using
8procedures outlined in the agricultural impact mitigation
9agreement entered into by the commercial wind energy facility
10owner or commercial solar energy facility owner, and
11procedures for the repair and restoration of surface drainage
12affected during construction or deconstruction. All surface
13and subsurface damage shall be repaired as soon as reasonably
14practicable.
15    (k) A county may not condition approval of a commercial
16wind energy facility or commercial solar energy facility on a
17property value guarantee and may not require a facility owner
18to pay into a neighboring property devaluation escrow account.
19    (l) A county may require certain vegetative screening
20surrounding a commercial wind energy facility or commercial
21solar energy facility but may not require earthen berms or
22similar structures.
23    (m) A county may set blade tip height limitations for wind
24towers in commercial wind energy facilities but may not set a
25blade tip height limitation that is more restrictive than the
26height allowed under a Determination of No Hazard to Air

 

 

SB2690- 13 -LRB104 15180 WRO 28324 b

1Navigation by the Federal Aviation Administration under 14 CFR
2Part 77.
3    (n) A county may require that a commercial wind energy
4facility owner or commercial solar energy facility owner
5provide:
6        (1) the results and recommendations from consultation
7    with the Illinois Department of Natural Resources that are
8    obtained through the Ecological Compliance Assessment Tool
9    (EcoCAT) or a comparable successor tool; and
10        (2) the results of the United States Fish and Wildlife
11    Service's Information for Planning and Consulting
12    environmental review or a comparable successor tool that
13    is consistent with (i) the "U.S. Fish and Wildlife
14    Service's Land-Based Wind Energy Guidelines" and (ii) any
15    applicable United States Fish and Wildlife Service solar
16    wildlife guidelines that have been subject to public
17    review.
18    (o) A county may require a commercial wind energy facility
19or commercial solar energy facility to adhere to the
20recommendations provided by the Illinois Department of Natural
21Resources in an EcoCAT natural resource review report under 17
22Ill. Adm. Code Part 1075.
23    (p) A county may require a facility owner to:
24        (1) demonstrate avoidance of protected lands as
25    identified by the Illinois Department of Natural Resources
26    and the Illinois Nature Preserve Commission; or

 

 

SB2690- 14 -LRB104 15180 WRO 28324 b

1        (2) consider the recommendations of the Illinois
2    Department of Natural Resources for setbacks from
3    protected lands, including areas identified by the
4    Illinois Nature Preserve Commission.
5    (q) A county may require that a facility owner provide
6evidence of consultation with the Illinois State Historic
7Preservation Office to assess potential impacts on
8State-registered historic sites under the Illinois State
9Agency Historic Resources Preservation Act.
10    (r) To maximize community benefits, including, but not
11limited to, reduced stormwater runoff, flooding, and erosion
12at the ground mounted solar energy system, improved soil
13health, and increased foraging habitat for game birds,
14songbirds, and pollinators, a county may (1) require a
15commercial solar energy facility owner to plant, establish,
16and maintain for the life of the facility vegetative ground
17cover, consistent with the goals of the Pollinator-Friendly
18Solar Site Act and (2) require the submittal of a vegetation
19management plan that is in compliance with the agricultural
20impact mitigation agreement in the application to construct
21and operate a commercial solar energy facility in the county
22if the vegetative ground cover and vegetation management plan
23comply with the requirements of the underlying agreement with
24the landowner or landowners where the facility will be
25constructed.
26    No later than 90 days after January 27, 2023 (the

 

 

SB2690- 15 -LRB104 15180 WRO 28324 b

1effective date of Public Act 102-1123), the Illinois
2Department of Natural Resources shall develop guidelines for
3vegetation management plans that may be required under this
4subsection for commercial solar energy facilities. The
5guidelines must include guidance for short-term and long-term
6property management practices that provide and maintain native
7and non-invasive naturalized perennial vegetation to protect
8the health and well-being of pollinators.
9    (s) If a facility owner enters into a road use agreement
10with the Illinois Department of Transportation, a road
11district, or other unit of local government relating to a
12commercial wind energy facility or a commercial solar energy
13facility, the road use agreement shall require the facility
14owner to be responsible for (i) the reasonable cost of
15improving roads used by the facility owner to construct the
16commercial wind energy facility or the commercial solar energy
17facility and (ii) the reasonable cost of repairing roads used
18by the facility owner during construction of the commercial
19wind energy facility or the commercial solar energy facility
20so that those roads are in a condition that is safe for the
21driving public after the completion of the facility's
22construction. Roadways improved in preparation for and during
23the construction of the commercial wind energy facility or
24commercial solar energy facility shall be repaired and
25restored to the improved condition at the reasonable cost of
26the developer if the roadways have degraded or were damaged as

 

 

SB2690- 16 -LRB104 15180 WRO 28324 b

1a result of construction-related activities.
2    The road use agreement shall not require the facility
3owner to pay costs, fees, or charges for road work that is not
4specifically and uniquely attributable to the construction of
5the commercial wind energy facility or the commercial solar
6energy facility. Road-related fees, permit fees, or other
7charges imposed by the Illinois Department of Transportation,
8a road district, or other unit of local government under a road
9use agreement with the facility owner shall be reasonably
10related to the cost of administration of the road use
11agreement.
12    (s-5) The facility owner shall also compensate landowners
13for crop losses or other agricultural damages resulting from
14damage to the drainage system caused by the construction of
15the commercial wind energy facility or the commercial solar
16energy facility. The commercial wind energy facility owner or
17commercial solar energy facility owner shall repair or pay for
18the repair of all damage to the subsurface drainage system
19caused by the construction of the commercial wind energy
20facility or the commercial solar energy facility in accordance
21with the agriculture impact mitigation agreement requirements
22for repair of drainage. The commercial wind energy facility
23owner or commercial solar energy facility owner shall repair
24or pay for the repair and restoration of surface drainage
25caused by the construction or deconstruction of the commercial
26wind energy facility or the commercial solar energy facility

 

 

SB2690- 17 -LRB104 15180 WRO 28324 b

1as soon as reasonably practicable.
2    (t) Notwithstanding any other provision of law, a facility
3owner with siting approval from a county to construct a
4commercial wind energy facility or a commercial solar energy
5facility is authorized to cross or impact a drainage system,
6including, but not limited to, drainage tiles, open drainage
7ditches, culverts, and water gathering vaults, owned or under
8the control of a drainage district under the Illinois Drainage
9Code without obtaining prior agreement or approval from the
10drainage district in accordance with the farmland drainage
11plan required by subsection (j-5).
12    (u) The amendments to this Section adopted in Public Act
13102-1123 do not apply to: (1) an application for siting
14approval or for a special use permit for a commercial wind
15energy facility or commercial solar energy facility if the
16application was submitted to a unit of local government before
17January 27, 2023 (the effective date of Public Act 102-1123);
18(2) a commercial wind energy facility or a commercial solar
19energy facility if the facility owner has submitted an
20agricultural impact mitigation agreement to the Department of
21Agriculture before January 27, 2023 (the effective date of
22Public Act 102-1123); or (3) a commercial wind energy or
23commercial solar energy development on property that is
24located within an enterprise zone certified under the Illinois
25Enterprise Zone Act, that was classified as industrial by the
26appropriate zoning authority on or before January 27, 2023,

 

 

SB2690- 18 -LRB104 15180 WRO 28324 b

1and that is located within 4 miles of the intersection of
2Interstate 88 and Interstate 39.
3    (v) Grundy County or a municipality with planning
4jurisdiction may prohibit the siting or establish standards
5for the development and operation of a commercial wind energy
6facility, a commercial solar energy facility, or both, on any
7portion of the Brisbin Road commercial or industrial site
8under its planning jurisdiction.
9    Notwithstanding any other provision of this Section, the
10standards adopted by Grundy County or a municipality with
11planning jurisdiction under this subsection (v) must comply
12only with the provisions of this Section that were in effect on
13the day immediately before the effective date of Public Act
14102-1123. However, Grundy County or such a municipality may
15exercise any powers otherwise granted to it under this
16Section, including the authority to direct facilities and
17facility owners to comply with subsection (j-5), subsection
18(s-5), or any other applicable provision of this Section.
19(Source: P.A. 102-1123, eff. 1-27-23; 103-81, eff. 6-9-23;
20103-580, eff. 12-8-23; revised 7-29-24.)
 
21    Section 99. Effective date. This Act takes effect upon