Sen. Mike Porfirio
Filed: 3/6/2026
| | 10400SB2808sam001 | | LRB104 16795 AAS 35333 a |
|
|
| 1 | | AMENDMENT TO SENATE BILL 2808
|
| 2 | | AMENDMENT NO. ______. Amend Senate Bill 2808 by replacing |
| 3 | | everything after the enacting clause with the following: |
| 4 | | "Section 1. Short title. This Act may be cited as the |
| 5 | | Electric Transmission Colocation and Siting Priority Act. |
| 6 | | Section 5. Definitions.As used in this Section: |
| 7 | | "Authority" means the Illinois State Toll Highway |
| 8 | | Authority. |
| 9 | | "Commission" means the Illinois Commerce Commission. |
| 10 | | "Department" means the Illinois Department of |
| 11 | | Transportation. |
| 12 | | "Electric transmission facility" means an electrical |
| 13 | | transmission system designed and constructed with the |
| 14 | | capability of being safely and reliably energized at 69 |
| 15 | | kilovolts or more, including transmission lines, transmission |
| 16 | | towers, conductors, insulators, foundations, grounding |
|
| | 10400SB2808sam001 | - 2 - | LRB104 16795 AAS 35333 a |
|
|
| 1 | | systems, access roads, and all associated transmission |
| 2 | | facilities, including transmission substations. "Electric |
| 3 | | transmission facility" does not include a project located on |
| 4 | | the electric generating side of a facility's point of |
| 5 | | interconnection. |
| 6 | | "Highway" has the meaning given to that term in Section |
| 7 | | 2-202 of the Illinois Highway Code. |
| 8 | | "High-voltage transmission line" means any line for the |
| 9 | | transmission of electric current with a nominal voltage of at |
| 10 | | least 115 kilovolts that is colocated longitudinally in a |
| 11 | | public right-of-way or a corridor, including all supporting |
| 12 | | structures and accessories necessary for such line. |
| 13 | | "High-voltage transmission line" does not include any line for |
| 14 | | the transmission of electric current that crosses through but |
| 15 | | is not wholly contained within a State highway right-of-way. |
| 16 | | "Public utility" has the meaning given to that term in |
| 17 | | Section 3-105 of the Public Utilities Act. |
| 18 | | "Public utility corridor" means the land, or interest |
| 19 | | therein, acquired for or devoted to a public utility to place |
| 20 | | and maintain infrastructure for electricity, water, gas, or |
| 21 | | Internet service. |
| 22 | | "Secretary" means the Secretary of Transportation. |
| 23 | | "State highway corridor" means the land, or interest |
| 24 | | therein, acquired for or devoted to a State highway. |
| 25 | | "Transmission developer" means any company that (i) has |
| 26 | | been issued a certificate of public convenience and necessity |
|
| | 10400SB2808sam001 | - 3 - | LRB104 16795 AAS 35333 a |
|
|
| 1 | | in this State that authorizes the company to own and operate an |
| 2 | | electric transmission line and (ii) is a State electric |
| 3 | | utility, as defined in Section 16-102 of the Public Utilities |
| 4 | | Act, or an affiliate of a State electric utility through a |
| 5 | | common ownership structure. |
| 6 | | Section 10. Electric transmission siting priorities. |
| 7 | | (a) In the siting of new electric transmission facilities, |
| 8 | | including high-voltage transmission lines, available corridors |
| 9 | | shall be considered in the following order of priority: |
| 10 | | (1) Existing public utility corridors. |
| 11 | | (2) State highway corridors. |
| 12 | | (3) New corridors. |
| 13 | | (b) Consideration of the corridors listed in subsection |
| 14 | | (a) shall be done, to the greatest extent possible, in a manner |
| 15 | | that accounts for economic and engineering considerations, the |
| 16 | | reliability of the electric system, and the protection of the |
| 17 | | environment. The order of priority under subsection (a) shall |
| 18 | | not apply to projects that have been sited on or before the |
| 19 | | effective date of this Act. |
| 20 | | Section 15. High-voltage transmission line colocation |
| 21 | | requests. |
| 22 | | (a) A public utility or transmission developer may |
| 23 | | construct, place, or maintain a high-voltage transmission line |
| 24 | | on a public right-of-way or along a highway if (i) the public |
|
| | 10400SB2808sam001 | - 4 - | LRB104 16795 AAS 35333 a |
|
|
| 1 | | utility or transmission developer submits to the Secretary or |
| 2 | | the Authority a colocation request for the high-voltage |
| 3 | | transmission line and (ii) the Secretary or the Authority |
| 4 | | reviews and approves the colocation request. |
| 5 | | (b) The Secretary or the Authority may deny a colocation |
| 6 | | request under this Section if the Secretary or the Authority |
| 7 | | determines that the construction, placement, or maintenance of |
| 8 | | a high-voltage transmission line on a public right-of-way or |
| 9 | | along a highway would endanger public safety or would |
| 10 | | interfere with the proper function of the highway. |
| 11 | | (c) If the Secretary or the Authority denies a colocation |
| 12 | | request under this Section, the Secretary or the Authority |
| 13 | | shall submit the reasons for the denial to the Director of the |
| 14 | | Environmental Protection Agency, the Executive Director of the |
| 15 | | Commission, and the Director of Commerce and Economic |
| 16 | | Opportunity within 90 days after the issuance of the denial. |
| 17 | | Section 20. Consultation and constructability report. |
| 18 | | (a) A public utility or transmission developer may submit |
| 19 | | a written request to the Department or the Authority for an |
| 20 | | evaluation of the corridors described in subsection (a) of |
| 21 | | Section 10 for possible locations for a high-voltage |
| 22 | | transmission line. Within 30 days after receipt of a written |
| 23 | | request under this subsection (a), the Secretary or the |
| 24 | | Authority shall assign a project coordinator to the request. A |
| 25 | | project coordinator, upon assignment to a request, shall begin |
|
| | 10400SB2808sam001 | - 5 - | LRB104 16795 AAS 35333 a |
|
|
| 1 | | the evaluation in coordination with the applicable public |
| 2 | | utility or transmission developer. |
| 3 | | (b) The Department or the Authority shall inform a public |
| 4 | | utility or transmission developer about any of the |
| 5 | | Department's or the Authority's current plans or projects that |
| 6 | | could impact the public utility's or transmission developer's |
| 7 | | potential construction or placement of a high-voltage |
| 8 | | transmission line within a corridor. |
| 9 | | (c) After an evaluation under subsection (a) identifies an |
| 10 | | acceptable location within a corridor, a public utility or |
| 11 | | transmission developer, in consultation with the Department or |
| 12 | | the Authority, shall develop a constructability report. The |
| 13 | | constructability report shall include (i) the terms and |
| 14 | | conditions for the siting of the high-voltage transmission |
| 15 | | line and (ii) an agreed-upon time frame during which the |
| 16 | | Department or the Authority may not request the relocation of |
| 17 | | the high-voltage transmission line. The Department or the |
| 18 | | Authority shall issue a permit to the public utility or |
| 19 | | transmission developer for the use of a public right-of-way |
| 20 | | within the corridor for the siting of a high-voltage |
| 21 | | transmission line only after a constructability report is |
| 22 | | approved by both the Department or the Authority and the |
| 23 | | public utility or transmission developer. |
| 24 | | (d) A public utility or transmission developer and the |
| 25 | | Department or the Authority shall follow the terms and |
| 26 | | conditions of the approved constructability report during the |
|
| | 10400SB2808sam001 | - 6 - | LRB104 16795 AAS 35333 a |
|
|
| 1 | | planning and approval process for the siting of a high-voltage |
| 2 | | transmission line. If the Department or the Authority requires |
| 3 | | the relocation of a high-voltage transmission line on a public |
| 4 | | right-of-way by a specific date, the Department or the |
| 5 | | Authority shall give the applicable public utility or |
| 6 | | transmission developer notice of the required relocation at |
| 7 | | the time the Department or the Authority becomes aware of the |
| 8 | | need for the relocation. |
| 9 | | Section 25. Project labor agreements. Electric |
| 10 | | transmission facilities constructed or placed on a public |
| 11 | | right-of-way or along a highway in accordance with this Act |
| 12 | | shall be built by general contractors who have entered into a |
| 13 | | project labor agreement prior to construction. |
| 14 | | Section 99. Effective date. This Act takes effect upon |
| 15 | | becoming law.". |